Agenda 10/22/2024 Item #17D (Ordinance - Amending the Potable Water Sub-Element to reference the updated 10 year water supply facilities work plan)10/22/2024
Item # 17.D
ID# 2024-1190
Executive Summary
Recommendation to adopt an Ordinance of the Board of County Commissioners proposing an amendment to the Collier
County Growth Management Plan, Ordinance 89-05, as amended, specifically amending the Potable Water Sub-Element
of the Public Facilities Element to amend Policy 1.7 to reference the updated ten-year water supply facilities work plan,
and amending the Capital Improvement Element to change the level of service standards for county potable water
systems and county sanitary sewer-wastewater treatment systems; furthermore directing transmittal of the amendment to
the Florida Department of Commerce. (PL20240000400)
OBJECTIVE: For the Board of County Commissioners (Board) to approve and transmit the proposed large-scale
amendment to the Growth Management Plan (GMP) to the Florida Department of Commerce. Every five years, the
County updates the Ten-Year Water Supply Facilities Work Plan.
CONSIDERATIONS: The proposed text change seeks to amend the Potable Water Sub-Element of the Public
Facilities Element and the Capital Improvement Element to update the reference to the County’s next Ten-Year Water
Supply Facilities Work Plan, as required for Collier County by Section 163.3177(6)(c), Florida Statutes. Policy 1.7 is
proposed to be amended as follows:
Policy 1.7:
The County has developed the Ten-Year Water Supply Facilities Work Plan, dated January 2024, in accordance with the
water supply guidelines of the most current version of the South Florida Water Management District’s Lower West
Coast Water Supply Plan. The County’s Ten-Year Water Supply Facilities Work Plan is incorporated herein by
reference.
The goal of the Potable Water Sub-Element of the Growth Management Plan is to protect the public's health and safety
by ensuring access to environmentally sound, cost-effective, and implementable potable water facilities and services.
OBJECTIVE 1: To locate and develop potable water supply sources to meet the future needs of the county-owned and
operated systems. Supply sources must meet the minimum level of service standards established by this plan. The
development and utilization of new potable water supply sources and the acquisition of land necessary for such
development shall be based upon the information, guidelines, and procedures identified within the County’s Ten-Year
Water Supply Facilities Work Plan (as updated) and the Lower West Coast Water Supply Plan prepared by the South
Florida Water Management District. [Note: No revisions to Policies 1.1 through 1.6 are proposed.]
In December 2022, the South Florida Water Management District’s (SFWMD) Governing Board approved the 2022
Lower West Coast Water Supply Plan Update. Therefore, Collier County must adopt the proposed GMP text
amendment referencing the County’s proposed Ten-Year Water Supply Facilities Work Plan by June 28, 2024 (or 18
months after the District Governing Board approved each regional water supply plan) [s. 163.3177(6)(c), F.S.].
As noted in the attached Ten-Year Water Supply Facilities Work Plan, the updated document addresses the following
objectives:
· Identifies population and water demands of the County and each utility for the planning period, 2023 to 2033.
· Presents existing and planned potable and reclaimed water facilities that will be utilized to meet demand projections.
· Identifies sources of raw water needed for potable water and irrigation water supply to meet demands through the
year 2033.
· Identifies the steps necessary to develop additional potable and reclaimed water supplies and specifies when they
must occur and how they will be funded.
· Demonstrates that the water supply plans for each utility within the County are feasible with respect to facility
capacity to be developed and consumptive use permit allocations required.
Page 6963 of 7162
10/22/2024
Item # 17.D
ID# 2024-1190
• Describes the conservation practices and regulations utilized by the County and each utility to meet water
supply demand.
The population methodology used by the Collier County Water Sewer District and the Collier County Growth
Management Community Development Department for the Ten-Year Water Supply Facilities Work Plan is based on the
County’s latest adopted Annual Update Inventory Report and Capital Improvement Element (AUIR-CIE), which was
available when the plan was created (2023 AUIR-CIE).
FINDINGS AND CONCLUSIONS: Staff made the following findings and conclusions after reviewing this petition,
including the supporting data and analysis. The Staff Report to the Collier County Planning Commission (CCPC)
provides more analysis.
• There are no transportation or public utility-related concerns as a result of this petition.
• There are no adverse environmental impacts as a result of this petition.
• No historical or archaeological sites are affected by this amendment.
• There are no concerns about impacts on other public infrastructure.
• There is a demonstrated need for the proposed amendment.
STAFF RECOMMENDATION TO THE COLLIER COUNTY PLANNING COMMISSION: To have the Collier
County Planning Commission, acting as the Environmental Advisory Council and the Local Planning Agency, forward
Petition PL20240000400 to the Board of County Commissioners with a recommendation to approve for Transmittal to
the Florida Department of Commerce and other statutorily required agencies.
COLLIER COUNTY PLANNING COMMISSION RECOMMENDATION (CCPC): The CCPC heard this petition
at their March 7, 2024, meeting for Transmittal and at their May 16, 2024, meeting for Adoption. The Planning
Commission voted unanimously to forward the petition to the Board with a recommendation of approval for transmittal
to the Department of Commerce.
FISCAL IMPACT: Petition fees account for staff review time and materials and the cost of associated legal
advertising/public notice for the public hearings. Therefore, the adoption of this amendment will not result in fiscal
impacts to Collier County.
GROWTH MANAGEMENT IMPACT: Approval of the proposed amendment by the Board for Transmittal and its
submission to the Florida Department of Commerce and other statutorily required agencies will commence the
Department’s thirty (30) day review process and ultimately return the amendment to the CCPC and the Board for
Adoption hearings tentatively scheduled in May 2024.
LEGAL CONSIDERATIONS: This item is approved as to form and legality. Adoption of the GMP amendment
requires an affirmative vote of four. (HFAC)
RECOMMENDATIONS: To adopt and transmit the adopted Ordinance for petition PL20240000400 to the Florida
Department of Commerce and other statutorily required agencies.
PREPARED BY: James Sabo, AICP, Comprehensive Planning Manager.
ATTACHMENTS:
1. CCPC Staff Report 10 year water 3-7-24
2. Proposed Ordinance CIE Water Supply GMPA
Page 6964 of 7162
10/22/2024
Item # 17.D
ID# 2024-1190
3. Proposed Ordinance Potable Water SubE GMPA
4. Post CCPC_Collier Co 10YR WSFWP 3-12-24
5. 2024) WEB - Collier County 10-Year Water Supply Work Plan Update - (Large Scale GMPA _Adoption Hearing_)
(PL20240000400)
Page 6965 of 7162
PL20240000400 GMPA
Ten-Year Water Supply – Potable Water Sub element of the Public Facilities Element
1
STAFF REPORT
TO: COLLIER COUNTY PLANNING COMMISSION (CCPC)
FROM: COMPREHENSIVE PLANNING SECTION, ZONING DIVISION,
GROWTH MANAGEMENT COMMUNITY DEVELOPMENT
HEARING DATE: MARCH 7, 2024
RE: PL20240000400, Ten-Year Water Supply Facilities Work Plan, Growth Management Plan
Amendment. (TRANSMITTAL HEARING)
NOTE: CCPC / Environmental Advisory Council approval is required
AGENT/APPLICANT:
Public Utilities Department
Engineering and Project Management Division
Collier County Government
3299 East Tamiami Trail, Suite 303
Naples, FL 34112
GEOGRAPHIC LOCATION:
The proposed Growth Management Plan amendment (GMPA) is not location-specific.
REQUESTED ACTION:
The proposed text change seeks to amend the Potable Water Sub-Element of the Public Facilities Element and the
Capital Improvement Element to update the reference to our next Ten-Year Water Supply Facilities Work Plan, as
required for Collier County by Section 163.3177(6)(c), Florida Statutes. Policy 1.7 is proposed to be amended as
follows:
OBJECTIVE 1:
Locate and develop potable water supply sources to meet the future needs of the County owned and operated
systems, said supply sources meeting the minimum Level of Service Standards established by this Plan. The
development and utilization of new potable water supply sources and the acquisition of land necessary for such
development shall be based upon the information, guidelines, and procedures identified within the County’s Ten-
Year Water Supply Facilities Work Plan (as updated) and the Lower West Coast Water Supply Plan prepared by
the South Florida Water Management District. [Note: No revisions to Policies 1.1 through 1.6 are proposed.]
Page 6966 of 7162
PL20240000400 GMPA
Ten-Year Water Supply – Potable Water Sub element of the Public Facilities Element
2
Policy 1.7:
The County has developed the Ten-Year Water Supply Facilities Work Plan, dated February 2019 January 2024, in
accordance with the water supply guidelines of the most current version of the South Florida Water Management
District’s Lower West Coast Water Supply Plan. The County’s Ten-Year Water Supply Facilities Work Plan is
incorporated herein by reference.
STAFF ANALYSIS:
As Policy 1.7 of the Public Facilities Element, Potable Water Sub-Element indicates, the County has developed the
Ten-Year Water Supply Facilities Work Plan. The proposed text amendment seeks to adopt the updated version of
the County’s plan, which has been prepared in accordance with the most current version of the South Florida Water
Management District’s Lower West Coast Water Supply Plan. The updated version of the Ten -Year Water Supply
Facilities Work Plan is proposed for incorporation into the County’s GMP by reference.
Regional Planning:
In December 2022, the Governing Board of the South Florida Water Management District (SFWMD) approved the
2022 Lower West Coast Water Supply Plan (LWCWSP) Update. Under Florida law (section 163.3177(6)(c),
Florida Statutes), Collier County must adopt amendments to its comprehensive plan within 18 months of the
SFWMD's approval of the update. These amendments include the development of an updated Ten – Year Water
Supply Facilities Work Plan and amendments to the Growth Management Plan (GMP). The LWCWSP amendment
required the five water management districts to initiate regional water supply planning in all areas of the State.
The purpose of regional water supply planning is to develop strategies to meet future water demands of urban and
agricultural uses while meeting the needs of the environment. This process identifies historical uses of water and
water source options to meet potential shortfalls. Each regional water supply plan is based on at least a 10-year
future planning horizon, and a complete update of each plan is required every five years.
The Lower West Coast Water Supply Planning Area includes Lee County and portions of Charlotte, Collier, Glades,
Hendry, and Monroe counties. The 2022 Lower West Coast Water Supply Plan Update (LWC Update) was
approved by the SFWMD Governing Board in December 2022. The LWC Update assesses projected water demands
and potential water sources for the period through 2040.
Page 6967 of 7162
PL20240000400 GMPA
Ten-Year Water Supply – Potable Water Sub element of the Public Facilities Element
3
Source: 2022 Lower West Coast Water Supply Plan Update
Page 6968 of 7162
PL20240000400 GMPA
Ten-Year Water Supply – Potable Water Sub element of the Public Facilities Element
4
Local Planning:
In December 2022, the SFWMD’s Governing Board approved the 2022 Lower West Coast Water Supply Plan
Update. Therefore, Collier County must adopt the proposed GMP text amendment referencing the County’s
proposed Ten-Year Water Supply Facilities Work Plan by June 28, 2024 (or 18 months after the District Governing
Board approved each regional water supply plan) [s. 163.3177(6)(c), F.S.].
Proposed Ten-Year Water Supply Facilities Work Plan update:
As noted in the attached Ten-Year Water Supply Facilities Work Plan, the updated document addresses the
following objectives:
• Identifies population and water demands of the County and each utility for the planning period,
2023 to 2033.
• Presents existing and planned potable and reclaimed water facilities that will be utilized to meet
demand projections.
• Identifies sources of raw water needed for potable water and irrigation water supply to meet
demands through the year 2033.
• Identifies the steps necessary to develop additional potable and reclaimed water supplies and
specifies when they must occur and how they will be funded.
• Demonstrates that the water supply plans for each utility within the County are feasible with
respect to facility capacity to be developed and consumptive use permit allocations required.
• Describes the conservation practices and regulations utilized by the County and each utility to
meet water supply demand.
The population methodology used by the Collier County Water Sewer District and the Collier County Growth
Management Department for the Ten-Year Water Supply Facilities Work Plan is based on the County’s latest
adopted Annual Update Inventory Report and Capital Improvement Element (AUIR-CIE) available at the time the
plan was created (2023 AUIR-CIE). Please note that because of updates to data, the proposed Ten-Year Water
Supply Facilities Work Plan will differ from the 2022 Lower West Coast Plan Update, as well as the most recent
AUIR-CIE documents. These variances have been vetted with SFWMD staff, who agree that the population
methodology is appropriate. The other utility providers have used alternative population methodologies, which are
also consistent with state statutes and have been vetted by SFWMD staff.
This Ten-Year Water Supply Facilities Work Plan was prepared by the County’s consultant, Johnson Engineering,
in coordination with Public Utilities Department and Growth Management Department staff, as well as
representatives from various private and public utilities, and includes the areas of the County served by the Collier
County Water and Sewer District, the Ave Maria Utility Company (AMUC), the Immokalee Water and Sewer
District (IWSD), and the Port of the Islands Capital Improvement District.
Also referenced in the plan are the Lee Cypress Water and Sewer Co-Op, Inc., as well as several small-capacity
water systems regulated by the Florida Department of Environmental Protection (FDEP) (see section 3.7 of the
attached plan). These did not meet the minimum size requirements to be included in facility reporting.
In substance, the CCWSD portions of the Plan update provide detail behind the following broad
subject areas:
(a) Existing Facilities (Section 4): The CCWSD is served by two interconnected water treatment plants,
the North County Regional Water Treatment Plant and the South County Regional Water Treatment
Plant, with maximum finished water production capacities of 20 MGD and 32 MGD, respectively.
Page 6969 of 7162
PL20240000400 GMPA
Ten-Year Water Supply – Potable Water Sub element of the Public Facilities Element
5
Three wellfields provide raw water for the plants, drawing from both brackish and freshwater sources.
Collier County has been a leader in the use of brackish water source production. Along with these
production and wellfield facilities, the CCWSD contains over 1,200 miles of transmission and
distribution pipelines, water storage tanks, pumping facilities, and approximately 86,400 individual
service connections. In addition, the CCWSD operates one of the largest irrigation quality (IQ) water
systems in South Florida, with contractual commitments of over 23 MGD to golf course communities,
parks, and roadway medians.
(b) Planned Water Supply Facilities (Section 5): Based on the 2023 AUIR population and Level of Service
(LOS) standard, the Plan update indicates 2033 as the optimal first production year for the new
Northeast Regional Water Treatment Plant Wellfield Phase 1.
(c) Facilities Capacity Analysis (Chapter 6): Plans to bring online a new potable water treatment facility
and associated wellfield during the Ten-year period will allow CCWSD to stay ahead of the demand
curve during the Ten-year planning period.
(d) Conservation (Section 7): Conservation measures have been an important element in CCWSD
planning for many years. Local regulations on domestic irrigation, low flow devices, Florida Friendly
landscape principles, Fridays are Dry Days, and a block rate structure have been employed and will be
continually improved. A meter replacement program is now underway, and efficiency gains at the
Regional Plants and throughout the Distribution system are being realized.
(e) Capital Improvement Projects (Section 8): Subsections present the capital improvement projects
planned by each utility, including the funding source, timelines, project name, and cost estimate for
each project.
A depiction of the District boundaries for each of the covered utilities follows:
Page 6970 of 7162
PL20240000400 GMPA
Ten-Year Water Supply – Potable Water Sub element of the Public Facilities Element
6
Source: Collier County 10 Year Water Supply Plan Update, 2023
Page 6971 of 7162
PL20240000400 GMPA
Ten-Year Water Supply – Potable Water Sub element of the Public Facilities Element
7
Statutory Requirements:
The Department of Commerce (DOC) has published “A Guide to Preparation of the Water Supply Facilities Work
Plan”. Local governments must comply with the following statutory requirements for water supply and facility
planning (Each requirement followed by staff comment in bold and italics):
1. Coordinate appropriate aspects of their comprehensive plan with the appropriate water management
district's regional water supply plan. [Section 163.3177(4)(a), F.S.]. The current GMP contains Goals,
Objectives, and Policies that were adopted to maintain coordination with the SFWMD’s water supply
plan.
2. Revise the Potable Water Sub-Element to adopt a water supply facility work plan covering at least a 10-
year planning period to meet existing and projected demand. The work plan should address those water
supply facilities for which the local government is responsible and include the facilities needed to develop
alternative water supplies. The work plan should also identify conservation and reuse measures to meet
future needs. [Section 163.3177(6)(c), F.S.] Policy 1.7 of the Potable Water Sub-Element was amended
by Ordinance 09-04 to incorporate by reference the County’s 10-Year Water Supply Facilities Work
Plan. This proposed GMP amendment seeks to adopt the revised update to the plan, which identifies the
County’s traditional and alternative water supply sources to meet existing and projected needs for the
10-year period; the capital improvements that will be needed to develop, treat, and deliver those
alternative supplies; and the conservation measures and reuse supplies utilized to offset demand for new
water. The County also updates its Capital Improvement Element on a yearly basis through the AUIR-
CIE to include the capital improvements needed in the first five years of the 10-Year Water Supply
Facilities Work Plan.
3. Revise the Conservation Element to assess current and projected water needs and sources for at least a 10-
year planning period. The analysis must consider the existing levels of water conservation, use, and
protection and the applicable policies of the water management district and the district’s approved regional
water supply plan. In the absence of an approved regional water supply plan, the analysis must consider the
district’s approved water management plan. [Section 163.3177(6)(d)3, F.S.] The current Conservation and
Coastal Management Element of the GMP contains Goals, Objectives, and Policies that consider the
SFWMD levels of water conservation, use, and protection.
4. Revise the Capital Improvements Element to identify capital improvement projects to be implemented in
the first five years of the work plan for which the local government is responsible, including both publicly
and privately funded water supply projects necessary to achieve and maintain the adopted level of service
standards; and adopt a 5-year schedule of capital improvements to include those projects as either funded
or unfunded, and if unfunded, given a level of priority for funding. [163.3177(3)(a)4, F.S.] The County
updates its Capital Improvement Element on a yearly basis through the AUIR-CIE to include the capital
improvements needed in the first five years of the 10-Year Water Supply Facilities Work Plan.
5. Revise the Intergovernmental Coordination Element to adopt principles and guidelines to be used to
coordinate the comprehensive plan with the regional water supply authority (if applicable) and with the
applicable regional water supply plan. [163.3177(6)(h)1, F.S.] The current Intergovernmental
Coordination Element of the GMP contains Goals, Objectives, and Policies that provide principles and
guidance for coordination with the SFWMD and other public and private utilities regarding water supply
planning.
6. During the Evaluation and Appraisal review, determine if comprehensive plan amendments are necessary
to reflect statutory changes related to water supply and facilities planning since the last update to the
comprehensive plan. If necessary, transmit the amendments to incorporate the statutory changes as
Page 6972 of 7162
PL20240000400 GMPA
Ten-Year Water Supply – Potable Water Sub element of the Public Facilities Element
8
appropriate. [Section 163.3191(1) and (2), F.S.] The adopted County’s EAR-based amendments included
revisions to several of its Elements to revise references to the County’s 2014 Water and Wastewater
Master Plan Update document and include the adopted Ten-Year Water Supply Facilities Work Plan,
the Lower West Coast Water Supply Plan, and the Water Master Plan as the County’s appropriate
documents for water supply planning.
NEIGHBORHOOD INFORMATION MEETING (NIM) SYNOPSIS
A NIM is not required under the provisions of the Collier County Land Development Code Chapter 10.03.00: Notice
Requirements.
LEGAL CONSIDERATIONS:
The Office of the County Attorney has reviewed and approved this staff report on 2/16/2024.
STAFF RECOMMENDATION:
For the Collier County Planning Commission, acting as the Environmental Advisory Council and the Local
Planning Agency, to forward Petition PL20240000400 to the Board of County Commissioners with a
recommendation to approve for Transmittal to the Florida Department of Commerce and other statutorily required
agencies.
Page 6973 of 7162
[24-CMP-01211/1873011/1]45
Capital Improvement Element
6/17/24 Page 1 of 3
ORDINANCE NO. 2024- _______
AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF
COLLIER COUNTY, FLORIDA AMENDING ORDINANCE NO. 89-05,
AS AMENDED, THE COLLIER COUNTY GROWTH MANAGEMENT
PLAN FOR THE UNINCORPORATED AREA OF COLLIER COUNTY,
FLORIDA, SPECIFICALLY AMENDING THE CAPITAL
IMPROVEMENT ELEMENT TO CHANGE THE LEVEL OF SERVICE
STANDARDS FOR COUNTY POTABLE WATER SYSTEMS AND
COUNTY SANITARY SEWER-WASTEWATER TREATMENT
SYSTEMS, DIRECTING TRANSMITTAL OF THE ADOPTION
AMENDMENT TO THE FLORIDA DEPARTMENT OF COMMERCE,
AND FURTHERMORE PROVIDING FOR SEVERABILITY AND
PROVIDING FOR AN EFFECTIVE DATE. [PL20240000400]
WHEREAS, Collier County, pursuant to Section 163.3161, et. seq., Florida Statutes, the
Community Planning Act, formerly the Florida Local Government Comprehensive Planning and
Land Development Regulation Act, was required to prepare and adopt a comprehensive plan;
and
WHEREAS, the Collier County Board of County Commissioners adopted the Collier
County Growth Management Plan on January 10, 1989; and
WHEREAS, the Community Planning Act of 2011 provides authority for local
governments to amend their respective comprehensive plans and outlines certain procedures to
amend adopted comprehensive plans; and
WHEREAS, Collier County has prepared plan amendments to the Capital Improvement
Element; and
WHEREAS, Collier County transmitted the Growth Management Plan amendment to the
Department of Commerce for preliminary review on May 16, 2024, after public hearings before
the Collier County Planning Commission and the Board of County Commissioners; and
WHEREAS, the Department of Commerce and various State agencies have reviewed the
amendment to the Growth Management Plan and transmitted their comments, if any, in writing
to Collier County within the time provided by law; and
WHEREAS, Collier County has 180 days from receipt of the Comments Report from the
Department of Commerce to adopt, adopt with changes or not adopt the proposed amendments to
the Growth Management Plan; and
Page 6974 of 7162
[24-CMP-01211/1873011/1]45
Capital Improvement Element
6/17/24 Page 2 of 3
WHEREAS, Collier County has gathered and considered additional information, data and
analysis supporting adoption of these amendments, including the following: the Collier County
Staff Report, the document described as the Collier County Growth Management Plan
Amendment, and other documents, testimony and information presented and made a part of the
record at the public hearings of the Collier County Planning Commission held on
_______________, and the Collier County Board of County Commissioners held on
___________________; and
WHEREAS, all applicable substantive and procedural requirements of law have been
met.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that:
SECTION ONE: ADOPTION OF AMENDMENTS TO THE GROWTH MANAGEMENT
PLAN.
The Board of County Commissioners hereby adopts these amendments to the Capital
Improvement Element in accordance with Section 163.3184, Florida Statutes. The amendment is
attached hereto as Exhibit “A” and incorporated herein by reference.
SECTION TWO: TRANSMITTAL TO FLORIDA DEPARTMENT OF COMMERCE.
The Board of Couty Commissioners directs transmittal of the adopted amendment to the
Florida Department of Commerce.
SECTION THREE: SEVERABILITY.
If any phrase or portion of this Ordinance is held invalid or unconstitutional by any court
of competent jurisdiction, such portion shall be deemed a separate, distinct and independent
provision and such holding shall not affect the validity of the remaining portion.
SECTION FOUR: EFFECTIVE DATE.
The effective date of this plan amendment, if the amendment is not timely challenged,
shall be 31 days after the state land planning agency notifies the local government that the plan
amendment package is complete. If timely challenged, this amendment shall become effective
on the date the state land planning agency or the Administration Commission enters a final order
determining this adopted amendment to be in compliance. No development orders, development
permits, or land uses dependent on this amendment may be issued or commence before it has
become effective.
Page 6975 of 7162
[24-CMP-01211/1873011/1]45
Capital Improvement Element
6/17/24 Page 3 of 3
PASSED AND DULY ADOPTED by the Board of County Commissioners of Collier
County, Florida this _____ day of ________________ 2024.
ATTEST: BOARD OF COUNTY COMMISSIONERS
CRYSTAL K. KINZEL, CLERK COLLIER COUNTY, FLORIDA
__________________________ BY: ________________________________
Deputy Clerk Chris Hall, Chairman
Approved as to form and legality:
___________________________
Heidi Ashton-Cicko
Managing Assistant County Attorney
Attachment: Exhibit A – Text Amendment
Page 6976 of 7162
Words underlined are added; words struck through are deletions.
******** ******** indicates a break in text
CAPITAL IMPROVEMENT ELEMENT
******** ******** ******** ******** ******** ******** *****
OBJECTIVE 1: (PUBLIC FACILITY LEVEL OF SERVICE STANDARDS) [Page 2]
IdenƟfy and define types of public faciliƟes, establish standards for levels of service for each such
public facility, and determine what quanƟty of addiƟonal public faciliƟes is needed in order to
achieve and maintain the standards.
******** ******** ******** ******** ******** ******** *****
Policy 1.5: [Page 5]
The standards for levels of service of public faciliƟes shall be as follows:
******** ******** ******** ******** ******** ******** *****
D. County Potable Water Systems: [Page 6]
County Water District = 150 130 gallons per capita per day (gpcd)
E. County Sanitary Sewer ‒ Wastewater Treatment Systems:
North Wastewater Treatment Service Area = 100 gallons per capita per day (gpcd)
South Wastewater Treatment Service Area = 100 gallons per capita per day (gpcd)
Wastewater Treatment Service Area = 90 gallons per capita per day (gpcd)
[remainder of this page intenƟonally leŌ blank]
06/17/2024
Page 6977 of 7162
[24-CMP-01211/1873012/1]46
6/17/24 Page 1 of 3
ORDINANCE NO. 2024- _______
AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF
COLLIER COUNTY, FLORIDA AMENDING ORDINANCE NO. 89-05,
AS AMENDED, THE COLLIER COUNTY GROWTH MANAGEMENT
PLAN FOR THE UNINCORPORATED AREA OF COLLIER COUNTY,
FLORIDA, SPECIFICALLY AMENDING THE POTABLE WATER SUB-
ELEMENT OF THE PUBLIC FACILITIES ELEMENT TO AMEND
POLICY 1.7 TO REFERENCE THE UPDATED TEN YEAR WATER
SUPPLY FACILITIES WORK PLAN, DIRECTING TRANSMITTAL OF
THE ADOPTION AMENDMENT TO THE FLORIDA DEPARTMENT OF
COMMERCE, AND FURTHERMORE PROVIDING FOR
SEVERABILITY AND PROVIDING FOR AN EFFECTIVE DATE.
[PL20240000400]
WHEREAS, Collier County, pursuant to Section 163.3161, et. seq., Florida Statutes, the
Community Planning Act, formerly the Florida Local Government Comprehensive Planning and
Land Development Regulation Act, was required to prepare and adopt a comprehensive plan;
and
WHEREAS, the Collier County Board of County Commissioners adopted the Collier
County Growth Management Plan on January 10, 1989; and
WHEREAS, the Community Planning Act of 2011 provides authority for local
governments to amend their respective comprehensive plans and outlines certain procedures to
amend adopted comprehensive plans; and
WHEREAS, Collier County has prepared plan amendments to the Potable Water
Subelement of the Public Facilities Element; and
WHEREAS, Collier County transmitted the Growth Management Plan amendment to the
Department of Commerce for preliminary review on May 16, 2024, after public hearings before
the Collier County Planning Commission and the Board of County Commissioners; and
WHEREAS, the Department of Commerce and various State agencies have reviewed the
amendment to the Growth Management Plan and transmitted their comments, if any, in writing
to Collier County within the time provided by law; and
WHEREAS, Collier County has 180 days from receipt of the Comments Report from the
Department of Commerce to adopt, adopt with changes or not adopt the proposed amendments to
the Growth Management Plan; and
Page 6978 of 7162
[24-CMP-01211/1873012/1]46
6/17/24 Page 2 of 3
WHEREAS, Collier County has gathered and considered additional information, data and
analysis supporting adoption of these amendments, including the following: the Collier County
Staff Report, the document described as the Collier County Growth Management Plan
Amendment, and other documents, testimony and information presented and made a part of the
record at the public hearings of the Collier County Planning Commission held on
_______________, and the Collier County Board of County Commissioners held on
___________________; and
WHEREAS, all applicable substantive and procedural requirements of law have been
met.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that:
SECTION ONE: ADOPTION OF AMENDMENTS TO THE GROWTH MANAGEMENT
PLAN.
The Board of County Commissioners hereby adopts these amendments to the Potable
Water Sub-Element of the Public Facilities Element in accordance with Section 163.3184,
Florida Statutes. The amendment is attached hereto as Exhibit “A” and incorporated herein by
reference.
SECTION TWO: TRANSMITTAL TO FLORIDA DEPARTMENT OF COMMERCE.
The Board of Couty Commissioners directs transmittal of the adopted amendment to the
Florida Department of Commerce.
SECTION THREE: SEVERABILITY.
If any phrase or portion of this Ordinance is held invalid or unconstitutional by any court
of competent jurisdiction, such portion shall be deemed a separate, distinct and independent
provision and such holding shall not affect the validity of the remaining portion.
SECTION FOUR: EFFECTIVE DATE.
The effective date of this plan amendment, if the amendment is not timely challenged,
shall be 31 days after the state land planning agency notifies the local government that the plan
amendment package is complete. If timely challenged, this amendment shall become effective
on the date the state land planning agency or the Administration Commission enters a final order
determining this adopted amendment to be in compliance. No development orders, development
permits, or land uses dependent on this amendment may be issued or commence before it has
become effective.
Page 6979 of 7162
[24-CMP-01211/1873012/1]46
6/17/24 Page 3 of 3
PASSED AND DULY ADOPTED by the Board of County Commissioners of Collier
County, Florida this _____ day of ________________ 2024.
ATTEST: BOARD OF COUNTY COMMISSIONERS
CRYSTAL K. KINZEL, CLERK COLLIER COUNTY, FLORIDA
__________________________ BY: ________________________________
Deputy Clerk Chris Hall, Chairman
Approved as to form and legality:
___________________________
Heidi Ashton-Cicko
Managing Assistant County Attorney
Attachment: Exhibit A – Text Amendment
Page 6980 of 7162
Words underlined are added; words struck through are deletions.
******** ******** indicates a break in text
Exhibit A
COLLIER COUNTY GROWTH MANAGEMENT PLAN
PUBLIC FACILITIES ELEMENT
Potable Water Sub-Element
******** ******** ******** ******** ******** ******** *****
OBJECTIVE 1: [Page 2]
Locate and develop potable water supply sources to meet the future needs of the County owned
and operated systems, said supply sources meeƟng the minimum Level of Service Standards
established by this Plan. The development and uƟlizaƟon of new potable water supply sources
and the acquisiƟon of land necessary for such development shall be based upon the informaƟon,
guidelines and procedures idenƟfied within the County’s Ten-Year Water Supply FaciliƟes Work
Plan (as updated), and the Lower West Coast Water Supply Plan prepared by the South Florida
Water Management District.
******** ******** ******** ******** ******** ******** *****
Policy 1.7:
The County has developed the Ten-Year Water Supply FaciliƟes Work Plan, dated February 2019
January 2024 (Revised June 2024), in accordance with the water supply guidelines of the most
current version of the South Florida Water Management District’s Lower West Coast Water Supply
Plan. The County’s Ten-Year Water Supply FaciliƟes Work Plan is incorporated herein by reference.
[remainder of this page intenƟonally leŌ blank]
06/17/2024
Page 6981 of 7162
COLLIER COUNTY
10-YEAR WATER SUPPLY FACILITIES
WORK PLAN UPDATE
2023 to 2033
Prepared For:
COLLIER COUNTY
Public Utilities Department
Engineering & Project Management Division
3339 Tamiami Trail East, Suite 303
Naples, Florida 34112-5361
Prepared By:
2122 Johnson Street
Fort Myers, Florida 33901
(239) 334-0046
E B 642
January 2024
Page 6982 of 7162
I
EXECUTIVE SUMMARY
The purpose of the Collier County 10-Year Water Supply Facilities Work Plan Update (Work Plan)
is to identify and plan for the water supply sources and facilities needed to serve existing and new
development within the Collier County jurisdiction. Chapter 163, Part II, F.S., requires local
governments to prepare and adopt Work Plans into their comprehensive plans within 18 months after
the applicable water management district approves a regional water supply plan or its update for a
region. The 2022 Lower West Coast Water Supply Plan (LWCWSP) Update was approved by the
South Florida Water Management District (SFWMD) on December 8, 2022. The 2022 SFWMD
LWCWSP Update covers Lee and Collier Counties, as well as portions of Hendry, Glades, and
Charlotte Counties; Collier County is located within the planning area for the LWCWSP.
Collier County is comprised of incorporated and unincorporated areas in southwest Florida. Within
Collier County, both public and private utility providers maintain service areas in which water and
wastewater services are provided. The utilities identified within Collier County include Collier
County Water-Sewer District, Immokalee Water and Sewer District, Ave Maria Utility Company,
Everglades City, City of Naples, City of Marco Island, and the Port of the Islands Community
Improvement District. The City of Naples, the City of Marco Island, and Everglades City are local
City government and are subject to Chapter 163, F.S. Therefore, these local governments are
responsible for completing an independent Work Plan which incorporates the 2022 SFWMD
LWCWSP Update. Based on the obligation to complete Work Plans separate from Collier County,
these local governments have been excluded from the Collier County Work Plan evaluation.
The purpose of this Work Plan is to update the previous 2019 Collier County Water Supply Facilities
Work Plan and considers a planning period of 2023 through 2033 for concurrency with updates to the
2023 Collier County Annual Update and Inventory Report (AUIR) adopted December 12, 2023 and
Comprehensive Plan and the SFWMD 18-month local government adoption requirement. The
Page 6983 of 7162
II
population estimates and projections used in this Work Plan consider incorporated and unincorporated
Collier County as a whole and the incorporated and unincorporated areas served by County Sewer-
Water District, Immokalee Water-Sewer District, Ave Maria Utility Company, and Port of the Islands
Community Improvement District service areas. Based on the analyses herein, the utility providers
included in this Work Plan will have and/or have planned adequate water treatment plant capacity
and permitted allocations from the SFWMD through the planning period to serve anticipated
populations. This Work Plan identifies several capital improvement projects planned over the next
five years to support continuous water supply to the areas served at the per capita demands (i.e., level
of service standard) and projects to upgrade wastewater treatment facilities and increase reclaimed
water capacity and distribution.
An assessment of existing Goals, Objectives, and Policies (GOPs) in Collier County’ comprehensive
plan was performed in preparation of the Work Plan to identify those that address water supply
sources and facilities, as well as conservation and reuse programs.
This Work Plan will be adopted as a standalone document incorporated into the Collier County
Comprehensive Plan by reference.
Page 6984 of 7162
III
TABLE OF CONTENTS
EXECUTIVE SUMMARY ......................................................................................................... I
ACRONYM LIST ....................................................................................................................... V
1.0 INTRODUCTION ........................................................................................................... 1
1.1 Statutory History .................................................................................................. 2
1.2 Statutory Requirements ....................................................................................... 2
2.0 BACKGROUND AND LOCAL GOVERNMENT OVERVIEW .................................. 5
3.0 DATA AND ANALYSIS ............................................................................................... 9
3.1 Population Information ........................................................................................ 9
3.2 Population by Utility ............................................................................................ 9
3.3 Current and Future Areas Served ........................................................................ 11
3.4 Level of Service Standard .................................................................................... 11
3.5 Population and Potable Water Demand Projections ............................................ 12
3.6 Facility Capacity Analysis for Projected Water Demands ................................. 13
3.7 Populations Served by Domestic Self-Supply (DSS) .......................................... 19
3.8 Agricultural, Landscape/Recreational, and
Commercial/Industrial Water Demands .............................................................. 21
3.9 Power Generation Supply Demands .................................................................... 22
3.10 Water Supply Provided by Other Entities ........................................................... 22
3.11 Potential Future Water Suppliers ......................................................................... 22
3.12 Conservation and Reuse Efforts .......................................................................... 22
4.0 REGIONAL WATER SUPPLY ISSUES ....................................................................... 29
5.0 ALTERNAVIE WATER SUPPLY ................................................................................. 30
6.0 CAPITAL IMPROVEMENTS ....................................................................................... 32
7.0 GOALS, OBJECTIVES, POLICIES ............................................................................... 34
8.0 REFERENCES ............................................................................................................... 39
Page 6985 of 7162
IV
LIST OF TABLES
Number
1 County-Wide Population Projections for Permanent Residents in Collier County……....... 9
2 Current and Projected Permanent Resident Populations by Utility……….…………....….. 11
3 Potable Water Demand Projections…………………….……………………………….…. 12
4.1 CCWSD Raw Water Supply Wellfields and Storage……………………………....……… 14
4.2 CCWSD Facility Capacity Analysis for Projected Finished Water Demands…….…….... 14
5.1 IWSD Raw Water Supply Wellfields and Storage……………………………...………..... 15
5.2 IWSD Facility Capacity Analysis for Projected Finished Water Demands……………..... 15
6.1 AMUC Raw Water Supply Wellfield and Storage………………………...……………..... 17
6.2 AMUC Facility Capacity Analysis for Projected Finished Water Demands……………..... 17
7.1 Port of the Islands CID Raw Water Supply Wellfield and Storage……………………….. 18
7.2 Port of the Islands CID Facility Capacity Analysis for Projected Finished
Water Demands…………………………………………………………………………….. 19
8 Population Served by FDEP Potable Water Systems (PWS), 2022 …….……………….... 20
9 Agricultural, Landscape/Recreational, and Commercial/Industrial Water Demand
Projections…………………………………………………………………………………. 21
10 Water Treatment Facilities and Reclaimed Water Distribution…………………………… 28
11 2022 LWCWSP Capital Improvement Projects…………………………………………… 32
12 Capital Improvement Projects Update……………………………………………………… 33
LIST OF FIGURES
1 – Current and Future Water Service Areas
2A – Existing and Proposed CCWSD Production Wellfields
2B – Existing and Proposed IWSD and AMUC Production Wellfields
2C – Existing Port of the Islands CID Production Wellfield
3 – Current and Future Wastewater Service Areas
4 – Existing Reclaimed Water Lines and Wastewater Treatment Facilities
APPENDICES
Appendix A – Interlocal Agreement between CCWSD and the City of Naples
Appendix B – Agreement for Potable Water Service Calusa Island Village (Goodland Area)
Appendix C – Agreement for Potable and Emergency Water Interconnects between Bonita Springs
Utilities, Inc. and CCWSD
Appendix D - Interlocal Agreement between CCWSD and the Big Cypress Stewardship District
(Town of Big Cypress)
Appendix E – Interlocal Agreement between CCWSD and the Big Cypress Stewardship District
(Bellmar Village)
Appendix F - Interlocal Agreement between CCWSD and the Big Cypress Stewardship District
(Rivergrass Village)
Appendix G – Capital Improvement Schedules
Page 6986 of 7162
V
ACRONYM LIST
AMUC Ave Maria Utility Company
ASR Aquifer Storage and Recovery
AUIR Annual Update and Inventory Report
BEBR Bureau of Economic and Business Research
BSU Bonita Springs Utilities
CCWSD Collier County Water-Sewer District
CID Community Improvement District
DSS Domestic Self-Supply
FDEP Florida Department of Environmental Protection
F.A.C. Florida Administrative Code
F.S. Florida Statutes
GOP Goals, Objectives, and Policies
GPD Gallons Per Day
GPDPC Gallons Per Day Per Capita
ID Identification
IQ Irrigation Quality
IWSD Immokalee Water and Sewer District
LHA Lower Hawthorn Aquifer
LOS Level of Service
LTA Lower Tamiami Aquifer
LWC Lower West Coast
LWCWSP Lower West Coast Water Supply Plan
MDL Maximum Developable Limit
MHA Mid-Hawthorn Aquifer
MG Million Gallons
MGD Million Gallons Per Day
NESA Northeast Expansion Service Area
PWS Potable Water System
RO Reverse Osmosis
RWDS Reclaimed Water Distribution System
RWSP Regional Water Supply Plan
SAS Surficial Aquifer System
SFWMD South Florida Water Management District
TDS Total Dissolved Solids
UIC Underground Injection Control
UFA Upper Floridan Aquifer
UFAS Upper Floridan Aquifer System
WRF Water Reclamation Facility
WTA Water Table Aquifer
WTP Water Treatment Plant
WUP Water Use Permit
WWTF Wastewater Treatment Facility
WWTP Wastewater Treatment Plant
Page 6987 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
1
1.0 INTRODUCTION
The purpose of the Collier County 10-Year Water Supply Facilities Work Plan Update (Work
Plan) is to identify and plan for the water supply sources and facilities needed to serve existing
and new development within the local government’s jurisdiction. Chapter 163, Part II, F.S.,
requires local governments to prepare and adopt Work Plans into their comprehensive plans
within 18 months after the water management district approves a regional water supply plan
(RWSP) or its update. The Lower West Coast Water Supply Plan Update (LWCWSP) was
approved by the South Florida Water Management District (SFWMD) on December 8, 2022.
Therefore, the deadline for local governments within the Lower West Coast Planning Area to
amend their comprehensive plans with an adopted Work Plan is June 8, 2024.
This Work Plan for Collier County is divided into eight (8) sections:
Section 1 – Introduction
Section 2 – Background and Local Government Overview
Section 3 – Data and Analysis
Section 4 – Regional Water Supply Issues
Section 5 – Alternative Water Supply
Section 6 – Capital Improvements
Section 7 – Goals, Objectives, and Policies
Section 8 – References
Johnson Engineering, Inc. prepared this Work Plan based on information obtained from
government entities and other parties. While Johnson Engineering has used reasonable care to
avoid reliance upon faulty or incomplete information, Johnson Engineering is not responsible
for verifying the accuracy of all data and information provided by these governmental entities
and other parties.
Page 6988 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
2
1.1 Statutory History
The Florida Legislature enacted bills in the 2002, 2004, 2005 and 2011 sessions to
address the state’s water supply needs. These bills, especially Senate Bills 360 and 444
(2005 legislative session), significantly changed Chapter 163 and 373 Florida Statutes
(F.S.) by strengthening the statutory links between the regional water supply plans
prepared by water management districts and comprehensive plans prepared by local
governments. In addition, these bills established the basis for improving coordination
between local land use planning and water supply planning.
1.2 Statutory Requirements
Each local government must comply with the following requirements:
1. Coordinate appropriate aspects of its comprehensive plan with the applicable
RWSP [Section 163.3177(4)(a), F.S.].
2. Ensure that its future land use plan is based upon availability of adequate water
supplies and public facilities and services [Section 163.3177(6)(a), F.S.,
effective July 1, 2005]. Data and analysis demonstrating that adequate water
supplies and associated public facilities will be available to meet projected
growth demands must accompany all proposed Future Land Use Plan and Plan
amendments submitted for review.
3. In consultation with the water supplier, ensure adequate water supplies and
potable water facilities are available to serve new development no later than the
issuance by the local government of a certificate of occupancy or its functional
equivalent [Section 163.3180(2), F.S.].
4. For local governments subject to a RWSP, revise the General Sanitary Sewer,
Solid Waste, Drainage, Potable Water, and Natural Groundwater Aquifer
Recharge Element (the “Infrastructure element”) through a Comprehensive
Plan amendment to:
a. Identify and incorporate the alternative water supply project(s) selected by
the local government from projects identified in the applicable RWSP, or
Page 6989 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
3
alternative project(s) proposed by the local government under Section
373.709(8)(b), F.S. [Section 163.3177(6)(c), F.S.];
b. Identify the traditional and alternative water supply projects and the
conservation and reuse programs necessary to meet water needs identified
in the applicable RWSP [Section 163.3177(6)(c)3., F.S.]; and
c. Update Work Plan for at least a 10-year planning period for constructing
the public, private, and regional water supply facilities identified in the
element as necessary to serve existing and new development. [Section
163.3177(6)(c), F.S.]
5. Revise the Five-Year Schedule of Capital Improvements to include water supply,
reuse, and conservation projects and programs to be implemented during the 5-year
period [Section 163.3177(3)(a)4., F.S.].
6. To the extent necessary to maintain internal consistency after making changes
described in Paragraph 1 through 5 above, revise the Conservation element to
assess projected water needs and sources for at least a 10-year planning period,
considering the applicable RWSP and water use permit(s) [Section 163.3177(6)(d),
F.S.]. The comprehensive plan must address the water supply sources necessary to
meet the existing and projected water use demand for the established planning
period, considering the applicable RWSP [Section 163.3167(9), F.S.].
7. To the extent necessary to maintain internal consistency after making changes
described in Paragraphs 1 through 5 above, revise the Intergovernmental
Coordination Element to ensure coordination of the comprehensive plan with
applicable regional water supply plans and regional water supply authorities’
plans. [Section 163.3177(6)(h)1., F.S.].
8. Local governments are required to comprehensively evaluate and update the
Comprehensive Plan to reflect changes in local conditions every seven years. The
evaluation could address the local government’s need to update their Work Plan,
including the development of alternative water supplies, and determine whether the
identified alternative water supply projects, traditional water supply projects, and
Page 6990 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
4
conservation and reuse programs are meeting local water use demands [Section
163.3191(3), F.S.].
9. Local governments may be exempt from updating their Work Plan if they meet
certain criteria. A local government that does not own, operate, or maintain its own
water supply facilities and is served by a public water supply entity with a permitted
allocation of 300 million gallons per day or greater is not required to amend its
Comprehensive Plan when an RWSP is updated if the local government uses less
than 1 percent of the public water supply entity’s total permitted allocation.
However, the local government must cooperate with the public water supply entity
that provides service within its jurisdiction and must keep the Sanitary Sewer, Solid
Waste, Drainage, Potable Water, and Natural Groundwater Aquifer Recharge
element up to date, pursuant to Section 163.3191, F.S. A local government should
contact the Florida Department of Economic Opportunity (DEO) to verify its
qualifications for the exemption [Section 163.3177(6)(c)4., F.S.].
10. Local governments with a Sector Plan adopted in accordance with Section
163.3245, F.S., should incorporate information from the adopted Sector Plan,
Master Plan, and Detailed Specific Area Plan into the Work Plan. The focus should
be on water needs, water supply and resource development, conservation measures,
and intergovernmental coordination activities with the SFWMD and water supply
development projects needed to address projected development in the Sector Plan
area [Section 163.3245, F.S.].
(section intentionally left blank)
Page 6991 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
5
2.0 BACKGROUND AND LOCAL GOVERNMENT OVERVIEW
Collier County is comprised of incorporated and unincorporated areas. Within Collier
County, both public and private utility providers maintain service areas in which water
and wastewater services are provided. Based on review of the water and wastewater
services within Collier County, the following utility providers were identified:
Collier County Water-Sewer District;
Immokalee Water-Sewer District;
Ave Maria Utility Company;
Everglades City;
City of Naples Utilities;
City of Marco Island Utilities; and
Port of the Islands.
Below are brief descriptions of these seven (7) utility service areas within Collier
County.
2.1 Water and Wastewater Utility Providers within Collier County
2.1.1 Collier County Water-Sewer District (CCWSD)
The CCWSD service area is comprised of approximately 261 square miles for
potable water use while its current wastewater service area encompasses
approximately 263 square miles which extend into north, east, and south Collier
County with some areas extending into southeast City of Naples service area,
Stevens Landing, Goodland and Key Marco. CCWSD maintains the
interconnections with Bonita Springs Utilities and the City of Naples which are
maintained for emergency use. The area served is constantly growing within
the boundary of the CCWSD.
Generally, the service area is bounded on the north by Lee County, to the south-
southwest by the City of Marco Island city limits and the Gulf of Mexico, to the
west by the City of Naples city limits and the Gulf of Mexico, and on the east
by the Urban Planning Boundary. Notable expansions within the CCWSD
service area include the Northeast Expansion Area (NESA) in 2018 to
accommodate organic growth of the service area, the acquisition of the Golden
Page 6992 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
6
Gate City water and wastewater systems in 2018, and the execution of
agreements with the Big Cypress Stewardship District for potable water,
sanitary sewer, and injection quality (IQ) water services for all County-
approved projects for the Town of Big Cypress, Bellmar Village, and
Rivergrass Village in 2023. Applicable agreements are provided in Appendices
A through F.
2.1.2 Immokalee Water-Sewer District (IWSD)
IWSD is an Independent Special District of the State of Florida that was created
on July 5, 1978, by an Act of the Florida Legislature to provide water and sewer
services in Immokalee. The IWSD service area covers approximately 107
square miles in Collier County and is bound to the north and west by Lee
County, to the east by unincorporated Collier County lands, and to the south by
unincorporated Collier County lands and Immokalee Road.
2.1.3 Ave Maria Utility Company (AMUC)
The Ave Maria Stewardship Community District was created in 2004, Chapter
2004-461, Laws of Florida. AMUC provides water and wastewater to a service
area comprised of the approximate 5,000-acre Ave Maria community located
in eastern unincorporated Collier County. The AMUC service area is generally
bound to the north by Immokalee Road, to the east by unincorporated Collier
County lands, to the south by Oil Well Road, and to the west by Big Cypress
Stewardship District.
2.1.4 Everglades City
The Everglades City service area includes Everglades City, Chokoloskee
Island, and Copeland. Everglades City encompasses approximately 1.5 square
miles and is surrounded by Everglades National Park; Chokoloskee Island
encompasses 0.23 square miles and is located within the Chokoloskee Bay,
southeast of Tamiami Trail East. The Copeland portion of the Everglades City
service area is comprised of a few parcels associated with the Fakahatchee
Strand Preserve Park Offices and the Everglades City public water supply
system wellfield located northeast of Tamiami Trail East and west of the State
Page 6993 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
7
Route 29. The residential area of Copeland is served by Collier County Utility
Company (formerly known as the Lee Cypress Water and Sewer Co-op, Inc.),
operated by U.S. Water Services Corporation which is accounted for in the
population served by domestic self-supply. In addition to these portions of the
service area, the most-recent SFWMD water use permit modification (permit
No. 11-00160-W) indicates the Everglades City service area includes Plantation
Island, located southeast of Everglades City and Carnestown, located south of
the intersection of Tamiami Trail East and State Route 29.
2.1.5 City of Naples Utilities
The City of Naples Utility Department service area is comprised of
approximately 33 square miles for potable water and 18.6 square miles for
wastewater services generally bound to the west by the Gulf of Mexico, to the
north by Pine Ridge Road and to the south by Keewaydin Island. The service
area extends east into unincorporated areas of Collier County as far as
Livingston Road.
2.1.6 City of Marco Island Utilities
The City of Marco Island service area is predominantly limited to areas within
the corporate boundaries of the City of Marco Island and areas in adjacent
unincorporated areas of Collier County, previously served by the Florida Water
Services Corporation. The service area provides potable water to CCWSD
under an interlocal agreement for distribution to the Stevens Landing, Goodland
and Key Marco areas. The City of Marco Island service area is bound to the
north by the Big Marco Pass, to the east by Whiskey Creek Drive, to the south
by Caxambas Pass, and to the west by the Gulf of Mexico.
2.1.7 Port of the Islands Community Improvement District (CID)
The Port of the Islands CID service area is located in southern Collier County
and is comprised of an approximate 0.5 square mile residential community with
various amenities and a hotel. The community is surrounded by the Picayune
Strand State Park and the Ten Thousand Island National Wildlife Reserve. The
service area is situated directly north and south of Tamiami Trail East.
Page 6994 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
8
The City of Naples, the City of Marco Island, and Everglades City are local City
governments and are subject to Chapter 163, F.S. Therefore, these local governments
are responsible for completing an independent Work Plan which incorporates the 2022
SFWMD LWCWSP. Based on the obligation to complete Work Plans separate from
Collier County, these local governments have been excluded from the Collier County
Work Plan evaluation.
In addition to the abovementioned water and wastewater utility providers, areas of
incorporated and unincorporated Collier County have several private water supply
systems regulated by the Florida Department of Environmental Protection (FDEP)
which provide less than 100,000 gallons annually and serve less than 10,000 residents
within Collier County. Furthermore, domestic water supply systems exist throughout
Collier County, but only account for a minimal of the County-wide potable water
demand. A majority of the current population is within utility provider service areas.
This Work Plan includes an evaluation of CCWSD, AMUC, IWSD, and Port of the
Islands CID potable water capacity to meet growth within these service areas of Collier
County over the 10-year planning horizon. Information used in compiling the Work
Plan include the 2022 SFWMD LWCWSP, the 2019 Collier County 10-Year Water
Supply Facilities Work Plan, the 2023 Collier County AUIR, and applicable SFWMD
and Florida Department of Environmental Protection (FDEP) permits and databases.
Population estimates and projections used in this Work Plan are based on values
provided in the 2023 Collier County AUIR adopted by the Board of County
Commissioners on December 12, 2023, which were developed using the Bureau of
Economic and Business Research (BEBR), Projections of Florida Population by
County, 2025-2050, with Estimates for 2022 (Volume 56, Bulletin 195, April 2023,
medium range), supplemented using data from Metro Forecasting Models, LLC and
the Collier County Comprehensive Planning Section. The water supply demand
estimates and projections were based on existing utility-specific SFWMD public water
supply water use permits, FDEP water treatment facility capacities, and potable water
level of service standards provided in 2022 SFWMD LWCWSP. The data herein has
been provided to and verified by IWSD, AMUC, and Port of the Islands CID in
preparation of this Work Plan.
Page 6995 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
9
3.0 DATA AND ANALYSIS
3.1 Population Information
Population projections used in this Work Plan are based on the 2023 Collier County
AUIR estimates and projections which were determined using the BEBR, Projections
of Florida Population by County, 2025-2050, with Estimates for 2022 (Volume 56,
Bulletin 195, April 2023). Populations provided for the BEBR medium range are
anticipated to have the highest probability of occurrence; therefore, the medium range
projection for the planning period is considered most representative and was used in
this Work Plan. The County-wide population projections are provided below in
Table 1 – County-Wide Population Projections for Permanent Residents in Collier
County.
Table 1 – County-Wide Population Projections for Permanent Residents in Collier County
DATA SOURCE 2023 2028 2033
2023 Collier County AUIR¹ 400,257 428,595 452,606
¹ Projected County-wide permanent population on October 1, 2023, is 400,257. This projection is extrapolated from the April 1, 2022, estimate
390,912 provided in the BEBR, Projections of Florida Population by County, 2025-2050 (Volume 56, Bulletin 195, April 2023) supplemented
using data from Metro Forecasting Models, LLC, and the Collier County Comprehensive Planning Section.
3.2 Population by Utility
The utility providers in Collier County each have unique population considerations;
therefore, the following sections identify these considerations.
3.2.1 Collier County Water and Sewer District (CCWSD)
The CCWSD service area extends through the majority of north and south-
southeast unincorporated Collier County with areas in southeast incorporated
Naples. CCWSD has planned expansions in the Northeast Service Area
(NESA) which will include villages and areas of Big Cypress Stewardship
District (Town of Big Cypress, Bellmar, and Rivergrass), the adjacent SkySail
subdivision, Immokalee Road Rural Village, and Brightshore Village. In
addition, CCWSD is actively working on a project to convert domestic self-
supply users in Golden Gate City to potable water; therefore, only a portion of
the population is served, and the additional customers do not reflect growth of
the service area, but an increase in population served. Presently, additional
Page 6996 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
10
water customers are being connected on an individual basis where existing
infrastructure exists or when new water mains are installed. Based on the
estimated population projections, an approximate 11-percent increase in
population served is anticipated from 2023 to 2033. The population projections
include current service areas and the planned expansions over the planning
period.
3.2.2 Immokalee Water and Sewer District (IWSD)
The IWSD service area is comprised of land primarily dedicated to agricultural
production. The service area does not currently anticipate significant population
increases over the 10-year planning horizon, but the potential for growth exists.
Potential factors which could result in population increases include residential,
commercial, and industrial developments within the service area. Based on the
estimated population projections, an approximate 4-percent increase in
population served is anticipated from 2023 to 2033. IWSD is currently in
planning phases for potential improvements of the water treatment facilities,
but is anticipated to begin in 2031; therefore, improvements would be
considered in future Work Plans.
3.2.3 Ave Maria Utility Company (AMUC)
The AMUC service area is comprised of an approximate 5,000-acre
community. The population growth is limited to expansions of residential and
commercial developments within the community limits until buildout is
achieved and/or new land is acquired for expansion of the community. Based
on the estimated population projections, an approximate 147-percent increase
in population served is anticipated from 2023 to 2033. AMUC is currently
working on water treatment and wastewater treatment facilities improvement
projects to meet projected future demands that are addressed in this Work Plan.
3.2.4 Port of the Islands Community Improvement District (CID)
The Port of the Islands CID service area is comprised of an approximate 0.5
square mile residential community with various amenities and a hotel. The
Page 6997 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
11
community is surrounded by the Picayune Strand State Park and the Ten
Thousand Island National Wildlife Reserve. Based on the physical setting of
these service areas, growth and the potential for growth is limited to the
geographic extent of this service area. Based on the population projections
provided by Hole Montes, Inc., which includes planned development upon
build-out of the vacant properties, and the 58-acre redevelopment site currently
owned by the local and County governments, an approximate 37-percent
increase in population is anticipated from 2023 to 2033.
Table 2 – Current and Projected Permanent Resident Populations by Utility
Utility Provider 2023 2028 2033
Population in CCWSD¹ 236,636 250,782 262,483
Population in IWSD2 25,086 25,641 26,101
Population in AMUC3 9,952 16,577 24,552
Population in Port of the Islands CID4 1,130 1,300 1,550
Total 272,804 294,300 314,686
¹ Source: 2023 Collier County AUIR, Appendix I, County Water District Population Estimates and Projections as of October 1. Projected
populations derived using BEBR, Projections of Florida Population by County, 2025-2050 (Volume 56, Bulletin 195, April 2023)
supplemented using data from Metro Forecasting Models, LLC, the Collier County Comprehensive Planning Section, and 2010 Census &
2020 Census.
² Source: 2023 Collier County AUIR, Appendix I, Permanent Population Estimates and Projections as of October 1 for Immokalee Planning
Community.
3 Population projections provided by AMUC on January 11, 2024.
4 Population estimates are based on Port of the Islands CID Population Projections [2020 thru 2040], prepared by Hole Montes, Inc., which
includes planned development upon build-out of the vacant properties, and the 58-acre redevelopment site currently owned by the local and
County governments.
3.3 Current and Future Areas Served
A map depicting current and proposed service area boundaries is shown in Figure 1. At
the time of this evaluation, no changes were identified throughout the planning horizon
that would result in short-term increases in population that would require increases in
potable water demand not already permitted and/or planned. Organic growth is
anticipated to continue within utility service area boundaries throughout the planning
horizon.
3.4 Level of Service Standard
The potable water level of service standards adopted by the utilities are concurrent with
the 2022 LWCWSP. Each standard is based on the utility’s current potable water
demands and future potable water demands which allows the utility to evaluate current
Page 6998 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
12
and future infrastructure capacities to meet potable water demand through the 10-year
planning horizon considered in this Work Plan. The potable water level of service
(LOS) standard for each utility is provided below. All potable water LOS are consistent
with the 2022 LWCSP. CCWSD maintains the accuracy of their LOS by evaluating
population and flow data over a 10-year period.
•CCWSD: 130 gallons per day per capita (gpdpc)
•IWSD: 89 gpdpc
•AMUC: 89 gpdpc
•Port of the Islands CID: 106 gpdpc
The wastewater LOS per the utilities is provided below. CCWSD maintains the
accuracy of their LOS by evaluating population and flow data over a 10-year period.
•CCWSD: 90 gpdpc
•IWSD: 73 gpdpc
•AMUC: 80 gpdpc
Port of the Islands: 100 gpdpc
3.5 Population and Potable Water Demand Projections
Potable water demand projections for the utility providers included in this Work Plan
were determined by multiplying the population by the potable water level of service
standard and utility-specific peak factors, provided in SFWMD public water supply
water use permits. The projections are provided below in Table 3 – Potable Water
Demand Projections.
Table 3 – Potable Water Demand Projections
Utility Provider gpdpc
2023 2028 2033
Population Demand
(MGD) Population Demand
(MGD) Population Demand
(MGD)
Population in CCSWD 130 236,636 30.76 250,782 32.60 262,483 34.12
Population in IWSD 89 25,086 2.23 25,641 2.28 26,101 2.32
Population in AMUC 89 9,952 0.89 16,577 1.48 24,552 2.19
Population in Port of
the Islands CID 106 1,130 0.12 1,300 0.14 1,550 0.16
Total 272,804 34.00 294,300 36.50 314,686 38.79
gpdpc = Gallons per day per capita
MGD = Million Gallons per Day
Page 6999 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
13
3.6 Raw Water Supply Facilities and Facility Capacity Analysis for Projected
Water Demands
The facility raw water supply and capacity analysis for projected water demands were
determined based on data collected from the 2022 LWCWSP, the 2023 Collier County
AUIR, SFWMD public water supply permits and FDEP public supply operating
capacities.
3.6.1 Collier County Water-Sewer District (CCWSD)
CCWSD maintains two (2) SFWMD public supply water use permits (11-
00249-W and 11-00419-W) which expire in December 2037 and February
2027, respectively. CCWSD is currently working to update these permits.
CCWSD operates four (4) wellfields that withdraw raw water from the Lower
Tamiami aquifer (LTA), the Mid-Hawthorn aquifer (MHA), and the Lower
Hawthorn aquifer (LHA, i.e., uppermost portion of the Upper Floridan aquifer
(UFA)) for maximum annual allocations of 19.527 million gallons (MG) (11-
00249-W) and 775.95 MG (11-00419-W). The SFWMD allocations included
in the analysis consider the current permitted allocations and proposed increases
to account for planned service area expansions and increase in demand.
Included in this analysis is the Northeast County Regional Water Treatment
Plant which proposes an increase of 10 million gallons per day (MGD) of
additional treatment capacity for the CCWSD service area by fiscal year 2033.
Based on the results of this analysis, sufficient water supply through the 10-
year planning period exists and/or is planned to meet population projections.
CCWSD plans to renew existing water use permits to maintain permitted raw
water supply to meet potable water demands. Summary tables are provided on
the next page for the water treatment plant (WTP) wellfields and raw water
supply and analysis for the utility service area are provided in Table 4.1 –
CCWSD Raw Water Supply Wellfields and Storage and Table 4.2 - CCWSD
Facility Capacity Analysis for Projected Finished Water Demands. The existing
and proposed CCWSD wellfields are depicted in Figure 2A - Existing and
Proposed CCWSD Production Wellfields.
Page 7000 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
14
Table 4.1 - CCWSD Raw Water Supply Wellfields and Storage
Detail
Aquifer Source
Lower Tamiami Mid-Hawthorn Lower
Hawthorn
SFWMD Allocation (MGD) 28.63 1.33 19.52
Water Quality Fresh Brackish Brackish
Total Permitted Wells 64 46 42
Potable Water Storage Tank Capacity (MG) 38.75
Wellfields permitted under SFWMD WUP No(s). 11-00249-W and 11-00419-W (North and South Reverse Osmosis, NESA, and Golden
Gate).
Table 4.2 - CCWSD Facility Capacity Analysis for Projected Finished Water Demands
Permanent Resident Population Projections 2023 2028 2033
236,636 250,782 262,483
Finished Water Demand per Capita (GPD) 130 130 130
Finished Water Avg. Daily Demand (MGD)¹ 30.76 32.60 34.12
Available Facility Capacity (MGD)² 50.00 50.00 60.00
Facility Capacity Surplus (MGD) 19.24 17.40 25.88
Raw Water SFWMD Allocation (MGD)* 55.63 55.63 65.63³
Raw Water Avg. Daily Demand (MGD)** 35.38 37.49 39.24
Raw Water Permitted Surplus (MGD) 20.25 18.14 24.39
GPD = Gallons per Day
MGD = Million Gallons per Day
¹ Water supply demand determined by multiplying population by level of service standard.
² Value based on FDEP PWS ID No. 5114069 design capacity and subtracting 2 MGD which equates to potentially lost capacity during
maintenance of a system
during peak demand (52 MGD - 2 MGD = 50.00 MGD).
³ Increased Raw Water SFWMD Allocations were determined based on the ongoing expansion of treatment capacity related to the Northeast
Expansion Area.
* Permitted allocations for raw water under SFWMD WUP No(s). 11-00249-W and 11-00419-W.
** Raw water demands were determined using utility-specific raw-to-finished water ratio of 1.15, provided in the 2022 LWCWSP.
Bulk sales available to Bonita Springs Utility (BSU), completed via emergency connect (minimal, approximately 74 GPD).
3.6.2 Immokalee Water-Sewer District (IWSD)
IWSD maintains SFWMD public supply water use permit No. 11-00013-W
which expires in May 2031. IWSD operates three wellfields which withdraw
raw water from the LTA and is permitted for one (1) wellfield proposed for the
UFA for a maximum annual allocation of 1,515 MG. Previously, IWSD
proposed the use of the UFA wellfield, but is exploring alternative water supply
for the proposed wellfield. The SFWMD allocations included in the analysis
consider the current permitted allocations.
Page 7001 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
15
Based on the results of this analysis, sufficient water supply exists through the
10-year planning period to meet population projections; it is assumed IWSD
will renew the existing water use permit and/or modify to meet projected
demands prior to the expiration of the existing public water supply permit.
Summary tables for the WTP wellfields and raw water supply and analysis for
the utility service area are provided in Table 5.1 – IWSD Raw Water Supply
Wellfields and Storage and Table 5.2 - IWSD Facility Capacity Analysis for
Projected Finished Water Demands. The existing and proposed IWSD wellfield
areas are depicted in Figure 2B - Existing and Proposed ISWD and AMUC
Production Wellfields.
Table 5.1 - IWSD Raw Water Supply Wellfields and Storage
Detail Aquifer Source
Lower Tamiami Upper Floridan
SFWMD Allocation (MGD) 3.45 Proposed
Water Quality Fresh Brackish
Total Permitted Wells 19 4
Potable Water Storage Tank Capacity (MG) 3.75
Wellfields permitted under SFWMD WUP No. 11-00013-W (Carson Road, J.V. Warden, Airport, and Upper Floridan).
Table 5.2 - IWSD Facility Capacity Analysis for Projected Finished Water Demands
Permanent Resident Population Projections 2023 2028 2033
25,086 25,641 26,101
Finished Water Demand per Capita (GPD) 89.00 89.00 89.00
Finished Water Avg. Daily Demand (MGD) 2.23 2.28 2.32
Available Facility Capacity (MGD)¹ 5.64 5.64 5.64
Facility Capacity Surplus (MGD) 3.41 3.36 3.32
Raw Water SFWMD Allocation (MGD)² 4.15 4.15 4.15
Raw Water Avg. Daily Demand (MGD)³ 2.25 2.30 2.35
Raw Water Permitted Surplus (MGD) 1.90 1.85 1.80
GPD = Gallons per Day
MGD = Million Gallons per Day
¹ Value based on FDEP PWS ID 5110142 design capacity.
² Permitted allocations for raw water under SFWMD WUP No. 11-00013-W.
³ Raw water demands were determined using utility-specific raw-to-finished water ratio of 1.01, provided in the 2022 LWCWSP.
Page 7002 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
16
3.6.3 Ave Maria Utility Company (AMUC)AMUC maintains SFWMD public
supply water use permit No. 11-02298-W which expires in March 2026. AMUC
operates one wellfield which withdraws raw water from the LTA with two (2)
proposed Sandstone aquifer (SSA) production wells for a maximum annual
allocation of 404.12 million gallons (MG). The SFWMD allocations included
in the analysis consider the current permitted allocations.
Based on the results of this analysis, sufficient water supply currently exists,
but as indicated by the raw water permitted deficit, modifications to the existing
water use permit to increase allocations will be required to meet estimated
demands through the 10-year planning period.
AMUC proposes a WTP expansion to include an additional 2.76 MGD capacity
by 2031; therefore, proactive measures are being taken to address the projected
deficits. In addition, the peak factor included in the finished water demand
provides a conservative estimate for demands which are likely to be below what
is projected in the analysis; therefore, removing the peak factor for the
projection demonstrates that AMUC is within required treatment capacity to
meet the projected population growth for 2028 with a permitted raw water
surplus of 0.01 MGD. Summary tables for the WTP wellfields and raw water
supply and analysis for the utility service area are provided on the next page in
Table 6.1 – AMUC Raw Water Supply Wellfield and Storage and Table 6.2 -
AMUC Facility Capacity Analysis for Projected Finished Water Demands. The
existing and proposed AMUC wellfield is depicted in Figure 2B - Existing and
Proposed IWSD and AMUC Production Wellfields.
(section intentionally left blank)
Page 7003 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
17
Table 6.1 - AMUC Raw Water Supply Wellfield and Storage
Detail
Aquifer Source
Lower
Tamiami Sandstone
SFWMD Allocation (MGD) 1.11 Proposed
Water Quality Fresh Fresh
Total Permitted Wells 3 2
Potable Water Storage Tank Capacity (MG) 1.5
Note: Wellfield permitted under SFWMD WUP No. 11-02298-W.
Table 6.2 - AMUC Facility Capacity Analysis for Projected Finished Water Demands
Permanent Resident Population Projections 2023 2028 2033
9,952 16,577 24,552
Finished Water Demand per Capita (GPD) 89.00 89.00 89.00
Finished Water Avg. Daily Demand (MGD) 0.89 1.48 2.19
Available Facility Capacity (MGD)¹ 1.67 2.5 4.63
Facility Capacity Surplus (MGD) 0.78 1.02 2.44
Raw Water SFWMD Allocation (MGD)² 1.11 1.11 1.11
Raw Water Avg. Daily Demand (MGD)³ 1.12 1.87 2.78
Raw Water Permitted Surplus (MGD) -0.01 -0.76 -1.67
GPD = Gallons per Day
MGD = Million Gallons per Day
¹ Value based on FDEP PWS ID 5114154 available facility capacity. ² Permitted allocations for raw water under SFWMD WUP No. 11-02298-W. ³ Raw water demands were determined using utility-specific raw-to-finished water ratio of 1.27, provided in the 2022 LWCWSP.
(section intentionally left blank)
Page 7004 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
18
3.6.4 Port of the Islands Capital Improvement District (CID)
Port of the Islands CID maintains a SFWMD water use permit with combined
allocations to serve both public water supply and irrigation demands under
water use permit No. 11-00372-W which expires in September 2029, for a
maximum annual allocation of 200 MG. This permit includes a series of surface
water pumps that withdraw from FKA Canal for standby fire protection
demands, in addition to a public water supply wellfield consisting of three (3)
Surficial Aquifer System (SAS) wells. The SFWMD allocations included in the
analysis consider the current permitted allocations associated with the public
water supply only (98.66 MG) and exclude allocations dedicated to irrigation
demands.
Based on the results of this analysis, sufficient water supply currently exists,
but renewal of the water use permit will be necessary to meet estimated
demands through the 10-year planning period. Summary tables for the WTP
wellfields and raw water supply and analysis for the utility service area are
provided in Table 7.1 – Port of the Islands CID Raw Water Supply Wellfield
and Storage and Table 7.2 – Port of the Islands CID Facility Capacity Analysis
for Projected Finished Water Demands. The existing and proposed Port of the
Islands CID wellfield is depicted in Figure 2C - Existing Port of the Islands CID
Production Wellfield.
Table 7.1 - Port of the Islands CID Raw Water Supply Wellfield and Storage
Detail Aquifer Source
Lower Tamiami
SFWMD Allocation (MGD) 0.27
Water Quality Fresh
Total Permitted Wells 3
Potable Water Storage Tank Capacity (MG) 0.14
Note: Wellfield permitted under SFWMD WUP No. 11-00372-W.
(section intentionally left blank)
Page 7005 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
19
Table 7.2 - Port of the Islands CID Facility Capacity Analysis for Projected Finished
Water Demands
Permanent Resident Population Projections 2023 2028 2033
1,130 1,300 1,550
Finished Water Demand per Capita (GPD) 106 106 106
Finished Water Avg. Daily Demand (MGD) 0.12 0.14 0.16
Available Facility Capacity (MGD)¹ 0.44 0.44 0.44
Facility Capacity Surplus (MGD) 0.32 0.30 0.27
Raw Water SFWMD Allocation (MGD)² 0.27 0.27 0.27
Raw Water Avg. Daily Demand (MGD)³ 0.16 0.18 0.22
Raw Water Permitted Surplus (MGD) 0.11 0.09 0.05
GPD = Gallons per Day
MGD = Million Gallons per Day
¹ Value based on FDEP PWS ID 5110230 design capacity.
² Permitted allocations for raw water under SFWMD WUP No. 11-00372-W.
³ Raw water demands were determined using utility-specific raw-to-finished water ratio of 1.33, provided in the 2022 LWCWSP.
3.7 Populations Served by Domestic Self-Supply (DSS)
The 2022 SFWMD LWCWSP Update defines DSS as potable water used by
households served by small utilities (less than 0.10 MGD) and by private wells
and estimates DSS as all permanent residents outside the utility service areas
included in the total population for Collier County. Furthermore, SFWMD
assumes that the DSS demand is sourced from fresh surficial aquifer systems.
Based on the data provided, 72,817 permanent residents are served by DSS in
2020 and 88,512 permanent residents are estimated for 2035 demonstrating an
increase in anticipated DSS in Collier County and demands of 12.09 to 14.69
MGD from 2020 to 2035. For the 10-year planning period considered in this
Work Plan, the DSS estimate provided in the 2022 SFWMD LWCWSP Update
has been included in the overall analysis.
Demands associated with DSS will be influenced by expansions in service areas
to portions of Collier County not currently served by utility providers; inclusive
of the providers included in this plan and those serving other local governments
within Collier County and the LWC planning area.
Page 7006 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
20
3.7.1 Populations Served by FDEP Potable Water Systems (PWS)
A review of the FDEP database for current potable water facilities (last updated
2022) was completed to determine populations served outside of CCWSD,
IWSD, AMUC, and Port of the Islands CID service areas. Based on the PWS
database, a total population of 9,991 is served by FDEP PWS with design
capacities of less than 0.10 MGD. The FDEP regulated PWS are provided
below in Table 8 – Populations Served by FDEP Potable Water Systems (PWS),
2022.
Table 8 – Population Served by FDEP Potable Water Systems (PWS), 2022
PWS ID Provider Name City
Population
Served
5110058 COLLIER COUNTY UTILITY COMPANY (LEE CYPRESS CO-OP) COPELAND 250
5110061 CORKSCREW SWAMP SANCTUARY NAPLES 50
5110087 BIG CYPRESS PARK HEADQUARTERS OCHOPEE 100
5110121 HAKAN SERVICES, INC. NAPLES 700
5110288 TRAIL LAKES CAMPGROUND OCHOPEE 240
5114074 CENTER POINT COMMUNITY CHURCH NAPLES 600
5114077 TEMPLE BETHEL NAPLES 40
5114083 FCA US LLC NAPLES 40
5114098 7 ELEVEN - GOLDEN GATE NAPLES 500
5114108 OASIS RANGER STATION OCHOPEE 25
5114111 RANDALL CENTER NAPLES 50
5114113 SWFREC IMMOKALEE 99
5114119 VALERO GAS STATION IMMOKALEE 25
5114126 UNITY FAITH MISSIONARY BAPTIST NAPLES 25
5114129 I-75 SOUTH REST STOP NAPLES 999
5114130 GOLDEN GATE LIBRARY NAPLES 175
5114131 BONITA BAY EAST GOLF CLUB - MAINTENANCE NAPLES 210
5114132 BONITA BAY EAST GOLF CLUB - CLUBHOUSE NAPLES 210
5114135 MONUMENT LAKE CAMPGROUND OCHOPEE 40
5114136 BONITA BAY EAST GOLF CLUB REST SHELTER 1 NAPLES 200
5114137 BONITA BAY GOLF CLUB REST SHELTER 2 NAPLES 200
5114139 HIDEOUT GOLF CLUB SYSTEM NAPLES 100
5114139 HIDEOUT GOLF CLUB SYSTEM NAPLES 100
5114139 HIDEOUT GOLF CLUB SYSTEM NAPLES 100
5114140 TREES CAMP WTP NAPLES 50
5114141 GOLDEN GATE ASSEMBLY OF GOD NAPLES 200
5114163 CENTER POINT COMMUNITY CHURCH YOUTH SANC NAPLES 166
Page 7007 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
21
Table 8 – Population Served by FDEP Potable Water Systems (PWS), 2022 (continued)
PWS ID Provider Name City
Population
Served
5114164 PEACE LUTHERAN CHURCH OF NAPLES NAPLES 100
5114165 PEPPER RANCH IMMOKALEE 25
5114166 1-75 REST AREA MM 63 NORTHSIDE NAPLES 25
5114169 EVERGLADES SQUARE NAPLES 61
5114170 BIG BEAR PLAZA FOOD MART NAPLES 25
5114147 SABAL PALM ELEMENTARY NAPLES 1530
5114149 LA HISPANA #2 NAPLES 38
5114151 LA FITNESS NAPLES 500
5114152 ESTATES ELEMENTARY SCHOOL NAPLES 673
5114153 MIDWAY CAMPGROUND OCHOPEE 307
5114158 PALMETTO J ELEMENTARY SCHOOL NAPLES 583
5114159 WILSON BLVD. RETAIL CENTER NAPLES 50
5114160 NAPLES THERAPEUTIC RIDING CENTER NAPLES 30
5114161 NAPLES CHURCH NAPLES 500
5114162 GOLDEN GATE WALGREENS (STORE #10742) NAPLES 50
3.8 Agricultural, Landscape/Recreational, and Commercial/Industrial Water
Demands
A summary of the estimated demands for agricultural, landscape/recreational, and
commercial/industrial demands based on the data provided in the 2022 SFWMD
LWCWSP Update, is provided in Table 9 - Agricultural, Landscape/Recreational, and
Commercial/Industrial Water Demand Projections.
Table 9 - Agricultural, Landscape/Recreational, and Commercial/Industrial
Water Demand Projections
Use Category Demand Projections (MGD)
2020 2025 2030 2035
Agricultural 133.13 131.33 130.57 128.66
Commercial/Industrial/Institutional 7.52 8.19 8.76 9.29
Landscape 44.34 52 58.29 64.06
Golf 40.46 40.46 40.46 40.46
Total 225.45 231.98 238.08 242.47
Demand associated with agricultural, landscape/recreational, and
commercial/industrial is anticipated to remain consistent with projections provided in
Page 7008 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
22
the 2022 LWCWSP. Potential decreases in use for these categories could result in the
expansion of services areas into former agricultural areas, which may include
development of residential/commercial areas. Generally, raw water demands for
landscape/recreation and commercial/industrial uses are less per acre than agricultural
demands which could result in a net decrease in raw water demands.
3.9 Power Generation Supply Demands
No existing and/or proposed use of power generation was identified for the utility
providers included in this Work Plan.
3.10 Water Supply Provided by Other Entities
The City of Naples, the City of Marco Island, and Everglades City provide water utility
services within Collier County. These utilities are associated with local City
government and are subject to Chapter 163, F.A.C. Therefore, these local governments
are responsible for completing an independent Work Plan which incorporates the 2022
SFWMD LWCWSP Update.
3.11 Potential Future Water Suppliers
No future water suppliers within Collier County are anticipated during the planning
period. The Big Cypress Stewardship District has entered into agreements for potable
water, sanitary sewer, and IQ water services with the CCWSD for all County-approved
projects. While such agreements are anticipated should future developments be
proposed, the Big Cypress Stewardship District retains the right and authority to
establish its own infrastructure.
3.12 Conservation and Reuse Efforts
3.12.1 Conservation
The utility providers covered in this Work Plan actively promote the
conservation of water resources through ordinances and public outreach. The
Page 7009 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
23
following ordinances and guidelines provide conservation efforts within the
CCWSD, IWSD, AMUC, and Port of the Islands CID service areas:
County
Adoption of the SFWMD’s Mandatory Year-Round Landscape
Irrigation Conservation Measures Rule, pursuant to Chapter 40E-24,
F.A.C.
Adoption of the use of low flow plumbing fixtures pursuant to section
604.4 of the Florida Building Code, Plumbing, 7th Edition (2020).
Land Development Code (4.06.00) for Landscaping, Buffering, and
Vegetation Retention promoting the use of native and drought-tolerant
vegetation through Florida-friendly landscaping.
Collier County Ordinance 91-103 – Groundwater Protection Zone,
updated by Ordinance 12-38.
Collier County Code of Ordinance, Chapter 54 – Environment, Article
XII – Water Conservation for Landscape Irrigation.
Collier County Code of Ordinance, Chapter 90 – Water Resource
Management, Article II, Division 4, Water Shortage Plan.
Collier County Code of Ordinance, Chapter 134, Article II, Collier
County Water-Sewer District IQ Water Ordinance.
Collier County Code of Ordinance, Chapter 134, Article III, Utilities
Standards and Procedures.
Creation and maintenance of ConserveWaterLoveCollier.com, which is
an internet resource maintained by Collier County to provide educational
information and tools for the public to conserve water.
Collier County’s stewardship of water resource conservation via ordinances has
been successful and has resulted in a total of 1,213 code enforcement actions
from 2018 to 2023, related to water conservation and irrigation code
investigations.
Page 7010 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
24
Outreach
In addition, the utility providers promote public outreach for the education of
end-users to employ conservation efforts at the user-level. Water conservation
outreach includes, but is not limited to the following initiatives:
Distribution of educational pamphlets, school visits, and/or information
booths for employees and customers. Information signs, press releases,
and messages about water conservation on the bills.
Landscape irrigation guidelines for allowed days and times as established
in the local government’s year-round landscape irrigation ordinance.
Encourage the use of irrigation timers to ensure settings are correct and
rain sensors work properly.
Finding and fixing water leaks conserves water, saves money and
protects your home from damage.
Avoid washing or cleaning streets, sidewalks, driveways, or other
impervious areas with water.
When utilizing water indoors, reduce shower durations, minimize loads
of laundry, and only run dishwashers when full.
Instructions for optimal irrigation hours and system design to prevent the
use of excess irrigation water (i.e., use of drought-tolerant trees and
plants, prevent watering of impervious areas, etc.);
Proper maintenance and operation of irrigation system components to
prevent unnecessary use and/or losses; and
Interior conservation recommendations for domestic water use (i.e.,
shower durations, laundry, etc.), replacement of leaking pipes/fittings
and/or appliances.
Public Water Supply Water Use Permits
o Low Flow Fixtures: Ultra-low volume plumbing fixtures will be
installed in all new homes and businesses.
o Rate Structures: Customer billing will be based on the use of water
conservation-based rate structures. The rate structure will incorporate at
Page 7011 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
25
least one or more of the following: increasing block rates, seasonal rates,
quantity-based surcharges, and/or time of day pricing.
o Leak Detection: The utility will implement leak detection programs in
the event water losses exceed 10 percent. Reports of water leaks will be
directed to personnel during working hours. Site tours and routine
maintenance personnel trips along water supply and distribution lines
will also be conducted. On a monthly basis, metered usage will be
compared to the master potable supply meter reading.
o Public Education: The utility will implement public education
programs, including, but not limited to, distribution of literature to
households describing water conservation practices.
o Irrigation: The utility will provide irrigation water via a separate
distribution system strictly dedicated to that purpose, or individual
developments will be responsible for providing irrigation water separate
from the potable supply system. The utility will convert treatment plant
effluent to reclaimed water, which will be used for irrigation to the
greatest extent feasible. All irrigation systems will adhere to the water
conservation measures described in Section 2.6.1 of the SFWMD Basis
of Review for Water Use Permit Applications.
o Plan Review: The Water Conservation Plan will be reviewed by
management on an annual basis and will have changes incorporated in
the plan at that time.
Conservation Projects
o CCWSD is in the process of installing water mains within Golden Gate
City to convert existing domestic self-supply users to CCWSD’s Golden
Gate Wellfield water supply which utilizes a brackish blend. The
conversion of these existing domestic self-supply users to the CCWSD
water supply will ultimately reduce demands from the SAS and replace
demand with an alternative water source. This conservation project is
anticipated to save 170 MGY.
Page 7012 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
26
o CCWSD is in the process of installing water quality monitoring panels
on water lines to reduce unnecessary flushing of lines and ultimately
improve system efficiency.
3.12.2 Reuse Efforts
CCWSD maintains two Water Reclamation Facilities (WRF): the North County
WRF (NCWRF) and the South County WRF (SCWRF). In addition, CCWSD
plans for the construction of the Northeast Service Area WRF (NESAWRF)
which is planned to provide IQ water. These facilities either dispose of treated
effluent via underground injection (UIC) and/or the treatment of wastewater to
IQ water to be distributed to end-users primarily consisting of golf courses,
residential communities, environmental mitigation areas, and County-owned
lands to offset the irrigation demands. Furthermore, Collier County has adopted
the Collier County Water-Sewer District IQ Water Ordinance (Ordinance No.
2013-48) which establishes rules for the use of IQ water over higher quality
water sources. The distribution system maintains approximately 130 miles of
distribution lines, 7 storage tanks, 29 storage ponds, and 6 pumping stations for
distribution. The reuse system is interconnected allowing distribution to north
and south regions within CCWSD and is supplemented by withdrawals from
the LTA and water table aquifer (WTA) under SFWMD water use permit
number 11-00052-W (which CCWSD is actively working to update), via the
Pelican Bay and Mule Pen Wellfields (9.23 MGD). In addition to the NCWRF
and SCWRF, CCWSD plans upgrades of the existing Golden Gate Wastewater
Treatment Plant (GGWWTP) and construction of the NESAWRF to increase
treatment capacity and reuse distribution for the proposed service area.
IWSD is in the planning phase for expansion and improvements of the current
WTF. A component of the improvements will include reclaimed water
infrastructure to provide IQ water to end-users within the service area. The
intent to develop reclaimed water infrastructure will assist in reducing demands
for IQ water currently being served by groundwater withdrawals. Currently, a
Page 7013 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
27
reclaimed water distribution system does not exist in the IWSD service area.
However, the IWSD has received state appropriations for advanced wastewater
treatment plant improvements, which are scheduled to be completed by the end
of 2029. Additionally, the IWSD anticipates beginning installation of reclaimed
water mains within the service area to serve new developments as they occur
during the 10-year planning horizon.
AMUC currently maintains a reclaimed water distribution system which
provides commercial and residential end-users IQ water within the Ave Maria
community. The reclaimed water system is designed to store treated IQ water
in irrigation lakes throughout the community which are withdrawn from to
supply IQ water to the end-users. AMUC has proposed an expansion of the
existing WWTF which will provide an additional 1.25 MGD of treatment
capacity and increased capacity to provide IQ water. The reclaimed water
system has been a key element of infrastructure since the construction of the
community and is planned to expand alongside the community. The use of
reclaimed water assists in decreasing demand from the LTA and proposed use
of the SSA.
Port of the Islands CID currently maintains a WTF which provides reuse water
for IQ water and industrial quality water, used for standby fire protection which
ultimately reduces demand from FKA Canal and LTA wellfield. The WTF
permit authorizes the use of groundwater to supplement treated effluent which
is then stored in one (1) storage tank and/or surface water pond prior to
distribution for irrigation and/or fire system.
(section intentionally left blank)
Page 7014 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
28
A summary table is provided below in Table 10 – Water Treatment Facilities
and Reclaimed Water Distribution for WTFs for utility providers included in
this Work Plan. Existing and proposed wastewater service areas are provided
in Figure 3 and existing reclaimed water lines and WTFs are shown in
Figure 4.
Table 10 - Water Treatment Facilities and Reclaimed Water Distribution
Water Treatment Facility
Permitted Facility
Treatment Capacity
(MGD)
Disposal Reuse Reuse Percentage
North County Regional
WTP
(FL0141399)
24.10 Underground Injection
Control / Reuse Y 80 to 90%
South County Regional
WTP
(FL0141356)
16.00 Underground Injection
Control / Reuse Y 80 to 90%
Orange Tree WWTP¹
(FLA014165) 0.75 Percolation Pond N --
Golden Gate
(FLA142140) 1.50 Underground Injection
Control N --
IWSD
(FLA014132) 4.00 Underground Injection
Control N Potential Future Use
AMUC
(FLA376400) 0.90 Reuse Y 100%
Port of the Islands CID
(FLA141704) 0.20 Reuse Y 100%
¹ Now proposed to be the NESAWRF.
(section intentionally left blank)
Page 7015 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
29
4.0 REGIONAL WATER SUPPLY ISSUES
Regional water supply issues identified in this Work Plan that may impact county and
municipal water supply planning include the following in conjunction with the 2022
LWCWSP, which the County is actively working to address:
Existing use of fresh water sources (Surficial and Intermediate Aquifer Systems) is
widespread throughout the LWC planning area due to favorable construction costs,
shallow depths, aquifer yields, and fresh water quality. These aquifers can be sensitive
due to the potential for impacts to wetlands and existing legal water uses, saltwater
intrusion, and the potential to reach aquifer-specific maximum developable limits
(MDLs). The SFWMD oversees the permitting for these and all water resources within
the LWC Planning Area and will only consider new or increased allocations on an
application-by-application basis to determine if a project meets water use permitting
criteria; therefore, the demand for fresh water resources will encounter competing
factors between users.
Withdrawals from the Floridan aquifer system are expected to increase to meet future
demands.
Climate change and sea level rise could impact the availability of freshwater resources
in the LWC Planning Area.
Water supply planning intergovernmental coordination between utility service
providers within Collier County.
(section intentionally left blank)
Page 7016 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
30
5.0 ALTERNATIVE WATER SUPPLY
The utility providers included in this Work Plan primarily use the Surficial and Floridan
Aquifer Systems due to the fresh groundwater quality and generally sufficient yield to provide
the current demands but given the possible increased demand for population growth considered
in this Work Plan, alternative water supplies must be evaluated for future planning
considerations. Suitable alternative water supplies must be considered based on yield,
recharge, current demand, and water/groundwater quality suitable for future development and
sustainability as an alternative source. Traditionally, the Surficial aquifer has been utilized for
current and historical demands due to the fresh groundwater quality, sufficient yield, and the
financial advantage of a shallow aquifer requiring less treatment than surface water and/or
deeper saline groundwater. For consideration by utility providers and consistent with the 2022
SFWMD LWCWSP Update, potential alternative water supplies include the following:
Expanded Use of the Surficial Aquifer System (SAS):
A significant demand in the Collier County portion of the LWC Planning Area is agricultural
and unincorporated areas which utilize the SAS for domestic and potable water supply, crop
production and irrigation. Some utility providers have supplemented demands using brackish
water supply, but the majority of the groundwater withdrawals remain shallow fresh water
sources. Expansion of development into current agricultural lands would relieve current
allocations held by the existing agricultural users to be available for other uses such as potable
water use. Although this would require rezoning and planning strategies, the groundwater use
required for potable water systems is generally less per acre than existing agricultural use;
therefore, the SAS remains a viable groundwater resource for future expansions into
agricultural and unincorporated areas of Collier County.
Expansion of Reclaimed Water Distribution System (RWDS):
Expansion of RWDS can supplement current irrigation demands within utility service areas
and reduce the net withdrawals from the SAS associated with irrigation demands. Currently,
utility providers have proposed expansions and/or construction of reclaimed water
infrastructure, but the use of reclaimed water should remain a priority beyond the 10-year
planning horizon to supplement demands for irrigation and/or industrial water demands. The
Page 7017 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
31
expansion of RWDS requires significant infrastructure planning and development but can
assist with providing an alternative IQ and industrial source to offset current and future
demands from the aquifer systems.
Aquifer Storage and Recovery System (ASR):
The benefits to an ASR include long-term storage of treated effluent and/or irrigation-quality
water that can be used as a source for IQ water in times of drought and/or high demand.
Additionally, ASR can improve (i.e., decrease salinity) lower quality groundwater depending
on the chosen aquifer. The implementation of an ASR can require significant hydrogeological
investigations and planning to assess whether suitable aquifer characteristics are present (i.e.,
confinement, groundwater quality, etc.); therefore, this alternative water supply source is
subject to subsurface conditions.
Upper Floridan Aquifer System (UFAS):
The UFAS is known to contain higher salinity groundwater and require additional
blending/treatment to provide irrigation and/or potable quality water than shallower aquifers
comprising the SAS. Although the saline water presents treatment challenges, it can provide
significant yield and current use of the UFAS is minimal in comparison to the SAS; therefore,
less competing factors to consider for allocations.
(section intentionally left blank)
Page 7018 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
32
6.0 CAPITAL IMPROVEMENT PROJECTS
The proposed Capital Improvements include both publicly and privately funded water supply
projects necessary to achieve and maintain the level of service standards throughout the 10-
year planning horizon considered in this Work Plan and consistent with the capital
improvements presented in the 2022 LWCWSP, the 2023 Collier County AUIR, and the Port
of the Islands CID Capital Improvement Plan, updated August 2022. The Capital Improvement
schedules for the utility providers are provided in Appendix H. A summary of the 2022
LWCWSP capital improvement projects and capital improvement projects update for utility
providers included in this Work Plan are provided below in Table 11 – 2022 LWCWSP Capital
Improvement Projects and Table 12 – Capital Improvement Projects Update.
Table 11 - 2022 LWCWSP Capital Improvement Projects
Utility Projected
Completion Project Name/Description
Project
Capacity
(MGD)
Capital Costs
($M)
Potable - SAS
CCWSD 2032 Northeast Interim WTP (three phases) and NE
Lower Tamiami Aquifer Wellfield
2.88 $28.80
CCWSD 2037 New Northeast 3.0 MGD WTP Using Ion
Exchange Phase I
3 $24.20
Potable - IAS
AMUC 2023 Sandstone Aquifer Wellfield Expansion (2
wells)
0 $3.70
Potable - FAS
AMUC 2031 2.76 MGD RO WTP Expansion 2.76 $5.00
IWSD 2032 New 2.5 MGD RO WTP 2.5 $12.00
CCWSD 2037 New 2.0 MGD Northeast WTP – Phase I 2 $24.20
Nonpotable - Reclaimed Water
AMUC 2030 Phase 2 – 1.25 MGD WWTF Expansion 1.25 $6.50
CCWSD 2030 Northeast New 1.50 MGD WWTF 0.75 $65.00
CCWSD 2023 Foxfire Reclaimed Water Supplemental Wells 1 $1.00
CCWSD 2030 South County WWTF Supplemental Wells 1 $3.00
CCWSD 2030 Golden Gate 2.5 MGD WWTF Expansion 2.5 $86.00
IWSD 2027 3.0 MGD Reclaimed Water Production Facility
and Water Main Extension
3 $3.40
Page 7019 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
33
Table 12 – Capital Improvement Projects Update
Utility Projected
Completion Project Name/Description
Project
Capacity
(MGD)
Capital Costs
($M)
Potable - Surface Water
Port of the
Islands CID
To Be
Determined Water Line replacement Phase 1 1 $1.00
Port of the
Islands CID
To Be
Determined Water Line replacement Phase 2 0.4 $1.00
Port of the
Islands CID
To Be
Determined
Dual-Purpose Potable Water/Fire Storage
Tank 0.12 $1.00
Potable - SAS
CCWSD 2030 Northeast Regional Water Treatment Plant
Phase I - Nano
6 $105.60
CCWSD 2026 Northeast LT Wellfield 5 $22.50
CCWSD 2041 Tamiami Wellfield New Wells 0 $14.90
CCWSD Substantially
Complete
SCRWTP Reactor #4 0 $4.83
Potable - IAS
AMUC 2029 Expansion of RO Treatment Plant 2.13 $8.50
AMUC In Progress,
2024
Sandstone Aquifer Wellfield Expansion (2
wells)
0.83 $6.90
Potable - FAS
CCWSD 2030 Northeast Regional Water Treatment Plant
Phase I - LPRO
4 $70.40
IWSD 2032 2.5 MGD RO WTP 2.5 $12.00
Nonpotable - Reclaimed Water
CCWSD 2027 SCWRF/FOXFIRE IQ supplement 2 $3.00
CCWSD 2030 Northeast Regional Water Reclamation
Facility
4 $144.00
CCWSD 2024 NE Utility Facilities - Interim 1.5 MGD WRF 1.5 $87.00
CCWSD 2027 Golden Gate City 3.5 MGD WWTP
Expansion
3.5 $165.00
AMUC 2024 Phase 2 – 0.9 MGD WWTF Expansion 0.9 $20.00
AMUC 2030 Phase 3 – 1.2 MGD WWTF Expansion 1.2 $29.50
IWSD 2029 4.0 MGD Reclaimed/Reuse Water Treatment 4 $5.00
(section intentionally left blank)
Page 7020 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
34
7.0 GOALS, OBJECTIVES, POLICIES
An assessment of existing Goals, Objectives, and Policies (GOPs) in the Collier County
comprehensive plan was performed in preparation of this Work Plan to determine those that
address water supply sources and facilities, as well as conservation and reuse programs. The
following comprehensive plan GOPs are consistent except for two recommended changes to
bring the Capital Improvement Element Policy 1.5: The standards for levels of service of public
facilities, and Public Facilities Element, Potable Water Sub-Element Policy 1.7 into
consistency among the 2022 LWCWSP and this Work Plan, where indicated below in
strikethrough/underline format:
o Intergovernmental Coordination:
o (II)(IV) GOAL: COLLIER COUNTY WILL MAINTAIN OR ENHANCE
THE LEVEL OF COORDINATION AND COOPERATION AMONG
THE VARIOUS GOVERNMENTS, AUTHORITIES AND AGENCIES
MAKING DECISIONS AFFECTING NATURAL RESOURCES,
HOUSING, HISTORIC AND ARCHAEOLOGICAL RESOURCES,
PUBLIC FACILITIES, AND PUBLIC SERVICES WITHIN AND
AROUND COLLIER COUNTY, TO RESOLVE DIFFERENCES AND
TO ACHIEVE COMPATIBLE AND COORDINATED PLANS.
o (II)(IV) OBJECTIVE 1: Collier County (County) shall continue to establish
and maintain intergovernmental communication and level of service
coordination mechanisms to be used by the County, Everglades City, the
City of Marco Island, the City of Naples, and the City of Bonita Springs,
adjacent Lee County, Hendry County, Broward County, Dade County,
Monroe County, the District School Board of Collier County School Board,
the State of Florida, the Florida Department of Environmental Protection,
Florida Department of Transportation, and South Florida Water
Management District, and any other entity that provides a service but may
not have land use authority.
o (II)(III) Policy 1.4: In situations where other public or private entities are
providing a facility or service within Collier County for roads, water, sewer,
Page 7021 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
35
drainage, parks, public schools, or solid waste, the County will coordinate
its adopted level of service standard(s) within the parameters allowed by the
Concurrency Management System of the Capital Improvement Element as
part of the County’s Growth Management Plan.
o (II)(IV) Policy 2.8: The County shall coordinate with the South Florida
Water Management District and other regulatory agencies in implementing
the Growth Management Plan.
o Public Facilities Element, Potable Water Sub-Element:
o (VII)(VI)(IX)(X) Policy 1.7: The County has developed the Ten-Year
Water Supply Facilities Work Plan, dated February 2019 January 2024,
in accordance with the water supply guidelines of the most current version
of the South Florida Water Management District’s Lower West Coast Water
Supply Plan. The County’s Ten-Year Water Supply Facilities Work Plan is
incorporated herein by reference.
o Capital Improvement Element:
o (VIII) GOAL: TO PROVIDE ADEQUATE PUBLIC FACILITIES
CONCURRENT WITH NEW DEVELOPMENT IN ORDER TO
ACHIEVE AND MAINTAIN OR EXCEED ADOPTED STANDARDS
FOR LEVELS OF SERVICE.
o (VIII)(IX) OBJECTIVE 1: (PUBLIC FACILITY LEVEL OF SERVICE
STANDARDS) Identify and define types of public facilities, establish
standards for levels of service for each such public facility, and determine
what quantity of additional public facilities is needed in order to achieve
and maintain the standards.
o (VIII) Policy 1.5: The standards for levels of service of public facilities shall
be as follows:
(I)(III)(IV)(VIII)(X)(XV)(XX) D. County Potable Water Systems:
County Water District = 150 130 gallons per capita per day (gpcd)
(I)(III)(IV)(VIII)(X)(XV)(XX) E. County Sanitary Sewer ‒
Wastewater Treatment Systems:
Page 7022 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
36
North Wastewater Treatment Service Area = 100 gallons per
capita per day (gpcd)
South Wastewater Treatment Service Area = 100 gallons per
capita per day (gpcd) Wastewater Treatment Service Area – 90
gpcd
o (VIII)(X) OBJECTIVE 4: (PROVIDE NEEDED IMPROVEMENTS)
Coordinate County land use planning and decisions with its plans for public
facility capital improvements, as described in Policy 1.1 above, by
providing needed capital improvements for replacement of obsolete or worn
out facilities, eliminating existing deficiencies, and future development and
redevelopment caused by previously issued and new development orders.
o (III)(V)(VII)(VIII)(IX)(XV) Policy 4.6: Public facilities and services
provided by Collier County with public funds in accordance with the
Schedule of Capital Improvements in this Capital Improvement Element
will be limited to Service Areas established within the boundaries
designated on Figure PW-1 “Collier County Water District Boundaries”,
and Figure PW-2 “Existing and Future Potable Water Service Areas”, in the
Potable Water Sub-Element of the Public Facilities Element, and on Figure
WT-1, “Collier County Sewer District Boundaries”, and Figure WT-2,
“Existing and Future Wastewater Treatment Service Areas”, in the
Wastewater Treatment Sub-Element of the Public Facilities Element. Road
and Public School improvements will be provided as designated in their
respective Schedule of Capital Improvements appearing in this Capital
Improvement Element. All other public facilities and service types will be
provided on a countywide availability basis.
o (VIII)(X)(XV)(XX) Policy 5.3: The concurrency requirement for the
Potable Water, Wastewater Treatment, Stormwater Management and Solid
Waste Disposal Level of Service Standards of this Growth Management
Plan will be achieved or maintained if any one of the following standards
of the Concurrency Management System is met:
Page 7023 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
37
(III) A. The necessary facilities and services are in place at the time
a final site development plan, final plat or building permit is issued;
or
(III) B. The necessary facilities and services are under construction
at the time a final site development plan, final plat or building permit
is issued; or
(IX)(XV) C. The necessary facilities and services are guaranteed in
an enforceable development agreement that includes the provisions
of paragraphs A and B of this Policy. An enforceable development
agreement may include, but is not limited to, development
agreements pursuant to Sections 163.3220 ‒ 163.3243, Florida
Statutes, or an agreement or development order issued pursuant to
Chapter 380, Florida Statutes. The agreement must guarantee that
the necessary facilities will be in place when the impacts of the
development occur, pursuant to Section 163.3180, Florida Statutes.
Future Land Use Element:
o GOAL: TO GUIDE LAND USE DECISION-MAKING SO AS TO
ACHIEVE AND MAINTAIN A HIGH QUALITY NATURAL AND
HUMAN ENVIRONMENT WITH A WELL PLANNED MIX OF
COMPATIBLE LAND USES WHICH PROMOTE THE PUBLIC'S
HEALTH, SAFETY AND WELFARE CONSISTENT WITH STATE
PLANNING REQUIREMENTS AND LOCAL DESIRES.
o (XXX)(XLIV) OBJECTIVE 2: Coordinate land uses with the availability
of public facilities, accomplished through the Concurrency Management
System of the Capital Improvement Element and implemented through the
Adequate Public Facilities Ordinance of the Land Development Code.
o (XXX)(XLIV) Policy 2.2: The County shall prepare annually the Annual
Update and Inventory Report (AUIR) on Public Facilities which shall
include a determination of the existing conditions of capital public facilities,
determine the remaining available capacity, forecast future needs in the five
year capital improvement schedule and identify needed improvements and
Page 7024 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
38
funding to maintain the level of service adopted in Policy 1.5 of the Capital
Improvement Element
Conservation and Coastal Management Element
o (VI)(XI) OBJECTIVE 4.2: Continue to promote conservation of Collier
County’s potable water supply and continue to develop, implement and
refine a comprehensive conservation strategy through the Collier County
Water-Sewer District and the Collier County Water and Wastewater
Authority, which identifies specific goals for reducing per capita potable
water consumption.
o Policy 4.2.1: Continue to rely on the South Florida Water Management
District to take appropriate measures to conserve water in emergency
situations.
o (VI) Policy 4.2.2: The County shall negotiate agreements with area golf
courses to accept and use treated wastewater effluent for irrigation when
and where such treated effluent is available from existing and future
wastewater treatment plants.
o Policy 4.2.3: Identify existing and future publicly owned lands suitable for
irrigation with treated wastewater effluent, such as government building
grounds, parks and highway medians, and incorporate these into future
planning for effluent disposal.
o Policy 4.2.4: Identify existing and future privately owned lands suitable for
irrigation with treated wastewater effluent, such as cemeteries, agricultural
operations, nurseries and commercial/industrial parks, and incorporate
these into future planning for effluent disposal.
o Policy 4.2.5: Evaluate and make recommendations, where appropriate, for
plumbing fixtures and landscapes that are designed for water conservation
purposes.
Page 7025 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
39
8.0 REFERENCES
Bureau of Economic and Business Research (BEBR), 2023, Projections of Florida
Population by County, 2025-2050, with Estimates for 2022. Volume 56, Bulletin 195. April
2023.
CDM Smith, 2019, Collier County 10-Year Water Supply Facilities Work Plan Update,
February 2019.
Collier County Planning and Zoning Department, Comprehensive Planning Section, Collier
County Growth Management Plan, Intergovernmental Coordination Element, adopted
October 1997, amended May 23, 2023.
Collier County Planning and Zoning Department, Comprehensive Planning Section, Collier
County Growth Management Plan, Future Land Use Element, adopted October 1997,
amended January 8, 2023.
Collier County Comprehensive Planning Section, Zoning Division Growth Management
Community Development Department, Collier County 2022 Annual Update & Inventory
Report/Capitol Improvement Element Schedule Update on Public Facilities. 2022.
Collier County Comprehensive Planning Section, Zoning Division Growth Management
Community Development Department, Collier County 2023 Annual Update & Inventory
Report/Capitol Improvement Element Schedule Update on Public Facilities. 2023.
Immokalee Water and Sewer District, Strategic Report & Development, 2022.
IWSD Water and Sewer District, Public Facilities Report, Immokalee Water and Sewer
District, 2022.
Florida Department of Environmental Protection, Potable Water Systems Facility Reports,
2022.
Port of the Islands Community Improvement District, Capital Improvement Plan, August
2021, Updated August 2022.
South Florida Water Management District, 2015, Applicant’s Handbook for Water Use
Permit Applications within the South Florida Water Management District, 2015.
South Florida Water Management District, Ave Maria University and Town PWS, Ave
Maria Town and County Utilities, Water Use Permit No. 11-02298-W, Application No.
201019-9. March 31, 2021.
South Florida Water Management District, Collier County Public Water Supply, Collier
County Board of County Commissioners, Water Use Permit No. 11-00249-W, Application
No. 200221-10. July 27, 2020.
Page 7026 of 7162
Collier County 10-Year Water Supply Facilities Work Plan Update January 2024
Collier County Public Utilities
40
South Florida Water Management District, CCWSD IQ Supplemental Wellfields, Collier
County Board of County Commissioners, Water Use Permit No. 11-00052-W, Application
No. 220715-3. August 3, 2022.
South Florida Water Management District, Immokalee Water and Sewer District, Water Use
Permit No. 11-00013-W, Application No. 100514-6. May 23, 2011.
South Florida Water Management District, Lower West Coast Water Supply Plan with
Appendices, December 21, 2017.
South Florida Water Management District, 2022, Lower West Coast Water Supply Plan with
Appendices, December 8, 2022.
South Florida Water Management District, Northeast Service Area, Collier County Board of
County Commissioners, Water Use Permit No. 11-00419-W, Application No. 210817-4.
February 17, 2022.
South Florida Water Management District, Port of the Islands, Port of the Islands
Community Improvement District, Water Use Permit No. 11-00372-W, Application No.
081125-11. August 7, 2009.
Page 7027 of 7162
Figure 1 – Current and Future Water Service Areas
Page 7028 of 7162
10-Year Collier County Water SupplyFacilities Work Plan UpdateCollier County, FloridaCurrent and Future Water Service AreasPage 7029 of 7162
Figure 2A – Existing and Proposed CCWSD
Production Wellfields
Page 7030 of 7162
GG
§¨¦75
OIL WELL RD
zz{951
¬«29
§¨¦75
EVERGLADES BLVDGOLDEN GATE BLVD
COLLIER BLVDIMMOKALEE RD
AIRPORT PULLING RDGul
f
o
f
Mex
ico
£¤41
£¤41
zz{846
zz{858
COLLIER BLVDzz{92LOGAN BLVDLIVINGSTON RDDAVIS BLVD
CCWSD NORTHEAST SERVICE AREA WELLFIELD
CCWSD NORTH SERVICE AREA WELLFIELD
CCWSD SOUTH SERVICE AREA WELLFIELD
ORANGE TREE WELLFIELD
Dec 2023 20203066-037 -As Shown Figure 2A
Existing and Proposed CCWSDProduction Wellfields10-Year Collier County Water Supply Facilities Work Plan UpdateCollier County, Florida
q
0 42
Miles
E:\20200000\20203066-037 - Collier Co 10-Year Water Supply Facilities Work Plan Update\Facilities Work Plan Update\Report\Figures\Fig 2A CCWSD Existing and Proposed Production Well Locations_ARPREVISED20240103.mxd Date: 1/18/2024 Time: 4:58:38 PM User: arpJOHNSON ENGINEERING, INC.
2122 JOHNSON STREET
FORT MYERS, FLORIDA 33901
PHONE (239) 334-0046
E.B. #642 & L.B. #642 DATE PROJECT NO.FILE NO.SCALE SHEET
Legend
"Proposed Public Water Supply Wellfield
"Existing Public Water Supply Wellfield
Notes
1. South Florida Water Management District (SFWMD) Public Water
Supply Wellfield locations were acquired from the SFWMD GIS
Website and were last updated 9/22/2023.
Page 7031 of 7162
2B – Existing and Proposed IWSD and AMUC
Production Wellfields
Page 7032 of 7162
¬«29
OIL WELL RD
IMMOKALEE RD
¬«82
zz{846
zz{846
zz{858
AMUC WELLFIELD
PROPOSED UPPER
FLORIDAN WELLFIELD
CARSON ROAD WELLFIELD
AIRPORT ROAD
J.V. WARDEN WELLFIELD
Dec 2023 20203066-037 -As Shown Figure 2B
Existing and Proposed IWSDand AMUC Production Wellfields10-Year Collier County Water Supply Facilities Work Plan UpdateCollier County, Florida
q
0 42
Miles
E:\20200000\20203066-037 - Collier Co 10-Year Water Supply Facilities Work Plan Update\Facilities Work Plan Update\Report\Figures\Fig 2B IWSD and AMUC Existing and Proposed Production Well Locations_REVISED20240103.mxd Date: 1/18/2024 Time: 4:52:34 PM User: arpJOHNSON ENGINEERING, INC.
2122 JOHNSON STREET
FORT MYERS, FLORIDA 33901
PHONE (239) 334-0046
E.B. #642 & L.B. #642 DATE PROJECT NO.FILE NO.SCALE SHEET
Legend
"Proposed Public Water Supply
Wellfield
"Existing Public Water Supply
Wellfield
Notes
1. South Florida Water Management District (SFWMD) Public
Water Supply Wellfield locations were acquired from the
SFWMD GIS Website and were last updated 9/22/2023.
Page 7033 of 7162
Figure 2C – Existing Port of the Islands CID
Production Wellfield
Page 7034 of 7162
¬«29
£¤41zz{92
PORT OF THE ISLANDS
CID WELLFIELD
Dec 2023 20203066-037 -As Shown Figure 2C
Existing Port of the Islands CID Production Wellfield10-Year Collier County Water Supply Facilities Work Plan UpdateCollier County, Florida
q
0 42
Miles
E:\20200000\20203066-037 - Collier Co 10-Year Water Supply Facilities Work Plan Update\Facilities Work Plan Update\Report\Figures\Fig 2C POI CID Existing and Proposed Production Well Locations_REVISED20240103.mxd Date: 1/18/2024 Time: 4:55:45 PM User: arpJOHNSON ENGINEERING, INC.
2122 JOHNSON STREET
FORT MYERS, FLORIDA 33901
PHONE (239) 334-0046
E.B. #642 & L.B. #642 DATE PROJECT NO.FILE NO.SCALE SHEET
Legend
"Existing Public Water
Supply Wellfield
Notes
1. South Florida Water Management District (SFWMD) Public
Water Supply Wellfield location was acquired from the SFWMD
GIS Website and were last updated 9/22/2023.
Page 7035 of 7162
Figure 3 – Current and Future Wastewater Service
Areas
Page 7036 of 7162
10-Year Collier County Water SupplyFacilities Work Plan UpdateCollier County, FloridaCurrent and Future Wastewater ServiceAreasNoteCollier County Water-Sewer Districtprovided document for current servicearea, September 22, 2023.Page 7037 of 7162
Figure 4 – Existing Reclaimed Water Lines and
Wastewater Treatment Facilities
Page 7038 of 7162
k
k
k
OIL WELL RD
zz{951
§¨¦75
EVERGLADES BLVDGOLDEN GATE BLVD
COLLIER BLVDIMMOKALEE RD
AIRPORT PULLING RDGul
f
o
f
Mex
ico
£¤41
£¤41 zz{846
COLLIER BLVDzz{92
BONITA BEACH ROAD
LOGAN BLVDLIVINGSTON RDDAVIS BLVD
Golden Gate Pkwy
Pine Ridge Rd
Port of The Islands
Collier County - South Regional
Collier County - North Regional
Dec 2023 20203066-037 -As Shown Figure 4
Existing Reclaimed Lines and Wastewater Treatment Facilites10-Year Collier County Water SupplyFacilities Work Plan UpdateCollier County, Florida
q
0 21
Miles
E:\20200000\20203066-037 - Collier Co 10-Year Water Supply Facilities Work Plan Update\Facilities Work Plan Update\Report\Figures\Figure 4 Existing Reclaimed Water Users_ARP.mxd Date: 1/18/2024 Time: 5:40:02 PM User: arpJOHNSON ENGINEERING, INC.
2122 JOHNSON STREET
FORT MYERS, FLORIDA 33901
PHONE (239) 334-0046
E.B. #642 & L.B. #642 DATE PROJECT NO.FILE NO.SCALE SHEET
Legend
k Wastewater Treatment Facilities
Reclaimed Lines
Notes
1. South Florida Water Management District (SFWMD) Alternative Water
Supply (AWS) Projects were acquired from the SFWMD GIS Website and
were last updated 11/14/2021.
2. South Florida Water Management District (SFWMD) Water Reuse
Lines were acquired from the SFWMD GIS Website and were last
updated 10/20/2023.
k
k
¬«29
OIL WELL RD
¬«29
¬«82
zz{846
zz{858
zz{846
Immokalee Rd
Camp Keais RdAve Maria
Immokalee
q
0 21
Miles
Legend
k Wastewater Treatment Facilities
Reclaimed Lines
Notes
1. Water Treatment Facilities were acquired from the SFWMD GIS Website and
were last updated 10/03/2023.
2. Reuse Water Lines were acquired from the SFWMD GIS Website and were last
updated 09/20/2023.
Page 7039 of 7162
Appendix A – Interlocal Agreement between CCWSD
and the City of Naples
Page 7040 of 7162
Page 7041 of 7162
Page 7042 of 7162
Page 7043 of 7162
Page 7044 of 7162
Page 7045 of 7162
Page 7046 of 7162
Page 7047 of 7162
Page 7048 of 7162
Page 7049 of 7162
Page 7050 of 7162
Page 7051 of 7162
Page 7052 of 7162
Page 7053 of 7162
Page 7054 of 7162
Page 7055 of 7162
Appendix B – Agreement for Potable Water Service
Calusa Island Village (Goodland Area)
Page 7056 of 7162
Page 7057 of 7162
Page 7058 of 7162
Page 7059 of 7162
Page 7060 of 7162
Page 7061 of 7162
Page 7062 of 7162
Page 7063 of 7162
Page 7064 of 7162
Page 7065 of 7162
Page 7066 of 7162
Page 7067 of 7162
Page 7068 of 7162
Page 7069 of 7162
Page 7070 of 7162
Page 7071 of 7162
Page 7072 of 7162
Page 7073 of 7162
Page 7074 of 7162
Page 7075 of 7162
Page 7076 of 7162
Page 7077 of 7162
Page 7078 of 7162
Page 7079 of 7162
Page 7080 of 7162
Page 7081 of 7162
Page 7082 of 7162
Appendix C – Agreement for Potable and Emergency
Water Interconnects between Bonita Springs Utilities,
Inc. and CCWSD
Page 7083 of 7162
Agenda Item No 16C3
October 23 2007
Page 1 of 11
EXECUTIVE SUMMARY
Recommendation to approve an Interlocal Agreement for reconstruction of the
existing interconnect between the Collier County Water Sewer District and Bonita
Springs Utilities Inc to provide for reverse potable water flows at Bonita Springs
Utilities expense to provide for the design and construction of a second
interconnect at a location to be determined at the expense of the Collier County
Water Sewer District and to establish rates for usage of potable water
OBJECTIVE The public purpose of this Interlocal Agreement is to provide for potable
water flows through the existing interconnect fi om Bonita Springs Utilities Ine BSU
potable water system to the Collier County Water Scwer District CCWSD potable
water distribution system to provide for two way flows of potable water between
CCWSD and BSU at a second interconnect and to establish user rates for each Utilities
potable water usage whenever either of the two interconnects arc in service
CONSIDERATIONS Recently CCWSD staff has been working in the area of Barefoot
Beach Boulevard Bonita Beach Road and Vanderbilt Drive the northern most areas of
the CCWSD to uncover the reason s for nontypical disinfection residuals in the water
distribution system providing potable water to these areas Minimum free chlorine and
combined residual levels are set by the Florida Department of Environmental Protection
and the Environmental Protection Agency Should chlorine residuals continue to remain
low the utility faces the possibility of falling out of compliance with the disinfection
requirements of these regulatory agencies From a public health and safety perspective it
would be in the best interest of the potable water customers in these areas to have an
additional potable water source available to supplement as needed the CCWSD water
distribution system The Interlocal Agreement provides for reconstruction of the existing
interconnect to provide for two way flows between the respective utilities distribution
systems The Interlocal Agreement will replace the August 26 1997 Agreement for
Emergency Water Interconnects
On August 26 1997 Agenda Item 16B 15 the Board of County Commissioners of
Collier County as Ex Officio the Governing Board of the Collier County Water Sewer
District Board approved an agreement for emergency water interconnect between BSU
and the Board The agreement provided for one way flows of potable water from the
CCWSD to BSU for temporary emergency potable water service The existing
interconnect located on Bonita Beach Road was designed constructed and paid for by
BSU so that the water flows in a nOliherly direction only i e from CCWSD to BSU
The portion of the interconnect from the Board s water main up to and including the first
isolation valve which controls the flow of water from the Board s water system was
conveyed to the Board The remainder of the Interconnect is owned and maintained by
BSU
The Interloeal Agreement also calls for a second potable water interconnect for two way
flows to be designed constructed and paid for by the CCWSD at another location where
CCWSD and BSU have adjacent distribution systems most likely on Livingston Road
This interconnect will be completed by September 30 2009 Estimated cost for the
second potable water interconnect is 300 000 00
Page 7084 of 7162
Executive Summary
Interlocal Agreement with BSU
Page 2
Agenda Item No 16C3
October 23 2007
Page 2 of 11
Simultaneous with the Agreement being rccommended to the Board of County
Commissioners for their approval the Agrcement is being recommended to the Bonita
Springs Utilities Board of Directors in order to expedite modi1ieation work to provide a
temporary supplement of potable water to CCWSD
The staff s of the two utilities have agreed to a bulk user fee that is based on a recent
Collier County bulk rate study modifiable by CPI and or future rate study
FISCAL IMP ACT There is no fiscal impact for the reconstruction of the existing
interconnect as the Bonita Springs Utilities will incur this cost There will be an
undetermined fiscal impact in Fund 408 Operating User Fees depending on the volume
of potable water that is purchased 1rom Bonita Springs Utilities Finally a budgct
amendment in the FY08 budget will be set up in the Fund 412 Water User Fees in the
estimated amount of 300 O O 00 to fund the second interconnect
GROWTH MANAGEMENT IMPACT There IS no impact on the Growth
Management Plan
RECOMMENDATIONS I That the Board of County Commissioners as Ex officio
the Governing Board of the Collier County Water Sewer District approve an Interlocal
Agrecment for reconstruction ofthe existing emergency interconnect between the Collier
County Water Sewer District and Bonita Springs Utilities Inc to provide for reverse
potable water flows at Bonita Springs Utilities expense and to establish rates for usage of
potable water 2 To approve Collier County Water Sewer District recommendation to
permit design and construct a second interconnect at a location to be determined at the
expense of the Collier County Watcr Sewer District 3 To establish rates for potable
water 4 To approve any budget amendments required in Fund 408 User Fees to
compensate Bonita Springs Utilities for bulk water supplied 5 To approve a budget
amendment in the FY08 Budget in the Fund 412 in the amount of 300 000 00 to fund
the second interconnect
Prepared by Peter Lund Division Operations Analyst Public Utilities Operations
Page 7085 of 7162
Agenda Item No 16C3
October 23 2007
Page 3 of 11
2007 AGREEMENT FOR POTABLE WATER INTERCONNECTS
BONITA SPRINGS UTILITIES INC
AND
COLLIER COUNTY WATER SEWER DISTRICT
This AGREEMENT is made and entered into effective on this day of
2007 by and between the Bonita Springs Utilities Inc a Florida not for profit
corporation BSU and the Board of County Commissioners of Collier County
Florida as the Governing Board of Collier County Florida and as Ex Officio the
governing Board of the Collier County Water Sewer District CCWSD collectively
Parties
WHEREAS the Parties are geographically ncighboring utilities and each has
existing facilities capable of furnishing limited quantities of potable water to the other
and
WHEREAS BSU and CCWSD are parties to that certain Agreement for
Emergency Water Interconnects dated August 26 1997 pursuant to which CCWSD has
contracted to provide water on a limited as needed basis to BSU 1997 Agreement
and
WHEREAS the Parties wish to modiry the existing interconnect to provide for
the ability to supply water in either direction to BSU or CCWSD and provide for a
second interconnect for such purpose and
WHEREAS the Parties agree that it is in each Party s best interests to enter into
this Agreement so that either Party can supply potable water to the other Party should the
receiving utility require potable water from the sending utility and
WHEREAS it is in the best interests of the Parties their respective water
customers and the region to promote the interconnection of water systems to meet
emergency and periodic water supply needs
NOW THEREFORE based upon the mutual undertakings and other
consideration referenced herein the sufficiency of which is hereby acknowledged the
Parties agree as follows
1 Subject to the tenns of this Agreement BSU agrees to supply to the
CCWSD such potable water as BSU determines is available within the
Page 7086 of 7162
Agenda Item No 16C3
October 23 2007
Page 4 of 11
BSU water system as may be requested by CCWSD from time to time to
meet its water supply demands Said supply shall be delivered in a
manner so as to maintain the best available pressure at the discharge side
of the Point of Delivery so as to limit adverse effects to BSU s customers
2 Subject to the terms of this Agreement CCWSD agrees to supply to BSU
such potable water as CCWSD determines is available within the CCWSD
water system as may be requested by BSU from time to time to meet its
water supply demands Said supply shall be delivered in a manner so as to
maintain the best available pressure at the discharge side of the point of
delivery so as to limit any adverse effects to CCWSD s utility customers
The point of delivery shall be the point at which the supplying utility s
ownership and responsibility f r water supplied under this Agreement
ends and the ownership and responsibility of the receiving utility begins
Point of Delivery
3 Potable water supplied under this Agreement shall be delivered to and
received from permanent interconnecting facilities at two points where
the CCWSD and BSU potable water systems are in close geographic
proximity to one another The Point of Delivery for water supplied by
BSU to CCWSD through either interconnect shall be on the CCWSD side
of the isolation valve on the CCWSD side of the interconnect assembly
The Point of Delivery for water supplied by CCWSD to BSU through
either interconnect shall be on the BSU side of the isolation valve on the
BSU side of the interconnect assembly BSU agrees to modifY the
existing one way Ilow interconnect facility constructed to supply potable
water to the BSU located on Bonita Beach Road so as to provide Ilow in
either direction Existing Interconnect BSU shall own maintain and
operate all facilities comprising the Existing Interconnect up to the Point
of Delivery on the CCWSD isolation valve on the CCWSD side of the
interconnect CCWSD agrees to construct a second interconnect facility
in close geographic proximity to the Livingston Road Imperial Street
interchange New Interconnect The exact location on the New
Interconnect shall be as mutually agreed upon by the Parties in writing
2
Page 7087 of 7162
Agenda Item No 16C3
October 23 2007
Page 5 of 11
This operational decision may be made on behalf of CCWSD by the
County Manager or designee CCWSD shall own maintain and operate
the New Interconnect up to the Point of Delivery at the BSU isolation
valve The nature of the supply requirement and the availability of water
from the sending utility s system shall dictate the number and location of
the interconnect to be activated at a given point in time The receiving
utility shall identify the interconnect it desires to activate subject to
limitations in availability of the sending utility Both interconnecting
facilities shall be constmcted as long tenn interconnections
4 The Existing Interconnect shall be modified pursuant to BSU standards as
may be amended repealed and or superseded unless and or as otherwise
specified in the Agreement The New I ntereonnect shall be constructed
pursuant to the CCWSD Utilities Standards and Procedures Ordinance as
may be amendcd repealed and or superseded unless and or as otherwise
specified in the Agreement Each party shall submit the plans and
specifications for their respective interconnect to the other for review and
comment prior to proceeding with the project
a The design pennitting and construction modifying the Existing
Interconnect will be undertaken by BSU at no cost to the CCWSD and
shall be completed by March 31 2008
b The design permitting and construction of the New Interconnect will
be undertaken by CCWSD at no cost to BSU and shall be completed
by September 30 2009
e The interconnects shall be designed to include provisions for locking
features so that each party shall have sole access to the locking device
for its valve operator which when opened provides water to or
receives water from the other party
5 Water provided by a supplying utility under this Agreement shall be only
that quantity of water needed to provide temporary assistance in the event
the receiving party has a period of reduced availability in its system
subject to concurrent excess supply of potable water in the sending utility s
3
Page 7088 of 7162
Agenda Item No 16C3
October 23 2007
Page 6 of 11
system as determined by such utility Such supply of potable water shall
be subject to the following
a The Parties hereto shall each designate and from time to time re
designate as needed to comply with this Agreement an authorized
member of its staff to be responsible for sending and receiving written
requests for water and who shall have the authority to approve or
disapprove requests for supply of water from the other party Each
party shall keep the other advised of the then current phone number
and e mail address of the designated individual
b Upon each written request for temporary potable water service under
this Agreement the request shall be acted upon in good faith and in a
timely manner by both Parties By entering into this Agreement
Parties agree to supply said service subject to availability as described
above The supplying utility shall not be obligated to supply any
specific volume of water The receiving utility may terminate receipt
of water supply with not less than twenty four 24 hours notice by
sending the notice to the supplying utility when the need for temporary
potable water service by the receiving utility has been met
c At its discretion the supplying utility may establish and enforce by
unilateral control of valves under its control limits as to times of day
and or days of the week during which delivery of potable water will or
will not be made the rates of flow at which delivery will be made
and or the total volume of water to be delivered over one or more
designated time periods
d In each instance the receiving party shall exercise prompt and diligent
efforts to eliminate its need to be supplied temporary potable water
rom the sending party
6 Payment for water supplied under this Agreement shall be on a per
thousand 1000 gallon basis as measured by the appropriate meter at the
interconnect in use The meter shall be read jointly by the Parties at the
following times when the valves are first opened at the beginning of
delivery in response to a request for water at the time of the final
4
Page 7089 of 7162
Agenda Item No 16C3
October 23 2007
Page 7 of 11
termination of all deliveries of water in response to that request for potable
water from the sending party and if necessary at approximately the first
of each calendar month that occurs between the beginning and termination
of the response to that request It shall be the responsibility of the sending
party to schedule all readings of the meter at mutually agreeable times
7 Labor and material costs incurred for opening or closing the valves or
reading the meters as a result of a request for temporary potable water
supply shall not be charged by either party to the other party
8 It shall be the responsibility of the sending utility to make annual checks
of the accuracy of the interconnect meters used to supply the receiving
utility If either receiving party believes that a biIl1 r water received may
be based on readings from an inaccurate meter upon request the other
paIiy shall perform an additional check of the meter s accuracy with the
requesting party physically present if desired by the requesting paIiy
Should thaI additional check reveal accuracy within the limits of the
manufacturer s recommended accuracy then the cost of obtaining the
check shall be bome entirely by the requesting party If either an annual
check or an additional check of accuracy reveals an error beyond the limit
of the manufacturer s recommended accuracy it shall be assumed that the
inaccuracy was in existence for the later one half of the period of time
from the last check that indicated accepfable accuracy Any billings that
occurred during that period shall be adjusted to reflect the quantity of over
read or under read exceeding the appropriate limit of accuracy at the rate
per thousand 1000 gallons that was in effect at the time delivery
occurred
9 The rates for potable water charged by each party shall be fair and
reasonable Parties agree that the initial rates charged one to the other for
water supply shall be the same Such rates shall be reflected in each
party s respective rate tariff resolution or ordinance as may be amended
from time to time The initial agreed rate to be three dollars twenty five
cents 3 25 per 1000 gallons In the event there occurs a period of time
during which there is a differential in rates between the Parties each party
5
Page 7090 of 7162
Agenda Item No 16C3
October 23 2007
Page 8 of 11
shall be entitled to charge the other the higher rate then in effect Each
party shall give the other not less than thirty 30 days notice of any
change in the rate to be charged hereunder The potable water service rate
will be expressed on a per thousand gallons of metered potable water as
delivered to the Point of Delivery basis and will always be rounded to the
nearest cent for billing and rate calculation purposes
10 This Agreement shall remain in full force and effect for not less than ten
10 years following its date of execution and until thereafter tem1inated
upon sixty 60 days written notice by either party to the other at its sole
discretion provided that in the event CCWSD clects to terminate this
Agreement prior to constructing the New Interconnect CCWSD agrees to
reimburse BSU for out of pocket costs incurred by BSU in modifying the
Existing Interconnect to provide tlow in either direction as set forth in
paragraph 3 above within the guidelines of the Florida Statute referencing
prompt payments
II If any condition or provision in this Agreement held to be invalid by any
court of competent jurisdiction such invalidity shall not affect any other
condition or provision and does not materially prejudice either party in its
respective rights and obligations contained in the remaining valid
conditions or provisions of this Agreement
12 No waiver of any breach of this Agreement shall be held to be a waiver of
any other subsequent breach irrespective of the length of time the fonner
breach was waived
13 Both Parties agree that it is a material part of the consideration for this
Agreement to deliver only potable water meeting the requirements of all
State Federal and local regulatory agencies having jurisdiction over
potable water supply for public water systems
l4 Each party hereby saves and holds the other harmless from and against
any claims demands damages or expenses resulting from delivery of
water which does not meet the quality standards set forth herein delivery
of water at a pressure not exceeding 95 psi operation of the facilities
located on supplying utility s side of the Point of Delivery and the storage
6
Page 7091 of 7162
Agenda Item No 16C3
October 23 2007
Page 9 of 11
transmission distribution and use of potable water received through an
interconnect
15 Acts of God such as storms hurricanes earthquakes land subsidence
strikes lockouts or other industrial disturbances acts of public enemy
terrorist acts wars blockades riots acts of armed forces delays by
carners inability to obtain materials or rights of way acts of public
authority regulatory agencies or courts inability to construct the required
infrastructure or any other cause whether the same kind is enumerated
herein not within the control of the Parties and which by the exercise of
due diligence a party is unable to overcome which prevents the perfor
mance of all or any specific part of this Agreement shall excuse
performance of said part of this Agreement until such force majeure is
abated or overcome
16 The 1997 Agreement is hereby replaced and superseded in its entirety and
as of the date ofthis Agreement of no further force or effect
17 This Agreement shall take affect only upon approval by the Governing
Board of CCWSD and BSU s franchisor the City Council of the City of
Bonita Springs Florida
IN WITNESS WHEREOF the Parties have executed or have caused this
Agreement with any Exhibits attached to be duly executed
ATTEST
DWIGHT E BROCK Clerk
COMMISSIONERS
BOARD OF COUNTY
COLLIER COUNTY FLORIDA AND AS
EX OFFICIO THE GOVERNING BOARD
OF THE COLLIER COUNTY WATER
SEWER DISTRICT
By
Deputy Clerk James Coletta Chainnan
Approved at to form and legal sufficiency
7
Page 7092 of 7162
Agenda Item No 16C3
October 23 2007
Page 10 of 11
By
Assistant County Attorney
BONITA SPRINGS UTILITIES INC
David McKee President
8
Page 7093 of 7162
Page I of I
Agenda Item No 16C3
October 23 2007
Page 11 of 11
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
Item Number IC CJ
Item Summary F I C nllnelldatiull to lpplllVe em InterlOBIAweemenl fOf reconstruction of the existing
inlerconnect b lweHl the r ollier COlJllly WatRr Sewer Dislricl and l30nita Springs Utilities Ille
10 pluvidp flJr I Hvcr pu iille walerflOlNs at 80nita 3fJrill j3 Utilities expense to provide f H
Ow dWiiWI 8 ld conslruclii lluf Cl second interconnect at a IOCCllioll to be determined at the
expen801the Collier County Water cwer District 1nd to est8bli h nles for llsilge of
prJt8hlp w3Ier i WDII lOj
Meeting Date HiI23UOI 9UOUO 1 1
AlllJrOVCll By
lwln Lilli Nnl01 PCi i 1tiUIi Jf1ii jl1 Date
Public UtHitios Watf r 1019120071 2 PM
Approved By
Viq IIP r ffillHin pr CIO lj p i l i Mnn J r f lte
P1blic Utiiilir I nb 11i ili1 Fnqin rlt1l h11 17 7 007 UjI M
Aj fll ovcll B v
il10t1I t id0S pp l iuil l1il I 1 i lle
uhlk lJtliili hlk iii1ilic p I l i il io 1G 007 1 1 AM
Aflprovcll8y
DiannJ Ferryman Contract Speci ist DJte
Adll1irJif trdtivServieHs PllnJ1si1lq 10116 20Q711 24AM
Allproved By
Jellnif8l A Belpedio I ssistant COllllty Attorney Date
COllllty Attorney County Attonwy Office 10 161200711 30 AM
Af II oCd By
Steve Carnell PllrchasillgfGencral Svcs Director Date
Adnlinistrative Services Purchlsing 10116 20071 21 PM
Approved By
James W Delany Public Utilities Administrator Date
Public Utilities Public Utilities Administration 10 16 20071 22 PM
Apllroved By
OMS Coordinator Applications Analyst Date
Administrative Services Information Technology 10 16 2007133 PM
AIlI roved By
Susan Usher Senior Management Budget Analyst Date
COllnty Manager s Office Office of MaMgement Budget 10 16 20075 26 PM
AI Ill Ovcd By
James V Mudd COllnty Manager Date
Board of County
Commissioners County Manager s Office 10 16 20078 26 PM
Page 7094 of 7162
Page 7095 of 7162
Page 7096 of 7162
Page 7097 of 7162
Page 7098 of 7162
Page 7099 of 7162
Page 7100 of 7162
Appendix D - Interlocal Agreement between CCWSD
and the Big Cypress Stewardship District (Town of
Big Cypress)
Page 7101 of 7162
INSTR 6426309 OR 6266 PG 2221
RECORDED 7/10/2023 10:27 AM PAGES 11
CLERK OF THE CIRCUIT COURT AND COMPTROLLER
COLLIER COUNTY FLORIDA
REC$95.00 INDX$2.00
AGREEMENT TO PROVIDE
POTABLE WATER,WAS I"LWATER AND IRRIGATION QUALITY WATER UTILITY SERVICES
TO THE TOWN OF BIG CYPRESS
THiS INTERLOCAL AGREEMENT ("Agreement") is made and entered into this 27i4day of
Xne , 2023 by and between the Board of County Commissioners of Collier County, Florida.
acting ex-officio as the Governing Board of the Collier County Water-Sewer District (hereinafter referred
to as the"CCWSD"),the Board of Supervisors of the Big Cypress Stewardship District(hereinafter referred
to as the"District"),CDC Land investments, LLC and Collier Land Holdings, Ltd. (hereinafter referred to
as"Landowners")(collectively the"Parties").
RECITALS:
WHEREAS, Section 163.01(4), Florida Statutes, the Florida Interlocal Cooperation Act of 1969
the "Act"), authorizes the joint exercise of any power. privilege or authority that the public agencies
involved herein might exercise separately; and
WHEREAS,the CCWSD and the District are public agencies within the meaning of the Act and
desire to engage in the joint exercise of power that each might exercise separately: and
WHEREAS, the CCWSD provides water, wastewater and irrigation water service (collectively
known as "utility services"), in an economical and environmentally beneficial manner to much of the
unincorporated area of Collier County; and
WHEREAS,the District also has statutory authority to provide utility services within the District,
but intends to authorize the CCWSD to provide utility services within certain designated areas of the
District;and
WHEREAS,the CCWSD's service boundaries encompass the District: and
WHEREAS, the CCWSD shall incorporate certain designated lands and property within the
District into CCWSD's service area to exclusively provide retail potable water, wastewater and irrigation
water(including effluent irrigation water,when available)utility services in the same manner and pursuant
to the same ordinances and policies as CCWSD currently provides service to all other customers located
throughout the unincorporated service area of Collier County, Florida; and
WHEREAS, the District acknowledges the CCWSD's right to offer utility services within the
District and further authorizes the CCWSD to exclusively provide utility services inside a portion of the
District's jurisdictional area known as the Town of Big Cypress;and
WHEREAS, the Parties previously entered into an Agreement to Provide Potable Water and
Wastewater Utility Services dated June 8, 2021 and recorded on June 15, 2021 at OR 5964, Pages 1662-
1670. which Agreement is being replaced in its entirety with this Agreement;and
WHEREAS,this Agreement is intended to reduce to writing the terms and conditions between the
CCWSD, the District and the Landowners as to the exclusive provision of utility services by the CCWSD
within the Town of Big Cypress area of the District.
NOW,THEREFORE,the CCWSD,the District and the Landowners agree as follows:
1. The foregoing recitals are true and correct and are incorporated herein by this reference.
41:11
Page 7102 of 7162
2. The Landowners and/or subsequent developers shall construct and pay for potable and irrigation
quality water mains and gravity sewers, force mains, wastewater pump stations and a community
pump station (collectively known as "public utility facilities") within the Town of Big Cypress
development and convey such facilities to the CCWSD in the manner provided in the applicable
CCWSD policies and County ordinances, including but not limited to Ordinance No. 2004-31, as
amended, otherwise known as the Collier County Utilities Standards and Procedures Ordinance
the "Utilities Standards Ordinance"), all of which as may be amended by the Board of County
Commissioners from time to time.Upon final acceptance of facilities,CCWSD shall be responsible
for maintenance and operations of such accepted facilities.
3. District Improvements:
A. The District shall upsize and construct potable water transmission mains,wastewater force
mains and irrigation water transmission facilities from the Rivergrass Point of Connection
POC) to the Town of Big Cypress North POC within the future Big Cypress Parkway
ROW and the Oil Well Road ROW which shall be available to serve the Town of Big
Cypress' demand in accordance with its development schedule as defined in Exhibit A.
The Town of Big Cypress North POC shall be as defined on Exhibit B. The CCWSD shall
reimburse the District for the cost of upsizing the potable water transmission mains,
wastewater force mains, and irrigation water transmission facilities in an amount not to
exceed $2,702,186 identified by Exhibit C.I. The CCWSD reimbursement to the District
shall be made within 60 days after final acceptance of the infrastructure.
B. The District will construct an IQ Main from the Oil Well Road/Big Cypress Parkway
intersection to the Town of Big Cypress South POC using the future Big Cypress right of
way to an intersection with 18`h Avenue NE/spine road, east on the spine road and south in
the 80' right of way to the TOBC South POC. This IQ main will supply the future utility
site in order to serve all development south of the utility site. The Town of Big Cypress
South POC shall be as defined on Exhibit B. The CCWSD shall reimburse the District for
the cost of the IQ main extension as detailed in Exhibit C.2 in an amount not to exceed
3,239,900. The CCWSD reimbursement to the District shall be made within 60 days after
final acceptance of the infrastructure.
C. The District shall upsize and construct water and wastewater mains on a portion of the
spine road and within the 80' right of way from the intersection of Big Cypress Parkway
to the utility site as defined on Exhibit B. These mains will supply the utility site which in
turn will serve all development south of the utility site. The CCWSD shall reimburse to
the District for the cost of upsizing potable water and wastewater mains as detailed in
Exhibit C.3 in an amount not to exceed $804,400. The CCWSD reimbursement to the
District shall be made within 60 days after final acceptance of the infrastructure.
4. Per the Rivergrass Interlocal Agreement,the CCWSD agreed to provide the necessary potable/fire
water design flows at a minimum pressure of 60 psi in the potable water system at the Rivergrass
Point of Connection. The Landowners and/or subsequent developers, through their design(s), will
size their system(s)as required.
5. The CCWSD agrees to provide a wastewater system head value of 60 psi for the projected
wastewater flows at the Rivergrass Point of Connection by June 30, 2022.
6. The CCWSD agrees to provide the necessary irrigation water design flows at a minimum pressure
of 60 psi in the IQ water system at the Rivergrass Point of Connection by June 30,2022.
7. The Landowners agree that locations for a total of five(5)well sites shall be made available for use
2
GAO,
Page 7103 of 7162
NNW
at no cost to CCWSD as shown in Exhibit D. The Landowners shall convey a County Utility
easement for the well sites, which shall be a minimum of 30-foot by 50-foot easement area, shall
abut a Right-of-way(ROW)with dedications for use to CCWSD,and shall be adjacent to the ROW
that includes an irrigation quality water transmission main. The Landowners will provide the
Office of the County Attorney with an executed County Utility Easement, suitable for recording.
Upon receipt, the County shall assume all costs associated with the recordation of the easement.
The Landowners will cooperate in the transfer of the South Florida Water Management District
Consumptive Use Permit(CUP) for the five (5) well sites. Should the transfer of a Consumptive
Use Permit not be approved,the District will support the acquisition of such permit by the CCWSD.
8. The District shall construct potable water mains and wastewater force mains designed to Collier
County standards within the future Big Cypress Parkway and Town of Big Cypress of sufficient
size up to and including I 6"needed by the CCWSD to supply its future utility site which is needed
to serve Town of Big Cypress South and Bellmar Village. The wastewater force main, potable
water main, and irrigation quality main will connect to the utility site from the mains in the 80'
Town right of way. The utility site will be the point of connection (POC) for potable water,
wastewater and IQ for all development in the Town of Big Cypress South.
9. The Landowners will require all developers in the Town of Big Cypress to install an internal IQ
system to serve residential areas and the Town in accordance with the Collier County Land
Development Code to their respective Points of Connection.
10. The CCWSD will install iQ meters and manage and bill residents based on their IQ water
consumption at the CCWSD Board approved IQ rates for the IQ service provided regardless of the
CCWSD's water source(s). The Landowner shall pay for the cost of the IQ meter installations by
the CCWSD.
11. The Landowners shall convey a minimum 5-acre utility site located as shown on the Town of Big
Cypress SRA Masterplan("Utility Site")suitable for the construction and operation of the facilities
necessary to provide sufficient utility services. CCWSD will provide a minimum 30 days' notice
of intent to purchase the property. Upon payment by CCWSD,the Landowners shall convey to the
CCWSD the Utility Site in fee simple, free and clear of all liens and encumbrances, by warranty
deed. The Landowners will be responsible for paying any and all costs of any title work and
searches and shall be responsible for all costs for promptly removing or curing any liens,
encumbrances or deficiencies revealed in any title work. The Landowners will promptly provide
the Office of the County Attorney with an executed deed, suitable for recording. Upon receipt.the
County shall assume all costs associated with the recordation of the deed. The value of the Utility
Site shall be determined by two accredited Real Estate Appraisers.each party will secure their own
accredited Real Estate Appraiser. The purchase price shall be based on the market value of the
land before any SRA action is taken on the Town of Big Cypress, before any application for
increases in density,and before any other up-zoning applications to the Town of Big Cypress.The
final price per acre shall be equal to the average of the two independent appraisal reports.
Section 1 I of the Rivergrass Agreement,OR 5746,Pages 3307-3314,shall be deleted in its entirety.
12. The Landowners agree to pre-pay water and wastewater impact fees to the CCWSD without
expiration (the "prepayment"). Landowners shall reserve water capacity equivalent to 350 ERCs
and wastewater capacity equivalent to 350 ERCs.
13. Prepayment of water and wastewater impact fees shall be due no later than thirty (30) days after
Landowners' receipt and acceptance of:
3
CAO
Page 7104 of 7162
A. An approved and non-appealable SRA for the Town of Big Cypress development.
B. All required and non-appealable permits from the South Florida Water Management
District or any federal or state regulatory authorities for the first phase of development.
C. The prepayment shall be at the then current CCWSD Board approved rates for water and
wastewater impact fees: The credit for water and wastewater impact fees identified herein
shall be reduced by 50%of the prepayment per ERC for each residential unit on a building
permit issued thereon until the development is either completed or the credits are exhausted
or have been assigned as provided for in the Collier County Impact Fee Ordinance. The
developer shall be responsible for any difference between the prepayment amount per ERC
and the rate in effect at the time of building permit application submittal.
14. This Agreement shall remain in effect until terminated by the CCWSD, the District or the
Landowners.Any party may terminate this Agreement,with or without cause,by providing written
notice to the other parties prior to the date that either the CCWSD, the District or the Landowners
commit any affirmative act to construct or provide potable water, wastewater or irrigation water
utility service within the District including. but not limited to.entering into an agreement hiring a
contractor or a consultant to provide utility construction-related services in furtherance of this
Agreement. Any attempt to terminate the Agreement once any party has incurred any expense in
furtherance of fulfilling its duties under the Agreement, without the express written consent of the
other parties,shall be considered a nullity.Termination shall be effective one hundred eighty(180)
days after receipt of said written notice. This Agreement may be amended from time to time upon
the written consent of all parties. Any amendment to the Agreement must he in writing and must
he executed with the same formalities as this original Agreement.
15. The Agreement to Provide Potable Water and Wastewater Utility Services dated June 8,2021,and
recorded on June 15, 2021. at OR 5964. Pages 1662-1670. is hereby repealed and replaced in its
entirety with this Agreement.
16. NOTICES. All notices required under this Agreement shall be directed to the following offices.
For the County: Office of the County Manager, 3335 East Tamiami Trail, Suite 101, Naples,
Florida 34112. For the District/Landowners: Patrick Utter. Collier Enterprises, Vice President of
Real Estate and Club Operations,999 Vanderbilt Beach Road,Suite 507,Naples, Florida 34108.
17. INDEMNIFICATION. To the extent allowed by law,each party agrees to indemnify, defend and
hold harmless the other. its officers,board members,council members,agents and employees from
and against any and all fines.suits,claims,demands,penalties, liabilities,costs or expenses, losses,
settlements,judgments and awards and actions of whatever kind or nature, including attorney'sfeesandcosts(and costs and fees on appeal)and damages(including, but not limited to,actual and
consequential damages) arising from any negligent, willful or wrongful misconduct, knowing
misrepresentation or material breach of this Agreement by such party, its officers.board members,
council members,agents or employees.The foregoing indemnification shall not constitute a waiver
of the CCWSD or the District's sovereign immunity beyond the limits set forth in Florida Statutes,
Section 768.28, nor shall the same he construed to constitute agreement by any party to indemnify
another party for such other party's negligent, willful or intentional acts or omissions.
18. COUNTERPARTS. This Agreement may he executed in any number of counterparts, each of
which shall be deemed to he an original as against any party whose signature appears thereon and
all of which shall together constitute one and the same instrument.
19. RECORDING AND BINDING ON SUCCESSORS.This Agreement shall binding on any party's
4
GP
O
Page 7105 of 7162
successors, assigns. or other subsequent parties in interest and shall be recorded in the Public
Records of Collier County.The County shall he responsible for recording the same.
IN WITNESS WHEREOF,the parties hereto have set their hands and seals the day and year first
written above.
tl,Jtf_
j
ATTEST BOARD OF COUNTY COMMISSIONERS
Crystal K.`Kinzel. Clerk 4f Courts COLLIER COUNTY, FLORIDA
47By: ___T I' By:
imistromso 6207'
Attest as to C hairmcn'' i Rick LoCastro, Chairman
signature , ,,, ,
r
Approv, . .s to form and leg y:
Sale s1.rW
s : ' ounty Attorney C644- 23
Z
ATTEST:BIG CYPRESS STEWARDSHIP D STRIC
By:
Printed Name:Patrick L. Utter. President
ATTEST:CDC LAND INVESTMENTS,LLC
By:7 _702
Printed Name:Christian Spilker, President&CEO
ATTEST:COLLIER LAND HOLDINGS,LTD.
By: TARPON BLUE CE MANAGEMENT,
LLC, Its Sole General Partner
By: e"----
1'
AL'"(------,,_,.............,_
Printed Name:Christian Spilker, President&CEO
5
CAO
Page 7106 of 7162
Exhibit A
Taw 0/11C»,20
42.20144 200404
1042
Tun Yen tun Vora
W a 12013 204 205 104 201 1,5 1011 1011 2030 2001 2032 010 1033 2034 205 104 2007 11. 15 2/11 7001 2003 2041 2012 1020 11101111100 Cow 10 Mt
107t4014 1av4/4m11 31 11/ 11,1 145 NS 510 145 144 144 141 IN 12 141 141 IIS 423 0 1.204
551.l 401044 20 OS 15 10 10 510 IC SI S1 II II N4 Al 42 ID 0 117
MuHI1m02 7 15 11 25 I3 0S 25 IS IS 25 25 115 25 15 0 0 _240
S5.447.1 C44444 0 40.0O )a00 3p00 10,00 10002 0 0 10AO
0144 0 13.000 LINO I10O0 0_..... 0 21,002
1e.n 100224002 50 50 SO\ 100 10 30 SO 50 SO 210 SO 10 500 0 S00
4444 11/2a'4n 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0
141410400 0 0 220 ISO 0 150
SMapn1 CN44r 0 4.143 1,14.1 1325 0343 1343 21.141 12,227 12,221 151O 45,10 14p10 21114 14010 21.030 11010 13,020 1410 22201 1013211
O100 0 1221 I,1SI 4}23 477) 1.173 20.445 L1N ION 1335 2335 2,524 *IN 1,545 2344 1}41 0321 2355 41151 10,00
4,3444n4011k4 0 34N 3,4I3 1111 4,7S 4.771 20,444 4.344 /311 7.153 1315 0321 54.144 1341 2,541 1,524 1.524 7,155 20131 10,00
04r/011k4 4 p00 3,00 SA00 2.000 500 Sp00 Y1p00 2400
SMOyn 020.0 C 1321 1323 10301 1440 1030 41,223 14.145 14.545 14.N 11103 WY 41.114 24324 31. 41/1 MINA 21.111 14142 10,454 214.1120
On2/00K2 0 230 `.50 30 2,3 0 I,500 MOO 3p00 10003
4.414114)M0 0 200O 20000 WOO 02,0O 100O 110,00 40003 40.000 30,000 5400 JOpO 210.00 1000 au:. N,000 40,011 50A00 210_000 401,020
64001044 0 I,500 2 S00 130 10 0500 2.500 20000 14000
444oe. 0 0 110,0 O0120A 0 120,003
Page 7107 of 7162
i
47th Ave NE
1 45th Ave NE 4'G N O L r
RIVERGRASS POC f
43rd Ave NE Connection to Collier County
et' Utility Mains Service e.
hi
Rivergrass Village
E Connection to 4-
Rivergrass Village Ql'n u s
in
0 2000 4000
Oil Well Road(C.R.858) jr>— 1 —j
33rd Ave NE Lam,
91st Ave NE -
0 TOBC (NORTH)
ra
POC
29th Ave NE m
o 1!/
i.
Town of Big Cypress(North)
27th Ave NE
o
Randall Blvd. j//j
0
7/724thAveNE
co
H
920.
1 //
22nd Ave NE rn //////j'/ l' //
UTILITY LINE ASSOCIATED WITH
20th Ave NE LL /1//•./1/,// • TOBC (NORTH)
18th Ave NE
4 SPINE ROAD FROM TOBC (NORTH) POCriTOTOBC (SOUTH) POC
16th Ave NE >
o
14th Ave NE a -r
o TOBC (SOUTH) POC
12th Ave NE o r.
Future Vanderbilt Extension
10th Ave NE Town of Big Cypress(South)
8th Ave NE
BELLMAR POC
6th Ave NE
We
4th Ave NE Bellmar Village
2ndAveNE 17. - i LEGEND
Golden Gate Blvd E r, POC
11L3 jf/ A TOBC (NORTH)
end Ave.SF
TOBC (SOUTH)
4th Ave.SE /UTILITY MAINS ROUTE
6th Ave.SE ( J UTILITY MAINS ROUTE
ASSOCIATED WITH
8th Ave.SE TOBC (NORTH)
Collier County Utility Agreement - TOBC Exhibit (B)
13206ME03.dw6 REV 12.16.22 GP,O
Page 7108 of 7162
AGNOI.I
9/22/2020
BARBER& ORIGINAL
BRUNDAGE, INC.
Profs nal rnwncrra,r'lannrrr.Sort cYorr
tanauapr Arrhhc cc
COST TO SERVE LONGWATER THROUGH RIVERGRASS
Engineer's Opinion of Probable Construction Cost
Pipe Upsizing and New Pipe Under Connector Road
RIVERGRASS changes when LONG WATER goes online
Potable Water Wastewater Irrigation
Length Length Length
Upsizing Pipe Cost Upsizing Pipe Cost Upsizing Pipe Cost
Valve Cost Valve Cost Valve Cost
5,077 ft 1,946 ft 6,959 ft
8"to 12" ($74,124) 6"to 1?" ($38,609) 4"to 6' ($18,441)
58,400) 53,120) 3,000)
3,427 ft 4,117 ft 2,176 ft
8''to 1.6" ($126,285) 10"to 16" ($127,956) 4"to 16" ($97,354)
33,960) 8,300) 27,320)
8,273 ft 6,319 ft 9,436 ft
12"to 16" ($184,074) 12"to 16" ($140,598) 6' to 16" ($397,161)
59,930) 30,330) 97,950)
5,623 ft
8"to 16' ($207,208)
50,940)
7,961 ft
12"to 16' ($177,132)
64,540)
TOTAL COST
Potable Water Wastewater Irrigation
486,773 348,913 1,141, 047
Subtotal I 1,976,733
NEW PIPE ON CONNECTOR ROAD
Potable Water Wastewater Irrigation
Length Length Length
Size Pipe Cost Size Pipe Cost Size Pipe Cost
Valve Cost Valve Cost Valve Cost
3,316 ft 4,850 ft 3,316 ft
16" ($221,907) 12" (S202,100) 16" ($221,907)
79,320) 520,900) 529,320)
TOTAL COST
Potable Water Wastewater Irrigation
251,227 223,000 251,227
Subtotal I 725,453
Grand Total
2,702,186
This Opinion of Probable Construction Cost(OPC)has been prepared by Agnoli,Barber,&Brundage,Inc.(ABB)at the request of
owner or as a requirement of a governmental agency. ABB has based the unit costs of this OPC on previous work history with
similar projects or on values provided by reputable contractors we have worked with. In accordance with F.A.C.61G-1518.011,
this is not a guarantee or warranty expressed or implied as to the construction cost that may be obtained by owner using
competitive bidding. If such a guarantee is needed,it is recommended that owner procure the services of a professional cost
estimator or obtain a binding bid from a contractor.
CCWSD total reimbursement S2,702,186
Page 7109 of 7162
AGNOLI
BARBER&
C BRUNDAGE L\C.
sr s,. .'NJ.
a:\IIla1T C.2
The Town of Rig Cypress
Irrigation OPC
March 202S
Concepl:The coil of irrigation wresting far the additonel mains shot will be required to acne The Town and eeamar which rum from the inlenec lion of Big(9prres
Pas kwaysi Oil Well Rood to the utility elle.
Description Ural Price Quantity Unit Cal
12'PVC Irrigation Main 5150 1.600 LF S240.000
12'Cale Valve 56,900 2 EA $11.100
16'PVC Irrigation Main $2120 11.700 I.F 52,340,000
Jrrintiaq I6'Cute Valve 19,900 15 EA f293.SU(1
Vertical Deflection 5/,1110 20 EA 5162.1601
ARV S4.640 40 EA 51115,600
loaf 11,219, 900
This Opinion of Probable Cost(OPCI has been prepared be Agneli.Barber&Brundage.Inc.(ABB)at the request of the owner or as a requirement of governmental steno" ARR has based the unit costs
of this OPC on previous work history with simile/projects or on values provided by reputable contracton we base worked ssith in accordance with F.A.C.61G•1511. 01 I,this is not a guarantee or
warranty expressed or implied as to the construction cost that may be obtained by rimer using competitive bidding.!lurch a guarantee is needed,it is recommended that owner procure the sersices of a
professional cost estimator or obtain a binding bid front a contractor
CCWSD total reimbursement $3,239, 900
Gp,O
Page 7110 of 7162
AGNOLI
BARBER&
BRUNDAGE INC.
ESlllBIrc)
The Town of Bit Cypress
Utility Uplite Cost Compos icon
March 2023
Concept Previously,16"transmission mains were to run don;Bit Cypress Parkway to Golden Gate Book,ard by Collier County.Smaller local service lines were to also run in the intenorroadofTheTown(Scenario II.however the current plans are far The Town and Belltoar to be served via IS"muss That wilt attend solely through the Interwr road al Ike Town(Scenario2)and not through BCP.The TOBC cost comparison breaks down the difference in costs fur Ilse pipes not lb of the utility site,s CIA tlnn to the into,at road of The Town,The mains along RCParenorincludedinantvestcomparison(Scenario II.
Scenario I(Oldl Scenario 2(76ew)
Descripban Unit Price Quantity Unit Con Quanta, Unit CostrPVCWM60a70LE132.200 - LF
b'GV S5.6110 I EA 55.600 - EA
Potahle\\'aiF
12'PVC WM SISO 730 I 1109.500 IF
12'0V S6.900 I EA 56.910 EA16*PVC WM S200 - LF 1,61n1 LI' 1320.0(1016'GV SI9.906 - IA 3 EA 239.000 OW Cost NH,
Sod-rand 3171,2011 Sarll-Teriel, SiSl.S00 S105.600DesenymonUnitPoetQuantityUnitCostOoaruinUnitCost2'PVC FM Sitm 730 I F S7:on, - 1 F
WutewOt(r
1"Plug Vatic 13,750 I FA S3 750 - EA
I6'PVC FM Silo - I.I'730 LE S153,30016'Plug Valve 13.450 - EA I FA 113130 WW Colt DIN,
Sue-Twu1 576,750 A'uh-Tnuul 5166,710 190,000
Total Coil $100,9S0 Total_Con, 5526,950
icw\h'nrk' Description Unit Pncc Qwatus Una Cost
1•9tabls19ote.
In'PVC WM S200 730 LF S116,000
Prruittaus Versa,.IV GV S19.900 I EA S19.900 't,tber 7027•tam sal'
Vaalnyatrr
l6'PVC FM 1210 1.6000 LF 1336,066
la'Plug Valve 113.130 2 EA 126w10 (1 indicates previous iotdts.ai
InelndaC cost ataoc sited wrin f roar Optics a PunSub-Two/ 5521.180 Base.
Total Coat Differential 5275.600
Now Work• $510,000
TOR('1alai Credit 5601.400
rho Nan onnoddas MU taints AM HO',ono tan etcoat Ow Owe on oapy,c in doe Won.n Scrorrio I Oa+rsrrit repirrlw Snood.2 Rya riasaa for nWrwnJkr.bi
This Opinion of Prabobk Cost(OPCI has been prepared by Agaoh,Barber&Bnsnda0c.Inc.(ABB)at the tequest of the Ow net or as a r quimnent of governmental agency,AB B has baud the unit costsofthisOPConpromoswonhistorywithsimilarprojectsoronvaluesprovidedbyreputablecontractorswehaveworkedwithinwcmdatcewanFA.C.61G•1516 011,this is not atwrontec or warrant)
teprsssed or smoked as to the comtructno cost that may be obtaar.d by awnot using competitive bddmg If such a guarantee is needed.its recommended that owsr procure the seniccs of professionalcostestimatorcrobtainabindingbidfromacontractor
CCWSD total reimbursement $804,400
I
Lam)
1 Page 7111 of 7162
1 / N....._10\c-::-.2 ,A \
3 \
0„,........... .IL, ,......, i
i _____...
s, /.
0. „......._____, 2,-„,/,,,,
iiii!!!;;;„ ,/, ,,,
0
1
g:, r! i
I,ui5 I r/
I''
tt' I-1.RIVERGRASS VILLAG-
Irt I. -- \
E-
III i-
I
IQ WELD SITE#1
r---)9
I {(
i
IQ WELL SITE
L i
i I_
KixIA I I_
21
OIL WELL ROAD(C_ .858)
A I/
if''i0 f.10 ,O.Oi is.tl ]I./0 ]5.10 11'M.
jjLLSITE#2
I // 1)
I
J \
I
EIOW I 1\
AN r---%------II
i 1_....: 1 7i
IQ WELL SITE f t
L-al
E I i
w WELL SITE R; w WELL SITE fD
I ' I -1,,,,.--
L. I 1 4_,,T...
I If-ji.' -I
1 ,...RIVERGRASS VILLAGE I COi. a i .I..1
ICI,
jc . l I iIi 111j,
z „,
W i IQ WELL SITE>I4 w WELL SITE/f
iCu U' r mir--mi i I II
r.,..-;-"-- --
5-
II
IQWEISITE#4'
ill ,
r: -a-
i
1(1/ r- j
III'Lr--------) i j i
IQ WELL SITE>16
f
1 . EXHIBIT D , n /
Rivergrass Village IQ Well Site Locations Map !
Page 7112 of 7162
Appendix E – Interlocal Agreement between CCWSD
and the Big Cypress Stewardship District (Bellmar
Village)
Page 7113 of 7162
low INSTR 6426302 OR 6266 PG 2206
RECORDED 7/10/2023 10:19 AM PAGES 7
CLERK OF THE CIRCUIT COURT AND COMPTROLLER
COLLIER COUNTY FLORIDA
REC$61.00
AGREEMENT TO PROVIDE
POTABLE WATER,WASTEWATER AND IRRIGATION QUALITY WATER UTILITY
SERVICES
TO BELLMAR VILLAGE
ri
THIS INTERLOCAL AGREEMENT ("Agreement") is made and entered into this 27 day of
Le 2023 by and between the Board of County Commissioners of Collier County',
Florida, acting ex-officio as the Governing Board of the Collier County Water-Sewer District(hereinafter
referred to as the"CCWSD"),the Board of Supervisors of the Big Cypress Stewardship District(hereinafter
referred to as the "District"), and Collier Land Holdings, Ltd. (hereinafter referred to as "Landowner")
collectively,the"Parties").
RECITALS:
WHEREAS, Section 163.01(4), Florida Statutes, the Florida Interlocal Cooperation Act of 1969
the "Act"), authorizes the joint exercise of any power, privilege or authority that the public agencies
involved herein might exercise separately; and
WHEREAS,the CCWSD and the District are public agencies within the meaning of the Act and
desire to engage in the joint exercise of power that each might exercise separately; and
WHEREAS, the CCWSD provides water, wastewater. and irrigation quality water service
collectively known as"utility services") in an economical and environmentally beneficial manner to much
of the unincorporated area of Collier County; and
WHEREAS,the District also has statutory authority to provide utility services within the District
but intends to authorize the CCWSD to provide utility services within certain designated areas of'the
District; and
WHEREAS,the CCWSD's service boundariesencompass the District; and
WHEREAS, the CCWSD shall incorporate certain designated lands and property within the
District into CCWSD's service area to exclusively provide retail potable water,wastewater and irrigation
quality water utility services in the same manner and pursuant to the same ordinances and policies as
CCWSD currently provides service to all other customers located throughout the unincorporated service
area of Collier County, Florida; and
WHEREAS, the District acknowledges the CCWSD's right to offer utility services within the
District and further authorizes the CCWSD to exclusively provide utility services inside a portion of the
District's jurisdictional area known as Bellmar Village; and
WHEREAS, the Parties previously entered into an Agreement to Provide Potable Water and
Wastewater Utility Services dated June 8, 2021 and recorded on June 15, 2021 at OR 5964, Page 1671,
which Agreement is being replaced in its entirety with this Agreement; and
WHEREAS,this Agreement is intended to reduce to writing the terms and conditions between the
CCWSD, the District and the Landowner as to the exclusive provision of utility services by the CCWSD
within the Bellmar Village area of the District.
NOW,THEREFORE,the CCWSD,the District and the Landowner agree as follows:
1 GPO
Page 7114 of 7162
1. The foregoing recitals are true and correct and are incorporated herein by this reference.
2. The Landowner and/or subsequent developers shall construct and pay for potable and irrigation
quality water mains and wastewater facilities within the Bellmar Village development including,
but not limited to, gravity sewers, force mains, wastewater pump stations, wastewater community
pump station, and irrigation quality water mains within the Bellmar development and convey such
facilities to the CCWSD in the manner provided in the applicable CCWSD policies and County
ordinances including,but not limited to,Ordinance No. 2004-31, as amended,otherwise known as
the Collier County Utilities Standards and Procedures Ordinance (the "Utilities Standards
Ordinance"), all of which as may be amended by the Board of County Commissioners from time
to time. Upon final acceptance of facilities, CCWSD shall be responsible for maintenance and
operations of such accepted facilities.
3. The District shall, as shown on Exhibit B, upsize and construct the potable water and wastewater
transmission main from the utility site to the Bellmar POC so that sufficient flows are available to
service Bellmar Village. The District will also construct the irrigation transmission main from the
utility site to the Bellmar POC to serve the Bellmar Village's demand. The improvements shall be
completed in accordance with the development schedule defined in Exhibit A.
4. The CCWSD agrees to reimburse the District for the cost of upsizing the potable water and
wastewater transmission main and for the cost of the irrigation transmission main from the utility
site to the Bellmar POC,as identified in Exhibit C. The CCWSD shall reimburse the District in an
amount not to exceed $6,109,350, which reimbursement shall be made within 60 days after final
acceptance of the infrastructure.
5. The CCWSD agrees to provide the necessary potable/fire water design flows at a minimum
pressure of 60 psi in the potable water system at the utility site. The developers, through their
design(s),will size their system(s)as required.
6. The CCWSD agrees to provide a wastewater system head value of 60 psi for the projected
wastewater flows at the utility site.
7. The CCWSD agrees to provide the necessary irrigation quality water design flows at a minimum
pressure of 60 psi in the IQ water system at the utility site.
8. The Landowner will require all developers in Bellmar to install an internal IQ system to serve
residential areas and the Village Center in accordance with the LDC to the Bellmar POC.
9. The CCWSD will install IQ meters and manage and bill residents based on their IQ water
consumption at the CCWSD Board approved IQ rates for the IQ service provided regardless of the
CCWSD's water source(s). The Landowner shall pay for the cost of the IQ meter installations by
the CCWSD.
10. The Landowner within Bellmar Village agrees to pre-pay water and wastewater impact fees to the
CCWSD without expiration (the "prepayment"). Landowner shall reserve water capacity
equivalent to 650 ERCs and wastewater capacity equivalent to 350 ERCs.
11. The prepayment shall be due no later than thirty(30)days after Landowner's receipt and acceptance
of:
a. An approved and non-appealable SRA for the Bellmar Village development.
CPO ,
2
Page 7115 of 7162
b. All required and non-appealable permits from the South Florida Water Management
District or any federal or state regulatory authorities for the first phase of development.
c. The prepayment shall be at the then current CCWSD Board approved rates for water and
wastewater impact fees: The credit for water and wastewater impact fees identified herein
shall be reduced by 50%of the prepayment per ERC for each residential unit on a building
permit issued thereon until the development is either completed or the credits are exhausted
or have been assigned as provided for in the Collier County Impact Fee Ordinance. The
developer shall be responsible for any difference between the prepayment amount per ERC
and the rate in effect at the time of building permit application submittal.
12. This Agreement shall remain in effect until terminated by the CCWSD, the District or the
Landowner. Any' party may terminate this Agreement,with or without cause,by providing written
notice to the other parties prior to the date that either the CCWSD, the District or the Landowner
commit any affirmative act to construct or provide potable water, wastewater or irrigation quality
water utility service within the District including, but not limited to, entering into an agreement
hiring a contractor or a consultant to provide utility construction-related services in furtherance of
this Agreement. Any attempt to terminate the Agreement once any party has incurred any expense
in furtherance of fulfilling its duties under the Agreement, without the express written consent of
the other parties, shall be considered a nullity. Termination shall be effective one hundred eighty
180)days after receipt of said written notice. This Agreement may be amended from time to time
upon the written consent of all parties. Any amendment to the Agreement must be in writing and
must be executed with the same formalities as this original Agreement.
13. The Agreement to Provide Potable Water and Wastewater Utility Services dated June 8, 2021 and
recorded on June 15, 2021 at OR 5964, Page 1671, is hereby repealed and relaced in its entirety
with this Agreement.
14. NOTICES. All notices required under this Agreement shall be directed to the following offices.
For the County: Office of the County Manager, 3335 East Tamiami Trail, Suite 101, Naples,
Florida 34112. For the District/Landowner: Patrick Utter, Collier Enterprises, Vice President of
Real Estate and Club Operations,999 Vanderbilt Beach Road, Suite 507,Naples, Florida 34108.
15. INDEMNIFICATION. To the extent allowed by law, each party agrees to indemnify, defend and
hold harmless the other, its officers,board members,council members,agents and employees from
and against any and all fines,suits,claims,demands, penalties, liabilities,costs or expenses, losses,
settlements, judgments and awards and actions of whatever kind or nature, including attorney's
fees and costs(and costs and fees on appeal)and damages(including,but not limited to,actual and
consequential damages) arising from any negligent, willful or wrongful misconduct, knowing
misrepresentation or material breach of this Agreement by such party, its officers, board members,
council members,agents or employees.The foregoing indemnification shall not constitute a waiver
of the CCWSD or the District's sovereign immunity beyond the limits set forth in Florida Statutes,
Section 768.28, nor shall the same be construed to constitute agreement by any party to indemnify
another party for such other party's negligent, willful or intentional acts or omissions.
16. COUNTERPARTS. This Agreement may be executed in any number of counterparts, each of
which shall be deemed to be an original as against any party whose signature appears thereon and
all of which shall together constitute one and the same instrument.
17. RECORDING. This Agreement shall be recorded in the Public Records of Collier County. The
G
3
PO
Page 7116 of 7162
County shall be responsible for recording the same.
IN WITNESS WHEREOF,the parties hereto have set their hands and seals the day and year
first written above.
BOARD OF COUNTY COMMISSIONERS
ATTEST' COLLIER COUNTY,FLORIDA
Crystal Kinzel, Clerk .*'• F,
thA(.;--netite- g BY:
Clerk Ve
Rick LoCastro,Chairman
Attest as to Chairnnart's
signature only
Approved as to form and
Lega ty:
Sa . A hk .
17AssitountyAttorneyCO/41/
ATTEST:BIG CYPR SS STEWARDSHIP I T
By:
Printed Name:Patrick . Utter, President
ATTEST: COLLIER LAND HOLDINGS,LTD.
By: TARPON BLUE CE MANAGEMENT,
LLC, Its Sole General Partner
By:
Printed Name:Christian Spilker, President& CEO
4 0
Page 7117 of 7162
C))0 0 0 0 00 0 003tONO O to nHCOco00ri1DNN 1D 00OMONNOOOululininMMtNNinIll1DoONNNomoNOInInvro, a -+ co coNveILilo., m
O O N N
00 O O
O O 1D M 100
M N N N O IN M O V O Ol
OM H1 MO N N N 1p
N N
N
in inpp0O0
in ID01 W <I
N N N O N O N N N N r N
MO O 1D Q N N 01 1p
N
M
N
0000000 o 0
Ln O N O M O in co nt -
N O N O N co IN ti 0 Ol in in
N W In ID MO N 1 V1
N
0 0 0 O 0 0 0 O In in O
N 0 Ln 0 N 0 In Lb co Li,
O 0 N 0 O n O N I N n
MO lD V1 O 01 M0 N .-1 .-1 Q
ro N0A
j
ILA 0 IIn 0 0L oN E
0- m m NCO
cn N C N C N N U, in V O O
NO 1D O U p ._,` ti .-i p
N C
N
Q
J COO O O O 0
kg/ 6-1
N
CO
N 1.0N 0 In V?
Q NO O 01 01 fl N N O
W ry
in
N N M O
ti
ULA
0 o In L o ut Ill 0
Z Ln Vl N N Lb ro -
O N N N N N n O Cl in In co) In O InN
F-
N N '
N O inN m
CI- N ry
IX0LA O O Oin
to LA LA O O 1D 01 00
113 N N N n 1D r N M n W In Co. in 00
l in
N rl N N I N Ll1 0
Q
cc O O O
m N O W co 0
1 O O O O O In O in
Wco In NN NO .1 Cl in in V .-I 0 I1 0 u1 N n O l LA
O O OI rNi
N O cn -I-I N
N N ooNa =m N .y `.
000OOInIn
O 0 O 1-1 1D N
N N N O v to N In
1DI
o 0 0
1DI
0 0 0
N N N p N Ln p uiOcor.J
O L p U O IT O cy,01 In O N .i
O In In 0 in In O
I to
ti
in
LA .-I ro 01 1 Ln O O 0 In O C O
O O O 0 v1 In O O •it In
N N In I. Ol N
In . AL
tD —Ill rtl ,
0! v C
YO Y O 0 O 0
N O 0 OMN
N J N N M 00 m W
Y `A
N
Y
N O M M Pi H .1 m
0 0 N N r`l.-i,
C U E. U N N N
E ZX V
OJ W O
U E 0 U 4! N C
w wd .-1 0_ y d In L A In
a+
v m j
p O p O rp 01 N W t N N Q
N N 3 " 3 „ " W " 3 To
m m w m w m 3 3 F
U U
cc
N .- W IL O 0
C E E C E C N C N C y C y u u LA m
a E a E v E a E a E a E -o E c c
E E E E E E E > w o u o w o v o v o v o w o
CC U CC U C U C U C U C U C U C C
w a`
03
to
00 m E — E Page 7118 of 7162
47th Ave NE
45th Ave NE PGNOLI
1
iiit43rdAveNEZ
w
m
I R'vergrass Village k,
1 QA'n it a
I
ml
0 2000 4000
Oil Well Road(C.R.858) LL33rdAveNELO —7
31st Ave NE w
29th Ave NE a°
o y)
Town of Big Cypress (North)
27th Ave NE o I L /N,
Randall Blvd. -6
m
Vl
24th Ave NE v
a
0
22nd Ave NE rn
bp
UTILITY LINE ASSOCIATED WITH
zoth Ave NE1 L TOBC (NORTH)
18th Ave NE
LL
12 1 litH16thAveNE % UTILITY SITE
I 1
14th Ave NE Ca
0 '
0 I
12th Ave NE o I
Future Vanderbilt Extension I I
10th Ave NE
1
I
1
Town of Big Cypress(South) 80' ROW
8th Ave NE Utility Mains Serving
1; Bellmar Village
6th Ave NE
BELLMAR POC
4th Ave NE
I Bellmar Village
2nd Ave NEIqi LEGEND
Golden Gate Blvd E
POC
2nd Ave.SE UTILITY MAINS ROUTE
4th Ave.SE
J
UTILITY MAINS ROUTE
ASSOCIATED WITH
6th Ave.SE TOBC (NORTH)
8th Ave.SE
Collier County Utility Agreement - Bellmar Exhibit (B)
13206ME03.dwg REV 12.16.22 CAO
Page 7119 of 7162
AGNOLI
1:GBARBER&
r,vI°BRUNDAGE,INC.
ESIIIBITC
Delhear Utility Service
Cost Comparison
March 1023
Concept:Previously,16"transmission mains were to run along Big Cypress Parkway to Golden Gate Boulevar d by Collier County.Smaller local service lines were to also run in the interior
road of The Town(Scenario I).However the current plans are for The Town and Bdlnur to be served via 16"mains that will earned solely through the interior road of The Town(Scenario 2)
and riot through BC?.The Bellmar cost coneporisnn breaks down the difference in costs for the pipes south of the utility site,relating to the interior road of The Town.The mains along BCP
c not included in slime cost comparison(Scenario II.The cost of irrigation accounts for the•ddimnsl maim that will be required to serve Mint ar which runs from the utility site to Coldest
Gate Boulevard.
Scenario I(Old) Scenario 2(New)
Description Unit Price Quantity- Unit Cost Quantity Unit Cost
6"PVC WM 105 6.800 LF 5714,1600 - LF
6"GV 51.800 10 EA S111.000 - EA
8"PVC WM 60 2.250 LF S1351160 - LF
Pnthlc Wetcr
9"GV 53.600 3 EA $16.80 - EA
16"PVC WM 5200 LF 9.100 LF S1.82ih000
16"GV S19.900 - EA 14 EA 5178 h161 PW Cost Dill.
Sub-Total SJ13,800 Sub-T rnl T2.098.600 51,21 4,80f1
Description Unit Price Quanrtitr Unit Cost Quantity Unit Cost
6-PVC FM S83 350 IT S29.750 - LF
Wastewatel 16"PVC FM 5210 - LF UM) I.F 5191I10111
16"Plug Vohs: 513.430 - FA 14 EA 1188.200 WW Cost Diff.
Sub-Total 529,75O Sub-Total 52,099.300 S2.069,550
Total Cost $913,550 Trial Cost S4,197,9120
Description tine Price Quantity Unit Cost
12"PVC Irrigation Morn $150 1I,00u LF S1,630.000
12"Gate Valve 56.9110 2 EA S13,800
Irrigation Vertical Deflection 51,100 25 LA S202.500
ARV 5.1.640 MI EA 5232.000
Sub-Total $2,096,300
urn Work• Description Unn Pete Quanets Unit Cost
Potable N'atcr
16"PVC WM 521111 1.900 LF S380,000 Previous Version,
16"GV S19.901 2 BA S39.800 December 2022.88,119,350•
Wastewater
li"PVC FM 5155 1.900 BA $294,501
f•)Indicates previous-Beumar Total Credit`wmch40012"Plug Valve 6.200 2 EA 512, included cost associated with Fiber opucs a pun
Sub-Total 5726,700 Bo:o•.
Total Cost Differential S3,284,350
CCWSD total reimbursement S6,109,350 Irrigation S2,098,300
New Work• S726,7110
Bethnal.Total Credit S6,109,350
Mt pips urdalal ix Mil erotica re la0•.ae,e.Die'nexnadmderr,raen pipe in tau torsion in.Sceneriv I tanner I.moire!ill Srenrrw 2(Ser erbiiit.f edruieaal Jeioiu)
This Opinion of Probable Cost(OPC)has been prepared by A2ooh.Barber A Bmndago.Inc.(ABB)at the request of to ow nor or as a requirement oIgo,ernenental agency.ABB has bawd the unit costs of
this OPC on previous work history with scribe projects or on satins protidcd by reputable conrractoes we have worked with in accordance with F.A C.61G-1518.011,Ibis is not a guarantee or warrantyexpressedorimpliedastotheconsuuctioncostthatmaybeobtainedbyownerusingcompctititebiddingIfsuchaguaranteeoneeded.it u recommended shut owner roam he Ian ices ofa professional
cost estimator or obtain a binding bid from a contractor.
Gpp i
Page 7120 of 7162
Appendix F - Interlocal Agreement between CCWSD
and the Big Cypress Stewardship District
(Rivergrass Village)
Page 7121 of 7162
Page 7122 of 7162
Page 7123 of 7162
Page 7124 of 7162
Page 7125 of 7162
Page 7126 of 7162
Page 7127 of 7162
Page 7128 of 7162
Appendix G – Capital Improvement Schedules
CCWSD
IWSD
Port of the Islands CID
AMUC not provided by utility or publicly available
Page 7129 of 7162
Collier County Water-Sewer District
Page 7130 of 7162
Line No.Project No.Responsible Project NameFY 2024 Proposed BudgetAUIR FY 2024 FY 2025 FY 2026 FY 2027 FY 2028SummaryFY 2024-2028Existing 412 Water Projects1 33842FDEP Statewide Water Restoration2 50105Patrick T.Robin B.Integrated Asset Management Program100,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 900,000$ 3 50154Hurricane Irma-$ -$ -$ -$ -$ -$ -$ 4 50199COVID-19-$ -$ -$ -$ -$ -$ -$ 5 60224 Diana D. Lely Golf Estates (PUR)-$ 5,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 20,000,000$ 6 70010 Jesse K. Water Meter Renewal and Replacement Program200,000$ 300,000$ 300,000$ 4,000,000$ 4,000,000$ 4,000,000$ 12,500,000$ 7 70014 Ben B. Real Property/Infrastructure Audit25,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 225,000$ 8 70019 Jesse K. Cross Connections Program50,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 4,050,000$ 9 70023 Shon F. Fire Hydrants Replacement25,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 425,000$ 10 70031 Anthony S. Utility Master Plan100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ 11 70034 Alicia A.Water Plant Concrete Structure Rehabilitation-$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 800,000$ 12 70041 Alicia A.Water Lighting/ Surge Protection & Grounding-$ 150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 600,000$ 13 70045 Anthony S. FDOT Utility Construction Projects - W-$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 400,000$ 14 70069Shon F.Tom S.Well/Plant Power System3,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 7,000,000$ 15 70071 Anthony S. Countywide Utility Projects - Water-$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 200,000$ 16 70084 Mike R. Wellfield SCADA Support Operating 250,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,450,000$ 17 70085 Tom S. Wellfield/Raw Water Booster Station Op TSP4,500,000$ 1,000,000$ 5,000,000$ 1,500,000$ 1,500,000$ 1,500,000$ 14,000,000$ 18 70087 Ben B. Vanderbilt Dr WM-$ -$ -$ -$ -$ -$ -$ 19 70102 Mike R. SCRWTP SCADA Support Operating300,000$ 350,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,500,000$ 20 70103Tom S.Corinne T.NE Svs Area Interg-$ -$ -$ -$ -$ -$ -$ 21 70104 Tom S. Water Plant Compliance1,200,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 1,600,000$ 22 70109 Alicia A. Lime Treatment TSP-$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,200,000$ 23 70111 Close/BA NCRWTP Facilities-$ -$ -$ -$ -$ -$ -$ 24 70113 Matt F. Facility Infrastructure Maint Water 15,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,215,000$ 25 70114 Matt F. Infrastructure TSP Field Ops-Water-$ 150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 600,000$ 26 70118Matt F.Robin B.Infrastructure TSP -Water Plants500,000$ 1,300,000$ 400,000$ 400,000$ 400,000$ 400,000$ 2,100,000$ 27 70120Diana D. Naples Pk Basin Optimization2,300,000$ 5,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ -$ 17,300,000$ 28 70121 Annia M. Utility Billing Customer Serv Software10,000$ -$ -$ -$ -$ -$ 10,000$ 29 70122 Diana D. VB DR CDS Basin 101-$ -$ -$ -$ -$ -$ -$ 30 70123 Diana D. Naples Park Water Main Replacement-$ -$ -$ -$ -$ -$ -$ 31 70125 Close/BA BCHS W Main Replacement - Close Out-$ -$ -$ -$ -$ -$ -$ 32 70129 Ben B. VBR WM Replacement-Apt. to US41-$ -$ -$ -$ -$ -$ -$ 33 70131 Jesse K. Large Meters Renewal & Replacement200,000$ $ 200,000 200,000$ 1,000,000$ 1,000,000$ 1,000,000$ 3,400,000$ 34 70132 Close/BA SCRWTP Power Systems Reliability-$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 400,000$ 35 70134 Close/BA Imp GC Blvd WM Replacement Close out Project-$ -$ -$ -$ -$ -$ -$ 36 70135 Alicia A. SCRWTP Reactor #4-$ -$ -$ -$ -$ -$ -$ 37 70136Alicia A.Tom S.Water Plant Capital Projects1,600,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 2,600,000$ 38 70167Government Operations Business Park-$ -$ -$ -$ -$ -$ -$ 39 70173 Tom S. Orangetree Plant TSP (op)-$ -$ -$ -$ -$ -$ -$ 40 70174Diana D.Shon F.Distribution Capital Projects (unplanned)-$ -$ 1,500,000$ 2,000,000$ 2,500,000$ 1,000,000$ 7,000,000$ 41 70176 Ben B. Goodland-$ -$ 42 70179 Close/BA Orangetree HSP & Chloramine Systems Close out Project-$ -$ -$ -$ -$ -$ -$ 43 70180Diana D.Ben B.Warren St. Looping-$ -$ -$ -$ -$ -$ -$ Page 7131 of 7162
Line No.Project No.Responsible Project NameFY 2024 Proposed BudgetAUIR FY 2024 FY 2025 FY 2026 FY 2027 FY 2028SummaryFY 2024-202844 70181Alicia A.Ben B.Diana D.Trail Blvd. WM Replacement-$ -$ -$ -$ -$ -$ -$ 45 70185Diana D.Ben B.YMCA Road AC WM Replacement-$ -$ -$ -$ -$ -$ -$ 46 70188 Alicia A. Twin Eagles Mon Panl-$ -$ -$ -$ -$ -$ -$ 47 70189 Close/BA Cyber Security SCADA-$ -$ -$ -$ -$ -$ -$ 48 70192 Close Palm River Bridge Pipe Replacement Close out Project-$ -$ -$ -$ -$ -$ -$ 49 70194 Craig P. NE Utility Facilities-$ -$ -$ -$ -$ -$ -$ 50 70195 Diana D. Pelican Ridge AC Pipe Removal-$ -$ -$ -$ -$ -$ -$ 51 70196 Tom S. Tamiami Wellfield-$ -$ 1,800,000$ 1,800,000$ 3,600,000$ 52 70197 Close/BA Lely PUR-$ -$ 53 70202 Anthony S. Collier County Utility Standards20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ 54 70220 Close Golden Gate Interconnect Close out Project-$ -$ -$ -$ -$ -$ -$ 55 70222Corinne T.Shon F.Ben B.Golden Gate City Utility Compliance-$ -$ 900,000$ -$ -$ -$ 900,000$ 5670229 Shon F. I-75 / CR951 Utility-$ -$ -$ -$ -$ -$ -$ 57 70242 Close/BA SCRWTP Ion Exchange Improvements-$ -$ -$ -$ -$ -$ -$ 58 70244 Transportation VBR Extension - Utility Relocations-$ -$ -$ -$ -$ -$ -$ 59 70247 Close/BA US 41 N Utility Replacement-$ -$ -$ -$ -$ -$ -$ 60 70248 Diana D. US 41 East WM Replacement-$ -$ -$ -$ -$ -$ -$ 61 70257 Diana D. Palm River PUR4,500,000$ 5,000,000$ -$ 5,000,000$ -$ 5,000,000$ 14,500,000$ 62 70258 Tom S. NCRWTP Degasifiers Mods-$ -$ -$ -$ -$ -$ -$ 63 70260 Ben B. Goodland Commercial Water Main Replacement-$ -$ -$ -$ 64 70261Plant/Pump Station Asphalt Overlay Program (Const)-$ -$ -$ -$ 65 70263 Shon F. Golden Gate WTP-$ -$ -$ 66 70264Manatee Pump Station Yard Piping Improvements-$ 3,000,000$ -$ 3,000,000$ -$ -$ 3,000,000$ 67 70265Manatee Road Water Main Improvements-$ 1,000,000$ -$ 1,000,000$ -$ 1,000,000$ 68 70267 Tom S. NCRWTP Concentrate Well Pumps & Motor-$ -$ -$ -$ 69 70268Cast Iron Water Main Replacement (Carica P.S to Airp)-$ -$ -$ -$ -$ -$ 70 70271 Ben B. Tamiami Raw WM Replacement-$ -$ -$ 7170273Generator Replacement Program-$ 4,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 20,000,000$ 72 70275WM Repl Carlton & Catts-$ 2,000,000$ 2,000,000$ -$ 4,000,000$ 73 70276 Alicia A. Goodland PS Improvements-$ 3,000,000$ -$ 3,000,000$ 74 70277 Tom S. NCRWTP Nano Skid Rehab-$ -$ -$ 75 70282 Diana D. Pine Ridge Road Utility Relocation-$ -$ 76 71009 Dave M. Water Security Systems150,000$ 400,000$ 200,000$ 200,000$ 400,000$ 400,000$ 1,350,000$ 77 71010 Water Distribution System TSP -$ 1,000,000$ 400,000$ 400,000$ 400,000$ 400,000$ 1,600,000$ 78 71055 Mike R. NCRWTP SCADA Support Operating150,000$ 300,000$ 150,000$ 150,000$ 300,000$ 300,000$ 1,050,000$ 79 71056 Mike R. SCADA Compliance Assurance Program- Water100,000$ 125,000$ 125,000$ 125,000$ 125,000$ 125,000$ 600,000$ 80 71057 Tom S. Membrane Replacement & Interstage Booster1,400,000$ -$ -$ -$ -$ -$ 1,400,000$ 81 71058 PUD General Legal Services50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ 82 71063 Alicia A. Water Plant Variable Frequency Drives-$ 275,000$ 275,000$ 275,000$ 275,000$ 275,000$ 1,100,000$ 83 71065Alicia A.Ben B.SCRWTP Operating TSP600,000$ 600,000$ 600,000$ 600,000$ 600,000$ 600,000$ 3,000,000$ 8471066 Tom S. NCRWTP Operating TSP1,000,000$ 600,000$ 600,000$ 600,000$ 600,000$ 600,000$ 3,400,000$ 85 71067 Shon F.Distribution Repump Station TSP100,000$ 300,000$ 100,000$ 100,000$ 300,000$ 300,000$ 900,000$ 86 75005 Alicia A. Wellfield Program Management-$ 100,000$ 50,000$ 50,000$ 150,000$ 150,000$ 400,000$ 87 75017 Ben B. PUD Hydraulic Modeling50,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 450,000$ 88 75018 Katrina L. Financial Services30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ 89 75019 Anthony S.GM Comprehensive Planning Technical Support250,000$ 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 350,000$ -$ Page 7132 of 7162
Line No.Project No.Responsible Project NameFY 2024 Proposed BudgetAUIR FY 2024 FY 2025 FY 2026 FY 2027 FY 2028SummaryFY 2024-2028New 412 Water Projects-$ 90 70262Golden Gate City PUR-$ -$ -$ 500,000$ 2,000,000$ 2,000,000$ 4,500,000$ 91 WNEW11 TBD Variable TDS Treatment Bridge-the-Gap-$ -$ 2,000,000$ 2,000,000$ 92 WNEW12 TBD SCRWTP Odor Control - RO-$ -$ -$ 2,000,000$ 2,000,000$ 93 WNEW13 TBD Raw Water Main Fusible PVC Replacement-$ -$ -$ -$ -$ -$ -$ 94 70286 TBD PCCP Replacement (Ph1 - Carica PS to Airport)300,000$ -$ -$ 300,000$ 95 70285 TBD Airport Road Cast Iron Water Main Repl (VBR to Pine Ridge)500,000$ 500,000$ 6,500,000$ 7,000,000$ 96 WNEW19 TBD Water Main Replacement with high failure rates-$ 300,000$ 2,000,000$ 2,000,000$ 4,300,000$ 97 WNEW20 TBD Tamiami Raw Water Main under Golden Gate Canal-$ -$ 98 70283Shon F.Ben B.SCRWTP Improvements/Expansion-$ 2,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 17,000,000$ 99 70287 TBD NCRWTP Facility Plan/Improvements/Reliability Expansion1,000,000$ 1,000,000$ WNEW24Future PUR (Cast Iron WM replacement near Carica)2,000,000$ 500,000$ 2,000,000$ 2,500,000$ WNEW25CCWSD Building5,000,000$ -$ TOTAL FUND 412 WATER Projects24,575,000$ 42,025,000$ 46,575,000$ 47,175,000$ 46,325,000$ 44,025,000$ 208,675,000$ Existing 419 Bond Funded Projects Water Impact Fee109 70194 Craig P. Perimeter Wellfield Design Update2,620,804$ -$ -$ -$ -$ -$ 2,620,804$ 110 70194 Craig P. Drill perimeter wells (14 wells ~ $1.75M/well)25,000,000$ -$ -$ -$ -$ 25,000,000$ 111 70194 Craig P. CEI & CA - Drill perimeter wells (14 wells ~ $1.75M/well)5,000,000$ -$ -$ -$ -$ -$ 5,000,000$ 112 70194 Craig P. Construct deep injection well12,500,000$ -$ -$ -$ 12,500,000$ 113 70253Ben B.Liz G.Golden Gate City Utility Ph 1 & 2 (Transmission)-$ -$ TOTAL FUND 419 WATER Impact Fee45,120,804$ -$ -$ -$ -$ -$ 45,120,804$ Existing 419 Bond Funded Projects Water User Fee114 70167Government Operations Business Park (User Fee)-$ -$ -$ -$ -$ -$ TOTAL FUND 419 WATER User Fee-$ -$ TOTAL FUND 419 WATER Projects42,500,000$ -$ -$ -$ -$ -$ 42,500,000$ Projects which will require Commercial Paper115 70194 Craig P. Town of Big Cypress Water Reimbursement + 10% CEI (Impact Fee)1,198,450$ 1,198,450$ 116 70194 Craig P. Belmar Water Reimbursement + 10% CEI (Impact Fee)1,798,060$ 1,798,060$ TOTAL Projects which will require Commercial Paper-$ -$ 2,996,510$ -$ -$ -$ 2,996,510$ Projects which will require Bond/Loan -Impact Fee / User Fee115 70194 Craig P. Const South Wellfield (5 wells) - 50% W, 50% WW - IQ-$ 3,750,000$ -$ -$ 3,750,000$ 116 70194 Craig P. CEI & CA - Const South Wellfield (5 wells) - 50% W, 50% WW - IQ-$ 750,000$ -$ 750,000$ 117 70194 Craig P. Construct 10 mgd NECWTP (Impact Fee)-$ -$ -$ -$ -$ -$ 118 70194 Craig P. CEI & CA - 10 mgd NECWTP (Impact Fee)-$ -$ -$ -$ -$ 119 70194 Craig P. Construct Perimeter Wellfield (14 wells)-$ 120 70194 Craig P. CEI & CA - Construct Perimeter Wellfield (14 wells)-$ 121 70194 Craig P. Construct Common Area Facilities-$ -$ 122 70194 Craig P. CEI & CA - Construct Common Area Facilities-$ -$ 123 70194 Craig P. North Collier Aquifer Analysis-$ -$ TOTAL Projects which will require Bond/Loan -Impact Fee / User Fee-$ -$ 4,500,000$ -$ -$ -$ 4,500,000$ Page 7133 of 7162
Line No.Project No.Responsible Project NameFY 2024 Proposed BudgetAUIR FY 2024 FY 2025 FY 2026 FY 2027 FY 2028SummaryFY 2024-2028-$ -$ -$ -$ -$ -$ -$ 24,575,000$ 42,025,000$ 46,575,000$ 47,175,000$ 46,325,000$ 44,025,000$ 208,675,000$ -$ -$ -$ -$ -$ -$ -$ 42,500,000$ -$ -$ -$ -$ -$ 42,500,000$ -$ -$ 2,996,510$ -$ -$ -$ 2,996,510$ Total Future Bond-$ -$ 4,500,000$ -$ -$ -$ 4,500,000$ 24,575,000$ 42,025,000$ 46,575,000$ 47,175,000$ 46,325,000$ 44,025,000$ 208,675,000$ -$ -$ -$ -$ -$ 67,075,000$ 42,025,000$ 46,575,000$ 47,175,000$ 46,325,000$ 44,025,000$ 251,175,000$ Total Water Impact Fee Projects (411)Total Water User Fees Projects (412)Total NE Bond Funded Projects (415)TOTAL WATER PROJECTS (411, 412 & 415) excl new loans (419)TOTAL WATER PROJECTS (411, 412, 415 & incl new loans 419)Total NE Bond Funded Projects (419)Total Commercial Paper Funded Projects (420)Page 7134 of 7162
Line No.Project No.Project NameFY 2023-2027FY 2029FY 2030FY 2031FY 2032FY2033FY 2029-2033SummaryFY 2023-2032Existing 412 Water Projects2 50105 Integrated Asset Management Program900,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ 1,900,000$ 3 50154 Hurricane Irma-$ -$ -$ -$ -$ -$ 4 50199 COVID-19-$ -$ -$ -$ -$ -$ 5 60224 Lely Golf Estates (PUR)20,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 25,000,000$ 45,000,000$ 6 70010 Water Meter Renewal and Replacement Program12,500,000$ 4,000,000$ 4,000,000$ 4,000,000$ 4,000,000$ 4,000,000$ 20,000,000$ 32,500,000$ 7 70014 Real Property/Infrastructure Audit225,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ 475,000$ 8 70019 Cross Connections Program4,050,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 5,000,000$ 9,050,000$ 9 70023 Fire Hydrants Replacement425,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ 925,000$ 10 70031 Utility Master Plan500,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ 1,000,000$ 11 70034 Water Plant Concrete Structure Rehabilitation800,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ 1,800,000$ 12 70041 Water Lighting/ Surge Protection & Grounding600,000$ 150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 750,000$ 1,350,000$ 13 70045 FDOT Utility Construction Projects - W400,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ 900,000$ 14 70069 Well/Plant Power System7,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 5,000,000$ 12,000,000$ 1570071Countywide Utility Projects - Water200,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ 450,000$ 16 70084 Wellfield SCADA Support Operating 1,450,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,500,000$ 2,950,000$ 17 70085 Wellfield/Raw Water Booster Station Op TSP14,000,000$ 6,500,000$ 1,500,000$ 1,500,000$ 1,500,000$ 1,500,000$ 12,500,000$ 26,500,000$ 18 70087 Vanderbilt Dr WM-$ -$ -$ -$ -$ -$ -$ -$ 19 70102 SCRWTP SCADA Support Operating1,500,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,500,000$ 3,000,000$ 20 70103 NE Svs Area Interg-$ -$ -$ -$ -$ -$ -$ -$ 21 70104 Water Plant Compliance1,600,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ 2,100,000$ 22 70109 Lime Treatment TSP1,200,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,500,000$ 2,700,000$ 23 70111 NCRWTP Facilities-$ -$ -$ -$ -$ -$ -$ -$ 24 70113 Facility Infrastructure Maint Water 1,215,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,500,000$ 2,715,000$ 25 70114 Infrastructure TSP Field Ops-Water600,000$ 150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 750,000$ 1,350,000$ 26 70118 Infrastructure TSP -Water Plants2,100,000$ 400,000$ 400,000$ 400,000$ 400,000$ 400,000$ 2,000,000$ 4,100,000$ 27 70120 Naples Pk Basin Optimization17,300,000$ -$ -$ -$ -$ -$ -$ 17,300,000$ 28 70121 Utility Billing Customer Serv Software10,000$ -$ -$ -$ -$ -$ -$ 10,000$ 29 70122 VB DR CDS Basin 101-$ -$ -$ -$ -$ -$ -$ -$ 30 70123 Naples Park Water Main Replacement-$ -$ -$ -$ -$ -$ -$ -$ 31 70125 BCHS W Main Replacement - Close Out-$ -$ -$ -$ -$ -$ -$ -$ 32 70129 VBR WM Replacement-Apt. to US41-$ -$ -$ -$ -$ -$ -$ -$ 33 70131 Large Meters Renewal & Replacement3,400,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 5,000,000$ 8,400,000$ 34 70132 SCRWTP Power Systems Reliability400,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ 900,000$ 35 70134 Imp GC Blvd WM Replacement Close out Project-$ -$ -$ -$ -$ -$ -$ -$ 3670135 SCRWTP Reactor #4-$ -$ -$ -$ -$ -$ -$ -$ 37 70136 Water Plant Capital Projects2,600,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 1,250,000$ 3,850,000$ 38 70167 Government Operations Business Park-$ -$ -$ -$ -$ -$ -$ -$ 39 70173 Orangetree Plant TSP (op)-$ -$ -$ -$ -$ -$ -$ -$ 40 70174 Distribution Capital Projects (unplanned)7,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 5,000,000$ 12,000,000$ 70176 Goodland-$ -$ 42 70179 Orangetree HSP & Chloramine Systems Close out Project-$ -$ -$ -$ -$ -$ -$ -$ 43 70180 Warren St. Looping-$ -$ -$ -$ -$ -$ -$ -$ Page 7135 of 7162
Line No.Project No.Project NameFY 2023-2027FY 2029FY 2030FY 2031FY 2032FY2033FY 2029-2033SummaryFY 2023-203244 70181 Trail Blvd. WM Replacement-$ -$ -$ -$ -$ -$ -$ -$ 45 70185 YMCA Road AC WM Replacement-$ -$ -$ -$ -$ -$ -$ -$ 46 70188 Twin Eagles Mon Panl-$ -$ -$ -$ -$ -$ -$ -$ 47 70189 Cyber Security SCADA-$ -$ -$ -$ -$ -$ -$ -$ 48 70192 Palm River Bridge Pipe Replacement Close out Project-$ -$ -$ -$ -$ -$ -$ -$ 49 70194 NE Utility Facilities-$ -$ -$ -$ -$ -$ -$ -$ 50 70195 Pelican Ridge AC Pipe Removal-$ -$ -$ -$ -$ -$ -$ -$ 51 70196 Tamiami Wellfield3,600,000$ 1,800,000$ 1,800,000$ 1,800,000$ 5,400,000$ 9,000,000$ 52 70197 Lely PUR-$ -$ -$ -$ -$ 53 70202 Collier County Utility Standards100,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ 200,000$ 54 70220 Golden Gate Interconnect Close out Project-$ -$ -$ -$ -$ -$ -$ -$ 55 70222 Golden Gate City Utility Compliance900,000$ -$ -$ -$ -$ -$ -$ 900,000$ 56 70229 I-75 / CR951 Utility-$ -$ -$ -$ -$ -$ -$ -$ 57 70242 SCRWTP Ion Exchange Improvements-$ -$ -$ -$ -$ -$ -$ -$ 58 70244 VBR Extension - Utility Relocations-$ -$ -$ -$ -$ -$ -$ -$ 59 70247 US 41 N Utility Replacement-$ -$ -$ -$ -$ -$ -$ -$ 60 70248 US 41 East WM Replacement-$ -$ -$ -$ -$ -$ -$ -$ 61 70257 Palm River PUR14,500,000$ -$ 5,000,000$ -$ -$ -$ 5,000,000$ 19,500,000$ 62 70258 NCRWTP Degasifiers Mods-$ -$ -$ -$ -$ -$ 63 70260 Goodland Commercial Water Main Replacement-$ -$ -$ -$ -$ -$ -$ -$ 64 70261 Plant/Pump Station Asphalt Overlay Program (Const)-$ -$ -$ -$ -$ -$ -$ -$ 65 70263 Golden Gate WTP-$ -$ -$ -$ -$ -$ -$ -$ 66 70264 Manatee Pump Station Yard Piping Improvements3,000,000$ -$ -$ -$ -$ -$ -$ 3,000,000$ 67 70265 Manatee Road Water Main Improvements1,000,000$ -$ -$ -$ -$ -$ -$ 1,000,000$ 68 70267 NCRWTP Concentrate Well Pumps & Motor-$ -$ -$ -$ -$ -$ -$ -$ 69 70268 Cast Iron Water Main Replacement (Carica P.S to Airp)-$ -$ -$ -$ -$ -$ -$ -$ 70 70271 Tamiami Raw WM Replacement-$ -$ -$ -$ -$ -$ -$ -$ 71 70273 Generator Replacement Program20,000,000$ -$ -$ -$ -$ -$ -$ 20,000,000$ 72 70275 WM Repl Carlton & Catts4,000,000$ -$ -$ -$ -$ -$ -$ 4,000,000$ 73 70276 Goodland PS Improvements3,000,000$ -$ -$ -$ -$ -$ -$ 3,000,000$ 74 70277 NCRWTP Nano Skid Rehab-$ -$ -$ -$ -$ -$ -$ -$ 70282 Pine Ridge Road Utility Relocation-$ -$ 76 71009 Water Security Systems1,350,000$ 400,000$ 400,000$ 400,000$ 400,000$ 400,000$ 2,000,000$ 3,350,000$ 77 71010 Distribution System TSP 1,600,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 5,000,000$ 6,600,000$ 78 71055 NCRWTP SCADA Support Operating1,050,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,500,000$ 2,550,000$ 7971056 SCADA Compliance Assurance Program- Water600,000$ 125,000$ 125,000$ 125,000$ 125,000$ 125,000$ 625,000$ 1,225,000$ 8071057 Membrane Replacement & Interstage Booster1,400,000$ -$ -$ -$ -$ -$ -$ 1,400,000$ 81 71058 General Legal Services250,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ 500,000$ 82 71063 Water Plant Variable Frequency Drives1,100,000$ 275,000$ 275,000$ 275,000$ 275,000$ 275,000$ 1,375,000$ 2,475,000$ 83 71065 SCRWTP Operating TSP3,000,000$ 600,000$ 600,000$ 600,000$ 600,000$ 600,000$ 3,000,000$ 6,000,000$ 84 71066 NCRWTP Operating TSP3,400,000$ 600,000$ 600,000$ 600,000$ 600,000$ 600,000$ 3,000,000$ 6,400,000$ 85 71067 Distribution Repump Station TSP900,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,500,000$ 2,400,000$ 86 75005 Wellfield Program Management400,000$ 150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 750,000$ 1,150,000$ 87 75017 PUD Hydraulic Modeling450,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ 950,000$ 88 75018 Financial Services150,000$ 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ 300,000$ 89 75019 GM Comprehensive Planning Technical Support350,000$ 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ 475,000$ -$ -$ -$ Page 7136 of 7162
Line No.Project No.Project NameFY 2023-2027FY 2029FY 2030FY 2031FY 2032FY2033FY 2029-2033SummaryFY 2023-2032New 412 Water Projects-$ -$ -$ 90 70262 Golden Gate City PUR4,500,000$ 2,000,000$ 2,000,000$ 2,000,000$ 2,000,000$ 2,000,000$ 10,000,000$ 14,500,000$ 91 WNEW11 Variable TDS Treatment Bridge-the-Gap2,000,000$ 7,000,000$ 7,000,000$ 7,000,000$ -$ 21,000,000$ 23,000,000$ 92 WNEW12 SCRWTP Odor Control - RO2,000,000$ 2,000,000$ -$ -$ -$ 2,000,000$ 4,000,000$ 93 WNEW13 Raw Water Main Fusible PVC Replacement-$ -$ -$ -$ -$ -$ -$ 94 70286 PCCP Replacement (Ph1 - Carica PS to Airport)300,000$ 4,000,000$ 4,000,000$ 4,000,000$ 12,000,000$ 12,300,000$ 95 70285 Airport Road Cast Iron Water Main Repl (VBR to Pine Ridge)7,000,000$ -$ 7,000,000$ 96 WNEW19 Water Main Replacement with high failure rates4,300,000$ 2,000,000$ 2,000,000$ 2,000,000$ 2,000,000$ 2,000,000$ 10,000,000$ 14,300,000$ 97 WNEW20 Tamiami Raw Water Main under Golden Gate Canal-$ -$ 98 70283 SCRWTP Improvements/Expansion17,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 25,000,000$ 42,000,000$ NCRWTP Facility Plan/Improvements/Reliability Expansion-$ WNEW23 Future PUR2,500,000$ 2,000,000$ 5,000,000$ 7,000,000$ 9,500,000$ WNEW24 CCWSD Building-$ -$ -$ #### #####TOTAL FUND 412 WATER Projects207,675,000$ 46,425,000$ 42,625,000$ 45,425,000$ 39,625,000$ 36,425,000$ 210,525,000$ 418,200,000$ Existing 419 Bond Funded Projects Water Impact Fee109 70194 #REF!2,620,804$ -$ -$ -$ -$ -$ -$ 2,620,804$ 110 70194 CEI & CA - Drill perimeter wells (14 wells ~ $1.75M/well)25,000,000$ -$ -$ -$ -$ -$ -$ 25,000,000$ 111 70194 05,000,000$ -$ -$ -$ -$ -$ -$ 5,000,000$ 112 70194 Construct deep injection well12,500,000$ -$ 12,500,000$ 113 70253 Golden Gate City Utility Ph 1 & 2 (Transmission)-$ -$ -$ TOTAL FUND 419 WATER Impact Fee45,120,804$ -$ -$ -$ -$ -$ 45,120,804$ Existing 419 Bond Funded Projects Water User Fee114 70167 Government Operations Business Park (User Fee)-$ -$ -$ -$ -$ -$ -$ -$ TOTAL FUND 419 WATER User Fee-$ -$ -$ -$ -$ -$ -$ TOTAL FUND 419 WATER Projects42,500,000$ -$ -$ -$ -$ -$ 45,120,804$ 115 70170Town of Big Cypress Water Reimbursement + 10% CEI (Impact Fee)1,198,450$ -$ -$ -$ -$ -$ -$ 1,198,450$ 116 70171 Belmar Water Reimbursement + 10% CEI (Impact Fee)1,798,060$ -$ -$ -$ -$ -$ -$ 1,798,060$ TOTAL Projects which will require Commercial Paper $ 2,996,510 $ - $ - $ - $ - $ - $ - $ 2,996,510 ProjecProjects which will require Bond/Loan - User Fee115 70194 Const South Wellfield (5 wells) - 50% W, 50% WW - IQ3,750,000$ -$ -$ -$ -$ -$ -$ 3,750,000$ 116 70167CEI & CA - Const South Wellfield (5 wells) - 50% W, 50% WW - IQ750,000$ -$ -$ -$ -$ -$ -$ 750,000$ 117 70194 Construct 10 mgd NECWTP (Impact Fee)-$ 146,900,000$ -$ -$ -$ -$ 146,900,000$ 146,900,000$ 118 70194 CEI & CA - 10 mgd NECWTP (Impact Fee)-$ 29,380,000$ -$ -$ -$ -$ 29,380,000$ 29,380,000$ 119 70194 Construct Perimeter Wellfield (14 wells)-$ 21,000,000$ 21,000,000$ 21,000,000$ 120 70194 CEI & CA - Construct Perimeter Wellfield (14 wells)-$ 4,200,000$ 4,200,000$ 4,200,000$ 121 70168 Construct Common Area Facilities-$ 15,000,000$ -$ -$ -$ -$ 15,000,000$ 15,000,000$ 122 70169 CEI & CA - Construct Common Area Facilities-$ 3,000,000$ -$ -$ -$ -$ 3,000,000$ 3,000,000$ 123 70172 North Collier Aquifer Analysis-$ 800,000$ -$ -$ -$ -$ 800,000$ 800,000$ ##TOTAL Projects which will require Bond/Loan - User Fee $ 4,500,000 $ 220,280,000 $ - $ - $ - $ - 220,280,000$ 224,780,000$ Page 7137 of 7162
Line No.Project No.Project NameFY 2023-2027FY 2029FY 2030FY 2031FY 2032FY2033FY 2029-2033SummaryFY 2023-2032-$ -$ -$ -$ -$ -$ -$ -$ 208,675,000$ 46,425,000$ 42,625,000$ 45,425,000$ 39,625,000$ 36,425,000$ 210,525,000$ 419,200,000$ -$ -$ -$ -$ -$ -$ -$ -$ 42,500,000$ -$ -$ -$ -$ -$ -$ 42,500,000$ Total Commercial Paper Funded Projects (420)2,996,510$ -$ -$ -$ -$ -$ -$ 2,996,510$ Total Future Bond4,500,000$ 220,280,000$ -$ -$ -$ -$ 220,280,000$ 224,780,000$ #### #####208,675,000$ 46,425,000$ 42,625,000$ 45,425,000$ 39,625,000$ 36,425,000$ 210,525,000$ 419,200,000$ ####(6,836,000)$ -$ -$ -$ -$ ####251,175,000$ 46,425,000$ 42,625,000$ 45,425,000$ 39,625,000$ 36,425,000$ 210,525,000$ 461,700,000$ Total Water Impact Fee Projects (411)Total Water User Fees Projects (412)Total NE Bond Funded Projects (415)TOTAL WATER PROJECTS (411, 412 & 415) excl new loans (419)TOTAL WATER PROJECTS (411, 412, 415 & incl new loans 419)Total NE Bond Funded Projects (419)Page 7138 of 7162
Line No.Project No. Responsible Project NameFY 2024 Proposed BudgetAUIR FY 2024 FY 2025 FY 2026 FY 2027 FY 2028SummaryFY 2023-2027Existing 414 Wastewater (Non-IQ) Projects-$ 1 33842FDEP Statewide Water Restoration-$ 2 50105 Facilities Integrated Asset Management Program200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ 3 50110Biosolids Reuse Facility-$ -$ -$ -$ -$ -$ 4 50154 Close/BA Hurricane Irma-$ -$ -$ -$ -$ -$ 5 50196 Matt F. Chiller NCWRF Ops Bldg-$ -$ -$ -$ -$ -$ 6 50199 Close/BA COVID-19-$ -$ -$ -$ -$ -$ 7 50391 Harry R. WW Hurricane Resiliency-$ -$ -$ -$ -$ -$ 8 60224Liz G.StormwaterLely Golf Estates675,000$ 6,000,000$ 6,000,000$ 6,000,000$ 6,000,000$ 6,000,000$ 24,675,000$ 9 70014 Ben B. Real Property/Infrastructure Audit80,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 280,000$ 10 70031 Anthony S. Utilities Master Plan100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ 11 70043 Close/BA Gravity Sewers TSP CAP-$ -$ -$ -$ -$ -$ 12 70044 Close/BA Force Main Improvements Cap-$ -$ -$ -$ -$ -$ 13 70046Wastewater Pump Station TSP -$ -$ -$ -$ -$ -$ 1470050 Close/BA Master Pump Stations TSP Cap-$ -$ -$ -$ -$ -$ 15 70053 Close/BA NCWRF Power System TSP-$ -$ -$ -$ -$ -$ 16 70055 Close/BA SCWRF Power System Cap-$ -$ -$ -$ -$ -$ 17 70060 Mike R. NCWRF SCADA Support Operating TSP350,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,550,000$ 18 70061 Mike R. SCWRF SCADA Support Operating TSP350,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,550,000$ 19 70103 Close/BA NE Svs Area Interg-$ -$ -$ -$ -$ -$ 20 70117Robin B.Dayan H.WW Remote Sites MSP80,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 880,000$ 21 70119Robin B.Matt F.WW Treatment Plants MSP-$ 400,000$ 400,000$ 400,000$ 400,000$ 400,000$ 1,600,000$ 22 70120 Diana D. Naples Pk Basin Optimization8,000,000$ 5,500,000$ 8,000,000$ 8,000,000$ 8,000,000$ 8,000,000$ 40,000,000$ 23 70121 Annia M. Utility Billing Customer Serv Software10,000$ -$ -$ -$ -$ -$ 10,000$ 24 70122 Close/BA VB DR CDS Basin 101-$ -$ -$ -$ -$ -$ 25 70139Corinne T.Diana D. Damian C.Basin 101 Program Capital-$ -$ -$ -$ -$ -$ -$ WASTEWATER (NON-IQ) AND IRRIGATION QUALITY (IQ) WATER2022 WASTEWATER 10-YEAR CIP PLAN UPDATECAPITAL IMPROVEMENT PROJECTS 2023-2027Page 7139 of 7162
Line No.Project No. Responsible Project NameFY 2024 Proposed BudgetAUIR FY 2024 FY 2025 FY 2026 FY 2027 FY 2028SummaryFY 2023-202726 70141 Zamira D. Basin 305 Program Capital (Pump Stations)500,000$ 2,000,000$ 3,000,000$ 3,000,000$ 3,000,000$ 3,000,000$ 12,500,000$ 27 70142 Ismael I. Basin 306 Program Capital-$ 1,000,000$ 1,500,000$ 1,500,000$ 1,500,000$ 1,500,000$ 6,000,000$ 28 70143 Lourdes S. Gravity Transmission Systems TSP -$ -$ -$ -$ -$ -$ 29 70144Corinne T.Damain C.Force Main Transmission Systems TSP 100,000$ 250,000$ 200,000$ 300,000$ 300,000$ 300,000$ 1,200,000$ 30 70145 Corinne T. WW Pump Station TSP50,000$ -$ -$ -$ -$ -$ 50,000$ 31 70146 Close/BA Master PS TSP Op-$ -$ -$ -$ -$ -$ 32 70147 Close/BA Collections Power System TSP-$ -$ -$ -$ -$ -$ 33 70148Peter S.Wayne K.Water Reclamation Facilities TSP1,000,000$ 4,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 21,000,000$ 34 70149Wayne K.Craig P.NCWRF New Headworks4,094,200$ 10,000,000$ 12,500,000$ 12,500,000$ -$ -$ 29,094,200$ 35 70164 Close/BA WW Collections SCADA Telemetry-$ -$ -$ -$ -$ -$ 36 70167 Facilities Government Operations Business Park-$ -$ -$ -$ -$ -$ 37 70173Ben B.Peter S.Tom S.Orangetree Compliance100,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,300,000$ 38 70183 Close/BA Pump Station 300.06-$ -$ -$ -$ -$ -$ 39 70189 Mike R. Cyber Security SCADA-$ -$ -$ -$ -$ -$ 40 70192 Close/BA Palm River Bridge Pipe Replacement-$ -$ -$ -$ -$ -$ 41 70194 Craig P. NE Utility Facilities-$ -$ -$ -$ -$ -$ 42 70202 Harry R. County Utility Standards -$ 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 100,000$ 43 70204 Peter S. SCWRF IQ Storage Improvements-$ -$ -$ -$ -$ -$ 44 70207 Ismael I. MPS 301 Rehabilitation750,000$ -$ -$ -$ -$ -$ 750,000$ 45 70208 Close/BA PS 302.07 Gravity Sewer-$ -$ -$ -$ -$ -$ 46 70213 Close/BA MPS 300 Rehab-$ -$ -$ -$ -$ -$ 47 70214 Dan R. MPS 107 Re-Configuration-$ -$ -$ -$ -$ -$ 48 70215 Lourdes S. MPS 302 Reconfiguration-$ -$ -$ -$ -$ -$ 49 70217 Damian C. MPS 309 Replacement (E Naples Middle School)-$ -$ 5,000,000$ 5,000,000$ -$ -$ 10,000,000$ 50 70222 Ben B. Golden Gate City CAP1,290,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 3,290,000$ 51 70229 Shon F. I-75 / CR951 Utility-$ -$ -$ -$ -$ 52 70230 Close/BA MPS 308 Force Main-$ -$ -$ -$ -$ -$ 53 70233 Close/BA Logan Blvd FM (Immkl - VB)-$ -$ -$ -$ -$ -$ 54 70234 Harry R. Eliminate NPDES-$ -$ 2,250,000$ 2,250,000$ -$ -$ 4,500,000$ 55 70237 Close/BA MPS 306-$ -$ -$ -$ -$ -$ 56 70240 WW Collections Operating TSP3,600,000$ 3,500,000$ 2,500,000$ 3,500,000$ 3,500,000$ 3,500,000$ 16,600,000$ 57 70243Corinne T.Craig P.Golden Gate WWTP-$ -$ -$ -$ -$ -$ 58 70244 Alicia A. VBR Extension - Util-$ -$ -$ -$ -$ 59 70245 Close/BA NCWRF DZMW-$ -$ -$ -$ -$ -$ Page 7140 of 7162
Line No.Project No. Responsible Project NameFY 2024 Proposed BudgetAUIR FY 2024 FY 2025 FY 2026 FY 2027 FY 2028SummaryFY 2023-202760 70247 Dan R. US 41 N Utility Replacement-$ -$ -$ -$ -$ -$ 61 70249 Dan R. MPS 313 Relocation2,000,000$ 1,000,000$ 2,000,000$ 2,000,000$ 5,000,000$ 62 70250 Close/BA Villagewalk WW Rehab-$ -$ -$ -$ -$ -$ 63 70251WayneCraig P.SCWRF Plant PS # 5-$ -$ -$ -$ -$ -$ 64 70254 Close/BA PS 305.17 and FM-$ -$ -$ -$ -$ -$ 65 70255 Close/BA GGWTP Forcemain-$ -$ -$ -$ -$ -$ 66 70256 Damian C. I-75 Force Main Replacement-$ -$ -$ -$ -$ -$ 67 70257Diana D.Liz G.Palm River PUR6,000,000$ 3,000,000$ -$ 8,000,000$ -$ 8,000,000$ 22,000,000$ 68 70259 Dan R. MPS 316 Force Main Relocation-$ -$ -$ -$ -$ -$ 69 70262 Craig P. Golden Gate City PUR-$ -$ -$ -$ 500,000$ 500,000$ 70 70270 Craig P. SCWRF CL 2 Mods-$ -$ -$ -$ -$ -$ 71 70272 Lourdes S. ARV Replacement Program1,150,000$ 2,850,000$ 1,500,000$ 1,500,000$ 1,500,000$ 1,500,000$ 7,150,000$ 72 70273 TBD Generator Replacement Program650,000$ 650,000$ 650,000$ 650,000$ 650,000$ 2,600,000$ 73 70279 Alicia A. WW DIW Mgmt & TSP-$ -$ -$ -$ -$ -$ 74 70280WW Valve Replacement Prgm-$ 75 70281WW Electrical Upgrades Program-$ 76 70282Pine Ridge Road Utility Relocation-$ 77 71058 PUD General Legal Services 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ 78 72009Zamira D. Damian C.Western Interconnect-$ 3,000,000$ 3,000,000$ -$ -$ -$ 3,000,000$ 79 72013Matt F. Robin B.Facility Infrastructure Maint Wastewater200,000$ 350,000$ 200,000$ 200,000$ 200,000$ 350,000$ 1,150,000$ 80 72505 Dave M. WW Security Systems250,000$ 500,000$ 250,000$ 250,000$ 500,000$ 500,000$ 1,750,000$ 81 72541 Mike R. SCADA Compliance Assurance Program- Wastewater100,000$ 105,000$ 110,000$ 115,000$ 115,000$ 115,000$ 555,000$ 82 73045Anthony S.TBDFDOT Utility Construction Projects - WW-$ 1,000,000$ 500,000$ 500,000$ 500,000$ 500,000$ 2,000,000$ 83 73065Anthony S.TBDCW Util Proj-WW-$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 800,000$ 84 73922 Mike R. WW Collection SCADA Telemetry150,000$ 200,000$ 100,000$ 100,000$ 200,000$ 200,000$ 750,000$ 85 73944 Annia M. Cust Svs Billing-$ -$ -$ -$ -$ -$ 86 73968 Close/BA NCWRF Technical Support Program-$ -$ -$ -$ -$ -$ 87 73969 Close/BA SCWRF Technical Support Program -$ -$ -$ -$ -$ -$ 88 74310 Tara C. State Revolving Loan Funding10,000$ -$ -$ -$ -$ -$ 89 75009 Tara C. Grant Applications-$ -$ -$ -$ -$ -$ 90 75017 Damian C. PUD Hydraulic Modeling100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ 91 75018 Katrina L. Financial Services 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ 92 75019Anthony S.TBDGM Comprehensive Planning Technical Support250,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 450,000$ 93 33667 Damian C. HMGP PUD Gen H0419-$ -$ -$ -$ -$ -$ Page 7141 of 7162
Line No.Project No. Responsible Project NameFY 2024 Proposed BudgetAUIR FY 2024 FY 2025 FY 2026 FY 2027 FY 2028SummaryFY 2023-202794 7XXXX TBD SCWRF New Headworks250,000$ 2,000,000$ 25,000,000$ 25,000,000$ 52,000,000$ 95 70278 Mike R. NCWRF Switchgear #1 Replacement6,000,000$ 6,000,000$ -$ -$ -$ -$ 6,000,000$ 96 70274 TBD MPS 310 Reconfiguration and Rehabilitation-$ 2,500,000$ -$ 2,500,000$ -$ -$ 2,500,000$ 97 70284 TBD MPS 103 Replacement500,000$ 500,000$ 3,000,000$ -$ -$ 3,500,000$ 98WWNEW TBD Wastewater Valve Replacement - Multi Year Program-$ 375,000$ 200,000$ 200,000$ 300,000$ 300,000$ 1,000,000$ 99WWNEW TBD Wastewater Electrical Upgrades - Multi year program-$ 500,000$ 500,000$ 500,000$ 500,000$ 1,500,000$ TOTAL 414 WASTEWATER (NON-IQ) Projects36,159,200$ 58,895,000$ 56,815,000$ 71,420,000$ 61,620,000$ 67,770,000$ 293,784,200$ ###30,228,900$ 69,420,000$ 28,380,000$ 63%-4%20%-16%10%Existing 414 Irrigation Quality Water Projects100 70056 TBD IQ Power Systems240,000$ 240,000$ 101 70062 Mike R. IQ SCADA Support Operating300,000$ 400,000$ 400,000$ 400,000$ 400,000$ 400,000$ 1,900,000$ 102 70166Lourdes S. Damian C. Harry R.IQ Water System TSP 300,000$ 750,000$ 750,000$ 750,000$ 750,000$ 750,000$ 3,300,000$ 103 74030 Zamira D. IQ Aquifer Storage and Recovery-$ -$ -$ -$ -$ -$ -$ New 414 Irrigation Quality Water Projects-$ 104 WWNEW TBD Pelican Bay New Storage Tank-$ -$ -$ -$ -$ -$ 105 WWNEW TBD Pelican Bay Facility-$ -$ -$ -$ -$ -$ 106 70234 Harry R. Foxfire supplemental wells3,000,000$ 3,000,000$ -$ -$ 2,000,000$ 5,000,000$ -$ TOTAL 414 IRRIGATION QUALITY WATER Projects600,000$ 4,150,000$ 4,150,000$ 1,150,000$ 1,150,000$ 3,390,000$ 10,440,000$ ##1,650,000$ 1,150,000$ 1,500,000$ 1,390,000$ 3,390,000$ TOTAL FUND 414 Projects36,759,200$ 63,045,000$ 60,965,000$ 72,570,000$ 62,770,000$ 71,160,000$ 304,224,200$ ##31,878,900$ 1,150,000$ 70,920,000$ 1,390,000$ 31,770,000$ Page 7142 of 7162
Line No.Project No. Responsible Project NameFY 2024 Proposed BudgetAUIR FY 2024 FY 2025 FY 2026 FY 2027 FY 2028SummaryFY 2023-2027Existing 419 Bond Funded Projects Wastewater - Impact Fee120 70194 Craig P. Design updates to 10 mgd NECWTP.5,626,190$ -$ 5,626,190$ 121 70194 Craig P. South Wellfield+Trans Mains Phase 15,000,000$ -$ 5,000,000$ 122 70194 Craig P. Construct deep injection well (2)12,500,000$ 12,500,000$ 123 70194 Craig P. Final Brightshore Transmission Mains4,500,000$ 4,500,000$ 124 70243Corinne T.Craig P.Golden Gate City WWTP Emergency PO5,000,000$ 5,000,000$ 125 70243Corinne T.Craig P.DIW design140,000$ 140,000$ 126 70243Corinne T.Craig P.GG Transmission Phase 1B Force Main1,024,643$ 127 70194 Craig P. Transmission Mains Phase 2A (southern portion)5,000,000$ 5,000,000$ 128 70194 Craig P. CEI & CA - Transmission Mains Phase 2A (southern portion)1,000,000$ 1,000,000$ 129 70194 Craig P. Transmission Mains Phase 2B (northern portion)7,500,000$ 7,500,000$ 130 70194 Craig P. CEI & CA - Transmission Mains Phase 2B (northern portion)1,500,000$ 1,500,000$ Total Existing 419 Bond Funded Projects Wastewater - Impact Fee48,790,833$ -$ -$ -$ -$ -$ 47,766,190$ Existing 419 Bond Funded Projects Wastewater - User Fee131 70243Corinne T.Craig P.IQ to Golf Course1,400,000$ 1,400,000$ Total Existing 419 Bond Funded Projects Wastewater - User Fee1,400,000$ -$ -$ -$ -$ -$ 1,400,000$ TOTAL FUND 419 Projects50,190,833$ -$ -$ -$ -$ -$ 49,166,190$ Projects which will require Commercial Paper132 70194 Craig P.Town of Big Cypress WW Reimbursement + 10% CEI (Impact Fee)1,127,294$ 1,127,294$ 133 70194 Craig P. Belmar WW Reimbursement + 10% CEI (Impact Fee)2,614,095$ 2,614,095$ 134 70194 Craig P.Town of Big Cypress IQ Reimbursement + 10% CEI (User Fee)5,095,390$ 5,095,390$ 135 70194 Craig P. Belmar IQ Reimbursement + 10% CEI (User Fee)2,308,130$ 2,308,130$ TOTAL Projects which will require Commercial Paper-$ -$ 11,144,910$ -$ -$ -$ 11,144,910$ Projects which will require New Bond/Loan - Impact Fee136 70243 Corinne T.Craig P. Golden Gate City WWTP Expansion 4 mgd (2.5 mgd additional treatment capacity) - 62.5% Impact Fee112,000,000$ 112,000,000$ 137 70243 Corinne T.Craig P. CEI - Golden Gate City WWTP Expansion 4 mgd (2.5 mgd additional treatment capacity) - 62.5% Impact Fee1,200,000$ 1,200,000$ 138 70243 Corinne T.Craig P. Construct Golden Gate City DIW15,000,000$ 15,000,000$ 139 70194 Craig P.Construct 4 mgd NECWRF + CEI & CA (0.75 mgd existing Orange Tree flow; 3.25 mgd additional treatment capacity) - 81.25% Impact Fee117,000,000$ 117,000,000$ Page 7143 of 7162
Line No.Project No. Responsible Project NameFY 2024 Proposed BudgetAUIR FY 2024 FY 2025 FY 2026 FY 2027 FY 2028SummaryFY 2023-2027140 70194 Craig P. Const South Wellfield (5 wells) - 50% W, 50% WW - IQ3,750,000$ 3,750,000$ 141 70194 Craig P.CEI & CA - Const South Wellfield (5 wells) - 50% W, 50% WW - IQ750,000$ 750,000$ 142 70194 Craig P. Construct Common Area Facilities-$ 143 70194 Craig P. CEI & CA - Construct Common Area Facilities-$ 144 70167 FacilitiesGovernment Operations Business Park (R&R - NEW BOND - User Fee)-$ -$ -$ -$ -$ -$ 145 7XXXX TBDGolden Gate City converting to sewer - need financing info. (Grant)Est $-$ TOTAL Projects which will require Bond/Loan - Impact Fee-$ 128,200,000$ -$ 121,500,000$ -$ 249,700,000$ Projects which will require New Bond/Loan - User Fee146 70243 Corinne T.Craig P. Golden Gate City WWTP Expansion 4 mgd (2.5 mgd additional treatment capacity) - 37.5% User Fee28,000,000$ 28,000,000$ 147 70243 Corinne T.Craig P. CEI - Golden Gate City WWTP Expansion 4 mgd (2.5 mgd additional treatment capacity) - 37.5% User Fee300,000$ 300,000$ 148 70194 Craig P.Construct 4 mgd NECWRF + CEI & CA (0.75 mgd existing Orange Tree flow; 3.25 mgd additional treatment capacity) - 18.75% User Fee-$ 27,000,000$ 27,000,000$ 149 70194 Craig P. Construct Common Area Facilities-$ 150 70194 Craig P. CEI & CA - Construct Common Area Facilities-$ TOTAL Projects which will require Bond/Loan - User Fee-$ -$ 28,300,000$ -$ 27,000,000$ -$ 55,300,000$ ich wTOTAL Future Bond Projects-$ -$ 156,500,000$ -$ 148,500,000$ -$ 305,000,000$ Total Wastewater (Non-IQ) Projects (413)-$ -$ -$ -$ -$ -$ 7,932,000$ Total IQ Water Projects (413)-$ -$ -$ -$ -$ -$ -$ Total Wastewater (Non-IQ) Projects (414)36,159,200$ 58,895,000$ 56,815,000$ 71,420,000$ 61,620,000$ 67,770,000$ 343,274,200$ Total IQ Water Projects (414)600,000$ 4,150,000$ 4,150,000$ 1,150,000$ 1,150,000$ 3,390,000$ 11,926,000$ TOTAL WASTEWATER AND IQ PROJECTS (413 & 414)36,759,200$ 63,045,000$ 60,965,000$ 72,570,000$ 62,770,000$ 71,160,000$ 363,132,200$ Total NE Bond Funded Projects (415)-$ -$ -$ -$ -$ -$ 12,587,000$ Total 2021 Series Bond Funded Projects (419)50,190,833$ -$ -$ -$ -$ -$ 67,700,833$ Total Commercial Paper Funded Projects (420)-$ -$ 11,144,910$ -$ -$ -$ 11,144,910$ Total Potential Future Bond/Loan-$ -$ 156,500,000$ -$ 148,500,000$ -$ 305,000,000$ Page 7144 of 7162
Line No.Project No. Project NameSummaryFY 2023-2027FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2028-2032Summary FY 2023-2032Existing 414 Wastewater (Non-IQ) Projects1 50105 Integrated Asset Management Program1,000,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ 2,000,000$ 3 50110 Biosolids Reuse Facility-$ -$ -$ -$ -$ -$ -$ -$ 4 50154 Hurricane Irma-$ -$ -$ -$ -$ -$ -$ -$ 5 50196 Chiller NCWRF Ops Bldg-$ -$ -$ -$ -$ -$ -$ -$ 6 50199 COVID-19-$ -$ -$ -$ -$ -$ -$ -$ 7 50391 WW Hurricane Resiliency-$ -$ -$ -$ -$ -$ -$ -$ 8 60224 Lely Golf Estates24,675,000$ 6,000,000$ 6,000,000$ 6,000,000$ 6,000,000$ 6,000,000$ 30,000,000$ 54,675,000$ 9 70014 Real Property/Infrastructure Audit280,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ 530,000$ 10 70031 Utilities Master Plan500,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ 1,000,000$ 11 70043 Gravity Sewers TSP CAP-$ -$ -$ -$ -$ -$ -$ -$ 12 70044 Force Main Improvements Cap-$ -$ -$ -$ -$ -$ -$ -$ 13 70046 Wastewater Pump Station TSP -$ -$ -$ -$ -$ -$ -$ -$ 14 70050 Master Pump Stations TSP Cap-$ -$ -$ -$ -$ -$ -$ -$ 15 70053 NCWRF Power System TSP-$ -$ -$ -$ -$ -$ -$ -$ 16 70055 SCWRF Power System Cap-$ -$ -$ -$ -$ -$ -$ -$ 17 70060 NCWRF SCADA Support Operating TSP1,550,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,500,000$ 3,050,000$ 18 70061 SCWRF SCADA Support Operating TSP1,550,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,500,000$ 3,050,000$ 19 70103 NE Svs Area Interg-$ -$ -$ -$ -$ -$ -$ -$ 20 70117 WW Remote Sites MSP880,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ 1,880,000$ 21 70119 WW Treatment Plants MSP1,600,000$ 400,000$ 400,000$ 400,000$ 400,000$ 400,000$ 2,000,000$ 3,600,000$ 22 70120 Naples Pk Basin Optimization40,000,000$ 8,000,000$ -$ -$ -$ -$ 8,000,000$ 48,000,000$ 23 70121 Utility Billing Customer Serv Software10,000$ -$ -$ -$ -$ -$ -$ 10,000$ 24 70122 VB DR CDS Basin 101-$ -$ -$ -$ -$ -$ -$ -$ 25 70139 Basin 101 Program Capital-$ 2,500,000$ 3,500,000$ 3,500,000$ 3,500,000$ 3,500,000$ 16,500,000$ 16,500,000$ WASTEWATER (NON-IQ) AND IRRIGATION QUALITY (IQ) WATER2022 WASTEWATER 10-YEAR CIP PLAN UPDATECAPITAL IMPROVEMENT PROJECTS 2025-2029Page 7145 of 7162
Line No.Project No. Project NameSummaryFY 2023-2027FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2028-2032Summary FY 2023-203226 70141 Basin 305 Program Capital (Pump Stations)12,500,000$ 3,000,000$ 3,000,000$ 3,000,000$ 3,000,000$ 3,000,000$ 15,000,000$ 27,500,000$ 27 70142 Basin 306 Program Capital6,000,000$ 1,500,000$ 1,500,000$ -$ -$ -$ 3,000,000$ 9,000,000$ 28 70143 Gravity Transmission Systems TSP -$ -$ -$ -$ -$ -$ -$ -$ 29 70144 Force Main Transmission Systems TSP 1,200,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,500,000$ 2,700,000$ 30 70145 WW Pump Station TSP50,000$ -$ -$ -$ -$ -$ -$ 50,000$ 31 70146 Master PS TSP Op-$ -$ -$ -$ -$ -$ -$ -$ 32 70147 Collections Power System TSP-$ -$ -$ -$ -$ -$ -$ -$ 33 70148 Water Reclamation Facilities TSP21,000,000$ 8,000,000$ 8,000,000$ 8,000,000$ 8,000,000$ 8,000,000$ 40,000,000$ 61,000,000$ 34 70149 NCWRF New Headworks29,094,200$ -$ -$ -$ -$ -$ -$ 29,094,200$ 35 70164 WW Collections SCADA Telemetry-$ -$ -$ -$ -$ -$ -$ -$ 36 70167 Government Operations Business Park-$ -$ -$ -$ -$ -$ -$ -$ 37 70173 Orangetree Compliance1,300,000$ 3,000,000$ -$ -$ -$ -$ 3,000,000$ 4,300,000$ 38 70183 Pump Station 300.06-$ -$ -$ -$ -$ -$ -$ -$ 39 70189 Cyber Security SCADA-$ -$ -$ -$ -$ -$ -$ -$ 40 70192 Palm River Bridge Pipe Replacement-$ -$ -$ -$ -$ -$ -$ -$ 41 70194 NE Utility Facilities-$ -$ -$ -$ -$ -$ -$ -$ 42 70202 County Utility Standards 100,000$ 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ 225,000$ 43 70204 SCWRF IQ Storage Improvements-$ -$ -$ -$ -$ -$ -$ -$ 44 70207 MPS 301 Rehabilitation750,000$ -$ -$ -$ -$ -$ -$ 750,000$ 45 70208 PS 302.07 Gravity Sewer-$ -$ -$ -$ -$ -$ -$ -$ 46 70213 MPS 300 Rehab-$ -$ -$ -$ -$ -$ -$ -$ 47 70214 MPS 107 Re-Configuration-$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 5,000,000$ 5,000,000$ 48 70215 MPS 302 Reconfiguration-$ -$ -$ -$ -$ -$ -$ -$ 49 70217 MPS 309 Replacement (E Naples Middle School)10,000,000$ -$ -$ -$ -$ -$ -$ 10,000,000$ 50 70222 Golden Gate City CAP3,290,000$ -$ -$ -$ -$ -$ -$ 3,290,000$ 70229 I-75 / CR951 Utility-$ -$ -$ 52 70230 MPS 308 Force Main-$ -$ -$ -$ -$ -$ -$ -$ 53 70233 Logan Blvd FM (Immkl - VB)-$ -$ -$ -$ -$ -$ -$ -$ 54 70234 Eliminate NPDES4,500,000$ -$ -$ -$ -$ -$ -$ 4,500,000$ 55 70237 MPS 306-$ -$ -$ -$ -$ -$ -$ -$ 56 70240 Collections Operating TSP16,600,000$ 3,500,000$ 4,000,000$ 4,000,000$ 4,000,000$ 4,000,000$ 19,500,000$ 36,100,000$ 57 70243 Golden Gate WWTP-$ -$ -$ -$ -$ -$ -$ -$ 70244 VBR Extension - Util-$ -$ -$ 59 70245 NCWRF DZMW-$ -$ -$ -$ -$ -$ -$ -$ Page 7146 of 7162
Line No.Project No. Project NameSummaryFY 2023-2027FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2028-2032Summary FY 2023-203260 70247 US 41 N Utility Replacement-$ -$ -$ -$ -$ -$ -$ -$ 70249 MPS 313 Relocation5,000,000$ -$ 5,000,000$ 62 70250 Villagewalk WW Rehab-$ -$ -$ -$ -$ -$ -$ -$ 63 70251 SCWRF Plant PS # 5-$ -$ -$ -$ -$ -$ -$ -$ 64 70254 PS 305.17 and FM-$ -$ -$ -$ -$ -$ -$ -$ 65 70255 GGWTP Forcemain-$ -$ -$ -$ -$ -$ -$ -$ 66 70256 I-75 Force Main Replacement-$ -$ -$ -$ -$ -$ -$ -$ 67 70257 Palm River PUR22,000,000$ -$ 8,000,000$ -$ -$ -$ 8,000,000$ 30,000,000$ 68 70259 MPS 316 Force Main Relocation-$ -$ -$ -$ -$ -$ -$ -$ 69 70262 Golden Gate City PUR500,000$ 3,000,000$ 3,000,000$ 3,000,000$ 3,000,000$ 3,000,000$ 15,000,000$ 15,500,000$ 70 70270 SCWRF CL 2 Mods-$ -$ -$ -$ -$ -$ -$ 71 70272 ARV Replacement Program7,150,000$ 3,000,000$ 3,000,000$ 3,000,000$ 3,000,000$ 3,000,000$ 15,000,000$ 22,150,000$ 72 70273 Generator Replacement Program2,600,000$ 650,000$ 650,000$ 650,000$ 650,000$ 650,000$ 3,250,000$ 5,850,000$ 73 70279 WW DIW Mgmt & TSP-$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 77 71058 General Legal Services 500,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ 1,000,000$ 78 72009 Western Interconnect3,000,000$ -$ -$ -$ -$ -$ -$ 3,000,000$ 79 72013 Facility Infrastructure Maint Wastewater1,150,000$ 350,000$ 350,000$ 350,000$ 350,000$ 350,000$ 1,750,000$ 2,900,000$ 80 72505 WW Security Systems1,750,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 2,500,000$ 4,250,000$ 81 72541 SCADA Compliance Assurance Program- Wastewater555,000$ 115,000$ 115,000$ 115,000$ 115,000$ 115,000$ 575,000$ 1,130,000$ 82 73045 FDOT Utility Construction Projects - WW2,000,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 2,500,000$ 4,500,000$ 83 73065 CW Util Proj-WW800,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ 1,800,000$ 84 73922 WW Collection SCADA Telemetry750,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ 1,750,000$ 85 73944 Cust Svs Billing-$ -$ -$ -$ -$ -$ -$ -$ 86 73968 NCWRF Technical Support Program-$ -$ -$ -$ -$ -$ -$ -$ 87 73969 SCWRF Technical Support Program -$ -$ -$ -$ -$ -$ -$ -$ 88 74310 State Revolving Loan Funding-$ -$ -$ -$ -$ -$ -$ -$ 89 75009 Grant Applications-$ -$ -$ -$ -$ -$ -$ -$ 90 75017 PUD Hydraulic Modeling500,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ 1,000,000$ 91 75018 Financial Services 150,000$ 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ 300,000$ 92 75019 GM Comprehensive Planning Technical Support450,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ 700,000$ 93 33667 HMGP PUD Gen H0419-$ -$ -$ -$ -$ -$ -$ -$ Page 7147 of 7162
Line No.Project No. Project NameSummaryFY 2023-2027FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2028-2032Summary FY 2023-2032SCWRF New Headworks52,000,000$ -$ -$ -$ 52,000,000$ 95 70278 NCWRF Switchgear #1 Replacement6,000,000$ -$ -$ -$ -$ 6,000,000$ 96 70274 MPS 310 Reconfiguration and Rehabilitation2,500,000$ -$ -$ -$ -$ 2,500,000$ 97 70284 MPS 103 Replacement3,500,000$ -$ -$ -$ -$ 3,500,000$ 98 WWNEW Wastewater Valve Replacement - Multi Year Program1,000,000$ -$ -$ -$ -$ -$ -$ 1,000,000$ 99 WWNEW Wastewater Electrical Upgrades - Multi year program1,500,000$ -$ 1,500,000$ TOTAL 414 WASTEWATER (NON-IQ) Projects293,784,200$ 47,170,000$ 45,670,000$ 36,170,000$ 36,170,000$ 36,170,000$ 201,350,000$ 495,134,200$ 28,880,000$ 30,380,000$ 30,380,000$ -44%-3%-26%0%Existing 414 Irrigation Quality Water Projects100 70056 IQ Power Systems240,000$ 240,000$ 240,000$ 240,000$ 240,000$ 240,000$ 1,200,000$ 1,440,000$ 101 70062 IQ SCADA Support Operating1,900,000$ 400,000$ 400,000$ 400,000$ 400,000$ 400,000$ 2,000,000$ 3,900,000$ 102 70166 IQ Water System TSP 3,300,000$ 750,000$ 750,000$ 750,000$ 750,000$ 750,000$ 3,750,000$ 7,050,000$ 103 74030 IQ Aquifer Storage and Recovery-$ -$ -$ -$ -$ -$ -$ -$ -$ -$ New 414 Irrigation Quality Water Projects-$ -$ 104 WWNEW Pelican Bay New Storage Tank-$ 2,500,000$ -$ -$ -$ -$ 2,500,000$ 2,500,000$ 105 WWNEW Pelican Bay Facility-$ -$ 1,500,000$ -$ -$ -$ 1,500,000$ 1,500,000$ 106 70234 Foxfire supplemental wells5,000,000$ -$ -$ -$ -$ -$ -$ 5,000,000$ -$ -$ TOTAL 414 IRRIGATION QUALITY WATER Projects10,440,000$ 3,890,000$ 2,890,000$ 1,390,000$ 1,390,000$ 1,390,000$ 10,950,000$ 21,390,000$ 3,890,000$ 2,890,000$ 1,390,000$ TOTAL FUND 414 Projects304,224,200$ 51,060,000$ $ 48,560,000 $ 37,560,000 $ 37,560,000 $ 37,560,000 $ 212,300,000 516,524,200$ 32,770,000$ 33,270,000$ 31,770,000$ Page 7148 of 7162
Line No.Project No. Project NameSummaryFY 2023-2027FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2028-2032Summary FY 2023-2032Existing 419 Bond Funded Projects Wastewater - Impact Fee120 70194Design updates to 10 mgd NECWTP.5,626,190$ -$ 5,626,190$ 121 70194South Wellfield+Trans Mains Phase 15,000,000$ -$ 5,000,000$ 122 70194Construct deep injection well12,500,000$ -$ 12,500,000$ 123 70194Golden Gate City WWTP Expansion (4 mgd additional treatment capacity) Impact Fee 87.5%4,500,000$ -$ 4,500,000$ 124 70243Golden Gate City WWTP Expansion (4 mgd additional treatment capacity) Impact Fee 87.5%5,000,000$ -$ 5,000,000$ 125 70243Golden Gate City WWTP Expansion (4 mgd additional treatment capacity) Impact Fee 87.5%140,000$ -$ 140,000$ 127 70194 Transmission Mains Phase 2A (southern portion)5,000,000$ -$ 5,000,000$ 128 70194 CEI & CA - Transmission Mains Phase 2A (southern portion)1,000,000$ -$ 1,000,000$ 129 70194 Transmission Mains Phase 2B (northern portion)7,500,000$ -$ 7,500,000$ 130 70194 CEI & CA - Transmission Mains Phase 2B (northern portion)1,500,000$ -$ 1,500,000$ 47,766,190$ -$ -$ -$ -$ -$ -$ 47,766,190$ 131 70243Golden Gate City WWTP Expansion (4 mgd additional treatment capacity) User Fee 12.5%1,400,000$ -$ 1,400,000$ 1,400,000$ -$ -$ -$ -$ -$ -$ 73,806,190$ TOTAL FUND 419 Projects7,026,190$ -$ -$ -$ -$ -$ 7,026,190$ 132 70194Town of Big Cypress WW Reimbursement + 10% CEI (Impact Fee)1,127,294$ -$ 1,127,294$ 133 70194 Belmar WW Reimbursement + 10% CEI (Impact Fee)2,614,095$ -$ 2,614,095$ 134 70194 Town of Big Cypress IQ Reimbursement + 10% CEI (User Fee)5,095,390$ -$ 5,095,390$ 135 70194 Belmar IQ Reimbursement + 10% CEI (User Fee)2,308,130$ -$ 2,308,130$ TOTAL Projects which will require Commercial Paper11,144,910$ -$ -$ -$ -$ -$ -$ 11,144,910$ Projects which will require Bond/Loan - User Fee136 70243Golden Gate City WWTP Expansion 4 mgd (2.5 mgd additional treatment capacity) - 62.5% Impact Fee112,000,000$ -$ 112,000,000$ 137 70243CEI - Golden Gate City WWTP Expansion 4 mgd (2.5 mgd additional treatment capacity) - 62.5% Impact Fee1,200,000$ -$ 1,200,000$ 138 70243 Construct Golden Gate City DIW15,000,000$ -$ 15,000,000$ 139 70194Construct 4 mgd NECWRF + CEI & CA (0.75 mgd existing Orange Tree flow; 3.25 mgd additional treatment capacity) - 81.25% Impact Fee117,000,000$ -$ 117,000,000$ Page 7149 of 7162
Line No.Project No. Project NameSummaryFY 2023-2027FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2028-2032Summary FY 2023-2032140 70194 Const South Wellfield (5 wells) - 50% W, 50% WW - IQ3,750,000$ -$ 3,750,000$ 141 70194CEI & CA - Const South Wellfield (5 wells) - 50% W, 50% WW - IQ750,000$ -$ 750,000$ 142 70194 Construct Common Area Facilities-$ 14,250,000$ 14,250,000$ 14,250,000$ 143 70194 CEI & CA - Construct Common Area Facilities-$ 2,850,000$ 2,850,000$ 2,850,000$ 144 70167Government Operations Business Park (R&R - NEW BOND - User Fee)-$ -$ -$ 145 7XXXXGolden Gate City converting to sewer - need financing info. (Grant)-$ -$ -$ TOTAL Projects which will require Bond/Loan - Impact Fee249,700,000$ 17,100,000$ -$ -$ -$ -$ 17,100,000$ 266,800,000$ Projects which will require Bond/Loan - User Fee146 70243Golden Gate City WWTP Expansion 4 mgd (2.5 mgd additional treatment capacity) - 37.5% User Fee28,000,000$ -$ 28,000,000$ 147 70243CEI - Golden Gate City WWTP Expansion 4 mgd (2.5 mgd additional treatment capacity) - 37.5% User Fee300,000$ -$ 300,000$ 148 70194Construct 4 mgd NECWRF + CEI & CA (0.75 mgd existing Orange Tree flow; 3.25 mgd additional treatment capacity) - 18.75% User Fee27,000,000$ -$ 27,000,000$ 149 70194 Construct Common Area Facilities750,000$ 150 70194 CEI & CA - Construct Common Area Facilities150,000$ ill require Bond/Loan - User Fee55,300,000$ 900,000$ -$ -$ -$ -$ -$ 55,300,000$ TOTAL Future Bond Projects305,000,000$ 18,000,000$ -$ -$ -$ -$ 18,000,000$ 323,000,000$ Total Wastewater (Non-IQ) Projects (413)7,932,000$ -$ -$ -$ -$ -$ -$ 7,932,000$ Total IQ Water Projects (413)-$ -$ -$ -$ -$ -$ -$ -$ Total Wastewater (Non-IQ) Projects (414)343,274,200$ 47,170,000$ 45,670,000$ 36,170,000$ 36,170,000$ 36,170,000$ 165,180,000$ 508,454,200$ Total IQ Water Projects (414)11,926,000$ 3,890,000$ 2,890,000$ 1,390,000$ 1,390,000$ 1,390,000$ 9,560,000$ 21,486,000$ TOTAL WASTEWATER AND IQ PROJECTS (413 & 414)363,132,200$ 51,060,000$ 48,560,000$ 37,560,000$ 37,560,000$ 37,560,000$ 174,740,000$ 537,872,200$ Total NE Bond Funded Projects (415)12,587,000$ -$ -$ -$ -$ -$ -$ 12,587,000$ Total 2021 Series Bond Funded Projects (419)67,700,833$ -$ -$ -$ -$ -$ -$ 51,676,190$ Total Commercial Paper Funded Projects (420)11,144,910$ -$ 11,144,910$ Total Potential Future Bond/Loan User Fee305,000,000$ 18,000,000$ -$ -$ -$ -$ 18,000,000$ 323,000,000$ Page 7150 of 7162
Immokalee Water and Sewer District
Page 7151 of 7162
STRATEGIC REPORT AND DEVELOPMENT FOR IMMOKALEE WATER AND SEWER DISTRICT 10
The IWSD’s current 5-year Capital Improvement Plan (FY2023-FY2027) is listed below:
CAPITAL IMPROVEMENT PLAN CAPITAL IMPROVEMENT PLAN
Immokalee Water and Sewer District Projection of Capital Improvement Projects
Wednesday, August 31, 2022
Line No.Description Project ID
Recognized
Funding
Source
Dept.2023 2024 2025 2026 2027 Total
WATER PLANT
1 Water Softening for Immokalee - Design Engineering W-01 USDA-B2 10 $470,000 $470,000
2 Water Softening for Immokalee - Construction W-01 USDA-B2 10 4,700,000 4,700,000
3 Water Softening for Immokalee - Construction Engineering W-01 USDA-B2 10 300,000 300,000
4 Fuel Storage Tank at Airport WTP - Design Engineering W-02 Revenue Fund 10 5,000 5,000
5 Fuel Storage Tank at Airport WTP - Construction W-02 Revenue Fund 10 80,000 80,000
6 Fuel Storage Tank at Airport WTP - Construction Engineering W-02 Revenue Fund 10 5,000 5,000
7 Legacy Lots & Water Main Looping - Design Engineering W-03 Revenue Fund 60 75,000 75,000 75,000 75,000 300,000
8 Legacy Lots & Water Main Looping - Construction W-03 Revenue Fund 60 637,500 637,500 637,500 637,500 2,550,000
9 Legacy Lots & Water Main Looping - Construction Engineering W-03 Revenue Fund 60 90,000 90,000 90,000 90,000 360,000
10 IFAS Tank & Booster Station - Design Engineering W-04 Grant 60 80,000 80,000
11 IFAS Tank & Booster Station - Construction W-04 Grant 60 2,000,000 2,000,000
12 IFAS Tank & Booster Station - Construction Engineering W-04 Grant 60 120,000 120,000
13 New 2.5 MGD Reverse Osmosis WTP - Design Engineering W-05 USDA-B3 10 400,000 400,000 800,000
14 New 2.5 MGD Reverse Osmosis WTP - Construction W-05 USDA-B3 10 10,000,000 10,000,000
15 New 2.5 MGD Reverse Osmosis WTP - Construction Engineering W-05 USDA-B3 10 600,000 600,000
16 Water Distribution System AMI - Design Engineering W-06 Grant 60 - - -
17 Water Distribution System AMI - Construction W-06 Grant 60 2,000,000 2,000,000 4,000,000
18 Water Distribution System AMI - Construction Engineering W-06 Grant 60 - - -
19 South 9th WTP Fence Addition W-07 Revenue Fund 10 15,000 15,000
20 South 9th WTP Shed W-08 Revenue Fund 10 19,000 19,000
21 Hypo Tank Scale W-09 Revenue Fund 10 40,000 40,000
22 New Maintenance Building GP-01 Revenue Fund 50 830,000 830,000
23 Fuel Storage Tanks at JVW & WWTP GP-02 Revenue Fund 10 110,000 110,000
24 Utility Relocation for SR29 Widening from CR846 to Agriculture Way GP-03 FDOT 60 25,000 25,000 840,000 890,000
25 Utilities for SR29 By-Pass from CR846 to north of New Market Road GP-04 FDOT 60 90,000 2,165,000 2,255,000
26 District Wide Water and Sewer Expansion GP-05 Revenue Fund 60 50,000 50,000
27 Master Plan Update GP-06 Revenue Fund 10 & 60 150,000 150,000
28 New Administration Building (Land Acquisition)GP-07 Bank Note 40 1,132,500 1,132,500
29 New Administration Building (Study)GP-07 Revenue Fund 40 35,000 35,000
30 NEW SCADA SYSTEM GP-08 Revenue Fund 10 120,000 400,000 200,000 200,000 200,000 1,120,000
Capital Outlay
31 Allowance for Capital Outlay - Water Treament & Distribution TBD Revenue Fund 10 & 60 305,000 305,000 305,000 305,000 305,000 1,525,000
32 Assumed Additional Average Capital Outlay TBD Revenue Fund - - - - - -
33 Assumed Additional Average Maintenance TBD Revenue Fund - - - - - -
34 TOTAL WATER PLANT COSTS $4,252,500 $9,596,500 $3,587,500 $4,797,500 $12,307,500 $34,541,500
WASTEWATER PLANT
35 Rehab Three Existing Clarifiers - Design Engineering WW-01 Revenue Fund 20 $0 $0
36 Rehab Three Existing Clarifiers - Construction WW-01 USDA-B1 20 - -
37 Rehab Three Existing Clarifiers - Construction WW-01 USDA-G1 20 382,500 382,500
38 Rehab Three Existing Clarifiers - Construction WW-01 Revenue Fund 20 100,000 100,000
39 Rehab Three Existing Clarifiers - Construction Enginering WW-01 Revenue Fund 20 - -
40 Line 8" & 18" Clay Pipe Sewers - Design Engineering WW-02 Revenue Fund 30 42,500 42,500 85,000
41 Line 8" & 18" Clay Pipe Sewers - Construction WW-02 Revenue Fund 30 750,000 650,000 100,000 1,500,000
42 Line 8" & 18" Clay Pipe Sewers - Construction Engineering WW-02 Revenue Fund 30 35,100 35,100 70,200
43 Lift Station P&O Upgrades and 10" FM Extension - Design Engineering WW-03 Revenue Fund 30 65,200 65,200
44 Lift Station P&O Upgrades and 10" FM Extension - Construction WW-03 Revenue Fund 30 496,000 496,000
45 Lift Station P&O Upgrades and 10" FM Extension - Construction Engineering WW-03 Revenue Fund 30 34,400 34,400
46 6" Plug Valve Replacement at Arrowhead - Design Engineering WW-04 Revenue Fund 30 5,000 5,000
47 6" Plug Valve Replacement at Arrowhead - Construction WW-04 Revenue Fund 30 24,000 24,000
48 6" Plug Valve Replacement at Arrowhead - Construction Engineering WW-04 Revenue Fund 30 5,000 5,000
49 Line Key Manholes Throughout System - Design Engineering WW-05 Revenue Fund 30 5,000 5,000 5,000 5,000 5,000 25,000
50 Line Key Manholes Throughout System - Construction WW-05 Revenue Fund 30 206,200 100,000 100,000 100,000 100,000 606,200
51 Line Key Manholes Throughout System - Construction Engineering WW-05 Revenue Fund 30 5,000 5,000 5,000 5,000 5,000 25,000
52 Lake Trafford Road/Carson Road Area Lift Stations & Force Main
Improvements - Design Engineering Modeling WW-07 Revenue Fund 30 - -
53 Lake Trafford Road/Carson Road Area Lift Stations & Force Main
Improvements - Design Engineering WW-07 Cost Share 30 100,000 100,000
54 Lake Trafford Road/Carson Road Area Lift Stations & Force Main
Improvements - Construction WW-07 Revenue Fund 30 500,000 500,000
55 Lake Trafford Road/Carson Road Area Lift Stations & Force Main
Improvements - Construction WW-07 Cost Share 30 500,000 500,000
Projected Fiscal Year Ending September 30,
Page 7152 of 7162
STRATEGIC REPORT AND DEVELOPMENT FOR IMMOKALEE WATER AND SEWER DISTRICT 11
Immokalee Water and Sewer District Projection of Capital Improvement Projects
Wednesday, August 31, 2022
Line No.Description Project ID
Recognized
Funding
Source
Dept.2023 2024 2025 2026 2027 Total
Projected Fiscal Year Ending September 30,
56 Lake Trafford Road/Carson Road Area Lift Stations & Force Main
Improvements - Construction Engineering WW-07 Revenue Fund 30 85,000 85,000
57 Lake Trafford Road/Carson Road Area Lift Stations & Force Main
Improvements - Construction Engineering WW-07 Cost Share 30 85,000 85,000
58 Oxidation Ditch Bridges (2 Bridges - Ditch #3) - Design Engineering WW-08 Revenue Fund 20 8,000 8,000
59 Oxidation Ditch Bridges (2 Bridges - Ditch #3) - Construction WW-08 Revenue Fund 20 145,000 145,000
60 Oxidation Ditch Bridges (2 Bridges - Ditch #3) - Construction Engineering WW-08 Revenue Fund 20 10,000 10,000
61 Deep Injection Well #2 - Design Engineering WW-09 Grant 20 250,000 250,000
62 Deep Injection Well #2 - Design Engineering WW-09 Grant 20 46,040 46,040
63 Deep Injection Well #2 - Construction WW-09 Grant 20 14,640,000 14,640,000
64 Deep Injection Well #2 - Construction Engineering WW-09 Grant 20 850,000 850,000
65 Agricultural Public Acces Re-Use Water System - Design Engineering WW-10 Grant 20 100,000 100,000
66 Agricultural Public Acces Re-Use Water System - Construction WW-10 Grant 20 1,500,000 1,500,000 3,000,000
67 Agricultural Public Acces Re-Use Water System - Construction Engineering WW-10 Grant 20 80,000 80,000 160,000
68 Unsewered Areas/Septic Tank Replacement Program - Design Engineering WW-11 Grant 30 -
69 Unsewered Areas/Septic Tank Replacement Program - Design Engineering WW-11 Grant 30 150,000 150,000 150,000 450,000
70 Unsewered Areas/Septic Tank Replacement Program - Design Engineering WW-11 Grant 30 150,000 150,000 300,000
71 Unsewered Areas/Septic Tank Replacement Program - Construction WW-11 Grant 30 -
72 Unsewered Areas/Septic Tank Replacement Program - Construction WW-11 Grant 30 1,500,000 1,500,000 3,000,000
73 Unsewered Areas/Septic Tank Replacement Program - Construction WW-11 Grant 30 1,500,000 1,500,000 1,500,000 4,500,000
74 Unsewered Areas/Septic Tank Replacement Program - Construction Engineer WW-11 Grant 30 -
75 Unsewered Areas/Septic Tank Replacement Program - Construction Engineer WW-11 Grant 30 150,000 150,000 300,000
76 Unsewered Areas/Septic Tank Replacement Program - Construction Engineer WW-11 Grant 30 150,000 150,000 150,000 450,000
77 Wastewater Collection System AMI - Design Engineering WW-12 Grant 30 -
78 Wastewater Collection System AMI - Construction WW-12 Grant 30 2,500,000 2,500,000 5,000,000
79 Wastewater Collection System AMI - Construction Engineering WW-12 Grant 30 -
80 No. 4 Clarifier Catwalk - Design Engineering WW-13 Revenue Fund 20 112,000 112,000
81 No. 4 Clarifier Catwalk - Construction WW-13 Revenue Fund 20 400,000 400,000
82 No. 4 Clarifier Catwalk - Construction Engineering WW-13 Revenue Fund 20 56,000 56,000
83 Bleach Secondary Containment - Design Engineering WW-14 Revenue Fund 20 12,200 12,200
84 Bleach Secondary Containment - Construction WW-14 Revenue Fund 20 40,000 40,000
85 Bleach Secondary Containment - Construction Engineering WW-14 Revenue Fund 20 5,000 5,000
86 Weight Scales - Design Engineering WW-15 Revenue Fund 20 - -
87 Weight Scales - Construction WW-15 Revenue Fund 20 60,000 60,000
88 Weight Scales - Construction Engineering WW-15 Revenue Fund 20 2,000 2,000
89 Oxidation Ditch Fences (1, 2 & 3)WW-16 Revenue Fund 20 50,000 50,000
90 Bypass Pump System for 4 Lift Stations WW-17 Revenue Fund 30 272,000 272,000
91 WWTP Carport Bays (3)WW_18 Revenue Fund 20 28,500 28,500
92 Bioset Upgrades WW-19 Revenue Fund 20 500,000 500,000
93 New Maintenance Building GP-01 Revenue Fund 50 830,000 830,000
94 Fuel Storage Tanks at JVW & WWTP GP-02 Revenue Fund 20 110,000 110,000
95 Utility Relocation for SR29 Widening from CR846 to Agriculture Way GP-03 FDOT 30 25,000 25,000 840,000 890,000
96 Utilities for SR29 By-Pass from CR846 to north of New Market Road GP-04 FDOT 30 90,000 2,165,000 2,255,000
97 District Wide Water and Sewer Expansion GP-05 Revenue Fund 30 50,000 50,000
98 Master Plan Update GP-06 Revenue Fund 20 & 30 150,000 150,000
99 New Administration Building (Land Acquisition)GP-07 Bank Note 40 1,132,500 1,132,500
100 New Administration Building (Study)GP-07 Revenue Fund 40 35,000 35,000
101 NEW SCADA SYSTEM GP-08 Revenue Fund 20 & 30 120,000 400,000 200,000 200,000 200,000 1,120,000
Capital Outlay
102 Allowance for Capital Outlay - Wastewater Treament TBD Revenue Fund 20 391,000 391,000 391,000 391,000 391,000 1,955,000
103 Allowance for Capital Outlay - Wastewater Collection TBD Revenue Fund 30 244,000 244,000 244,000 244,000 244,000 1,220,000
104 Assumed Additional Average Capital Outlay TBD Revenue Fund - - - - - -
105 Assumed Additional Average Maintenance TBD Revenue Fund - - - - - -
106 TOTAL WASTEWATER PLANT COSTS $10,588,000 $9,465,700 $6,968,000 $3,681,040 $18,485,000 $49,187,740
107 TOTAL CAPITAL IMPROVEMENT PROJECTS $14,840,500 $19,062,200 $10,555,500 $8,478,540 $30,792,500 $83,729,240
CAPITAL IMPROVEMENT PLAN CAPITAL IMPROVEMENT PLAN
Page 7153 of 7162
Port of the Islands Community Improvement District
Page 7154 of 7162
1
TABLE NO. 8
CAPITAL IMPROVEMENT PLAN
UTILITY COMPONENT
(NOTE: Projects are not listed in priority)
PROJECT
NO.
DESCRIPTION YEAR BUDGET
1 Water Storage Tank Addition 1-5 $425,000
2 Water Storage Tank Repair 1-5 $75,000
3 Wastewater Filter Evaluation 1-5 $10,000
4 Fire Hydrant Removal – North Hotel 1-5 $2,500
5 Plant Facility Gate Replacement 1-5 $10,000
6 Wastewater Filter Replacement/Modification 1-5 $150,000
7 Wastewater Collection System Evaluation 1-5 $27,500
8 Wastewater Pump Station Evaluation 1-5 $10,000
9 Water System Isolation Valve Replacement Phase 1 1-5 $150,000
10 Fire/Irrigation System Isolation Valve Replacement
Phase 1
1-5
$100,000
11 Wastewater Pump Station Rehabilitation 1-5 $150,000
12 Wastewater Plant Aeration Piping Replacement 1-5 $65,000
13 Wastewater Plant Bar Screen Replacement 1-5 $80,000
14 Wastewater Transmission System Isolation Valve
Replacement Phase 1
1-5
$6,000
15 Wellfield AC Transmission Main Replacement 5-10 $1,210,000
16 Well Reconditioning/Pump Replacement (Wells 1-3) 5-10 $150,000
17 Wellfield Emergency Generator Replacement 5-10 $70,000
18 Wastewater Collection System Rehabilitation 5-10 $10,000
19 Plant Facility Existing Building Evaluation 5-10 $20,000
20 Wastewater MBR Equipment Removal 5-10 $50,000
21 Fire/Irrigation High Service Pump Replacement 5-10 $60,000
22 Union Road AC Water Main Replacement 5-10 $490,000
23 Orchid Cove Water Main Interconnect 5-10 $20,000
24 Orchid Cove Fire/Irrigation Main Interconnect 5-10 $35,000
25 Plant Facility Existing Building
Demolition/Renovation
5-10
$350,000
26 Water System Isolation Valve Replacement Phase 2 5-10 $150,000
27 Wastewater Transmission System Isolation Valve
Replacement Phase 2
5-10
$6,000
28 Fire/Irrigation System Isolation Valve Replacement
Phase 2
5-10
$100,000
29 Water System High Service Pump Replacement 10-20 $120,000
30 Water RO Membrane Replacement 10-20 $60,000
31 Well Reconditioning/Pump Replacement (Wells 1-3) 10-20 $150,000
Page 7155 of 7162
1
TABLE NO. 9
CAPITAL IMPROVEMENT PLAN
UTILITY COMPONENT
FIVE YEAR PROJECTS
(NOTE: Projects are not listed by priority)
PROJECT
NO.
DESCRIPTION YEAR BUDGET
1 Water Storage Tank Addition 1-5 $425,000
2 Water Storage Tank Repair 1-5 $75,000
3 Wastewater Filter Evaluation 1 $10,000
4 Fire Hydrant Removal – North Hotel 1 $2,500
5 Plant Facility Gate Replacement 1 $10,000
Subtotal $522,500
6 Wastewater Filter Replacement/Modification 2 $150,000
7 Wastewater Collection System Evaluation 2 $27,500
8 Wastewater Pump Station Evaluation 2 $10,000
9 Water System Isolation Valve Replacement Phase 1 2 $150,000
Subtotal $337,500
10 Fire/Irrigation System Isolation Valve Replacement
Phase 1
3
$100,000
11 Wastewater Pump Station Rehabilitation 3 $150,000
12 Wastewater Plant Aeration Piping Replacement 3 $65,000
Subtotal $315,000
13 Wastewater Plant Bar Screen Replacement 4 $80,000
14 Wastewater Transmission System Isolation Valve
Replacement Phase 1
4
$6,000
15 Wellfield AC Transmission Main Replacement 4-6 $1,210,000
Subtotal $1,296,000
Page 7156 of 7162
1
TABLE NO. 10
CAPITAL IMPROVEMENT PLAN
ROADWAY & DRAINAGE COMPONENT
(NOTE: Projects are not listed by priority)
PROJECT
NO.
DESCRIPTION YEAR BUDGET
1 Stella Maris North Pavement Current $150,000
2 Newport Drive Drainage 1-5 $165,000
3 Morning Star Cay Drainage 1-5 $70,000
4 Cays Drainage (Wilderness, Windward, Venus Cay
& Sunset Cay)
1-5
$400,000
5 Union Road Pavement Upgrade 1-5 TBD
6 Newport Drive Pavement Rehabilitation 5-10 $235,000
Reserve Funds - Annually
Drainage $65,000
Roadways $50,000
Page 7157 of 7162