Agenda 09/24/2024 Item #16F11 (Invitation to Bid No. 24-8250, “Golden Gate Golf Course Outfall Swale," to South Florida Excavation, Inc.)9/24/2024
Item # 16.F.11.
ID#: 2024-1060
Executive Summary
Recommendation that the Board award Invitation to Bid No. 24-8250, “Golden Gate Golf Course Outfall Swale," to
South Florida Excavation, Inc., in the amount of $1,657,712, approve an Owner’s Allowance of $220,000, and authorize
the Chairman to sign the attached Agreement (Project No. 80412).
OBJECTIVE: Construct approximately 2,400 linear feet of a 35-foot-wide lined swale and a 300 linear foot outfall pipe
at the Golden Gate Golf Course.
CONSIDERATIONS: This project encompasses the construction of a 2,400 linear foot, 35-foot-wide lined outfall
swale and the reconstruction of an existing 300 linear feet of swale, berm, and outfall pipe near the Golden Gate Main
Canal. The designed swale will manage inflows from the current golf course stormwater system and future
developments.
On April 2, 2024, the Procurement Services Division issued Invitation to Bid No. 24-8250, the “Golden Gate Golf
Course Outfall Swale.” The County received two bids by the May 17, 2024, deadline as summarized below:
Respondents:
Company Name City County State Bid Amount Responsive/Responsible
South Florida
Excavation, Inc.
Naples Collier FL $1,657,712.00 Yes/Yes
Quality Enterprise
USA, Inc
Naples Collier FL $3,349,191.73 Yes/Yes
Staff reviewed the two bids and found both bidders responsive and responsible, with South Florida Excavation, Inc.
(“SFE”) as the lowest, responsive, and responsible bidder. Staff recommends that the attached Agreement be awarded to
low bidder SFE for the total bid amount of $1,657,712.00. In addition to the total bid amount, staff is allocating the
amount of $220,000 as an Owner’s Allowance, to be used by the Owner to address unforeseen conditions, as directed by
the County.
The County’s engineering consultant Davidson Engineering, Inc. (“Davidson”) evaluated the bids and determined that
SFE met all the requirements for this project as the low bidder and that “SFE’s project references confirmed it had
sufficient relevant experience with similar projects to demonstrate the required skills to complete the Golden Gate Golf
Course Outfall Swale project. The bid received from SFE is approximately 24% lower than Davidson’s Opinion of
Probable Construction Cost of $2,193,522.71.
Established in 1994, SFE is registered to conduct business as a construction company in Florida. Staff recommends that
South Florida Excavation, Inc. be awarded the attached Agreement as the lowest responsible bidder in the amount of
$1,877,712 and approve an Owner’s Allowance in the amount of $220,000 only to be utilized at the direction of the
County’s should unforeseen conditions be encountered during the work.
FISCAL IMPACT: Funding in the amount of $1,877,712 is available within the County Wide Capital Project Fund
(3001), GG Golf Course Project 80412.
GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action.
LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board
approval. -SRT
RECOMMENDATIONS: To award Construction Invitation to Bid No. 24-8250, titled "Golden Gate Golf Course
Outfall Swale," to South Florida Excavation, Inc., for a total of $1,657,712, approve the Owner’s Allowance in the
Page 3752 of 4908
amount of $220,000, and authorize the Chairman to sign the attached Agreement. (Project No. 80412).
PREPARED BY: Brian DeLony, Supervisor Project Management (Licensed), Facilities Management Division
ATTACHMENTS:
1. 24-8250 DELORA
2. 24-8250 Insurance _South Florida
3. 24-8250 NORA
4. 24-8250 VS_South Florida
5. 24-8250 Bid Tabulation
Page 3753 of 4908
Civil Engineering • Planning • Permitting
D esigningE xcellence
4365 Radio Road • Suite 201 • Naples, FL 34104 • P: 239.434.6060 • www.davidsonengineering.com
June 7, 2024
Justin Landgrebe
Procurement Strategist I
Collier County Procurement Services Division
3295 Tamiami Trail East, Bldg. C2
Naples, FL 34112-5361
Re: Design Entity Letter of Recommended Award
Solicitation # 24-8250
Golden Gate Golf Course Outfall Swale
Collier County, Florida
Dear Justin:
Davidson Engineering, Inc. (EOR) has completed our review of the quotes submitted for the above-
referenced project and we are pleased to provide the following award recommendation. The scope of the
Golden Gate Golf Course Outfall Swale project includes the construction of approximately 2,406 linear
feet of a 35-foot-wide lined outfall swale, along with the reconstruction of the existing approximately 300
linear feet of swale, berm, and outfall pipe near the Golden Gate Main Canal. The proposed swale is
designed to accept inflows from the existing golf course stormwater management system and any future
developments. It is required that all existing utilities, irrigation equipment, nearby private residential site
improvements, and telecommunication assets affected by the swale installation be restored or relocated
as necessary.
Collier County Procurement’s review of the bid tabulations determined that the apparent low bidder is
South Florida Excavation, Inc. with a total base bid + alternate of $1,657,712. Davidson Engineering was
provided with the bid schedule and the South Florida Excavation, Inc. bid is approximately 24% lower
than the Engineer’s Opinion of Probable Construction (OPC) Cost of $2,193,522.71.
References were provided, and 4 of the 5 Vendor Reference Check Logs were completed and are attached
hereto. The project references provided by South Florida Excavation, Inc. were all contacted and contain
sufficient relevant experience with similar projects to demonstrate the required successful experience to
complete the project.
South Florida Excavation, Inc. formed in 1994, active with the State of Florida Division of Corporations and
registered with the Florida Department of Business and Professional Regulations as a Construction
Business with Shannon Lee Donahue as the qualifier of the Certified Underground Utility and Excavation
Contractor license, both of which registrations are current and active.
Page 3754 of 4908
DELORA
Solicitation # 24-8250
Golden Gate Golf Course Outfall Swale
Page 2 of 2
Davidson Engineering has worked successfully with South Florida Excavation, Inc. on other projects
located in Collier County. Based on that experience, the favorable performance reviews provided on the
Vendor Reference Check Logs and its current licensing, it appears that it is a qualified firm to conduct the
requested work. We, as the design entity, therefore, recommend that South Florida Excavation, Inc. be
awarded the contract for the Golden Gate Golf Course Outfall Swale in the amount of $1,657,712.
Should there be any questions, please feel free to contact our office.
Sincerely,
Lee Davidson, P.E.
Project Manager
Attachments:
Vendor Reference Check Logs
Page 3755 of 4908
VENDOR REFERENCE CHECK LOG
Solicitation No.: 24-8250 Reference Check by:
Davidson Engineering, Inc.
Tocia Hamlin-Rosa, Sr Project
Coordinator
Solicitation Title:
Golden Gate Golf Course Outfall
Swale Date:
5/29/2024 -Completed via
email
Bidder’s Name: Michael Grable Phone: 239-434-6060
Design Entity: South Florida Excavation, Inc.
REFERENCED PROJECT:
Project Name:
Collier County Sports
Complex 2.1 Project Location:
City Gate Blvd. N
Naples, FL
Project Description: Excavation, Swales, Roadway, Curb, Sidewalk
Completion Date: 11/2023 Contract Value: 12,620,097
Project Owner/Title:
Collier County Board of County Commissioners – General Contractor: Manhattan
Construction
Owner’s Address:
3705-1 Westview Drive
Naples, FL Phone: 239-571-5457
Owner’s Contact
Person: Craig Bryant E-Mail: Cbryant@Manhattanconstruction.com
1.
Was project completed timely and within budget? (If not, provide detail)
No – Owner Delays
2.
Was the submittal/review process performed satisfactorily? (If not, provide detail)
Yes
3.
Was the construction process performed satisfactorily? (If not, provide detail)
Yes
4.
Did the process run smoothly? Were there any changes? Describe below.
Yes. Yes: extensive Owner Changes to the project.
5. Was the contract closeout process performed satisfactorily? (If not, provide detail)
Yes
6.
Any warranty issues since closeout? Were they responded to and performed satisfactorily?
No issues. Any punch, closeout and warranty items have been promptly responded to.
7.
Additional comments:
Page 3756 of 4908
VENDOR REFERENCE CHECK LOG
Solicitation No.: 24-8250 Reference Check by:
Davidson Engineering, Inc.
Tocia Hamlin-Rosa, Sr Project
Coordinator
Solicitation Title:
Golden Gate Golf Course Outfall
Swale Date:
5/29/2024 -Completed via
email
Bidder’s Name: Michael Grable Phone: 239-434-6060
Design Entity: South Florida Excavation, Inc.
REFERENCED PROJECT:
Project Name: Miromar Clubhouse Project Location: Estero, FL
Project Description: Earthwork, Grading, Install HDPE
Completion Date: 8/2023 Contract Value: 172,876
Project Owner/Title: Miromar – General Contractor: Rycon Construction, Inc.
Owner’s Address:
11215 Metro Parkway
Fort Myers, FL Phone: 239-399-1502
Owner’s Contact
Person: Julie Irvin E-Mail: Jirvin@ryconinc.com
1.
Was project completed timely and within budget? (If not, provide detail)
Yes
2.
Was the submittal/review process performed satisfactorily? (If not, provide detail)
Yes
3.
Was the construction process performed satisfactorily? (If not, provide detail)
Yes
4.
Did the process run smoothly? Were there any changes? Describe below.
Yes
5. Was the contract closeout process performed satisfactorily? (If not, provide detail)
Yes
6.
Any warranty issues since closeout? Were they responded to and performed satisfactorily?
No Issues
7.
Additional comments: South Florida Excavation is a good sub
Page 3757 of 4908
VENDOR REFERENCE CHECK LOG
Solicitation No.: 24-8250 Reference Check by:
Davidson Engineering, Inc.
Tocia Hamlin-Rosa, Sr Project
Coordinator
Solicitation Title:
Golden Gate Golf Course Outfall
Swale Date:
5/29/2024 -Completed via
email
Bidder’s Name: Michael Grable Phone: 239-434-6060
Design Entity: South Florida Excavation, Inc.
REFERENCED PROJECT:
Project Name: Uline F6 Distribution Bldg. Project Location:
3830 Uline Drive
Naples, FL
Project Description: Excavation, Swales, Roadway, Curb, Sidewalk
Completion Date: 7/2023 Contract Value: $10,772,322
Project Owner/Title: Uline c/o General Contractor - Mortenson
Owner’s Address:
115 S. 84th Street
Milwaukee, WI Phone: 262-313-8774
Owner’s Contact Person: Liam Parks, Project Manager E-Mail: Liam.Parks@mortenson.com
1.
Was project completed timely and within budget? (If not, provide detail)
There was added scope which caused the contractor’s price to increase during the project, but otherwise the
work was performed on a lump sum basis
2.
Was the submittal/review process performed satisfactorily? (If not, provide detail)
Yes
3.
Was the construction process performed satisfactorily? (If not, provide detail)
Yes
4.
Did the process run smoothly? Were there any changes? Describe below.
Yes, it did. Changes were caused by the owner and/or site conditions out of the contractor’s control
5. Was the contract closeout process performed satisfactorily? (If not, provide detail)
Yes
6.
Any warranty issues since closeout? Were they responded to and performed satisfactorily?
One warranty issue regarding a section of exterior concrete that experienced settlement. The matter has not
been fixed yet.
7. Additional comments:
Page 3758 of 4908
VENDOR REFERENCE CHECK LOG
Solicitation No.: 24-8250 Reference Check by:
Davidson Engineering, Inc.
Tocia Hamlin-Rosa, Sr Project
Coordinator
Solicitation Title:
Golden Gate Golf Course Outfall
Swale Date:
5/29/2024 -Completed via
email
Bidder’s Name: Michael Grable Phone: 239-434-6060
Design Entity: South Florida Excavation, Inc.
REFERENCED PROJECT:
Project Name: Winchester Project Location: Immokalee Road, Naples, FL
Project Description: Earthwork, Swales, Roadway, Curb, Sidewalk
Completion Date: 5/2024 Contract Value: $3,080,401
Project Owner/Title: BCHD Partners – Peninsula Engineering
Owner’s Address:
2600 Golden Gate Parkway
Naples, FL 34105 Phone: 239-719-0824
Owner’s Contact
Person: Kyle Fruth E-Mail: Kfruth@Pen-Eng.com
1.
Was project completed timely and within budget? (If not, provide detail)
Yes. SFE completed the job two months ahead of schedule and found saving within the budget.
2.
Was the submittal/review process performed satisfactorily? (If not, provide detail)
Yes. Contractor submittals were provided promptly upon request.
3.
Was the construction process performed satisfactorily? (If not, provide detail)
Yes.
4.
Did the process run smoothly? Were there any changes? Describe below.
The project had challenges due to client design modifications throughout the duration of the project. SFE
worked with the EOR through the design updates to keep the project on schedule and within budget.
5. Was the contract closeout process performed satisfactorily? (If not, provide detail)
Yes. SFE completed the EOR and County punch-list efficiently through the certification / permit close-out
process.
6.
Any warranty issues since closeout? Were they responded to and performed satisfactorily?
None to date.
7.
Additional comments: Following the completion of numerous projects with SFE over 10-years, I would
recommend them for this project.
Page 3759 of 4908
VENDOR REFERENCE CHECK LOG
Solicitation No.: 24-8250 Reference Check by:
Davidson Engineering, Inc.
Tocia Hamlin-Rosa, Sr Project
Coordinator
Solicitation Title:
Golden Gate Golf Course Outfall
Swale Date:
1st Attempt: 5/29/2024 -via
email; returned as
undeliverable, corrected email
address and resent
2nd Attempt: 6/4 Follow up
email sent
3rd Attempt: 6/7 Called and
left a voice mail message
Bidder’s Name: Michael Grable Phone: 239-434-6060
Design Entity: South Florida Excavation, Inc.
REFERENCED PROJECT:
Project Name: Siena Lakes Phase I Project Location: Osceola Trail, Naples, FL
Project Description: Lake Excavation with Permeable Liner, Roadway, Curb, Sidewalk
Completion Date: 10/2021 Contract Value: $8,320,114
Project Owner/Title: Siena Lakes, LLC – General Contractor: Kaufman Lynn Construction
Owner’s Address:
9410 Corkscrew Palms Circle
Estero, FL Phone: 239-745-5482
Owner’s Contact
Person: Steve DeLong E-Mail: SDelong@kaufmanlynn.com
1.
Was project completed timely and within budget? (If not, provide detail)
2.
Was the submittal/review process performed satisfactorily? (If not, provide detail)
3.
Was the construction process performed satisfactorily? (If not, provide detail)
4.
Did the process run smoothly? Were there any changes? Describe below.
5. Was the contract closeout process performed satisfactorily? (If not, provide detail)
6.
Any warranty issues since closeout? Were they responded to and performed satisfactorily?
Page 3760 of 4908
Page 3761 of 4908
Notice of Recommended Award
Solicitation: 24-8250 Title: Golden Gate Golf Course Outfall Swale
Due Date and Time: May 17, 2024, at 3:00 PM EST.
Company Name City County State Bid Amount Responsive/Responsible
South Florida Excavation, Inc. Naples Collier FL $1,657,712.00 Yes/Yes
Quality Enterprise USA, Inc. Naples Collier FL $3,349,191.73 Yes/Yes
Utilized Local Vendor Preference: Yes No N/A
Recommended Vendor(s) For Award:
On April 2nd, 2024, the Procurement Services Division issued Construction Invitation to Bid (ITB) No. 24-8250,
Golden Gate Golf Course Outfall Swale, to one thousand eight hundred and four (1,804) vendors. The
solicitation was advertised for a total of 45 days, one thousand one hundred and fourteen (1,114) bid packages
were viewed, and the County received two (2) bids by the May 17, 2024, submission deadline, as summarized
above.
Staff reviewed the bids received. Both bids were deemed responsive and responsible, with South Florida
Excavation, Inc. having a minor irregularity. Staff determined that South Florida Excavation, Inc. was deemed
the lowest responsive responsible bidder.
Staff recommends that the contract be awarded to South Florida Excavation, Inc., the lowest responsive and
responsible bidder, based on the award of the Base Bid with bid alternates for a total contract amount of
$1,657,712.00. In addition to the total bid amount, the staff has allocated $220,000.00 in Owner’s Allowance,
for Owner’s use as directed.
Contract Driven Purchase Order Driven
Required Signatures
Project Manager:
Procurement Strategist:
Procurement Services Director:
__________________________________ _________________
Sandra Srnka Date
DocuSign Envelope ID: 252DEEBA-6EA3-46A2-A0B1-8E5E7566321F
6/27/2024
6/28/2024
6/28/2024
Page 3762 of 4908
Page 3763 of 4908
Page 3764 of 4908
Page 3765 of 4908
Page 3766 of 4908
Page 3767 of 4908
Page 3768 of 4908
Page 3769 of 4908
Page 3770 of 4908
Page 3771 of 4908
Page 3772 of 4908
Page 3773 of 4908
Page 3774 of 4908
Page 3775 of 4908
Page 3776 of 4908
Page 3777 of 4908
Page 3778 of 4908
Page 3779 of 4908
Page 3780 of 4908
Page 3781 of 4908
Page 3782 of 4908
Page 3783 of 4908
Page 3784 of 4908
Page 3785 of 4908
Page 3786 of 4908
Page 3787 of 4908
Page 3788 of 4908
Page 3789 of 4908
Page 3790 of 4908
Page 3791 of 4908
Page 3792 of 4908
Page 3793 of 4908
Page 3794 of 4908
Page 3795 of 4908
Page 3796 of 4908
Page 3797 of 4908
Page 3798 of 4908
Page 3799 of 4908
Page 3800 of 4908
Page 3801 of 4908
Page 3802 of 4908
Page 3803 of 4908
Page 3804 of 4908
Page 3805 of 4908
Page 3806 of 4908
Page 3807 of 4908
Page 3808 of 4908
Page 3809 of 4908
Page 3810 of 4908
Page 3811 of 4908
Page 3812 of 4908
Page 3813 of 4908
Page 3814 of 4908
Page 3815 of 4908
Page 3816 of 4908
Page 3817 of 4908
Page 3818 of 4908
Page 3819 of 4908
Page 3820 of 4908
Page 3821 of 4908
Page 3822 of 4908
Page 3823 of 4908
Page 3824 of 4908
Page 3825 of 4908
Page 3826 of 4908
Page 3827 of 4908
Page 3828 of 4908
Page 3829 of 4908
Page 3830 of 4908
Page 3831 of 4908
Page 3832 of 4908
Page 3833 of 4908
Page 3834 of 4908
Page 3835 of 4908
Page 3836 of 4908
Page 3837 of 4908
Page 3838 of 4908
Page 3839 of 4908
Page 3840 of 4908
Page 3841 of 4908
Page 3842 of 4908
Page 3843 of 4908
Page 3844 of 4908
Page 3845 of 4908
Page 3846 of 4908
Page 3847 of 4908
Page 3848 of 4908
Page 3849 of 4908
Page 3850 of 4908
Page 3851 of 4908
Page 3852 of 4908
Page 3853 of 4908
Page 3854 of 4908
Page 3855 of 4908
Page 3856 of 4908
Page 3857 of 4908
Page 3858 of 4908
Page 3859 of 4908
Page 3860 of 4908
Page 3861 of 4908
Page 3862 of 4908
Page 3863 of 4908
Page 3864 of 4908
Page 3865 of 4908
Page 3866 of 4908
Page 3867 of 4908
Page 3868 of 4908
Page 3869 of 4908
Page 3870 of 4908
Page 3871 of 4908
Page 3872 of 4908
Page 3873 of 4908
Page 3874 of 4908
Page 3875 of 4908
Page 3876 of 4908
Page 3877 of 4908
Page 3878 of 4908
Page 3879 of 4908
Page 3880 of 4908
Page 3881 of 4908
Solicitation Number and Title: 24-8250 Golden Gate Golf Course Swale
Procurement Strategist : Justin Landgrebe
Project Manager: Brian Deloney
Invitations : 1,804
Downloaded : 65
Bid Received :2
Line No.Description Quantity Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 Mobilization/ General Conditions 1 LS 24,000.00$ 24,000.00$ 281,401.75$ 281,401.75$ 200,000.00$ 200,000.00$
2 Silt Fence 5,484 LF 3.00$ 16,452.00$ 3.00$ 16,452.00$ 3.15$ 17,274.60$
3 Turbidity Barrier 1 LS 3,400.00$ 3,400.00$ 1,352.00$ 1,352.00$ 2,135.00$ 2,135.00$
4 NPDES Pollution Prevention & Monitoring 1 LS 12,400.00$ 12,400.00$ 15,059.00$ 15,059.00$ 6,980.00$ 6,980.00$
5 Survey Stake-out/ Survey As-built 1 LS 45,000.00$ 45,000.00$ 41,157.75$ 41,157.75$ 41,001.58$ 41,001.58$
6 Private Utility Locates 1 LS 24,000.00$ 24,000.00$ 6,950.00$ 6,950.00$ 11,700.00$ 11,700.00$
7 Clearing/ Grubbing 3.1 AC 7,000.00$ 21,700.00$ 31,639.00$ 98,080.90$ 124,097.12$ 384,701.07$
8 Site Grading Rough/Final 16,612 SY 6.00$ 99,672.00$ 64.75$ 1,075,627.00$ 19.58$ 325,262.96$
9 Dewatering 1 LS 56,800.00$ 56,800.00$ 119,120.25$ 119,120.25$ 47,019.00$ 47,019.00$
10 Sod - (Bahia unless otherwise specified)1 LS 83,650.00$ 83,650.00$ 169,435.25$ 169,435.25$ 102,399.00$ 102,399.00$
11 Removal of Excess Soils 1 LS 675,900.00$ 675,900.00$ 1,069,775.58$ 1,069,775.58$ 152,700.00$ 152,700.00$
1,062,974.00$ 2,894,411.48$ 1,291,173.21$
12 Swale Liner (30 mil HDPE)1 LS $544,388.00 544,388.00$ $326,080.75 326,080.75$ $897,740.00 897,740.00$
13 Drainage Pipe - 24" RCP 29 LF $320.00 9,280.00$ $231.50 6,713.50$ $108.50 3,146.50$
14 Mitered End Section 2 EA $8,800.00 17,600.00$ $4,022.50 8,045.00$ $731.50 1,463.00$
571,268.00$ 340,839.25$ 902,349.50$
1,634,242.00$ 3,235,250.73$ 2,193,522.71$
13A Drainage Pipe - 36" Reinforced Concrete Pipe 58 LF 375.00$ 21,750.00$ 279.00$ 16,182.00$ 231.50$ 13,427.00$
14A Dual Pipe Mitered End Section 2 EA 9,800.00$ 19,600.00$ 18,049.00$ 36,098.00$ 3,775.00$ 7,550.00$
15 36" Inline Check Valve 2 EA 4,500.00$ 9,000.00$ 38,209.75$ 76,419.50$ 35,000.00$ 70,000.00$
50,350.00$ 128,699.50$ 90,977.00$
1,657,712.00$ 3,349,191.73$ 2,279,890.21$
Bid Opened by: Trevor Adaline
Bid Witnessed by: Justin Landgrebe
BID Tabulation
Engineer's EstimateQuality Enterprise USA,
INC.
SunBiz
Addendums (1)
Vendor Declaration Statement (Form 10)
Immigration Affidavit Certification (Form 11)
Insurance and Bonding Requirements (Form 8)
Conflict of Interest Affidavit (Form 9)
Yes
Yes
Yes
Yes
Yes
Yes
Supplemental Qualifications
License
E-Verify
W-9
Yes
Yes
Yes
Yes
Yes
Statement of Experience of Bidder (Form 5)
Yes
Yes
Trench Safety Act Acknowledgement (Form 6)
Bid Bond (Form 7)
Yes
YesYes
Yes
Yes
Contractors Key Personnel Assigned to Project - (Form 2)
Material Manufacturers (Form 3)
Yes
Yes
List of Major Subcontractors (Form 4)
Yes
Yes
Yes
Total Base Bid
Bid Schedule
Bid Response Form (Form 1)
Yes
Yes
Yes
Yes
Construction ITB 24-8250
Golden Gate Golf Course Outfall Swale
South Florida
Excavation
Quality Enterprise USA, Inc.
Yes/No
South Florida Excavation
Yes/No
* Staff has allocated $220,000.00 of the total bid amount in Owner’s Allowance – for Owners Use as Directed. This Allowance will be used only
at the Owner’s direction to accomplish work due to unforeseen conditions and/or by the Owner. Inclusion of the Allowance as part of the
Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners
Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.
Bid Alternate Subtotal
Site Work
Site Work Subtotal
Total Base Bid with Bid Alternates
Drainage Utilities
Drainage Utilities Subtotal
Bid Alternates
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes Yes