Loading...
Backup Documents 07/23/2024 Item #16F 2 ORIGINAL DOCUMENTS CHECKLIST&ROUTING SLIP 1 6 r 2 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW**ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s)(List in routing order) Office Initials Date I. County Attorneys Office County Attorney Office 7//](2.3/ el 2. BCC Office Board of County Commissioners Chairman 12 /LY 3. Minutes and Records Clerk of Court's Office cm," �' PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addresses above,may need to contact staff for additional or missing information. Name of Primary Staff Bendisa E.Zela,Facilities Division Phone 239-252-8440 Contact/Department Number Bendisa.Miller c@i colliercountyfl.gov Email Agenda Date Item was July 23,2024 Agenda Approved by the BCC Item 16.F.2 Number Type of Document Attached Recommendation to approve Change Order No. 4, Number of adding seven days to the Substantial Completion date Original and utilizing $ 11,219.01 of the Owner's Allowance, Documents and Change Order No. 5, adding five days to the Attached Substantial Completion date and utilizing$6,473.50 of the Owner's Allowance for Purchase Order No. 4500229878 under Agreement No. 21-7883-ST with O-A-K/Florida, Inc., d/b/a Owen-Ames-Kimball Company for the Main Campus Upgrades, and authorize the Chairman to sign the attached Change Orders.(Project No.50214) PO number or account The Facilities Division is requesting a completed opy number if the document is to be recorded INSTRUCTIONS&CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is appropriate. Yes N/A(Not (Initial) Applicable) I. Does the document require the chairman's original signature? N/A 2. Does the document need to be sent to another agency for additional signatures? If yes,provide the Contact N/A Information(Name,Agency,Address,Phone)on an attached sheet. 3. The original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,except for most letters,must be reviewed and signed by the Office of the County Attorney. BEM 4. All handwritten strikethroughs and revisions have been initialed by the County Attorney's Office and all N/A other parties except the BCC Chairman and the Clerk to the Board. 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the BEM final negotiated contract date,whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be N/A provided to the County Attorney's Office at the time the item is input into SIRE. Some documents are time-sensitive and require forwarding to Tallahassee within a certain time frame,or the BCC's actions are nullified. Be aware of your deadlines! 8. The BCC approved the document on July 23,2024,and all changes made during the meeting have N/A is not an been incorporated in the attached document. The County Attorney's Office has reviewed the option for this changes,if applicable. line. 9. Initials of attorney verifying that the attached document is the version approved by the BCC,all changes N/A is not an directed by the BCC have been made,and the document is ready for the Chairman's signature. option for this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16F2 �rOrl_TPY Comity Procurement Services Change Order Form Contractil 21-7883-ST CO#4 }PO# 4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: O-A-K/Florida Inc. Select One:El Contract Modification(Construction or Project Specific) ❑Work Order Modification Project Manager Name;Ltn1 Rygiel-PMP,CFM,Project Manager III Division Name: Facilities Management Original Contract/Work Order Amount -_-- `— Original ---D Agenda g sn 646,669_D7 1rsr;oz�t1r _-•� BCC Approval Date;AgeItem tl Current BCC Approved Amount $17,r46,6e9.47 trsr2024 110 Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $16,653,663.73 6ri612025 SAP Contract Expiration Date(MASTER) Dollar Amount of this Change ---- --�----- -- % g •5.61% Total /o Change from Original Amount Revised Contract/Work Order Total S 16,653,663.73 0.00% %Change from Current BCC Approved Amount Total Cumulative Changes -5995,026.24 0.00% %Change from Current Amount Notice to Proceed 2-19-2024 Original NTP 485 Original Final 6-18-2025 Last Final 6.18-2025— Date , #of Days J Completion Date Approved Date #of Days Added 7 Revised Final Date Current Substantial Completion Date 6 25 2025 d/i0/2025 (Includes this change) (if applicable) Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete summary on next page. Check all that apply to this Chan a Order request:ElAdd Time;1D Add funds;El Use of Allowance; ❑Modify/Delete existing Task(s);El Add new Task(s); Reallocate funds;❑Other(must be explained In detail below) 1.) Detail of change/s to be made through this Change Order. This change order will add 7 days and utilize $1.1,219.01 of the Contingency leaving a balance of $470,040.01 for WD##2 for required additional work from the two contractors listed due to Site Plan changes requested by the Building Department to comply with the Collier County Land Development Code (LDC) for issuance of the Site Development Plan (SDP) for this project. 2.) If this Change Order is currently under a Stop Work, please identify the date issued and number of days remaining or "N/A" if not applicable. N/A 3.) Explain why this change was not included in the original contract/Work Order. This change was not included as the ASI#1 design drawing changes required for permitting compliance resulted in the additional work listed in WD#2. 4,) Describe the impact if this change is not processed. If this change order is not processed, the project will not be in compliance with the LDC and Certificate of Completion cannot be obtained. Page 1 of 4 Change Order Form(2023_ver.1) 16F2 c.:o'[ ev County Procurement Services Change Order Form Contract# 21.7883•ST CO#4 PO#4500229878 Project fl: 50214,2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: 0-A-K/Florida Inc. Change Order/Amendment Summary (If additional spaces needed,attached a separate Summary page to this amendment request) -------- COST TIME CO# AMD# Description Additive Deductive Days Total New Justification _ __—_--_-- (+) (-).—. Added Time —__._.-------- -- Direct Material To provide cost savings to 1 Purchase $(30187882) the County in the amount of $22,181,82 Direct Material To provide cost savings to 2 Purchase s(335,349.02) the County in the amount of $18,982.02 Direct Material To provide cost savings to 3 Purchase $(267,798.40) the County in the amount of $15,148.40 Adds 7 days to the If this change order is not processed,the project will not be in contract time and 4 uses $11,219.01 of 7 492 compliance with the LDC and Certificate of Completion cannot be the Contingency. obtained. I]Check here If additional summary page/s are attached to this Change Order Page 2of4 Change Order Form(2023_ver,1) 16F2 Co ier Coimty Procurement Services Change Order Form Contract# 21-7883-ST Co#4 PO// 4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: 0-A-K/Florida inc. Acceptance of this Change Order shall constitute a modification to contract/work order Identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated In this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for Impact and delay costs, Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional "Project Coordinator"or Design/Engineer Professional under the agreement, Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations (Sunbiz) website (hitps�//do anyflorida.cotn/;unbiz/search/). If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the company giving that person signature authority. f ygielTimoth Digitally signed byNygielTimothy Prepared by: Y Date:2024.05.21 15:54:19-04'00' Date: Signature-Division Project Manager Tim Rygiel PMP,CFM, Project Manager Ill, Facilities Management Printed Name K. Todd Griffith, PE °'y" " ' dyxl�"fihP` f�:< xiy rd G.IliIP[ AUvm rrolef c�i[ryhr<,.a. Accepted by: onr o 405No/.ra]44r00 ----- Date:--- —_— Signature-Design/t;ngineer Prefesslonat(if applicable) K.Todd Griffith,PE,SVP-Director of SWFL Division,Matern Professional Engineering, Inc. Printed Name/Title/Company Name t — Accepted by: _ Date: jib r 11 Signature-Conti rcler/Con ultant/Vendor — �— --- —v Matthew Zwack, President, 0-A-K/Florida, Inc. Printed Namefrltlo/Company Name Approved by: Date: Signature-Division Manager or Designee(Optional) Printed Name M cC o rm i ckJ o h n Digitally signed by McCormickJohn Approved by: Date: 2024.05,28 09:43:11 -04'00' Date: Signature-Division Director or Designee (Optional) —� John McCormick, PE, Facilities Management Printed Name Approved by: Date: Signature-Division Administrator or Designee (Optional) Printed Name -- — — — Page 3 of 4 Change Order Form(2023_ver.1) GArt 16F2 C0 (fer Coutity ..�.G . .. � ,., Procurement Services Change Order Form Contract# 21-7883-ST CO#4 PO# 4500229878 Project it: 502'14.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: O-A-K/Florida Inc. FOR PROCURMENT USE ONLY FY 24 CHO Request# 395 l ZimmermanBecca Digitally signed byZimmermanBecca Approved by:_. Date; 2024.05.29 08:02:14 -04'00' Signature-Procurement Professional Signature/Dale Approved by: Signature-Procurement Manager/Director(OPTIONAL.) APPROVAL TYPE; ❑ Administrative PI Report ❑ BCC Stand-Alone ES (BCC Approval Required) BCC APPROVAL ATTEST: Crystal K. Kinzel,Clerk of the Circuit Court BOARD OF COUNTY COMMISSIONERS and Comptrol r COLLIER U TY, FLORIDA By: .._ • BY _ 79 halrman Attest as to Chairman's Date; signature only r (SAL) Agenda#_ �b• F Z Appr.vec as t orn P er •Iity: r. D:. 'County Attorney Print Name Page4of4 `4 Change Order Form(2023_ver.1) 1 6F 2 CS mbi� Owen-Ames-Kimball Company 11941 Fairway Lakes Drive,Fort Myers,Florida 33913-8338 Voice 239.561-4141* Fax 239-561-1996 RFCO#1 May 20'1',2024 Tim Rygiel Project Manager III Collier County Board of County Commissioners 3327Tanliami Trail I. ° Naples,FL 34112 Re; 21-7883-ST MAIN CAMPUS UPGRADES(MCU) Job i14020 Dear Tim: Based on the issuance of work directive#2 dated 5/15/24 for additional underground utility and landscape work.we are recognizing additional costs as listed below. Strickler Bros Underground Inc.change order dated 3/19/24 $ 7.917.00 Big Tree.Inc.change order dated 4/15/24 $ 2,282.11) Owen-Ames-Kimball Overhead(5%) $ 509.96 Owen-Ames-Kimball Profit(5%) $ $09.95 i ^ Total Change Order Amount Request $ 11,219.01 THIS IS A CHANGE IN THE SCOPE OF'ME WORK. ADDITIONAL DAYS REQUESTED:7 DAYS Respectfully submitted. 53�cicut sietpef Brian Filipek Project Manager 16F2 Facilities Management WORK DIRECTIVE #2 CONTRACT#/PROJECT NAME: 2.1-7883-ST CHANGE Main Campus Upgrades-New Chiller Plant DATE OF ISSUANCE: 05/15/2024 EFFECTIVE DATE: 05/14/2024 ( OWNER: Collier County Board of Commissioners PROJECT#: 50214.2 CONTRACTOR: 0-A-K/Florida,Inc. ENGINEER/DESIGN PROFESSIONAL: Matern Professional I nginecring, Inc You are directed to proceed promptly with the following change(s): Description: Additional underground utility work required by Strickler Brothers and additional landscape work from Big Tree Inc. Purpose of Work Directive Change: AS#1 design drawing changes required for permitting compliance resulted in additional items needed from the approved subcontractors. Attachments: Ifa claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Contract Price: Method of determining change in Contract Times: i ❑ Unit Prices ❑ Contractor's records El Lump Sum ❑ Engineer's record ❑ Other ❑ Other Estimated increase (decrease) in Contract Price Estimated change in Contract Time: None $11,000 Owners Allowance No change in contract price RECOMMENDED: AUTHORIZED: RygielTimoth r%?i9i Ta'rY by Date;2024.05.15 Y 1216125 By: By: Tim Rygiel PMP,CFM.Project Manager III Owner's Representative 16F2 STRICKLER BROS UNDERGROUND INC. REQUEST FOR CHANGE ORDER 3/19/24 OAK Attn: Brian Re: Request for change order#1 for the chiller project(AS-WI Changes) Change 26' of 18"RCP with one MES to 24" RCP $2,850.00 Add 28' of 12" PVC with one yard drain $5,067.00 TOTAL ... $7,917.00 • 16F2 Big Tree, Inc. CHANGE ORDER 5175 Country Lakes Dr. Fort Myers, FL 33905 co# 5428-1 Phone# (239)694-9700 Date 4/15/2024 Contractor Job Owen Ames Kimball Collier Co.New Chiller Plant 11941 Fairway Lakes Drive Ft Myers,FL 33919 Description Qty UIM Rate Total ASI#1 - - Add Green Buttonwood 14-16 x 6-8'x 2 1 EA 475.00 475.00 Add Sand Cordgrass#1 2 EA 5.00 10.00 Add Horizontal Cocoplum#7 14 EA 63.00 882.00 Deduct Sabel Palm 10'CT -1 EA 190.00 (190,00) Deduct Sabel Palm 12'CT -1 EA 190.00 (190.00) • Deduct Sabel Palm 16'CT -1 EA 190.00 (190.00) Deduct Green Buttonwood#7 -2 EA 35.70 (71.40) Add Oak Tree Protection 1 EA 550.00 550.00 Add Palm Protection 3 EA 250.00 750.00 • Add Floratam Sod 1 Pallet 256.50 256.50 i . Terms&Conditions • Subject to Terms&Conditions of prime contract. Prico is valid for 30 days. • Client Signature Total $ 2,282.10 F www.BigTreelnc.com (,�2) Page 1 «-: i i 1 16F2 MAT!- RN Mochcolica. Eloc,rroal•F lurttbiog•Firo Prolertion ENGINEERING BUILDING SYSTEMS THAT WORN FOR YOU )ectOIOIoljy Eneruy"Corltlttinrionirlq Ftlulrluurs ASI No, 1 ASI No. 1, dated 02/22/2024, for Collier County New Chiller Plant Building K-1, as prepared by MATERN PROFESSIONAL ENGINEERING, INC., Fort Myers, Florida. This ASI No. 1 shall ONLY be utilized by the General Contractor and his/her sub-contractors to provide additive or deductive pricing as it relates to the attached drawings describing the proposed change in scope and is not in any way a directive to proceed with the purchasing of materials, labor or construction. The following clarifications, amendments, additions, revisions, changes and/or modifications are to change the original Contract Documents only in the amount and to the extent hereinafter specified and set forth in this ASI No. 1. CHANGES TO DRAWINGS CIVIL ITEM NO. 1.: DRAWING SHEET NO. C001 —COVER SHEET { A. Revised Zoned information. ITEM NO.2.: DRAWING SHEET NO. C002—INDEX TO SHEETS A. Revised building K areas to match architectural plan. ITEM NO. 3.: DRAWING SHEET NO. C101 —ZONING AND DATA PLAN A. Revised Maximum height of TES Tank to match architectural plan. y B. Revised Maximum height of Chiller building. r C. Added site buffer requirements. ITEM Na 4.: DRAWING SHEET NO C104—SITE PLAN A. Revised Loading area. B. Revised site signage and striping. C. Revised sidewalk for loading area. D. Revised crosswalk location and ADA ramp. ITEM NO. 5.: DRAWING SHEET NO. C105—GRADING AND DRAINAGE PLAN A. Revised grading at loading area B. Revised parking lot grading. C. Added storm structure#10 and 12" PVC storm pipe. D. Revised water management summary table. ITEM NO. 6.: DRAWING SHEET NO. C106—UTILITY PLAN A. Revised 6"sewer lateral slope. ITEM NO.7.: DRAWING SHEET NO. C200—TYPICAL CROSS SECTIONS AND CROSS SECTIONS MAP A. Revised sections to match plan layout. Page 1012 580 Cambridge Manor Piece,Suite 101,Ft,Myers,Florida 33907 1/239.332.1187 Orlando • Fort Myets • Jacksonville • Tampa FL CA 45096•Federal CAGE/1 OSCD3 I GSA Small Business Conti act#A7OSIIA 1900928•vAwe.rnttlern.net t {ALABAMA•FLORIDA•GEORGIA•NEW JERSEY•NORTH CAROLINA'PENNSYLVANIA•SOUTH CAROLINA•TENNESSEE•TEXAS•VIRGINIA 16F2 ASI No. 1 02122/2024 ITEM NO, 8.: DRAWING SHEET NO. C405—PAVING DETAILS A. Revised sidewalk ramp detail. t3. Added 6"reinforced concrete pad. ITEM NO. 9.: DRAWING SHEET NO. C701 —EROSION CONTROL PLAN AND DETAILS A. Revised general site erosion control. LANDSCAPE ITEM NO. 10.: DRAWING SHEET NO. L0000—COVERSHEET A. Update of submittal information ITEM NO, 11.: DRAWING SHEET NO. L0001 —DRAWING SUBMITTAL LOG AND SHEET INDEX A. Update of drawing submittal log and sheet index. ITEM NO. 12.: DRAWING SHEET NO. LP100 — EXISTING LANDSCAPE BUFFERS & GENERAL NOTES A. "Existing Landscape Buffer and General Notes" sheet per County request& update buffer type designations per County comments. ITEM NO. 13.: DRAWING SHEET NO. LP101 — PLANTING PLAN, PLANTING SCHEDULE, AND LDC TABULATIONS A. Revised landscape areas, quantities, and tabulations per County comments and civil revisions. ARCHITECTURE ITEM NO. 14.: DRAWING SHEET NO.A000—CODE SUMMARY, INDEX,WALL TYPES A. Revised Existing Building K area and proposed addition area and added Thermal tank height in Building Code Summary on sheet A000 under revision dated 01.08.2024 in response to Collier County SDPA Review comment letter. ITEM NO. 15.: DRAWING SHEET NO.AS102—SITE DETAILS: A.Added elevation to show thermal tank height on sheet AS102 under revision dated 01.08,2024 in response to Collier County SDPA Review comment letter. END OF ASI NO.1 ASI No. 1 Page-2 / f 16F2 co xomity Procurement Services Change Order Form Contract# 21-7883-ST co#5 Po# 4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: O-A-K/Florida Inc. Select One: [] Contract Modification(Construction or Project Specific) ❑Work Order Modification Project Manager Name: Tim Rygiel-PMP,CFM,Project Manager III Division Name: Facilities Management Original Contract/Work Order Amount $17,648,689.97 1/9/2024 11G Original BCC Approval Date;Agenda Item# Current BCC Approved Amount $17,548,689.97 1/9/2024 11G Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $16,653,663,73 8/18/2025 SAP Contract Expiration Date(MASTER) Dollar Amount of this Change -5,64% Total%Change from Original Amount Revised Contract/Work Order Total $16,653,063.73 0.00% %Change from Current BCC Approved Amount Total Cumulative Changes -$995,026.24 o.00%a %Change from Current Amount — Notice to Proceed 2-19-2024 Original NTP 485 Original Final 6-18-2025 Last Final 6-25-2025 Date it of Days Completion Date Approved Date #of Days Added 5 Revised Final Date 6-30-2025 Current Substantial Completion Date 4-26-2025 (includes this change) (if applicable) Provide responses after each question In box below (Responses should he brief and specific), Attach additional information and/or documentation from the Design Professional and/or Contractor, If needed, with your submission of this Change Order and complete summary on next page. Check all that apply to this Change Order request: 0 Add Time;❑Add funds; 0 Use of Allowance; ❑ Modify/Delete existing Task(s);❑Add new Task(s);❑ Reallocate funds;❑Other(must be explained In detail below) 1.) Detail of change/s to be made through this Change Order. This change order will add 5 days and utilize $6,473.50 of the Contingency leaving a balance of $463,566,51 for WD#1 to add a floor drain in the new pump room and add 2-12"chilled water piping valves. 2.) If this Change Order is currently under a Stop Work, please identify the date issued and number of days remaining or "N/A" if not applicable. N/A 3.) Explain why this change was not included in the original contract/Work Order. This change was not included as the additional floor drain and additional chilled water piping valves required were not shown on the design drawings as an over-site therefore not included in the bid from the subcontractor. 4.) Describe the impact if this change is not processed. If this change order is not processed the new system will not operate properly. Page 1 of 4 Change Order Form(2023_ver.1) 1 6F 2 fEf Go rer County Procurement Services Change Order Form Contract# 21-7883-ST Cott 5 Po#4500229878 Project#: 50214,2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: O-A-K/Florida Inc. li Change Order/Amendment Summary `` (If additional spaces needed,attached a separate Summary page to this amendment request) COST TIME hh CO# AMD# Description Additive Deductive Days Total New Justification + Added Time Direct Material To provide cost savings to 1 Purchase $(391,878,82) the County in the amount of $22,181.82 Direct Material To provide cost savings to 2 Purchase $(335,349.02) the County in the amount of $18,982.02 Direct Material To provide cost savings to 3 Purchase $(267,79II,40) the County in the amount of $15,148.40 Adds 7 days to the if this change order is not contract time and processed,the project will not be in 4 uses $11,219.01 of 7 492 compliance with the LDC and Certificate of Completion cannot be the Contingency. obtained. Adds 5 days to the If this change order is not contract time and processed the new system 5 uses $6,473.50 of 5 497 will not operate properly. the Contingency. ❑Check here if additional summary page's are attached to this Change Order Page 2of4 Change Order Form(2023 ver,1) 16F2 Co :tar County Procurement Services Change Order Form Contract# 21-7883-ST Cott 5 Po# 4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: O-A-K/Florida Inc. Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional"Project Coordinator"or Design/Engineer Professional under the agreement. Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations (Sunbiz) website (https://dos.mvflorida.com/sunbiz/search/. If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the company giving that person signature authority. R ielTimoth Digitally signed by RygielTimothy Prepared by: �� Date:2024.06.03 14:30:09.04'00' _ Date: Signature-Division Project Manager Tim Rygiel PMP,CFM, Project Manager III, Facilities Management Printed Name K. Todd Griffith, PE °'t'llY`I, .�I"KToddGrlffhl`Pf (kl'.[n:K.Tadd telflhh.PF,o=Maleln ProlKf tlawl fngl,Merinp. Int-nu,nnallal9iitfiingmateln.nnl,t=tIT Accepted by: Wu:M21.0.04 i&oot-04.00' Date: Signature-Design/Engineer Professional(if applicable) K.Todd Griffith, PE,SVP-Director of SWFL Division, Matern Professional Engineering, Inc, Printed Name/ 'tie/Company Name y Accepted b .�,/� / / Date: (�/ /' Y ,,7� p ci t re-Con a tor/Consul taut/Vtrr r' Matthew Z\y ck, President,O-A-K/Florida, Inc. Printed Name/Title/Company Name Approved by: Date: Signature-Division Manager or Designee(Optional) Printed Name M CC o rm i ckJ o h n Digitally signed by McCormickJohn Approved by: Date: 2024.06.04 14:23:39-04'00' Date: Signature-Division Director or Designee(Optional) John McCormick, PE, Facilities Management Printed Name Approved by: Date: Signature-Division Administrator or Designee (Optional) Printed Name Page 3 of 4 Change Order Form(2023_ver.1) "f� ;„ t 1 6 F 2 Co :r v County --"— • - ... Procurement Services Change Order Form Contract# 21-7883-ST CO# 5 PO# 4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: 0-A-K/Florida Inc. FOR PROCURMENT USE ONLY 1 FY 24 CHO Request# 403 7 i m m e rm ca n B eCCcn' Digitally signed by ZimmermanBecca Approved by:L• Date: 2024.06.10 09:18:43 -04'00' Signature-Procurement Professional Signature/Date Approved by: gi Signature-Procurement Manager/Director(OPTIONAL) APPROVAL TYPE; ❑ Administrative ✓ Administrative-BCC Report ❑ BCC Stand-Alone ES (BCC Approval Required) BCC APPROVAL ATTEST: Crystal K.Kinzel,Clerk.. • Circuit Court BOARD OF COUNTY COMMISSIONERS and ComptrbUer . COLLIE TY, FLO IDA BY &pr.° By. — Dated: _, Chairman v `� 'Attest a$,to,Chirman's Date: 7/ 312 2. I signature only (SEAL)- Agenda# 16. F. Z Appro a as t arm d egal'y: Deputy ount Attorney G. lt --7;:ttA.,._, Print Name Page 4 of 4 Change Order Form(2023_ver.1) 4 A11 16F2 rile es Owen-Amos-Kimball Company 11941 Fairway Lakes Drive,Fort Myers,Florida 33913-8338 Voice 239-561-4141 * Fax 239-561-1996 RFCO#2 .tune 3'd,2024 Tim Rygiel Project Manager Ill Collier County Board of County Commissioners 3327 Tamiami Trail E. Naples,Fl,34112 Re: 21-7883-ST MAIN CAMPUS UPGRADES(MCU) Job 44020 Dear Tim: Based on the issuance of work directive#1 dated 5/15/24 for additional floor drain and chilled water piping valves, we are recognizing additional costs as listed below. B&1 Contractors(Plumbing)change order dated 5/29/24 $ 844.00 B&I Contractors(Mechanical)change order dated 5/29/24 $ 5,041.00 Owen-Ames-Kimball Overhead(5%) $ 294.25 Owen-Ames-Kimball Profit(5%) $ 294.25 Total Change Order Amount Request $ 6,473.50 THIS IS A CHANGE IN THE SCOPE OF THE WORK. ADDITIONAL,DAYS REQUESTED:5 DAYS Respectfully submitted, J3'tiwt :ieip c Brian Filipek Project Manager (CAC) 16F2 Facilities Management WORK DIRECTIVE #1 CONTRACT#/PROJECT NAME: 21-7883-ST CHANGE Main Campus Upgrades-New Chiller Plant DATE OF ISSUANCE: 05/15/2024 EFFECTIVE DATE: 05/14/2024 OWNER: Collier County Board of Commissioners PROJECT#: 50214.2 CONTRACTOR: 0-A-K/Florida,Inc. ENGINEER/DESIGN PROFESSIONAL: Matern Professional Engineering,Inc gf You are directed to proceed promptly with the following change(s): Description: Add floor drain in new pump room and add 2-12"chilled water piping valves. Purpose of Work Directive Change: Additional floor drain needed for chilled water chemical system, additional chilled water piping valves required were not shown on the design drawings. Attachments: If a claim is made that the above change(s)have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Prices ❑ Contractor's records ® Lump Sum ❑ Engineer's record ❑ Other ❑ Other Estimated increase(decrease) in Contract Price Estimated change in Contract Time: None $5,000 Owners Allowance No change in contract price RECOMMENDED: AUTHORIZED: RygielTirnoth RygleRimo ey by Dale:2024.05.15 �, Y 12:18:47-04'00' By: By: Tim Rygiel PMP,CFM,Project Manager III Owner's Representative 16F2 Page 1 BM ! CONTRACTORS TO: Brian Filipek Owen Ames Kimball Company 11941 Fairway Lakes Drive Fort Myers, FL 33913 RE: 4439- Collier County - New Chiller Plant K-1 - Plumbing PCO#: 2, RFI-31 Added Floor Drain 5/29/2024 Brian, We are submitting a pending change order(PCO) for our costs relating to the changes indicated on the above referenced documents regarding our scope of work as generally described as follows and attached: 1. The addition of a floor drain and associated pipe/fittings per the response to RFI #31: Water Treatment Clarifications, Materials = $514.00 Labor= $330.00 Total = $844.00 The price for this pending change order is $844 (LS) This proposal is valid for fourteen (14) days and is subject to escalation thereafter. This work will proceed only after receipt of written approval of PCO. B & I Contractors, Inc. requests an extension of(0) working day(s) to its contract to perform this change. We respectfully exclude shift work, overtime labor, HVAC, electrical, painting, cutting/patching and any other items that are not mentioned in this proposal. Exclusions also include those listed in our original contract. Please approve at your earliest convenience. Sincerely, Tony Amitia Project Manager Accepted (Signature) Date(Acceptance) (CAO) 16F2 Pending Change Order Page 1 BAI CONTRACTORS TO: Brian Filipek Owen Ames Kimball Company 11941 Fairway Lakes Drive Fort Myers, FL 33913 RE: 4438 -Collier County- New Chiller Plant Building K-1 - HVAC PCO#: 3, RFI-35 Missing CHW Valves 5/29/2024 Brian, We are submitting a pending change order (PCO) for our costs relating to the changes indicated on the above referenced documents regarding our scope of work as generally described as follows and attached: 1. The addition of(2) 12" butterfly valves per the response to RFI #35: Chilled Water Valve Clarifications. Material = $3,341.00 Labor= $1,700.00 Total =$5,041 The price for this pending change order is $5,041 (LS) This proposal is valid for fourteen (14) days and is subject to escalation thereafter. This work will proceed only after receipt of written approval of PCO. B & I Contractors, Inc. requests an extension of(0) working day(s) to its contract to perform this change. We respectfully exclude shift work, overtime labor, plumbing, electrical, painting, cutting/patching and any other items that are not mentioned in this proposal. Exclusions also include those listed in our original contract. Please approve at your earliest convenience. Sincerely, Tony Amitia Project Manager Accepted (Signature) Date(Acceptance) 16F2 (-� 4 Project:50214 New Chiller Plant Building K Col.JI( 1 County 3315 Tamiami Trail East Naples,Florida 34112 RFI #31: Water Treatment Clarifications Status Closed on 04/17/24 To Evan Case(Matern Professional Engineering) From Brian Filipek(O-A-K/Florida) Date Initiated Apr 8,2024 Due Date Apr 15,2024 Location Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number Reference Linked Drawings P101 Received From Tony Amitia(B and I Contractors) Copies To Shawn Brink(0-A-K/Florida),Todd Griffith(Matern Professional Engineering),Tim Rygiel(Collier County Government),Jovani Trejo(0-A-K/Florida) Activity Question Question from Brian Filipek 0-A-K/Florida on Monday,Apr 8,2024 at 09:23 AM EDT "Nalco is currently planning not to provide a temporary filter for the Campus Closed Loop,as this is currently In review by the Engineer.Nalco will be providing a Sidestream Cartridge Filter for the Campus Loop that will be a permanent fixture in the plant.The Engineer is deciding whether or not the permanent filter can be used during startup instead of adding in a temporary unit in order to VE out the temporary filter from the project."I want to say that I brought this point up directly with the Engineer and his team when I was editing the Water Treatment Specification for them.My point was that we are adding in a SS sidestream filter to continuously filter the Campus CHW Loop AND a separate one for the TES CHW Loop,so why bring in another,temporary filter just for the construction phase only to have it be removed and not used. I said that we can throw away and replace the filter cartridges after construction is done so that the Owner is left with new ones once the plant is started up,but that it was a waste of money to buy a whole other temporary filter to use only during that time period." Please provide clear direction on the above. "Provide Nalco with the following items for the AccuPro Biocide Program:•Power requirements:2-100- 120VAC,50/60Hz,15amps or 2-220 to 240VAC,50/60Hz,15amp clean power We will need power over at the Accupro"corner" of the room.I spoke with my Equipment guy just now and we will need the 2-120VAC circuits over in that corner by our equipment" Please confirm electrical power requirements specified are shown and included in the contract documents.If they are not please issue a revision to the contract documents adding the required Infrastructure. "A sanitary system drain is required to be located with 10'from the AccuPro system"The nearest FD-1 is 13.5'away as shown below and piping to this drain may create a tripping hazard." Please Issue a revision to the plumbing drawings showing an appropriate floor drain or confirm It Is acceptable to route to the one shown in the attachment, Attachments 4-CCCEPK1-B&i RFI-Water Treatment Confirmations-4-2-24.pdf Awaiting an Official Response All Replies Response from Evan Case Matern Professional Engineering on Tuesday,Apr 16,2024 at 05:25 PM EDT Please see attached Response. Attachments 2022-021_RFI_31_04_16-2024_mstr.pdf Page 1 of 2 Printed On:May 31,2024 11:12 AM EDT IFFt`,;\ 16F2 l I ` Project:50214 New Chiller Plant Building K Collier County 1/ 3315 Tamiami Trail East Naples,Florida 34112 RFI #35: Chilled Water Valve Clarifications Status Closed on 04/24/24 To Evan Case(Matern Professional Engineering) From Brian Filipek(0-A-K/Florida) Dato Initiated Apr 18,2024 Due Date Apr 25,2024 Location Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number M101 Reference Linked Drawings M101_ Received From Tony Amitia(B and I Contractors) Copies To Shawn Brink(0-A-K/Florida),Luke DeCalres (Matern Professional Engineering),Todd Griffith (Matern Professional Engineering),Tim Rygiel (Collier County Government),Jovani Trejo(0-A- K/Florida) Activity Question Question from Brian Filipek O-A-K/Florlda on Thursday,Apr 18,2024 at 08:06 AM EDT M101 details valves required for each of the chilled water valve boxes.Two out of three of the boxes show a 6-valve configuration,one box shows a 4-valve configuration.Please see attached document for reference and confirm this is the design intent. Attachments 5-CCCEPK1 -B&I RFI-Potentially Missing CI-IW Valves-4.17.24.pdf Awaiting an Official Response All Replies Response from Evan Case Matern Professional Engineering on Tuesday,Apr23,2024 at 05:15 PM EDT The Design intent is for 6-valve configuration for each of the chilled water valve boxes. Page 1 of 1 Printed On: May 31,2024 11:11 AM EDT .. .