PBSD MSTBU Minutes 05/08/202433.A.c
PELICAN BAY SERVICES DIVISION BOARD REGULAR SESSION
MAY 8, 2024
The Pelican Bay Services Division Board met on Wednesday, May 8, 2024, at 1:00 p.m. at the
Community Center at Pelican Bay, 8960 Hammock Oak Drive, Naples, Florida 34108.
In attendance were:
Pelican Bay Services Division Board
Michael Fogg, Chairman
Joe Chicurel, Vice -Chairman
Jack Cullen
Jacob Damouni
Mark Ferland (absent)
Pelican Bay Services Division Staff
Neil Dorrill, Administrator
Dawn Brewer, Ops. Support Spec. 11
Chad Coleman, Ops. Manager
Darren Duprey, Supervisor -- FieId I
Also Present
Tony D'Errico, Pelican Bay Foundation
Peter Griffith
Susan Hamilton
Michael Rodburg
Rick Swider
Michael Weir
Dave Greenfield, Supervisor - Field 11
Karin Herrmann, Project Manager I
Lisa Jacob, Project Manager 1I
Barbara Shea, Admin. Support Spec. 11
Susan Levine, PBF Board
APPROVED AGENDA (AS PRESENTED)
I . Pledge of Allegiance
2. Roll Call
3. Agenda approval
4. Approval of 4/10/24 Regular Session meeting minutes
5. Audience comments
6. Administrator's report
a. Capital Projects updates
i. Sidewalk Phase H status
ii. Operations Facility
iii. Clam Pass dredging project
iv. Coastal resiliency
b. April 30 Financial Report
7. Committee Reports
a. Landscape & Safety
i. *Opening up of Crayton Rd. to Seagate Dr.
8. Chairman's Report
a. June board meeting
b. PBF Strategic Planning
9. Old Business
10. New Business/Miscellaneous Correspondence
11. Adjournment
1
Packet Pg. 619
Pelican Bay Services Division Board Regular Session
33.A.c
May 8, 2024
ROLL CALL
Mr. Ferland was absent and a quorum was established.
AGENDA APPROVAL
Ms. Hamilton motioned, Mr. Griffith seconded to approve the agenda as
presented. The motion carried unanimously.
Ms. Hamilton motioned, Mr. Griffith seconded to approve the 4/10/2024 regular I
session meeting minutes as amended. The motion carried unanimously.
AUDIENCE COMMENTS
Dr. Raia complimented the PBSD on the sidewalk project. He also thanked the PBSD for the
installation of an American flag at the intersection of Gulf Park Drive and US 41, although he would
have preferred a central island installation of the flag at this intersection.
ADMINISTRATOR'S REPORT
OPERATIONS FACILITY
Mr. Dorrill reported that the demolition of the Operations Facility was completed about a
month ago. Phase 0 is underway which includes site work, including completing work on subsurface
utilities and grading. Exotics on the west side were removed in advance of the demolition. Mr. Dorrill
noted that our $5.34 million contract is with Heatherwood Construction,
SIDEWALK PHASE H UPDATE
Mr. Dorrill reported that although our sidewalk project is at substantial completion, our
contractor has an extensive punch list to work through. The contracted price of this project is $5.4
million.
CLAM PASS DREDGING PROJECT
Mr. Dorrill reported that no bids were received for our Clam Pass dredging project at the recent
bid opening. He suggested that potential contractors are working on more lucrative projects in Florida
in the current post -hurricane cleanup environment. Mr. Dorrill noted that we have issued an addendum
and extended the bid deadline to May 20. He commented that our Coastal Engineer is working on
stirring up some interest on the project with a potential project bidder. Mr. Dorrill commented that if
we are unable to attract a project bidder through the summer (storm season), and the Pass were to
close, we would develop a contingency plan utilizing long reach track excavators to keep the inlet
sustainable until we were able to perform a full hydraulic dredge after sea turtle nesting season in the
Fall. He reported on the recent unexpected death of Mr. Ken Humiston, founder of Humiston &
Moore.
COASTAL RESILIENCY
Mr. Dorrill reported that a beach dune swale recreation project was completed in Bay Colony
about three years ago, and noted that a section at the south end in front of the Contessa was not part
of that project as we found no PBSD drainage easements on the record for that area. With the help of
consultants, we were able to address this area by obtaining an authorization and exemption to re-create
2
Packet Pg. 620
33.A.c
Pelican Bay Services Division Board Regular Session
May 8, 2024
the cross-section of the Swale to the design characteristics of the beach dune swale. Work was
underway last week and is expected to be finished shortly. Contessa residents are very pleased with
the work. A mangrove conservation area, south of the Contessa, owned by Bay Colony Assoc., has
sustained a substantial die -off over the last year or two. The Contessa is evaluating some additional
improvements to improve drainage and tidal exchange underneath the road. We have no easements
in these areas.
Mr. Dorrill commented on power point slides entitled, "Collier County Dune Restoration
Planting," included in the agenda packet. He reported that recently staff met onsite with the County's
Coastal Zone Management Dept. and the U.S. Army Corps of Engineers. There are two sections at
Clam Pass Park that received substantial overwash from Hurricane Ian that destroyed a large section
of the dune and the adjacent mangrove forest. There is a County grant -funded dune restoration project
to re-create the plantings associated with the dune work that was completed immediately following
the hurricane. No matching funds are required from the County or the PBSD. He noted that the prime
beneficiary is Clam Pass Park. Mr. Dorrill explained that the project's contract includes growing the
plantings as well as installation of the plantings.
Mr. Damouni questioned Mr. Dorrill on whether we have any knowledge of Clam Pass Park
boardwalk improvement plans by the County. Mr. Coleman commented that he will follow up with
the County's Parks and Rec. Dept. to determine what their plans are for maintenance repair of loose
boards. Mr. Dorrill commented that he will follow up on this issue with Mr. Dan Rodriguez, Deputy
County Manager.
Mr. Coleman provided a brief overview of the County's dune restoration project. He noted
that the County has been working with the Naples Botanical Gardens and other environmental groups
to select the appropriate species of plantings. Mr. Coleman suggested that it may be difficult to obtain
over a million of these plants, as they are in limited supply. He noted that the project is now out to
bid, and that planting will likely begin at the end of this summer. The Pelican Bay coastline (R-30.5
to R-36.3) is included in the project. Mr. Coleman commented that the Clam Bay Committee may opt
to add additional similar plantings to the Pelican Bay shoreline after reviewing how this project's
plantings respond to their environment.
Mr. Coleman commented that we have installed plantings (recommended by our Earth Tech
consultants) behind the Marker 36 facility, and continue to monitor growth, to determine how these
plantings respond to this area. Mr. Coleman noted that it has been difficult to find large quantities of
plants, such as sea oats. He suggested that we patiently monitor the new plantings, and if successful,
we will add more plantings to this area. Mr. Coleman commented that limited plantings at South
Beach have responded well to their environment, and new growth is visible in this area. He noted that
Earth Tech, the Clam Bay Committee, and staff will continue to monitor these plantings.
APRIL 30 FINANCIAL REPORT
Mr. Dorrill reviewed the April 30 financial statements and discussed highlights including a
current PBSD cash balance of approximately $13.8 million, $7.2 million in unspent capital project
balances, $1.5 million in reserves, and $61,000 in interest earned over seven months. Mr. Coleman
reported that our Street Lighting Fund has received $10,000 from the sale of our bucket truck.
COMMITTEE REPORTS
OPENING UP OF CRAYTON RD. TO SEAGATE DR.
3
Packet Pg. 621
33.A.c
Pelican Bay Services Division Board Regular Session
May 8, 2024
Mr. Fogg provided an overview of the issues related to Commissioner Hall's proposal to install
a bike path (over the embankment/grassy knoll) from Crayton Rd. (north) to Seagate Dr. Highlights
included the following.
• An aerial photo of the intersection of Crayton Rd. and Seagate was provided and added to the
record. This intersection contains crosswalks and stop signs.
• Southbound cyclists have been observed riding over and wearing away the surface of the
grassy knoll area, and cutting through the tennis court parking lot. Several years ago, the PBSD
installed posts at the south end of Crayton Rd. (in the cul-de-sac) to prevent vehicles from
driving through this area.
• The grassy knoll area between the south end of Crayton Rd. and Seagate Dr. is platted for a
roadway. However, before the County is able to construct a connection, a public hearing is
required.
• A bike path would be "less than contemplated" in the plat.
Mr. Trent Waterhouse commented that the Crayton Rd, right-of-way is 96 feet wide, the cul-
de-sac is 72 feet wide, and Crayton Rd. is 24 feet wide. He suggested that there is sufficient room for
a road to be constructed through the grassy knoll.
Dr. Chicurel provided a discussion of this issue which included the following highlights.
• Tomorrow's town hall meeting at the PB Community Center will provide more specificity to
exactly what Commissioner Hall's plans are.
• Photos of the "no outlet" sign at the north end of Crayton Rd. (at the intersection of Pelican
Bay Blvd.) and a pack of cyclists traveling south on Crayton Rd. were provided and added to
the record.
• The agenda packet included photos of the grassy knoll, as well as adjacent properties including
Naples Grande property and a County water quality facility.
• Installing a pathway over the grassy knoll will increase bicycle traffic (including motorcycles)
on Crayton Rd.
• Cyclists using PB roads blatantly disregard traffic laws. This disregard for laws relating to
traffic signs and crosswalks are a safety issue for pedestrians and motorized vehicles. The
Sheriff's Dept. has limited resources to police our roads.
• Opening up a 12th public access point to Pelican Bay increases cyclist traffic, outside pedestrian
traffic, and motorcycle access.
• Cyclist traffic law violations observed include (1) not stopping at stop signs, (2) not stopping
at crosswalks containing pedestrians, (3) not yielding to pedestrians in the road or sidewalk,
(4) taking up the entire travel lane, even when there is no safety issue for them, and (5) riding
more than two abreast on roads not marked for their exclusive use (i.e. bike lanes).
• Opening up a 121h public access point increases the potential for crime. Recently there has
been reports of (1) multiple mailbox thefts, (2) PBSD equipment thefts, (3) a robbery at
Waterside Shops, and (4) vandalism to our new sidewalks.
• A Crayton Rd./Seagate Dr. connection has the potential to attract motorcycles which would
create ambient noise to the Naples Grande as well as the 10 communities that are on or border
Crayton Rd.
• When cyclists are riding in the road, they must obey the same traffic laws as vehicles. When
cyclists are using a crosswalk, they are considered pedestrians.
4
Packet Pg. 622
33.A.c
Pelican Bay Services Division Board Regular Session
May S, 2024
...........
.
Mr. Swider commented that speaking as a cyclist, some cyclists do obey the traffic laws. He
suggested that Myra Janco Daniels Blvd. is not a better solution for southbound cyclists as this road
is dangerously narrow for cyclists to safely travel on.
Mr. Coleman commented on the water quality testing site at the south end of Crayton Rd. and
suggested that it would not be easily relocated.
Mr. Louis Merletti commented on (1) cyclists not stopping at stop signs, (2) multiple cyclists
dangerously utilizing entire traffic lanes, and (3) golf carts driving over the grassy knoll in order to
travel between Crayton Rd. and Seagate Dr.
Mr. Trent Waterhouse comments included the following.
• Pelican Bay is committed to ensure the safety of cyclists and pedestrians.
• Recent PB security issues include bicycle thefts.
• A study performed for the proposed coastal trail by the Pathways Coalition documented the
federally protected woodpecker, blue heron, and gopher tortoise within one mile of the
proposed bike path.
• Myra Janco Daniels Blvd. is a safer solution for southbound cyclists as it has stop signs at the
intersection of PB Blvd. and a traffic light at the intersection of Seagate Dr. Myra Janco
Daniels Blvd. at its narrowest is 44 feet wide, and 72 feet wide at the intersection of Seagate
Dr.
• The master plans of the Artis-Naples and Waterside Shops include the removal of the Myra
Janco Daniels Blvd. median within five years. This would allow for six-foot bike lanes in
addition to two travel lanes and a turn lane. Until the median is removed, the short-term
solution is for the PBSD to add two sharrows on Myra Janco Daniels Blvd.
• The PBSD should consider installing a horizontal barrier at the south end of Crayton Rd.
• If cyclists continue to cut through the tennis court parking lot, this may create a permissive
easement on Naples Grande property. The Naples Grande should consider installing a
horizontal barrier to prevent the development of such an easement.
Mr. Hank Rossi commented that when this issue came to light about six years ago, he was part
of a team (made up of Crayton Rd. residents) formed to investigate cyclist traffic on Crayton Rd. This
team observed many instances of cyclists who did not follow the traffic rules. He noted that he can
provide these photos to any interested parties. Mr. Rossi commented on two PB bicycle accidents he
was witness to as well as elderly residents on Crayton Rd. who regularly walk their dogs on Crayton
Rd. He suggested that Myra Janco Daniels Blvd. would be a better alternative for cyclist traffic.
Ms. Kay Soltysiak, President of the Lugano Association, located on Crayton Rd., commented
on biker clubs who frequent Pelican Bay roads including the Naples Velo Club which on their website
shows a video of a pack of bikers not stopping at a stop sign. She commented that she is in agreement
with Dr. Chicurel and expressed her concern for the safety and security of pedestrians and dog walkers.
She suggested that the proposed bike path would invite misbehavior and that Myra Janco Daniels
Blvd. is a better alternative.
Ms. Mary Anne Beirne commented on the bombardment of bike traffic on Crayton Rd.
Ms. Carol Grones commented on (1) cars going through the stop sign at the intersection of
Seagate Dr. and Crayton Rd., (2) constant bike traffic at the south end of Crayton Rd., and (3) a former
split -rail fence installed across the grassy knoll which was removed a number of years ago after an
accident at this site.
E
Packet Pg. 623
33.A.c
Pelican Bay Services Division Board Regular Session
May 8, 2024
Ms. Sarah Ford commented that she agreed with all of the former comments and suggested
that we should not go forward with any changes to the grassy knoll area until we know what the Naples
Grande has planned for their properties adjacent to this area.
Mr. Harvey Hirst, an avid cyclist, commented (1) a bike path across the grassy knoll would not
be a safety issue, (2) the intersection of Crayton Rd. & Seagate Dr. is hazardous to cross, (3) an
engineered solution should be investigated, and (4) Myra Janco Daniels Blvd. is the preferred
alternative.
Mr. Swider questioned whether there is any way to accelerate the removal of the median on
Myra Janco Daniels Blvd. Mr. Fogg responded that the PBSD Board is an advisory board, and as
such, we have no actual standing to recommend this action. Our ordinance does not include a
responsibility for road safety.
Mr. Fogg commented that tomor7ow's tow hall meeting is important for concerned residents
to attend and voice their opinions. He noted that Commissioner Hall brought this issue up at a BCC
meeting and that eventually it will be brought to the full BCC for a vote. Mr. Fogg commented that
Pelican Bay documents require a County public hearing if a Crayton Rd./Seagate Dr. connection is to
occur. He noted that a bike pathway may not rise to the definition of a connection. Mr. Fogg suggested
that if access to Pelican Bay increases, then all of the bicycle issues will also increase. He suggested
that Mr. Waterhouse's solution is a good one.
Mr. Fogg encouraged residents to attend tomorrow's town hall meeting, and noted that PBSD
Board members may attend and express their personal opinions (not that of the PBSD Board). Mr.
Dorrill commented that PBSD Board members should not say anything which may reflect future
PBSD Board voting intent.
LANDSCAPE & SAFETY COMMITTEE REPORT
Dr. Chicurel provided the following updates, included in his "Landscape & Safety Committee
Update Report," which was included in the agenda packet.
1. The County has completed traffic studies on the intersections along Gulf Park Dr. to determine
if enough criteria are present to warrant a 3-way stop for both or one of the intersections with
Green Tree Dr. or Ridgewood Dr. (to replace the existing ambiguous signage). Mr. Coleman
reported that the studies concluded that the parameters do not show that a 3-way stop is
warranted at these intersections. He requested that the studies be redone in season. Mr. Fogg
requested that staff ask for similar studies to be completed for the intersections of Hammock
Oak Dr. and North Point Dr., both at their intersections with PB Blvd.
2. The U-turn lane line -of -sight issue on US 41 (the first U-turn opening after snaking a right turn
onto US 41 from Gulf Park Dr.) has been mitigated and addressed.
3. PBSD staff recently met with CCSO community policing deputies, and items discussed
included 1) when school is out, extra patrols will be available to us, after 4:00 p.m., in four-
hour blocks for two days at a time, (2) "Crime Prevention & Community Policing" seminars
and informational meetings are available to groups and associations upon request, and (3)
vandalism of sidewalks, mailbox thefts, and PBSD/County equipment theft.
4. According to FDOT, the crash data does not meet the criteria needed for FDOT to modify the
US 41 median at the Gulf Park Dr./US 41 intersection. Also, it has now been learned that the
"quick curb" short-term solution is also not possible, because FDOT's Maintenance Dept. does
not allow a short-term solution that does not have a permanent remedy scheduled within five
years.
on
Packet Pg. 624
33.A.c
Pelican Bay Services Division Board Regular Session
May 8, 2024
Dr. Chicurel commented that the news on the US 41 median was very disappointing, but noted
that if US 41 is resurfaced sometime in the future, that this may be an opportunity for a quick curb
and/or median modification. He commented that we will continue to look at other alternative
solutions.
Mr. Fogg suggested that a public meeting with FDOT and PB residents to discuss the
intersection of Gulf Park Dr. and US 41 may exert more influence on FDOT.
Dr. Chicurel commented that we need additional clarification on extra Sheriff patrols, which
will be discussed at a future Landscape & Safety Committee meeting. Mr. Coleman commented that
the patrols are not free, and that in prior years, the PBSD budgeted $30,000/year for these extra patrols.
Mr. Fogg asked for an update on the tree assessment of Pelican Bay Blvd. Dr. Chicurel
commented that a pilot assessment of Green Tree Dr. was completed and that an assessment of Pelican
Bay Blvd. is ongoing. Mr. Coleman reported that only a few areas on Green Tree Dr. were identified
as suitable to plant a new tree. Mr. Dorrill suggested that new tree opportunity assessments is put on
the agenda of the next L&S Committee meeting, for discussion of potential locations subject to (1)
access to irrigation, and (2) a willing homeowner who would be willing to receive a tree in the road
right-of-way. Mr. Coleman commented that proper root barriers would also be necessary. Mr. Dorrill
commented that he has had a discussion with Dr. Chicurel on working together to perform an
assessment of areas on Pelican Bay Blvd. that warrant additional canopy trees. Dr. Chicurel
commented that he will schedule a June L&S Committee meeting to discuss these issues.
CHAIRMAN'S REPORT
JUNE BOARD MEETING
Mr. Fogg announced that there will be no June PBSD Board meeting, and that the next board
meeting is scheduled for Wednesday, July 10.
PBF STRATEGIC PLANNING
Mr. Fogg commented that the PBF's mission is to prepare a strategic plan for Pelican Bay
which includes many activities, some of which intertwine with the PBSD. He noted that we will work
together on those intersecting activities. Mr. Fogg commented that we maintain approximately 90
acres of property in Pelican Bay, 50% of which is owned by the PBF. The PBF is currently working
with a consultant to develop a strategic plan.
Mr. Fogg reported that our ordinance allows for the PBF to appoint one non -voting board
member to our board, without our approval. The PBF has appointed Mr. Brad Hildebrandt to our
board, who shall be approved by the BCC at the May 28 BCC meeting. Mr. Dorrill will follow up
with the County Attorney's Office to determine whether Mr. Hildebrandt must follow Florida
Sunshine Law in the same exact way as our voting board members.
Mr. Fogg reported that Mr. Stone is scheduled to be appointed to the PBSD Board at the May
14 BCC meeting.
OLD BUSINESS
OAKMONT LAKE UPDATES
Mr. Fogg thanked Mr. Greenfield for working with a neighbor on landscape improvements to
the area adjacent to Oakmont Lake. He reported that a fountain has been installed in Oakmont Lake
and that the PBF is working on getting power to it.
ADDITIONAL AUDIENCE COMMENTS
7
Packet Pg. 625
33.A.c
Pelican Bay Services Division Board Regular Session
May 8, 2024
Mr. Andy Deimitriou commented on vehicles parked on the south end of Crayton Rd. (adjacent
to Bay Villas), when the tennis court parking lot is full. He noted that the Sheriff's Dept, has
recommended that additional "no parking" signs are added on Crayton Rd. including the cul-de-sac.
Dr. Chicurel will follow up to see if this is possible. Mr. Dorrill confirmed that vehicles are not
allowed to park on Crayton Rd.
Mr. Fritz Mayhew asked for an opinion on what entity, such as the PBSD, PBF, or County, is
the best option to seek solutions and help manage traffic, safety, and bicycle issues in general. Mr.
Dorrill commented that we have used the Sheriff's Dept through our community policing officer. In
the past, we have contracted off -duty deputies to perform additional patrols and directed activities.
Due to school shootings in the past, these patrols have not been available for a number of years.
However, we have now learned that contracted patrols are available again, after 4 p.m. Mr. Dorrill
noted that most of the recreational cyclist activity occurs in the early morning when these contracted
patrols are not available. Mr. Fogg suggested that the only solution seems to be for the Sheriff's Dept.
to issue enough tickets over a period of time to cause the behavior of the cyclists to change. He
suggested that staff and the L&S Committee obtain additional information on the contracted extra
patrols.
The meeting was adionrned at 2:50
VchacI Fogg, h aasese
Minutes approv ded ORL _____.] as amended ON date