Loading...
Agenda 09/24/2024 Item #16C5 (Water-Sewer District, to award a Request for Quotation (“RFQ”) under Agreement No. 19-7622, “Wastewater Pump Station Repair and Renovation")9/24/2024 Item # 16.C.5. ID#: 2024-1034 Executive Summary Recommendation that the Board of County Commissioners, as ex-officio the Governing Board of the Collier County Water-Sewer District, to award a Request for Quotation (“RFQ”) under Agreement No. 19-7622, “Wastewater Pump Station Repair and Renovation,” for the Pump Station 304.08 Rehabilitation project to Precision Lift Stations, Inc., in the amount of $489,648, approve an Owner’s Allowance of $30,000, and authorize staff to open a Purchase Order for the work. (Project Number 70240) OBJECTIVE: To bring outdated utility infrastructure into compliance with current standards while meeting the demand for service, protecting public health and safety, and providing a proactive environmental protection approach. CONSIDERATIONS: The proposed scope of work for the "Pump Station 304.08 Rehabilitation" falls under Project Number 70240, "Collections Op TSP", is consistent with the FY2024 Capital Improvement Project Budget approved by the Board on September 21, 2023. This project is located east of the intersection of Bayshore Drive and Republic Drive, near 5085 Bayshore Dr. The pump station is 35 years old and at the end of its useful life. The scope of work includes: • Coating the interior of the wet well to protect the concrete walls from corrosion. • Replacing deteriorated pipes with corrosion-proof high-density polyethylene (HDPE) pipe material. • Eliminating the underground valve vault and replacing it with above ground valves and HDPE pipe, which will reduce corrosion and improve safety during maintenance. • Replacing the existing wastewater submersible pumps with more efficient and reliable pumps. • Replacing the existing electrical components with a standard control panel to meet current standards and codes. • Site restoration: sidewalk repair, landscaping in disturbed areas. These improvements will: (1) update Pump Station 304.08 to meet current Collier County utility standards in a coordinated manner that will not interrupt sewer service, (2) improve the performance and reliability of the sewer system in the community, (3) improve safety during routine maintenance by the County’s Wastewater Division staff, and (4) provide reliability and resiliency to the wastewater system. On March 27, 2024, the County distributed a Request for Quotation for the Pump Station 304.08 Rehabilitation project to the four contractors under the Annual Agreement for Wastewater Pump Station Repair and Renovation Agreement No. 19-7622. Three contractors submitted quotes to the County by the April 19, 2024 deadline as summarized in the table below. Vendor Total Base Bid Amount Precision Lift Stations, Inc. $ 489,648 Quality Enterprises USA, Inc. $ 585,122 Douglas N. Higgins, Inc. $ 613,200 U.S. Water Services Corporation No Quote Submitted The County did not receive a quote from the U.S. Water Services Corporation due to the lack of time in their schedule to complete the work in a timely manner. County staff and the County’s Engineering consultant, Johnson Engineering, Inc., evaluated the bids and determined that Precision Lift Stations, Inc. met all qualifications required for the project and submitted the lowest bid. The base bid provided by Precision Lift Stations, Inc. is approximately 2 percent lower than the engineering consultant’s opinion of probable cost of $520,500. Page 3126 of 4908 The bid specifications informed bidders that there may be unforeseen conditions associated with the project. Staff has allocated an Owner-directed project allowance of $30,000 for unanticipated costs including, but not limited to, un- located utilities and unforeseen conditions (no additional payment shall be made for rock excavation, replacement of fill material, or dewatering). Use of the allowance amounts will only be authorized as necessary and subject to the County’s approval and direction, in accordance with the terms of the Agreement. Precision Lift Stations, Inc. is a Florida Corporation specializing in the construction and rehabilitation of Pump Stations in Southwest Florida. They are a State-licensed Underground Utility & Excavation Contractor and have been doing business in the county since 2017, with its main office in Longwood, Florida. County staff and its engineering consultant recommend that the County award the RFQ to Precision Lift Stations, Inc., the lowest responsive and responsible bidder, in the total contract amount of $489,648, approve the Owner’s Allowance in the amount of $30,000. And authorize staff to open a Purchase Order to commence work. Agreement No. 19-7622 requires all Purchase Orders issued over the amount of $500,000 be approved by the Board, and that the awarded contractor on projects over $200,000 provide payment and performance bonds prior to the issuance of the Purchase Order and the commencement of work. Subject to the Board’s approval of this item, payment and performance bonds in the quoted amount are attached as backup to this item. This item is consistent with the Infrastructure and Asset Management element of the Collier County Strategic Plan objectives. FISCAL IMPACT: There is adequate funding in Project Number 70240 “Collections Op TSP”. The source of funding is the Wastewater User Fee Capital Projects Fund (4014). GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities, and to remain in compliance with all regulatory programs. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. - CJS RECOMMENDATIONS: To award Request for Quotation (“RFQ”) under Agreement No. 19-7622, the “Annual Agreement for Wastewater Pump Station Repair and Renovation” for the Pump Station 304.08 Rehabilitation project to Precision Lift Stations, Inc., in the amount of $489,648, approve an Owner’s Allowance of $30,000, and authorize staff to open a Purchase Order for the work. (Project Number 70240) PREPARED BY: Storm Gewirtz, PE, Project Manager III (Licensed), Engineering and Project Management Division ATTACHMENTS: 1. Att 1 - Collier County PS 304.08 - Precision Lift Stations Bid Submittal 2. Att 2 - PS 304.08 Award Recommendation Letter 05082024 3. Att 3 - PS 304.08 PP Bonds 4. Att 4 - 19-7622PrecisionLiftStations Page 3127 of 4908 Page 3128 of 4908 Page 3129 of 4908 Page 3130 of 4908 2122 Johnson Street ■ Fort Myers, Florida 33902-1550 (239) 334-0046 ■ Fax (239) 334-3661 20203066-029/PS304.08 SINCE 1946 May 8, 2024 Via Email Only to: Storm.Gewirtz@colliercountyfl.gov Storm Gewirtz Project Manager III Collier County Public Utilities Engineering and Project Management 3339 Tamiami Trail East, Suite 303 Naples, FL 34112 RE: Low Quoter Recommendation for Collier County Contract # 19-7622 Project: Pump Station 304.08 Rehabilitation Dear Ms. Gewirtz: Collier County provided the quotes received for the above-referenced project to Johnson Engineering, and we performed an evaluation of the results. Our recommendation is contained herein. The responsive quoters and their quote amounts submitted are listed below from lowest to highest: QUOTER OVERALL QUOTE AMOUNT Precision Lift Stations, Inc. $519,648.00 Quality Enterprises USA, Inc. $615,122.00 Douglas N. Higgins, Inc. $643,200.00 U.S. Water Services Corporation No Quote Submitted For comparison purposes, Johnson Engineering provided Collier County with an Opinion of Probable Construction Cost in the amount of $550,500.00. Following the quote opening, Johnson Engineering prepared the enclosed Quote Tabulation which includes an analysis for mathematical errors; no mathematical errors were found. The results of the Quote Tabulation show Precision Lift Stations, Inc. as the lowest bidder. Precision Lift Stations, Inc. did acknowledge Addendum #1, and their unit price for Item 1: Mobilization/Demobilization did not exceed 10% of the construction quote. Their quote for Item 1 is 7.6% of their construction total. Collier County and Johnson Engineering have past work experience with Precision Lift Stations, Inc., and they are reasonable and have provided a responsive quote. Subject to concurrence with Collier County’s Purchasing and Contracts Administration Division and Precision Lift Stations, Inc. furnishing the appropriate bonding and other required insurances, we believe the selection of Precision Lift Stations, Inc. by Collier County for the intended work contained within the bid documents to be the appropriate choice. Should you have any questions, or require additional information, please let us know. Sincerely yours, William H. Saum, P.E. Enclosure Senior Project Manager Page 3131 of 4908 Bid Analysis Pump Station 304.08 Rehabilitation Collier County Public Utilities Engineering and Project Management Division CLASS ITEM NO. DESCRIPTION EST. QUANT.UNIT UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE 1 Mobilization/Demobilization (10% Maximum of Construction Total)1 LS 45,000.00$ 45,000.00$ 39,500.00$ 39,500.00$ 52,274.00$ 52,274.00$ 60,000.00$ 60,000.00$ 2 Pre-Construction Audio/Video Recording 1 LS 1,500.00$ 1,500.00$ 3,000.00$ 3,000.00$ 3,565.00$ 3,565.00$ 4,000.00$ 4,000.00$ 3 Survey Layout and As-Built Drawings 1 LS 3,000.00$ 3,000.00$ 4,000.00$ 4,000.00$ 9,093.00$ 9,093.00$ 8,000.00$ 8,000.00$ 4 Establish & Maintain Bypass Pumping System 1 LS 25,000.00$ 25,000.00$ 22,500.00$ 22,500.00$ 32,560.00$ 32,560.00$ 30,000.00$ 30,000.00$ 5 Maintenance of Pedestrian and Vehicular Traffic 1 LS 2,000.00$ 2,000.00$ 2,500.00$ 2,500.00$ 35,222.00$ 35,222.00$ 15,000.00$ 15,000.00$ Offsite 6 Furnish and Install 6" Plug Valve and Box on Existing PVC Force Main 1 LS 5,000.00$ 5,000.00$ 6,332.00$ 6,332.00$ 9,504.00$ 9,504.00$ 11,000.00$ 11,000.00$ 7 Demolish, Remove, and Dispose of Concrete Lid and Hatches, Hooks, Rails, Riser Pipes, Valve Vault, Discharge Piping and Valves, portion of force main, and other Misc. Wet & Dry Well Components, and Bollards 1 LS 20,000.00$ 20,000.00$ 15,000.00$ 15,000.00$ 43,853.00$ 43,853.00$ 20,000.00$ 20,000.00$ 8 Abandon, Remove, and Dispose of Pump Control Panel, Service Meter, Telemetry Antenna, Equipment Rack, Vent Pipe, and other Misc. Panels, Boxes, and Electrical Components 1 LS 10,000.00$ 10,000.00$ 15,000.00$ 15,000.00$ 15,977.00$ 15,977.00$ 2,000.00$ 2,000.00$ 9 Demolish, Remove, and Dispose of Concrete Sidewalk 1 LS 1,000.00$ 1,000.00$ 4,000.00$ 4,000.00$ 1,818.00$ 1,818.00$ 3,000.00$ 3,000.00$ 10 Furnish and Install Two Submersible Pumps and Associated Hardware and Accessories, FLYGT NP 3102 MT Adaptive 463 Impeller, 5.7-HP, 480V, 3-Phase 1 LS 95,000.00$ 95,000.00$ 142,247.00$ 142,247.00$ 132,299.00$ 132,299.00$ 125,000.00$ 125,000.00$ 11 Furnish and Install Equipment Rack and Electrical Panels and FPL Power Conversion Coordination (Pump Control Panel, Junction Box, Mini-Power Zone, Generator Receptacle, Main Disconnect, Utility Meter, Equipment Rack and Posts, and Hardware) 1 LS 140,000.00$ 140,000.00$ 133,800.00$ 133,800.00$ 113,050.00$ 113,050.00$ 69,000.00$ 69,000.00$ 12 Furnish and Install Telemetry Antenna and Associated Accessories and Concrete Base with Structural Engineer Certification 1 LS 15,000.00$ 15,000.00$ 12,158.00$ 12,158.00$ 33,147.00$ 33,147.00$ 40,000.00$ 40,000.00$ 13 Furnish and Install 4" Plug Valve and Box 1 LS 3,000.00$ 3,000.00$ 2,860.00$ 2,860.00$ 2,509.00$ 2,509.00$ 3,000.00$ 3,000.00$ 14 Furnish and Install 4" PVC DR18 Force Main (15 LF) (Below Ground)1 LS 20,000.00$ 20,000.00$ 5,175.00$ 5,175.00$ 2,917.00$ 2,917.00$ 4,000.00$ 4,000.00$ 15 Furnish and Install 4" Discharge Piping and Valves with H-Tech ARV and 4" Combination Suction & Vent Piping and Above Ground 4" Discharge Connection and 4" Plug Valve 1 LS 60,000.00$ 60,000.00$ 31,878.00$ 31,878.00$ 38,223.00$ 38,223.00$ 115,000.00$ 115,000.00$ 16 Furnish and Install 12" Thick 7.3' Diameter Concrete Wet Well Lid and 30"x50" Clear Opening Access Hatches 1 LS 13,000.00$ 13,000.00$ 8,250.00$ 8,250.00$ 17,258.00$ 17,258.00$ 32,000.00$ 32,000.00$ 17 Furnish and Install Protective Liner on Interior Surface of existing 6' Diameter Wet Well 1 LS 25,000.00$ 25,000.00$ 28,448.00$ 28,448.00$ 16,004.00$ 16,004.00$ 25,000.00$ 25,000.00$ 18 Remove and Replace Rim, Cover, Ring(s), and Frame of 4' Diameter Master Manhole 1 LS 4,000.00$ 4,000.00$ 2,000.00$ 2,000.00$ 8,986.00$ 8,986.00$ 4,000.00$ 4,000.00$ 19 Furnish and Install 6" Thick Concrete Support Pad for Discharge Piping (4' x 4')1 LS 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,557.00$ 1,557.00$ 4,000.00$ 4,000.00$ 20 Furnish and Install 6" Thick Concrete Support Pad for Control Panel (11' x 4')1 LS 3,000.00$ 3,000.00$ 2,000.00$ 2,000.00$ 2,490.00$ 2,490.00$ 7,000.00$ 7,000.00$ 21 Furnish and Install 15'x8' Reinforced Concrete Pad for Trailer Mounted Generator 1 LS 15,000.00$ 15,000.00$ 3,000.00$ 3,000.00$ 3,009.00$ 3,009.00$ 14,000.00$ 14,000.00$ 22 Furnish and Install 6" Thick 5' Wide Concrete Sidewalk 1 LS 6,000.00$ 6,000.00$ 3,000.00$ 3,000.00$ 4,307.00$ 4,307.00$ 7,000.00$ 7,000.00$ 23 Furnish and Install Removable Vehicle Guard posts 4 EA 2,000.00$ 8,000.00$ 500.00$ 2,000.00$ 1,375.00$ 5,500.00$ 2,800.00$ 11,200.00$ CLASS ITEM NO. DESCRIPTION UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE Allowance 24 Owner Directed Work Allowance: Unforeseen Conditions 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ YMobilization/Demobilization is less than 10% of total Y Y Y Y QUOTE REQUIREMENTS PRECISION LIFT STATIONS, INC. QUALITY ENTERPRISES USA, INC. DOUGLAS N. HIGGINS, INC. Acknowledged Addensum #1 YEquipmentSiteworkDemolition GeneralUtilityStructuresPRECISION LIFT STATIONS, INC. QUALITY ENTERPRISES USA, INC. DOUGLAS N. HIGGINS, INC.SECTION 1: PUMP STATION 304.08 ENGINEER'S OPC ANTICIPATED CONSTRUCTION TOTAL: SECTION 1 SUBTOTAL: 520,500.00$ 520,500.00$ 30,000.00$ 550,500.00$ SECTION 2: ALLOWANCE SUBTOTAL:30,000.00$ T&M UNIT SECTION 2: ALLOWANCES ENGINEER'S OPC SUMMARY ENGINEER'S OPC SECTION 1 PUMP STATION 304.08 SUBTOTAL: SECTION 2 ALLOWANCES SUBTOTAL: 30,000.00$ 519,648.00$ 585,122.00$ 30,000.00$ 615,122.00$ 613,200.00$ 30,000.00$ 643,200.00$ 489,648.00$ 585,122.00$ 613,200.00$ PRECISION LIFT STATIONS, INC. QUALITY ENTERPRISES USA, INC. DOUGLAS N. HIGGINS, INC. PRECISION LIFT STATIONS, INC. QUALITY ENTERPRISES USA, INC. DOUGLAS N. HIGGINS, INC. 30,000.00$ 30,000.00$ 30,000.00$ 489,648.00$ 5/2/2024 Page 1 of 1 JEI Project #20203066-029 Page 3132 of 4908 Page 3133 of 4908 Page 3134 of 4908 Page 3135 of 4908 Page 3136 of 4908 Page 3137 of 4908 Page 3138 of 4908 Page 3139 of 4908 Page 3140 of 4908 Page 3141 of 4908 Page 3142 of 4908 Page 3143 of 4908 Page 3144 of 4908 Page 3145 of 4908 Page 3146 of 4908 Page 3147 of 4908 Page 3148 of 4908 Page 3149 of 4908 Page 3150 of 4908 Page 3151 of 4908 Page 3152 of 4908 Page 3153 of 4908 Page 3154 of 4908 Page 3155 of 4908 Page 3156 of 4908 Page 3157 of 4908 Page 3158 of 4908 Page 3159 of 4908 Page 3160 of 4908 Page 3161 of 4908 Page 3162 of 4908 Page 3163 of 4908 Page 3164 of 4908 Page 3165 of 4908 Page 3166 of 4908 Page 3167 of 4908 Page 3168 of 4908 Page 3169 of 4908 Page 3170 of 4908 Page 3171 of 4908 Page 3172 of 4908 Page 3173 of 4908 Page 3174 of 4908 Page 3175 of 4908 Page 3176 of 4908 Page 3177 of 4908 Page 3178 of 4908 Page 3179 of 4908 Page 3180 of 4908 Page 3181 of 4908 Page 3182 of 4908 Page 3183 of 4908 Page 3184 of 4908 Page 3185 of 4908 Page 3186 of 4908 Page 3187 of 4908 Page 3188 of 4908 Page 3189 of 4908 Page 3190 of 4908 Page 3191 of 4908 Page 3192 of 4908 Page 3193 of 4908 Page 3194 of 4908 Page 3195 of 4908 Page 3196 of 4908 Page 3197 of 4908 Page 3198 of 4908 Page 3199 of 4908