Backup Documents 11/12/2024 Item #16A 7 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 1 6 A 7
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1.
2.
3 County Attorney Office County Attorney Office
00 P it( 1RIZ1
4. BCC Office Board of County
Commissioners (f f t j/5/ /ili0/2 y
5. Minutes and Records Clerk of Court's Office
r'i/ / l 144
/
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the
addressees above,may need to contact staff for additional or missing information.
Name of Primary Staff Lucia S.Martin Phone Number Ext.2279
Contact/ Department
Agenda Date Item was November 12,2024 Agenda Item Number 16.A.7
Approved by the BCC
Type of Document Construction and Maintenance Agreement Number of Original 2
Attached and Performance Bond Documents Attached
PO number or account
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature? LM
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be LM
signed by the Chairman,with the exception of most letters,must be reviewed and signed
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the LM
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's LM
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip LM
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 11-12-2024 and all changes made N/A is not
during the meeting have been incorporated in the attached document. The County i0 9 P an optionjgf
Attorney's Office has reviewed the changes,if applicable. this line
9. Initials of attorney verifying that the attached document is the version approved by the A is not
BCC,all changes directed by the BCC have been made,and the document is ready for the ,p P
Chairman's signature.
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
16A 7
CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISON IMPROVEMENTS
THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS
entered into this 12th day of November 2024 between Naples Associates VI, LLLP hereinafter referred to as
"Developer", and Board of County Commissioners of Collier County, Florida, hereinafter referred to as the
"Board".
RECITALS:
A. Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the Board
of certain plat of a subdivision to be known as: Valencia Sky
B. Chapter 4 and 10 of the Collier County Land Development Code required the Developer to post
appropriate guarantees for the construction of the improvements required by said subdivision regulations,
said guarantees to be incorporated in a bonded agreement for the construction of the required
improvements.
NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set forth,
Developer and the Board do hereby covenant and agree as follows:
1. Developer will cause to be constructed: All required improvements within 36 months from the date of
approval of said subdivision plat, said improvements hereinafter referred to as the required
improvements.
2. Developer herewith tenders its subdivision performance security (attached hereto as Exhibit "A" and
by reference made a part hereof) in the amount of$ 8,114,041.22 which amount represents 10% of the
total contract cost to complete the construction plus 100% of the estimated cost of to complete the
required improvements at the date of this Agreement.
3. In the event of default by the Developer or failure of the Developer to complete such improvements within
the time required by the Land Development Code, Collier County, may call upon the subdivision
performance security to insure satisfactory completion of the required improvements.
4. The required improvements shall not be considered complete until a statement of substantial completion
by Developer's engineer along with the final project records have been furnished to be reviewed and
approved by the County Manager or his designee for compliance with the Collier County Land
Development Code.
5. The County Manager or designee shall, within sixty (60) days of receipt of the statement of substantial
completion, either: a) notify the Developer in writing of his preliminary approval of the improvements; or
b) notify the Developer in writing of his refusal to approve improvements, therewith specifying those
conditions which the Developer must fulfill in order to obtain the County Manager's approval of the
improvements. However, in no event shall the County Manager or designee refuse preliminary approval
of the improvements if they are in fact constructed and submitted for approval in accordance with the
requirements of this Agreement.
6. The Developer shall maintain all required improvements for a minimum period of one year after preliminary
approval by the County Manager or his designee.After the one-year maintenance period by the Developer
has terminated, the Developer shall petition the County Manager or designee to inspect the required
improvements. The County Manager or designee shall inspect the improvements and, if found to be still
in compliance with the Land Development Code as reflected by final approval by the Board, the Board
shall release the remaining 10% of the subdivision performance security. The Developer's responsibility
for maintenance of the required improvements shall continue unless or until the Board accepts
maintenance responsibility for and by the County.
11/23/2021 Page 1 of 3
16A 7
7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter the
Developer may request the County Manager or designee to reduce the dollar amount of the subdivision
performance security on the basis of work complete. Each request for a reduction in the dollar amount
of the subdivision performance security shall be accompanied by a statement of substantial completion
by the Developer's engineer together with the project records necessary for review by the County
Manager or designee. The County Manager or designee may grant the request for a reduction in the
amount of the subdivision performance security for the improvements completed as of the date of the
request.
8. In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon
certification of such failure, the County Manager or designee may call upon the subdivision performance
security to secure satisfactory completion, repair and maintenance of the required improvements. The
Board shall have the right to construct and maintain, or cause to be constructed or maintained, pursuant
to public advertisement and receipt and acceptance of bids, the improvements required herein. The
Developer, as principal under the subdivision performance security, shall be liable to pay and to indemnify
the Board, upon completion of such construction, the final total cost to the Board thereof, including, but
not limited to, engineering, legal and contingent costs, together with any damages, either direct or
consequential, which the Board may sustain on account of the failure of the Developer to fulfill all of the
provisions of this Agreement.
9. All of the terms, covenants and conditions herein contained are and shall be binding upon the Developer
and the respective successors and assigns of the Developer.
IN WITNESS WHEREOF, the Board and the Developer have caused this Agreement to be executed by
their duly authorized representatives this 2 h day of lifovrnbar , 2024.
(Name of Entity)
SIGNED IN THE PRESENCE OF
Naples Associates VI, LLLP
a Florida limited liability limited partnership
By: Naples VI Corporation,
A Florida corporation, its General Partner
Printed Name: . �i - vn� �s Printed Name/Title: Richard M. Norwalk, Vice President
By: (Provide Proper Evidence of Authority)
Printed Name: a"�,. �,. VIkwy,
11/23/2021 Page 2 of 3
16A 7
ATTEST:
BOARD OF COUNTY COMMISSIONERS
CRYSTAL K.•KFNZEL, cLEIR2K OF COLLIER COUNTY, FLORIDA
i3
BY:
Deputy Clerkin, Air qa
flY
Approved as to form and legality:
Ot�VJ
DorPl D Pere �\
Assistant County Attorney w c,`
b"ty
11/23/2021 Page 3 of 3
16A 7
Exhibit "A"
70
16A 7
PERFORMANCE BOND
BOND NO. LICX1026799
KNOW ALL PERSONS BY THESE PRESENTS: that
Naples Associates VI, LLLP (Name of Owner)
1600 Sawgrass Corporate Parkway, Suite 400 (Address of Owner)
Sunrise, FL 33323 (Address of Owner)
(hereinafter referred to as "Owner") and
Endurance Assurance Corporation (Name of Surety)
12890 Lebanon Road (Address of Surety)
Mount Juliet, TN 37122-2870 (Address of Surety)
615-553-9500 (Telephone Number)
(hereinafter referred to as "Surety") are held and firmly bound unto Collier County, Florida,
(hereinafter referred to as "County") in the total aggregate sum of Eight Million One Hundred
Fourteen Thousand Forty One and 22/100 Dollars ($8,114,041.22) in lawful money of the United
States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs,
executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
Owner and Surety are used for singular or plural, as the context requires.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for
approval by the Board of a certain subdivision plat named Valencia Sky and that certain
subdivision shall include specific improvements which are required by Collier County Ordinances
and Resolutions (hereinafter "Land Development Regulations"). This obligation of the Surety shall
commence on the date this Bond is executed and shall continue until the date of final acceptance by
the Board of County Commissioners of the specific improvements described in the Land
Development Regulations (hereinafter the "Guaranty Period").
NOW THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and
duties in accordance with the Land Development Regulations during the guaranty period
established by the County, and the Owner shall satisfy all claims and demands incurred and shall
fully indemnify and save harmless the County from and against all costs and damages which it may
suffer by reason of owner's failure to do so, and shall reimburse and repay the County all outlay and
expense which the County may incur in making good any default, then this obligation shall be void,
otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received hereby, stipulates and
agrees that no change, extension of time, alteration, addition or deletion to the proposed specific
improvements shall in any way affect its obligation on this Bond, and it does hereby waive notice of
any such change, extension of time, alteration, addition or deletion to the proposed specific
improvements.
PROVIDED, FURTHER, that it is expressly agreed that the Bond shall be deemed amended
automatically and immediately, without formal and separate amendments hereto, so as to bind the
Owner and the Surety to the full and faithful performance in accordance with the Land Development
Regulations. The term "Amendment", wherever used in this Bond, and whether referring to this
Bond, or other documents shall include any alteration, addition or modification of any character
whatsoever.
C'1
9
16A 7
IN WITNESS WHEREOF, the parties hereto have caused this PERFORMANCE BOND to
be executed this fr lay of October , 2024.
WITNESSES: Naples Associates VI, LLLP, a Florida limited liability
limited partnership
By: Naples VI Corporation, a Florida corporation, its
general partner
By: By
Printed Name: l z‘;(4 4o6.2,1',
Printed Name: Richard M. Norwalk
By: Title: Vice President
Printed Name: 1-�e,2f mu, (Provide Proper Evidence of Authority
ACKNOWLEDGEMENT
STATE OF FLORIDA
COUNTY OF BROWARD
The foregoing instrument was acknowledged before me by means of ® physical presence or❑ online
notarization, this day of October , 2024 (year) , by Richard M. Norwalk (name of person) as Vice
President for Naples VI Corporation, a Florida corporation the general partner of Naples Associates VI,
LLLP, a Florida limited liability limited partnership on behalf of said corporation and limited liability
partnership (name of party on behalf of whom instrument was executed) authorized to do business in
Florida herein identified as the PRINCIPAL and who is EJ Personally Known or E Produced Identification
Type of Identification Produced:
NOTARY SEAL:
(Signature of Notary Public—State of Florida) i
Notary Public
STEVEN M.HELFMAN
1 gi Commission#HH 251040
"•::*'"p•' CjL' Evires May 30,2026 e`�'•
%COF 6y�
Printed Name of Notary Public
My Commission Expires:
16A 7
WITNESSES: SURETY: Endurance Assurance Corporation
Authorized Signature
Printed Name: Christian Collins
Dale A. Bells
By: Printed Name
Printed Name: Taylor Rosenhaus Attorney-In-Fact and Florida Resident Agent
Title
STATE OF FLORIDA
COUNTY OF PALM BEACH
The foregoing instrument was acknowledged before me by means of 0 physical presence or ❑ online
notarization, this 17th day of October , 2024 (year) , by Dale A. Bells (name of person) as Attorney-In-Fact
for Endurance Assurance Corporation (name of party on behalf of whom instrument was executed)
authorized to do business in Florida herein identified as the SURETY and who is ® Personally Known or❑
Produced Identification Type of Identification Produced
NOTARY SEAL:
(Signature of Notary Public—State of Florida) n I�
Avg\
Notary,Public
•:'c 'r" . KAILEE STONE
L.gin, . _
r, •, Notary Public-State of Florida.
"" 5 1; Commission.=HH 19593i (7
•••`..o��-"•' My Comm.Expires Nov 9,2025 ,
Bonded through National Notary Assn. Printed Name of Notary Public
My Commission Expires: "t 1`"
� 6A 7
SOMPO INTERNATIONAL POWER OF ATTORNEY
9627
KNOW ALL BY THESE PRESENTS,that Endurance Assurance Corporation,a Delaware corporation("EAC"),Endurance American Insurance Company,a Delaware
corporation("EAIC"),Lexon Insurance Company,a Texas corporation("LIC"),and/or Bond Safeguard Insurance Company,a South Dakota corporation("BSIC"),each,
a"Company"and collectively,"Sompo International,"do hereby constitute and appoint:Brett Rosenhaus,Kevin Wojtowicz,Charles J.Nielson,Shawn Burton,
Charles D.Nielson,Dale A.Bells,David Hoover,Jarrett Merlucci as true and lawful Attorney(s)-In-Fact to make,execute,seal,and deliver for,and on its behalf as
surety or co-surety;bonds and undertakings given for any and all purposes,also to execute and deliver on its behalf as aforesaid renewals,extensions,agreements,
waivers,consents or stipulations relating to such bonds or undertakings provided,however,that no single bond or undertaking so made,executed and delivered shall
obligate the Company for any portion of the penal sum thereof in excess of the sum of One Hundred Million Dollars($100,000,000.00).
Such bonds and undertakings for said purposes,when duly executed by said attorney(s)-in-fact,shall be binding upon the Company as fully and to the same extent as if
signed by the President of the Company under its corporate seal attested by its Corporate Secretary.
This appointment is made under and by authority of certain resolutions adopted by the board of directors of each Company by unanimous written consent effective the 30'h
day of March,2023 for BSIC and LIC and the 17th day of May,2023 for EAC and EAIC,a copy of which appears below under the heading entitled"Certificate".
This Power of Attorney is signed and sealed by facsimile under and by authority of the following resolution adopted by the board of directors of each Company by
unanimous written consent effective the 30'h day of March,2023 for BSIC and LIC and the 17'h day of May,2023 for EAC and EAIC and said resolution has not since
been revoked,amended or repealed:
RESOLVED,that the signature of an individual named above and the seal of the Company may be affixed to any such power of attorney or any certificate relating thereto
by facsimile,and any such power of attorney or certificate bearing such facsimile signature or seal shall be valid and binding upon the Company in the future with respect
to any bond or undertaking to which it is attached.
IN WITNESS WHEREOF,each Company has caused this instrument to be signed by the following officers,and its corporate seal to be affixed this 25th day of
May,2023.
Endurance Assurance Corporation. Endurance American Lexon Insurance Company Bond Safeguard
In uragcQ Company r Insurance Company
•
> e.44. '"( ;i B .e r k ' c/I J c i kV
t fy.
Richard Appel,„WR,,&„,enior Counsel Richard Appel,;,S11P,'&,.�Senior Counsel Rich ,ard Appel; ,, Senior Counsel Ric and Appel,SVP&Seniors'ourisel
°�55uranCe''' o an I t h P NS 4``�\G n•S�j;'',. AMC C
U
^Vq,, •�P P O' 1 ��'. r '.j�P OR.e•'mod,^.' �' `VJ� ���
cc: SEAL '- , SEA SEAL < ,
= m.
-s, 2002 :° 1996 G= ,. *f -a .I>tE,,NCI- .0
y,DELA;ARE.'J ,; .DELft'd;;�cE•%J�,r e �i ` e-�. ;t;F:{F:qf.'. ,.`•:
��' �R� M�•' r: fr •
''''„„,,,,, °' ACKNOWLEDGEMENT ``-.
On this 25th day of May,2023,before me,personally came the above signatories known to me,who being duly sworn,did depose and say that he/thpy'i "aliofticer of each
of the Companies;and that he executed said instrument on behalf of each Company by authority of his office under th by- ws of each Company'." {�Ycpq
snrc
a
By: w
nra
Amy aylor,Not ublic My Commission Expires
CERTIFICATE % o, y;'
I,the undersigned Officer of each Company,DO HEREBY CERTIFY that:
1.That the original power of attorney of which the foregoing is a copy was duly executed on behalf of each Company and has not since been revoked amended or modified;
that the undersigned has compared the foregoing copy thereof with the original power of attorney,and that the same is a true and correct copy of the original power of
attorney and of the whole thereof;
2.The following are resolutions which were adopted by the board of directors of each Company by unanimous written consent effective 30th day of March,2023 for BSIC
and LIC and the 17'h day of May,2023 for EAC and EAIC and said resolutions have not since been revoked,amended or modified:
"RESOLVED,that each of the individuals named below is authorized to make,execute,seal and deliver for and on behalf of the Company any and all bonds,
undertakings or obligations in surety or co-surety with others: RICHARD M.APPEL,MATTHEW E.CURAN,MARGARET HYLAND,SHARON L.SIMS,
CHRISTOPHER L.SPARRO,
and be it further
RESOLVED,that each of the individuals named above is authorized to appoint attorneys-in-fact for the purpose of making,executing,sealing and delivering bonds,
undertakings or obligations in surety or co-surety for and on behalf of the Company."
3.The undersigned further certifies that the above resolutions are true and correct copies of the resolutions as so recorded and of the whole thereof.
IN WITNESS WHEREOF,I have hereunto set my hand and affixed the corporate seal this 17th day of October / 2024
By:— _i -___
Dame S. .rie, retary
NOTICE: U.S.TREASURY DEPARTMENT'S OFFICE OF FOREIGN ASSETS CONTROL(OFAC1
No coverage is provided by this Notice nor can it be construed to replace any provisions of any surety bond or other surety coverage provided.This Notice provides info)mation concerning
possible impact on your surety coverage due to directives issued by OFAC. Please read this Notice carefully.
The Office of Foreign Assets Control(OFAC)administers and enforces sanctions policy,based on Presidential declarations of"national emergency". OFAC has identified and listed
numerous foreign agents,front organizations,terrorists,terrorist organizations,and narcotics traffickers as"Specially Designated Nationals and Blocked Persons".This list can be located
on the United States Treasury's website—https://www.treasurv.gov/resource-center/sanctions/SDN-List.
In accordance with OFAC regulations,if it is determined that you or any other person or entity claiming the benefits of any coverage has violated U.S.sanctions law or is a Specially
Designated National and Blocked Person,as identified by OFAC,any coverage will be considered a blocked or frozen contract and all provisions of any coverage provided are immediately
subject to OFAC. When a surety bond or other form of surety coverage is considered to be such a blocked or frozen contract,no payments nor premium refunds may be made without
authorization from OFAC. Other limitations on the premiums and payments may also apply.
Any reproductions are void.
Surety Claims Submission:LexonClaimAdministrationOsompo-intl.com
Telephone:615-553-9500 Mailing Address:Sompo International;12890 Lebanon Road;Mount Juliet,TN 37122-2870
16A 7
EXHIBIT " B"
Signing Authority
2024 FLORIDA LIMITED PARTNERSHIP ANNUAL REPORT FILED 1 6 A 7
DOCUMENT*A2013000002743 Mar OS, 2024 -
Entity Nanle: NAPLES ASSOCIATES VI. LLLP Secretary of State
690140594CC
Current Principal Place of Business:
1614 SAVIAGRASS CORPORATE PKWY STE 400
SUNRISE, IL 33323
Current Mailing Address:
1.500 SAWG RASS CORPORATE PKWY STE 400
SUNRISE, FL 33323 US
FEI'Number: GS-267E109 Certificate Of&atlas Desired: Yus
Name and Address of Current Registered Agent:
in.rmAur STEVEN PA
NSW SIMGRASS CORPORATE WRY STE 400
S LitsIRISE,FL 31323 LIS
'LWPr namA1 t,.•Oy rim Otis fcr rttl!ccr,a,ce,at ritth-vog eel tcvirr_rell c ftl,:c C 14,3 tv G' estt vnkh..In Inc SLik Fkrida.
SIGNATURE:
Eletirdrid.Sigrratfre L Refastened Auer crate
General Part net Detail .1.
17.1:xutrent
tbrilE, NAPLES Nit CORPORATION
&Firms: 11300 SAWGRASS CORPORATE RAW
STE 40
City,State SLP4RiSE IL 33123
uurelty.Yur Mrs.C70.111P4151117:1i114116.1daY,Y6,:44XIA:ix ativilarriviStApirt ts, L Of/dALLIJIadu ene mit ins it..youligoat khaki ham NW UMW 11.$:p1 ...(natie
arms Willi,a'ftatttvr tri Ift w 4.1 paritroalip. itk nit vrerii Lauri a rv.teati v.nt ,1411,1 ritiwal.11", Li*NT eiviu MACAW/MU'LIVA:V.y.naNTV:
atIpl'arm do&11VE.11!:.111 I7A.Y.62VIVAlf Will Al WIT 101110 I:n=1mm a
SIGNATURE:RICHARD M. NORWALK VP 03.05.2024
ELurc Strjruettse f Sigrtrig Gerieral Para , D ate
2024 FLORIDA PROFIT CORPORATION ANNUAL REPORT FILED 1 6 A 7
DOCUMENTO P2001313054372 Apr 23, 2024
Entity Name: NAPLES VI CORPORATION Secretary of State
9499052913CC
Current Principal Place of BUM :
labia SAWGRASS CORPORATE PARKWAY,SUITE 4E4
:SUNRISE, FL 33323
Current Mailing Address:
lEODSAWORASS CORPORATE PARKWAY, SUITE 40D
SUNRISE, FL 33323 US
FEI Number: 85.23332E5 Certificate of Status DVSittEtid: Y
Name and Address of Current Registered Agent:
HELFMAN, STEVEN M ESO
1603 SAWGRASS CORPORATE PARKWAN',SUITE tifil
SUNRISE,rL 33323 LS
a..howe surnal arely sticm &us e2.7.tyrors M rho wpase rt.gogy9 tiN?Itived Jaen a-tam.x me stair o.,,F.LyA.-kv.
SIGNATURE:
Sigriatti.eLI Retzi..telie: Ay.it DAIO.
Officer/Director Detail :
Title P VP,AS
Name E2RATT1,MIS,IA Name FANT,ALANJ.
1E00 SAWGR.ASS CORPORATE Abs 1E100 SAWGRASS CORPORATE
PARKWAY,SUITE 402 PARKWAY,'SUITE.4e0
Cty State IT): SUNRISE rt 31323 CitpState Zip: SUNRISE FL 33322
Title VP Title VP,T
Name NORWALK,RiCtIARD M. Norm MENENDEZ, L.MARIA
lEOrl&AMOR-ASS CORPORATE iOSAVGRASS CORPORATE
PARKWAY,SUITE 400 PARKWAY,SUITE 4C+3
Cy Slate 24.1: SUNRISE FL 33323 City-SUE Zip: SUNRISE FL 33323
Title VP Title 4;
Name- ARKIN,RiCtARDA. k!COWAN.STEVEN M.
&kir eft., 1603 SAWGRASS CORPORATE Atz±es 1 60::SAWGRAss CORPORATE
PARKWAY,SUITE 401 PARKWAY,SUITE 4C
Cey State Zip: SUNRISE rL 33223 City Sub.:Zip: SUNRISE FL 33323
t It!f LvallyNut e.t.nuatkr..,:uatAsiltiur M. cucti ur uwad t,!wt.'InIti.w.undet.am,I4 tit' %hr.!!um 3u,utinv lupol ts.cliftf Jr,Amu*isOur
;J11,..111(AVIV ur ur 141 IlValC11 Li 1.L.111.1!.111g:**'III ILA ii ,'4 !AV,tArre3a Ntrek,U... ecc.v.v.
,s•at:Au oitu.srnue4 ottut
SIGNATURE: RICHARD M. NORWALK VP 0412312024
Elurte Sigrwture::1 Sign re: Deta,1 Diite
010
16A 7
EXHI B 1T "C"
Opinion of Probable Cost
1i 6 A 7 r.
ROf3AU &ASSOCIATES
Exhibit "A"
VALENCIA SKY - Plat Recordation Submittal 1
PRELIMINARY OPINION OF PROBABLE COST
SUMMARY
POTABLE WATER&FIRE $ 1,288,575.00
SANITARY SEWER $ 2,001,191.50
UTILITIES TOTAL $ 3,289,766.50
GENERAL $ 629,197.00
STORM DRAINAGE $ 1,415,664.00
PAVING $ 2,041,773.61
CONSTRUCTION TOTAL $ 4,086,634.61
TOTAL $ 7,376,401.11
Contingency(110%) of TOTAL $ 8,114,041.22
This item has been electronically signed and sealed by Matthew W.DeFrancesco,Professional Engineer Using a SHA Authentication Code.
Printed copies of this document are not considered signed and sealed and the SHA Authentication Code must be verified on any electronic copies.
tttttttttIU lHlllllll 4
Digitally signed
by Matthew
No. 8 A o _DeFrancesco
.3) : s z. Date:
s--,AN . OR10P. \��;,�' 2024.10.17
NG
' ' F• 10:57:57-04'00'
l�o•.''''''''1 tt1ttUNt At ,,.
10/15/2024 Z:\Shared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\
1:47 PM OPC_all project_arb.xlsx 1 of 9
tt
16A 7
Lkty RoBAU &ASSOCIA.CES
PRELIMINARY OPINION OF PROBABLE COST
VALENCIA SKY
Estimated By:ARB
Checked By:MWD
GENERAL
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
Staked Silt Fence LF 11,985 $ 1.50 $ 17,977.50
Double Staked Silt Fence LF 8,170 $ 1.50 $ 12,255.00
Landscape buffers(Includes Irrigation) LS 1 $ 364,224.50 $ 364,224.50
Cooper Lights EA 41 $ 2,500.00 $ 102,500.00
FPL Lights EA 67 $ 1,800.00 $ 120,600.00
Construction Entrance(FDOT Stone Bed) EA 3 $ 3,500.00 $ 10,500.00
Rip-Rap(12")w/Fabric SY 19 $ 60.00 $ 1,140.00
General Subtotal $629,197.00
*Excavation fees paid under excavation permit
l0/15/71Y2Shared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx
1:47 PM OPC_all project_arb.xlsx 2 of 9
1 6 A 7 t.,
t krr d; ROBAU & ASSOCIATES
PRELIMINARY OPINION OF PROBABLE COST
VALENCIA SKY
Estimated By:ARB
Checked By:MWD
POTABLE WATER&FIRE
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
8"PVC Water Main(C-900,DR-18) LF 11,537 $ 30.00 $ 346,110.00
10"PVC Water Main(C-900,DR-18) LF 2,923 $ 36.00 $ 105,228.00
8"PVC Water Main(C-900,DR-14) LF 814 $ 33.00 $ 26,862.00
10"PVC Water Main(C-900,DR-14) LF 275 $ 39.00 $ 10,725.00
2"Gate Valve w/Box EA 3 $ 750.00 $ 2,250.00
8"Gate Valve w/Box EA 45 $ 2,200.00 $ 99,000.00
10"Gate Valve w/Box EA 17 $ 2,800.00 $ 47,600.00
Fire Hydrant Assembly EA 34 $ 7,500.00 $ 255,000.00
Permanent Bacterial Sample Point EA 4 $ 3,500.00 $ 14,000.00
Double Service W/Curb Stop EA 116 $ 1,600.00 $ 185,600.00
Single Service W/Curb Stop EA 95 $ 1,400.00 $ 133,000.00
Temp.Gap Configuration EA 1 $ 3,500.00 $ 3,500.00
Automatic Flushing Device EA 4 $6,800.00 $ 27,200.00
Temporary Bact.Sample Points&Blow-Off EA 1 $ 4,000.00 $ 4,000.00
Air Release Valve EA 5 $ 4,500.00 $ 22,500.00
Connect to WM existing stubout EA 2 $ 3,000.00 $ 6,000.00
l0/15/ZOIShared\P\024-00-004 Sandy Lane Assemblage PPLA\Ol General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx
l:47 PM OPC_all project_arb.xlsx 3 of 9
16A 7
lr ROBAU &ASSOCIATES
PRELIMINARY OPINION OF PROBABLE COST
VALENCIA SKY
Estimated By:ARB
Checked By:MWD
POTABLE WATER&FIRE
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
Potable Water&Fire Station Subtotal $ 1,288,575.00
10/15/7A29hared\P\024-00-004 Sandy Lane Assemblage PPLA\0I General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx
L47 PM OPC_all project_arb.xlsx 4 of 9
f
16A 7 •
4
E Liktd, ROBAu & ASSOCIATES
PRELIMINARY OPINION OF PROBABLE COST
VALENCIA SKY
Estimated By:ARB
Checked By:MWD
SANITARY SEWER
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
8"PVC Sanitary Sewer Main(0'-6'Depth) LF 4,693 $ 30.00 $ 140,790.00
8"PVC Sanitary Sewer Main(6'-8'Depth) LF 3,233 $ 48.00 $ 155,184.00
8"PVC Sanitary Sewer Main(8'-10'Depth) LF 2,082 $ 62.00 $ 129,084.00
8"PVC Sanitary Sewer Main(10'-12'Depth) LF 1,438 $ 73.00 $ 104,974.00
8"PVC Sanitary Sewer Main(12'-14'Depth) LF 1,479 $ 82.00 $ 121,278.00
10"PVC Sanitary Sewer Main(12'-14'Depth) LF 106 $ 90.00 $ 9,540.00
4'Diameter Manholes(0'-6'Depth) EA 21 $ 7,200.00 $ 151,200.00
4'Diameter Manholes(6'-8'Depth) EA 17 $ 8,400.00 $ 142,800.00
4'Diameter Manholes(8'-10'Depth) EA 9 $ 10,200.00 $ 91,800.00
4'Diameter Manholes(10'-12'Depth) EA 8 $ 11,000.00 $ 88,000.00
4'Diameter Manholes(12'-14'Depth) EA 9 $ 13,500.00 $ 121,500.00
Additional Cost,Drop Manhole for(12'-14') EA 10 $ 1,800.00 $ 18,000.00
6"Single Clean-out EA 63 $ 1,000.00 $ 63,000.00
6"Double Clean-out EA 132 $ 1,250.00 $ 165,000.00
Video Inspection LF 13,031 $ 3.50 $ 45,608.50
Lift Station Average,with Diesel Pump EA 1 $ 380,000.00 $ 380,000.00
10/15/2Mhared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx
1:47 PM OPC_all project_arb.xlsx 5 of 9
16A 7
RO 3AU & ASSOCIATES
PRELIMINARY OPINION OF PROBABLE COST
VALENCIA SKY
Estimated By:ARB
Checked By:MWD
SANITARY SEWER
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
8"PVC Force Main(C-900,DR-18) LF 1,761 $ 25.50 $ 44,905.50
8"PVC Force Main(C-900,DR-14) LF 127 $ 28.00 $ 3,556.00
6"PVC Force Main(C-900,DR-18) LF 45 $ 21.50 $ 967.50
6"PVC Force Main(C-900,DR-14) LF 21 $ 24.00 $ 504.00
Air Release Valves EA 4 $ 4,500.00 $ 18,000.00
8"Plug Valve EA 1 $ 2,500.00 $ 2,500.00
Connect Force Main(simultaneous construction) EA 1 $ 3,000.00 $ 3,000.00
Sanitary Sewer Subtotal $ 2,001,191.50
10/15/2A.2 hared\P\024-00-004 Sandy Lane Assemblage PPLA\O1 General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx
L47 PM OPC_all project_arb.xlsx 6 of 9
16A 7
4
( L ,) ROBAU &ASSOCIATES
PRELIMINARY OPINION OF PROBABLE COST
VALENCIA SKY
Estimated By:ARB
Checked By:MWD
STORM DRAINAGE
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
15"RCP LF 4,768 $ 35.00 $ 166,880.00
18"RCP LF 1,193 $ 42.00 $ 50,106.00
24"RCP LF 1,745 $ 56.00 $ 97,720.00
30"RCP LF 1,806 $ 68.00 $ 122,808.00
36"RCP LF 3,845 $ 80.00 $ 307,600.00
Valley Gutter Inlets EA 74 $ 4,000.00 $ 296,000.00
Junction Box EA 5 $ 4,000.00 $ 20,000.00
Type"X"Box EA 6 $ 2,400.00 $ 14,400.00
DBI FDOT-TYPE"B"CUSTOM EA 2 $ 3,500.00 $ 7,000.00
DBI FDOT-TYPE"C" EA 21 $ 2,200.00 $ 46,200.00
DBI FDOT-TYPE"C"CUSTOM EA I $ 5,000.00 $ 5,000.00
DBI FDOT-TYPE"D" EA 1 $ 3,000.00 $ 3,000.00
FDOT TYPE 9 EA 22 $ 6,500.00 $ 143,000.00
15"Flared End Section EA 5 $ 2,000.00 $ 10,000.00
18"Flared End Section EA 4 $ 2,300.00 $ 9,200.00
24"Flared End Section EA 5 $ 2,500.00 $ 12,500.00
t0/l5/7ABahared\P\024-00-004 Sandy Lane Assemblage PPLA\Ol General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx
1:47 PM OPC all project_arb.xlsx 7 of 9
16A 7
4
40.3, ROBAU & ASSOCIATES
PRELIMINARY OPINION OF PROBABLE COST
VALENCIA SKY
Estimated By:ARB
Checked By:MWD
STORM DRAINAGE
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
30"Flared End Section EA 9 $ 3,250.00 $ 29,250.00
36"Flared End Section EA 12 $ 3,500.00 $ 42,000.00
Control Structure EA 6 $ 5,500.00 $ 33,000.00
Storm Drainage Subtotal $ 1,415,664.00
IO/l5/IA.hared\P\024-00-004 Sandy Lane Assemblage PPLA\Ol General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx
1:47 PM OPC_all project_arb.xlsx 8 of 9
'1
16A 7
40 ROBAU &ASSOC IATES
PRELIMINARY OPINION OF PROBABLE COST
VALENCIA SKY
Estimated By:ARB
Checked By:MWD
PAVING
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
2'Valley Gutter LF 23,772 $ 13.00 $ 309,036.00
Type"D"Curb&Gutter LF 1,170 $ 11.00 $ 12,870.00
Type"F"Curb&Gutter LF 7,229 $ 17.00 $ 122,893.00
3/4"Type S-111 Asphalt(2nd Lift) SY 37,857 $ 6.50 $ 246,070.50
1"Type S-111 Asphalt(1st Lift) SY 27,224 $ 8.10 $ 220,514.40
1-1/4"Type S-111 Asphalt(1st Lift)(AURORA BLVD) SY 10,657 $ 10.13 $ 107,955.41
6"Limerock Base(LBR 100) SY 27,224 $ 8.50 $ 231,404.00
8"Limerock Base(LBR 100)(AURORA BLVD) SY 10,657 $ 8.50 $ 90,584.50
12"Stabilized Subgrade(LBR 40) SY 48,226 $ 3.00 $ 144,678.00
Signage&Pavement Marking LS 1 $ 25,000.00 $ 25,000.00
2'Sod Strip Behind Curb SY 7,149 $ 2.20 $ 15,727.80
ADA Ramps&Detectable Warnings EA 41 $ 500.00 $ 20,500.00
5'Wide Sidewalk(4"Thick Concrete) LF 24,577 $ 20.00 $ 491,540.00
Saw-Cut&Match Existing Pavement EA 2 $ 1,500.00 $ 3,000.00
Paving Subtotal $2,041,773.61
10/l5/2 t2 hared\P\O24-00-004 Sandy Lane Assemblage PPLA\01 General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx
1:47 PM OPC_all project_arb.xlsx 9 of 9