Backup Documents 03/26/2024 Item #16B 7 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP
1 6 B 7
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
** ROUTING SLIP**
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing_lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1. Felipe Baez De La Cruz Transportation Engineering FBC 3/29/2024
2.
3. County Attorney Office County Attorney Office Y)4)'
4. BCC Office Board of County �, // � Z��
Commissioners c.-cT b?,�,(may Y
5. Minutes and Records Clerk of Court's Office 11( ((( I 37 .
r�GU 3� CC��
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the
addressees above may need to contact staff for additional or missing information.
Name of Primary Staff Felipe Baez De La Cruz/Transportation Phone Number 239-348-1328
Contact/Department
Agenda Date Item was 3/26/24 Agenda Item Number 16.B.7
Approved by the BCC
Type of Document(s) Change Order#1 Unsuitable Material Number of Original 1
Attached Removal&Additional Contract Time Documents Attached
PO number or account 4500218686
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's signature?(stamped unless otherwise stated) FB
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name; Agency; Address; Phone)on an attached sheet.
3. Original document has been signed/initialed for legality. (All documents to be signed by FB
the Chairman,with the exception of most letters,must be reviewed and signed by the
Office of the County Attorney.)
4. All handwritten strike-through and revisions have been initialed by the County Attorney N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board.
5. The Chairman's signature line date has been entered as the date of BCC approval of the FB
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's FB
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip N/A
should be provided to the County Attorney Office at the time the item is uploaded to the
agenda. Some documents are time sensitive and require forwarding to Tallahassee within a
certain time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 3/26/24 and all changes made during the FB `t.'
meeting have been incorporated in the attached document. The County Attorney
Office has reviewed the changes,if applicable.
9. Initials of attorney verifying that the attached document is the version approved by the FB
BCC,all changes directed by the BCC have been made,and the document is ready for the
Chairman's signature.
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04;Revised 1.26.05;2.24.05; 11/30/12;4/22/16;9/10/21
16B 7
Cof%�►� Procurement Services
er County Change Order Form
®Contract Modification ❑Work Order Modification
Contract#: 22-7976 Change 11: 1 Purchase Order#: 4500218686 Project#: 60168
Construction Services for Vanderbilt Beach
Contractor/Firm Name: SACYR Construction USA LLC Contract/Project: Road Extension
Project Manager Name: Felipe Baez De La Cruz Division Name: Transportation Management Services
Original Contract/Work Order Amount $152,999,999.91 7/12/22#11.F Original BCC Approval Date; Agenda Item#
Current BCC Approved Amount $152,999,999.91' 7/12/22#11.F Last BCC Approval Date; Agenda Item#
Current Contract/Work Order Amount $152,999,999.91 9/26/2025 SAP Contract Expiration Date (Master)
Dollar Amount of this Change 0.00% Total Change from Original Amount
Revised Contract/Work Order Total $152,999,999.91 0.00% Change from Current BCC Approved Amount
Cumulative Changes $ 0.00 0.00% Change from Current Amount
Completion Date,Description of the Task(s)Change,and Rationale for the Change
Notice to Proceed 9/12/2022 Original 9/26/2025 Last Approved 9/26/2025 Revised Date 3/18/2026
Date Completion Date Date <Includes this change)
#of Days Added 173 Select Tasks ®Add new task(s) ❑ Delete task(s) ®Change task(s) ❑Other
Provide a response to the following:1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or
the additional days added(if requested); 2.)why this change was not included in the original contract;and,3.) describe the impact
if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed.
A. Unsuitable Removal
1. This change order will utilize the Roadway Allowance in the amount of$790,742.31 to compensate for
the removal and replacement of 13,972 CY of unsuitable material and will incorporate into the contract
with a new pay item 9999-1. The unsuitable material exceeded the 12" maximum depth per FDOT
Clearing and Grubbing specification 110-2.2, After further exploratory testing it was discovered that the
material was not suitable to stay under the roadway bed and needed to be removed and replaced.
2. This change being requested was not included in the original contract because the unforeseen
unsuitable material in wooded areas was not discovered during the project design. This area was not
fully accessible during the design due to the heavy overgrowth of vegetation and equipment for subsoil
explorations could not reach the area without clearing and grubbing.
3. If this modification is not processed the roadway would be constructed on unstable material and
adversely affect the life of the roadway. Leaving unsuitable material under the roadway could further
compromise drainage and infrastructure in the future and put the traveling public at risk of road failures.
B. Additional Contract Time for Wildlife Survey (Gopher Tortoise Removal & Relocation),Weather and
Holidays Thru January 16, 2024.
1. This change order will add ninety-six (96) days for the Wildlife Survey, thirty (30) days for inclement
weather and sixteen (16) days for holidays, and thirty-one (31) days for extra work of unsuitable
material removal for a total of one hundred and seventy-three (173) days to the original contract time
(1,110 days), This change order is required to meet the requirements of FDOT Specifications 8-6.4,
Suspension of Contractor's Operations- Holidays and Special events, and Specification 8-7.3 Contract
Time Extensions, and Construction Service Agreement section 10.
2. The change being requested was not included in the original contract time because the schedule
impacts are not predicted, and the presence of the Gopher Tortoises was not known. The tortoises
were found during a wildlife survey performed in the beginning of the project. Work was halted in areas
where active tortoise burrows were located which impacted the contractors work schedule. Controlling
Items of Work were delayed from October 12, 2022, to January 16, 2023.
Revised:01/1 412 02 1 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY
Admin Ric OCC ES y
ICAO
16B 7
3. If this modification is not processed the Contractor would not receive the days authorized by the
contract documents and the County would be out of compliance.
The cost of this change order amounts to a total of$790,742.31 utilized from the Owner Allowance-Roadway.
(See further details in Exhibit A). The total additional days requested incorporates the unsuitable material
removal, wildlife survey,weather days, and holidays for a total of one hundred and seventy-three (173)
calendar days that will be added to the contract.
•
oleltelly signed by baezFollpo
■ DN.E+Folipe.Beoz@colliarcounlyll.gov,CN•DaoeFalipo,
BaezFeli
p e En Inae,tng,O llan Engineering nd Ma,Ounrer CM Transporlallon
EN. a letip DUoz@colliar on and Mal,ab-ca,OU-GMD,
OD-Divisions,DC=bca,OC=calllergnv,DC-net
Prepared by: Dale:2024.01.3012:45.39-05'00' Date:
(Felipe Baez De La Cruz, Project Manager II,Transportation Engineering)
Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same
terms and conditions as contained In the contract/work order indicated above,as fully as if the same were stated In this acceptance.The
adjustment, if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor r'Vendor/Consultant/
Design Professional arising out of or related to the change set forth herein, including claims for Impact and delay costs.
ENRIQUE ALONSO Digitally signed by ENRIQUE ALONSO
Accepted by: Date:2024.01.31 13:04:38-05'00' Date:
(Enrique Alonso Zuniga, Country Manager, SACYR Construction USA LLC)
ThomasMatthew Digitally signed by ThomasMatthew
Accepted by: Date: 2024.01.30 15:25:09 -05 00 Date:
(Matthew Thomas P.E,, Supervisor of Project Management,Transportation Engineering)
AhmadJay Digitally signed by AhmadJay
Approved by: Date: 2024.02.01 13:10:47 -05'00' Date:
(Jay Ahmed P.E., Division Director,Transportation Engineering)
Olgilelly signed by
ScottTrinity Date`T202A92.05
Approved by: ta:04:�4.0500 Date:
(Trinity Scott, Department Head,Transportation Management Services Department)
McNealLindsey Digitally signed by McNealLindsey
Approved by: Date:2024.02.13 11:46:52-05'00' Date:
(Procurement Strategist, Procurement Services)
Revised:01/14/2021 (Divisions who may require additlonat signatures may Include on separate sheet.) PROCUREMENT USE ONLY
Admin R�° BCC ES
16B 7
ATTEST: BOARD OF COUNTY COMMISSIONERS
Crystal K. 1inzel";, Pa•I<C.of Courts COLLIER C TY, FLORIDA
{ &Comptrol
By: By:
is Hall, Chairman
Dated: (�:�
(S ',L) tiAtttie'�Nas to Chairman's
signature only
Appr ed as for gality:
By:
Scott R. each
Deputy County Attorney
I
01
s
16B 7
Change Order/Amendment Summary
COST TIME
CO# AMD# Description Deductive Days New Justification
Additive(+) Added Amount
Leaving unsuitable material under
the roadway could further
Excavate unsuitable compromise drainage and
01 material and add $790,742.31 173 1283 infrastructure In the future and put
embankment/fill the traveling public at risk of road
failures.
Revised:01/14/2021 (Divisions who may require additional signatures may Include on separate sheet.) PROCUREMENT USE ONLY
Admin RpI BCC ES
CAO
1 6 B 7
ieo ter county
Transportation Management Services Department
Transportation Engineering Division
WORK DIRECTIVE CHANGE
22-7976-Construction Services for Vanderbilt Beach Road Extension CHANGE#02
DATE OF ISSUANCE: March 16,2023 EFFECTIVE DATE: March 16,2023
OWNER: Collier County Board of Commissioners PROJECT#: 60168
CONTRACTOR: SACYR Construction USA LLC
ENGINEER/DESIGN PROFESSIONAL: Bill Gramer,P.E.,Jacobs
You are directed to proceed promptly with the following change(s):
Description: Excavate unsuitable soils,organic and plastic,from the area;STA 789+50 to 793+50,from the northern
1:2 Control Line to the southern 1:2 Control Line,to an average depth of 3 feet, Refer to the attached Geotechnical Report
[ and field observations to determine excavation depths across the area.The excavation of the unsuitable soil will be paid as
a new pay item(T&M) labeled subsoil excavation. Replace the material with embankment suitable for roadway
construction. The embankment will be paid using unit price pay item 120-6A(REPLACEMENT FOR UNSUITABLE).
Purpose of Work Directive Change: Unsuitable soils were discovered by the Contractor during clearing and grubbing
operations.Soil analyses were performed by geotechnical engineering firms and the area found to be unsuitable to build
roadway on. Per the FDOT Standard Plans 120-002,removal of the material is called for within the 1:2 Control Line.
Attachments: Jacob's Geotechnical Report and Recommendations,FDOT Standard Plans 120-002
If a claim is made that the above change(s)have affected Contract Price or Contract Times any claim for a Change Order
based thereon will involve one or more of the following methods of determining the effect of the change(s).
Method of determining change in Contract Price: Method of determining change in Contract Times:
® Unit Prices ® Contractor's records
❑ Lump Sum ❑ Engineer's record
Other-T&M ❑ Other—No additional Contract Time is required
Estimated increase in Contract Price $0, Estimated change in Contract Time: 21 days
associated costs of this WD will be applied Increase by 21 calendar days.
against the Owner's Roadway Allowance
RECOMMENDED: AUTHORIZED:
William Digitally signed by Th o m a s M atth Digitally signed by
William Gramer ThomasMatthew
Date:2023.03,21 Date:2023.03,22 07:32:14
By: Gramer 16:10:03-04'00' By: ew -04'00'
Engineer Owner's Representative
EA-
O
16B 7
sacyr
ENGINEERING AND
INFRASTRUCTURES
An Equal Opportunity Employer
July 21', 2023
Mr. Felipe Baez
Project Manager II
Collier County,Transportation Engineering Division
Vanderbilt Beach Project
2885 S. Horseshoe Drive
Naples, Fl 34104
RE: Project Number 60168 —
Vanderbilt Beach Project Extension
Dear Mr. Baez:
I, Enrique Alonso, authorized representative of Sacyr Construction SA, Inc. (the"company"), hereby
certify that the following information is true and accurate to the best of my knowledge and belief:
The following is a listing of on-site personnel and weekly rates:
Description Rate/Hr.
Carl Davis $ 44.20
Chris Slaby $42.50
Trace Roy $47.50
Tyrone Page $16.50
_.. _____---------...----
Richard Delarosa $20.00
Hunter Whiteaker $19.50
James Kelly $27.00
Joshua yree $26.00
Sincerely
Erika Betancourt Rivera on behalf of Enrique Alonso
Vice President of Human Resources
sacyr
ENGINEERING AND
INFRASTRUCTURES
3191 Coral Way, Suite 510, Miami, FL 33145, USA
CAO
16B 7
cVr2;nr
ror.
PROJECT NAME J Vanderbilt Beach Road Extension I
Remove&Replacement of Material arising from D5C notice
Quantity 1 LS ITotal Cost I$ 790,742.31
,
a)labor -_
Description
QTY Rate/Hr Regular Overtime Total
Carl Davis-Working Foreman 1.00 $ 44.20 225 $ 9,945.00
Chris Slahy-Working Foreman 1.00 $ 42.50 4 _ $ 170.00
Trace Roy•Working Foreman 1.00 $ 47.50 8.5 $ 403.75
Tyrone Page-Operator 1.00 $ 16.50 166.25 $ 2,743.13
Richard Dolorosa-Operator 1.00 $ 20.00 145,5 $ 2,910.00
Hunter Whlteaker-Operator 1.00 $ 19.50 136,75 $ 2,666,63
lances Kelly-Operator 1.00 $ 27.00 30.5 $ 823.50
Joshua Tyree-Operator 1.00 $ 26.00 173.5 $ 4,511.00
DENSITY TESTING(Oc Inspector)-NO CHARGE
SURVEY(Angel Peres-surveyor)-NO CHARGE
Overtime-NO CHARGE
Sub•Total 5 24,173,00
Cost to Employ-28.15% $ 6,804.70
Total Labor Cost $ 30,977.70
b)Equipment
Description QTY Rate/Hr Hr Total
Pickup Truck-1/2 Ton 1.00 $ 26.63 237.5 $ 6,324.63
007E6 071 1,00 $191.00 188 $ 35,908.00
EXCAVATORJO210 1,00 $117.30 143.5 $ 16,832.55
LOADER WA380 1.00 $ 97.17 __ _ 60 $ 5,830.20
OFFROAD HM400 1.00 $255,17 256 $ 65,323.52
ROLLER BOMAG W210 1,00 $116.10 100.5 $ 11,668,05
0O2ER 071-IDLE 1.00 $140,92 69 _ $ 9,723.48
EXCAVATOR JD210•IDLE 1.00 $ 60.94 105.5 $ 8,539.17
LOADER WA380-IDLE 1.00 $ 73.87 145 $ 10,711.15
OFFROAD HM400-IDLE 1.00 $196.22 207.5 $ 40,715.65
ROLLER BOMAG W210-IDLE 1.00 $ 71.67 139.5 $ 9,997.97
Total Equipment Cost $ 221,574,36
c)Material
Description CITY Unit Price Tax Total
Replacement Fill 29,230.56 TON $ 15.42 $ 450,735.24
Total Material Cost $ 450,735.24
di Subcontractor __,
Description QTY Unit Price Tax Total
Testing(To prove DSC) 1 L5 $ 17,126,29 $ 17,126.29
$ 17,126,29
Description Allowable Markup Amount Total Total Markup
Total Labor Cost 10,0% $ 30,977.70 $ 3,097.77
Total Equipment Cost 10,0% $221,574.36 $ 22,157.44
, Total Material Cost 10,0% $450,735.24 $ 45,073,52
Total Subcontractor Cost 0 $ 17,126.29 $ -
$ 70,328.73
TOTALI$ 790,742,31
(GA0
16B 7
H
N m
> O N
U n
@ O
Q1
c o 4' r
o H- in.
U
-o v . '
U1 U) },
0 c
f0
Cx CC O r-i
U)
O a)
a) r I
`) m
co
`) N
ci) (•
O U r-
N
a.) a)
40 c u
m c {n
s
U a
0 n
H :C
c
2
0 0 0
co v c o
v `u = ri
a) c u d
u
It - O -0 '2 C ....
a) a m O O OA O
a) 1-d m ° .-1 �o O 0'
2
i >< ut U
X C 0 a)
m w o G) _ U
U O ra .5 ` u C o
CI U a c o d
CU
O c
4, V
Ui C y
T.
c
O r-I 0 ,-I m
U >. m O m Lc
~ N O ' N N
co
N. O N N
•61 a)
C O di3O O 0
O bA N 00 N CJ
O 'n d
2
o � aao
as
Cr 0 v) U c
c ra CC )o u, ro
° 'C 0 v s 3`O•
2 3 o w
-o _ @ @
°' ^ v
U o ce v, v 'O
vl c u cc
O ro a
o 0 v w
_ u >
z ri < N U a)
m c
L 61 7 .0.. O O B cfio
O n. F- F- �•, ...
16B 7
Days Tracking Log
VBR Ext -#60168
CONTRACT TIME ADDED
DESCRIPTION ADDED DAYS REMARKS
Wildlife Survey 96 October 12, 2022 to January16, 2023
Unsuitable 31 Days from T&M sheets
Weather 30 NTP 9/12/2022 Thru 1/16/2024
Holidays 16 NTP 9/12/2022 Thru 1/16/2024
Total Days added 173
Contract Time 1,110 Original Date 9/26/2025
Revised Contract Time 1,283 Revised Date 3/18/2026
Holidays Tracking Log
VBR Ext-#60168
Days Date Reason
1 11/11/2022 Veteran's Day
2 11/24/2022 Thanksgiving Day
3 11/25/2022 Day After Thanksgiving
4 12/23/2022 Christmas Eve
5 12/26/2022 Christmas Day
6 1/2/2023 New Year's Day
7 5/29/2023 Memorial Day
8 7/4/2023 Independence Day
9 9/4/2023 Labor Day
10 11/10/2023 Veteran's Day
11 11/23/2023 Thanksgiving Day
12 11/24/2023 Day After Thanksgiving
13 12/22/2023 Christmas Observe
14 12/25/2023 Christmas Day
15 1/1/2024 New Year's Day
16 1/15/2024 MLK Jr. Day
CPO
16B 7
Weather Days Tracking Log
VBR Ext -#60168
Days Date Reason
1 9/27/2022 Hurricane Ian
2 9/28/2022 Hurricane Ian
3 9/29/2022 Hurricane Ian
4 9/30/2022 Hurricane Ian
5 4/12/2023 Weather- Rain
6 4/17/2023 Weather- Rain
7 4/18/2023 Weather- Rain
8 6/5/2023 Weather- Rain
9 6/6/2023 Weather- Rain
10 7/3/2023 Weather- Rain
11 7/20/2023 Weather- Rain
12 8/4/2023 Weather- Rain
13 8/16/2023 Weather- Rain
14 8/29/2023 Hurricane Idalia
15 8/31/2023 Hurricane Idalia
16 9/18/2023 Weather - Rain
17 9/19/2023 Weather- Rain
18 9/20/2023 Weather- Rain
19 9/22/2023 Weather - Rain
20 9/26/2023 Weather- Rain
21 9/27/2023 Weather - Rain
22 9/28/2023 Weather - Rain
23 10/2/2023 Weather- Rain
24 10/13/2023 Weather- Rain
25 11/15/2023 Weather- Rain
26 11/16/2023 Weather- Recovery
27 1/8/2024 Weather- Rain
28 1/10/2024 Weather- Rain
29 1/11/2024 Weather- Rain
30 1/16/2024 Weather- Rain
I 6 B 7 .
nsm k.
Lists. Lai—La
l.xsU.S.,+N=a LULL—sit.
rap. lmbft et,1.41,•00,1
0.1 na,lm,.w re,l•I,t tteetftel
f.X�!
I:Nil:1111AI.F:t,1.111:tale timid if 11mt en esItenll&woe Centvm Ms le a 4wted tablet end Uhl a vanto eaubnll lb.n opemnl amain eat Dr 6441nd IN.o
Gird morning Nips,
es xd spot.,IIII It the lebet burden,,?Oat mutt be tonpdaed on CO toil,(71 till)if?Dv need far Naha dew?,pleem iel me 1 ror,
Svme,ely,
/term:lltal ehint.tt&Ma ae be tte.,neer•td.:r>
f ant:Tune at 0ecember 13.3033 4.13 PM
Tetluen Pablo eIol 4le$f eµ1ll:ya:aSLLH
Sub),m:Burden
teto toner QMM 0Ne54s Wastrote .xwta L#hh
Otte Nt4 Id Ott a..IGl euntO Do 0,?4,4vmron Lte rt it.a 40114;M.mt lit. p•14udt IMdGIPI I PLO Ymp1,5
S$714 1.3914 0,314 11414 0.5554 0.))14 0.9511 00114 0000 1.14% 3.791A 10114 0064, 70014_._...,.I1.15574
10 d Ilpa0e,
ItAe Imam.d 11 M1e
VreM1,'hds.letN.,e.to e,.�v.,lff("ret•.
s0cyr
fnl-I�nVrk yhtr.�,f. ..
4e1096.1 41)1471)dlei
4114nMt.ILO3761)te
st.te,mn i:.aaDs xt
llei Orel VI..I^/Darr,fur?sift
Snot tt
000®C OI secvri19j
CAA
16B 7 .i
EMBANKMENT QUOTES
SOURCE DATE UNIT PRICE YEAR
YOUNG QUIST MINE 5/13/2022 $ 17.68
LEE MAR 5/13/2022 $ 16.21 Not All 2022 Sources were Available at
the Moment when the Work directive was
TOMAHAWK 5/13/2022 $ 16.31 executed but the prices related on the
AGGRISOURCE 5/13/2022 $ 15.35 2022 k List, shows a tendency an the Average of
LEE MAR 9/15/2022 $ 16.98 the Price.
BG MINE 9/15/2022 $ 15.49
AVERAGE 2022 $ 16.34
SOURCE DATE UNIT PRICE
BG MINE 1/25/2023 $ 15.49
QE SUNNILAND 1/25/2023 $ 15.56
EARTHTECH 1/25/2023 $ 15.50
846 MINE 3/30/2023 $ 15.42 2023
RANDALL BLVD FILL 4/19/2023 $ 15.97
AVE MARIA FILL DIRT 8/8/2023 $ 18.10
ALLICO MINE-CEMEX 9/14/2023 $ 16.75
AVERAGE 2023 $ 16.11 MATERIAL UTILIZED
fs4G MINE (Screened Stint koc.x
Material -S "O 42
Haul .tlr
To al '15.42/Tor ..
•
GAO
16B 7
x �
T. Disney Trucking & Grading, Inc.
6324 US HWY 301 S
Riverview, FL 33578
TRUCKING Phone: (844) 258-7825
Customer Name: Job Information: QUOTE
Sacyr Construction Vanderbilt Rd
Naples, FL Date: 3/15/2023
Valid Through: 4/15/2023
Quoted By: Stephen Disney
Terms: Net 30
HAULED FROM ITEM/SERVICE MATERIAL I HAUL UNIT I TOTAL
846 Mine Screened shot rock/FIII Dirt 10.42 5.00 TON 15.42
Signature of Acceptance Date
Terms&Conditions:
This quotation Is for goods named above.Payment on completed lobs Is due by terms listed above to avoid finance charges.Terms are net date of delivery.Payments are
not continguint upon prime contractor being paid.Expired quotes are not valid and must be requoted prior to work commencing.Credit application must be on file In
addition to the signed quote for work to commence,
Fax:(800) 530-2126 Email:Sales@disneytrucking.com Website:www.disneytrucking.com
sa
cAO
16B 7
� .a�� .. @. ., °r.. v3�rawi`2�sue. r. ,,..��
T. Disney Trucking & Grading, Inc.
�� � 6324 US HWY 301 S
Riverview, FL 33578
TRUCKINO Phone: (844) 258-7825
Customer Name: Job Information: ��{ ``)L = T E
Sacyr Construction Vanderbilt Beach Rd 2023
22-7976 Date: 1/25/2023
Valid Through: 2/24/2023
BG MINE QE-SUNNILAND EARTHTECH uoted By; Stephen Disney
Material-$7.49 Material-$8.56 Material-$ 160.501LD Terms: Net 30
Haul -$8.00 Haul -$7.00 Haul -$165.00/LD
Total -$ 15.49/Ton Total -$ 15.56(Ton Total -$325.50/LD
1 LD HAS 21 TONS
$15.50/TON
look{ l l.ru'4o'�1.:l ltri MA'1LRIALr m"itli I ii1k'I` ' o ,ci
Vulcan Alice All Materials 10,00 Ton 10,00
Stewart Mining Fill Dirt 5.00 10.00 Ton 15.00
BG Mine FDOT Base Rock 12,50 8.00 Ton 20.50
846 Mine FDOT Base Rock 13,00 7.50 Ton 20.50
BG Mine Fill Dirt 7.00 8.00 Ton 15.00
On Site Fill/Debris 75,00 Hourly 75.00
On site Asphalt 80.00 Hourly 80.00
On Site Concrete/Demo 90.00 Hourly 90.00
QE-Sunniland Fill Dirt 8.00 7,00 Ton 15,00
Tomahawk FOOT Bank&Shore 45.00 15,00 Ton 60.00
Tomahawk FDOT Ditch Lining 45,00 15.00 Ton 60,00
Tomahawk FDOT Bedding Stone 45.00 15.00 Ton 60,00
' Earthtech Fill Dirt 150.00 165.00 Load 315,00
'Y-Y-Th'YY
846 MINE(Screened Shot Rock
Material -$ 10.42
Signature of Acceptance Date Haul-5.00
Total 15.42/Ton.
Terms&Conditions: -1`..•-.)"°• -X.-
This quotation Is for goods named above.Payment on completed Jobs Is due by terms listed above to avoid finance charges.Terns are net date of delivery.Payments are not
continguint upon from contractor being paid.Expired quotes are not valid and must be requoted prior to work commencing.Credit application must be on file In addition to the
signed quote for work to commence,Fuel Surcharge currently applied to all haul cost.
Fax:(800)530-2126 Email:Sales@disneytrucking.com Website:www.disneytrucking.com
16B 7
'•. a. t, .... ,..Ak0:- a*tea. o,,�,
T. Disney Trucking & Grading, Inc.
6324 US HWY 301 S
q° IDISN Riverview, FL 33578
T Ft U c KIN 0 Phone: (844) 258-7825
Customer Name: Job Information: QU •TE
Sacyr Construction Vanderbilt Beach Rd
22-7976 Date: 5/13/2022
From 951 to 16th ST NE Valid Through: 6/12/2022
Lee Mar- Tomahawk- Quoted By: Stephen Disney
Younquist Material-$160,5 Material-5192,8
Material-$9.57 Haul $ 180.00 Haul $ 150,00 Terms: Net 30
Haul -$8.10 Total - $340,5/Load Total - $342,6/Load Aggrisource-
Total -$ 17.68/Ton Material-$5,35
1 Load has 21 Tons 1 Load has 21 Tons
$ 16,21/Ton $16,31/Ton Haul -$ 10
$ 15,35/Ton
, t,0.i,i,i;a A ITEM/SERVICE MATER a '"� p, lit,=f,_ a�� ' +,
Aggrisource Fill Dirt 5.00 10.00 Ton 15.00
Tomahawk Fill Dirt 180.00 150.00 Load 330,00
Lee Mar Fill Dirt**When Available 150.00 180.00 Load 330.00
Younquist Fill Dirt 8.95 8.10 Ton 17.05
BG Mine Fill Dirt**When Available 7.00 8,00 Ton 15.00
BG Mine FDOT Base 12.00 8.00 Ton 20.00
BG Mine Commercial 57 Stone 24.00 8.00 Ton 32.00
Onsite Fill/Debris 70.00 Hourly 70.00
Asphalt Plant Asphalt 75.00 Hourly 75.00
Star Quarries Ditch Lining 40,00 35.00 Ton 75.00
Younquist Bedding Stone 50,00 8.10 Ton 58.10
Cemex Alico DOT 57 Stone 24.00 8.25 Ton 32.25
BG Mine Commerical Ditch Lining 28.00 9.00 Ton 37,00
Signature of Acceptance Date
Terms&Conditions;
This quotation Is for goods named above.Payment on completer)lobs is due by terns listed above to avoid finance charges.Terms are net date of delivery,Payments are
not contingutnt upon from contractor being paid.Expired quotes are not valid and must be requoted prior to work commencing.Credit application must be on Mein
addition to the signed quote for work to commence.Fuel Surcharge currently applied to all haul cost,
I
Fax:(800)530-2126 Email:Sales@disneytrucking.com Website:www.disneytrucking.com
1
Clay-'
16B 7
T. Disney Trucking & Grading, Inc.
6324 US HWY 301 S
I
DiSt.......201. 11 " 1" "
Riverview, FL 33578
Phone: (844) 258-7825
Customer Name: Job Information: OTE
Sacyr Construction Vanderbilt Beach Rd 2 J,tLJ
22-7976 Date: 9/15/2022
Lee Mar- HG MINE- Valid Through: 10/15/2022
Material-$176,55 Material-$7,49 Quoted By: Stephen Disney
Haul -$ 180.00 Haul -$8,00
Total - $356,55/Load $ 15,49/Ton Terms: Net 30
1 Load has 21 Tons
$ 16,08/Ton
1lAIti II Fro go ITEtvt/S[RVICE - r1 . HAUL, A` ' y`
Vulcan Alico All Materials 10.00 Ton 10.00
I Lee Mar Fill Dirt 165.00 180,00 Load 345.00
BG Mine FDOT Base Rock 12.00 8.00 Ton 20.00
Cemex FDOT 57 Stone 25.00 8.25 Ton 33,25
BG Mine Fill Dirt 7,00 8.00 Ton 15.00
On Site Fill/Debris 75.00 Hourly 75,00
On site Asphalt 80.00 Hourly 80.00
On Site Concrete/Demo 90,00 Hourly 90.00
Signature of Acceptance Date
Terms&Conditions:
This quotation is for goods named above.Payment on completed Jobs Is due by terms listed above to avoid finance charges.Terms are net date of delivery.Payments are not
continguint upon from contractor being paid.Expired quotes are not valid and must be requoted prior to work commencing.Credit application must be on file in addition to the
signed quote for work to commence,Fuel Surcharge currently applied to all haul cost.
Fax:(800)530-2126 Email:Sales@disneytrucldng.com Webslte:www,disneytrucldng,com
€..)
16B 7
T. Disney Trucking & Grading, Inc.
r) 6324 US HWY 301 S
Riverview, FL 33578
T it U c I( I N 0 Phone: (844) 258-7825
Customer Name: Job Information: (41 TE
Sacyr Construction Vanderbilt Beach Rd 2023-A3
22-7976 Date: 4/19/2023
Valid Through: 5/19/2023
Quoted By: Stephen Disney
Terms: Net 30
Randall Blvd Fill Fill Dirt 220.00 100.00 Load 320.00
Material-S 23fi.40
Haul -$ 100.00
Total - $335.40/Load
1 Load has 21 Tons
$ 15.97/1 on
Signature of Acceptance Date
Terms&Conditions:
This quotation is for goods named above.Payment on completed Jobs Is due by terms listed above to avoid finance charges.Teens are net date of delivery.Payments are not
contingulnt upon from contractor being paid.Expired quotes are not valid and must be requoted prior to work commencing.Credit application must be on file In addition to the
signed quote for work to commence.Fuel Surcharge currently applied to all haul cost.
Fax:(800)530-2126 Email:Sales@disneytrucking.com Website:www.disneytrucicing.com
E;())
16B 7
.6.a. . ..lww \
T. Disney Trucking & Grading, Inc.
6324 US HWY 301 S
Riverview, FL 33578
TRUCKING �� � Phone: (844) 258-7825
Customer Name: Job Information: • U E
Sacyr Construction anderbilt Beach Rd 2023-Ave Mar
22-7976 Date: 8/8/2023
Valid Through: 9/7/20 23
Quoted By: Stephen Disney
Terms: Net 3()
HAIR Lit Iliorvt t 11i0 t
Ave Marla Fill Dirt 215.00 150.00 Load 365.00
Material-$230.05
Haul -$150.00
Total - $380.05/Load
1 Load has 21 Tons
$18.10/Ton
•
Signature of Acceptance Date
Terms&Conditions:
This quotation Is for goods named above.Payment on completed jobs Is due by terms listed above to avoid finance charges.Terms are net date of delivery.Payments are not
continguint upon from contractor being paid.Expired quotes are not valid and must he regarded prior to work commencing.Credit application must be on file In addition to
the signed quote for work to commence.Fuel Surcharge currently applied to all haul cost.
Fax:(800)530-2126 Email:Sales@disneytrucking.com Website:www.disneytrucking.com
CAQ
166 7
YOUNGQUIST BROTHERS ROCK,LLC
January 1,2023
$30.00 FOR A TRANSPONDER.FOR SALES,CALL SHANNON 239-910-1025.
ALL PRICES ARE PER'ION, PLUS A$3.00 ENVIRONMENTAL FEE PER LOAD,PLUS TAX,
F11.1.DIRT S12.95 FOB Volinggn1st
MASON SAND S14,95 FOIL Ynungqulst
Tot'SOIL 514a; YOUNGOUIST
Material-$ 14,009(Material + Taxi Env fee)
❑EACH SAND 514.95 Haul -$30.00
CONSTRUCTION SAND S1.1.95 Total $44.009/Ton
PERC SAND 514.95
CONCRETE SAND S16.95 FOB\'nungulsl
COMM 131 SCREENINGS S 16.95 FOB YoungquIsl
FDOT 131 SCREENINGS SI7.95 FOB 1'ounggulst
COMM 114 SCREENINGS(89s1131s) S39.95 FOB Ytntngqulst
COMM RICE ROCK S28,95 FOB Youngqulst
FOOT BASE ROCK S19.95 FOB Youngqulst
DOUBLE CRUSH BASE 120CE S22,95 FOB Youngqulst
COMM 89 STONE. S39.95 FOB Youngqulst
FDOT 89 STONE S40.95 FOB Youngqulst
COMM 67 STONE $35,95 FOB Youngqulst
FOOT 67 STONE(SIA CODE 42) S39.95 FOB Youngqulst
COMM 57 STONE S30,95 FOR Youngqulst
FDOT 57 STONE $31,95 FOB Voungqulst
COMM S STONE S31,95 FOR Youngqulst
FDOT4 STONE S36.95 FOB Ynungqulst
COMM 4 STONE S33,95 FOIL Youngqulst
COMM 3 STONE S33,95 FOB\'oungqulst
COMM 2 STONE $33,95 FOR Youngqulst
COMM I STONE S42.95 FOR Ynungqulst
COMM 3"-6"RII'RAP S49.95 FOB\'oungqulsl
COMM 4"-8"RIP RAP S49.95 FOB Youngqulst
6"-I2"DITCH LINING(FDOT STOCK) FOB OB Ynungqulst
1-3 FT.BOULDERS nod CAP ROCK S99.95 FOB Youngqulst
4.6 FT.BOULDERS nuts CAP ROCK $199.95 FOB Youngqulst
1-YARD SUPERSACKS S41.95(Plus n S12 Deposit Per Bog) FOR Youngqulst
FOOT BEDDING STONE S39.95 FOB\'ouugquisl
WEIGHT SLIP S10.110(no On,no Iona fee) FOB Youngqulst
PLANT ADDRESS: 15401 ALICO RD.,FORT MYERS,FL 33913
ALL PRODUCTS ARE SUBJECT TO AVAILABILITY.
*THERE IS A 3%SERVICE FEE FOR CREDIT/DEBIT CARD PAYMENTS.
GAO
1 6 B 7
i t 11
1 ' CTI-Construction Testing&Inspection,Inc. I n v°ice
..A .11. . .. 509 Sawgrass Corporate Parkway
`°Q"""`k°r""q+A Lomita;Ina Date Invoice#
1 cillab0.nei Sunrise,FL 33325
12/15/2022 20173
RECEIVED BY l ')4'f''z'
elll To '�
, '�,PRO tf -
Saoyr Construction USA,LLC nM "" `'A CON VENIENC.4 FEE WILL.HE ADDED
3191 Coral Way,Suite 510 COST CODE_; C1 —0 if .10ALI,IN VOI( FSPMD BY C1(1 19I"1
Miami,FL 33145 - '_ ' —- __ w' - CARD.Please call our office fur details,
APPROVED BY;. � - / I-..
ENTERED F3Y;
Terms Due Date Project No./Description PO No,
Net 30 1/14/2023 11817-VBH-CON-00035-Vanderbilt VBIB-CON-00035
Item Description Quantity U/M Rate Amount
T-267 Organic Content Ignition 23 40,00 920.00
M-145 Soils Classification 23 27.00 621.00
R-58 Dry Prep,of Disturbed Soils and Soils Aggregate 23 30.00 690.00
Samples for Test
T 88-N Particle Size Analysis-No Hydrometer-Moisture 23 62.00 1,426.00
Only
T-89 Liquid Limit 23 50.00 1,150.00
T-90 Plasticity Index 23 47.00 1,081.00
T-11 Amount Finer than 11200 23 36.00 828.00
T-27 :Sieve Analysis 23 60.00 1,380.00
T-265 Determination of Moisture Content of Soils 23 12.00 276.00
LUMP SUM _._.. t3E0rECHNICAL _____.. T_-_-� --..J�_ 2,950.00 — 2,950.00_..
LUMP SUM GEOTBCHNICAL 3,350.00 3,350.00
Professional Eng... Professional Engineer 17.25 95.00 1,638.75
CLERICAL SUB-TOTAL. 16,310.75
CLERICAL FEB CLERICAL FEE 5.00% . 815.54
CTI Lab under contract
with Sacyr for this project
f(., ��' f
Ca , f,
, ) 'Df)
(.)4
Total $17,126,29
Phone# E-mail
9548356000 ptrueblood@ctilabs.net
CAS
1 6 B 7 I r�
Johnson Engineering Inc. Single project Agreement
used to provide cost reasonableness
SCHEDULE B—ATTACHMENT 1
CONSULTANT'S HOURLY RATE SCHEDULE
Title Hourly Rate
Principal $238
Senior Project Manager $201
Project Manager $165
Senior Engineer $175
_ Engineer $136 _..
Senior Inspector $117
Inspector $96
Senior Planner $164
Planner $130
Senior Designer $128
Designer $109
Environmental Specialist $120
Senior Environmental Specialist $156
Scientist/Geologist $115
Marine Biologist/Hydrogeologist $133
Senior Marine Biologist/Hydrogeologist $169
Senior GIS Specialist $149
GIS Specialist $114
Clerical/Administrative $73
Senior Technician $102
Technician $83
Surveyor and Mapper $142
CADD Technician $95
Survey Crew-2 Man $152
Survey Crew- 3 Man $185
Survey Crew-4 Man $218
Senior Architect $154
Architect $121
Lab/Materials Testing Fees/Rates
To follow this page
The above hourly rates are applicable to Time and Materials task(s) only. The above list may not be
all inclusive. Additional hourly rates for other personnel may be added via an Amendment upon mutual
agreement in advance and in writing by the parties. For Grant Funded Protects, the above hourly
rates are for purposes of providing estimate(s), as required by the grantor agency.
Page 22 of 30
t'SA_CCNA Single Project Agreement l2022_ver.I I
€:') (;()
1 6 B 7
Johnson Engineering Inc. Single project Agreement
used to provide cost reasonableness
ATTACHMENT 2 TO SCHEDULE"B"
LAB/MATERIALS TESTING FEES/RATES
Item Unit a_ Unit Rate_
SOIL CLASSIFICATION TESTS
Moisture Content(ASTM D-2216) Each $22.00
Organic Content(ASTM D-2974) Each $46.00
Sieve Analysis(AS FM D-42I, D-422) Each $69,00
Percent Fines(ASTM D-I 140) Each $48,00
Atterberg Limits(ASTM D4318) Set
CEMICAL TESTS $151.00
H
pH Water Each $12.00
Sulfate Each $60.00
Chloride Each $60,00
Soil pH Each $60.00
Resistivity Each •$67.00
Carbonate Content Each $161,00
Water Corrosivity Series(FM5-550, 551,552, 553) Each $195,00
Soil Corrosivity Series(FM5-550, 551,552, 553) Each $244.00
AGGREGATE TESTS
Sieve Analysis of Fine Aggregate Each $84,00
Sieve Analysis of Coarse Aggregate Each $105,00
Fine Aggregate Each $158,00
Coarse Aggregate Each $158,00
Rip Rap(maximum 6-inch) Each $158.00
L.A. Abrasion Each $564.00
EARTH WORKS
Standard or Modified Proctor Each $152.00
Limerock Bearing Ratio(LBR)Tests Each $507.00
Sieve Analylis Each $69.00
Organic Content Each $46.00
Moisture Content - Each $22.0()
Atterberg Limits Set $151,00
Percent Fines Each $48,00
CONCRETE
Cylindrical Concrete Specimens Cylinder $24.00
Mortar Cubes Cube $24.00
Grout Specimens —I Specimen $24,00
Cylinders Made by Others Cylinder $30,00
Flexural Strength of Beams Specimen $72.00
ASPHALT
Technical Sampling Bituminous Paving Mixtures Hour $73.00
Bitumen Extraction and Aggregate Gradation Each $230.00
Bitumen Extraction(FM 5-563) Each $132.00
Aggregate Gradation(FM 11'030) Each $101.00
Laboratory Density Determinations by Marshal Method Each $230.00
(DA°
CA0
� �� �� ~�
o �� �� �
,
|
! Johnson Engineering Inc. Single project AnU3eDl8Dt
used h] provide cost reasonableness
! '
� Density Determination o[Cmcd_§pecimmm _ Gmk $45.00
Thickness Dotcno|nxJouoyComd Specimens _ Dock *|70O
� In-Place Density?ugo(Nuclear DeooiU/ BuuksuuKu,���}�o6) — — —
T�m�� — —
| Hour $73.00
� Density Tests Bxoh $24.00
� Asphalt Plant or Roadway Inspector(Senior Inspector) Hour ' $96.00
C0K|NO '
Mobilization o[Cnrin8Equipment Popicot $220.00
Ooc'Mxo Coring Crew(8uninrTechnician) Hour $90.00
Two-Man Coring Crew(8cxior1ep|miciuo and 1eohoio|xo> Hour $163,00
' Core oil Portland Cement Concrete(up N4'ioohdiameter) Coro $84.00 '
� Core oil Asphaltic Concrete(up to4-inohdiomctor) Core $70.00
Limumck Base Thickness Determination Hour $56.00
� PILE INSTALLATION& V|BRO COMPACTION/RCPLACGWN7 '
Monitoring oy|ux(uUxdoobyTechnician Hou, $100.00
�
}
`
!
| �
|
/
�
�
i [^�
�7 0CP,0
1 6 B 7
Universal Engineering agreement Exhibit I to Attachment B
used to compare cost reasonableness
Collier County Project No,60160:County Road No.062—Vanderbilt Beach Rood March 3,2023
From Collier Blvd.(CR 051)to 16th Street NE
Proposal No.0514,0323.00002
1. Third-Party Resolution Lab Testing
UES's scope of services includes performing the miscellaneous third-party resolution testing on an as needed
basis.We understand the below rates are approved by Collier County for the scope of the project and match the
unit rates provided in document titled "VBR Rate Schedule" (Schedule B—Attachment 1 &2). In general, UES
anticipates the following services may be required:
Schedule B-Attachment 1: Consultant's Hourly Rate Schedule
Description Hourly Rate
Principal $238.00 Hour
Senior Project Manager $201.00 Hour
Project Manager $165.00 Hour
Senior Engineer $175.00 Hour
Engineer $136.00 Hour
Senior Inspector $117.00 Hour
Inspector $96,00 Hour
Enviromental Specialist $120.00 Hour
Senior Enviromental Specialist $156,00 Hour
Scientist/Geologist $115.00 Hour
ClericaV Administrative $73.00 Hour
Senior Technician $102,00 Hour
Technician $83.00 Hour
Lab/Materials Testing Fees/Rates
To Follow This Page
e2020 Unlversol roglneorIng Soioncoa All Rights R000fvod,SAL-000044R3 Pogo 3 of'7
16B 7
Universal Engineering agreement
used to compare cost reasonableness
Collier County Project No,00180;County Road No.882—Vanderbilt Beach Road March 3,2023
From Collier Blvd,(CR 051)to 16e Street NE
Proposal No.0514,0323.00002
Schedule B -Attachment 2: Lab/ Materials Testing Fees/ Rates
Item Unit Unit Rate
SOIL CLASSIFICATION TESTS
Moisture Content (ASTM D-2216) $22.00 Each
Organic Content (ASTM D-2974) $46.00 Each
Sieve Analysis (ASTM D-421, D-422) $69.00 Each
Percent Fines (ASTM D- 1140) $48,00 Each
Atterberg Limits (ASTM D4318) $151.00 Set
CHEMICAL TEST
pH Water $12.00 Each
Sulfate _ .-`�._
Chloride $60.00 Each
olo pH $60.00 Each
S $60.00 Each
Resistivity $87.00 Each
Carbonate Content $161.00 Each
Water Corrosivity Series (FM5- 550, 551, 552, 553) _ --'
$195.00 Each
Soil Corrosivity Series (FM5-550, 551, 552, 553) $244.00 Each
AGGREGATE TEST
Sieve Analysis of Fine Aggregate $84.00 Each
Sieve Analysis of Coarse Aggregate —
$105.00 Each
Fine Aggregate $158.00 Each
Coarse Aggregate $158.00 Each
Rip Rap (maximum 6-inch) $158,00 Each
L.A. Abrasion $564,00 Each EARTHWORKS Standard or Modified Proctor $152,00 Each
Limerock Bearing Ratio (LBR) Test $507.00 Each
Sieve Analysis $69.00 Each
Organic Content ___ $46.00 Each
Moisture Content $22.00 Each
Atterberg Limits $151 00 Set
Percent Fines $48.00 Each
CONCRETE
Cylindrical Conrete Specimens $24.00 Cylinder
Mortar Cubes _ $24.00 Cube
Grout Specimens $24.00 Specimen
Cylinders Made by Others $30.00 Cylinder
Flexural.Strengh of Beams $72.00 Specimen
ASPHALT — —�
Technical Sampling Bituminous Paving Mixtures $73.00 Hour
Bitumen Extraction and Aggregate Gradation $230.00 Each
Bitumen Extraction (FM 1-T030) $132.00 Each
Aggregate Gradation(FM 1-T030) $101.00 Each
*2020 Unlverael Englneoring Sclencea AU Rlghle Rasorvod.SAL-000044R3 Page 4 of 7
16B 7
Universal Engineering agreement
used to compare cost reasonableness
Collier County Project No.60166:County Road No.802—Vanderbilt Beach Road March 3,2023
From Collier Blvd (CR 051)to 10'h Street NE
Proposal No,0514.0323.00002
Schedule B -Attachment 2: Lab/Materials Testing Fees/ Rates(Continued)
Item Unit
Density Determination of Cored Specimens $45.00 Each
Thickness Determination of Cored Specimens $17.00 Each
In Place Density Test(Nuclear Density Backscatter Method)
Tenchniclan $73.00 Hour
Density Test $24.00 Each
Asphalt Plant or Rodway Inspector(Senior Inspector) $96.00 Hour
CORING
Mobilization
of Coring Equipment $239.00 Project
One-Man Coring Crew(Senior Technician) $90,00 Hour
Two-Man Coring Crew(Senior Technician&Technician) $163.00 Hour
Core on Portland Cement Concrete (Up to 4- inch diameter) -----__—. $84.00 Core
Core on Asphalt Concrete (Up to 4- inch diameter) _ $79.00 Core
Limerock Base Thickness Determination T $56.00 Hour
PILE INSTALLATION&VIE3RO COMPACTION/REPLACEMENT
Monitoring of Installation by Technician $100.00 Hour
Billing will be for actual services performed per the unit fee schedule(s) presented above. The above unit rates
and/or hourly rates do not include any overtime work. Overtime work (scheduled for before 7:00 AM or going
past 4:00 PM Monday through Friday, more than 8 hours in one day, more than 40 hours in one week,or anytime
on Saturdays, Sundays, or Holidays), will be charged at the standard rate times 1.5, Technician Time will be
charged if the Contractor's work is not ready for testing/inspection upon arrival of UES's representative, or if our
minimum testing frequencies specified herein cannot be achieved.
A typed report, signed and sealed by a State of Florida Registered Professional Engineer will be provided. In
accordance with Florida Statues Chapter 471 and the rules of the Florida Board of Professional Engineers
(Chapter 61G15),a Professional Engineer is required to perform a thorough review of each report before affixing
his seal and signing for certification for each report's validity. A fee equal to 10% of the total invoiced amount
will be applied to each invoice for this mandated requirement.
CONDITIONS AND QUALIFICATIONS
Please note that UES's services do not include supervision or direction of the actual work.Also, be aware that
neither the presence of our field representative nor the observation and testing by our firm shall imply UES's
responsibility for defects discovered in the construction work. It Is understood that UES will not be responsible
for job or site safety on this project. Job site safety will be the sole responsibility of the contractor.
In this proposal the words"inspection"and"verify are used to mean observation of the work and the conducting
of tests by UES to determine substantial compliance with plans, specifications and design concepts.
These services Include an engineering technician or inspector,field sampling,travel,test equipment and a'typed
report signed and sealed by a State of Florida Registered Professional Engineer. The rates for professional
engineering services apply to report review, site visits and meetings, consultations, engineering letters, and
letters of Intent and certification.
*2020 Universal Engineering Sciences All Rights Reserved.SAL-000041R3 Pogo 5 of 7