Loading...
Agenda 11/12/2024 Item #16B12 (To install re-light indicators (blue lights) at 20 intersection s Collier County to assist the Collier Counry Sherriff withe red ligh enforcement )11/12/2024 Item # 16.B.12 ID# 2024-1863 Executive Summary Recommendation to install red-light indicators (‘blue lights’) at 20 signalized intersections in Collier County to assist the Collier County Sheriff with red light enforcement and approve the attached Budget Amendment in the amount of $160,000. OBJECTIVE: To install red-light indicators at high-crash intersections to assist red light enforcement, which will improve safety and reduce crashes. CONSIDERATIONS: On September 24, 2024, the Board of County Commissioners (the "Board"), asked the Traffic Operations team to make a presentation on traffic signal timing, maintenance and operations as well as potential engineering solutions to reduce crashes at signalized intersections. One of the discussed improvements was to install red-light indicators at strategic locations. In cooperation with the Collier County Sheriff’s Office, staff identified 20 high-crash intersections (out of a total of 233 signalized intersections) where blue lights will be installed. An analysis for each approach was completed by the Collier County Sheriffs' Office to ensure that the deputy is able to position his vehicle accordingly and 55 approaches were deemed feasible. A list identifying each intersection and which approach will have a blue light installed is attached. Staff utilized an existing contract with Southern Signal & Lighting, Inc., who is the primary vendor under Contract #23- 8163, to obtain quotes for each of the identified locations for a total estimated cost of $130,787.40. A contingency of approximately 20% was added to the Budget Amendment to address unforeseen conditions for a total of $160,000. This item is consistent with the Collier County strategic plan objectives to support the Collier County Constitutional Officers in the execution of their responsibilities. FISCAL IMPACT: A budget amendment in the amount of $160,000 is necessary to reallocate funding from another project within the Transportation Capital Fund (3081) to the Traffic Signals Project (60172). The source of funding is general funds. GROWTH MANAGEMENT IMPACT: This item is consistent with the Collier County Growth Management Plan. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires a majority vote for approval. - SAA RECOMMENDATIONS: To approve the installation of red-light indicators (‘blue lights’) at 20 signalized intersections in Collier County and authorize the necessary Budget Amendment. PREPARED BY: Anthony Khawaja, P.E., Chief Engineer of Traffic Operations ATTACHMENTS: 1. List of proposed intersections and estimated cost 2. Southern Signal & Lighting Proposal 3. Budget Amendment Request Page 2075 of 5419 # Intersections Sept 22 - Aug 23 Sept 23 - Aug 24 Grand Total NB SB EB WB QTY Amount 1 Golden Gate Pkwy / Santa Barbara Blvd 91 67 158 YES YES 2 5,090.60 2 Vanderbilt Beach Rd / Livingston Rd 76 66 142 YES YES YES 3 7,635.90 3 Immokalee Rd / Collier Blvd 71 68 139 YES YES 2 5,090.60 4 Vanderbilt Beach Rd / Collier Blvd 63 72 135 YES YES YES 3 7,635.90 5 Immokalee Rd / Livingston Rd 67 54 121 YES YES 2 1,911.20 6 Golden Gate Pkwy / Livingston Rd 56 57 113 YES 1 2,545.30 7 Pine Ridge Rd / Livingston Rd 53 60 113 YES YES YES YES 4 10,181.20 8 *Immokalee Rd / US 41 [state] 58 50 108 YES 1 755.60 9 Pine Ridge Rd / Collier Blvd 50 45 95 YES YES YES 3 7,635.90 10 Pine Ridge Rd / Airport Pulling Rd 47 45 92 YES YES YES YES 4 10,181.20 11 *Davis Blvd / Collier Blvd [state] 35 50 85 YES YES YES YES 4 9,181.20 Golden Gate Pkwy / Collier Blvd 44 39 83 removed per County Directive - 12 Immokalee Rd / Juliet Blvd 47 35 82 YES YES YES 3 7,635.90 13 Collier Blvd / Golden Gate Blvd 42 37 79 YES YES YES 3 7,635.90 14 *Rattlesnake Hammock Rd / US 41 [state] 52 25 77 YES YES YES 3 6,150.90 15 *Davis Blvd / Santa Barbara Blvd [state] 40 34 74 YES YES YES YES 4 9,181.20 16 *Davis Blvd / Airport Pulling Rd [state] 41 33 74 YES YES YES 3 6,885.90 17 Pine Ridge Rd / Goodlette-Frank Rd 41 32 73 YES 1 2,545.30 18 Golden Gate Blvd / Wilson Blvd 32 39 71 YES YES YES YES 4 10,181.20 19 Vanderbilt Beach Rd / Airport Pulling Rd 24 45 69 YES YES YES 3 7,635.90 20 Immokalee Rd & Logan Blvd 31 28 59 YES YES 2 5,090.60 Total 1061 981 2042 8 15 17 15 55 130,787.40 *Materials for State Roads to be provided by FDOT # of Crashes Enforceable Approaches Page 2076 of 5419 Project:Blue Light F&I Location:Golden Gate Pky & Santa Barbara County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - SB & EB EA 2.00 2,545.30 5,090.60 GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 5,090.60 PROPOSAL # 102224.01-dgc 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2077 of 5419 Project:Blue Light F&I Location:Vanderbilt Bch & Livingston County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - NB, EB & WB EA 3.00 2,545.30 7,635.90 GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 7,635.90 PROPOSAL # 102224.02-dgc 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2078 of 5419 Project:Blue Light F&I Location:Immokalee & Collier County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - SB & EB EA 2.00 2,545.30 5,090.60 GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 5,090.60 PROPOSAL # 102224.03-dgc 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2079 of 5419 Project:Blue Light F&I Location:Vanderbilt Bch & Collier County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - SB, EB & WB EA 3.00 2,545.30 7,635.90 GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 7,635.90 PROPOSAL # 102224.04-dgc 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2080 of 5419 Project:Blue Light F&I Location:Immokalee & Livingston County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Span Wire - per unit / per direction Labor Supervisor MH 2.00 84.70 169.40 Signal Tech II MH 2.00 78.65 157.30 Laorer - 2 @ 2 hrs ea MH 4.00 66.55 266.20 Heavy Equip Bucket Truck HR 2.00 72.60 145.20 Materials Number 3 Conductor Wire LF 5.00 3.50 17.50 Confirmation Light [Blue Light]EA 1.00 200.00 200.00 Total per unit / direction for Span Wire 955.60 Total for this location - NB & EB EA 2.00 955.60 1,911.20 GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 1,911.20 PROPOSAL # 102224.05-dgc 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2081 of 5419 Project:Blue Light F&I Location:Golden Gate Pky & Livingston County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - EB EA 1.00 2,545.30 2,545.30 GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. 2,545.30 PROPOSAL # 102224.06-dgc Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2082 of 5419 Project:Blue Light F&I Location:Pine Ridge & Livingston County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - NB, SB, EB, WB EA 4.00 2,545.30 10,181.20 GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. 10,181.20 PROPOSAL # 102224.07-dgc Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2083 of 5419 Project:Blue Light Install Only Location:Immokalee & US 41 [State Road] County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Span Wire - per unit / per direction Labor Supervisor MH 2.00 84.70 169.40 Signal Tech II MH 2.00 78.65 157.30 Laorer - 2 @ 2 hrs ea MH 4.00 66.55 266.20 Heavy Equip Bucket Truck HR 2.00 72.60 145.20 Materials Number 3 Conductor Wire LF 5.00 3.50 17.50 Total per unit / direction for Span Wire 755.60 Total for this location - WB EA 1.00 755.60 755.60 Materials to be provided by FDOT GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. 755.60 PROPOSAL # 102224.08-dgc Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2084 of 5419 Project:Blue Light F&I Location:Pine Ridge & Collier County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - SB, EB, WB EA 3.00 2,545.30 7,635.90 GRAND TOTAL NOTES: Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 7,635.90 PROPOSAL # 102224.09-dgc * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2085 of 5419 Project:Blue Light F&I Location:Pine Ridge & Airport Pulling Rd County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - NB, SB, EB, WB EA 4.00 2,545.30 10,181.20 GRAND TOTAL NOTES: Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 10,181.20 PROPOSAL # 102224.10-dgc * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2086 of 5419 Project:Blue Light F&I Location:Davis Blvd & Collier Blvd [State Road] County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Total per unit / direction for Mast Arm 2,295.30 Total for this location - NB, SB, EB, WB EA 4.00 2,295.30 9,181.20 Materials to be provided by FDOT GRAND TOTAL NOTES: Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 9,181.20 PROPOSAL # 102224.11-dgc * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2087 of 5419 Project:Blue Light F&I Location:Immokalee & Juliet County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - SB, EB, WB EA 3.00 2,545.30 7,635.90 GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. PROPOSAL # 102224.13-dgc Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 7,635.90 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2088 of 5419 Project:Blue Light F&I Location:Collier & Golden Gate Blvd County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - NB, SB, WB EA 3.00 2,545.30 7,635.90 GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. PROPOSAL # 102224.14-dgc Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 7,635.90 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2089 of 5419 Project:Blue Light Install Only Location:Rattlesnake Hammock & Us 41 [State Road] County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Span Wire - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 5.00 3.50 17.50 Total per unit / direction for Span Wire 2,050.30 Total for this location - SB, WB, EB EA 3.00 2,050.30 6,150.90 Materials to be provided by FDOT GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 6,150.90 PROPOSAL # 102224.15-dgc 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2090 of 5419 Project:Blue Light F&I Location:Davis Blvd St Barbara Blvd [State Road] County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Total per unit / direction for Mast Arm 2,295.30 Total for this location - NB, SB, EB, WB EA 4.00 2,295.30 9,181.20 Materials to be provided by FDOT GRAND TOTAL NOTES: Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 9,181.20 PROPOSAL # 102224.16-dgc * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2091 of 5419 Project:Blue Light F&I Location:Davis Blvd & Airport Pulling Rd [State Road] County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Total per unit / direction for Mast Arm 2,295.30 Total for this location - SB, EB, WB EA 3.00 2,295.30 6,885.90 Materials to be provided by FDOT GRAND TOTAL NOTES: Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 6,885.90 PROPOSAL # 102224.17-dgc * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2092 of 5419 Project:Blue Light F&I Location:Pine Ridge & Goodlette Frank County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - SB EA 1.00 2,545.30 2,545.30 GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. PROPOSAL # 102224.18-dgc Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 2,545.30 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2093 of 5419 Project:Blue Light F&I Location:Golden Gate Blvd & Wilson County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - NB, SB, EB, WB EA 4.00 2,545.30 10,181.20 GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. PROPOSAL # 102224.19-dgc Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 10,181.20 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2094 of 5419 Project:Blue Light F&I Location:Vanderbilt Bch Rd & Airport Pulling County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - SB, EB, WB EA 3.00 2,545.30 7,635.90 GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. PROPOSAL # 102224.20-dgc Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 7,635.90 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2095 of 5419 Project:Blue Light F&I Location:Immokalee & Logan Blvd County:Collier Bid Letting : Estimator:David Rodriguez Date:Tuesday, October 22, 2024 Procurement: Construction Days:Comments:SEE BELOW Contract Unit Total Item Description UM Qty.Price Amount Mast Arm - per unit / per direction Labor Supervisor MH 4.00 84.70 338.80 Signal Tech II MH 4.00 78.65 314.60 Laorer - 3 @ 4 hrs ea MH 12.00 66.55 798.60 Heavy Equip Bucket Truck - 2 @ 4 hrs HR 8.00 72.60 580.80 Materials Number 3 Conductor Wire LF 75.00 3.50 262.50 Confirmation Light [Blue Light]EA 1.00 250.00 250.00 Total per unit / direction for Mast Arm 2,545.30 Total for this location - WB, EB EA 2.00 2,545.30 5,090.60 GRAND TOTAL NOTES: * COST IS APPROXIMATE AND IT DOES NOT INCLUDE ANY UNFORSEEN INFRASTRUCTURE ISSUES THAT MAY ARISE UPON COMMENCEMENT OF WORK. SHOULD ANY SUCH ISSUES ARISE, PROPER PERSONNEL WILL BE NOTIFIED FOR FURTHER INSTRUCTION. ACTUAL QUANTITIES MAY VARY. Making Roads Safer & Brighter southernsignalandlighting@gmail.com * QUOTE IS BASED ON CONTRACT 23-8163. 5,090.60 PROPOSAL # 102224.25-dgc 16909 US Highway 19 Hudson, FL 34667 Page 1 of 1 Phone727-819-2061 Fax: 727-857-4097 Page 2096 of 5419