Loading...
VB MSTU Minutes 07/13/202340.A.3 Vamdar6i@tamacli JV1.3.701 ,Advisory Gommoiff" 8300 Radio Road Naples, FL 34104 DULY 13, 2023 I. CALL TO ORDER AND PLEDGE OF ALLEGIANCE Chair Forman called the meeting to order at 2:15 P.M. Roll call was taken, and a quorum of four was established. The Pledge of Allegiance was not recited. II. ATTENDANCE Advisory Committee Staff: Others: III. APPROVAL OF AGENDA Bruce Forman — Chairman William Sjostrom —Vice Chair Mark Weber (ZOOM) Gabriella R. Miyamoto (Excused) William Arell Harris Judy Sizensky - Project Manager Rosio Garcia — Operations Coordinator Aaron Gross --- Ground Zero Landscaping (Excused) Wendy Warren - Transcriptionist Vice Chair Sjostrom moved to approve the Agenda of the Vanderbilt Beach MSTUAdvisofy Committee. Second by Mr. Harris. Carried unanimously 3 - 0. Member Participation via ZOOM Mr. Harris motioned to allow Mr. Weber to participate in the meeting via ZOOM remote access due to an extraordinary circumstance. Second by Chair Forman. Carried unanimously 3-0. Mr. Weber joined the meeting. A gatorum offour was present at 2:19 P.M. IV. APPROVAL OF MINUTES Mr. Harris moved to approve the minutes of the April 6, 2023, and May 4, 2023 Vanderbilt Beach MSTU meetings as presenter. Second by Vice Chair Sjostrom. Carried unanimously 4-0. V. LANDSCAPE MAINTENANCE REPORT —Aaron Gross, Ground Zero Landscaping Ms. Sizensky reported: Landscaping is in good condition. A Cocoplum hedge and mulch was installed between the county parking area and the north side of Bluebill Avenue by the parking lot on Bluebill Avenue. 1 Packet Pg. 750 40.A.3 VI. VANDERBILT DRIVE REFURBISHMENT —Mike McGee, McGee & Associates A. Regatta Corner of Vanderbilt Beach Drive and Vanderbilt Beach Road • McGee & Associates submitted the final subcontractor drawings for the renovation project at the NW corner of Vanderbilt Beach Road and Vanderbilt Drive at The Regatta Vanderbilt Beach. • A Request for Quote (RFQ) was distributed to all contractors on the Collier County General Contractors Contract #19-7525. • The single bid submitted by Capital Construction was significantly higher than the Opinion of Cost provided by the projects Architect and Engineer. • A Scope of Work (SOW) for the project will be posted on Bid -Sync for quotes from General Contractors. • The contract will be awarded to the lowest qualified bidder. B. Vanderbilt Dr Landscape ---- Vanderbilt Beach Road to Bluebill Avenue Landscape West Side Vanderbilt Drive • The environmentally conscious design, from Pahn Court to Bluebill Avenue, includes Christmas Palm trees at the intersections, ground covers and a storm water Rain Garden in the west Right of Way (ROW). Drawings include a I..,andscape Planting Plan, an Irrigation Plan, and a Plant Schedule for reference. Conformance to the twenty-four (24) inch high sightline standard at intersections will be ensured. • A drip line irrigation system will be installed to ensure adequate water flow to the landscaping. • McGee and Associates will submit an Opinion of Cost on completion of final construction drawings. • The Collier County General Contractors Contract 419-7525 will be utilized. • Once the Scope of Work and McGee & Associates plans are completed, an Invitation to Bid will be sent to all contractors on the Contract. • The lowest qualified bidder will be awarded the contract. • The Road Maintenance Division will review and endorse the plans with consideration for impact on utilities on the roadway. McGee & Associates will present a final updated version of the Vanderbilt Drive Landscape renovation construction drawings presented at the February 2, 2023, meetingJor Committee consideration at the September 7, 2023 meeting. C. Crosswalks (6) Along Vanderbilt Beach Drive • Trebilcock Consulting Solutions and McGee & Associates completed engineering and construction plans for six (6) ADA compliant paver crosswalks on Vanderbilt Drive. • Three (3) of the crosswalks will be installed at The Anchorage, The Dunes of Naples, and Marina Bay on completion of Phase IV construction. • A Request for Quote (RFQ) was distributed to the vendor(s) on Collier County General Contractors Contract #19-7525. • The bids received exceeded original cost estimates. • An Invitation to Bid will be posted on Bid -Sync. • The Road Maintenance Division will be consulted to determine if alternative contract options are available for vendor sourcing. 2 Packet Pg. 751 40.A.3 ® Consideration will be given to coordinating the work required for the landscape projects at Vanderbilt Drive and The Regatta Vanderbilt Beach with the crosswalk project. The Anchorage Refurbishment of landscape for property damaged by Phase IV construction is complete. The Dunes of Naples and Marina Bay Landscaping Landscape planting to replace material damaged during Phase IV construction will be undertaken upon completion of light pole removal by Florida Power & Light (FPL). A paver crosswalk will be ADA compliant abutting curbs, installed to eliminate water puddling. Enhancement of landscaping along the narrow strip of roadway will be scheduled for Fall 2023. Swales and gutters may be conducive to a simulated Japanese waterway. Design plans tivrll be prepared, and Hotneoivner" Assoeiatron approval secured, for Marina Bay and The Dunes of Naples. Bench Installation The Durres of Naples • Solid Pave submitted quote #23-0125, in the amount of $2,973.26, to install a paver pad and Madison style bench, with plaque commemorating Charlie Arthur, at The Dunes of Naples. A Notice -to- Proceed will be issued. Moraya Bay • A commemorative bench pad at the Moraya Bay Beach Tower will be constructed at a higher elevation, surfaced with pavers and a Madison style bench installed. • The area will be surveyed to ensure Right of Way (ROW) compliance and provision for ADA access. • Irrigation will be modified, and sod replaced. Le Dauphin • A Madison style bench will be re -installed in the vicinity of Le Dauphin Condominiums on the west side of Vanderbilt Drive. • The existing bench pad will be evaluated for safety, replaced if necessary, and surfaced with pavers. V11. PROJECT MANAGER REPORT — Judy Sizensky A. FY-23 Budget for May Vanderbilt Beach MSTU Fund Budget 143 dated July 13, 2023 • Current Ad Valorem tax, Line 1, is $1,702,200.00, an increase of 14.3% over FY-22. • Transfers and Contributions, Line 13, in the amount of $4,439,041.27, is a carry-over of unexpended FY-22 funds (minus a 5% reserve of $86,700). • Total Revenue, Line 14, is $6,169,241.27, including investment interest, transfers, and contributions. • Purchase Orders Active: (Contractors) ➢ Century Link— Engineering Design & Supervision, Phase IV Utility Project. ➢ Ground Zero Landscaping -- o Incidentals are for landscape refurbishment and miscellaneous. Packet Pg. 7 2 40.A.3 o Ground Maintenance includes Conner Park and irrigation repairs. MasTec North America -- Contract for burial of conduit and placing of equipment for Florida Power & Light, Comcast cable and Century Link for Phase IV. ➢ McGee & Associates — Landscape Architecture — Refurbishment of Vanderbilt Drive and Regatta Landscaping and miscellaneous projects. ➢ Premier Staffing — Transcription Services. ➢ Stantec Consulting — CEI Professional Services, Phase IV Utility Project. ➢ Site One Landscape Supply — Irrigation Parts & Pumps. • Operating Expense, Line 36, is budgeted at $5,305,541.27 with current Commitments of $1,226,133.23, Expenditures of $269,316,23, and a Budget Remainder (unspent operating funds) of $3,810,091.81. • Capital Outlay, Line 38, budgeted at $650,000.00, is for the current fiscal year long term projects, consistent with the MSTU ordinance and upon a motion from the Advisory Committee. • Transfer to Fund 111, Line 39, in the amount of $91,000.00, is for MSTU. Staff salaries and accrued County overhead related to M.S.T.U. operations. • Transfer to the Property Appraiser, Line 41, in the amount of $13,500.00 is for computation of MSTU Ad Valorem data for the tax rolls. • Transfer to the Tax Collector, Line 42, in the amount of $34,200.00 is for collection of MSTU millage as part of the annual County tax bill, currently 0.5000 mills. • Reserves for Capital, Line 44, in the amount of $75,000.00, is for anticipated Maintenance and Capital projects in future fiscal years as identified in the Asset Management Plan. • Total Budget, Line 46, lists FY-23 M.S.T.U. budgeted funds at $6,169,241.27; with tabulated Commitments of $1,226,133,23, Expenditures of $401,449.01, and a Budget Remainder (total unspent funds) of $4,541,659.03. The budget amount of $6,169,241.27 does not change during the fiscal year. Notes: • FY-23 millage rate of 0.5000 will fund future projects, as well as the existing MSTU assets identified in the Capital Asset Management Plan, updated annually. • MasTec has an outstanding financial commitment of $1,038,882.77 for Phase IV construction. • Available funds are sufficient to complete Phase IV construction, landscaping at the Regatta of Naples at Vanderbilt Beach Road and Vanderbilt Drive and the Vanderbilt Drive landscape renovation project and the crosswalks. • Salt deposited on landscaping by Hurricane Ian flooding necessitated an increase in irrigation frequency. The irrigation schedule was reduced by 50% to reduce expenses. B. Phase IV Utility Burial Status • The Phase IV Utility Burial Project is completed. • MasTec removed the overhead cable and the two (2) utility poles on either side of the bridge. Florida Power & Light (FPL) is responsible for removal of the utility poles on the north section of Vanderbilt Drive. 4 Packet Pg. 753 40.A.3 C. Greenway Multi -Use Bike Path — Vanderbilt Drive North of Blue Bill A ten (10) foot bike and pedestrian north of the Dunes of Naples entrance cannot be navigated at high tide or during extreme rain events. RWA Engineering surveyed the area to determine the feasibility of installing an asphalt surface and curb. The survey will be presented at the September meeting. D. Reclaim Water Connection Ms, Sizensky met with the Division Manager for Reuse Water Management to propose a reuse water line installation from US 41 to Conner Park to supply water to Connor Park and Vanderbilt Drive. He noted the County and Environmental Protection Agencies are very cautious about placement of reclaimed water lines and do not want to place them close to wastewater service. As a result, the project is not of interest currently. Ms. Sizensky,, iidll continue to research options. E. Quote for Connor Park Plant Replacements Ground Zero Landscaping's proposal #E636 in the amount of $10,503.48 to replace plants and mulch the berms at Connor Park was presented to the Committee. Vice Chair Sjostrom motioned to approve Ground Zero Landscaping, Inc. '.s proposal 4636, dated July 13, 2023, in the amount of $10,503.48, to replace plants in Connor Park damaged by Hurricane Ian. Second by Mr. Harris. Carried unanimously 4 — 0. VIII. OLD BUSINESS A. Potential Future Projects 1. Refurbish Bridge of Channel on Bluebill The Committee suggested cleaning the waterway bridge and/or researching the application of a veneer stone. The Project Manager will rrreet with the Road Maintenance Division to discuss the project, 2. Install Sidewalks East and West Side of Gulf Shore Drive The Road Maintenance Division is considering sidewalk installation on the east side of Gulf Shore Drive for 2025. Design and find allocation are required; sidewalks must conform to the County code and be ADA compliant. A bike path should be incorporated into the project design. Drainage would have to be redesigned to accommodate the installation. Project timeline depends on coordination with Road Maintenance and Capital Planning. The Project Allanager will meet with the Road Maintenance Division to discuss the project. 3. Install 8" reuse water line from US41 to Conner Park. Vanderbilt Drive's current annual water bill is approximately $35,000 and Conner Park's approximately $30,000 per year. This is an investigation to determine if underwriting the cost of a reuse water line installation from US 41 to Conner Park is financially beneficial. One potential quote placed the cost at $550,000 for the conversion which would supply water to Packet Pg. 754 40.A.3 Connor Parlc and Vanderbilt Drive, Reuse Water management has not approved the project at this point. The agreement to undertake the project will be sought from the Director of Parks and Recreation and pursued with Reuse Water management. 4. Pedestrian Lighting Varying Places Lighting options for pedestrian safety and visual enhancement in areas as necessary will be researched. IX. NEW BUSINESS None X. PUBLIC AND COMMITTEE, COMMENTS None XI. ADJOURN There being no further business for the good of the County, the meeting was adjourned by order of the Chair at 3:15 P.M. VANDERBIL,T BEACH M.S.T.U. ADVISORY COMMITTEE Bruce Forman, Chair roved b the Board/Committee on q h 2023 "cis subinitted" J or "as The minutes approved y [� amended' _j. NEXT MEETING DATE; SEPTEMBER 7, 2023 - 3:00 P.M. Claussen Family Center at St. John's Church 625 111 "'Avenue Naples, FL 34108 R Packet Pg. 755