Agenda 09/10/2024 Item #16B 6 (Approve Change Order Bo. 1 for the "Carson Road Stormwater Treatment Area," under Agreement No. 23-8114)16.B.6 09/ 10/2024 EXECUTIVE SUMMARY Recommendation to approve Change Order No. 1 for the "Carson Road Stormwater Treatment Area," under Agreement No. 23-8114 with Quality Enterprises USA, Inc., to utilize $9,798.30 of the Owner's Allowance to address new South Florida Water Management District permit requirements, and authorize the Chairman to sign the attached Change Order. (Project Number 60143) OBJECTIVE: To obtain approval of Change Order No. 1 for the "Carson Road Stormwater Treatment Area" under Agreement No. 23-8114 to utilize $9,798.30 of the Board -approved $490,000 Owner's Allowance. CONSIDERATIONS: On August 8, 2023 (Agenda Item I LA), the Board approved Agreement No. 23-8114 (the "Agreement") for $5,865,783.20, with Quality Enterprises USA, Inc. (the "Contractor"). The Agreement concerns the construction of five lakes within the Carson Road area to provide stormwater quality treatment and storage prior to discharge into the Immokalee Slough toward Lake Trafford. The Carson Road Stormwater Treatment Area (the "STA") is intended to accept flow from the existing stormwater system within the Immokalee Drive Right -of -Way. Staff is requesting approval of Change Order No. 1 to reallocate $9,798.30 from the Board's previously approved $490,000.00 Owner's Allowance and $26,990.75 from bid tab line item 57 to pay for the completion of Work Directive No. 1, to replace the forty -two-inch (42") diameter pipe's specified in the design specifications and the Agreement with forty- eight inch (48") diameter pipes based on the recommendation of the County's Engineer of Record. This requested change arises because of new South Florida Water Management District ("SFWMD") permit requirements that were unknown at the time of bidding. At the time that the Carson Road STA was advertised for construction bids, the design and permitting process for the upstream Lake Trafford Road ROW was still in progress, but subsequent comments received from SFWMD during the design and permitting of the drainage improvements within the Lake Trafford Road ROW required the size of the culvert from Lake CR-113 to Lake CR-2A be increased from forty -two -inches (42") to forty -eight -inches (48") inches in diameter to accept the anticipated flow into the Carson Road STA from the future drainage improvements within the Lake Trafford Road Right -of -Way. Approval of Change Order No. 1 will result in adjusting bid tab line item 57 from 107 linear feet of forty -two-inch (42") RCP pipe to 107 linear feet of forty -eight -inch (48") ADS pipe. If this modification is not processed, the Contractor will not be able to proceed with the construction in accordance with the updated construction documents and the project will not be in compliance with the permit issued by the SFWMD. This item is consistent with the Infrastructure and Asset Management element of Collier County's Strategic Plan by preparing for the impacts of natural disasters on our critical infrastructure and natural resources. FISCAL IMPACT: The source of funding is contained within the project allowance under Purchase Order #4500225866. Utilization of $9,798.30 from the $490,000.00 Owner's Allowance does not increase the overall cost of the project. GROWTH MANAGEMENT IMPACT: This project is in accordance with the goals and objectives of the Stormwater Element of the Growth Management Plan. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT RECOMMENDATION: To approve Change Order No. 1 for the "Carson Road Stormwater Treatment Area" under Agreement No. 23-8114 with Quality Enterprises USA, Inc., to utilize $9,798.30 of the Owner's Allowance to address new South Florida Water Management District permit requirements, and authorize the Chairman to sign the attached Change Order. (Project Number 60143) Prepared By: Pawel Brzeski PMP Project Manager, Stormwater Management, Capital Project Planning, Impact Fees, and Program Management Division Packet Pg. 593 16.B.6 09/ 10/2024 ATTACHMENT(S) 1. [Linked] 23-8114 Contract QE (PDF) 2. CO#1_CarsonRd STA QE_23-8114 (PDF) 3. Location of Carson Road Stormwater Treatment Area (DOCX) Packet Pg. 594 16.B.6 09/10/2024 COLLIER COUNTY Board of County Commissioners Item Number: 16.13.6 Doc ID: 29565 Item Summary: Recommendation to approve Change Order No. 1 for the "Carson Road Stormwater Treatment Area" under Agreement No. 23-8114 with Quality Enterprises USA, Inc., to utilize $9,798.30 of the Owner's Allowance to address new South Florida Water Management District permit requirements, and authorize the Chairman to sign the attached Change Order. (Project Number 60143) Meeting Date: 09/10/2024 Prepared by: Title: — Capital Project Planning, Impact Fees, and Program Management Name: Pawel Brzeski 08/05/2024 1:11 PM Submitted by: Title: Division Director - Capital Proi Plan, Impact Fees — Capital Project Planning, Impact Fees, and Program Management Name: Beth Johnssen 08/05/2024 1:11 PM Approved By: Review: Procurement Services Vanessa Miguel Level 1 Purchasing Gatekeeper Completed 08/06/2024 10:43 AM Transportation Engineering Lisa Taylor TMSD Reviewer Completed 08/06/2024 11:14 AM Transportation Management Services Department Danielle Bates Transportation Management Services Department Completed 08/06/2024 11:18 AM Transportation Management Operations Support Tara Castillo TMSD Reviewer Completed 08/08/2024 9:00 AM Capital Project Planning, Impact Fees, and Program Management Raquel Ovares TMSD Reviewer Completed 08/09/2024 11:14 AM Capital Project Planning, Impact Fees, and Program Management Beth Johnssen TMSD Reviewer Completed 08/09/2024 3:35 PM Procurement Services Becca Zimmerman Other Reviewer Completed 08/13/2024 8:35 AM Transportation Management Services Department Trinity Scott Transportation Completed 08/13/2024 3:19 PM County Attorney's Office Scott Teach CAO Reviewer Completed 08/16/2024 9:50 AM Procurement Services Sandra Srnka Procurement Director Review Completed 08/16/2024 4:36 PM Office of Management and Budget Blanca Aquino Luque Level 3 OMB Gatekeeper Review Completed 08/16/2024 4:46 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 08/19/2024 8:20 AM Community & Human Services Maggie Lopez OMB Reviewer Completed 08/27/2024 10:56 AM County Manager's Office Amy Patterson Level 4 County Manager Review Completed 09/03/2024 2:41 PM Board of County Commissioners Geoffrey Willig Meeting Pending 09/10/2024 9:00 AM Packet Pg. 595 16.B.6.b Co je-r Co-wity Procurement Services Change Order Form Contract# 23-8114 CO# 1 PO# 4500225866 Project #: 60143.2.4 Project Name: Carson Road Stormwater Treatment Area Improvement Contractor/Consultant Name: Quality Enterprises USA, Inc. Select One: ❑■ Contract Modification (Construction or Project Specific) ❑ Work Order Modification Project Manager Name: Pawel BrzeSkl Division Name: CPP Stormwater Management Original Contract/Work Order Amount $5,865,783.20 08/08/2023 #11A Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $5,865,783.20 08/08/2023 #11A Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $5,865,783.20 11/15/2024 SAP Contract Expiration Date (MASTER) Dollar Amount of this Change 0.00% Total % Change from Original Amount Revised Contract/Work Order Total $5,865,783.20 0.00 /e % Change from Current BCC Approved Amount Total Cumulative Changes $0.00 0.00% % Change from Current Amount Notice to Proceed 10/17/2023 Original NTP 395 Original Final 11/15I2024 Last Final 11/15/2024 Date I # of Days Completion Date Approved Date # of Da s Added Revised Final Date Current Substantial Completion Date y (includes this change) 11/15/2024 (if applicable) p 10/16I2024 Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete summary on next page. Check all that apply to this Change Order request: ❑ Add Time; ❑ Add funds; 2 Use of Allowance; ❑ Modify/Delete existing Task(s); ❑ Add new Task(s); ❑ Reallocate funds; [] Other (must be explained in detail below) 1.) Detail of change/s to be made through this Change Order. This change order is to add 107 LF 48 inch ADS pipe and reduce 107 LF 42 inch RCP pipe Item # 57 on the SOV. The size of the culvert from proposed Lake CR-1 B to Lake CR-2A was required to be increased from 42 inch to 48 inches to accept the anticipated flow into the Carson Road STA from the future drainage improvements from the Lake Trafford Road Right -of -Way. This change will add 9,798.30 to the cost of the pipe. Funds will come from the Owner's Allowance. 2.) If this Change Order is currently under a Stop Work, please identify the date issued and number of days remaining or "N/A" if not applicable. N/A The project is currently on -going. 3.) Explain why this change was not included in the original contract/ Work Order. Up -sizing the pipe was not considered in the original contract because the design and permitting process for the upstream Lake Trafford Road Right -of -Way (ROW) was still ongoing and comments from the South Florida Water Management District (SFWMD) were received only after the project was bid. The Carson Road Stormwater Treatment Area (STA) is intended to accept flow from the existing stormwater system within the Immokalee Drive ROW and from a series of areas in which Collier County plans to install future stormwater improvements. At the time the Carson Road STA was advertised for construction bids, the design and permitting process for the upstream Lake Trafford Road ROW was still in progress, but subsequent comments received from SFWMD during the design and permitting of the drainage improvements within the Lake Trafford Road ROW, required the size of the culvert from Lake CR-1 B to Lake CR-2A be increased from 42 inches to 48 inches diameter to accept the anticipated flow into the Carson Road STA from the future drainage improvements of the Lake Trafford Road Right -of -Way. 4.) Describe the impact if this change is not processed. If this modification is not processed, Quality Enterprises USA , Inc. will not be able to proceed with the construction in accordance with the updated construction documents and the project will not be in compliance with the permit issued by SFWMD. Page 1 of 4 Change Order Form (2023_ver.1) Packet Pg. 596 16.B.6.b W CO ler County Procurement Services Change Order Form Contract# 23-8114 CO# 1 PO# 4500225866 Project #: 60143.2.4 Project Name: Carson Road Stormwater Treatment Area Improvement Contractor/Consultant Name: Quality Enterprises USA, Inc. Change Order/Amendment Summary (If additional spaces needed, attached a separate Summary page to this amendment request) CO# AMD# Description COST TIME Justification Additive + Deductive H Days Added Total New Time Use funds of $9,798.30 from the Owner's Allowance for a change in the pipe on the job Following permitting comments from SFWMD the Lake CR-1 B to CR-2A interconnecting pipe needs to be increased from 42" to 48" diameter ❑ Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form (2023_ver.1) Q Packet Pg. 597 16.B.6.b Colew Cot4nty Procurement Services Change Order Form Contract# 23-8114 CO# 1 PO# 4500225866 Project #: 60143.2.4 Project Name: Carson Road Stormwater Treatment Area Improvement Contractor/Consultant Name: Quality Enterprises USA, Inc. Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract / work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/ Vendor/ Consultant/ Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional "Project Coordinator" or Design/Engineer Professional under the agreement. Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations (Sunbiz) website(https://dos.myflorida.com%sunbiz/search/). If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the company giving that person signature authority. BrzeskiPawel o�E_P,.,e�°rze�®�a�..w�e,�na°"1 Prepared by: °"� °°"a' "° °""" Date: o,111011obz,,,.o3201 o Signature -Division Project Manager Pawel Brzeski, Project Manager II Printed Name Accepted by: Signature- Design/Engineer Professional (if applicable) N/A Printed Name/Title/Company Name Accepted by: Lou Gaudio Signature- Contra ctor/ConsultantlVendor Date: Digitally signed by Lou Gaudio Date: 2024.06,27 14:28:25-04'00' Date: Louis J Gaudio, Vice President, Quality Enterprises USA, Inc. Printed Name/Title/ Company Name rnEnc OvaresEric Approved by: Date: Signature-Stormwater Reviewer Designee (Optional) Eric Ovares, Project Manager II Printed Name OvaresRa(ry1Ue� Digitally signed by OvaresRaquel Approved by: ` 1 Date: 2024.06.27 13:20:31-04'00' Date: Signature -Division Director or Designee (Optional) T.C.7/1/24 Approved by: Beth Johnssen, Director, Capital Project Planning, Impact Fees & Program Management Printed Name ScottTrinity Digitally signed by ScottTrinity Date: 2024.07.09 10:38:24-04'00' Date: Signature -Division Administrator or Designee (Optional) Trinity Scott, Department Head, Transportation Management Services Printed Name Page 3 of 4 Change Order Form (2023_ver.1) Packet Pg. 598 16.B.6.b C: o je r County y Procurement Services Change Order Form Contract# 23-8114 CO# 1 PO# 4500225866 Project #: 60143.2.4 Project Name: Carson Road Stormwater Treatment Area Improvement Contractor/Consultant Name: Quality Enterprises USA, Inc. FOR PROCURMENT USE ONLY FY 24 CHO Request # 451 by ZlmmermanBec Zimmermally signedcca L7 ZimmermanBecca Date: 2024.08.01 13:31:40 Approved by: Ca-04'00' Signature -Procurement Professional Signature/Date Approved by: Signature -Procurement Manager/Director (OPTIONAL) APPROVAL TYPE: ❑ Administrative ❑ Administrative -BCC Report �✓ BCC Stand -Alone ES (BCC Approval Required) ATTEST: Crystal K. Kinzel, Clerk of the Circuit Court and Comptroller By: Dated: (SEAL) BCC APPROVAL BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA By: Chris Hall, Chairman Date: Agenda # Approved as to Form and Legality: Deputy County Attorney Print Name Page 4 of 4 Change Order Form (2023_ver.1) Q Packet Pg. 599 Collier County Capital Proiect Planning, Impact Fees & Program Management Division WORK DIRECTIVE CHANGE CONTRACT # /PROJECT NAME: #23-8114 Carson Road Stormwater Treatment Area Work Directive #: 1 DATE OF ISSUANCE: December 12, 2023 OWNER: Collier County Board of Commissioners CONTRACTOR: Quality Enterprises USA, Inc. PURCHASE ORDER # 4500225866 CHANGE: #1 EFFECTIVE DATE: December 12, 2023 PROJECT#: 60143.2.4 ENGINEEMESIGNPROFESSIONAL: GHD, Inc You are directed to proceed promptly with the following change(s): Description: The Carson Road STA is intended to accept flow from the existing stormwater system within the Immokalee Drive Right -of -Way and from a series of areas in which Collier County plans to install future stormwater improvements. At the time the Carson Road STA was advertised for construction bids, the design and permitting process for the upstream Lake Trafford Road Right -of -Way was ongoing. Based on comments received from SFWMD during the design and permitting of the drainage improvements within the Lake Trafford Road Right -of -Way, the size of the culvert from proposed Lake CR-1B to Lake CR-2A was required to be increased from 42 inch to 48 inches to accept the anticipated flow into the Carson Road STA from the future drainage improvements from the Lake Trafford Road Right -of -Way. Purpose of Work Directive Change: To resolve unforeseen pipe size change after the project was bid. Reason/Justification: By providing the upsized storm pipe, Quality Enterprises will be able to proceed with the construction in accordance with the updated construction drawings. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Contract Price: ❑ Unit Prices ❑ Lump Sum ® Time & Material ❑ Other Estimated increase (decrease) in Contract Price $9,798.30 RECOMMENDED: Michael A Studne Digitally signed by Michael A Studney By: Y Date: 2023.12.21 15:03:31-05'00' Engineer Method of determining change in Contract Times: ❑ Contractor's records ® Engineer's record ❑ Other Estimated change in Contract Time: Increase or decrease by calendar days. AUTHORIZED: GN p9�wm.Geraai@W amunryT Oav LN-Gewr¢S,am, GewirtzStorm A4.w•,-rp G..,-.c.. WCpx HqN a M4+ ou<ww.,e on.,a ra. m...,.. ou•oMG. By: u C±a ... oc-c�, oo-w,.w, Gc•.n Owner's Representative Packet Pg. 600 16.B.6.b Pawel Brzeski ATTN.: Immokalee, FL JOB LOCATION WE PROPOSE hereby to furnish all labor, materials, equipment and services necessary to complete the following: Carson Road Construction Plans Rev06 dated 10/19/23 1. Revised pipe size on control structure CS CR1B / CR2A to 48-inch RCP (see sheets C-111, C-121, and C-122) Estimated Total: $9,798.30 DidWy signed by Brze Pa l DN: E=Pawel.Brzaski�cdliercpuntytl. gmv, 1; W BrzeskiPawel, OU=Capital PlgW BrzeskiPawel Planning Users. OU=GMD CM Capital Project Warming, OU=Con—awn and Maintenance, OU=GMD, OU=Divisions. DG=blx, DC=collimgmv, DC=net Data: =4,06 27 11.40.49-DOO' CUSTOMER —SIGNATURE & DATE Lou Digitally signed by Lou Gaudio Gaudio Date: 2024.06.27 14:28:48-04'00' QUALITY ENTERPRISES USA, INC. — SIGNATURE & DATE Page 1 Packet Pg. 601 Change Order p 1 EXHIBIT "A" Deductions from allowance Carson Rd. SW Treatment Area BID PROPOSAL Original Contract Previous Change Orders This Change Revised Contract Original Qty Unit ur Measure Increaseantity ase Quantity Original Quantity Increase/De crease Quantity Unit ur Measure Cost per Unit Total Revised Item Quantity Total Revised Item Cost ITEM # Description 57 42" RCP pipe 930 LF 930 -107.00 LF $ 252.25 823 $ (26,990.75) ADD 96 48" ADS pipe 0 LF 0 107.00 LF $ 343.82 107 $ 36,789.05 CHANGEORDERSUM $ 9,798.30 Owner Allowance -Roadway $ 490,000.00 Previous CO Increases / (Decreases) $ - Total Increase /(Decrease)This Change $ 9,798.30 Total Revised- Roadway Allowance $ 480,201.70 Packet Pg. 602 QUALITY ENTERPRISES USA, INC. Job # 14623-12 Emergency Repair Work for Rates - Carson Rd SW Treatment Area Date 06/18/24 Collier County - Board of County Commissioners Under Contract #20-7800 ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 $0.00 $0.00 $0.00 Project Manager HR $125.00 $162.60 $0.00 $0.00 $0.00 Superintendent HR $85.00 $110.50 16 $1,360.00 $0.00 $1,360.00 Foreman HR $85.00 $110.50 16 4 $1,360.00 $442.00 $1,802.00 Mechanic, Equipment & Truck Operator HR $75.00 $97.50 32 8 $2,400.00 $780.00 $3,180.00 Laborer HR $55.00 $71.50 48 12 $2,640.00 $858.00 $3,498.00 Administrative HR $75,00 $97.50 $0.00 $0.00 $0.00 Eauioment Excavator > Cat349 HR $250.00 $0.00 $0.00 $0.00 Excavator> Cat320 HR $200.00 16 $3,200.00 $0.00 $3,200.00 Excavator <Cat 320 HR $150.00 $0.00 $0.00 $0.00 Excavator w/hammer/Epiroc HR $350.00 $0.00 $0.00 $0.00 Excavatorw/side grip vibratory hammer HR $350.00 $0.00 $0.00 $0.00 Wheel Loader >Cat 962 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader >Cat 938 HR $175.00 16 $2.800.00 $0.00 $2,800.00 Wheel Loader <Cat 938 HR $150.00 $0.00 $0.00 $0.00 Bull Dozer HR $175.00 $0.00 $0.00 $0.00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/Stone Roller HR $125.00 $0.00 $0.00 $0.00 Telehandler HR $125.00 $0.00 $0.00 $0.00 Manlift HR $125.00 $0.00 $0.00 $0.00 Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00 Milling Machine HR $685.00 $0.00 $0.00 $0.00 Skid steerwith milling head (bump grinder) HR $150.00 $0.00 $0.00 $0.00 Asphalt/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weiler 385 HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Cat1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0.00 $0.00 $0.00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane >130ton HR $1,500.00 $0.00 $0.00 $0.00 Crane a30ton HR $500.00 $0.00 $0.00 $0.00 Crane <30ton HR $260.00 $0.00 $0.00 $0.00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher HR $685.00 $0.00 $0.00 $0.00 Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0.00 $0.00 $0.00 Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone Lidar Photogrammetry HR $350.00 $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0.00 Lowboyffractor HR $175.00 $0.00 $0.00 $0.00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 Water Truck/Trailer HR $125.00 $0.00 $0.00 $0.00 Tacc/Pdme Truck/Trailer HR $150.00 $0.00 $0.00 $0.00 Lube/Mechanics Truck HR $126.00 $0.00 $0.00 $0.00 Truck with Hand Tools HR $95.00 16 $1,520.00 $0.00 $1,520.00 Pickup HR $40.00 16 $640.00 $0.00 $640.00 Camera Truck HR S400.00 $0.00 $0.00 $0.00 Vacuum Truck HR S475.00 $0.00 $0.00 $0.00 Small Equipment $0.00 Air Compressor with Hammer HR $60.00 $0.00 $0.00 $0.00 Concrete Saw HR $60.00 $0.00 $0.00 $0.00 Plate Compactor HR $60.00 16 $960.00 $0.00 $960.00 Trench Box 16' x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50.00 16 $800.00 $0.00 $800.00 Steel (Road) Plate HR $50.00 $0.00 $0.00 $0.00 Wellpoint System HR $250.00 $0.00 $0.00 $0.00 3" Trash/Submersible Pump HR $50.00 16 $800.00 $0.00 $800.00 6" Hydraulic Pump HR $150.00 $0.00 $0.00 $0.00 12" Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20.00 $0.00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder HR $50.00 $0.00 $0.00 $0.00 Generator70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150.00 $0.00 $0.00 $0.00 MOT HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 2-16" HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 18"-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine - small (3/4" - 3") each tap EA $750.00 $0.00 $0.00 $0.00 Tap Machine - large (4" - 12") each tap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchless Piercing tool HR $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Material Disposal Fee (concrete, asphalt, debris, etc) PER LOAD $500.00 $0.00 $0.00 $0.00 Ferguson Water Works - 48x20 HP w/ 10% mark up LF $151.6734 107 $16,229.05 $0.00 $16,229.05 Grand Total: $36.789.05 10% MARK UP ON MATERIAL 15% MARK UP ON SUBCONTRACTORS If work is performed other than Monday through Friday, 7:00am - 4:00 pm, excluding holidays, OT Rates will be used for Personnel. These rates also apply for travel time necessary to mobilize and demobilize to and from work. REV. 3/17/2021 Packet Pg. 603 16.B.6.b Z FERGUSON® 3801 PROSPECT WATERWORKS #136 AVE WATERWORKS NAPLES, FL 34104 08:27:20 DEC 11 2023 Phone: 239-643-4970 Fax: 239-643-4945 DeliverTo: ROBERT From: Grant Kutzke Comments: FEL-NAPLES WATERWORKS #136 Price Quotation Phone: 239-643-4970 Fax: 239-643-4945 Bid No: B316463 Cust Phone: 239-435-7200 Bid Date: 10/23/23 Terms: NET 10TH PROX Quoted By: TAE Customer: QUALITY ENTERPRISES USA INC Ship To: QUALITY ENTERPRISES USA INC 3494 SHEARWATER STREET 3494 SHEARWATER STREET CARSON RD STORMWATER CARSON RD STORMWATER NAPLES, FL 34117 NAPLES, FL 34117 Cust PO#: 48" ADS HP Job Name: CARSON RD STORMWATER Item Description Quantity Net Price UM Total A486500201BPL 48X20 HP N12 DW STORM SLD PL PIP 107 130.3500 FT 13947.45 Net Total: $13947.45 Tax: $886.85 Freight: $0.00 Total: $14834.30 Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. QUOTES FOR PRODUCTS SHIPPED FOR RESALE ARE NOT FIRM UNLESS NOTED OTHERWISE. Page 1 of 1 CONTRACTOR CUSTOMERS: IF YOU HAVE DBE/MBEANBE//VBE/SDVBE/SBE GOOD FAITH EFFORTS DIVERSITY GOALS/ REQUIREMENTS ON A FEDERAL STATELOCAL GOVERNMENT PRIVATE SECTOR PROJECT, PLEASE CONTACT YOUR BRANCH SALES REPRESENATIVE IMMEDIATELY PRIOR TO RECEIVING A QUOTE/ORDER. Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon Local, State and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the Buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document, or on the web at https://www.ferguson.com/content/website-info/terms-of-sale Govt Buyers: All items are open market unless noted otherwise. LEAD LAW WARNING: It is illegal to install products that are not "lead free" in accordance with US Federal or other applicable law in potable water systems anticipated for human consumption. Products with `NP in the description are NOT lead free and can only be installed in non -potable applications. Buyer is solely responsible for product selection. �R HOW ARE WE DOING? WE WANT YOUR FEEDBACK! Scan the QR code or use the link below to complete a survey about your bids: https://survey.medallia.com/?bidsorder&fc=136&on=48166 Packet Pg. 604 Carson Road Stormwater Treatment Area pipe size increase 42" to 48" diameter. Required change following SFWMD permitting comments between lake CR-1B and CR-2A a length of 107' total at this location that was bid under Item #57 at $252.2500 per linear foot installed of pipe Fergusson supplied material 48" in 20' lengths at $130.3500 per foot based on 10.23.2023 bid price and supplied before 12.31.2023 which was subject to taxes at 7% on the first $5,000.00 and at 6% on the balance, but Collier County only reimburses for actual length of pipe installed. 107' $130.35/ft $13,947.45 10% markup $ 1,394.75 7% Tax $ 5,000.00 $ '' 350.00 6% Tax $ 8,947.45 $ 536.85 Total Tax $ 886.85 Cost 107' with tax $14,834.30 Cost 107' with Tax and m/up $16,229.05* Unit rate entered into Item #96 Fergusson Water Works — 48x20 HP w/ 10% mark up no tax on markup amount the extra penny tax on first $5k expired 12.31.2023 on base amount only exclusive of mark up equivalent to $151;6734 /ft UNIT RATE MATERIAL LF $151,6734 107 $16,229.05 Bid Item #57 unit rate for 42" pipe at $252.2500 installed per LF Remove 107 LF (c, 252.2500 = $26,990.75 credited to Item #96 Additional construction costs = $20,560.00 plus additional pipe cost* _ $36,789.05** Less credit for 107'of 42"pipe not installed $26,990.75 - $26,990.75 Utilizing Item #97 Owners Allowance $ 9,798.30 ** The unit rate for installation of 48" diameter pipe is $343.8229 per LF v M NI W CY I Q co c 0 0 cc U I O U c E t v M Q Packet Pg. 605 16.B.6.c Location of Carson Road Stormwater Treatment Area Tony Rosbough FAITH Community Park_ LANDING LIBERTY LAND1NGi — I RARVEST FOR jIlUMAN I TY — _ LAKE TRAFFORD RD AR* ESPERANZA DAVENPORT IfPLAQE Phase 1 - Site Stormwater Treatment Area Packet Pg. 606