Loading...
Agenda 07/09/2024 Item #16A 7 (BCC Approve for recording the final plat of Del Webb Naples Parcels 304-306)16.A.7 07/09/2024 EXECUTIVE SUMMARY This item requires that Commission members provide ex-parte disclosure. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Del Webb Naples Parcels 304-306 (Application PL20230017431), approval of the standard form Construction and Maintenance Agreement, and approval of the performance security in the amount of $2,009,779.75. OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat of Del Webb Naples Parcels 304-306, a subdivision of lands located in Section 17, Township 48 South, Range 29 East, Collier County, Florida, in accordance with LDC Section 10.02.04.B.4. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: The Development Review Division of the Growth Management Department has completed the review of the construction drawings, specifications, and final plat of Del Webb Naples Parcels 304-306. These documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the Ave Maria SRA. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or designee and the County Attorney's office prior to the recording of the final plat. This procedure is in conformance with Section 10.02.04 F.2 of the Land Development Code. The Development Review Division recommends that the final plat of Del Webb Naples Parcels 304-306 be approved for recording. FISCAL IMPACT: The project cost is $1,827,072.50 (estimated) to be borne by the developer. The cost breakdown is as follows: a) Water & Sewer $ 734,660.00 b) Drainage, Paving, Grading $1,092,412.50 The Security amount, equal to 110% of the project cost, is $2,009,779.75. The County will realize revenues as follows: Fund: Growth Management Fund 1014 Agency: County Manager Cost Center: 138327 - Land Development Services Revenue generated by this project: Total: $33,907.37 Packet Pg. 224 16.A.7 07/09/2024 The Review Fees are based on a construction estimate of $1,827,072.50 (does not include Ave Maria Utilities) and were paid in December 2023 The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5. /ac) $ 1,135.00 b) Construction Drawing Review Fee Water & Sewer (.75% const. est.) n/a c) Drainage, Paving, Grading (.75% const. est.) $ 8,193.09 d) Construction Inspection Fee Water & Sewer (2.25% const. est.) n/a e) Drainage, Paving, Grading (2.25% const. est.) $24,579.28 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation, except when the applicant elects to delay obtaining a COA for non-residential developments that are required to obtain approval of a site development plan prior to the issuance of a building permit. LEGAL CONSIDERATIONS: The applicant is requesting approval of the final subdivision plat and construction and maintenance agreement. The Board shall consider the County Manager or designee's recommendation and shall take evidence and testimony regarding the final subdivision plat requirements identified in LDC sections 10.02.04 B, 10.02.04 C, and other provisions of the LDC, as well as Chapter 177, Florida Statutes. If the Board denies or places conditions on the final subdivision plat, it shall state reasons for such denial or conditions. This item has been approved as to form and legality and requires a majority vote for Board approval. (HFAC) RECOMMENDATION: To approve the final plat of Del Webb Naples Parcels 304-306 (Application PL20230017431) for recording with the following stipulations: 1. Approve the amount of $2,009,779.75 as performance security for the required improvements or such a lesser amount based on work completed and as is approved by the Growth Management Department. 2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager or designee: a. To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney's office and the Board of County Commissioners or the County Manager or designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the Land Development Code. Prepared by: Lucia S. Martin, Project Manager I, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Plat Map (PDF) 3.Opinion of Probable Cost - AMUC (PDF) 4. Opinion of Probable Cost - Collier County (PDF) Packet Pg. 225 16.A.7 07/09/2024 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.7 Doc ID: 29146 Item Summary: This item requires that Commission members provide ex-parte disclosure. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Del Webb Naples Parcels 304-306 (Application PL20230017431), approval of the standard form Construction and Maintenance Agreement, and approval of the performance security in the amount of $2,009,779.75. Meeting Date: 07/09/2024 Prepared by: Title: Technician — Development Review Name: Lucia Martin 06/ 12/2024 12:03 PM Submitted by: Title: Environmental Specialist — Name: Jaime Cook 06/12/2024 12:03 PM Approved By: Review: Growth Management Community Development Department Diane Lynch Development Review Brett Rosenblum Other Reviewer Engineering & Natural Resources Jack McKenna Other Reviewer Operations & Regulatory Management Michael Stark Other Reviewer Transportation Management Operations Support Diane Lynch Unknown Jaime Cook Division Director County Attorney's Office Lucia Martin Level 2 Attorney Review Growth Management Community Development Department James C French County Attorney's Office Office of Management and Budget County Attorney's Office Office of Management and Budget County Manager's Office Board of County Commissioners Heidi Ashton-Cicko Other Reviewer Debra Windsor Level 3 OMB Gatekeeper Review Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Laura Zautcke OMB Reviewer Geoffrey Willig Level 4 County Manager Review Geoffrey Willig Meeting Pending GMD Approver Completed 06/14/2024 5:49 PM Completed 06/17/2024 10:52 AM Completed 06/18/2024 10:57 AM Completed 06/26/2024 2:17 PM Other Reviewer Skipped 06/26/2024 2:47 PM Completed 06/26/2024 2:55 PM Skipped 06/26/2024 3:03 PM Growth Management Completed 06/26/2024 5:11 PM Completed 06/27/2024 11:00 AM Completed 06/27/2024 11:07 AM Completed 06/27/2024 12:39 PM Completed 06/28/2024 10:43 AM Completed 07/01/2024 1:39 PM 07/09/2024 9:00 AM Packet Pg. 226 16.A.7.a DEL WEBB NAPLES PARCELS 304-306 LOCATION MAP r a Packet Pg. 227 (90C-VOC SIGOJecl soldeN qqaM 100 Wid IL'ul=l W11,6z) dew leld :IUGW140ejjv o 2 x", gz z,- g. 0- 0 z < 'Z z— I z 0 < LLJ �z z- LL, — a. --j z u) ' E- < -;�� 6 - � z I z A 0 -25 zW S o. Ld z� > z z z� Of D k9 M, 'S 'z z z <- z o -zW .1 zW F g I Iz sm p -z R.- '- --i z w z, > � -, u -z - 'z 'z &a g § I < z I z. z E- 2 — wz �3, z w. I < -z zw< z, z, z. -'V z., z .wu z< sp z < -z zz '-z"z.--`Nzw z "- 'W. '-- 9 2. �': -z N W 51 < R T z, CZ) -, �z z' 3 � 5 �, -. -, -- �-, z< lw w. u z< ts 1, 'z 'z w, wo u z- �w z. z. "z a z, Iz E < w< I < z. ' .z < —<N E� pl:J mz z, T �,z2 < < < ffi E �z 1. z� < z oc000z < 71� h -< -� p i 'z, N 0 0(f) TW. < t . , z E z �j - IL-� > z C I'N M— �Q 4, 6�H- H. �zz< 9 1 _o Lj < cn OVO8 SIV3A dhVO F7 < z z CO lo < 0 Z,- cn F-- E- < 0 -0 0., l< 0 z -Z LL), LL, [2 M,- Z., z Z- 0 z o V) cl) LL LLj :2 ,—�< I Z, z �z UD Z, LLj < W LLj 31VOS I IONI 2 ZW 0 Z 3: i 0 -0 E- 8 Z-H 8 < Z8 Z. N < Ft < Z. E- CO 'Z- I z Z.. 'zW �z C:) 08, 'zW TSo C) 62 N -, " " 'W-Z-'.'.-.,w.'rw"-Z,�?�<-�����, E- z ow, 0 �, Z,' is o �Z! --< 2 E- C:) z '9 Z' Z., ��'Ovp's 12 "Z 'z <��, P, -� P4 T "S H8 - mo� 00i , W , z , � �a a �i m iP s � �- � W.- f ! C —Z !�� -zW H < z 09— O.M-.- -.�,Zw�.g. �2 5 Z.- < z Wz. �z W. 6 �- -. C/) i. 'Z'i 2zW m --< �m Z- W -< �-z �,8H�V �- V -, �z a -., 22H z �Z- Z. z 'o �- �' -< , '. '-� � "o �a ZH NZ ffi� np—pq m A 'W IZ -Q j, �xwj W, Rn R—m—Z l­ o-,<�! 9 ' '-� H - 9 '-� w� �2 E) F- Z---. Pm- < 8R 3— Hm Z— z —m Z. 10 �8w� Y, . E- > W 2� TP; �z 1<1.1� z 15 -<, -Z-0 -'!t Ld z .z a u) Z< & 0, z­ j. 8 i, 1 ,- Ld 1 .0 . ......... W Z-. zw -o ,� �,- ;Hd �.z �z 0, Z, .0 Z< 1W. Z-. zz- ao zz< 3. < cf) "'az �Z! m 2, Z'o z F, 6 'z -Z -j. gg E- ;4 < L- x '. - , - -3-W-�-n-sN, -88�, Q, Z--mz,, Z-� �z F z �5W P, . � Q 1 1, E!t�l , , l�,, ��92— Z. < ZIV LW �s I p�—U<� z Z..; I -,NH Tpa ,H,nn Z' t': �Z< --< 6 —i� M� 1. P W. 2 C2Q � 8'� 2 '& 0 '-�2C S [a 8 Z z --I (90C-VOC SIGOJecl soldeN qqaM 100 Wid IBul=l :NUz) dew leld :IUGW140ejjv z, --z<' 3 < �w- -z 2 5;o zz z'w' < LL LL z 0 < < < —?z wl.g 0 z 0 IN 5z Z LLJ < LLJ 0 < -0 E- C) lZ--01<nlZ 0' E. 0 11w Z� lz<., ­0 Zz -6"w— < z < L) < < r,<o -0 az� —Z. Z C) 0 w—w, CQ 4 — El —­,� 0 Co < -<> 0- wE-- CC. 1w. C) < P4 = .82'9a�o_—o wo <IZO-To-'- E- E- < Cn I .... ao- �Z, cc 0 z z 0 FLOO— ww 2 f' zw dw--E- zz<� t R�� C/I 6 2 "1 § E� >,o.z z6,,<2bw z. 0 1 0 Z, 0 do,�-- Z, 0 2-6 2 z <r �!- ffi I , < ow.,-Zo-,�>—< 2-zw-z-�,�w8lz z.E . . . 1; ;;.Z,z , I z -­2 < Z. Z uw 0 �zz, 'I �,z �ZmKwlo— L lz�< C:6 w 2 z 2 . Iz I <- , 0 -wl� . w 8 Z-zz� ±ow� < 0 0 ZS3 6-- z 'Zo w E- -6—w. 0> < z< Z. �w 0 MOO C F z z z 0 Z5 E� < ol 1. ;Z- M<—, "N" -<-P, ---�z > < zz <1 E- ZR Z.*b—'ON� < w. 0 X , 01 z - . �,woww,w - - - �o <---.z , _< �o < �-,j � z 0 % 0 % wom C) E- -z'o—l< .11;—�< ­w,6.0—o < 6-<cz , 1 Z.,--.1 o E- Wz,<wz0offi--z' o< < 1, Z F-02fw--w�w,<6 W z < < -UP -?.6 Iz 0'. <0, wo-- .0 .0.0 ,w-6 -<ZO Z. —4- 0 -0:Z-0 0�0� Z—OR 0�<w E- �z 2�-2 s,,2-z2< Zl < W�Olb—o-n— co —Z 0 1�5 -wi, -Z < < 0 < < .1 >: —2o, > 0 y�--E;< P�>Pw. O_ --6Z6--z—<>5<-wT, �T. ZI. 0 —�Zz— E- —z dl.,��'< -.1 1% < < w �z o z �z z� 'z z 5: cs <,< �>--.<d<. oz P, E- -< -. -< -- �, Q z z T" z 0 z lw 0 �z z oo zo -ell �z g —�—<O� S < -z�26 <zw o z 'z 5 ldl,.>�z -z <, z "g lo z 02� Fw.--7— F�F82D-- 7. E�2z'.. �zUld�; w (90C-VOC SIGOJecl soldeN qqaM 100 Wid IL'ul=l W11,6z) dew leld :IUGW140ellV na Lij L'i 01-- O�q X 0 Lj m L-j — < Lij EL C X E- E-1 P4 C L A 1, CT C) POO '100-18 C) C) E- C) --- — — — — — — — — — — — — — 0", iovdi so 2 E� .5) ---2NVI 400 ol C9 L> C) E� = Ro 0,7 o E- �4 �D 0 E- cc) C) 0 0 d, 05 4V, ol 00 E ---------- -------- E-1 CC) C) cn -ell S E- �z R 2z- 9,2 z, z g C) --z P2 'z� z-"-"- z. z- z- '�z 2 L E- �4 12. z, x "zl���,��<��'�.,�'��'�,Dz."��.-..>,.z< zI U Iz. z ID 0 co 0 m LLJ 0 LLJ --j T� E- 0 E-- E- C) C9 0 cn �T. E- E-, Cn �D CO 0 U) E- 12- UD co CYD C9 � L) T, 0 E- C, UD cc CO CM c) E- co E- CO �4 <1 E- 1.2 (90C-VOC SIGOJed saideN qqaM 100 Wid IBUH 9VI,6z) dew leld :IUGW140eIIV -71- x o, -z ag oil oilSE MINE! I 5�8�,,� 2x�w z- -1 -4-019-" z ��,z 6 o z. ,2z,,-.. zz Uzl� z 8-- Yp'z-..NE�Azz 0.1— —,� ] z .2 1 zo , 22 1 "1 1 —2 1. ­0 z z, z 06.z z z I 5�8�,,� 2x�w z- -1 -4-019-" z ��,z 6 o z. ,2z,,-.. zz Uzl� z 8-- Yp'z-..NE�Azz 0.1— —,� ] z .2 1 zo , 22 1 "1 1 —2 1. ­0 z z, z 06.z z z (90C-VOC SIGOJed soldeN qqaM 100 - leld IBUI=l W,Wz) dew 181d :IUGW140BPV 0 E- 0 > E- CO cn P-4 E-- 1-4 E-q E- �M, E. E- E-4 E- co E- E- 2v U�tHOIVFY 1111-9; E -'ROP Hu o .5 0 0 C) E- LLJ < LLJ j T� D- cn E- C) E- C) C�l C) cn E- cn �D Cc E- rn C\2 E- 0 0 E- E-1 cn E- cc C E-1 CC C) <1 C) c E- �4 <1 j 52, oo, (90C-VOC SIGOJed soldeN qqaM 100 leld leuli WWz) dew leld :IUGW140ellV �R LU < U) 00 LZ .00 �3 U) Ps 0 0 00 tg m,,t,0,6o.m F 4 LL, F�. �P­ ff 'P (90C-VOC SIGOJed soldeN qqaM 100 - leld IBUI=l W,Wz) dew 181d :IUGW140BPV co 0 0 m E- F-- LLJ m 0 < co C/D E- cn cn UD 7-n CQ E- UD c E- cn �T. C, Ot =10 9 133HS HOIVV4 inp p HU W. N� — ow NI 'm '5 'z , z z z—z -z-, ;t �2 V E A, 2 -.2 -z z z, z I z zz z. 'z < -z :z� sw A-- z- aw zz, < 12— I 1�—M < z z m 0 0 ED 2 1 z z (90C-VOC SIGOJed soldeN qqaM 100 - leld lBul=l :NUz) dew leld :lUGW140ellV co L- 0 0 C)o 0 D] co C) E- m �4 cy) > E- C: cn �-4 E- ;T� �4 E C,5 E- C) E- E- E- CC C) E— cn E- CC C) E- E- W4 X a iS z x mo �lz 20.1 — — — — — 017071.73374731;74 OM 0 C) m CO < D-- U) cl) E- E- P4 P; C'� E- E- E- E-, E-, L) E- cc E-- �2 (90C-VOC SIGOJecl soldeN qqaM 100 Wid IL'ul=l W11,6z) dew leld :IUGW140ellV mg� w o 0 00 LZ "00*LZ 0 00 V9 MJ0,60JON W F 0 < 'o Fz- w f"'loA 0� e-,- N t L o c . . . . . . . . . . . 0 -0 I m 9� 9c.00N m1111-11, 0 z, 11 os oo c� m Ij k 'I 6; llo.o� 27 0"' 7� o i . � N I' �.j j m 'M"L-I--...-N. 1'. 1 10, ..., —4� :,21 z- z F 'z V, -z w< 2-. '6�2692��< z z- z,. 62 X g 23"�- (90C-VOC SIGOJed soldeN qqaM 100 - leld IBUI=l W,Wz) dew 181d :IUGW140BPV �T4 0 CD E- co 0 L�j < 91 E- E. UD CO �T. E- E, C/I E— C) E E-1 E-o E- E-A E. = L) C) E-o 0 E- E-o &C PL, Fa-. -t E- E- �4 0 17 loo, ""JE Q M A M I o zo "-z--<zllz 11 Del Webb Naples (Parcels 304-306) AMUC - RevOl 2/15/2024 Phase A Phase B Phase C Total Wastewater Water Sub -Total $116,350.00 $119,010.00 $235,360.00 $109,700.00 $105,900.00 $215,600.00 $162,280.00 $121,420.00 $283,700.00 $388,330.00 $346,330.00 $734,660.00 10% O&M $23,536.00 $21,560.00 $28,370.00 $73,466.00 Total =1 $258,896.00 1 $237,160.00 1 $312,070.00 1 $808,126.00 Notes: 1) This Opinion of Probable Cost (OPQ shall be used for permitting and bonding purposes only. 2) This OPC is based on the engineer's understanding of the current rules, regulations, ordinances, and construction costs in effect on the date of this document. Interpretations of these construction costs may affect this OPC, and may require adjustments to delete, decrease, or increase portions of this OPC. 3) Al I costs p—ided in this OPC are based on recent contract prices, or the engineer's latest known unit costs. Unit prices are subject to change due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the ayailability of materials and labor. 4) Does not include permit fees or soft costs. 5) Does not include enhanced landscape or hardscape features Nikolaus J. Kasten, P.E. ,, 1�'-,'-TX,,,� Digitally signed 4 by Nikolaus J Fl- Registration #88638 Kaste Date 2024.02.15 COA#8636 16 14-5MFOO' Date Nikolaus J. Kasten State of Florida Professional Engineer, License No. 88638 This item has been digitally signed and sealed by Nikolaus J. Kasten, P.E., on 2/15/2024. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. I Packet Pg. 238 Del Webb Naples (Parcels 304-306) AMUC PHASE A Packet Pg. 239 Del Webb Naples (Parcels 304-306) - Phase A AMUC Wastewater $116,350.00 Water $119,010.00 Sub -Total $235,360.00 10% Contingency $23,536.00 Total =1 $258,896.00 Notes: 1) This Opinion of Probable Cost (OPQ shall be used for permitting and bonding purposes only. 2) This OPC is based on the engineer's understanding of the current rules, regulations, ordinances, and construction costs in effect on the date of this document. Interpretations of these construction costs may affect this OPC, and may require adjustments to delete, decrease, or increase portions of this OPC. 3) All costs provided in this OPC are based on recent contract prices, or the engineer's latest known unit costs.Unit prices are subject to change due to to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. 4) Does not include permit fees or soft costs. 5) Does not include enhanced landscape or hardscape features Nikolaus J. Kasten, P.E. FIL Registration #88638 COA #8636 Date I Packet Pg. 240 1 VALOR COURT - PARCEL 306 WW-1 8" PVC Gravity Sewer (0-6') 27S LF $50.00 $13,750.00 WW-2 8" PVC Gravity Sewer (6'-8') 385 LF $80.00 $30,800.00 WW-3 4'Manhole (0-6') 2 EA $7,SOO.00 $15,000.00 WW-4 4'Manhole (6'-8') 2 EA $9,000.00 $18,000.00 WW-5 6" Single Cleanout PVC Sewer Service I EA $1,500.00 $1,500.00 WW-6 6" Double Cleanout PVC Sewer Service 16 EA $1,750.00 $28,000.00 WW-7 Sanitary Sewer Cleanout I EA $1,000.00 $1,000.00 WW-8 Television Inspection 660 LF $5.00 $3,300.00 WW-9 Connect to Existing Manhole I EA $5,000.00 $5,000.00 TOTAL = $116,350.00 I Packet Pg. 241 1 Item Description I Estimated I Quantity Unit Unit Price Amount VALOR COURT - PARCEL 306 PW-1 8" PVC Water Main (DR-18) 796 LF $60.00 $47,760.00 PW-2 8" Gate Valve 1 EA $1,500.00 $1,500.00 PW-3 1" Single Water Service (Complete) 7 EA $1,500.00 $10,500.00 PW-4 1.5" Double Water Service (Complete) 13 EA $1,750.00 $22,750.00 PW-5 Fire Hydrant Assembly, Complete 2 EA $8,500.00 $17,000.00 PW-6 Temporary Blow -off w/ Automatic Flushing Device 1 EA $13,000.00 $13,000.00 PW-7 Connect to Existing Water Main 1 EA $6,500.00 $6,500.00 TOTAL $119,010.00 L) 0 U 0 L_ IL 4- 0 r_ 0 0 E U a I Packet Pg. 242 1 Del Webb Naples (Parcels 304-306) AMUC PHASE B Packet Pg. 243 Del Webb Naples (Parcels 304-306) - Phase B AMUC Wastewater $109,700.00 Water $105,900.00 Sub -Total $215,600.00 10% Contingency $21,560.00 Total =1 $237,160.00 Notes: 1) This Opinion of Probable Cost (OPQ shall be used for permitting and bonding purposes only. 2) This OPC is based on the engineer's understanding of the current rules, regulations, ordinances, and construction costs in effect on the date of this document. Interpretations of these construction costs may affect this OPC, and may require adjustments to delete, decrease, or increase portions of this OPC. 3) All costs provided in this OPC are based on recent contract prices, or the engineer's latest known unit costs.Unit prices are subject to change due to to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. 4) Does not include permit fees or soft costs. 5) Does not include enhanced landscape or hardscape features Nikolaus J. Kasten, P.E. FIL Registration #88638 COA #8636 Date I Packet Pg. 244 MEMORIAL LANE - PARCEL 305 WW-1 8" PVC Gravity Sewer (0-6') 250 LF $50.00 $12,500.00 WW-2 8" PVC Gravity Sewer (6'-8') 335 LF $65.00 $21,775.00 WW-3 4'Manhole (0-6') 3 EA $7,500.00 $22,500.00 WW-4 4'Manhole (6'-8') 1 EA $9,000.00 $9,000.00 WW-5 6" Single Cleanout PVC Sewer Service 8 EA $1,500.00 $12,000.00 WW-6 6" Double Cleanout PVC Sewer Service 12 EA $1,750.00 $21,000.00 WW-7 Sanitary Sewer Cleanout 3 EA $1,000.00 $3,000.00 WW-8 Television Inspection 585 LF $5.00 $2,925.00 WW-9 Connect to Existing Manhole I EA $5,000.00 $5,000.00 TOTAL = $109,700.00 I Packet Pg. 245 1 Item Description MEMORIAL LANE - PARCEL 305 PW-1 8" PVC Water Main (DR-18) PW-2 1.5" Double Water Service (Complete) PW-3 Fire Hydrant Assembly, Complete PW-4 Temporary Blow -off w/ Automatic Flushing Device PW-5 Connect to Existing Water Main Estimated I Unit I Unit Price I Amount 690 LF $60.00 $41,400.00 16 EA $1,750.00 $28,000.00 2 EA $8,500.00 $17,000.00 1 EA $13,000.00 $13,000.00 1 EA $6,500.00 $6,500.00 TOTAL $105,900.00 I Packet Pg. 246 1 Del Webb Naples (Parcels 304-306) AMUC PHASE C Packet Pg. 247 Del Webb Naples (Parcels 304-306) - Phase C AMUC Wastewater $162,280.00 Water $121,420.00 Sub -Total $283,700.00 10% Contingency $28,370.00 Total =1 $312,070.00 Notes: 1) This Opinion of Probable Cost (OPQ shall be used for permitting and bonding purposes only. 2) This OPC is based on the engineer's understanding of the current rules, regulations, ordinances, and construction costs in effect on the date of this document. Interpretations of these construction costs may affect this OPC, and may require adjustments to delete, decrease, or increase portions of this OPC. 3) All costs provided in this OPC are based on recent contract prices, or the engineer's latest known unit costs.Unit prices are subject to change due to to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. 4) Does not include permit fees or soft costs. 5) Does not include enhanced landscape or hardscape features Nikolaus J. Kasten, P.E. FIL Registration #88638 COA #8636 Date I Packet Pg. 248 CELEBRATION DRIVE - PARCEL 304 WW-1 8" PVC Gravity Sewer (0-6') 251 LF WW-2 8" PVC Gravity Sewer (6'-8') 425 LF WW-3 8" PVC Gravity Sewer (8'-10') 285 LF WW-4 4'Manhole (0-6') 3 EA WW-5 4'Manhole (6'-8') 3 EA WW-6 4'Manhole (8'-10') 1 EA WW-7 6" Single Cleanout PVC Sewer Service 8 EA WW-8 6" Double Cleanout PVC Sewer Service 10 EA WW-9 Television Inspection 961 LF WW-10 Connect to Existing Manhole I EA $50.00 $12,550.00 $65.00 $27,625.00 $80.00 $22,800.00 $7,500.00 $22,500.00 $9,000.00 $27,000.00 $10,500.00 $10,500.00 $1,500.00 $12,000.00 $1,750.00 $17,500.00 $5.00 $4,805.00 $5,000.00 $5,000.00 TOTAL = $162,280.00 I Packet Pg. 249 1 Item Description CELEBRATION DRIVE - PARCEL 304 PW-1 8" PVC Water Main (DR-18) PW-2 8" Gate Valve PW-3 1.5" Double Water Service (Complete) PW-4 Fire Hydrant Assembly, Complete PW-5 Temporary Blow -off w/ Automatic Flushing Device PW-6 Connect to Existing Water Main Estimated I Unit I Unit Price I Amount 982 LF $60.00 $58,920.00 1 EA $1,500.00 $1,500.00 14 EA $1,750.00 $24,500.00 2 EA $8,500.00 $17,000.00 1 EA $13,000.00 $13,000.00 1 EA $6,500.00 $6,500.00 TOTAL $121,420.00 I Packet Pg. 250 1 Del Webb Naples (Parcels 304-306) PPL 2/15/2024 Enpjneers Opinion of Probable Cost Phase A Phase 8 Phase C Total Paving $137,266.50 $123,911.50 $189,461.50 $450,639.50 Drainage $150,385.00 $133,795.00 $156,030.00 $440,210.00 Earthwork $20,413.50 $1,426.50 $3,023.00 $24,863.00 Lighting $13,200.00 $16,500.00 $16,500.00 $46,200.00 Landscaping $49,500.00 $48,000.00 $33,000.00 $130,500.00 Sub -Total = $370,76S.00 $323,633.00 $398,014.50 $1,092,412.50 10% O&M $37,076.50 $32,363.30 $39,801.45 $109,241.25 To—tal = $407,841.50 1 $355,996.30 $437,815.95 Notes: 1) This Opinion of Probable Cost 0 PC) shall be used for permitting and bond! ng purposes only. 2) This 0 PC is based on the engineer's understand! ng of the current rules, regulations, ordinances, and construction costs in effect on the date of this document. Interpretations of these construction costs may affect this 0 PC, and may require adjustments to delete, decrease, or increase portions of this OPC. 3) All costs provided in this OPC are based on recent contract prices, or the engineer's latest known unit costs. Unit prices are subject to change due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. 4) Does not include permit fees or soft costs. 5) Does not include enhanced landscape or hardscape features NikolausJ. Kasten, P.E. pr Digitally FL Registration #88638 �F V� signed by Niko aus J COA #8636 Kasten Date: 2024."2.15 15:46:18-05'00' Date Nikolaus J. Kasten State of Florida Professional Engineer, License No. 88638 This item has been digitally signed and sealed by Nikolaus J. Kasten, P.E., on 2/15/2024. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. I Packet Pg. 251 Del Webb Naples (Parcels 304-306) PPL PHASE A Packet Pg. 252 Del Webb Naples (Parcels 304-306) - Phase A PPL FP —a Drainage $150,385.00 1 Earthwork $20,413.50 Lighting $13,200.00 Landscaping $49,500.00 Sub -Total = $370,765.00 Contingency $37,076.50 Notes: 1) This Opinion of Probable Cost (OPC) shall be used for permitting and bonding purposes only. 2) This OPC is based on the engineer's understanding of the current rules, regulations, ordinances, and construction costs in effect on the date of this document. Interpretations of these construction costs may affect this OPC, and may require adjustments to delete, decrease, or increase portions of this OPC. 3) All costs provided in this OPC are based on recent contract prices, or the engineer's latest known unit costs. Unit prices are subject to change due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. 4) Does not include permit fees or soft costs. 5) Does not include enhanced landscape or hardscape features Nikolaus J. Kasten, P.E. FL Registration #88638 COA #8636 Date I Packet Pg. 253 1 Estimated Item IlDescription I -- --.— I Unit I Unit Price I Amount VALUM �-UUM I - rmM-CL 3UD P-1 3/4" Asphaltic Concrete (Type S-111) First Lift 2,033 SY $7.50 $15,247.50 P-2 3/4" Asphaltic Concrete (Type S-111) Second Lift 2,033 SY $8.00 $16,264.00 P-3 6" Linnerock Base 2,033 SY $11.00 $22,363.00 P-4 12" Stabilized Subgrade 2,643 SY $4.00 $10,572.50 P-5 Type "A" Curb 200 LF $19.00 $3,800.00 P-6 Valley Gutter 1,589 LF $15.00 $23,835.00 P-7 5'Concrete Sidewalk 893 SY $45.00 $40,185.00 P-8 Signing and Marking 1 LS $5,000.00 $5,000.00 TOTAL = $137,266.50 I Packet Pg. 254 1 VALOR COURT - PARCEL 306 D-1 18" RCP 23 D-2 24" RCP 204 D-3 36" RCP 418 D-4 24" Flared End I D-5 36" Flared End 2 D-6 Valley Gutter Inlet 4 D-7 Grate Inlet 1 LF $75.00 $1,725.00 LF $100.00 $20,400.00 LF $170.00 $71,060.00 EA $4,500.00 $4,500.00 EA $8,500.00 $17,000.00 EA $7,300.00 $29,200.00 EA $6,500.00 $6,500.00 TOTAL = $150,385.00 I Packet Pg. 255 1 VALOR COURT - PARCEL 306 E-1 Sod (1' off BOC) 199 SY $3.50 $696.50 E-2 2' Silt Fence (Single Row)* 4,587 LF $3.00 $13,761.00 E-3 Floating Turbidity Barrier 413 LF $12.00 $4,956.00 E-4 Inlet Protection 5 EA $200.00 $1,000.00 NOTE: *Includes silt fence for the entire project. TOTAL = $20,413.50 I Packet Pg. 256 1 VALOR COURT - PARCEL 306 L-1 Lighting 4 EA $3,300.00 $13,200.00 TOTAL = $13,200.00 Packet Pg. 257 VALOR COURT - PARCEL 306 LA-1 Code Minimum Landscaping I LS $49,500.00 $49,500.00 TOTAL = $49,500.00 Packet Pg. 258 Del Webb Naples (Parcels 304-306) PPL PHASE B Packet Pg. 259 Del Webb Naples (Parcels 304-306) - Phase B PPL Engineers Opinion of Probable Cost Paving $123,911.50 Drainage $133,795.00 Earthwork $1,426.50 Lighting $16,500.00 Landscaping $48,000.00 Sub -Total = $3 110% Contingency $ Total =1 $355,996.3 Notes: 1) This Opinion of Probable Cost (OPC) shall be used for permitting and bonding purposes only. 2) This OPC is based on the engineer's understanding of the current rules, regulations, ordinances, and construction costs in effect on the date of this document. Interpretations of these construction costs may affect this OPC, and may require adjustments to delete, decrease, or increase portions of this OPC. 3) All costs provided in this OPC are based on recent contract prices, or the engineer's latest known unit costs. Unit prices are subject to change due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. 4) Does not include permit fees or soft costs. 5) Does not include enhanced landscape or hardscape features Nikolaus J. Kasten, P.E. FL Registration #88638 COA #8636 Date I Packet Pg. 260 1 Estimated Item IlDescription I -- --.- I Unit I Unit Price I Amount IVICIVIUMAL LIANC — roAK%.CL 3U3 P-1 3/4" Asphaltic Concrete (Type S-111) First Lift 1,835 SY $7.50 $13,762.50 P-2 3/4" Asphaltic Concrete (Type S-111) Second Lift 1,835 SY $8.00 $14,680.00 P-3 6" Linnerock Base 1,835 SY $11.00 $20,185.00 P-4 12" Stabilized Subgrade 2,386 SY $4.00 $9,544.00 P-5 Type "A" Curb 200 LF $19.00 $3,800.00 P-6 Valley Gutter 1,411 LF $15.00 $21,165.00 P-7 5'Concrete Sidewalk 795 SY $45.00 $35,775.00 P-8 Signing and Marking 1 LS $5,000.00 $5,000.00 TOTAL = $123,911.50 I Packet Pg. 261 1 MEMORIAL LANE - PARCEL 305 D-1 18" RCP 26 LF D-2 24" RCP 193 LF D-3 30" RCP 461 LF D-4 24" Flared End I EA D-5 30" Flared End 2 EA D-6 Valley Gutter Inlet 4 EA $75.00 $1,950.00 $100.00 $19,300.00 $145.00 $66,845.00 $4,500.00 $4,500.00 $6,000.00 $12,000.00 $7,300.00 $29,200.00 TOTAL= $133,795.00 Packet Pg. 262 MEMORIAL LANE - PARCEL 305 E-1 Sod (1' off 130C) 179 SY $3.50 $626.50 E-2 Inlet Protection 4 EA $200.00 $800.00 TOTAL = $1,426.50 I Packet Pg. 263 MEMORIAL LANE - PARCEL 305 L-1 Lighting 5 EA $3,300.00 $16,500.00 TOTAL = $16,500.00 Packet Pg. 264 MEMORIAL LANE - PARCEL 305 LA-1 Code Minimum Landscaping I LS $48,000.00 $48,000.00 TOTAL = $48,000.00 Packet Pg. 265 Del Webb Naples (Parcels 304-306) PPL PHASE C Packet Pg. 266 Del Webb Naples (Parcels 304-306) - Phase C PPL Paving $189,461.50 Drainage $156,030.00 Earthwork $3,023.00 Lighting $16,500.00 Landscaping $33,000.00 Sub -Total = $3 110% Contingency $ Total =1 $437,815.9 Notes: 1) This Opinion of Probable Cost (OPC) shall be used for permitting and bonding purposes only. 2) This OPC is based on the engineer's understanding of the current rules, regulations, ordinances, and construction costs in effect on the date of this document. Interpretations of these construction costs may affect this OPC, and may require adjustments to delete, decrease, or increase portions of this OPC. 3) All costs provided in this OPC are based on recent contract prices, or the engineer's latest known unit costs. Unit prices are subject to change due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. 4) Does not include permit fees or soft costs. 5) Does not include enhanced landscape or hardscape features Nikolaus J. Kasten, P.E. FL Registration #88638 COA #8636 Date I Packet Pg. 267 1 Estimated Item IlDescription I -- --.— I Unit I Unit Price I Amount �-CLCDKA I I UVA unive - rmM-CL 3U14 P-1 3/4" Asphaltic Concrete (Type S-111) First Lift 2,727 SY $7.50 $20,452.50 P-2 3/4" Asphaltic Concrete (Type S-111) Second Lift 2,727 SY $8.00 $21,816.00 P-3 6" Limerock Base 2,727 SY $11.00 $29,997.00 P-4 12" Stabilized Subgrade 3,545 SY $4.00 $14,18 -0 P-5 Type "A" Curb 248 LF $19.00 $4,712.00 P-6 Type "I"' Curb 664 LF $22.00 $14,608.00 P-7 Valley Gutter 1,305 LF $15.00 $19,575.00 P-8 3' Valley Gutter 221 LF $25.00 $5,525.00 P-9 Type "D" Curb 12 LF $18.00 $216.00 P-10 5'Concrete Sidewalk 1,174 SY $45.00 $52,830.00 P-11 Concrete Handicap Ramps w/ Detectable Surface 1 EA $550.00 $550.00 P-11 Signing and Marking 1 LS $5,000.00 $5,000.00 TOTAL = $189,461.50 I Packet Pg. 268 1 CELEBRATION DRIVE - PARCEL 304 D-1 18" RCP 20 LF D-2 24" RCP 190 LF D-3 30" RCP 494 LF D-4 24" Flared End I EA D-5 36" Flared End 2 EA D-6 Valley Gutter Inlet 3 EA D-7 Type "9" Curb Inlet I EA D-8 Junction Box 2 EA $75.00 $1,500.00 $100.00 $19,000.00 $145.00 $71,630.00 $4,500.00 $4,500.00 $8,500.00 $17,000.00 $7,300.00 $21,900.00 $6,500.00 $6,500.00 $7,000.00 $14,000.00 TOTAL = $156,030.00 I Packet Pg. 269 1 CELEBRATION DRIVE - PARCEL 304 E-1 Sod (1' off BOC) 258 SY $3.50 $903.00 E-2 E-3 Floating Turbidity Barrier 110 LF $12.00 $1,320.00 Inlet Protection 4 EA $200.00 $800.00 TOTAL $3,023.00 I Packet Pg. 270 CELEBRATION DRIVE - PARCEL 304 L-1 Lighting 5 EA $3,300.00 $16,500.00 TOTAL = $16,500.00 Packet Pg. 271 CELEBRATION DRIVE - PARCEL 304 LA-1 Code Minimum Landscaping I LS $33,000.00 $33,000.00 TOTAL = $33,000.00 Packet Pg. 272