Agenda 04/09/2024 Item #16C 3 (Award a Work Order to cover unforseen work to Douglas N. Higgins Inc.)04/09/2024 EXECUTIVE SUMMARY Recommendation to award a $671,400.00 Purchase/Work Order comprised of $621,400 as a negotiated lump sum payment for the work, together with a $50,000 allowance to cover unforeseen work, to Douglas N. Higgins, Inc., under Agreement No. 20-7800 Underground Contractor Services, and authorize the Chairman to sign the Purchase/Work Order for NRO Wells 117N and 119N Improvements - Raw Water Main Replacement (Project No. 70085). OBJECTIVE: To maintain reverse osmosis potable water production capability and reliability at the North County Regional Water Treatment Plant (“NCRWTP”). CONSIDERATIONS: The proposed scope of work under Project No. 70085, “Wellfield Technical Support Projects,” is consistent with the FY2024 Budget approved by the Board on September 21, 2023. The NCRWTP utilizes two groundwater wellfields in the production of potable water. The North Reverse Osmosis (“NRO”) wellfield supplies raw water to the NCRWTP reverse osmosis process with a maximum potable water production capability of eight million gallons per day. The NRO wellfield contains 24 wells. A section of the existing HDPE and PVC raw water mains require replacement due to recent breaks. Approximately 250’ of dual 18” PVC and HDPE raw water mains will be replaced with similar size pipe and approximately 350’ of dual 18” HDPE mains will be downsized to well 112N. These pipelines will also be connected to new raw water pipelines being installed on the Vanderbilt Beach Road Extension Project. Staff distributed a Request for Quotation (RFQ) for the NRO Wells 117N and 119N Improvements - Raw Water Main Replacement, to the eight vendors on the County’s Fixed-Term Underground Contractor Services Agreement No. 20-7800. Of the eight vendors notified, four submitted quotations by the February 21, 2024, deadline, as summarized below: VENDOR QUOTE Douglas N. Higgins, Inc. $671,400.00 Quality Enterprises USA, Inc. $788,080.00 Kyle Construction, Inc. $983,500.00 Mitchell & Stark Construction Co. $988,430.00 Quotes were not received from four vendors (Coastal Concrete Products, Haskins, Inc., PWC, LLC., and Southwest Utility Systems, Inc), for various reasons including their work backlog, current workload, and availability of their crews. The lowest total quote received is $671,400.00, which is 12.6 percent lower than the engineer’s cost opinion of $768,000.00, including allowance. The engineer of record, CDM Smith, Inc., in a memorandum dated February 26, 2024, recommends award to Douglas N. Higgins, Inc., which has performed similar work in this area and has a satisfactory performance record on previous similar water utility related projects. Staff has determined the lowest quote is fair and reasonable and recommend awarding the work order to Douglas N. Higgins, Inc. Douglas N. Higgins, Inc. is a Michigan corporation formed in 1966 and has been authorized to transact business in Florida since 1973. Douglas N. Higgins, Inc., is currently one of the eight approved contractors on the County’s annual contract #20-7800 for Underground Contractor Services and has performed work on many Collier County Public Utilities projects. As with all existing agreements, this 2020 contract will be separately amended to reflect recent changes to the Florida Law. Because there may be unforeseen conditions associated with the project, the quote incorporated an allowance of $50,000.00 (time and materials) to address unforeseen conditions that may be encountered during construction. The price for any additional work that will utilize this allowance will be negotiated prior to commencement in 16.C.3 Packet Pg. 992 04/09/2024 accordance with the County’s Procurement Ordinance and the terms of the Agreement. This item is consistent with the Infrastructure and Asset Management element of the Collier County Strategic Plan objectives. FISCAL IMPACT: The source of funding is the Water User Fee Capital Fund (4012). The project is expected to be completed in FY 2025. There is no change in operating costs. GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to form and legality and requires majority vote for Board approval. - JAK RECOMMENDATION: Approve a $671,400.00 work order (comprised of $621,400 as a negotiated lump sum payment for the work, together with a $50,000 allowance to cover unforeseen work, to Douglas N. Higgins, Inc., under Agreement No. 20-7800 Underground Contractor Services, and authorize the Chairman to sign the work order for NRO Wells 117N and 119N Improvements-Raw Water Main Replacement. Prepared by: Alicia Abbott, E.I., PMP, Project Manager III, Public Utilities Engineering & Project Management Division ATTACHMENT(S) 1. Work Order_Quote_Bonds (PDF) 2. Recommendation of award (PDF) 3. NRO 117-119-BID RESULTS R 02-21-2024 (PDF) 4. Other Quotes Combined (PDF) 5. RFQ NRO Wells 117N-119N RawWater Main Replacement (PDF) 6. Insurance (PDF) 16.C.3 Packet Pg. 993 04/09/2024 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.3 Doc ID: 28319 Item Summary: Recommendation to award a $671,400.00 Purchase/Work Order comprised of $621,400 as a negotiated lump sum payment for the work, together with a $50,000 allowance to cover unforeseen work, to Douglas N. Higgins, Inc., under Agreement No. 20-7800 Underground Contractor Services, and authorize the Chairman to sign the Purchase/Work Order for NRO Wells 117N and 119N Improvements - Raw Water Main Replacement (Project No. 70085). Meeting Date: 04/09/2024 Prepared by: Title: Project Manager – Engineering and Project Management Name: Alicia Abbott 03/22/2024 1:48 PM Submitted by: Title: Director – Engineering and Project Management Name: Matthew McLean 03/22/2024 1:48 PM Approved By: Review: Engineering and Project Management Benjamin Bullert PUD Reviewer Completed 03/22/2024 1:57 PM Water Pamela Libby PUD Reviewer Completed 03/22/2024 2:01 PM Water Howard Brogdon PUD Reviewer Completed 03/22/2024 2:04 PM Public Utilities Operations Support Joseph Bellone PUD Reviewer Completed 03/25/2024 2:45 PM Public Utilities Department Vincent Dominach Level 1 Department Review Completed 03/25/2024 2:51 PM Engineering and Project Management Matthew McLean PUD Reviewer Completed 03/26/2024 8:22 AM Procurement Services Francheska Correa Level 1 Purchasing Gatekeeper Completed 03/26/2024 1:20 PM Procurement Services Sandra Srnka Procurement Director Review Completed 03/26/2024 11:54 PM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 03/27/2024 3:53 PM County Attorney's Office Carly Sanseverino Level 2 Attorney Review Completed 03/29/2024 3:02 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 04/02/2024 10:10 AM Corporate Compliance and Continuous Improvement Megan Gaillard Additional Reviewer Completed 04/02/2024 2:56 PM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 04/02/2024 3:04 PM Community & Human Services Maggie Lopez OMB Reviewer Completed 04/03/2024 8:14 AM County Manager's Office Dan Rodriguez Level 4 County Manager Review Completed 04/03/2024 10:20 AM Board of County Commissioners Geoffrey Willig Meeting Pending 04/09/2024 9:00 AM 16.C.3 Packet Pg. 994 16.C.3.a Packet Pg. 995 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 996 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 997 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 998 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 999 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 1000 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 1001 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 1002 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 1003 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 1004 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 1005 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 1006 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 1007 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 1008 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.a Packet Pg. 1009 Attachment: Work Order_Quote_Bonds (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe Memorandum To: Alicia Abbott, E.I., PMP Project Manager III From: Mark J. Sunyak, P.E., PMP Sr. Project Manager Date: February 26, 2024 Subject: NRO Wells 117N & 119N Improvements – Raw Water Main Replacement Request for Quotations Under Agreement 20-7800 Underground Contractor Services Quotations for the referenced project were transmitted to the eight contractors on the Underground Contractor Services Contract on February 5, 2024. A pre-quote meeting was held via Teams on February 12, 2024. Four contractors submitted proposals on the due date of February 21, 2024. A bid tabulation is attached for reference. The lowest responsible and responsive bid was submitted by Doulas N. Higgins, Inc at a total price of $671,400.00, which includes the additive alternate and an allowance of $50,000.00. The Engineer’s Opinion of Probable Cost was $768,000.00. The lowest bidder was $96,600.00, or 12.6%, lower than the Engineer’s estimate. The average total price for all bidders was $857,852.50 which is consistent with the Engineer’s cost estimate. The contractor has performed similar work in this area on an emergency basis and is keenly aware of the ground conditions and the work to be performed for this project. They have performed piping work for many years within Collier County and have considerable expertise in this specific area. Based on the contractor’s past performance with similar projects, I am recommending award of this project to Douglas N. Higgins, Inc. in the amount of $671,400.00. cc: File 16.C.3.b Packet Pg. 1010 Attachment: Recommendation of award (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe Bid/Quote Schedule 2/21/2024 NRO WELLS 117N & 119N IMPROVEMENTS - RAW WATER MAIN REPLACEMENT Agreement 20-7800 Underground Contractor Services Engineer's Estimate Douglas N. Higgins Quality Enterprises Kyle Construction Mitchell & Stark PWC Haskins Coastal Concrete Southwest Utility ITEM DESCRIPTION EST. QTY UNIT 1.1 Mobilization/Demobilization (Not to exceed 5% of items 1.2-1.5)1 LS 20,000.00$ $17,200.00 $17,510.00 $18,000.00 $20,000.00 No Quote No Quote No Quote No Quote 1.2 Miscellaneous items1 LS 40,000.00$ $14,000.00 $41,020.00 $10,500.00 $26,500.00 1.3 18" HDPE Pipe1 LS 323,000.00$ $314,000.00 $305,020.00 $422,000.00 $411,350.00 1.4 Restoration1 LS 35,000.00$ $18,000.00 $7,890.00 $35,000.00 $20,000.00 1.5 Access Drive 150 Ton 6,000.00$ $12,000.00 $25,500.00 $22,500.00 $15,000.00 Subtotal Phase I $424,000.00 $375,200.00 $396,940.00 $508,000.00 $492,850.00 1.6 Mobilization/Demobilization (Not to exceed 5% of items 1.7-1.10)1 LS 10,000.00$ $10,200.00 $12,660.00 $16,000.00 $20,000.00 1.7 Miscellaneous items1 LS 35,000.00$ $10,000.00 $41,020.00 $10,000.00 $24,300.00 1.8 12" & 18" HDPE Pipe1 LS 134,000.00$ $174,000.00 $198,670.00 $312,000.00 $287,680.00 1.9 Restoration1 LS 35,000.00$ $12,000.00 $7,890.00 $30,000.00 $20,000.00 1.10 Access Drive 250 Ton 10,000.00$ $20,000.00 $42,500.00 $37,500.00 $25,000.00 Subtotal Phase II $224,000.00 $226,200.00 $302,740.00 $405,500.00 $376,980.00 1.11 Bypass Piping for Phase 11 LS $70,000.00 $20,000.00 $38,400.00 $20,000.00 $68,600.00 1.12 Allowance 1 T&M $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 TOTAL PRICE FOR PROJECT $768,000.00 $671,400.00 $788,080.00 $983,500.00 $988,430.00 Section 4: Allowance Section 1: Phase I Section 2: Phase II Section 3: Additive Alternate 16.C.3.c Packet Pg. 1011 Attachment: NRO 117-119-BID RESULTS R 02-21-2024 (28319 : Approve $671,400 Work Order, Agreement 16.C.3.d Packet Pg. 1012 Attachment: Other Quotes Combined (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.d Packet Pg. 1013 Attachment: Other Quotes Combined (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.d Packet Pg. 1014 Attachment: Other Quotes Combined (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.d Packet Pg. 1015 Attachment: Other Quotes Combined (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.d Packet Pg. 1016 Attachment: Other Quotes Combined (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.d Packet Pg. 1017 Attachment: Other Quotes Combined (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.d Packet Pg. 1018 Attachment: Other Quotes Combined (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe ADDENDUM #2 NRO Wells 117N and 119N Raw Water Main Relocation ITEM DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT 1.1 MOBILIZATION AND DEMOBILIZATION (Not to exceed 5% of items 1.2-1.5)Lump Sum 1 $ 18,000.00 $ 18,000.00 1.2 MISCELLANEOUS ITEMS Lump Sum 1 $ 10,500.00 $ 10,500.00 1.3 18" HDPE PIPE Lump Sum 1 $ 422,000.00 $ 422,000.00 1.4 RESTORATION Lump Sum 1 $ 35,000.00 $ 35,000.00 1.5 ACCESS DRIVE TON 150 $ 150.00 $ 22,500.00 SUBTOTAL PHASE I $ 508,000.00 1.6 MOBILIZATION AND DEMOBILIZATION (Not to exceed 5% of items 1.7-1.10)Lump Sum 1 $ 16,000.00 $ 16,000.00 1.7 MISCELLANEOUS ITEMS Lump Sum 1 $ 10,000.00 $ 10,000.00 1.8 12" & 18” HDPE PIPE Lump Sum 1 $ 312,000.00 $ 312,000.00 1.9 RESTORATION Lump Sum 1 $ 30,000.00 $ 30,000.00 1.10 ACCESS DRIVE TON 250 $ 150.00 $ 37,500.00 SUBTOTAL PHASE II $ 405,500.00 1.11 BYPASS PIPING FOR PHASE 1 Lump Sum 1 $ 20,000.00 $ 20,000.00 1.12 ALLOWANCE T&M 1 $ 50,000.00 TOTAL (Phase I and II, Additive Alternate and Allowance) $ 983,500.00 *Owners Allowance - for Owners Use as Directed. Inclusion of the Allowance as part of the Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through a Change Order with proper documentation of Time and Materials supporting the change. SECTION 1: PHASE I SECTION 2: PHASE II SECTION 3: ADDITIVE ALTERNATE SECTION 4: ALLOWANCE *16.C.3.dPacket Pg. 1019Attachment: Other Quotes Combined (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.d Packet Pg. 1020 Attachment: Other Quotes Combined (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.d Packet Pg. 1021 Attachment: Other Quotes Combined (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 16.C.3.d Packet Pg. 1022 Attachment: Other Quotes Combined (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe ADDENDUM #2 NRO Wells 117N and 119N Raw Water Main Relocation ITEM DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT 1.1 MOBILIZATION AND DEMOBILIZATION (Not to exceed 5% of items 1.2-1.5)Lump Sum 1 $ 20,000.00 $ 20,000.00 1.2 MISCELLANEOUS ITEMS Lump Sum 1 $ 26,500.00 $ 26,500.00 1.3 18" HDPE PIPE Lump Sum 1 $ 411,350.00 $ 411,350.00 1.4 RESTORATION Lump Sum 1 $ 20,000.00 $ 20,000.00 1.5 ACCESS DRIVE TON 150 $ 100.00 $ 15,000.00 SUBTOTAL PHASE I $ 492,850.00 1.6 MOBILIZATION AND DEMOBILIZATION (Not to exceed 5% of items 1.7-1.10)Lump Sum 1 $ 20,000.00 $ 20,000.00 1.7 MISCELLANEOUS ITEMS Lump Sum 1 $ 24,300.00 $ 24,300.00 1.8 12" & 18” HDPE PIPE Lump Sum 1 $ 287,680.00 $ 287,680.00 1.9 RESTORATION Lump Sum 1 $ 20,000.00 $ 20,000.00 1.10 ACCESS DRIVE TON 250 $ 100.00 $ 25,000.00 SUBTOTAL PHASE II $ 376,980.00 1.11 BYPASS PIPING FOR PHASE 1 Lump Sum 1 $ 68,600.00 $ 68,600.00 1.12 ALLOWANCE T&M 1 $ 50,000.00 $ 50,000.00 TOTAL (Phase I and II, Additive Alternate and Allowance) $ 988,430.00 *Owners Allowance - for Owners Use as Directed. Inclusion of the Allowance as part of the Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through a Change Order with proper documentation of Time and Materials supporting the change. SECTION 1: PHASE I SECTION 2: PHASE II SECTION 3: ADDITIVE ALTERNATE SECTION 4: ALLOWANCE *16.C.3.dPacket Pg. 1023Attachment: Other Quotes Combined (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe 1Alicia Abbott From:Alicia AbbottSent:Monday, February 5, 2024 3:55 PMTo:Lou Gaudio (lgaudio@qeusa.com); Marcie Cohen; Mike Lobello; Tammy Ludwig; 'Brett@SWUtility.net'; David Torres; Maguiar@coastalconcreteproducts.com; Ryan MacPhee; MLAGO@HASKINSINC.NET; bpenner@mitchellstark.com; 'Kmarkhardt@pwc-llc.com'; 'mheath@pwc-llc.com'; Kyleconstinc@Aol.com; John Dina (jdina@mitchellstark.com)Cc:Pamela Libby; Joshua Bauer; Dustin Grossenbaugh; Casey Morris; Sunyak, Mark J.; Lis Carrasquel; Benjamin BullertSubject:Request for Quote - NRO Wells 117N & 119N Improvements - Raw Water Main Replacement Attachments:01_RFQ _2 Wells_117-119 impr rwm.pdf; 02_NRO 117-119 WM Relocation Plans 02.01.24.pdf; 03_NRO 117-119 WM Relocation Specs 02.01.24.pdf; 04_BID SCHEDULE 02.01.24.xlsx; 05_Soil boring info.pdf; 06_List of County Provided Materials.pdf 2If you have any questions, please contact me. Thank you. Alicia Abbott E.I., PMP Project Manager III Collier County Government Public Utilities Engineering & Project Management 3339 Tamiami Trail East, Suite 303 Naples, FL 34112 Phone: 239-252-5344 Cell: 239-877-3961 Collier County Public Utilities Department Engineering and Project Management Division “Continuous Improvement” Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 16.C.3.e Packet Pg. 1025 Attachment: RFQ NRO Wells 117N-119N RawWater Main Replacement (28319 : Approve $671,400 Work 16.C.3.fPacket Pg. 1026Attachment: Insurance (28319 : Approve $671,400 Work Order, Agreement 20-7800 to Douglas N. Higgins - NRO 117 119 Pipe Replacement)