Loading...
Backup Documents 07/09/2024 Item #16B12 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 1 6 B 1 2 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. Coastal Zone Management 3. County Attorney Office County Attorney OfficeGM n j G� 12-4 4. BCC Office Board of County Commissioners (fl if/ 7//Qk( 5. Minutes and Records Clerk of Court's Office rJ 71/0l PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Andrew Miller—TMSD—Capital Project Phone Number 239.252.2922 Contact/ Department Planning, Impact Fees and Program 239.252.2966 Management CC: Maria Becerra-TMSD-Capital Project Planning, Impact Fees and Program Management Agenda Date Item was 07/09/2024 Agenda Item Number 16.B.12 Approved by the BCC Type of Document FY25-26-LGFR Number of Original 3 Attached Documents Attached PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature AAM 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be AAM signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the AAM document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's AAM signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 12/12/2023 and all changes made during AAM N/A is not the meeting have been incorporated in the attached document. The County an option for Attorney's Office has reviewed the changes,if applicable. this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 9. Initials of attorney verifying that the attached document is the version approved by the AAM N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the an option fot Chairman's signature. this line. 16 El 2 I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 6B12 � pEPARf *"). Beach Management Funding Assistance Program Local Government Funding Request z Fiscal Year 2025/2026 ° Inlet Projects Application ° 1 H'tNTAL vc- I PART I: GENERAL INFORMATION Local Sponsor Collier County Coastal Management Program Federal ID Number(FEID) 59-6000558 Primary Contact Name Andrew Miller Title Manager Mailing Address Line 1 2685 South Horseshoe Drive, Unit 103 Mailing Address Line 2 City Naples Zip Code 34104 Telephone Number L239-252-2922 Email Address andrew.miller@colliercountyfl.com Additional Contact Information PART II: CERTIFICATION I hereby certify that all information pro d ith this a plication is true and complete to the best of my knowledge. Signature of Local Sponsor Electronic or scanned signatures accepted. Printed Name Chris Hall, Chairman Date 7/q/ .y ATTEST CtKYSTP► EC,CLERK Approved as to form and 1 lity 1 � , BY ot Assistant County Attorney "`'` : CAO 16B12 pEPART Beach Management Funding Assistance Program 4 ° Local Government Funding Request o Fiscal Year 2025/2026 Inlet Projects Application O�MENTAI pQ0�4 PART III: EVALUATION CRITERIA 1.Project Name:As listed in the Inlet Management Plan(IMP)or Strategic Beach Management Plan(SBMP) Wiggins Pass Inlet Management 2.Project Description:Include county,location with reference to DEP range monuments,brief project history,and description of proposed activities. The Wiggins Pass Project is located on the southwest Florida coastline in Collier County between FDEP monuments R-16 and R-17. The initial phase of the latest Inlet Management Plan Study was implemented in 2013 for maintenance dredging and initial realignment of the channel. In 2015, an interim maintenance dredging project cleared the shoal across the main inlet entrance channel. Material was placed in the ebb shoal disposal area north of the channel and within the flood shoal disposal. In Spring 2018, dredging split 2/3 of the total volume to the north and 1/3 of the total volume to the south to maintain the navigation of the inlet, refine and reinforce the alignment begun with the 2013 project. In March 2020 the County conducted a small interim dredging project, but due to storms since this project completion, the County needed an emergency dredging project to remove shoals that impeded navigation. As such, Wiggins Pass was dredged between January 26, 2022 and March 10, 2022. The County anticipates conducting a full channel dredging in 2025/2026. The requested funds are for construction, permitting and monitoring. FDEP staff have determined that the project is eligible for a 50% state cost share. CAO 16B12 o P -�ARTM o>° fti, Beach Management Funding Assistance Program ° Local Government Funding Request z Fiscal Year 2025/2026 ° Inlet Projects Application off . •'v MFNTAL Pa tf 3.Use of Requested Program Funds:Provide a brief description of tasks to be completed in each requested phase(Feasibility, Design,Construction,or Monitoring).Indicate which tasks are cost reimbursement from previous fiscal years. The requested funds are for construction, permitting and monitoring. No requests from previous years. 4.Map:Provide as an attachment. •Format:The project area must be formatted at a minimum of 1"=200'scale and include a compass rose and legend. •Required elements:Project boundary,DEP reference monuments,shoreline designated as critically eroded,area of inlet influence,and permitted sand bypassing placement area 5.Project length:Total restored project boundary(in feet)as listed in the IMP or SBMP. 10,560 feet 6.Schedule and Budget: Provide as a separate attachment,if needed.Clearly indicate project phase:Feasibility(F),Design(D), Construction(C),or Monitoring(M).Include the year of post-construction monitoring in the description. 7.Cost Reimbursement:Specify eligible costs incurred during the three years prior to the current application's fiscal year that are not in a current DEP agreement and have not been reimbursed(this includes fiscal years 22/23,23/24,and 24/25).Eligible costwill be added to the current funding request. S.Current and Future Costs:Specify eligible costs for the current application's fiscal year that are not in a current DEP agreement and have not been reimbursed as well as the estimated costs for the next 4 years.Note:If Construction costs are requested in the [ current fiscal year,then the Year 1 Post-Construction Monitoring costs will be added to the current funding request. Fiscal Year Project Phase Description Federal Cost State Cost Local Cost Total Cost 22/23 22/23 22/23 I'. 23/24 23/24 23/24 GAO 312 oP p4PARTMF • a„ Beach Management Funding Assistance Program o ° Local Government Funding Request ,, 2 Fiscal Year 2025/2026 -1'0410* Inlet Projects Application ' 0 FNiAI PQ Fiscal Project Phase Description Federal Cost State Cost Local Cost Total Cost Year 24/25 24/25 24/25 25/26 Construction Full Channel Dredging Construction $0 $800,000 $800,000 $1,600,000 25/26 Permitting Permitting $0 $50,000 $50,000 $100,000 i . 25/26 Monitoring Environmental&Physical Monitoring,and Tilling $0 $60,000 $60,000 $120,000 26/27 Design Interim Dredging Design $0 $75,000 $75,000 $150,000 26/27 Monitoring Environmental&Physical Monitoring, and Tilling $0 $65,500 $65,500 $131,000 26/27 27/28 Construction Interim Dredging Design $0 $400,000 $400,000 $800,000 27/28 Monitoring Environmental&Physical Monitoring,and Tilling $0 $71 ,400 $71 ,400 $142,800 27/28 28/29 Design Full Channel Dredge Design $0 $84,000 $84,000 $168,000 28/29 Monitoring Environmental&Physical Monitoring,and Tilling $0 $78,000 $78,000 $156,000 28/29 29/30 Construction Full Channel Dredging Construction $0 $900,400 $900,400 $1,800,800 29/30 Monitoring Environmental&Physical Monitoring,and Tilling $0 $67,500 $67,500 $135,000 29/30 S 1 6B12 DEPART, o�° �% Beach Management Funding Assistance Program ° Local Government Funding Request G o Fiscal Year 2025/2026 Inlet Projects Application �O4MFN7AL PQG�` 7.Sand reaching the inlet Provide the estimated annual quantity(cubic yards)of beach quality sand reaching the 20,600 cubic yards per year. updrift boundary of the improved jetty or inlet channel: 8.Severity of erosion Provide the annual bypassing objective(cubic yards/year)adopted by the IMP or SBMP or 20,600cy/yr(1/3 south,2l3 north) as determined by a Department-approved study: 9.Balancing the sediment budget Provide the current annual average of bypassed material(cubic yards)since the adoption 40,225 cy since 2018 of a bypass objective: Dredging: 2011, 49,900 cy removed from Wiggins Pass. 2013, 107,370 cy removed from Wiggins Pass 2015, 9,400 cy removed from Wiggins Pass and channel. 2018, 96,000 cy removed from Wiggins Pass and channel. 2020, 48,041 cy removed from Wiggins Pass. 2022, 66,033 cy removed from Wiggins Pass and channel. Provide a brief description of when the last sediment budget engineering analysis was The 1995 Inlet Management Study and corresponding strategic beach completed for the inlet and area of inlet management plan was implemented starting in 2001. influence.Discuss any proposals to update the sediment budget. A new study was completed in 2012, permitted and initiated in 2013. FDEP approved the final plan in April 2018. Since adoption,the bypassing objectives have been met. Cq0 J R 661 2 DEPART M�ti, Beach Management Funding Assistance Program ° Local Government Funding Request e Fiscal Year 2025/2026 Inlet Projects Application ,0O4,,FNiAI ppC�` Historical bypassing volumes:In the table below,provide the annual bypassing volumes(cubic yards/year),for the previous ten years(from the last calendar year or the most recent calculation).Attach additional documentation as needed. Quantity Bypassed Quantity Bypassed Year (cy)-Sand Transfer (cy)_Dredging Dredge Location Placement or Disposal Area Plant 2012 2013 66,064 Ebb Shoal(remaining dredged material not bypassed) RI 2-R 1 6 2014 2015 9,400 Ebb Shoal and Interior Channel R15.5-R16 2016 2017 2018 53,396 Ebb Shoal and Interior Channel R12-R14 2019 2020 4$,041 Ebb Shoal R12-R14 and R18-R20 2021 2022 66,033 Ebb Shoal and Interior Channel R18 and R20 2023 Total per0 242,934 Total bypass volume: 242,934 cy Years since IMP adoption: 6 years(2018-2023) Annual average bypass: 40,489cy/yr(2018-2023) Bypass objective: 20,600 cy/yr Percentage of bypass objective: 196.55% 040 6B12 ofPARt 0,0' .7045. Beach Management Funding Assistance Program Local Government Funding Request G o Fiscal Year 2025/2026 Inlet Projects Application O��FN7AL 01-10.Increased bypassing and cost-effectiveness Provide the estimated increase in annual bypassing of sand(cubic None proposed at this time yards/year)proposed for the project: Provide the estimated shortfall of annual bypassing of sand(cubic None Ii yards/year)within the inlet system: Is the proposed project requesting construction phase funds for a major inlet management project component? Yes If yes,and for the award of points for the cost-effectiveness of using inlet sand criteria,provide an opinion of probable cost per unit volume of the inlet and all other sand sources,certified by a licensed professional engineer. 11.Inlet Management Plans Select all that apply: Existing IMP:The proposed project has an existing IMP or completed Inlet Management Study that has been approved by the Department. Updated IMP:The Department has received and approved an update to an existing IMP in the ('form of a current Inlet Management Study/sediment budget analysis within the previous five years, or there is an update proposed to an existing IMP in the current application. New IMP:A new inlet management study is proposed for submission to the Department for an adoption in an IMP. 12.Enhanced longevity of proximate beach nourishment projects Annualized beach nourishment volume of proximate beach 57,910 cy/yr nourishment project: 13.Active permits Does the project have an active state permit? Yes Does the project have an active federal permit? Yes Permit number: 0142538-015-JN Permit number: SAJ-2004-07621(IP-MJD) Authorization date: 1/2/2013 Authorization date: 2/13/2013 Expiration date: 1/2/2028 Expiration date: 2/13/2025 C40 16812 pP pEPARl-e Beach Management Funding Assistance Program ° Local Government Funding Request .„,,,OWS,V z Fiscal Year 2025/2026 �° Inlet Projects Application yMfNTAL PR 14.Federal funds available Does the proposed project have federal funds available?If so,provide supporting documentation. No 15.Secured local funds Has the necessary local funding been secured for the proposed project?If so,provide a copy of the Yes draft Resolution. Additional comments II 16612 pEPART o>° 'Tele,, Beach Management Funding Assistance Program ° Local Government Funding Request i o Fiscal Year 2025/2026 Beach Projects Application 1 �p41FNTA4 9'47 PART I: GENERAL INFORMATION Local Sponsor Collier County Coastal Management Program Federal ID Number(FEID) 59-6000558 Primary Contact Name Andrew Miller Title Manager Mailing Address Line 1 2685 South Horseshoe Drive, Unit 103 Mailing Address Line 2 City Naples Zip Code 34104 Telephone Number 239-252-2922 Email Address andrew.miller@colliercountyfl.com Additional Contact Information PART II: CERTIFICATION I hereby certify that all information p d with thi pplication is true and complete to the best of my knowledge. Signature of Local Sponsor Electronic or scanned signatures accepted. Printed Name Chris Hall, Chairman Date 7/I/2 t/ Approved as to form and legality ATTEST IC otoutmi O CRYST EL,CLERK ;/ Assistant County At orney BY: CAO s frtn.fi,!r3 16B12 pEPART Beach Management Funding Assistance Program ° Local Government Funding Request o Fiscal Year 2025/2026 4 v Beach Projects Application 0h M{N7Al F� PART III: EVALUATION CRITERIA 1.Project Name:(as listed in the Strategic Beach Management Plan) Collier County Beach Renourishment 2.Project Description:Include county,location with reference to DEP range monuments,brief project history,and description of proposed activities. The project includes nourishment and monitoring of the Collier County beaches, dredging of Doctors Pass and erosion control structures for sand retention. The project is located between FDEP R-22+300 to R-37, R-42— R-54+400, and R-58A to R-79, and includes three reaches, Vanderbilt Beach, Park Shore, and Naples. Dunes will be restored to pre-storm conditions when damaged. Permit design is to a 100 ft. wide beach in Vanderbilt and Naples Beaches and a 85 ft. wide beach in Park Shore, with a 6-year project design life. Between 2017 and 2020 approximately 38,000 cubic material was placed from Clam Pass onto the beaches on either side of the inlet and an additional 20,000 cy was placed in the newly permitted segment. Park Shore Beach was nourished with approximately 130,000 cubic yards of sand as part of the 2019 project. Naples Beach received approximately 30,000 cubic yards of sand dredged from Doctors Pass in 2018 placed in the nearshore. The reach from the Doctors Pass south jetty to R-60 was nourished with sand in late 2020. Vanderbilt Beach (R-22 to R-32, 77,340 cy), Pelican Bay (R-33 to R-36, 20,000 cy) and Naples Beach (R-62 to R-74, 57,330 cy) were nourished in 2021 through Truck Haul. In Spring 2022 Doctors Pass was dredged with material placed at Lowdermilk Park from R-60 to R-62. Following the passage of Hurricane Ian, an emergency berm project restored portions of the dry beach within the project areas in spring/summer 2023. The South Naples portion (R-79 to R-89) of the emergency project is planned for fall 2024. The County plans to conduct a regular renourishment of the Park Shore beaches (R-44 to R-54) in the fall of 2024. Historically, the County has utilized upland sand mines and conducted truck haul projects to renourish their beaches; however, the County will continue to pursue the potential use of offshore borrow areas through further investigations in upcoming years. CA0 1 681 2 DE PART 01> "Fa, Beach Management Funding Assistance Program ° Local Government Funding Request o Fiscal Year 2025/2026 Beach Projects Application 0 4'4fFNrnt°IP 3.Use of Requested Program Funds:Provide a brief description of tasks to be completed in each requested phase(Feasibility, Design,Construction,Monitoring,or USACE Multiphase).Indicate which tasks are cost reimbursement from previous fiscal years. FY 2023/2024 Construction - FEMA Berm Project FY 2024/2025 Design/Construction - Hurricane Ian Post Storm Restoration Ph 2. Design/Construction - Park Shore Renourishment FY 2025/2026 Construction - Doctors Pass Dredging Construction and Sand Bypassing Design - Borrow Area Survey & Investigation, Doctors Pass Dredging Rock Removal Channel Re-Alignment, Sub-Surface Investigation Design and Permitting Monitoring - Physical, Biological, Shorebirds, Turtles, Tilling 4.Map:Provide as an attachment.The map(s)of the project area must be formatted at a minimum of 1"=200'scale and include a compass rose and legend. Map elements must include: 1.Project boundary:DEP reference monuments and shoreline designated as critically eroded 2.Eligibility:Indicate lengths of eligible shoreline based on criteria outlined in Chapter 62B-36.007,F.A.C. a.Beach access locations:indicate primary or secondary access,and include the shoreline length,number and location of auto parking spaces,mass transit stops,bike parking spaces,and public restroom facilities within 1/4 mile walking distance of each access b.Public lodging establishments:include the length fronting the project shoreline,and include the length of street-side frontage for lodging within 1/4 mile walking distance of a secondary beach access location 3.Recreational benefits:Comprehensive list of current land use designations of properties fronting the project shoreline 4.Value of upland property:Include one-quarter mile buffer and provide a comprehensive list of the values of properties (data from year 2023)that are enclosed or intersected by the buffer.The 2023 property value tax roll data and ArcGIS shapefiles can be obtained from the Department of Revenue website:https://floridarevenue,com/property/Pages/ DataPortal_RequestAssessmentRollGISData.aspx.See Guidance Document for more information. Vanderbilt:R-22+300 to R-37=$5,344,157,776 Park Shore:R-42 to R-54+400=$8,049,857,259 Naples:58A to R-79=$528,694,128 South Naples:R-79 to R-89(Since there is no established ECL in this area the PV was not determined) 5.Project length:Total restored project length(in feet)of the critically eroded area (as listed in the Strategic Beach Management Plan). •Vanderbilt:R-22+300 to R-37 =14,985 feet •Park Shore:R-42 to R-54+400=12,976 feet •Naples:58A to R-79=19,103 feet •South Naples:R-79 to R-89=9,960 feet CAO 16B12 SOP b4PAR?4,4 o+ tiA Beach Management Funding Assistance Program 4 ° Local Government Funding Request T -- z Fiscal Year 2025/2026 y Beach Projects Application �MfN7AL PLO 6. Eligibility:Required for all beach projects pursuant to Chapter 62B-36.007,F.A.C.Provide as a separate attachment,if needed. •Location/Access Name:Use the official name of the park or road that is associated with the public access. •DEP Reference Monument:Use the DEP monument that is closest to the main public access location. •Type of Access:Indicate Primary or Secondary beach access in accordance with the definitions in Chapter 62B-36,F.A.C. •Width of Access/Frontage:The length of the legal boundary(in feet)of the public access or lodging along the beach project shoreline.For public lodging establishments that do not front the beach,indicate the street-side length of the legal property boundary(in feet)that is used as the main access to the establishment. •Number of Eligible Units:A unit is defined as one automobile parking space,one rental unit in a public lodging establishment,one mass transit stop,or four bicycle parking spots. •Additional Width from Eligible Units:Total distance(feet)added to the Width of Access/Frontage.If there are multiple types of eligibility units used for this calculation,show the calculation separately for each. •Total Eligible Shoreline:Sum of the Width of Access/Frontage and Additional Width from Eligible Units columns.Eligible shorelines cannot overlap. •Website Link for DBPR License:Provide the link to the Department of Business and Professional Regulation(DBPR)website for proof of licensure for any public lodging establishments used for eligibility or the Recreational Benefits ranking criteria. Width of Additional Website Link Location/ DEP Reference Type of Access Access/ Number of Width from Total Eligible for DBPR Access Name Monument Frontage(ft) Eligible Units Eligible Units Shoreline(ft) License See Attached [ 1 _____ ___i r_ .____ CAO 16B12 Type of Width of Total Public Units or Additional Width from Eligible Location/Name R-Monument Access Access/Frontage Parking Spaces Eligibility Unit Shoreline Webslte Link for DBPR License (feet) Vanderbilt Segment Delmar Wiggins State R-22 Primary 60 340 2,640 2,700 NA Recreation Bluebill Beach Access R-22 Secondary 60 0 0 60 NA Public https://www.mvfloridalicense.com/LicenseDetail.asp?SID La Playa Beach Resort R-26 Lodging 597 189 0 597 =&id=6CB6F49EDEDC137B2DA35FOB1803FF871 Vanderbilt Beach Blvd. R-29 Primary 130 340 2,640 2,770 NA Ritz Carlton Hotel R-30 Public 742 350 0 Overlap https://www.myfloridalicense.com/License0etail.asp?SID Lodging =&id=513295F4128248C8458810C0E86A90EC Park Shore Segment Clam Pass Park R-44 Primary 3345 171 5,280 8,625 NA Seagate Drive(North and R-45.5 Secondary 100 38 2,006 Overlap NA South) - Horizon Way R-52 Secondary 60 36 1,901 1,961 NA Vedado Way R-53 Secondary 60 40 2,112 2,172 NA Via Miramar R-56 Secondary 60 40 2,112 2,172 NA Naples Segment Eligible Type of Width of Total Public Units or Additional Width from Location/Name R-Monument Access Access/Frontage Shoreline Webslte link for OBPR License Parking Spaces Eligibility Unit (feet) Edgewater Beach Hotel R-59 Public 265 0 0 265 htto5.//www,myfloridalicense.com/UcenseDetail,aso?$ID Lodging =&id=5S75452E59C2CC7C6775B8E72890F24B Lowdermilk Park R.61 Primary 920 200 5,280 6,200 NA Four Seasons Hotel R-63 Public 939 319 Overlap Overlap https://www.myfloridalicense.com/License Detall.a5p?SID Lodging =8cid=63331099AAF21135550704309C7498BOF I El'Ave N IS.Golf) R-63.5 Secondary 60 40 2,112 1,380 NA 7th Ave N R-64 Secondary 60 12 634 694 NA North Lake Ave R.64.5 Secondary 60 40 2,112 60 NA 6'"Ave N R-65 Secondary 60 12 634 60 NA 4'Ave N 13•66 Secondary 60 16 845 905 NA 3'a Ave N R-66.5 Secondary 60 16 845 60 NA I 2id Ave N R-67 Secondary 60 16 845 905 NA 1"Ave N R-67.5 Secondary 60 17 898 60 NA Central Ave R-68 Secondary 60 12 634 60 NA 1"Ave S R-68.5 Secondary 60 12 634 60 NA 2"a Ave5 R-69 Secondary 60 12 634 694 NA 3'a Ave 5 R-69.5 Secondary 60 12 634 60 NA , 4°Ave 5 R-70 Secondary 60 12 634 60 NA CAO i 1 6612 5'h Ave 5 R-70.5 Secondary 60 12 634 1,380 NA Hotel Lscalante R-71 Public 150 10 Overlap Overlap https://www.mvfloridalicense.com/LicenseDetail.asp?5ID Lodging =&id=4413460F722FFE312721368944987081A 6e Ave R-71 Secondary 60 12 634 694 NA 7e Ave R-71.5 Secondary 60 16 845 905 NA $"Ave S R-72 Secondary 60 12 634 694 NA 9'Ave S R-72.5 Secondary 60 12 634 694 NA 10v'Ave S R-73 Secondary 60 12 634 694 NA 11'Ave S R-73.5 Secondary 60 12 634 694 NA Broad Ave R-74 Secondary 60 31 1,637 1,697 NA 12e Ave R-74.5 Primary 60 100 5,280 5,340 NA 13'Ave 5 R-75 Secondary 60 12 634 694 NA 14e Ave S R-75.5 Secondary 60 31 1,637 1,697 NA — 15°Ave S R-76 Secondary 60 12 634 694 NA 16e Ave S R-76.5 Secondary 60 0 0 60 NA 17e Ave S R-77 Secondary 60 0 0 60 NA lee AveS R-77.5 Secondary 60 0 0 60 NA 19e Ave 5/Shell AA/ R-78.5 Secondary 60 0 0 60 NA 21"AveS R-78.5 Secondary 60 0 0 60 NA 32nd Ave South R-82 Secondary 60 12 634 694 NA 33nd Ave South R-83 Secondary 60 12 634 694 NA Cq0 16B12 O,aP pf PAq t,,,Fy Beach Management Funding Assistance Program ti ° Local Government Funding Request Fiscal Year 2025/2026 Beach Projects Application oy »c, 04" MFMTAL PR 7. Schedule and Budget: Provide as a separate attachment,if needed.Clearly indicate project phase:Feasibility(F),Design(D), Construction(C),Monitoring(M),or USACE Multiphase(USACE).Include the year of post-construction monitoring in the description. 8. Cost Reimbursement:Specify eligible costs incurred during the three years prior to the current application's fiscal year that are not in a current DEP agreement and have not been reimbursed(this includes fiscal years 22/23,23/24,and 24/25),Eligible costs will be added to the current funding request. 9. Current and Future Costs:Specify eligible costs for the current application's fiscal year that are not in a current DEP agreement and have not been reimbursed as well as the estimated costs for the next 4 years.Note:If Construction costs are requested in the. current fiscal year,then the Year 1 Post-Construction Monitoring costs will be added to the current funding request Fiscal Project Phase Description Federal Cost State Cost Local Cost Total Cost Year 22/23 23/23 22/23 23/24 Construction FEMA Berm Project TBD TBD TBD $21,906,100 24/25 Design Hurricane Ian Post Storm Restoration Ph 2. $0 TBD TBD $54,136.50 24/25 Construction Hurricane Ian Post Storm Restoration Ph 2. $0 TBD TBD $2,382,600 24/25 Design Park Shore Renourishment $0 $43,300 $58,818 $102,118 24/25 Construction Park Shore Renourishment $0 $2,794,900 $3,799,976 $6,594,876 25/26 Construction Doctors Pass Dredging Construction and Sand Bypassing $0 $400,500 $544,500 $945,000 25/26 Design (Wars Pass oredg4g Rock Rem...a olNeAfgnnan%Sue9ueaceInvcanpabnoae,naMV© $0 $63,600 $86,400 $150,000 25/26 Monitoring Physical,Biological,Shorebirds,Turtles,Tilling $0 $194,900 $265,100 $460,000 25/26 Design Borrow Area Survey& Investigation $0 $275,500 $374,500 $650,000 ii is 26/27 Monitoring Physical,Biological,Shorebirds,Turtles,Tilling $O $212,500 $288,900 $501 ,400 16612 eP pEPARTM: ti, Beach Management Funding Assistance Program ° Local Government Funding Request o Fiscal Year 2025/2026 Beach Projects Application ao4, ,�� MENTAL PR Fiscal Project Phase Description Federal Cost State Cost Local Cost Total Cost Year 27/28 Design Beach Renourishment Design R23-R89 $0 $50,900 $69,1 00 $120,000 27/28 Monitoring Physical, Biological,Shorebirds,Turtles,Tilling $0 $231,600 $314,900 $546,500 27/28 28/29 Construction Beach Renourishment Construction R23-R89 $0 $4,026,100 $5,473,900 $9,500,000 28/29 Monitoring Physical, Biological,Shorebirds,Turtles,Tilling $0 $252,500 $343,200 $595,700 28/29 29/30 Construction Doctors Pass Rock Removal and Realignment Dredging $0 $1,483,300 $2,016,700 $3,500,000 29/30 Monitoring Physical,Biological, Shorebirds,Turtles,Tilling $0 $275,200 $374,100 $649,300 29/30 8.Tourism-related impacts:Criteria is calculated by the Department using 2023 data.For reference,tax data can be obtained from the Department of Revenue website:https://floridarevenue.com/DataPortal/Pages/faxResearch.aspx See Guidance Document for more information. (:Current funding request includes construction and year one post-construction monitoring ('Project is managed by two or more counties Local Option Sales Tax Coll. July 2022 through June 2023= $117,092,827 Additional comments Tourist Development Tax July 2022 through June 2023 = $43,656,650 Line 39 of Form 10 April 2023 through end of March 2024 = $82,393,635.83 to 9. Federal involvement:The documentation to verify authorization,federal cost share percentage,and status of funding award must be provided with the application materials for the award of points. Is the project Federally authorized by the USAGE? No Authorization Year: Expiration Year: Does this project have a signed USACE Chiefs report or Civil Works Congressional authorization for the No requested phase? USACE federal cost share percentage for this project(excluding FCCE); CAO 16B12 °4PARt, Beach Management Funding Assistance Program ° Local Government Funding Request x = Fiscal Year 2025/2026 'ro 4�0 Beach Projects Application MFNTAI Pp Select all that apply for the requested project phase(s)and include documentation with application materials. C Executed USACE project agreement r Included in USACE work plan r Approved FEMA Project Worksheet Included in Congressional Appropriations Act (�Other documentation: Coker County and the USACE have executed a federally funded roeaiblhly study and the project is flied in a current federal budget document. 10.Storm damage reduction benefits:Criteria is calculated by the Department. What is the volume(cy)of advanced nourishment lost since the last sand placement event of (See Below) a beach restoration or nourishment project as measured above the Mean High Water contour?Data should be consistent with the annual post-construction monitoring reports. For restoration projects,what is the historical erosion rate? -0.61 foot/year 11.Cost effectiveness:Criteria is calculated by the Department.A project design analysis and supporting documentation must be provided with the application materials for the award of points.See Guidance Document for more information. What is the proposed sand placement volume(cy)? Emergency berm:45,000 tons, Park Shore:Approx. 100,000 cy What is the nourishment interval(years)? 6 Select all that apply for the current project funding request: ('Enhanced longevity:Propose structural or design components that could extend the beach nourishment interval Dune addition:Incorporate new or enhanced dune structures or new or existing dune restoration and revegetation projects ('Innovative technology:Propose innovative technologies designed to reduce project costs Regionalization:Two or more local sponsors manage projects together or projects propose regional sediment management strategies to conserve sand resources or reduce project costs Upland Volume Change 1/12 to 1/22 Vanderbilt Beach: R-22 to R-30.8 = 41,110 cy Pelican Bay Beach: R-30.8 to R-37 = 16,560 cy Additional comments for storm damage South of Clam Pass: Pass to R-43 = -700 cy reduction benefits and North Park Shore Beach: R-43 to R-48 = 4,900 cy cost effectiveness Park Shore Beach: R-48 to R-55 = 730 cy Naples Beach Doctors: Pass to R-60 = -4,610 cy Naples Beach: R-60 to R-79 = 58,720 cy AO 1 6B12 OP cEPAp.. o Beach Management Funding Assistance Program ° Local Government Funding Request = Fiscal Year 2025/2026 :x- Beach Projects Application o tiN• �4'FroraL ea 12.Previous state commitment Has the Department previously reviewed,approved,and cost-shared on a feasibility or design phase for this project. Yes Has the current proposed project phase(s)received a partial state appropriation within 3 years of phase completion?LNo J Additional comments 13.Accessible beach area:Criteria is calculated by the Department.Provide additional information for consideration. VaManpll R•22430010 R37=34 A of Advanced Nourishment Remolning as of 122 Describe the landward and seaward edge of the NP b9hvee=o4"-9;n;,va,===ra�e`n,a;f",,;,�:,g;0,122 accessible beach width Pad More Beach RA0 to Rdie=100 ft of Advanced Nau4shment Remaining as of t22 Naples Beech R.56A b R-60=127 ft of Advanced Nourishment Remaining as of 122 Kaaba Beach R.61 to RJB=134 n of Advencod Noonshment Remaining as of 122 Provide the project boundaries(R-monuments) Vanderbilt: R-22+300 to R-37, Park Shore: R-42 to R-54+400, Naples: 58A to R-79, South Naples: R-79 to R-89 Humiston & Moore Engineers COLLIER COUNTY BEACH Provide citations of reference sources NOURISHMENT PROJECT, 2021 POST-CONSTRUCTION ANNUAL MONITORING SUMMARY Vanderbilt 1,866 ft, 12% Park Shore 2,544 ft, 20% 14.Recreational benefits:Provide the percentage of Naples 929 ft, 5% linear footage within the project boundaries which is zoned recreational or open space;for commercial use;or to allow for public lodging establishment,or the equivalent.Provide additional documentation and DBPR website link in a separate attachment,if needed. 15.Mitigation of inlet effects:Criteria is calculated by the Department. Approximately 37,600 cy were dredged from Doctors Pass and bypassed south with nearshore disposal of Naples Beach in 2018. Utilizing volumes from the Department's Additional comments Annual Inlet Report(2023)the volume of inlet sand bypassing between 1997 and 2023 has been approximately 7,335 cy/yr. Supplemental nourishment is achieved by Collier County via beach nourishment sand placement events to mitigate for the bypassing deficit. 16.Successive unfunded requests is the current proposed project phase(s)a successive,unfunded request?If so,how many years of successive request(s)is the current application? Does the successive request add the construction phase? No CAO 16B12 VP Beach Beach Management Funding Assistance Program Local Government Funding Request a z Fiscal Year 2025/2026 Beach Projects Application o hMFNTAL P9- 17.Environmental habitat enhancement:Criteria is calculated by the Department.See Guidance Document for more information. Is the project within a designated critical habitat area for threatened or endangered species that is subject No to extensive shoreline armoring? Is the project within a non-designated area where extensive shoreline armoring threatens the habitat of No threatened or endangered species? If yes to either of the above,does the project exceed best management practices to incorporate turtle- . friendly designs and management strategies to protect resources or benefit critical habitat preservation? The project proposes a dune addition. Provide an explanation and supporting documentation for the strategies which exceed best management practices 18.Readiness to construct Does the project have an active state permit? Yes Does the project have an active federal permit? Yes Permit number 0331817-001-JC Permit number SAJ-2003-12405 Authorization date Oct. 2, 2015 Authorization date April 6, 2016 Expiration date Oct. 2, 2030 Expiration date April 6, 2031 Have all necessary easements been acquired for the upcoming or proposed construction phase? Yes Has the necessary local funding been secured for the proposed project?If so,provide a copy of the Yes draft Resolution. Is an Erosion Control Line established along the project length? Yes Additional comments for readiness to construct r. CAO 16B12 `QP„pAgTMF o- ti,, Beach Management Funding Assistance Program 4 ° Local Government Funding Request I z o Fiscal Year 2025/2026 Beach Projects Application PO 0 MfNtAI Pa Provide additional information and comments below or attach supporting documents. CAO 16B12 pfPART e " , Beach Management Funding Assistance Program Local Government Funding Request o Fiscal Year 2025/2026 Beach Projects Application 04,"ENTAi PART I: GENERAL INFORMATION Local Sponsor Collier County Coastal Management Program Federal ID Number(FEID) 59-6000558 Primary Contact Name Andrew Miller Title Manager Mailing Address Line 1 2685 South Horseshoe Drive, Unit 103 J Mailing Address Line 2 City Naples Zip Code 34104 Telephone Number 239-252-2922 Email Address andrew.miller@colliercountyfl.com Additional Contact Information PART II: CERTIFICATION I hereby certify that all information pro ' ith this a lication is true and complete to the best of my knowledge. Signature of Local Sponsor Electronic or scanned signatures accepted. Printed Name Chris Hall, Chairman Date 7/ 12 N Approved as to form and lc ality ATTEST ,. N n 0 w CI�.YSTA ?E1LfCLERK6? '(,�lt/` Assistant County fluor cy At t as 6 H cao 16812 pEPAI . o.9" �'''ts Beach Management Funding Assistance Program Local Government Funding Request o Fiscal Year 2025/2026 Beach Projects Application 0 444.N TA Ot- PART III: EVALUATION CRITERIA 1.Project Name:(as listed in the Strategic Beach Management Plan) South Marco Island Beach Renourishment Project 2.Project Description:Include county,location with reference to DEP range monuments,brief project history,and description of proposed activities. The South Marco Island Beach Renourishment Project is located on the southwest Florida coastline of Collier County between Florida Department of Environmental Protection monuments from reference monument R-144 to R-148+600 (G-4). The project's borrow area is the Caxambas Pass Borrow Area with upland sand mines permitted as supplemental sand sources. Structural repair of five existing erosion control structures was completed in 2013/14. The South Marco Island Beach Renourishment Project was then renourished through truck haul methods in November of 2016 with approximately 13,200 cubic yards of beach compatible material to offset storm damages caused by Tropical Storm Debby. Approximately 80,000 cy of dredged material from Caxambas Pass was placed in the South Marco Island Beach project area in March of 2020. Additionally, emergency sand placement occurred on the dry beach in June 2023 following the passage of Hurricane Ian, This project includes yearly physical beach monitoring, beach tilling, and environmental monitoring as required by FDEP and USAGE permits. FDEP staff has previously determined that 53.96% of the project is eligible for state cost share. Cost share for the engineering design and plans and specification creation are required in anticipation of the 2027/2028 construction. GPO 16B12 OEPARr q> M*ti, Beach Management Funding Assistance Program Local Government Funding Request m Z G O Fiscal Year 2025/2026 Beach Projects Application -MENTAL PCP 3.Use of Requested Program Funds:Provide a brief description of tasks to be completed in each requested phase(Feasibility, Design,Construction,Monitoring,or USACE Multiphase).Indicate which tasks are cost reimbursement from previous fiscal years. Monitoring - Physical and turtle monitoring and beach tilling funds. Design - Engineering, design, plans and specifications. 4.Map:Provide as an attachment.The map(s)of the project area must be formatted at a minimum of 1"=200'scale and include a compass rose and legend. Map elements must include: 1.Project boundary:DEP reference monuments and shoreline designated as critically eroded 2.Eligibility:Indicate lengths of eligible shoreline based on criteria outlined in Chapter 62B-36.007,F.A.C. a.Beach access locations:indicate primary or secondary access,and include the shoreline length,number and location of auto parking spaces,mass transit stops,bike parking spaces,and public restroom facilities within 1/4 mile walking distance of each access b.Public lodging establishments:include the length fronting the project shoreline,and include the length of street-side frontage for lodging within 1/4 mile walking distance of a secondary beach access location 3.Recreational benefits:Comprehensive list of current land use designations of properties fronting the project shoreline (see attached maps) 4.Value of upland property:Include one-quarter mile buffer and provide a comprehensive list of the values of properties (data from year 2023)that are enclosed or intersected by the buffer.The 2023 property value tax roll data and ArcGIS shapefiles can be obtained from the Department of Revenue website:https://floridarevenue.com/property/Pages/ DataPortal_RequestAssessmentRolIGISData.aspx.See Guidance Document for more information. $2,729,086,034 5.Project length:Total restored project length(in feet)of the critically eroded area 4,130 feet (as listed in the Strategic Beach Management Plan). CAO 16B12 p EPA RT oP. MF Beach Management Funding Assistance Program ti Local Government Funding Request M Z Fiscal Year 2025/2026 1. A. ° Beach Projects Application -:pO4,, to E Pad�` 6. Eligibility:Required for all beach projects pursuant to Chapter 62B-36.007,F.A.C.Provide as a separate attachment,if needed. •Location/Access Name:Use the official name of the park or road that is associated with the public access. •DEP Reference Monument:Use the DEP monument that is closest to the main public access location. •Type of Access:Indicate Primary or Secondary beach access in accordance with the definitions in Chapter 62B-36,F.A.C. •Width of Access/Frontage:The length of the legal boundary(in feet)of the public access or lodging along the beach project shoreline.For public lodging establishments that do not front the beach,indicate the street-side length of the legal property boundary(in feet)that is used as the main access to the establishment. •Number of Eligible Units:A unit is defined as one automobile parking space,one rental unit in a public lodging establishment,one mass transit stop,or four bicycle parking spots. •Additional Width from Eligible Units:Total distance(feet)added to the Width of Access/Frontage.If there are multiple types of eligibility units used for this calculation,show the calculation separately for each. •Total Eligible Shoreline:Sum of the Width of Access/Frontage and Additional Width from Eligible Units columns.Eligible shorelines cannot overlap. •Website Link for DBPR License:Provide the link to the Department of Business and Professional Regulation(DBPR)website for proof of licensure for any public lodging establishments used for eligibility or the Recreational Benefits ranking criteria. Additional Width of Website Link Location/ DEP Reference Number of Width from Total Eligible for DBPR Access Name Monument Type of Access Access/ Eligible Units Shoreline(ft) Frontage(ft) g Eligible Units License (ft) Marco Beach Ocean HOSen R-143 Secondary 117 60 0 117 °°o, .. aeam°— Hilton Marco Island Beach R-144 Secondary 500 320 0 500 h , mx e—a., Coy south Basch Public Assess R-144 Secondary 20 90 4,752 4,772 N/A Marriott Crystal Shores R-144.2 Secondary 362 71 0 362 NOG/../nyreeda.berisec. Marco Beach Vacation Suites R-147 [Secondary 400 30 0 400 N/A Swallow Ave R-148 Secondary 20 70 3,696 2,680 N/A ____.____] - I 1 (...A.,_c_;) 16B12 . , Beach Management Funding Assistance Program ° Local Government Funding Request Y Fiscal Year 2025/2026 `a Beach Projects Application �4144TAL 0` 7. Schedule and Budget: Provide as a separate attachment,if needed.Clearly indicate project phase:Feasibility(F),Design(D), Construction(C),Monitoring(M),or USACE Multiphase(USACE).Include the year of post-construction monitoring in the description. 8. Cost Reimbursement:Specify eligible costs incurred during the three years prior to the current application's fiscal year that are not in a current DEP agreement and have not been reimbursed(this includes fiscal years 22/23,23/24,and 24/25).Eligible costs will be added to the current funding request. 9. Current and Future Costs:Specify eligible costs for the current application's fiscal year that are not in a current DEP agreement and have not been reimbursed as well as the estimated costs for the next 4 years.Note:If Construction costs are requested in the. current fiscal year,then the Year 1 Post-Construction Monitoring costs will be added to the current funding request Fiscal Project Phase Description Federal Cost State Cost Local Cost Total Cost Year 22/23 22/23 22/23 23/24 23/24 23/24 24/25 24/25 24/25 25/26 Design Engineering Design, P&S $0 $67,300 $182,700 $250,000 25/26 Monitoring Physical, Turtle, Shorebird, Tilling $0 $33,000 $89,500 $122,500 25/26 26/27 Monitoring Physical, Turtle, Shorebird, Tilling $0 $36,000 $97,500 $133,500 26/27 26/27 16B12 SOP DEPAlit,H F .. 4,, Beach Management Funding Assistance Program ° Local Government Funding Request z Fiscal Year 2025/2026 o 1�0 ° Beach Projects Application Fiscal Project Phase Description Federal Cost State Cost Local Cost Total Cost Year 27/28 Construction Beach Nourishment and Services $0 $673,300 $1,826,700 $2,500,000 27/28 Monitoring Physical, Turtle, Shorebird, Tilling $0 $39,200 $106,300 $145,500 27/28 28/29 Monitoring Physical, Turtle, Shorebird, Tilling $0 $42,700 $115,900 $158,600 28/29 28/29 29/30 Monitoring Physical, Turtle, Shorebird, Tilling $0 $46,600 $126,300 $172,900 29/30 29/30 8.Tourism-related impacts:Criteria is calculated by the Department using 2023 data.For reference,tax data can be obtained from the Department of Revenue website:https://floridarevenue.com/DataPortal/Pages/TaxResearch.aspx See Guidance Document for more information. C Current funding request includes construction and year one post-construction monitoring C Project is managed by two or more counties Local Option Sales Tax Coll. July 2022 through June 2023= $117,092,827 Additional comments Tourist Development Tax July 2022 through June 2023 = $43,656,650 Line 39 of Form 10 April 2023 through end of March 2024 = $82,393,635.83 9. Federal involvement:The documentation to verify authorization,federal cost share percentage,and status of funding award must be provided with the application materials for the award of points. Is the project Federally authorized by the USACE? No Authorization Year: Expiration Year: Does this project have a signed USACE Chiefs report or Civil Works Congressional authorization for the requested phase? No USACE federal cost share percentage for this project(excluding FCCE): 0% 1 (C:Li() 16B12 ` P pEPARrM ono Fyn Beach Management Funding Assistance Program ° Local Government Funding Request _I Fiscal Year 2025/2026 '- ,-- ° Beach Projects Application MF__ PP i Select all that apply for the requested project phase(s)and include documentation with application materials. r Executed USACE project agreement C Included in USACE work plan r Approved FEMA Project Worksheet r Included in Congressional Appropriations Act C Other documentation: 10.Storm damage reduction benefits:Criteria is calculated by the Department. What is the volume(cy)of advanced nourishment lost since the last sand placement event of _24,490 CY a beach restoration or nourishment project as measured above the Mean High Water contour?Data should be consistent with the annual post-construction monitoring reports. For restoration projects,what is the historical erosion rate? —2.1 ft/yr 11.Cost effectiveness:Criteria is calculated by the Department.A project design analysis and supporting documentation must be provided with the application materials for the award of points.See Guidance Document for more information. i What is the proposed sand placement volume(cy)? 80,000 CY What is the nourishment interval(years)? 6 Select all that apply for the current project funding request: C,Enhanced longevity:Propose structural or design components that could extend the beach nourishment interval Dune addition:Incorporate new or enhanced dune structures or new or existing dune restoration and revegetation projects C Innovative technology:Propose innovative technologies designed to reduce project costs Regionalization:Two or more local sponsors manage projects together or projects propose regional sediment management strategies to conserve sand resources or reduce project costs Additional comments for storm damage reduction benefits and cost effectiveness CAO 16B12 VP pEPARrMF o� y, Beach Management Funding Assistance Program 4 ° Local Government Funding Request z Fiscal Year 2025/2026 0 Beach Projects Application oti` tiw , o MFkrA�FR 12.Previous state commitment Has the Department previously reviewed,approved,and cost-shared on a feasibility or design phase for this project?Yes Has the current proposed project phase(s)received a partial state appropriation within 3 years of phase completion? No Additional comments 13.Accessible beach area:Criteria is calculated by the Department.Provide additional information for consideration. Describe the landward and seaward edge of the The 2020 project area (R-146 to G-4) lost 29 feet between the accessible beach width April 2020 (post con) and the Jan. 2022 (2-year) monitoring. Provide the project boundaries(R-monuments) R-144 to R-148+600 (G-4) HUMISTON&MOORE ENGINEERS(April 2022).2020 SOUTH MARCO BEACH Provide citations of reference sources NOURISHMENT PROJECT,TWO-YEAR POST-CONSTRUCTION ANNUAL MONITORING SUMMARY. The project length is 4,130 feet. A total of 1,559 feet are designated as commercial and recreational, therefore 14.Recreational benefits:Provide the percentage of 37.7% of total project length. linear footage within the project boundaries which is zoned recreational or open space;for commercial use;or to allow for public lodging establishment,or the equivalent.Provide additional documentation and DBPR website link in a separate attachment,if needed. 15.Mitigation of inlet effects:Criteria is calculated by the Department. The Marco Island project is nourished through material from Caxambas Pass navigation dredging and meets objectives outlined in the SBMP. Additional comments 16.Successive unfunded requests Is the current proposed project phase(s)a successive,unfunded request?If so,how many years of successive request(s)is the current application? Does the successive request add the construction phase? S 16812 DEPART, `� Beach Management Funding Assistance Program 4 ° Local Government Funding Request c Fiscal Year 2025/2026 Beach Projects Application 0 1�. 0 ,fN TA 140. 17.Environmental habitat enhancement:Criteria is calculated by the Department.See Guidance Document for more information. Is the project within a designated critical habitat area for threatened or endangered species that is subject f to extensive shoreline armoring? I No Is the project within a non-designated area where extensive shoreline armoring threatens the habitat of No threatened or endangered species? If yes to either of the above,does the project exceed best management practices to incorporate turtle- friendly designs and management strategies to protect resources or benefit critical habitat preservation? Provide an explanation and supporting documentation for the strategies which exceed best management practices 18.Readiness to construct Does the project have an active state permit? Yes Does the project have an active federal permit? Yes Permit number 0235209-008-JM Permit number SAJ-1996- 02789 Authorization date 9/27/2016 Authorization date 3/9/2016 Expiration date 10/11/2027 Expiration date 3/9/2026 Have all necessary easements been acquired for the upcoming or proposed construction phase? Yes Has the necessary local funding been secured for the proposed project?If so,provide a copy of the Yes draft Resolution. Is an Erosion Control Line established along the project length? Yes Additional comments for readiness to construct CAD 16B12 op. 4, +A Beach Management Funding Assistance Program 4 ° Local Government Funding Request 2 Fiscal Year 2025/2026 ° Beach Projects Application 04,4' �fNrAt.p�� ` Provide additional information and comments below or attach supporting documents. PP 9 CAO