#23-8115 Change Order (Golden Gate City Transmission Water Main Improvements) ler Co County Procurement Services Change Order Form Contract# 23-8115 CO# 2 PO# 4500225907 Project#: 70253.7 Project Name: Golden Gate City Transmission Water Main Improvements—Phase 18 Contractor/Consultant Name: Metro Equipment Services, Inc. Select One: 0 Contract Modification(Construction or Project Specific) ❑Work Order Modification Project Manager Name: Liz Gosselin Division Name: Engineering and Project Management Original Contract/Work Order Amount S13,983,97970 08/08123,11 8 Original BCC Approval Date;Agenda Item# Current BCC Approved Amount N/A Last BCC Approval Date;Agenda item# Current Contract/Work Order Amount S13.983.97970 07/07/25 SAP Contract Expiration Date(MASTER) Dollar Amount of this Change -S199.12912 -1 42 io Total%Change from Original Amount Revised Contract/Work Order Total $13,784,850.58 0.00% %Change from Current BCC Approved Amount Total Cumulative Changes -$199,129.12 -1.42% %Change from Current Amount Notice to Proceed[10/30/2023 Original NTP Original Final Last Final 07/07/2025 Date #of Days 600 Completion Date 06/21/2025 Approved Date #of Days Added 0 Revised Final Date 07/07/2025 Current Substantial Completion Date 05/08/2025 (includes this change) (if applicable) Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete summary on next page. Check all that apply to this Change Order request: ❑Add Time;❑Add funds; ❑ Use of Allowance; Q Modify/Delete existing Task(s);0 Add new Task(s); ❑ Reallocate funds;0 Other(must be explained in detail below) Change Order No.1 was processed and subsequently voided since an additional work directive(Work Directive No,2)needs to be part of this change order. 1.) Detail of change/s to be made through this Change Order. Work Directive No.1(see work directive attached):This change is to modify the original contract bid schedule to accommodate the design change for the force main along 29th Place SW. The change is to directional drill the force main the entire length of 29th Place SW.The benefits for this proposed change include allowing the contractor to use materials already purchased by Public Utilities,reduce the local neighborhood impacts of the construction effort,and allow the contractor to install the force main along 29th Place SW quicker than installing the force main as per the bid. The credit to directional drill the force main the entire length of 29th Place is $250,879.12.The prices and quantities were reviewed by the EOR and are believed to represent current industry prices and practices(See attached Cost Reasonableness Letter). Work Directive No.2(see work directive attached):This change is to add two(2)additional 20"plug valves at the force main connection at Santa Barbara Blvd and 50 linear feet of 20"PVC force main via open cut at the corner of 29th PL SW and 53rd ST SW to connect the force main installed as part of this project(Contract 23-8115)to the force main installed as part of a separate project(Contract 23-8198).The contract unit prices will be used to reimburse the contractor for these additional items.The cost to add 2 additional plug valves and 20"PVC force main pipe is$51,750.00. The changes requested in Work Directive#1 and Work Directive#2 are estimated to reduce the original contract cost by$199,129.12.See attached Total Credit Breakdown. 2.)If this Change Order is currently under a Stop Work,please identify the date issued and number of days remaining or"N/A"if not applicable. N/A 3.)Explain why this change was not included in the original contractlWork Order, Work Directive No.1:The original contract called for the force main along 29th Place SW to be installed via open cutting and a section to be directional drilled.After the contract was awarded,the contractor suggested changing the installation to horizontal directional drilling(HDD)to allow for a quicker and less expensive installation. The EOR and County staff reviewed the contractor's request and determined that the request would reduce the overall construction cost. Work Directive No.2:This change was requested by the County to improve the ability to direct wastewater flows north,east or south,and so that the force main installed with this project can connect to the proposed Golden Gate force main(Contract 23-8198)to be installed under a separate project. 4.)Describe the impact if this change is not processed. Work Directive No.1:If this change is not processed,the contractor will not be correctly compensated for the installation of the force main along 29th Place SW and the County will not receive the substantial cost savings. Work Directive No.2:If this change is not processed,the operational flexibility to direct wastewater flows in any direction will not be achieved if the additional plug valves are not installed and not installing the 20'PVC will not connect the two force main projects from the Golden Gate City Wastewater Treatment Plant to the regional force main system on Santa Barbara. Not processing this change order will require the contractor to purchase additional materials for the project,cause delays to the project's construction,and prevent the County from reducing the contract price by 5199,129.12. Page 1 of 4 Change Order Form(2023_ver.1) Corrco . nty Procurement Services Change Order Form Contract# 23-8115 CO# 2 PO# 4500225907 Project#: 70253.7 Project Name: Golden Gate City Transmission Water Main Improvements— Phase 1 B Contractor/Consultant Name: Metro Equipment Services, Inc. Change Order/Amendment Summary (If additional spaces needed,attached a separate Summary page to this amendment request) COST TIME CO# AMD# Description Additive Deductive Days Total New Justification _t. (+) (').....___ Added Time Voided Voided 1 Modification of _ — The changes are necessary to modify the contract bid schedule i scope and cost of the contract to 2 ($199,129.12) 0 O accommodate the HOD installation of the (see attached Total force main along 29th Place SE,and the Credit Breakdown) additional plug valves and force main piping. { ❑Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form(2023_ver.1) CoCoLber County .- .. Procurement Services Change Order Form Contract# 23-8115 CO# 2 PO# 4500225907 Project#: 70253.7 Project Name: Golden Gate City Transmission Water Main Improvements— Phase 1 B contractor/consultant Name: Metro Equipment Services, Inc. Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional "Project Coordinator"or Design/Engineer Professional under the agreement. Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations (Sunbiz) website (https://dos.mvflorida.com/sunbiz/search/). If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the company giving that person signature authority. GosselinLizpolo m,a,:n :.��� Date. Prepared by:,T Signature-Division Project Manager Liz Gosselin KLA 6/18/24 Printed Name TMW 5-31-24 Michael S Dicke Digitally signed by Michael S Dickey Accepted by: Y Date:2024.06.18 16:33:13-04'00' Date: Signature-Design/Engineer Professional(if applicable) Michael S. Dickey P.E/William H.Saum, P.E., Engineer of Record, Johnson Engineering, Inc. Printed Name/Title/Company Name Nico Serrano Digitally signed by Nico Serrano Accepted by Date:2024.06.20 16:31:08-04'00' Date: 6/20/2024 Signature-Contractor/Consultant/Vendor Nicolas Serrano, Project Manager,Metro Equipment Services, Inc. Printed Name/Title/Company Name BullertBenjamin '°. pt...�..,."`"-"`�-�= °�KK C.P.LA. Approved by: k�. .gip a:52.0.� ,a Date- Signature-Division Manager or Designee(Optional) Benjamin N.Bullert Printed Name McLeanMatthew �•°°°�"�'�'��``"` �'•��`�"�`� Approved by: o..n2.041034.1,040Cr Date: Signature-Division Director or Designee (Optional) Matthew McLean Printed Name Approved by: Date: Signature-Division Administrator or Designee(Optional) Printed Name Page 3 of 4 Change Order Form(2023_ver.1) Corr County - .. Procurement Services Change Order Form Contract# 23-8115 CO# 2 PO# 4500225907 Project#: 70253.7 Project Name: Golden Gate City Transmission Water Main Improvements — Phase 1 B Contractor/Consultant Name: Metro Equipment Services, Inc. FOR PROCURMENT USE ONLY FY 24 CHO Request# 412 Digitally signed by ZimmermanBecca Approved by: ZimmermanBecca Digitally 2024.06.26 16:17:46-04'00' Signature-Procurement Professional Signature/Date Approved by: Signature-Procurement Manager/Director(OPTIONAL.) APPROVAL TYPE: ❑ Administrative ❑ Administrative-BCC Report ❑r BCC Stand-Alone ES (BCC Approval Required) BCC APPROVAL ATTEST: Crystal K. Kinzel, Clerk of the Circuit Court BOARD OF C UNTY COMMISSIONERS and Comptroller COLLIER C N , FLOR A By. 4 By: Attest as to Chairman's _ signature only : Dated: g/ (` - Chris Hall, Chairman (SEAL) Agenda# IL.C.5 8/!3/2y J A.• •v- to F r t Legality: C Deputy County Attorney s;e..611 UL7ac1 Print Name Page 4 of 4 Change Order Form(2023_ver.1) nm la NP= €Z W i A z i Z m 0 0 a j' o o^.. m d oia3 0 In =rom jpg om Ai,geron > 2 P s na 8 m ' a4Rniv�1IdA--;k6' 4' ; m ill4ii I oo m� ogS000a N I .o of. 7 io 5 S� � q' ,o h �i - ' i min 8 -- .- m , i-il T xi o Z 0/5 D 3 d O z G) -< Z F i m m o -N- «loaror.,j o N g� O n 2 _ al-..�.� y mm mm i z T ny T<< T 0> >> 0 7,' T 7I 7 7 i m Q N Z« l« ��« « T.A . «O bip tO o y o888 81 §§§§§ 0 g�o 8 g88 g 33 s8.888 81. 888 r s g AP irn pi --o x$t3E s a§§sa $ao� P tgN 8888 81 »8888 88° 8 888 8 0 0 82o Et -1- -- = goN i .o iT r<< ;I a a a a a a a a a T r ,T 1 a 1 Nm mmmm mmmm WF:!:! o tSH 5 o N$l88 HI$ S oW i g 88 I - F- ms - ««« «P$«« Np « g :o 0a 12,71 n I. mi 8N° V9 ,-N -- i'm' mm ti D n 8 T1 Tr; a m T r ;7; « , 88.8 i 80§§ § § 44 I88 . a 8888 8m888 �NN mSS 08 tEEEE VOi$88 No oS$ f a8g g8$ 8 g$888 $m888 w8 08V0 . x « ««« a ««« « ,. m.«« "" "'- oa P-'24N II !g n . mm N I 1 ..-...__.... I 'c Ire .,e co Z V ITH V§« 11111 a.sz6 o Work Directive No.1 t„r„ent#,A Collier County En2ineerin; & Project Manattiement Division WORK DIRECTIVE CHANGE CONTRACT#/PROJECT NAME: #23-8115/Golden Gate City Transmission Water Main Improvements—Phase 1B WORK DIRECTIVE#1 (Revised) DATE OF ISSUANCE: 12/4/2023 EFFECTIVE DATE: 12/4/2023 OWNER: Collier County Board of Commissioners PURCHASE ORDER#:4500225907 PROJECT#: 70253.7,70243.2.2.2,51029.12.5 CONTRACTOR: Metro Equipment Services,Inc. ENGINEER/DESIGN PROFESSIONAL: Johnson Engineering,Inc. You are directed to proceed promptly with the following change(s): Description: Contractor is directed to install the force main along 29th Place SW via horizontal directional drilling instead of via open cutting(see revised Attachment 1). Purpose of Work Directive Change: The purpose of this change is to authorize the contractor to install the majority of force main along 29th Place SW via horizontal directional drilling instead of open cutting. Reason/Justification: This change will reduce the areas impacted by the installation of the force main compared to open cut installation methods and will reduce the amount of restoration needed to be completed by the contractor in the project. This change would also allow the contractor to use materials that were previously purchased by Collier County and prevent additional materials required for this project. This change would result in net savings to the County(see cost breakdown in Attachment 2). If a claim is made that the above change(s)have affected Contract/Allowance Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Method of determining change in Contract Times: Contract/Allowance Price: ® Unit Prices ❑ Contractor's records ❑ Lump Sum ❑ Engineer's record ❑ Time&Material ❑ Other ❑ Other This amount is adjusted to $250,879.12 per backup provided Use of Allowance Funds: $0 by the vendor. Estimated decrease in rice: Estimated change in Contract Time: $250,665.51 0 days RECOMMENDED: AUTHORIZED: BullertBenjamin .,,:, .--- 04•11.9.B o.iv.n a n wn.rer By : y: _.� Johnson 1 ngineering,Inc. Owner's Representative Engineer I i 500.1.4 15•••515.• ...••••••••••••••• •,$,5,,5.0.,},. I 1''''''''''" 0...•••••°• ENGINE INC .:-I:7-1-•.--.0 il • ,,,„: '"'":2 I i'''''''''" ""'-,-* : -,..n..::::,z,•,-. ,,,„,,,..„........., .',.•,,II....“.,- .'"'''' • .,,..... , 4 ''' ' •,"'..'",",`'. ..r. ,/•+,,,,, ..Z',1 4,...,........--^-"—S, , ' - 1-,....' _..„,_.,......i.1 ""." ''''''''' 1'•'$2.;;:,:,':$..:.^ '".'''''''''''''''' . ' ' 1..1..111•1;-"..:1m."•;--:-.7:4$7-:-.L.:".." 4-1-- '''' '0'1••••••••••••••••••55.$,A "•-•-', •..7.-77•.,-,''.."-.,."--, .....,_r 7_,%:„, ,,,,5•,11,' . ,,,,,,,,,,,, ..„. rt ''' -,--• 11 0.51 VI 41'501.1,•'' ,.i 5,,,,,,,,,,,,,- •„..„. I i 1 .I . ''''''' ) i .... „„.,„,-„,,,:zz--.--,, - ..''..•'.-.,.,..,....---- - '7 W ' , ..•,..,„,„.,,.,... , i/ ,it - / : :'-'':',.''',. .....,„___.„,,---- ',XI-. — '. . • ...,....,...c.^'':'"'''''' . i ?' SI . „tt.1.1-,44,4 .'' •"T... OA '"' •:',-3_,.,_..-,-,,—,—, 51 2C'''''' ' 1' r•r 1 ''...,..--*.N '.• -''"' ...,..,/,), 1‘or••••.0 1 /0 11 \ g , IT.45•••,5 51161..-,4„, i. 'i 1 ., \ ''',•:',;:'5';".•••1‘4!4.;11*"'.1".k ' 1".i * \ 1 1;1'5.•- ttfiraFir:4. X ,,,..0P• e t : , • \:',, e A.,...*1,06.41110 • : *re.ie.,.e.e.•lea., r***111.0%11:'11NeN.'"' ,,;('"), ,I. 0. $0,-/,' 1.,,,,','''. i '..,1 19 i "i...---0,--0i$',.•1-,-05-0570::1'01,41.1,e...p.t 1 i. ' X".'S0,0-0$•`^ 1 te ',weer*'next wee ! "aoc.:1:a"!..=:',..-1/2.'I E i f''6c)i'RIC6.:h41-1-sN ... ' 1 '' .' ... ...1,1:.:....-.,,,....."...!...f..-.........! BEE SHEET 24:X t es i i f • 0 , 1 . root ce.vm.Anon t 5,0 T NN i ; 2filetPLACf.SW 91*C. o SIN 14:0 7 ,,,..,,A f StPIII:P.4.5 ;...•;7.,,,,,.. ? ...''''k '''. ................. ...._,A.„.1.. 1..nal.1•14,10515,0,1 /el.C. , 005 011..•. 1 Y..*teens*vae,e-,(I 1[11.or"• i , ,---,—...,---—,-----_____„,.—.-..— • . 1,1 .., , I /- ' L. I "---i 1 .,,.,„,,,-,„,,,,i,,.,. .,, , : . . r c•.•4,001115., ",'1 11 1..10../41 01,415 I 41 . ' '''',1•' I .... ,, , , ; ...1,;1. . . 1 (3;--•i • 1 . 1 ..,„,,,,,• i. 1;1 1, 1 i t, 1 ,•,.-,r........,,....-.. l• 8 v 1, -,...,.• . ' • ,L.• , ' • . ' ' I , . k...-,--{ ' I ;p.;I.•.I.P.;p1.,;•.i.:'.II.';.!I:g;I P p -7 '. 4" ,7-li .57,4•-1, .I.„'..r,.4 T., Tr7r,;-1—r. '.1. r.•..• -ir.'..l'i rr..11--Ii-7•Fc•-• .;',;..„.-:$....,.';•':.,-i. .,.••t . I ..,,,:....'..4....1!.....'__,...2......1...i; ;;--„...!:- ..-• i ! ' ;',4:-.il,;,,•;el...i.il.rt;>•ts I.?t,el;Id;.::I::: •i:•;•,...,vl,f 1.•5,11 01.••:,••••••,,.1. ••.15 *.er't 1,3 ' ' t. .a 0 k. MTN PLAC.411.ifet•CHO*U4 5403 gi/i ..... : , 0 pot' t : ' e• .I : 1 ,.. IN550 15.11 75/71-1 / $1 • I ' I ' • , . tr 1 1 • • 55..... . • I ..1.1101 . . • . • I ' odneueseese . : • P,P 7.i.1,,I;11;!:I::I;:; ti?;;;.::.!Il•.;;;:..•::::: •-„'.:::.:!:I!1:11i!:L.Ic..; P'`• Ii!_.;iIII!,,,,, _rt! .'S.•,2...:„:,:rti: i: 1;,...1 24 _ ., _ --....................______ • _..____----------Work Directive No.1•Continued ____.__._-------__._---- --._----.________._ _ ._.. �_ tt EN IN IN ii 6i I• 22 lJ' FOR PLAN VIEW OF -- — 5 E FORCE MAIN 1 t+r L `5Tt .,I V w E w u. SEE SHEET 21 I i 'H d ,.5. .__. NTH PLACE SIN DWo .M S(b ...-__,y Vi „Mw,...w. -I S.0 0 �m� ,o vo ell., v. I i t b O m ,� ;__4 s _A V 1 mw. 4«vcw,.� o ( I J ' iy r. i s _• j } '._` f li'in•P if AID).jf; 1 ill' S i1.•,. '� I, .Z..'. i,.i},i •- t R•' .-_u.J k Cs 24(X) ;' Work Directive NoJ ConUnuadl _ --.—_ _ ._,._. . .�,. .�..._.__,.__...._...........___ ,. v......." a..a e.w rea,n. wu'anna l t t}it,.".t.I .r»...' 1 EX41I E IX ,...m.n.. ,i �m.wr 1 + ,..,.".� r-. n... 11 ns 1 v t.. , .. x 'C"`YL'A3iE= "•-"" [�il� waa• .."n..M1+Jw7"'^'sYT f._.-....- ... LI III q. 4.J 7" W "l __ f t-�' 11 r , '.. w't �� FOR PROFILE VIEW OF ) ,� .Z ..,..... L FORCE MAIN 1 (, 7y) s+ e4 t x,F. e i BEE SHEET 24A(K) J 1 1 1i rFr. "ei PMCE YA'S1. •.00I.S W .._-. C%N 6N 7 n_ .s.., ^ 4,R!kV•6+f (?c j .Rn,,„ ;. ...t uinan. • � � °!"f M1( 4 lerme,rileile, I w .e .ww.,.s rev.a.anw.: 1. rw-oromon t ,, , 4 Io.I.` t r — a. 1 t?t` [ =1 ,I i,,=1+,) t :4! _:Tor . . I,_ ,r .F�3. .._I. : _T., f I _ 4k 4 k +u �tiµ OM ha.m.r { i 24A ._ 3 —.y {Work Directive NO .---.-.--.._ _.-_._._......_....._. —.___ ____.._. � ........_-_._.__. ENCINttNINE 61 li rr t�c N.i Fort PLAN 41r'W OF: FORCE MAN : y dkld't•'' .G SEE Sn FT as 2i1 PUCE SW Sa WO S c J.CC -. .. M 6 ---_. -1waw 1............... i .._ u ,,E LL 03r.s ` ( k tO . Yam.. ..>. i m 'e i 1 } i IrAWIRwL IMRL roM i, 1 a,• "., .. s I s as..we 1 24A(X) Fork rett a No.1•Continued—I..', • �T�'{j1���� .rr^. i ,—.--s., r.,Mrwwe V.nm.a 4�n•n e. , YiLLGiA�N ° I i .1"T.' i' [NGISMING c Y i f ;w y f ». _.. I w..I ..raw .y. ... (3 4 I 4 l I I I I 5 f a fr w a ....a an MN e } 297 IKAC!SW Su IS.%48 M1.00 fj x,' LL -.....Fro...... -_ —++M--_—— . ....w,..._ __._..- ..-.. f- s I sa 15 „ ...._.. _... _. ._.. .I o y 1� 111 W+fCIpAt. 0.U•TnA'.a.t �"w }IA i . T r .fib ; 24B (Work Directive No.1-ContInued]"'"""""12 ORIGINAL DESIGN OPTION LONG FM DRILL ON 29TH Cost Chan e SECTION 4,FORCE MAIN SYSTEM f156169, 0[[CAPYgN a'ai,WANT ISO UM • !'MM',r'•110460 [a1.cams& WO WI Pala! 6S36MWp P9K6 26 Force Main PlpOino[(Vu OPenLu11 >oh PVC DRa8 242 LF 'S 96 op 5 12403.2 DO 1,292 I.l S 8300 1 124,01U0 1 • , h 6.1nch PVC DRIB 760 .F S 10800 E 82,08000 ''60 LF S 'DO 00,$ A1i1600'0 8 4 20-���n PVC DR I B 946 LF S 39500 S 374,46000 104 LF 8 395N S 41.21111n C 1333.360001 27 For.Main Pipeline[[Oil Horizontal Dllenlonal 0511) a 74-,ncn HOPE 03311 825 LF S 42000 S 262,50000 1,419 it S 42000 $ 595,990.00, 1 333.460,00 b�...M 24.incn HOPE DR 11 IMalenel) 0 LF S S 1.419 ;F �S ;524r116 /13121493; S [131,214.93 26 Plug Valve[ : 4^Plug Valle 2 EA $ 1800.00 S 32J;r01^ 2 EA S 1 600 00 $ 320000 • b 8'Pica Valve 2 EA Y 3,00000 S 6 n0 09 2 I $ 31000 Y 100000 $ c 20'PI a v Iv ._. 4 EA $ '6,000 00 S 4 020 CO I F A. Y 6.000 30 S 16 002 0(] 8 (46,000.00sj EA I b. finch FM ICul innf edingl ( 2 EA 1 10,000010 L 1000003 2 El,' 10 1000001 5'• 2.78 21 0^ s..F, 7r;67 }S46Tl2` Plug...AI i 4 inch FM ICA in A S 1 EA 504 29 Alt Release Vaf e � 39 Connect) E 1 tm$F eM i - < 20 men fM(CO In Exo,I mill 1 EA S 27.00000 3 27,00000 EA�3 27.000.CD 1 31 Deflect E sitting 14 hem*Main I 1. EA )S 16 900 0C E 16 900 00+ 1 EA $ 16 900 00 S $ECIt0N 4 SUBTOTAL 1 1,076,172.00 s2.3746}•263046 3 ,"101',p MMaaal4 •ECM*& TORATION(FORCE MAIN) Ittbf r0. 6614M3P11011 ` Oat,p4MMl. 1007 OAT PMC[ 6271 .0 6117.OIMMT, ar6i�6! T MCI [11T[N9[0 Mc! 32 Cwnerel Reatorat1V6 I 1 020 IF $ 4 00 S 4,080 00 688 FA 5 4 1' S 2 744 CD $ (Ic336A0,t 33 Recopy.and Replace Driveway! a n. �• -•._.. • ( SY 1f '6700 1 3D WO 04 0 rY E 16700 S - $ ,j3P 04000I b C le 304 I+ 54 S 21600 $ NS2.200 62 97> 3 21600 $ 1311600 } (32,751.00t 34 Replace6ah11n90tiveway Culvert[ 160 OF S 3200 1 576030 90 IF $ 3200 $ 2 880 00 $ 12660O0; SECTION 6 SU8TOTAL: f06 17200 $ 19 140.99 1 67 032.Oo I N I. SYSTEM $ 1.076.•.200 P2,433 i $ 141a7 V2 (163;439,541 SECTION S.RESTORATION(FORCE MAIN] 3 1,23.•'2 PO / b 19.14C 00 1 t_(62,632.00) TOTAL'S 1,162,34400 S' ,."',934,47L49 6 )4 ,71`� (240.666,61) 1 'This amount Is sdjus$ed to$15,26711.] Collier County Engineering & Project Management Division WORK DIRECTIVE CHANGE CONTRACT#/PROJECT NAME: Work Directive No. 2 #23-8115/Golden Gate City Transmission Water Main Improvements—Phase 113 WORK DIRECTIVE#2 DATE OF ISSUANCE: 2/23/2024 EFFECTIVE DATE: 2/23/2024 OWNER:Collier County Board of Commissioners PURCHASE ORDER#:4500225907 PROJECT#: 70253.7,70243.2.2.2,51029.12.5 CONTRACTOR: Metro Equipment Services,Inc. ENGINEER/DESIGN PROFESSIONAL: Johnson Engineering,Inc. You are directed to proceed promptly with the following change(s): Description: The contractor is directed to install two(2)additional 20"plug valves and 50 linear feet of 20" PVC force main (Sec Attachment#1, Revision#10 &#11). Purpose of Work Directive Change: The purpose of this change is to authorize the contractor to install two (2) additional 20"plug valves at the force main connection at Santa Barbara Blvd and 50 linear feet of 20"PVC force main via open cut at the corner of 29th PL SW and 53`d ST SW. Reason/Justification: This change was requested by the County to improve the ability to direct wastewater flows north, east or south, and so that the force main installed with this project can connect to the proposed Golden Gate force main (Contract 23-8198) to be installed under a separate project. If a claim is made that the above change(s)have affected Contract/Allowance Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Method of determining change in Contract Times: Contract/Allowance Price: E Unit Prices ❑ Contractor's records ❑ Lump Sum ❑ Engineer's record ❑ Time& Material ® Other none ❑ Other Use of Allowance Funds: Estimated increase in Contract Price: Estimated change in Contract Time: $51,750.00 0 days RECOMMENDED: AUTHORIZED: lw By: +\/ I R-0..i Lu 1.b .uawas 6 JO.Mn+p.e GosselinLiz� Johnson fn' neering, inc. Owner's Representative Engineer .......ronow 44 .4 I..". ._...'"., ,..,, 04..r.on tor ...wt.... I /,•••••al avon .....wow. 0=1 ' l'. l' —,„, Work Directive No.2-Continued Kiacnmeni *7 1 t=IF= IT...1=0.11 1 E X G I NE fill M G "' ''••'` !I k, . — i 1 x ar..... ,m.r.,Iv.pma, I Pi :91,1PI.SVI .. . '' ——4—, 4• .....,. . ,r, I /I I 'I • KI/140.1----4 '-.-'---I WI...,.C./.,....r./. il i . , r -0. .....q. — - - -\l"..,f'-‘ =.:•2--,..z.--' ---needo.e7s.......405rVil"— -•• 9 ,,,....,.,....,.."4,,,,i, ' * ,..-,,...,,...., ', . 4...-.-, '`,. ___...,____÷ '- +," ' ':.---"'7$"'” ''''.7"—._ • , —--- ,,,..-- I 1 >: t. '...-!. • ' 4 A.:4,4,44... I 4,041."V4".,"TE ..—.E. \N ti . ! 4.1 ---- .. .. .20‘,..... .,..... ,.._ or..I 4., v Ir., 1 , . ' '''''''Z.,":"R°-,!..,7414:%`i•7:'.1',t,...,41 . , 1 "''"'.'"',•• ' '4 ;:.-:zi!;,:;'il"ff:" 1 . I PROFILES OF --;....=.4-.n. ,... r t. FOR 1 . - .,...,....„.P'...4 'i FORCE MAIN ii. t Nur r Et,r.s.14.1..11 • I SEE SHEET 24(X) .,,,,......04,' I...el I,DI KIN INC AII.4 r./PO/Li ,f,. 5.01/C44,001.13 A.O.t.•MI/0,14,1.11(1.1t0 Wog,. 1 ',OP Co.P.,...4,04.St i L/11,XI I \ 291P....AL L SW Sim 4,00 V.,SPE 4402 , .II.VII•nArI/04,11,1 . ....r....4.:-.7.,.. -/.04 It&I.Of.1,4 r .....t.... ' 1 f '4:44E,....•"'.444Eolotro. 4 1 1 if I . i.-,... 1 1 - , ..,„.„..„...,...,, i i , .. %,...... 4. ./ w,......e`c•CC,E 1 L:,.,, ,., ,,,,,..... III ip.I.act te/.111,-.11 cce tux.lit P..Ilitort1 ..---... —... —,. tf,',',^.!':..r.c*....'..• ,.-1 towit.,•C IA a."I ..r.- 4 1 I % I I . ../.R*No 01.1.4.I I 1 rI•''''t .0,..•.4.4),../..0, . 1 I 1 0 S ''.. ' ;21 0 I— p t , . I • 4 i 1 i i I lif' 44.4oT,E.o.monwes, M11. 11-4.1 T C•te U',wet r taccatt*FICItc,r• Stm 0.00 cO t... ct 24 • _ .... _ ............_ Iwo rk Directive No.2•Continued 'AttaChMellt*1 ,.....••••M1 41.1,.•••••••,-• •'''.t=1 •••••.••••••• ' I )14M'IP—C1 IN IN RING ...'""...7".' 1 I , i -... . tj. . ... - .... ....— . g i i .. . . ....., ...%1 KYR,11111 h• ' .. . .......... , ..... ... . 1 _ I i .......... I*•11111111.4••• .......... Man..la 5.13 A • T 3°. ',.. — -— 29H_P.A).cs.:,',,?8!.o0-1590...f_16.:_co___ ..... .„—...,......„ „,., ..,..,.,...... , • . . , • 1 i i matfctinku:.A. .1.X...,0 IVO..••4,11141•1, •••••—— '"!::F=Z".%.e'rs= Ni••••••—--.------ • RAM S•••• . ....... ........ "...........t 7 .. ...„.,„„c,..,...., , : I m''.... '' I' 1.._T—T___7717:7---T"---'-..., i .777-:77:1-7:— ''''''-T -LI _ [ ---T-1-.-. ' -: I. • I 1 . . L . . _ ........... ......... 248 ......... . ......._ _ ______... ......,..._ ...._ ..._.....m....................... Work Directive No.2-Continued -Attachment #2 Revised Quantities Per Work Directive#1 Adjusted Quantities Per Work Directive 02 Cost Chan ee SECTION4:FORGE Mate SYSTEM ilea NO. ?lOta 697,Ie4ANT, SOS WS lat:a IMAMS.P.M aa1,01,1A1rt, WT Ia11M1n.,,. a![161OS0 PaC8 26 Foes. —_, •""-`...,•••- p 4 nch Pig DRIB —.1292 _Lr t 98.00 f 11203200 1 292 LI $ a 931"5" 124.OJ2200 3 . , b &inch PVC Dri18 760 _ LF S toe.00 f 82,080 00 760 I F 5 106 00 j b 92 OSC 00 S • 20onch PVC DR,B 104 IF s 395 00 t 41,080 00 154 LF S 295 00 E IA BIC 30 f--.J»,. _,._19,730,00 27 Ftsce ki.fn Plpellnas tVla MaIsanlal Directional Driltl •- 22' )14OPF D�S 1 419 LF i 420.110 f 55h 980 00 14,5 _t' L 0 CO 5 55`J Hei 30 1---- 6. 24 hI»O>PEEfi1t_�Y_t ly- 1419 LF I92-421 $ [131214.93', to Os .trt f 024711 tit,.21.193? } xa PI'VtrVx 4 Plug Velvet 2 EA s 1yoo.PP i -3,2oo.oD 2 a _...,..... A f b04 DO f 12000 b' �f KA Val; 1 EA f 600 `0 S 60.000 2 CA 5 le 000 $ 500000 i try pl Il Val 1 EA 1 16 000 00 $ 16 000.00 .T CA f 7 O0R 00 3 45.COO iR,` t Ex 000.D0 I. Install 24 PI v 1 EA t 1548142 , 1 15'461-4'P ' CA5 t 48142 105,267111i 5 i et $ a • 20 tAl R 1 Valve 5 � EA t 17 000 00 $ 85,00000 5 A IS I 000 00 E el,G�Ow } sa IC t1 E iatln0 Force Maid `4 c C ICat In Ex 9l 1 EA t 1000000 1 10000.00 ' A 5 10 0 or) 3 000f)D' 4. B.. nrM IC at f an9j 7 EA S +0500.00 i 7+0^A.00 T EA t 10 00 MS. 27.-OA 60 t • ._.,,... ••^" 1 EA S 27 000 00' 27 000 00 - F:A 5 2 10 CC,.$ 1 000 00 S • • '-'- 1 A f 1680000 b 18900.00 EA f t6 HOC CC tF 9PV D1 t • Jt Osflecl Erlatiny la•Face Slain 1 E TIDM 4 SO610TAL ::1+t4 er eti66.+0 54 tos an iiiimmi1 780.00 SECTION Si RESTORATION(FORCE MAIN{ 11EM err? $01101011 of 1.arApli, 1..._-__ UAFla9S a7T8r10f0 Meet .... Es1.0UANT. In! LMR Pa1wl.."._, {MI1CSOPACE v,..e..m_...._ _ 1. 31 O aiRgafa loan _ 68fi F S 400 S� 2,7i400 685 LF S 1 S 2244 GO ! •",•„_ •— PJ .-_R d 77epla D i sways "" ▪— Asphalt —"' o SY $ 167.00 i 0 SY i 167.00,. • 6 h t wrote 62 SF 5 21600 1 13516.DO' 82 SY t 18.)0 b 13.516:00 �f 34 Replan tsenora Drweway Culverts 90 LF t 32 00 2.1300.00 90 lF t 32.20 S 7 eases S SECTION b SUSTOTAIL f 19 740.90 • 19,1 40,00 a L ON 4: O L MAIN SYS M ,10 374 5n a?599+9 "74 tle } .--1+--� Oa .__.___.........._...._.. I I i _. ..__—.� ._.... ... _ _ SE ON St RESTORATION FORGE MAIN 1914000 f 19 t16 CC 5 TOTAL, {1,1µs 64pi4,fiia-4.61Na:n}163+1ee:M •.x 57,750.110 This amount Is adjusted to S15,267.61: Total Credit Breakdown) ._,....__... _.. , .._.._w.. ,. n•I cottcn.np. ORIGINAL DESIGN OPTION i Adjust.Du•nun•1 Per Wort dr•ctiv III Cos lehang* Aepsl.d Directly* I P•r Work eo•Icn•np worp. Champ Dm.r n Work Pincer.•1 Pir•ativ.] Dlnetiv E3 Mort fNr•etlw.1 i E2 COT.nf.Oi I+e. .rw ••a mr rc i i wn+.0 I [' 1 I..1 i ..wr. I wr. — J rc — M ��® a 1x f1— 11111111111111111111111111111111111 ® sm N 611111111111111111111111111111111 � {. w i 1 _ r— ilst.w•ee ® $... •xc ul t "N K , J. .11 .1,111= 11 r1191in _ [ oac iJb a ll 0 y+., . Ir rvll a l t Rtty f W w T iti X... 1 f .Td 444.>NT . 1,A,f1 .W...... Y It{'— kA f)moo o: tf}.uo.,, t r f 1. x [H 0S. �_ 0� 1 XAr EMIMinlil .,..�.IA 4n E , O. 1 n r 1, 1. .._._ IIIIIW.WIIII J. I. JI A I t S 'n 1 -s Ir PnMt bif.O 1•Inrt MIn 1 V I II::A I .1 . 1 IA IY ILO As I IIC a, { � ! M34110.4 MIIITOL01.1 I I or..1R.. I I)Yip j IE_..a. IIV w.Hl 1 v.hII1I I •If.iteeee. A,.*mei . WPC.Me. ,�..� MUM t3..C4.L3�S''""�' 0 a.nar I 'C A nhe t f..N 9 yt 11 M A E" b+rweyr.' ausilEMEXEC IA""C [ l'i V I �_ .,, .... 1 ....._. .•S 1...Ih i w •nNurEr W maY GWrrm t.. •EOrlOtlt•Mnl1OT•E 11.1,11 ee I � Ii.i 41•IM•• w•l vw wl� 1.111=11.1.11111111 01111111111.... 1..0 ........._.... SECTION•'IOIKE.YN irEi. :1: 1 1 !\ .. $1.1,1147>. _ 10•!11 V W • ::: 1 •w.xo IY „ �"""""" t6tA[ ,wr u. 011,44,4.14 11",...,e_,„ _i jQIi4S `� Cost Reasonableness Letter SINCE 1946 . ENGINEERING June 7,2024 Via Email Only: Benjamin.Bullervitscolliercounivilizm Mr. Benjamin N. Bullert, P.E. Collier County Public Utilities - EPMD 3339 Tamiami Trail East, Suite 303 Naples, FL 34112-5361 RE: Cost Reasonableness for Change Order#1 Golden Gate City Transmission Water Main Improvements—Phase 1B Johnson Engineering, Inc. (Design Professional) — Metro Equipment Services, Inc. (Contractor) Dear Ben: Please accept this letter in response to your request to provide a review of Metro Equipment Services' proposal to install the force main along 29'Place SW via horizontal directional drill(I-IDD)in lieu of open- cutting for the above referenced project. Metro has provided quotes for the material credit for County- provided 24" HDPE DRl I pipe material and the cost to install a 24" plug valve that was provided by the County: Item Unit Price 24" HDPE DRII (Material) ($92.47)/LF Install 24"Plug Valve $15,267.81/EA 24-Inch HDPE Material Credit Metro, Collier County, and Johnson Engineering participated in good faith negotiations to determine the material cost credit Metro would provide Collier County for Collier County providing the 24"HDPE DRI 1 pipe materials. A unit cost of$92.47 per linear foot of 24" DRI I HDPE pipe material was agreed upon by the project team. For reference,the material cost quote from ISCO Industries showing a unit cost of$92.47 per linear foot of 24"HDPE DR I 1 pipe is attached.The material cost of$92.47 was reviewed by the design professional and is believed to represent current industry material prices. Install 24"Plug Valve Metro provided a unit cost of$15,267.81 to install the 24" plug valve. The 24" plug valve material was provided to Metro by Collier County. The 24" plug valve installation cost also includes loading, transporting, and offloading the 24" material from the County storage facility to the project site. The 24" plug valve installation cost of $15,267.81 was reviewed by the design professional and is believed to represent current industry prices and practices. Based upon our review of Metro's proposed costs and our recent experiences on similar projects, Johnson Engineering finds that the credit and cost provided by Metro to be within industry standards. Should you have any questions,or require additional information, please let me know. Very truly yours, William I I. Saum, P.L. Senior Project Manger WHS/FL Enclosures 2122 Johnson Street',Fort Myers,Florida 33902-1550 (239)334-0046.Fax(239)334-3661 ........... ... Cost Reasonableness Letter - continued Quotation Bill To: Ship To: VW" ....' 924237 P GOLDEN GATE CITY Quote Number 09062926 BRYAN FLETCHER-ISCO TRANSMISSION WATER MAIN Quote Date 08/04/23 926 BAXTER AVENUE IMPROVEMENTS-PHASE 1 B Expiration Date 08/18/23 INDUSTRIES LOUISVILLE,KY 40204 NAPLES,FL 34102 Page 1 of 1 Payment Terms Customer Job/PreteCt Name Written By TBD GOLDEN GATE RUFFIN MILBY Freight terms Oontact bales xep PREPAID AND ALLOW FL WEST Ship Via Additional into Best Way Golden Gate City Transmission Water Main Improvements-Phase 1B L# Qty UM Product Description mm Each Extended] BASE BID-WATER MAIN PIPELINE(VIA HDD) 1 4 EA 53241134 24"DR 11 DIPS MJ ADAPTER ONLY PE W/SS STIFF 1095,00 4,380.00 2 4 EA 53249999 24"MJ ACCESSORY KIT W/DI GLAND RING C153 358.00 1,432.00 3 8 EA 53301120 30"DR 11 DIPS MJ ADAPTER ONLY PE W/SS STIFF 3000.00 24,000.00 4 8 EA 53309999 30"MJ ACCESSORY KIT W/DI GLAND RING 890.00 7,120.00 Subtotal 36,932.00 FORCE MAIN SYSTEM(VIA HDD) 5 650 FT 10241112 24"DR 11 DIPS PIPE HDPE GREEN STR 92.47 60,105.50 50'LENGTHS 6 2 EA 53241134 24"DR 11 DIPS MJ ADAPTER ONLY PE W/SS STIFF 1095.00 2,190.00 7 2 EA 53249999 24"MJ ACCESSORY KIT W/DI GLAND RING C153 358.00 716.00 Subtotal 63,011.50 FREIGHT •PRICING INCLUDES FREIGHT DELIVERED TO COLLIER CO.,FL ISCO Standard Terms and Conditions apply. Please visit http://www.isco-pipe.com/terms-and-conditions.aspx Merchandise Total Tax(1) Freight(2) Quote Total 99,943.50 6,046.62 0.00 US$ 105,990.12 I Sales tax will be charged based on the ship to address at the time of invoice if there is no tax certificate on file, Accepted By: Printed Name: 2 Freight amount in this quote is an estimate only. Actual freight terms and charges will be determined at the time the order is placed. Date: 100 WITHERSPOON ST•LOUISVILLE,KY 40202 800-345-4726 METRO EQUIPMENT SERVICE,INC. 9425 ,EL 33173 72373t,Suitel50 Miami 24-inch Valve Installation Cost M METRO EQUIPMENT SERVICE, INC. Work Directive Estimate D ATE: 5/16/2024 Revised 06/07/2024 Co PROJECT: Golden Gate City Transmission Water Main Improvemetns-Phase 18 TO: Benjamin Bullert P E Collier County Public Utilities Engineering&Project Management 3339 Tamiami Trail East,Suite 303 Naples,FL 34112 RE: Installation of 24"Plua Valve provided by Collier County LABOR Total Allowable Mark Up (see attached documents) $ 1,774.08 $ 177.41 $ 1,951.49 EQUIPMENT Total Allowable Mark Up (see attached documents) $4,261.80 $426 18 $ 4,687 98 MATERIALS&SUPPLIES Total Allowable Mark Up (see attached documents) $ 6,876 10 $ 687 61 $ 7,563.71 SUBCONTRACTS Total Allowable Mark Up (see attached documents) $600 00 $ 30.00 $ 630.00 MISC.Reguirments Total Allowable Mark Up, (see attached documents) $ 395 12 $ 39.51 $434 63 Subtotal $ 15,267.81 Direct Costs Subtotal $ 15,267.81 Additional Items PAY ITEM DESCRIPTION UNIT OTY. UNIT COST SUB.TOT S Subtotal $ • In Contract Pay Items PAY ITEM DESCRIPTION UNIT OTY. UNIT COST SUB.TOT $ S • Subtotal: $ Change Order Sub-Total: $ 15,267.81 Additional Bonding(2%): TOTAL INCREASE TO THE CONTRACT: $ 15,267.81 TOTAL OF THIS CHANGE ORDER REQUEST ADD- DEDUCT[ 1 TBD I $ 15,267.81 The Contract Time will be revised to reflect: ADD- DEDUCT' I TBDI i ()Calendar Days Metro Equipment Service Inc. Daniel Gonzalez Operations Manager 4/16/2024 General Contractor Name Title Signature r Date Having received the above,I hereby certify that to the best of my knowledge and belief,the cost or pricing data submitted reflects ad 1uate values and that Contractor is entitled to payment and time extension as noted above, Project Engineer Name Title Signature Date Levised 06/07/2024 i REV 2-CO-24-inch Valve Installation-Labor Page I of 3 Confidential 24-inch Valve Installation Cost - continued COLLIER COUNTY PUBLIC UTILITIES Golden Gate City Transmission Water Main Improvemetns-Phase 1 B EXTRA WORK-Direct Cost Breakdown DESCRIPTION OF EXTRA WORK ACTIVITIES Installation of 24"PV provided by Collier County. ITEM# DESCRIPTION Time: 5.00 Hrs A.-Labor Requirements Description Qty Total Regular Regular Overtime Amount Position Hours Rate/Hr (Hrs) (Hrs) Foreman 1 5.00 $ 124.50 4.00 1,00 $684.75 Equipment Operator 1 5.00 $ 71 00 4.00 1.00 $390.50 Pipe Layer 1 5.00 $ 67,68 4,00 1,00 $372.24 Top Man 1 5.00 $ 59.38 4.00 1,00 $326.59 Laborer 0 5.00 $ 52 74 4.00 1.00 $0.00 4 Sub-Total $1,774.08 Overhead and Profit 10% $177.41 Total Labor, $1,951.49 8.-Equipment Requirements Ownership Operating Operating Duration Description Qty Rate Rate Hrs Hrs Amount Cost/Hr Cost/Hr Hours (Hrs) J Deere 470G Excavator 1 $ 152.33 $ 97 15 • 5.00 5.00 $1,247 40 Mini Excavator CAT 3080 1 $ 57.83 $ 40.03 5,00 5.00 $489.30 Wheel Loader Volvo L70 w/Forks 1 $ 43.78 $ 32.91 5.00 5.00 $383.45 Caterpillar 289G Skid Steer Tracks 1 $ 50.47 $ 36.00 5.00 5.00 $432 35 Self Propelled Pavement Broom 1 $ 44.81 $ 41.03 5.00 5.00 $429 20 Water Tanker Truck 1 $ 55.48 $ 68.46 5.00 5.00 $619.70 Bomag BW120-130 Roller 1 $ 42.84 $ 54.08 5.00 5,00 $484 60 Vibratory Plate Compactor 1 $ 5 39 $ 8 67 5.00 5.00 $70.30 Air Compressor 185 CFM-Sullair 185DPQ 0 $ 19.85 $ 23.03 5.00 5.00 $0.00 8"Hydraulic Trash Pump 0 $ 87.00 $ 13.00 5.00 5.00 $0.00 8'x20'Steel Road Plates 0 $ 3.05 $ 5.00 5.00 $0.00 Walk-behind Saw 0 $ 4.55 $ 10.74 5.00 5.00 1-1/2 Ton Crew cab Pick-up Truck 1 $ 4.02 $ 17.08 5 00 5.00 $105.50 1-3/4 Ton Utility Truck 0 $ 6.08 $ 28.93 5,00 5,00 $0.00 Sub Total $4,261.80 Overhead and Profit 10% $426.18 Total Equipment $4,687.98 C.-Material Description Qty Unit Rate Amount 24"PVC Pipe 20.00 LF $ 186.38 $3,727.60 'Megolug and Accessories 4.00 EA $ 654.00 $2,616.00 Valve Box and ID Tag 1.00 EA $ 266,25 $266.25 Concrete Pad for Valve 1.00 EA $ 266.25 $266.25 -... $0.00 ,I Sub Total $6,876.10 Overhead and Profit 10% $687.61 Total Materials $7,563.71 D.-Subcontractor Requirements Subcontractor Total Unit Rate Duration - Amount Qty , Mobilizatio to Pick up Valve 1.00 EA $ 600.00 $600.00 Sub Total' $600.00 Overhead and Profit 5% $30.00 Total Subcontractor $630.00 24-inch Valve Installation Cost - continued E.-Misc. Requirements Description Qty Unit Rate Duration Amount Extended MOT costs 1.0 Day $ 204.64 $204.64 Extended Yard costs 1.0 Day $ 190.48 $190.48 Sub Total Sub-Total $396.12 Overhead and Profit 10% $39.51 Total Misc.Requirements-_ $434,63 Total: IIIMEtWWIIIIII Additional Bond_IIIIIIIIIIIIII GRAND TOTAL: 5,267.81 NOTES; 1.Any restoration work required to be paid for the applicable/corresponding bid item. 2-.This change order is subject to modifications due errors and/or omissions upon discovery. 0 FERGUSON® TO FEL-FT.MYERS WATERWORKS#127 sliver To: 17323 JEAN STREET rom: Michael Hereu WATERWORKS FT MYERS,FL 33967-9998 omments: Phone:239-433-0555 Fax:239-433-0405 10:12:51 JUN 06 2024 24-inch Valve Installation Cost - continued Page 1 of 1 FEL-FT. MYERS WATERWORKS#127 Price Quotation Phone: 239-433-0555 Fax: 239-433-0405 Bid No: B325265 Cust Phone: 305-740-3303 Bid Date: 06/06/24 Terms: NET 10TH PROX Quoted By: MH Customer: METRO EQUIPMENT SERVICE INC Ship To: METRO EQUIPMENT SERVICE INC 9425 SW 72 ST SUITE 150 9425 SW 72 ST SUITE 150 GOLDEN GATE CITY TRANSMIS GOLDEN GATE CITY TRANSMIS MIAMI, FL 33173 MIAMI, FL 33173 Cust PO#: PHASE 16 29TH FM CHG Job Name: EDN Item Description Quantity Net Price UM Total DR25GP24 24 C900 DR25 CL165 PVC GJ GREE PIP 20 186.380 FT 3727.60 SSLDE24 24 DI MJ WOG REST GLND'ONELOK 4 654.000 EA 2616.00 D461SW 2PC SC CI VLV BX 18-24 WTR W/W LID 1 266.250 EA 266.25 CONRETE PAD Q110180 80#4000 PSI CNCRT MIX 1 266.250 EA 266.25 Net Total: $6876,10,. Tax: $462,57 Freight: $0.00 Total: $7338.67 Quoted prices are based upon receipt of the total quantity for immediate shipment(48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE.QUOTES FOR PRODUCTS SHIPPED FOR RESALE ARE NOT FIRM UNLESS NOTED OTHERWISE. CONTRACTOR CUSTOMERS:IF YOU HAVE DBE/MBETWBE/NBE/SDVBE/SBE GOOD FAITH EFFORTS DIVERSITY GOALS!REQUIREMENTS ON A FEDERAL STATE,LOCAL GOVERNMENT PRIVATE SECTOR PROJECT,PLEASE CONTACT YOUR BRANCH SALES REPRESENATIVE IMMEDIATELY PRIOR TO RECEIVING A QUOTE/ORDER. Seller not responsible for delays,lack of product or increase of pricing due to causes beyond our control,and/or based upon Local,State and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the Buyer's acceptance of Seller's terms and conditions,which are incorporated by reference and found either following this document,or on the web at https://www.ferguson.com/content/website-info/terms-of-sale Govt Buyers: All items are open market unless noted otherwise. LEAD LAW WARNING: It is illegal to install products that are not"lead free"in accordance with US Federal or other applicable law in potable water systems anticipated for human consumption.Products with`NP in the description are NOT lead free and can only be installed in non-potable applications,buyer is solely responsible for product selection. HOW ARE WE DOING? WE WANT YOUR FEEDBACK! 0 Scan the QR code or use the link below to .* complete a survey about your bids: r � • https:Nsurvey.medallia.com/?bidsorder&fc=127&on=48110 24-inch Valve Installation Cost - continued PROFESSIONAL "Aid first .ee to duuscd L q 813-242-0610 GUARDIAN 7809 NORTH US HWY 301 TAMPA FL 33637 PH:813-532-7118 dispatchproamS?gmailcom —, Clerical Error-Should read DATE: 5/30/2025 4...— 05/30i2024 DATE OF JOB: TBD ATTN: NICO PHONE: 305-333-5646 EMAIL: FAX: COMPANY: METRO EQUIPMENT SERVICES ADDRESS: ORIGIN: 9<=6%LWJJS%GQ[I NAPLES FL 34116 DESTINATION: 5500 29TH PLACE SW NAPLES FL 34116 NOTES: VALUE CARGO DESCRIPTION: WEIGHT: TRANSPORT VALVE HEIGHT: LENGTH: WIDTH: CHARGES: PER LOAD $ 600.00 QUOTED BY: NEIL WALLACE APPROVED BY: MISC: TOTAL: QUOTE GOOD FOR 30 DAYS 24-inch Valve Installation Cost - continued LEASE AGREEMENT BETWEEN: AL Muller "Lessor",ADDRESS: 5300 Golden Gate Pkwy Naples FL 34116 and Metro Equipment Service, Inc. "Lessee", 9425 SW 72 Street,Suite 150, Miami, FL 33173. The portion of the property delineated in attachment A, is to be leased by the Lessor, Mr. AL Muller,to the Lessee, Metro Equipment Service Inc.based on the terms listed below: RECITALS: 1. Lessor is the Owner of the real property as described in the attached attachment "A"and has the right to lease said property. 2. Lessee intends to lease the property from Lessor to support its construction activities related to the Collier County—Golden Gate City Force Main,including establishing a staging area,storing materials,stockpiling imported fill materials and,and other construction related activities. TERMS: $4,000.00 / 21 Working Days = $190.48 1. In exchange for use of Lessor's land, Lessee will pay the Lessor the sum of One Thousand Dollars($4,000.00) per month. The first payment will be made upon Lesse move on site and every month thereafter until vacated. 2. The Lessee expects to need the property for approx.to 1 month, beginning on or around 5/13/2024. Lessee will notify Lessor 15 days prior to vacating the property and terminating the lease.At any point during this lease,the Lessee and Lessor can terminate the agreement with 30 days advance notice. 3. Within 30 days of termination of the lease,the Lessee, Metro Equipment Service, Inc., will restore the property to its original condition. 4. Metro Equipment will "Hold Harmless"the lessor for any injuries that might occur due to lessee's equipment being on property and releases lessor of any liability for stolen or damaged equipment. 5. Lessee will be responsible for all permits and fees necessary to perform their intended use of the property and shall maintain all facilities with respect to all local,state and federal rules and regulations. 24-inch Valve Installation Cost - continued U4' BAn J�'". __ REFER TO INVOICE [( /A i:I ,IND. G930491 1 MAIN OFFICE 921 SHOTGUN ROAD/SUNRISE,F133326 —__ —____-vrt PE NO 1 '.. BECAUSE OUR TELEPHONE:(954)423-2627 FT.LAUDERDALE St ftwx �_���" s no 1 �, $l�rc, e0i6e4 clad at�+at CC--// TOLL FREE OFFICE 954-423-2627 �,�- " O �� TOLL FREE 800-432.5031 7cv cl rfmir icon, Weer la9e &ala4:da DELRAY 581-272-8487 L _ Zara& -,Sated - £owlet FT.IAUDERDALF 954.525-6736 FT.MYERS 239-656-1183 GAINESVILLE 352375-8140 MET082/ 450024 JACKSONVILLE 904-396-5121 METRO EQUIPMENT SERVICE MIAMI 305.854.0076 ORLANDD 407-855-7188 9425 SW 72 ST STE 150 TALLAHASSEE 850-575-7800 MIO SERRANO AP 7AMPA 813-886-D518 WEST PALM BEACH 561-585-4861 MIAMI, FL 33173 OPEN KINGMANARIZONA 928-757.5380 PHOENIX,ARIZONA 602-272-3434 PLEASE CHECK INVOICE DAZE BRANCH BILLING PERIOD TERMS: YOUR JOB STATUS 02/20/2024 Fort Myers 01/21/24 TO 02/20/24 NET 10 DAYS PURCHASE !JOB JOB ORDER NO. 23"04-03 i NO. 99 phase lb ADDRESS 2466 52ND TERR SW ITEM 7H 7FIA,' �,� 9 (1. L0D6. 1} ,; TA707 an C"' ARGEHI TAPC41QN LAt�QEM TAPE$1INON 30•61.01atWSW 1.4j41f3.CAN0 DEVIM ITAROETARROW70'/ �PNLY w„ j¢4*CRA�4E ,) C t C0144- PEALCp6 T BEGQTY 17 24 30 1 1 01/21/24 17 24 30 1 1 01/22/24 28 35 30 1 1 01/23/24 18 33 30 0 1 01/24/24 19 33 30 0 1 01/25/24 12 25 30 0 1 01/26/24 12 25 30 0 1 01/27/24 12 25 30 0 1 01/28/24 12 25 30 0 1 01/29/24 12 25 30 0 1 01/30/24 12 25 30 0 1 01/31/24 12 25 30 0 1 02/01/24 12 25 30 0 1 02/02/24 12 25 30 0 1 02/03/24 20 36 30 0 1 02/04/24 20 36 30 0 1 02/05/24 20 36 30 0 1 02/08/24 20 36 30 0 1 02/07/24 20 36 30 0 I 02/08/24 20 36 30 0 1 02/09/24 20 36 30 2 1 02/10/24 20 36 30 2 1 02/11/24 20 36 30 2 1 02/12/24 20 6 ]0 7 1 2/1 /24 37 Invoice for estimating purposes 2/14/24 37 providedmat 02/15/24 37 02116/24 37 only. 02/17/24 37 02/18/24 37 02/19/24 37 •2 9 4 1 02/20/24 37 62 ( 90) 4 1 $6,343.95/31 Calendar Days = $204.64 , , 1 Is6,724.59/31 Calendar Days = $216.92 TOTQTY 686.00 1,206. 1,410.00 i 42.00 l 31.00 PRICE $0.30 $0.30 $0.16 1 $0.30 ( $10.00 EXTPRICE 1 205.60 $361.00 $225.60 3 12.60 3 310.00 PLEASE PAY FROM THIS INVOICE SUB TOTALJ $6,343.95 i TOTAL $6,724.59 REMIT TO; PO BOX 526827 Miami, FL 33152-68027 For Payments by ACH or Wire,please call(954)423-2627 ext 118 4 . METRO EQUIPMENT SERVICE, INC. 9415 SW 72nd Street,Suite 131 Miami,FL 33173 • (305)740-3303 Office,(305)740-3305 Fax M ! i May 23, 2024 , Liz Gosselin Metro's signature authorization Project Manager II Public Utilities Engineering & Project Management Reference: Authorization Letter for Nicolas Serrano Mrs. Gosselin I, Jorge L. Godoy, President of Metro Equipment Service Inc. authorize Nicolas Serrano to sign change orders on behalf of Metro Equipment Service Inc.. If you have any questions or concerns you can contact me at your convenience. Thank you, � . ! /11 Resident Metro Equipment Service Inc. Jqmetro +bellsouth.net Mobile: 786-367-0044 Office: 305-740-3303 11Page Johnson's signature authorization From: Liz Gosselin Sent: Thursday, May 23,2024 2:23 PM To: Mike Dickey Cc: William H.Saum Subject: RE:Signature Authority Thank you, Mike.We will have Billy(William Saum)sign the change order(s)for the project. Liz Liz Gosselin Project Manager II Public Utilities Engineering & Project Management Office:239-252-1037 Collier Co Liz.Gosselin(a.colliercountyfLoov From:Mike Dickey<MSD(a)kohnsonengeom> Sent:Thursday, May 23, 2024 1:16 PM To:Liz Gosselin<Liz.Gosselin[ilcolliercountyfl.Rov_> Cc:William H.Saum<whspiohnsoneng.com> Subject: RE:Signature Authority EXTERNAL EMAIL:This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Hi Liz, By this email I am authorizing Billy Saum the ability to sign documents on behalf of Johnson Engineering as it relates to the Golden Gate Water Transmission project. Thanks Michael S. Dickey, P.E. From:Liz Gosselin<Liz.Gosselin@colliercounty,fLgov> Sent:Thursday, May 23,2024 12:28 PM To:Mike Dickey<MSD@iohnsonent,com> Cc:William H.Saum<whs@iohnsoneng.corry Johnson's signature Subject:Signature Authority authorization - Continued Mike- Could you please send an email giving signature authority to Billy?The Contract and Sunbiz don't list Billy: If you have any questions,please let me know. Liz Liz Gosselin Project Manager II Public Utilities Engineering & Project Management , Office:239-252-1037 Collier Co oEM: c Liz,_Gosselin(c colliercountyfl.gov Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request. do not send electronic mail to this entity. Instead. contact this office by telephone or in writing,