Backup Documents 05/14/2024 Item #16F10 ORIGINAL DOCUMENTS CHECKLIST&ROUTING SLIP 1 6 F 1 0 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2, complete the checklist,and forward to the County Attorney Office. Route to Addressee(s)(List in routing order) Office Initials Date 1. County Attorney's Office County Attorney Office s1/y 211 2. BCC Office Board of County Commissioners Chairman 3. Minutes and Records Clerk of Court's Office // ll / 7 1 0* PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addresses above,may need to contact staff for additional or missing,information. Name of Primary Staff Bendisa E. Zela,Facilities Division Phone 239-252-8440 Contact/Department Number Bendisa.Zela@colliercountyfl.gov Email Agenda Date Item was May 14,2024 Agenda Approved by the BCC Item 16.F.10 Number Type of Document Change Order No.3 for a 98-day time extension Number of Attached and add$154,920 under Agreement Number 21- Original 1 7911 with RG Architects,P.A.,for the Design Documents Services for Collier County Mental Health Attached Facility,and authorize the Chairman to sign the attached Change Order(Project No.50239). PO number or account The Facilities Division is requesting a number if the document completed copy is to be recorded INSTRUCTIONS&CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? N/A 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name,Agency,Address,Phone)on an attached sheet. 3. The original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,except for most letters,must be reviewed and signed by the BEZ Office of the County Attorney. 4. All handwritten strikethroughs and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board. 5. The Chairman's signature line date has been entered as the date of BCC approval of the BEZ document or the final negotiated contract date,whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 11I"!/ 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney's Office at the time the item is input into SIRE. Some documents are time-sensitive and require forwarding to Tallahassee within a certain time frame,or the BCC's actions are nullified. Be aware of your deadlines! 8. The BCC approved the document on May 14,2024,and all changes made during the N/A is not meeting have been incorporated in the attached document. The County Attorney's /09 an option for Office has reviewed the changes,if applicable. I this line. 9. Initials of attorney verifying that the attached document is the version approved by the N/A is not BCC, all changes directed by the BCC have been made, and the document is ready for the Os, an option for Chairman's signature. this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16F10 Collier County Procurement Services Change Order Form Contract# 21-7911 CO# 3 PO# 4500217007 Project#: 50239.1 Project Name: Design Services for Collier County Mental Health Facility Contractor/Consultant Name: R.G. Architects, P.A. Select One: Contract Modification (Construction or Project Specific) LI Work Order Modification Project Manager Name: Claudia Roncoroni Division Name: Facilities Management Original Contract/Work Order Amount $2,462,809.00 Original BCC Approval Date;Agenda Item# Current BCC Approved Amount $2,626,644.25 Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $2,626,644.25 SAP Contract Expiration Date(MASTER) Dollar Amount of this Change $154,920.00 12.94% Total%Change from Original Amount Revised Contract/Work Order Total $2,781,564.25 5.90% %Change from Current BCC Approved Amount Total Cumulative Changes $318,755.25 5.90% % Change from Current Amount Notice to Proceed 3-15-2022 Original NTP 1,215 Original Final 7-12-2025 Last Final 11-13-2026 Date #of Days Completion Date Approved Date #of Days Added 98 Revised Final Date 2 19 2027 Current Substantial Completion Date (includes this change) (if applicable) Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete summary on next page. Check all that apply to this Change Order request: ✓❑Add Time; ❑� Add funds; ❑ Use of Allowance; ❑ Modify/Delete existing Task(s); ❑Add new Task(s); ❑ Reallocate funds; ❑ Other(must be explained in detail below) 1.) Detail of change/s to be made through this Change Order. This change order will increase Task 5 - 90% Construction Documents by $144,920 and Task 20 — Reimbursables by $10,000 for a total contract increase of$154,920 and will also add 98 days. This is for additional design services required for value engineered items and to revisit and coordinate the drawings and 3D model. 2.) If this Change Order is currently under a Stop Work, please identify the date issued and number of days remaining or "N/A" if not applicable. N/A 3.) Explain why this change was not included in the original contract/Work Order. These changes were not originally included as while the project progresses changes are made at the owner's request to provide for a fully functional facility. 4.) Describe the impact if this change is not processed. If this change order is not processed the value engineered items will not be realized not allowing a cost savings to the County. Page 1 of 4 CND Change Order Form (2023_ver.1) 16F10 Collier County Procurement Services Change Order Form Contract# 21-7911 CO# 3 Po# 4500217007 Project#: 50239.1 Project Name: Design Services for Collier County Mental Health Facility Contractor/Consultant Name: R.G. Architects, P.A. Change Order/Amendment Summary (If additional spaces needed, attached a separate Summary page to this amendment request) COST TIME CO# AMD# Description Additive Deductive Days Total New Justification (+) (-) Added Time Additional Services Additional services and additional and time for Task 3—30% time necessary to complete 1 Construction Documents $126,500 258 1,473 Task-3 Additional Services Additional services and additional and time for Task 3—30% time necessary to complete 2 Construction Documents $37,335.25 231 1,704 Task-3 Additional Services Additional services and and time for Task 5 90% Construction Documents additional time necessary to 3 and Task 20 Reimbursables $154,920 98 1,802 complete Task 5 and Task 20 ❑ Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form (2023_ver.1) 16F10 Co Ater County Procurement Services Change Order Form Contract# 21-7911 CO# 3 PO# 4500217007 Project#: 50239.1 Project Name: Design Services for Collier County Mental Health Facility Contractor/Consultant Name: R.G. Architects, P.A. Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional "Project Coordinator"or Design/Engineer Professional under the agreement. Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations (Sunbiz) website (https://dos.myflorida.com%sunbiz/search/). If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the company giving that person signature authority. Ro n co ro n i C l a u d i a Digitally signed by RoncoroniClaudia Prepared by: Date:2024.04.22 07:39:58-04'00' Date: 04/22/2024 Signature-Division Project Manager Claudia Roncoroni, Project Manager II, Facilities Management Printed Name Digitally signed by Ryan S Richards Accepted by: Date:2024.04.24 16:38:34-04'00' Date: 04.24.24 Signature-Design/Engineer Professional (if applicable) Ryan Richards, AIA, Principal, RG Architects PA Printed Name/Title/Company Name Accepted by: Date: Signature-Contractor/Consultant/Vendor Printed Name/Title/Company Name Approved by: Date: Signature-Division Manager or Designee(Optional) Printed Name McCormickJohn Digitally signed by McCormickJohn Approved by: Date:2024.04.25 08:49:19-04'00' Date: Signature-Division Director or Designee(Optional) John McCormick, P.E., Division Director, Facilities Management Printed Name Approved by: Date: Signature-Division Administrator or Designee (Optional) Printed Name Page 3 of 4 Change Order Form (2023_ver.1) �A� 16F10 Col�iler County Procurement Services Change Order Form Contract# 21-7911 CO#3 PO# 4500217007 Project#: 50239.1 Project Name: Design Services for Collier County Mental Health Facility Contractor/Consultant Name: R.G. Architects, P.A. FOR PROCURMENT USE ONLY FY 24 CHO Request# 373 Zi m merma n Becca Digitally signed by ZimmermanBecca Approved by: Date:2024.04.30 08:34:50-04'00' Signature-Procurement Professional Signature/Date Approved by: Signature-Procurement Manager/Director(OPTIONAL) APPROVAL TYPE: ❑ Administrative ✓❑ Administrative-BCC Report El BCC Stand-Alone ES (BCC Approval Required) BCC APPROVAL ATTEST: Crystal K. Kinzel,.Clerk"o1'the,Circuit Court BOARD OF COUNTY COMMISSIONERS and Comptroller_- '` .:�' COLLIER CO T , FLORIDA • By. By: • Chris Hall , Chairman Dated: tte 8s to Chairman's Date: 5//y 2({ Signature only (SEAL) Agenda# 16Fia Ap rov d as t� For, d gality: uty County Attorney Sup-) R L1--s— Print Name Page 4 of 4 GPO Change Order Form (2023_ver.1) 16F10 April 17, 2024 Claudia Roncoroni Project Manager Facilities Management Division 3335 Tamiami Trail East Naples, Florida 34112 Claudia.Roncoroni(a.colliercountyfl.gov 239-877-8274 (c) Re: Change Order Request #3 Architectural Services for 90% Construction Documents and Contract Time Extension Collier County Government—Design Services for Collier County Mental Health Facility RPS#21-7911. PO#4500217007. Dear Roncoroni, RG Architects, P.A. respectfully submits the following proposal for Additional Design Services for the above-listed project. Services to be rendered under this add service proposal are as follows: (This work was not part of the original proposal and related scope of work.) We propose to adjust to Task 5—90% Construction documents and Task 20—Reimbursables for Additional Design Services to be billed as a percentage completed for the total amount of$154,920.00 for the Design Services for Collier County Mental Health Facility. These services are related to Design Development budget estimate and approved VE items, the design team is to revisit and coordinate the drawings and 3D model. VE Description Requiring Additional Time • Chain link fence in lieu of cast in place wall at generator • Use ACT ILO SA-03 Acoustibuilt Ceilings in all areas currently showing both Acoustibuilt&ACT • Eliminate drywall soffits in all rooms currently showing ACT &drywall soffits • 50% TBD reduction of Altro Whiterock Scope. Leave walls as impact rated walls. Epoxy paint bathroom walls. • Make all door canopies 24 SF • Reduce Nurse Call from entire building to Medicare pods only • Tilt wall in lieu of CMU - Bldg. exterior walls only. • Eliminate loading dock canopy. • Alternate light fixture package Fee Breakdown Task 5—90% Construction Documents RGArchitects,P.A. A,chiteclure Plarninn 2070 McGregor Blvd Ste 1 FL 33901 p 239.332.2040 1239 332 2049 1lPage CA0 16F10 Change Order Request April 1/, 2.I12/! Architectural/Structural Services for Collier County Government—Design Services for Collier County Mental Health Facility RPS#21-7911 Architectural Services $ 74,630.00 L.S.N.T.E MEP/FP $ 30,020.00 L.S.N.T.E Structural Services $ 35,040.00 L.S.N.T.E Civil Engineering $ 5,230.00 L.S.N.T.E SUB-Total Change Order#3—Task 5 $ 144,920.00 L.S.N.T.E SUB-Total Change Order#3—Task 20 $ 10,000.00 T&M TOTAL CHANGE ORDER#3 $ 154,920.00 L.S.N.T.E Fee Adjustments To PO#4500217007. Original PO Lump Sum $1,443,013.50 Original PO L.S.N.T.E $1,019,795.50 Change Order# 1 —Task 3(L.S.N.T.E) $126,500.00 Change Order#2—Task 3(L.S.N.T.E) $37,335.25 Change Order#3—Task 5&Task 20 (L.S.N.T.E) $154,920.00 REVISED TOTAL PO AMOUNT $2,781,564.25 In addition to Task 5 &Task 20, the schedule has been revised as of April 3, 2024. See Attached Exhibits. Thank you for your consideration in this matter. If there are questions concerning the above, please do not hesitate to contact our office. *The request for the time extension in the amount of 98 days is based on three main reasons: 1. The Design Development (60%) package's cost estimate came in approximately$9.2M higher than the Schematic Design estimate (30%). To address this, a round of value engineering (VE) was necessary, aiming to bring the estimated cost down to $49.9M. This change in estimated cost required notification to the Board of Collier County Commissioners. 2. The selected VE measures to reduce construction costs now need to be incorporated into the design. This process includes obtaining approval for a Change Order to execute the redesign associated with the VE. 3. In December 2020, the Environmental Protection Agency (EPA) transferred the responsibility of implementing Section 404 of the Clean Water Act from the U.S.Army Corps of Engineers (ACOE) to the Florida Department of Environmental Protection (FDEP), known as the State 404 Program. However, a federal judge ruled in favor of the Plaintiffs on February 15, 2024, overturning EPA's approval of FDEP's assumption of the program. Consequently, FDEP suspended processing all pending State 404 applications. Although ACOE has begun accepting Section 404 permit applications, the project site, the Collier County Behavioral Health Center, is not expected to RGArchitects,P.A. Architecture Planning 2070 McGregor Blvd Ste 1 Fort Myers FL 33901 p 239 332 2040 21Page Cq� 16F10 Change Order Request#3 April 17, 2024 Architectural/Structural Services for Collier County Government—Design Services for Collier County Mental Health Facility RPS#21-7911 contain wetlands or surface waters requiring authorization under the Clean Water Act. Nonetheless, the Design Team will proceed with the standard South Florida Water Management District(SFWMD) Environmental Resource Permit(ERP) process.This entails submitting a Dry Land Approved Jurisdictional Determination Form to ACOE, seeking confirmation that there are no jurisdictional waters of the United States on-site. The original June 24, 2024 deadline for project permitting on this site has been delayed by a minimum of six(6) months due to the pause in design review prompted by the case news and the subsequent hold status.Additionally, it may take several months to navigate the evolving process with ACOE. Other Attachments: • Schedule B—Fee Sheet MOD 5 • Collier County Labor Rates MOD 5 • Revised Project Schedule—04.16.2024 Exhibit • DeAngelis Diamond—Cost Management Log DD Budget Update 2/14/2024 Sincerely, RG Architects, PA. Collier County Government Ryan Richards,AIA, NCARB Claudia Roncoroni cc:Javier Salazar,AIA Project Manager RG Architects,P.A. Archileclurc Planning 2070 McGregor Blvd Ste 1 Fort Myers FL 33901 p 239.332 2040 31Page S 16F10 U) 4,9 O CD 0 O O O 6 o co co U) N N N Lci 0 0 m D U) O 0 0 0 0 0 0 O 0 0 In- Lo 1.6 co co H co 0 0 m D CO ER f/T 0 O O O 0 0 O O O N N N O O 0 O O O co co c U 0 0 no D CO co 0 0 0 �U o 0 0 m o 0 0 N 0 0 'is o c o o o 0 'i r 0 2a. = u1 0 o U) _ . z 0) U w J O X w n. N to Et 09- co O 0 0 0 0 a o m o 0 0 0 co co m co o co c0 Q co H 4. V O J .4 , ti O t� 61 61 U H ow O r - U a J o 0 0 CO CO (I) ►-- Ce CO C O U AO a) I -J Q I- 16F10 -_ _ O O O O z Opp O O 0 O OO en~ 4 cJ p Q b = t (r r'J w CO -J 0 0 0 0 0 io C N O O E w 0 o-o _ co 0 0 ❑ o 0 0 vi o a U V) N Cl) u N N 0 0 O C N O O O CD.O ( N C N a w N O rn 0 0 co ni -alo 0 0 0 , O 2 > h 6 E. a cn c". co w _ W 0 0 O 11 rn To S O7. C O O O m 0 c -al a m 0`n a, c in 2 o La a ❑ c^o 0 O oo 0 n- 2 U r u ur `-N0 m 0.0 0 0 «_p O 'U C a 0 O 0 O t0 O 8 d C 0, N 0 �0 nw a o O j• 3 a_ . ›....0_ 0 C T U O a u)N L N N N co C# E VI r, mi U1 Ln GO a N M = v a ,n a❑a: U I c 0 • u O O E v •v a v rn C 2 = N N N. O o0a co� O c o O U NO• C N Nr- O o a 2 M N 4.6 01 O O a 0• 5 ; ; ao" N n. n� 0 Ill r-I-i- 0 M 0 0 0 0 0ci000 0 QImzl- c F-O aw0 .1;cn O=�X~ ❑ U w W O a: N ❑ C J 0 E aF 3.Y o O o I- ❑ oa Gn O O( O To '� J ? ''�. Q Z. n J f C 17 0_ o m t= m F-CO U) CAO 16F10 U 0 r+•• IL. CD (CCa O C N CD - O RT E U p ,12 X n1 W Lo °O N N a ' CD - 1 in N N N N �' N N N CO pp co N N N N ' N _ N ' N op N �- CO c- N (n Co CO LL I p co c r n (U d- �r ` o N , N .- E �7 N cM t- fn Q) ` N co aiii d' I` M � C �r• CU N E -,-+ IQ cn < CO N C I E V N co O I Ct p N CO E OC CV _)EO M N L r - E ' M CL C M O L >• CON Nc O CZ ' O cow E LL Mcv . N I C N O N c7 CON p E I CO IZ N N N f N- ~ ' t (n C 0 C6 N N E c E -�+ CO O CO N I I E M i fX N N �_ M M I O as C E 1 6 F 1 0 N -o -p `0 r0 a) O I Y b0 ap-, Y > >, Y N U 03 03 G., I d 0 U as O 00 a) O• j U Q 7 7 N a)) CC p E C C C N — N f o O O r0 _c > O 4Q1 o v N - al o p mo a Gjl N N -o .-,- c E p \ 4- 3 a .0 — L . a) at *t Q N - (1 9— Y O C ro Cl) �13 3 U NJ O p -o -o N .fl 0) M Cr) a a C N Q = c Y O N L 0 -, E ., > v V) , rir‘i Q a 0 a Q a.. m G L. t/). i n 'O O O O co j u o 0 I O }M y"ti:crO r n• Q an U1• i/} O 0 O 0 0 O 0 0 O O O 0 0 0 0 O Q 0 0 O 0 0 �Qr) 'en.., C 01 O O O 00 O O r-1 h N h O 0 .4) 0 d' O 00 ON 0 LP) h .or :ta O M w to 0 O 00 •7 0 N 00 h d' N 0 M 0 O O ct C) c) CO N 03 O y h 00 N lO up' O lO In V r-1' to d O O c-i O M h O lO 4 tp t0 I M ,tO M ,-1 N m to 01 h N LD O ,-I V) N 01 `� V) CO '-i lO ri to 1 N.. E V v v v d v ram... ��'t u J- Q Q M v.. n sr .7 to to t/} to to into to V} to 4../1to to to i . to 'V) th L} V} to Y} .r; I 00 p Pig' 00 n c } 1/1 n c • a , ii. C r.t``e a d n i oo r, j p 00 co CO CO CO CO CO CO CO 03 03 CO ►� 1 U ` _ Q Q U U ? ,, U U U U Cr) C 00 0 0C9 Z Z U U Ur U U 0 0cJ CJ U U U U U y cc a a 0' a m a or 0 cc a' a M n CO ifF A' I "0 -o -0 -0 -0 -0 -0 -0 "O -O -O - -0 -O v -O LS a v - -6 N 0) a) 0) a) a) 0) 0) 0) a) 0) 0) a) (1J 0) (1) 0) 0) aU 0) a1 01 4-' 4-, 4.-, 4-,+ 4-4 4 4-' Y +, 4-, 4--, 4--, 4 4--, 4--, 4-, 4- 4--, 4-, 4-, Y .� O. Q Q a Q. d Q 0. 0. Q. a Q. f1 0_ 0_ Q. CI S1 O. CI O. OS1 a) 0) 0) 0) a) a) a) a) 0) a1 a1 0) 0) 0) al 0) a) 0) 0) a) 0) 4-' U U U U U U U U U U U U U U U U U U U U U "' < U U < U < < < 0 U U 0 U U U U < < U < < C CC 0) •cr M M M M M M M M CO M M M M M N N m m L m LS N N N N N N N N N N N N N N N N N N N Fa cu QJ O O O O O O O O O O O O O O O O ON NO O O O 7 0 (00 •(0 \ \ \ \ \ \ \ \ \ \ \ \ \ \ - \ N N \NI \ \ m 0 Q 4.. L) h v) in U) LO ill In in � in In � V) � in ,i LO In in \ r-1 '� \ \ \ \ \ \ \ '� \ \ \ \ \ \ \ \ OA C N \ N N N N N CO CO N N N N N N N N N N N N C .-i .-i c-i .-i t7 c-i ci ci c-i c-I .-1 a-i ci .-I ci c-I c-1 (i ci .-1 (-i 13 L 7 O bp m 1 N 3 > C a) 0) C • N L 0 O co O sO u Y O N U ro N J N to 00 ro L "d N > — › _C u c E c O) ip F- 4-, O_ 4-4 to .� O O : -O CO w a�i C •� Q v , C aJi 0 0 CO - }' 3 v ° - on U Y E . E oA 3 c E U H v CO c�a - p u w L. M Oa. ra ar v o f v > x .- L N a m >. to ) U .n o a- x v a) U o v r b0 c O 0 •c co v ,_ ro O -O •E 0 4 Q .Q , N C N > E o > > > — o w a ,L E p w ILO v v .-i F- L Q) . r0 rn O to L CO 'y tr) u0 w o 0 m C n C ~- 0) -V c C 7 o vC C a o o = < •N OJ N ncn > ro 0) CO 144 CO ro 0 0 o U u 0 i+{� �,- Q 3 Y a) v . E 0- E 4 an > aa)) 2 > N Si) (Cl ice- ? U 0 4_- co ' 0 _O Up .Q E -o � • L °Ll O = 0. 13 U O on N Q 4O +_ Y c v - o .� fO Q t.,i 7 C c ro c 0 M ea — ' U 0 ro c 5 n. a) m ro 73. — U CO 03 c v CO _ U \ h0 •yV—� Y Q) r6 Q z O 'J a :..a w '` f1• 'O OZf 0) O ._.� 411 4. ._ � 0 u c n o !C (0 CV -o fO ro o c n n N ni c 1 6F 1 O — — 'U C {. n N Ql O i O O G7 is to- O c u C >✓ C a) O COU O p Z J � v a ✓ O a v) _ a) a) c 'i_ (O • Y 5 • @ w O '- -a O 0 CO N E CDU LO VI ii, +' 0 a) aJ O U a) a) u c to N 0 u C CO O 1 C Y N 7 -0 O L. i Y Q) 00 a) a) n O O 'n J 'O O . 1)- Q LU ., 0 0 0 Q n b U U N �.. i CC c m' 4 0 WE CC h Q ; V' 4 m o O• Y o a Q E u 11 I i I-' Q Q CC' -O c I n G 9 Q. a 0 y in o 0 0 0 0 0 r_` n Q, 0 CT' o d rU o m 0 I n = W. co Ql Si) LI) N 0 LU oo m LU oo o "C W, N up N al i + a,_ V} VT t/} L} VT . \ Q Y1 ' 0 D "'Ii . — J -I J -I J J -IC 0 0 o 0 O 0 O 0 Vi. T 0 n m 0. co W h Q. CO N Q 7 Z(+ N H 0 W 0 J 'O u N N N N N N N 4! Z' O O O O O 0 0 F-+ •-• to N N N N N N N 0 in ,+_. i'' n Lj.i) Lf) Li) LU LI) I- C z N N N N N N '-i i--I a-1 .-I ci .-I .-I ...., N PF— N U al QJ w J V'. 0 0 a) Ln J 0 1 k Q)O >v c aO OE (Ea) N+' a)c4. hi O CU OcEz roy - U