Loading...
Backup Documents 08/27/2024 Item #16B 7 n( ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 6 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 16 B 7 THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing_lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. Jeff Klatzkow, County Attorney County Attorney Office 1<(,19 g(27 4. BCC Office Board of County Commissioners ctI3 5. Minutes and Records Clerk of Court's Office C 3�)1{ PR IMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Lorraine Lantz Phone Number 252-5779 Contact/ Department Agenda Date Item was 8/27/24 Agenda Item Number 16b7 Approved by the BCC Type of Document Agreement Number of Original 1 Attached Documents Attached PO number or account number if document is 313-163673-63301 1-60171 1 to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? LL 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signed LL by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the LL document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's LL signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip LL should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 8/27/24(enter date)and all changes LL N/A is not made during the meeting have been incorporated in the attached document. The an option for County Attorney's Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the LL N/A is not BCC,all changes directed by the BCC have been made, and the document is ready for the ••..•tion for Chairman's signature. •e I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 1 6 B 7 DEVELOPER AGREEMENT Skysail THIS DEVELOPER AGREEMENT (hereinafter referred to as the "Agreement") is made and entered into this a14"of Au ��} , 2024, by and among Neal Communities of Southwest Florida,LLC(hereinafter referred to as the"Developer"),whose address is 5800 Lakewood Ranch Blvd., Sarasota, Florida 34240, and Collier County, Florida, a political subdivision of the State of Florida(hereinafter referred to as the "County"). RECITALS: WHEREAS, Developer and County wish to coordinate the construction of transportation improvements at the intersection of Oil Well Road, Desoto Boulevard and Vela Boulevard and; and WHEREAS, the Parties agree to the terms and conditions set forth below. WITNESSETH NOW,THEREFORE, in consideration of Ten Dollars(10.00)and other good and valuable consideration exchanged amongst the parties, and in consideration of the covenants contained herein, the parties agree as follows: 1. All of the above RECITALS are true and correct and are hereby expressly incorporated herein by reference as if set forth fully below. 2. County will allow the Developer to proceed with the project on the following conditions: A. Developer will design, permit, and construct the road improvements ("Improvements") as set forth in Exhibit 1. Developer will utilize the services of Trebilcock Consulting Solutions, P.A. and RWA Engineering, Inc. for professional engineering and surveying services pertaining to the design, permitting and construction of the Improvements. The County shall reimburse the Developer fifty and one tenth percent (50.1%) of the design and permitting costs of the Improvements. Reimbursement shall be paid within sixty (60) days of completion of the Improvements and receipt of an invoice from Developer for those costs. However, payment shall occur no sooner than October 31, 2025. B. The County will contribute the construction costs for the Improvements needed by the County including 50.1% of the shared lump sum project costs, which will be reimbursed to Developer within sixty (60) days of the completion of the Improvements and receipt of an invoice from Developer for the costs. However, payment shall occur no sooner than October 31, 2025. Prior to commencing construction of the Improvements, the County and the Developer shall cooperate to advertise and bid the Improvement project in accordance with the County's normal solicitation procedures for public road projects.The County shall provide INSTR 6590566 OR 6396 PG 584 RECORDED 9/9/2024 8:53 AM PAGES 9 CLERK OF THE CIRCUIT COURT AND COMPTROLLER COLLIER COUNTY FLORIDA REC$78.00 1 6 B 7 written notice to the Developer documenting the result of such solicitation and ranking all qualified bids from lowest to highest, with the dollar amount of the lowest qualified bid being hereinafter referred to as responsible bidders. The Developer may negotiate with any of the bidders or any other qualified contractor, and in that regard the Developer shall not be obligated to award the construction of the Improvements to the low bidder or to any of the responsive bidders; however, in no event shall the County's reimbursement amount exceed the estimated construction costs in Exhibit 2 of$749,529.95 or 50.1% of the low bid amount, whichever is less. C. Developer has obtained a right-of-way permit(PRROW20230940383). Renewal permit fees are waived by the County. Developer shall not pay any lane or sidewalk rental fees for construction of the Improvements. Legal Matters 8. This Agreement shall not be construed or characterized as a development agreement under the Florida Local Government Development Agreement Act. 9. The burdens of this Agreement shall be binding upon, and the benefits of this Agreement shall inure to, all assigns successors in interest to the parties to this Agreement. The term "Developer" shall include all of Developer's assigns and successors in interest, including homeowner associations and commercial tenants. 10. In the event state or federal laws are enacted after the execution of this Agreement, which are applicable to and preclude in whole or in part the parties' compliance with the terms of this Agreement, then in such event this Agreement shall be modified or revoked as is necessary to comply with such laws, in a manner which best reflects the intent of this Agreement. 11. This Agreement shall be recorded by the County in the Official Records of Collier County, Florida, within fourteen (14) days after the Effective Date. The Developer shall pay all costs of recording this Agreement. The County shall provide a copy of the recorded document to the Developer upon request. 12. Developer's appeal is hereby withdrawn in all respects, with all issues having been resolved by this Agreement. In the event of any dispute under this Agreement, the parties shall attempt to resolve such dispute first by means of the County's then-current Alternative Dispute Resolution Procedure,if any. Following the conclusion of such procedure,if any,either party may file an action for injunctive relief in the Circuit Court of Collier County to enforce the terms of this Agreement, and remedy being cumulative with any and all other remedies available to the parties for the enforcement of the Agreement. 13. Except as otherwise provided herein, this Agreement shall only be amended by mutual written consent of the parties hereto or by their successors in interest. All notices and other communications required or permitted hereunder (including County's option) shall be in writing 1687 and shall be sent by Certified Mail, return receipt requested, or by a nationally recognized overnight delivery service, and addressed as follows: To County: To Developer: Collier County Manager's Office Neal Communities of Southwest 3299 Tamiami Trail East, Suite 202 Florida, LLC Naples, FL 34112-5746 Attn: Pamela Curran 5800 Lakewood Ranch Blvd. Sarasota, Florida 34240 14. This Agreement (which include the references set forth in the Recitals) constitutes the entire agreement between the parties with respect to the activities noted herein and supersedes and takes the place of any and all previous agreements entered into between the parties hereto relating to the transactions contemplated herein. All prior representations, undertakings, and agreements by or between the parties hereto with respect to the subject matter of this Agreement are merged into, and expressed in, this Agreement, and any and all prior representations, undertakings, and agreements by and between such parties with respect thereto hereby are canceled. 15. Nothing contained herein shall be deemed or construed to create between or among any of the parties any joint venture or partnership nor otherwise grant to one another the right, authority, or power to bind any other party hereto to any agreement whatsoever. IN WITNESS WHEREOF,the parties hereto have caused this Agreement to be executed by their appropriate officials, as of the date first above written. AS TO COUNTY: ATTEST: BOARD OF COUNTY COMMISSIONERS CRYSTAL K. KINZEL, Clerk COLLIER COUNTY, FLORIDA, on behalf of Collier County, Florida By. • �$,s\tut4.A4(\ste By' 61/0"kiks ,.A►tt-Fst as to PRIWmyanSerk �`r_ . 6:" ' : signature only Chris Hall, Chairman 1687 AS TO DEVELOPER: NEAL COMMUNITIES OF SOUTHWEST FLORIDA, LLC WI" ESS` (Print full nam ) By: Printed Name: v a61/14k - M Title: G, (Signature) a Cara ilitar, (Print full name) S"l'A"l'E OF FLORIDA COUNTY OF 6(t1'A50f1v The foregoing instrument was acknowle ged before me by means of'\ physical presence or n online notarization this (.1 day of (A. -{-* , 2024 , by (atytc IOI CckTt# , as Y AAk-O.0j of Neal mmunities of Southwest Florida, LLC, who is personally known to me or has produced as identification.. (Notary Seal) `1 t),At.,DQ. Notary Public Kathryn A. Pignatelli ,,•+ Notary Public State of Florida Printed Name of Notary: i Kathryn A.Pignatelli uu „, s Ely Commission 25 100931 Commission Number: ``t (Db93 'h+a„Is E+tpirea 04125/2025 My Commission Expires: 04= A6-9O5 Approve' a o o end legality: -ft Jeffrey tzko , County Attorney � i b 6 i ib".. y yy T 5 (MOO OE 113M 110 a M01311 for 3N11.O1VN ask g1 FF� x d0 H1OON OH10Ae 31Vnrod) 1 �.►= 1` I:1' 0350d OOd 1', +CS1 p . ! , . ..•``, > 1 iAFaei O 1 1l a .8 A <a,= • h n 1t 6 Yea t e 8 ;I 1 $ 6r4 8 Yi " la g Wy-- ; id e6 ___J 1 T r 4 nil tz �L1 I S 7 T . 0$8 I I VB ° 9t, C o G G a oI 1Qv IN �$ m 5IIX Q Da' rr b 1 i a •�i o> 1 qqq 5 I , ,. I-�I 0 ... I'l*t I 1 il . :8Ilii • I 1• , I+' , cc�{ g 6 ,4 m r. w7 I ''- I I -§ ,•::'. /I'., `,.Tli" W e Q j a r;��e r • 1 € z "x°re ;a I t; n' ,�---. 6-tt —) \ p oa"€gym 1 cSr. '• :I ! g w a x • ` $s �� r d o .i-ij q' ! tig a /� .� al , I.,,vi iti 1 I 11 o 100'ROW 1..OW il • 1 ! <l I RS 1 2. gsl pp `� 1 11 dd I . A g M 1 A 8 ,+ ,, ..AC 1''.' S •1 `y I > 111111 ▪ I. 11 1 Oe • I • Till! '•`f�' I I iO1 . 0 g T I Z LS II =BaIF ! 11J g£$g 8ti �. 85< N Ef ,T t g e ; 1 1 in `rd . .; . . 0 g , 1 I (moll OO 113M 110 f 1 4k� 4 I 1 1 3O HlOON "1 MEW +i ru.i- RTC 1 I I SO3H10 AS 31VMOd) OAlBtl13A n aF O3SOdOOd 3A0R033r3NIsHO100 M ; Yi I 11 ib87 �r3f�_v�ir ,i 7� 0 3 LL ,,,r 4 V S U O CO i;'./i 16 a `�' i`iji '-- o g 1 t,i, t,:iiit = ,8 40 3 0 !JEiE o 3 3 w e 0 i o z . g e p t m d z a 8 3. kT e g iill g- 1!"1.2 8 8 88 i� .LIP:' 4 3 A d aS I I e S r;$ s_o .im b.dia m.1 1 Z aioru�avwiw '� z *,, A G S'. O a Z • iRt. ',, Y G�e " .; $cls a o i ::_toy, HHEg o €i thy/ o o g f^, O < s /p 4R s $.. i 1 A < $ % � s w ' m g a is I 4. 1LL c ::t: I IIfl I 1 I 7 i 7 1 I 1 1 I I i A 1 i i 1 ii Exhibit 2 16 B 7 1,RIA,1 ENGINEERING State of Florida Business Certificate No.EB-0007663 SKYSAIL PHASE 4 ROW TURN LANES Engineer's Preliminary Opinion of Probable Costs SUMMARY (ON) OFFSITE ROW IMPROVEMENTS(NEAL-OIL WELL RD) $747,801.15 49.9% (OC) OFFSITE ROW IMPROVEMENTS(COLLIER COUNTY-OIL WELL RD&DESOTO BLVD) $749,529.95 50.1% ENGINEERING DESIGN,PERMITTING,&ADDITIONAL SURVEY $70,000.00 ESTIMATED SITE CONSTRUCTION SUB-TOTAL COST $1,567,331.10 10%CONTINGENCY $156,733.11 ESTIMATED SITE CONSTRUCTION GRAND TOTAL COST $1,724,064.21 Due at Due at Permit Submittal Approval Collier Fee Calculations for Utility Construction 0.75%for Construction Document Review $0.00 2.25%for Construction Inspection $0.00 Collier Fee Calculations for Site Construction 0.75%for Construction Document Review $11,754.98 2.25%for Construction Inspection $35,264.95 TOTAL ROW FEE BASED ON OPC* $11,754.98 $35,264.95 *Does not include Permitting fees Note: 1. This Engineer's Opinion of Probable Cost represents the estimated cost for constructing the above listed infrastructure for SKYSAIL PHASE 4 ROW TURN LANES (RWA,Inc.File No.220109.00.00 dated November,2023). 0 `,�111111//�,' ♦♦ 9. s , P.• ........ ENS '••. L This item has been digitally signed . '' ' \- F . and sealed by Laurie A.Swanson on • No 40254 the date adjacent to the seal. _ * •• * Printed copies of this document are not considered signed and sealed _-O • STATE OF • c and the signature must be verified on .p . .�, . Digitally signed by Laurie any electronic copies. 0 Laurie Swanson Swanson ,�;•.•FI O R O p,.' �'� ..• E"♦♦♦ Date:2023.12.13 19:04:45-05'00' i• 'ss B • ONA; 0% Laurie A.Swanson,P.E.#40254 12/13/2023 RWA,Inc. 6610 Willow Park Drive Suite 200 Naples,Florida 34109 12800 University Drive Suite 175 Fort Myers,Florida 33907 Phone:(239)597-0575 12/13/2023 Fax:(239)597-0578 5:14 PM 16B7 1J—Laki ENGINEERING State of Florida Business Certificate No.EB-0007663 Engineer's Preliminary Opinion of Probable Costs Project:SkySail Phase 4 ROW Turn lanes Date:December 7th,2023 Estimated By:ALO Checked By:LAS OFFSITE ROW IMPROVEMENTS(NEAL-OIL WELL RD) DESCRIPTION UNIT QUANTITY UNIT TOTAL COST ON-1 12"Stabilized Subgrade SY 6,147 $8.90 $54,708.30 ON-2 10"Limerock Base(Primed) SY 4,553 $27.90 $127,028.70 ON-3 1"Type FC-9.5 Friction Course SY 7,338 $20.00 $146,760.00 ON-4 1.5"Type SP-12.5 Structural Course SY 7,338 $20.00 $146,760.00 ON-5 Sawcut&Remove±4'Existing Asphalt Shoulder LF 2,747 $6.50 $17,855.50 ON-6 Milling of 1.5"Existing Asphalt SY 2,785 $22.00 $61,270.00 ON-7 Sod SY 21,651 $5.25 $113,667.75 ON-8 19 X 30 ERCP LF 104 $140.00 $14,560.00 ON-9 24"MES-Elliptical Equiv. EA 2 $2,900.00 $5,800.00 ON-10 Install 2"PVC Street Light Conduit* LF 183 $3.50 $640.50 ON-11 Install 6"PVC FPL Conduit* LF 312 $17.95 $5,600.40 ON-12 Directional Bore 6"PVC FPL Conduit* LF 68 $50.00 $3,400.00 ON-13 ROW Grading LS 1 $14,800.00 $14,800.00 ON-14 Turn Lane Striping LS 1 $13,100.00 $13,100.00 ON-15 Mainenance of Traffic LS 1 $21,850.00 $21,850.00 ROW and Turn Lane Improvements Sub-Total $747,801.15 Note: *FPL will provide 2"and 6"PVC conduit K:\2022\220109.00.00 SkySail Phase 4 Townhomes\0004 Civil Eng Design,Construction Plans\Current Plum\Sheet Files\Turn Lanes\Quantities\2023-12-13 Sky5ail ROW Permit OPC(rev S) 12/13/2023 NEAL-ROW&Turnlane 5:14 PM 161B7 IY--6-rai ENGINEERING State of Florida Business Certificate No.EB-0007663 Engineer's Preliminary Opinion of Probable Costs Project:SkySail Phase 4 ROW Turn lanes Date:December 7th,2023 Estimated By:ALO Checked By:LAS OFFSITE ROW IMPROVEMENTS(COLLIER COUNTY-OIL WELL RD&DESOTO BLVD) DESCRIPTION UNIT QUANTITY UNIT TOTAL COST OC-1 12"Stabilized Subgrade SY 4,217 $8.90 $37,531.30 OC-2 10"Limerock Base(Primed) SY 3,176 $27.90 $88,610.40 OC-3 1"Type FC-9.5 Friction Course SY 8,305 $20.00 $166,100.00 OC-4 1.5"Type SP-12.5 Structural Course SY 8,305 $20.00 $166,100.00 OC-5 2"Miscellaneous Asphalt Pavement SY 152 $35.00 $5,320.00 OC-6 Sawcut&Remove±4'Existing Asphalt Shoulder LF 1,803 $6.50 $11,719.50 OC-7 Milling of 1.5"Existing Asphalt SY 5,281 $22.00 $116,182.00 OC-8 Sod SY 7,607 $5.25 $39,936.75 OC-9 CRT 32'R Shop Bent Panels LF 50 $43.00 $2,150.00 OC-10 Approach End&Anchorage Assembly(Parallel) EA 1 $3,750.00 $3,750.00 OC-11 End Treatment Trailing Anchorage Type II EA 1 $2,150.00 $2,150.00 OC-12 TL-3 Guardrail LF 120 $26.50 $3,180.00 OC-13 19"x 30"ERCP LF 112 $140.00 $15,680.00 OC-14 30"RCP LF 24 $260.00 $6,240.00 OC-15 24"MES Elliptical Equiv.(19"x 30"ERCP) EA 2 $2,900.00 $5,800.00 OC-16 30"MES EA 1 $6,800.00 $6,800.00 OC-17 Remove Existing 24"CMP and MES LF 130 $100.00 $13,000.00 OC-18 ROW Grading LS 1 $14,800.00 $14,800.00 OC-19 Turn Lane Striping LS 1 $16,670.00 $16,670.00 OC-20 Mainenance of Traffic LS 1 $27,810.00 $27,810.00 ROW and Turn Lane Improvements Sub-Total $749,529.95 K:\2022\220109.00.00 SkySail Phase 4 Townhomes\0004 Civil Eng Design,Construction Plans\Current Plans\Sheet Files\Turn Lanes\Quantities\2023-12-13 SkySail ROW Permit OPC(rev 5) 12/13/2023 COLLIER-ROW&Turnlane 5:14 PM