Loading...
Backup Documents 08/13/2024 Item #16C 4 • ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 4 h 4' TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to he fonsarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must he received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s)(List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office f �4fl/,.j 8'13/7/' 4. BCC Office Board of County Commissioners 04/1 /s/ g(i(ky 5. Minutes and Records Clerk of Court's Office Yt4 V/(if)) PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff r additional or missing information. Name of Primary Staff �l1 Phone NumberZ Contact/ Department a M i k v C i t d r&4vWI 53 7 7 Agenda Date Item was fl , i3 Z Z Agenda Item Number ( b e Approved by the BCC D Type of Document ff Number of Original Attached 1, q H ie 0 f-de r Documents Attached PO number or account number if document is 5 Z2,5 3 to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column, whichever is Yes N/A(Not appropriate. (Initial) Applicable) I. Does the document require the chairman's original signature? 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name; Agency; Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N O' Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the N rA document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's / signature and initials are required. Al a 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on g/13/t7 and all changes made during N/A is not the meeting have been incorporated in the attached document. The County an option for Attorney's Office has reviewed the changes, if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the � N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the .fife an option for Chairman's signature. this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16C4 Co "�er County Procurement Services Change Order Form Contract# 20-7800 CO#01 PO# 4500225493 Project#: 70166.20 Project Name: Eagle Lakes Metering Assemblies Replacement and Improvements Contractor/Consultant Name: Quality Enterprises USA, Inc. Select One: El Contract Modification (Construction or Project Specific) 0 Work Order Modification Project Manager Name: Damian Cuadrado Division Name: Engineering & Project Management Original Contract/Work Order Amount $599 123 00 6/22/21 11B Original BCC Approval Date;Agenda Item# Current BCC Approved Amount Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $599,123 00 06/21/2026 SAP Contract Expiration Date(MASTER) Dollar Amount of this Change so.00 o.00 i Total%Change from Original Amount Revised Contract/Work Order Total $599,123.00 0.00% %Change from Current BCC Approved Amount Total Cumulative Changes so.00 o.00i %Change from Current Amount Notice to Proceed 01/10/2024 Original NTP 150 Original Final 06/08/2024 Last Final 08/09/2024 Date #of Days Completion Date Approved Date #of Days Added 30 Revised Final Date 09/08/2024 Current Substantial Completion Date 07/10/2024 (includes this change) (if applicable) Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete summary on next page. Check all that apply to this Change Order request: 0 Add Time; El Add funds; ❑ Use of Allowance; El Modify/Delete existing Task(s); ❑Add new Task(s); ❑ Reallocate funds; ❑Other(must be explained in detail below) 1.) This Change Order adds 30 days to the Work Order. 2.) N/A 3.) This change was not included in the original contract/Work Order because unforeseen conditions were encountered in the project which included the following: a. discovery of an existing abandoned pipe which had to be removed. b. existing piping having differing alignment than what was in the plans which required the procurement of additional fittings. 4.) If this change is not processed it is probable that the Contractor will not be able to finish the project by the current Final Completion Date of 08/09/2024. Page 1 of 4 Change Order Form(2023_ver.1) CAS 16C4 Colter County Procurement Services Change Order Form Contract# 20-7800 CO#01 PO# 4500225493 Project#: 70166.20 Project Name: Eagle Lakes Metering Assemblies Replacement and Improvements Contractor/Consultant Name: Quality Enterprises USA, Inc. Change Order/Amendment Summary (If additional spaces needed, attached a separate Summary page to this amendment request) COST TIME CO# AMD# Description Additive Deductive Days Total New Justification (+) (-) Added Time addition of time unforeseen conditions 01 30 180 encountered at the project site ❑Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form(2023_ver.1) (CAC) I b C4 Co aer County Procurement Services Change Order Form Contract# 20-7800 CO# 01 PO# 4500225493 Project#: 70166.20 Project Name: Eagle Lakes Metering Assemblies Replacement and Improvements Contractor/Consultant Name: Quality Enterprises USA, Inc. Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional"Project Coordinator"or Design/Engineer Professional under the agreement. Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations (Sunbiz) website (https://dos.myflorida.com%sunbiz/search/). if the person signing is not listed, we will require signature authority by one of the listed officers/directors of the company giving that person signature authority. CuadradoDamian ` m"` � �`" �" °" � " "°`"�° ` ° ° kfa,n..a.fuo w .y.a iv.n M�.wm..,,ou.wD.ou•a..o-...oc•xf.oami»,ao,. Prepared by: 0.W102ADa06Pa,at, Date: Signature-Division Project Manager Damian Cuadrado KLA 6/6/24 Printed Name DPpDNy•rwned by Stevan Agap Accepted by: Steven Agapi YC.US.E St�v 06 en a tech cum.0..sln Tad u,.SWan A,ap Date: Signature-Design/Engineer Professional(if applicable) Steven Agapi/Project Manager/Tetra Tech Printed Name/Title/Company Name Lou Gaudio Digitally signed by Lou Gaudio Accepted by: Date:2024.06.06 10:26:29-04'00' Date: Signature-Contractor/ConsultantlVendor Louis J.GaudioNice President/Quality Enterprises USA,Inc. Printed Name/Title/Company Name oyue..q..a M f.MrW.an. FandrichShon DW�Ems.,;✓b. . myr aw.`N.F.Mn&m Di.Da,..OU aPN U.w Approved by: D..A Inonn and ' w D�.4,D«.D.,aro.D DD DD.no Date: Signature-Division Manager or Designee(Optional) Shon Fandrich Printed Name McLeanMatthew `"� ��°�.....!•. ."'�'"""°""""°""""" .rc.un..OIFOUD q.^^•q wM awn Wi.p.mra.gMR10.OW DFpnu DC•Mc DC.aWrnev. Approved by: n.�. .a�a Date: Signature-Division Director or Designee(Optional) Matthew McLean Printed Name Approved by: Date: Signature-Division Administrator or Designee (Optional) Printed Name Page 3 of 4 Change Order Form (2023_ver.1) CA® � 16C4 Colt tr County Procurement Services Change Order Form Contract# 20-7800 CO# 1 PO# 4500225493 Project#: 70166.2 Project Name: Eagle Lakes Metering Assemblies Replacement and Improvements Contractor/Consultant Name: Quality Enterprises USA, Inc. FOR PROCURMENT USE ONLY FY 24 CHO Request# 407 ZimmermanBecca Digitally signed by ZimmermanBecca Approved by: Date:2024.06.28 08:46:58-04'00' Signature-Procurement Professional Signature/Date Approved by: Signature-Procurement Manager/Director(OPTIONAL) APPROVAL TYPE: ❑ Administrative Q Administrative-BCC Report ❑ BCC Stand-Alone ES (BCC Approval Required) BCC APPROVAL ATTEST: Crystal K. Kinzel, Clerk of the Circuit Court BOARD OF COUNTY COMMISSIONERS and Comptroller COLLIER CO T , FLORIDA By: TUP-'-+ B : Attest as foLnairman's y I signature only Dated: (- . (le/0.9 Chris Hall, Chairman (SEAL) Agenda# 16•C.4 STOP/ Approved as to Form and Legality: AshkarSaI Iy Dale 12024 0 7 26 15 171 8-04'00' Asst. County Attorney Sally Ashkar.Asa stsnl County Attorney on bettst of Jeffrey A.Klalzkow,County Attorney Print Name Page 4 of 4 Change Order Form(2023_ver.1) Cry® 16C4 Damian Cuadrado From: Lou Gaudio <Igaudio@qeusa.com> Sent: Wednesday,June 5, 2024 6:03 AM To: Damian Cuadrado Cc: Agapi, Steven Subject: Eagles Lakes Time Extension Request EXTERNAL EMAIL:This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Damian We would like to request a 30 day extension due to the unforeseen conditions encountered at the site. The discovery of an existing abandoned pipe for which a work directive was provided required additional time waiting for work directive,then removal-backfill-compaction required. Additionally,due to the differing alignment of existing pipes that we are tying into,we had to order additional fittings to make the tie in's work. Please let me know if you have any questions. Thanks Louis J. Gaudio _ Vice President - c:239-207-0660 o:239-435-7200 QUALITY e:Igaudio oeusa.com ENTERPRISES 3494 Shearwater Street,Naples,FL 34117 NOTICE: This email contains information that is legally privileged and confidential. If you have received this message in error, please notify me immediately and delete this message. Any unauthorized disclosure, copying, distribution or other use of this proprietary information is strictly prohibited. 1 E0)