Agenda 09/10/2024 Item #16B 6 (Approve Change Order Bo. 1 for the "Carson Road Stormwater Treatment Area," under Agreement No. 23-8114)16.B.6
09/ 10/2024
EXECUTIVE SUMMARY
Recommendation to approve Change Order No. 1 for the "Carson Road Stormwater Treatment Area," under
Agreement No. 23-8114 with Quality Enterprises USA, Inc., to utilize $9,798.30 of the Owner's Allowance to address
new South Florida Water Management District permit requirements, and authorize the Chairman to sign the
attached Change Order. (Project Number 60143)
OBJECTIVE: To obtain approval of Change Order No. 1 for the "Carson Road Stormwater Treatment Area" under
Agreement No. 23-8114 to utilize $9,798.30 of the Board -approved $490,000 Owner's Allowance.
CONSIDERATIONS: On August 8, 2023 (Agenda Item I LA), the Board approved Agreement No. 23-8114 (the
"Agreement") for $5,865,783.20, with Quality Enterprises USA, Inc. (the "Contractor"). The Agreement concerns the
construction of five lakes within the Carson Road area to provide stormwater quality treatment and storage prior to discharge
into the Immokalee Slough toward Lake Trafford. The Carson Road Stormwater Treatment Area (the "STA") is intended to
accept flow from the existing stormwater system within the Immokalee Drive Right -of -Way.
Staff is requesting approval of Change Order No. 1 to reallocate $9,798.30 from the Board's previously approved
$490,000.00 Owner's Allowance and $26,990.75 from bid tab line item 57 to pay for the completion of Work Directive No.
1, to replace the forty -two-inch (42") diameter pipe's specified in the design specifications and the Agreement with forty-
eight inch (48") diameter pipes based on the recommendation of the County's Engineer of Record. This requested change
arises because of new South Florida Water Management District ("SFWMD") permit requirements that were unknown at the
time of bidding. At the time that the Carson Road STA was advertised for construction bids, the design and permitting
process for the upstream Lake Trafford Road ROW was still in progress, but subsequent comments received from SFWMD
during the design and permitting of the drainage improvements within the Lake Trafford Road ROW required the size of the
culvert from Lake CR-113 to Lake CR-2A be increased from forty -two -inches (42") to forty -eight -inches (48") inches in
diameter to accept the anticipated flow into the Carson Road STA from the future drainage improvements within the Lake
Trafford Road Right -of -Way.
Approval of Change Order No. 1 will result in adjusting bid tab line item 57 from 107 linear feet of forty -two-inch (42")
RCP pipe to 107 linear feet of forty -eight -inch (48") ADS pipe. If this modification is not processed, the Contractor will not
be able to proceed with the construction in accordance with the updated construction documents and the project will not be
in compliance with the permit issued by the SFWMD.
This item is consistent with the Infrastructure and Asset Management element of Collier County's Strategic Plan by
preparing for the impacts of natural disasters on our critical infrastructure and natural resources.
FISCAL IMPACT: The source of funding is contained within the project allowance under Purchase Order #4500225866.
Utilization of $9,798.30 from the $490,000.00 Owner's Allowance does not increase the overall cost of the project.
GROWTH MANAGEMENT IMPACT: This project is in accordance with the goals and objectives of the Stormwater
Element of the Growth Management Plan.
LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board
approval. -SRT
RECOMMENDATION: To approve Change Order No. 1 for the "Carson Road Stormwater Treatment Area" under
Agreement No. 23-8114 with Quality Enterprises USA, Inc., to utilize $9,798.30 of the Owner's Allowance to address new
South Florida Water Management District permit requirements, and authorize the Chairman to sign the attached Change
Order. (Project Number 60143)
Prepared By: Pawel Brzeski PMP Project Manager, Stormwater Management, Capital Project Planning, Impact Fees, and
Program Management Division
Packet Pg. 593
16.B.6
09/ 10/2024
ATTACHMENT(S)
1. [Linked] 23-8114 Contract QE (PDF)
2. CO#1_CarsonRd STA QE_23-8114 (PDF)
3. Location of Carson Road Stormwater Treatment Area (DOCX)
Packet Pg. 594
16.B.6
09/10/2024
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.13.6
Doc ID: 29565
Item Summary: Recommendation to approve Change Order No. 1 for the "Carson Road Stormwater Treatment
Area" under Agreement No. 23-8114 with Quality Enterprises USA, Inc., to utilize $9,798.30 of the Owner's
Allowance to address new South Florida Water Management District permit requirements, and authorize the
Chairman to sign the attached Change Order. (Project Number 60143)
Meeting Date: 09/10/2024
Prepared by:
Title: — Capital Project Planning, Impact Fees, and Program Management
Name: Pawel Brzeski
08/05/2024 1:11 PM
Submitted by:
Title: Division Director - Capital Proi Plan, Impact Fees — Capital Project Planning, Impact Fees, and Program
Management
Name: Beth Johnssen
08/05/2024 1:11 PM
Approved By:
Review:
Procurement Services Vanessa Miguel Level 1 Purchasing Gatekeeper
Completed 08/06/2024 10:43 AM
Transportation Engineering Lisa Taylor TMSD Reviewer
Completed 08/06/2024 11:14 AM
Transportation Management Services Department Danielle Bates
Transportation Management Services
Department
Completed 08/06/2024 11:18 AM
Transportation Management Operations Support Tara Castillo
TMSD Reviewer Completed
08/08/2024 9:00 AM
Capital Project Planning, Impact Fees, and Program Management Raquel Ovares
TMSD Reviewer Completed
08/09/2024 11:14 AM
Capital Project Planning, Impact Fees, and Program Management Beth Johnssen
TMSD Reviewer Completed
08/09/2024 3:35 PM
Procurement Services Becca Zimmerman Other Reviewer
Completed 08/13/2024 8:35 AM
Transportation Management Services Department Trinity Scott
Transportation Completed
08/13/2024 3:19 PM
County Attorney's Office Scott Teach CAO Reviewer
Completed 08/16/2024 9:50 AM
Procurement Services Sandra Srnka Procurement Director Review
Completed 08/16/2024 4:36 PM
Office of Management and Budget Blanca Aquino Luque Level 3 OMB Gatekeeper Review
Completed 08/16/2024 4:46 PM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review
Completed 08/19/2024 8:20 AM
Community & Human Services Maggie Lopez OMB Reviewer
Completed 08/27/2024 10:56 AM
County Manager's Office Amy Patterson Level 4 County Manager Review
Completed 09/03/2024 2:41 PM
Board of County Commissioners Geoffrey Willig Meeting Pending
09/10/2024 9:00 AM
Packet Pg. 595
16.B.6.b
Co je-r Co-wity
Procurement Services Change Order Form
Contract# 23-8114 CO# 1 PO# 4500225866 Project #: 60143.2.4
Project Name: Carson Road Stormwater Treatment Area Improvement
Contractor/Consultant Name: Quality Enterprises USA, Inc.
Select One: ❑■ Contract Modification (Construction or Project Specific) ❑ Work Order Modification
Project Manager Name: Pawel BrzeSkl Division Name: CPP Stormwater Management
Original Contract/Work Order Amount
$5,865,783.20
08/08/2023 #11A
Original BCC Approval Date; Agenda Item #
Current BCC Approved Amount
$5,865,783.20
08/08/2023 #11A
Last BCC Approval Date; Agenda Item #
Current Contract/Work Order Amount
$5,865,783.20
11/15/2024
SAP Contract Expiration Date (MASTER)
Dollar Amount of this Change
0.00%
Total % Change from Original Amount
Revised Contract/Work Order Total
$5,865,783.20
0.00 /e
% Change from Current BCC Approved Amount
Total Cumulative Changes
$0.00
0.00%
% Change from Current Amount
Notice to Proceed 10/17/2023 Original NTP 395 Original Final 11/15I2024 Last Final 11/15/2024
Date I # of Days Completion Date Approved Date
# of Da s Added Revised Final Date Current Substantial Completion Date
y (includes this change) 11/15/2024 (if applicable) p 10/16I2024
Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or
documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete
summary on next page. Check all that apply to this Change Order request: ❑ Add Time; ❑ Add funds; 2 Use of Allowance;
❑ Modify/Delete existing Task(s); ❑ Add new Task(s); ❑ Reallocate funds; [] Other (must be explained in detail below)
1.) Detail of change/s to be made through this Change Order.
This change order is to add 107 LF 48 inch ADS pipe and reduce 107 LF 42 inch RCP pipe Item # 57 on the SOV. The
size of the culvert from proposed Lake CR-1 B to Lake CR-2A was required to be increased from 42 inch to 48 inches to
accept the anticipated flow into the Carson Road STA from the future drainage improvements from the Lake Trafford
Road Right -of -Way. This change will add 9,798.30 to the cost of the pipe. Funds will come from the Owner's Allowance.
2.) If this Change Order is currently under a Stop Work, please identify the date issued and number of days remaining or
"N/A" if not applicable.
N/A The project is currently on -going.
3.) Explain why this change was not included in the original contract/ Work Order.
Up -sizing the pipe was not considered in the original contract because the design and permitting process for the upstream
Lake Trafford Road Right -of -Way (ROW) was still ongoing and comments from the South Florida Water Management
District (SFWMD) were received only after the project was bid. The Carson Road Stormwater Treatment Area (STA) is
intended to accept flow from the existing stormwater system within the Immokalee Drive ROW and from a series of areas
in which Collier County plans to install future stormwater improvements. At the time the Carson Road STA was advertised
for construction bids, the design and permitting process for the upstream Lake Trafford Road ROW was still in progress,
but subsequent comments received from SFWMD during the design and permitting of the drainage improvements within
the Lake Trafford Road ROW, required the size of the culvert from Lake CR-1 B to Lake CR-2A be increased from 42
inches to 48 inches diameter to accept the anticipated flow into the Carson Road STA from the future drainage
improvements of the Lake Trafford Road Right -of -Way.
4.) Describe the impact if this change is not processed.
If this modification is not processed, Quality Enterprises USA , Inc. will not be able to proceed with the construction in
accordance with the updated construction documents and the project will not be in compliance with the permit issued by
SFWMD.
Page 1 of 4
Change Order Form (2023_ver.1)
Packet Pg. 596
16.B.6.b
W
CO ler County
Procurement Services Change Order Form
Contract# 23-8114 CO# 1 PO# 4500225866 Project #: 60143.2.4
Project Name: Carson Road Stormwater Treatment Area Improvement
Contractor/Consultant Name: Quality Enterprises USA, Inc.
Change Order/Amendment Summary
(If additional spaces needed, attached a separate Summary page to this amendment request)
CO#
AMD#
Description
COST
TIME
Justification
Additive
+
Deductive
H
Days
Added
Total New
Time
Use funds of $9,798.30
from the Owner's
Allowance for a change in
the pipe on the job
Following permitting comments from
SFWMD the Lake CR-1 B to CR-2A
interconnecting pipe needs to be
increased from 42" to 48" diameter
❑ Check here if additional summary page/s are attached to this Change Order
Page 2 of 4
Change Order Form (2023_ver.1)
Q
Packet Pg. 597
16.B.6.b
Colew Cot4nty
Procurement Services Change Order Form
Contract# 23-8114 CO# 1 PO# 4500225866 Project #: 60143.2.4
Project Name: Carson Road Stormwater Treatment Area Improvement
Contractor/Consultant Name: Quality Enterprises USA, Inc.
Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be
subject to all the same terms and conditions as contained in the contract / work order indicated above, as fully as if
the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final
settlement of any and all claims of the Contractor/ Vendor/ Consultant/ Design Professional arising out of or related
to the change set forth herein, including claims for impact and delay costs.
Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of
the Company or listed as the qualified licensed Professional "Project Coordinator" or Design/Engineer Professional
under the agreement. Signature authority of person signing will be verified through the contract OR through the
Florida Department of State, Division of Corporations (Sunbiz) website(https://dos.myflorida.com%sunbiz/search/).
If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the
company giving that person signature authority.
BrzeskiPawel o�E_P,.,e�°rze�®�a�..w�e,�na°"1
Prepared by: °"� °°"a' "° °""" Date: o,111011obz,,,.o3201 o
Signature -Division Project Manager
Pawel Brzeski, Project Manager II
Printed Name
Accepted by:
Signature- Design/Engineer Professional (if applicable)
N/A
Printed Name/Title/Company Name
Accepted by: Lou Gaudio
Signature- Contra ctor/ConsultantlVendor
Date:
Digitally signed by Lou Gaudio
Date: 2024.06,27 14:28:25-04'00' Date:
Louis J Gaudio, Vice President, Quality Enterprises USA, Inc.
Printed Name/Title/ Company Name
rnEnc
OvaresEric
Approved by: Date:
Signature-Stormwater Reviewer Designee (Optional)
Eric Ovares, Project Manager II
Printed Name
OvaresRa(ry1Ue� Digitally signed by OvaresRaquel
Approved by: ` 1 Date: 2024.06.27 13:20:31-04'00' Date:
Signature -Division Director or Designee (Optional)
T.C.7/1/24
Approved by:
Beth Johnssen, Director, Capital Project Planning, Impact Fees & Program Management
Printed Name
ScottTrinity
Digitally signed by ScottTrinity
Date: 2024.07.09 10:38:24-04'00' Date:
Signature -Division Administrator or Designee (Optional)
Trinity Scott, Department Head, Transportation Management Services
Printed Name
Page 3 of 4
Change Order Form (2023_ver.1)
Packet Pg. 598
16.B.6.b
C: o je r County
y
Procurement Services Change Order Form
Contract# 23-8114 CO# 1 PO# 4500225866 Project #: 60143.2.4
Project Name: Carson Road Stormwater Treatment Area Improvement
Contractor/Consultant Name: Quality Enterprises USA, Inc.
FOR PROCURMENT USE ONLY
FY 24 CHO Request # 451
by
ZlmmermanBec Zimmermally signedcca
L7 ZimmermanBecca
Date: 2024.08.01 13:31:40
Approved by: Ca-04'00'
Signature -Procurement Professional Signature/Date
Approved by:
Signature -Procurement Manager/Director (OPTIONAL)
APPROVAL TYPE:
❑ Administrative ❑ Administrative -BCC Report �✓ BCC Stand -Alone ES (BCC Approval Required)
ATTEST:
Crystal K. Kinzel, Clerk of the Circuit Court
and Comptroller
By:
Dated:
(SEAL)
BCC APPROVAL
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
By:
Chris Hall, Chairman
Date:
Agenda #
Approved as to Form and Legality:
Deputy County Attorney
Print Name
Page 4 of 4
Change Order Form (2023_ver.1)
Q
Packet Pg. 599
Collier County Capital Proiect Planning, Impact Fees & Program
Management Division
WORK DIRECTIVE CHANGE
CONTRACT # /PROJECT NAME: #23-8114
Carson Road Stormwater Treatment Area
Work Directive #: 1
DATE OF ISSUANCE: December 12, 2023
OWNER: Collier County Board of Commissioners
CONTRACTOR: Quality Enterprises USA, Inc.
PURCHASE ORDER # 4500225866
CHANGE: #1
EFFECTIVE DATE: December 12, 2023
PROJECT#: 60143.2.4
ENGINEEMESIGNPROFESSIONAL: GHD, Inc
You are directed to proceed promptly with the following change(s):
Description: The Carson Road STA is intended to accept flow from the existing stormwater system within the Immokalee
Drive Right -of -Way and from a series of areas in which Collier County plans to install future stormwater improvements. At the
time the Carson Road STA was advertised for construction bids, the design and permitting process for the upstream Lake
Trafford Road Right -of -Way was ongoing. Based on comments received from SFWMD during the design and permitting of the
drainage improvements within the Lake Trafford Road Right -of -Way, the size of the culvert from proposed Lake CR-1B to
Lake CR-2A was required to be increased from 42 inch to 48 inches to accept the anticipated flow into the Carson Road STA
from the future drainage improvements from the Lake Trafford Road Right -of -Way.
Purpose of Work Directive Change: To resolve unforeseen pipe size change after the project was bid.
Reason/Justification: By providing the upsized storm pipe, Quality Enterprises will be able to proceed with the construction
in accordance with the updated construction drawings.
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a
Change Order based thereon will involve one or more of the following methods of determining the effect of the
changes(s).
Method of determining change in Contract Price:
❑ Unit Prices
❑ Lump Sum
® Time & Material
❑ Other
Estimated increase (decrease) in Contract Price
$9,798.30
RECOMMENDED:
Michael A Studne Digitally signed by Michael A Studney
By:
Y Date: 2023.12.21 15:03:31-05'00'
Engineer
Method of determining change in Contract Times:
❑ Contractor's records
® Engineer's record
❑ Other
Estimated change in Contract Time:
Increase or decrease by calendar days.
AUTHORIZED:
GN p9�wm.Geraai@W amunryT Oav LN-Gewr¢S,am,
GewirtzStorm A4.w•,-rp G..,-.c.. WCpx HqN
a M4+ ou<ww.,e on.,a ra. m...,.. ou•oMG.
By: u C±a ... oc-c�, oo-w,.w, Gc•.n
Owner's Representative
Packet Pg. 600
16.B.6.b
Pawel Brzeski
ATTN.:
Immokalee, FL
JOB LOCATION
WE PROPOSE hereby to furnish all labor, materials, equipment and services necessary to complete the following:
Carson Road Construction Plans Rev06 dated 10/19/23
1. Revised pipe size on control structure CS CR1B / CR2A to 48-inch RCP (see sheets C-111, C-121, and
C-122)
Estimated Total: $9,798.30
DidWy signed by Brze Pa l
DN:
E=Pawel.Brzaski�cdliercpuntytl. gmv,
1; W BrzeskiPawel, OU=Capital PlgW
BrzeskiPawel Planning Users. OU=GMD CM Capital
Project Warming, OU=Con—awn and
Maintenance, OU=GMD, OU=Divisions.
DG=blx, DC=collimgmv, DC=net
Data: =4,06 27 11.40.49-DOO'
CUSTOMER —SIGNATURE & DATE
Lou Digitally signed
by Lou Gaudio
Gaudio Date: 2024.06.27
14:28:48-04'00'
QUALITY ENTERPRISES USA, INC. — SIGNATURE & DATE
Page 1
Packet Pg. 601
Change Order p 1
EXHIBIT "A"
Deductions from allowance
Carson Rd. SW Treatment Area
BID PROPOSAL
Original Contract
Previous Change Orders
This Change
Revised Contract
Original Qty
Unit ur
Measure
Increaseantity
ase Quantity
Original
Quantity
Increase/De
crease
Quantity
Unit ur
Measure
Cost per Unit
Total Revised
Item Quantity
Total Revised Item Cost
ITEM #
Description
57
42" RCP pipe
930
LF
930
-107.00
LF
$ 252.25
823
$ (26,990.75)
ADD 96
48" ADS pipe
0
LF
0
107.00
LF
$ 343.82
107
$ 36,789.05
CHANGEORDERSUM $ 9,798.30
Owner Allowance -Roadway $ 490,000.00
Previous CO Increases / (Decreases) $ -
Total Increase /(Decrease)This Change $ 9,798.30
Total Revised- Roadway Allowance $ 480,201.70
Packet Pg. 602
QUALITY ENTERPRISES USA, INC. Job # 14623-12
Emergency Repair Work for Rates - Carson Rd SW Treatment Area Date 06/18/24
Collier County - Board of County Commissioners
Under Contract #20-7800
ST HOURLY OT HOURLY ST OT
ST
OT
UNIT
RATE
RATE HOURS HOURS
TOTAL
TOTAL
TOTAL
Personnel
Corporate Officer
HR
$150.00
$195.00
$0.00
$0.00
$0.00
Project Manager
HR
$125.00
$162.60
$0.00
$0.00
$0.00
Superintendent
HR
$85.00
$110.50 16
$1,360.00
$0.00
$1,360.00
Foreman
HR
$85.00
$110.50 16 4
$1,360.00
$442.00
$1,802.00
Mechanic, Equipment & Truck Operator
HR
$75.00
$97.50 32 8
$2,400.00
$780.00
$3,180.00
Laborer
HR
$55.00
$71.50 48 12
$2,640.00
$858.00
$3,498.00
Administrative
HR
$75,00
$97.50
$0.00
$0.00
$0.00
Eauioment
Excavator > Cat349
HR
$250.00
$0.00
$0.00
$0.00
Excavator> Cat320
HR
$200.00
16
$3,200.00
$0.00
$3,200.00
Excavator <Cat 320
HR
$150.00
$0.00
$0.00
$0.00
Excavator w/hammer/Epiroc
HR
$350.00
$0.00
$0.00
$0.00
Excavatorw/side grip vibratory hammer
HR
$350.00
$0.00
$0.00
$0.00
Wheel Loader >Cat 962
HR
$225.00
$0.00
$0.00
$0.00
Wheel Loader >Cat 938
HR
$175.00
16
$2.800.00
$0.00
$2,800.00
Wheel Loader <Cat 938
HR
$150.00
$0.00
$0.00
$0.00
Bull Dozer
HR
$175.00
$0.00
$0.00
$0.00
Motor Grader
HR
$175.00
$0.00
$0.00
$0.00
Soil/Stone Roller
HR
$125.00
$0.00
$0.00
$0.00
Telehandler
HR
$125.00
$0.00
$0.00
$0.00
Manlift
HR
$125.00
$0.00
$0.00
$0.00
Forklift
HR
$100.00
$0.00
$0.00
$0.00
Broom Tractor
HR
$95.00
$0.00
$0.00
$0.00
Milling Machine
HR
$685.00
$0.00
$0.00
$0.00
Skid steerwith milling head (bump grinder)
HR
$150.00
$0.00
$0.00
$0.00
Asphalt/Mat.Shuttle Buggy
HR
$375.00
$0.00
$0.00
$0.00
Asphalt Paver Weiler 385
HR
$375.00
$0.00
$0.00
$0.00
Asphalt Paver Cat1055
HR
$575.00
$0.00
$0.00
$0.00
Asphalt Roller
HR
$125.00
$0.00
$0.00
$0.00
Off Road Dump
HR
$250.00
$0.00
$0.00
$0.00
Crane >130ton
HR
$1,500.00
$0.00
$0.00
$0.00
Crane a30ton
HR
$500.00
$0.00
$0.00
$0.00
Crane <30ton
HR
$260.00
$0.00
$0.00
$0.00
Vibratory Hammer
HR
$400.00
$0.00
$0.00
$0.00
Concrete Crusher
HR
$685.00
$0.00
$0.00
$0.00
Screener
HR
$375.00
$0.00
$0.00
$0.00
Push Boat
HR
$275.00
$0.00
$0.00
$0.00
Sectional/Hopper Barge
HR
$175.00
$0.00
$0.00
$0.00
Drone Lidar Photogrammetry
HR
$350.00
$0.00
$0.00
$0.00
Directional Drill JT 100
HR
$2,000.00
$0.00
$0.00
$0.00
Directional Drill AA 440
HR
$4,000.00
$0.00
$0.00
$0.00
Lowboyffractor
HR
$175.00
$0.00
$0.00
$0.00
Dump Truck/Roll Off
HR
$95.00
$0.00
$0.00
$0.00
Water Truck/Trailer
HR
$125.00
$0.00
$0.00
$0.00
Tacc/Pdme Truck/Trailer
HR
$150.00
$0.00
$0.00
$0.00
Lube/Mechanics Truck
HR
$126.00
$0.00
$0.00
$0.00
Truck with Hand Tools
HR
$95.00
16
$1,520.00
$0.00
$1,520.00
Pickup
HR
$40.00
16
$640.00
$0.00
$640.00
Camera Truck
HR
S400.00
$0.00
$0.00
$0.00
Vacuum Truck
HR
S475.00
$0.00
$0.00
$0.00
Small Equipment
$0.00
Air Compressor with Hammer
HR
$60.00
$0.00
$0.00
$0.00
Concrete Saw
HR
$60.00
$0.00
$0.00
$0.00
Plate Compactor
HR
$60.00
16
$960.00
$0.00
$960.00
Trench Box 16' x 10'
HR
$50.00
$0.00
$0.00
$0.00
Stone Box
HR
$50.00
16
$800.00
$0.00
$800.00
Steel (Road) Plate
HR
$50.00
$0.00
$0.00
$0.00
Wellpoint System
HR
$250.00
$0.00
$0.00
$0.00
3" Trash/Submersible Pump
HR
$50.00
16
$800.00
$0.00
$800.00
6" Hydraulic Pump
HR
$150.00
$0.00
$0.00
$0.00
12" Hydraulic Pump
HR
$200.00
$0.00
$0.00
$0.00
Cut Off Saw
HR
$20.00
$0.00
$0.00
$0.00
Light Set
HR
$50.00
$0.00
$0.00
$0.00
Generator/Welder
HR
$50.00
$0.00
$0.00
$0.00
Generator70kw
HR
$125.00
$0.00
$0.00
$0.00
Generator 125kw
HR
$150.00
$0.00
$0.00
$0.00
MOT
HR
$150.00
$0.00
$0.00
$0.00
Fusing Machine 2-16"
HR
$150.00
$0.00
$0.00
$0.00
Fusing Machine 18"-42"
HR
$300.00
$0.00
$0.00
$0.00
Tap Machine - small (3/4" - 3") each tap
EA
$750.00
$0.00
$0.00
$0.00
Tap Machine - large (4" - 12") each tap
EA
$1,000.00
$0.00
$0.00
$0.00
Pipe Trenchless Piercing tool
HR
$250.00
$0.00
$0.00
$0.00
Pipe Ramming
HR
$625.00
$0.00
$0.00
$0.00
Material
Disposal Fee (concrete, asphalt, debris, etc)
PER LOAD
$500.00
$0.00
$0.00
$0.00
Ferguson Water Works - 48x20 HP w/ 10% mark up
LF
$151.6734
107
$16,229.05
$0.00
$16,229.05
Grand Total:
$36.789.05
10% MARK UP ON MATERIAL
15% MARK UP ON SUBCONTRACTORS
If work is performed other than Monday through Friday, 7:00am
- 4:00 pm, excluding
holidays, OT
Rates will be used for Personnel. These
rates also apply for travel time necessary to
mobilize and demobilize to
and from work.
REV. 3/17/2021
Packet Pg. 603
16.B.6.b
Z FERGUSON® 3801 PROSPECT WATERWORKS #136
AVE
WATERWORKS NAPLES, FL 34104
08:27:20 DEC 11 2023
Phone: 239-643-4970
Fax: 239-643-4945
DeliverTo: ROBERT
From: Grant Kutzke
Comments:
FEL-NAPLES WATERWORKS #136
Price Quotation
Phone: 239-643-4970
Fax: 239-643-4945
Bid No: B316463 Cust Phone: 239-435-7200
Bid Date: 10/23/23 Terms: NET 10TH PROX
Quoted By: TAE
Customer: QUALITY ENTERPRISES USA INC Ship To: QUALITY ENTERPRISES USA INC
3494 SHEARWATER STREET 3494 SHEARWATER STREET
CARSON RD STORMWATER CARSON RD STORMWATER
NAPLES, FL 34117 NAPLES, FL 34117
Cust PO#: 48" ADS HP Job Name: CARSON RD STORMWATER
Item Description Quantity Net Price UM Total
A486500201BPL 48X20 HP N12 DW STORM SLD PL PIP 107 130.3500 FT 13947.45
Net Total: $13947.45
Tax: $886.85
Freight: $0.00
Total: $14834.30
Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE
AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. QUOTES FOR PRODUCTS SHIPPED FOR RESALE
ARE NOT FIRM UNLESS NOTED OTHERWISE.
Page 1 of 1
CONTRACTOR CUSTOMERS: IF YOU HAVE DBE/MBEANBE//VBE/SDVBE/SBE GOOD FAITH EFFORTS DIVERSITY GOALS/ REQUIREMENTS ON A
FEDERAL STATELOCAL GOVERNMENT PRIVATE SECTOR PROJECT, PLEASE CONTACT YOUR BRANCH SALES REPRESENATIVE
IMMEDIATELY PRIOR TO RECEIVING A QUOTE/ORDER.
Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon
Local, State and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the
Buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document, or
on the web at https://www.ferguson.com/content/website-info/terms-of-sale
Govt Buyers: All items are open market unless noted otherwise.
LEAD LAW WARNING: It is illegal to install products that are not "lead free" in accordance with US Federal or other applicable law in potable water
systems anticipated for human consumption. Products with `NP in the description are NOT lead free and can only be installed in non -potable
applications. Buyer is solely responsible for product selection.
�R HOW ARE WE DOING? WE WANT YOUR FEEDBACK!
Scan the QR code or use the link below to
complete a survey about your bids:
https://survey.medallia.com/?bidsorder&fc=136&on=48166
Packet Pg. 604
Carson Road Stormwater Treatment Area pipe size increase 42" to 48" diameter.
Required change following SFWMD permitting comments between lake CR-1B and CR-2A a length of
107' total at this location that was bid under Item #57 at $252.2500 per linear foot installed of pipe
Fergusson supplied material 48" in 20' lengths at $130.3500 per foot based on 10.23.2023 bid price and
supplied before 12.31.2023 which was subject to taxes at 7% on the first $5,000.00 and at 6% on the
balance, but Collier County only reimburses for actual length of pipe installed.
107' $130.35/ft $13,947.45
10% markup $ 1,394.75
7% Tax $ 5,000.00 $ '' 350.00
6% Tax $ 8,947.45 $ 536.85
Total Tax $ 886.85
Cost 107' with tax $14,834.30
Cost 107' with Tax and m/up $16,229.05*
Unit rate entered into Item #96
Fergusson Water Works — 48x20 HP w/ 10% mark up
no tax on markup amount
the extra penny tax on first $5k expired 12.31.2023
on base amount only exclusive of mark up
equivalent to $151;6734 /ft UNIT RATE MATERIAL
LF $151,6734 107 $16,229.05
Bid Item #57 unit rate for 42" pipe at $252.2500 installed per LF
Remove 107 LF (c, 252.2500 = $26,990.75 credited to Item #96
Additional construction costs = $20,560.00 plus additional pipe cost* _ $36,789.05**
Less credit for 107'of 42"pipe not installed $26,990.75 - $26,990.75
Utilizing Item #97 Owners Allowance $ 9,798.30
** The unit rate for installation of 48" diameter pipe is $343.8229 per LF
v
M
NI
W
CY
I
Q
co
c
0
0
cc
U
I
O
U
c
E
t
v
M
Q
Packet Pg. 605
16.B.6.c
Location of Carson Road Stormwater Treatment Area
Tony Rosbough FAITH
Community Park_ LANDING
LIBERTY
LAND1NGi —
I
RARVEST FOR
jIlUMAN I TY
— _ LAKE TRAFFORD RD
AR* ESPERANZA DAVENPORT
IfPLAQE
Phase 1 - Site
Stormwater
Treatment Area
Packet Pg. 606