Loading...
Backup Documents 01/23/2024 Item #16C 2 t - ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 6 C 2 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE 10 Print on pink paper. Attach to original document. The completed routing slip and original documents arc to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the 0 exception ot'the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s)(List in routing order) Office Initials Date li r , iii3. County Attorney Office County Attorney Office 0 ../zifi //011107-i 4. BCC Office Board of County r Commissioners Q} Jai/PAS/ I/2i/i c..l 5. Minutes and Records Clerk of Court's Office ( I i I ![1:,61 1(4,. PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the vent one of the addressees above,may need to contact staff for additional or missing information. OP Name of Primary Staff 1 .. 4 Phone Number Contact/ Department ZS/wvt t c‘ totT, ??ji, C tit ) . 2 341-2.= - -(-)Z I") Agenda Date Item was I Agenda Item Number Approved by the BCC Ni 1..-17114./?-9 j , C, .2- Type of Document l Number of Original Attached (�-1-S Ir,5 I`)„0 Documents Attached I PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) I. Does the document require the chairman's original signature? ------ 2. Does the document need to be sent to another agency for additional signatures? If yes, provide the Contact Information(Name; Agency;Address; Phone)on an attached sheet. ...-' 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. so4. All handwritten strike-through and revisions have been initialed by the County Attorney's / Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the IIIPdocument or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. /112 - 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 1/75I Y and all changes made during N/A is not the meeting have been incorporated in the attached document. The County ,( ��rr an option for Attorney's Office has reviewed the changes,if applicable. 1,'5' this line. 9. Initials of attorney verifying that the attached document is the version approved by the N/A is not BCC,all changes directed by the BCC have been made, and the document is ready for the ( p t1/Y7 an option for Chairman's signature. A" this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 1 6C 2 WORK ORDER/PURCHASE ORDER Contract 20-7800"Underground Utility Contractors" Contract Expiration Date: June 21, 2026 This Work Order is for professional underground utility services for work known as: Project Name: PS 308.09 Rehabilitation. Project No: 70240.4.11.1 70240.4.11.2 The work is specified in the proposal dated October 31,2023 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above,this Work Order/Purchase Order is assigned to: Kyle Construction Inc. Scope of Work: As detailed in the attached proposal and the following: * Task I Bid Items 1 through 7 and 14 through 31 -General Pump Station Work -70240.4.11.1 * Task II Bid Items 8 through 13 -Demolition Work -70240.4.11.2 * Task III Bid Item 32 -Owner's Allowance -70240.4.11.1 * Task IV Bid Item 33 -Owner's Landscape Allowance -70240.4.11.1 Schedule of Work: Complete work within 400 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement#20-7800 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above, the County will compensate the Firm in accordance with following method(s): ®Negotiated Lump Sum (NLS) ❑Lump Sum Plus Reimbursable Costs (LS+RC) Time & Material (T&M) (established hourly rate— Schedule A) ❑ Cost Plus Fixed Fee(CPFF), as provided in the attached proposal. Task I $ 644,400.00 LS Task II $ 21,600.00 LS Task III $ 65,000.00 T&M Task IV $ 15,000.00 T&M TOTAL FEE $ 746,000.00 Digitally signed by Ismael Irigoyen s m ae I Irigoyen Contact Info: 239-986-3541 PREPARED BY: Date: 2023.11.29 15:08:45-05'00' Ismael lrigoyen, Project Manager III Date Page 1 of 3 1 6 C 'l KLA Digitally signed by FandrichShon DN:E=Shon.Fandrich@colliercountytl.gov, F a n d r i e h S h o n CN=Fandrichn i n. nd Proj eral,O ageme User Accounts, O U=PUD Planning and Project Management.OU=PUU. OU=Divisions,DC=bcc.DC=colliergov,DC=net APPROVED BY: Date:2023.11.14 10:58:59-05'00' Shon Fandrich, Supervisor of Project Management Date Dgitalty signed by McLeanMatinew ONM c L e a n M att h ew OU GeneE=Mar I.OU. PM User Accounts, goy,CN=Munre nMa P OU=General.OU=PPM User Accounts.OU=PUD Planning and Project Management,OU=PUD.OU=Divisors,DC=bcc,DC=colliergov,DC=net APPROVED BY: Date:2023,11.1412:20,38.05'00' Matthew McLean, EPM Division Director Date VonHolleRobert Von H o I l e R o b e rt Digitally signed Date: 2023.11.14y12:41:02 -05 00' APPROVED BY: Robert Von holle, Wastewater Division Director Date BelloneJoseph Digitally signed by BelloneJoseph APPROVED BY: Date: 2023.11.14 14:31:50 -05'00' Joseph Bellone,Utilities Finance Division Director Date Digitally signed by YilmazGeorge Vii m az G e o rg e Date: 2023.11.28 16:56:35 -05'00' APPROVED BY: Dr, George Yilmaz,Public Utilities Department Head Date By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses, that,to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity(financial,contractual,organizational, or otherwise)which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally,the Firm agrees to notify the Procurement Director,in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Kyle Construction Inc. 11/13/2023 e A am,Project Manager Date (Remainder of page intentionally left blank) Page 2 of 3 16C 2 IN WITNESS WHEREOF, the parties hereto,have each,respectively,by an authorized person or agent, have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS Crystal K.Kinzel,'Clerk of Courts COLLIER COUNTY,FLORIDA By: 1. (.l. By: Dated: • )_ 7 0c) S Chris all,AA"Chairman (SEAL) `Atte t as to hairman' signature only Kyle Construction Inc. By: Fir fitness Si azure Kyle_ 4bct harn, t?ro c* manager j) � � � Type/print signature an title' rint wi IA / 9P A 'Type/print witness name' prow o Fo d gauzy: �p ( Msistant.County Attorney P ' t Name Page 3 of 3" 1;i) 160 2 Colter County Public Utilities Department Engineering&Project Management Division Date: October 11r-.2023 From: Ismael Irigoyen.PE Project Manager III tsmael.lrtgoyen mcolliercountyfl.goy To: Potential Quoters Subject: Request for Quotes-RFQ 20-7800 PS 308.09 Rehabilitation Project: Pump Station 308.09 Rehabilitation RFQ Due Date: Wednesday,November 10,2023,at 4:00 PM Pre-Quote Meeting)Non-Mandatory): N/A Q&A Deadline: Wednesday,October 25e',2023.at 4:00 PM Number of Days to Final Completion: 370 days to substantial t 30 days final=400 days Documents Provided 1. RFQ Cover Letter i 2. Bid Schedule 3. Supplemental Specifications 4. Construction Plans 5. SDPI Permit 6. Photos Liquidated Damages: S374 per day Payment and Performance Bonds: Required if quote exceeds S200.000 Your quotation response for this project is due electronically to the Email address listed above no later than the date and time specified above.We well not accept any quotation responses later than the noted time and date.We look forward to your participation in this request for information/quotation process. Please return the following documents with your quote • This RFQ Letter signed by an officer of the Firm. • Bid Schedule Form with quote costs. • Any and all Bid Addendums signed by an officer of the Firm. Vnjk 'C n3i-cuc,�t-,on T c.• Firm's Complete Legal Name (239) 1043-7059 (Z39) 643-4torl TelejaxNerho r ne%i�'�-- i ure% �i2y[G�/72:2,2ayel- Title Y>1k. AbraY».sy /o/si/Zae3 Print Name Date 0 Rbc iRlleu Enameling&''ram MandgEnw¢Canso)•3335 Tswam,Ira. a' J Ytb 303•Naples.F kola 341 t 2-5361•235-252-4285•FAX 239-252-53 T8 C ,�1I 16C 2 IIIbir COLLIER COUNTY PUBIC UTILITIES PUMP STATION 308.09 REHABILITATION Coer County BID SCHEDULE SECTION 1-GENERAL CONDITIONS ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENDED PRICE 1 Mobilization/Demobilization(NOT TO EXCEED 10%BID) 1 LS $ 58,000.00 $58,000.00 2 Maintenance of Traffic(Vehcile&Pedestrian) 1 LS $ 1,000.00 $1,000.00 3 Preconstruction Audio/Video Recording 1 LS $ 1,500.00 $1,500.00 4 Survey Layout and Record Drawings 1 LS $ 3,500.00 53,500.00 5 Furnish and Install Construction Project Sign 1 L5 $ 1,500.00 $1,500.00 6 Stormwater Pollution Plan 1 LS $ 1,000.00 S1,000.00 7 Bypass Pumping During Construction 1 LS $ 91,000.00 S91,000.00 SECTION 1 SUBTOTAL $157,500.00 SECTION 2-DEMOLITION ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENDED PRICE 8 General Site Clearing&Grubbing 1 LS $ 4,500.00 54,500.00 9 Concrete/Asphalt Sidewalk&Drives Removal 1 LS $ 4,500.00 $4,500.00 10 Electrical Service/Components Demolition 1 LS $ 2,000.00 52,000.00 11 Wetwell Above Grade Component Demolition 1 LS $ 3,000.00 53,000.00 12 Wetwell Below Grade Component Demolition 1 LS $ 3,500.00 $3,500.00 13 Valve Vault and Piping Demolition 1 LS $ 4,100.00 $4,100.00 SECTION 2-SUBTOTAL $21,600.00 SECTION 3-PUMP STATION ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENDED PRICE 14 Furnish and Install Submersible Pumps 1 LS $50,000.00 $50,000.00 15 Furnish and Install Discharge Piping and Valves 1 LS $84,000.00 $84,000.00 16 Furnish and Install Concrete Wetwell Top Slab with Hatches 1 LS $9,800.00 $9,800.00 17 Furnish and Install Vent/Pump Out Piping 1 LS $5,800.00 55,800.00 18 Wetwell Bottom Repair 1 LS $7,500.00 $7,500.00 19 Furnish and Install Wetwell Liner 1 LS $28,000.00 $28,000.00 20 Furnish and Install Concrete Control Panel Pad 1 LS $6,500.00 56,500.00 21 Furnish and Install Discharge Piping Pad 1 LS $6,500.00 56,500.00 22 Connect to Existing Force Main 1 LS $7,500.00 $7,500.00 23 Furnish and Install Equipment Mounting Rack(Located by Wetwell) 1 LS $77,000.00 $77,000,00 24 Furnish and Install Electrical Components 1 LS $52,000.00 $52,000.00 25 Furnish and Install Antenna 1 LS $34,000.00 $34,000.00 26 Furnish and Install New Electrical Service to Site 1 LS $10,000.00 $10,000.00 27 Pump Station Startup and Testing 1 LS $10,000.00 $10,000.00 SECTION 3-SUBTOTAL $388,600.00 SECTION 4-SITEWORK ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENDED PRICE 28 Furnish and Install Concrete Retaining Wall 1 LS $45,000.00 $45,000.00 29 Furnish and Install Site Fence&Gates 1 LS $30,000.00 $30,000.00 30 Furnish and Install Asphalt Driveway&Pavement 1 LS $20,000.00 $20,000.00 31 Furnish and Install Stone Surface 1 LS $3,300.00 S3,300.00 SECTION 4-SUBTOTAL $98,300.00 SECTION 5-ALLOWANCES ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENDED PRICE 32 Owner Directed Allowance for Unforeseen Conditions 1 LS/TM $65,000.00 33 Owner Directed Allowance for Landscaping 1 IS/TM $15,000.00 SECTION 5-SUBTOTAL $80,000.00 COST SUMMARY SECTION 1-GENERAL CONDITIONS $157,500.00 SECTION 2-DEMOLITION $21,600.00 SECTION 3-PUMP STATION $388,600.00 SECTION 4-SITEWORK $98,300.00 CONSTRUCTION TOTAL $666,000.00 SECTION 5-ALLOWANCES $80,000.00 CONSTRUCTION TOTAL WITH ALLOWANCES $746,000.00 16C 2 Collier County ADDENDUM#1 Date: October 16,2023 To Interested Bidders From: Ismael Irigoyen Subject: PS 308.09 Rehabilitation The following changes were made to Request for Quotes — RFQ 20-7800 PS 308.09 Rehabilitation Project. Item No. 1. The County will directly pay for the upgrading and extension of the primary electrical service.The Contractor shall remain responsible for all coordination with FPL and extension of power from the FPL power pole handhole to the site.This proposed work had been included on Sheet E-7. Keynote No. 1 Item No. 2: In lieu of utilizing concrete posts for the electrical equipment rack. aluminum posts shall be utilized in accordance with the attached sketch dated October 16. 2023. If your require additional information, please send your question(s)via email to Ismael.Ingoyen(a;colliercountyflgov by Wednesday. October 25. 2023 at 4 00 PM. The answers to the questions will be provided via email to all vendors. Please sign below and return a coy of this Addendum with your submittal for the above referenced solicitation. .!' Nip 442nAiam 1.13 11 Z.cZ3 Gig re De - jAvit Coiis#co for Name of Firm 6,C 2 Co er County ADDENDUM#2 Date: October 19,2023 To: Interested Bidders From: Ismael lrigoyen Subject: PS 308.09 Rehabilitation The following changes were made to Request for Quotes — RFQ 20-7800 PS 308.09 Rehabilitation Project. The following questions were received.Answers follow. Question No. 1 Sheet M-3 upper right says to provide a Gravity Wall with fence, then on left of page it says ribbon curb. I cannot find a section in the drawings showing this?The FDOT Gravity Wall is for an elevation change,can a section be provided showing the intent of this gravity wall A gravity wall is to be provided at the site penmeter except at the site entrance.A nbbon curb shall be provided at the entrance. Ribbon curb shall be 8-inches wide by 12-inches deep with two#5 reinforcing bars top and bottom. The proposed gravity wall is shown on Sheet M-9. Question No. 2 Does the County have any idea where manholes are located for bypassing?The drawing shows two 8-inch gravity lines coming to the lift station? The two gravity lines extend both east and west from the pump station. An existing manhole is located 225 feet (+/-) to the west and an existing manhole is located on the east side of the existing building 165 feet(*/-)from the pump station. See attached sketch for approximate location of the manholes. Question No.3 Ismael. I can't find anywhere what size the new pipe is,can this be provided? The information on the existing and proposed force main sizing can be found on Sheet M-4 on the Pump Station Data Table. The existing and proposed piping shall be 4-inch diameter. The existing 4-inch force main piping is also shown on Sheet M-2. 14101&(on1,e[n.11.wMAf('(•(CA\M]o.'A lilt Ana Mn,(M r.s w.a eaW Ckid Me J eon 16C 2 Collier County If your require additional information, please send your question(s)via email to: Ismael.lrigoven@colhercountvfl.gov by Wednesday, October 25, 2023 at 4:00 PM. The answers to the questions will be provided via email to all vendors. Please sign below and return a coy of this Addendum with your submittal for the above referenced solicitation. 466• A 'n 1013i) 2023 nOrfe) Da 1_on5i-fuctiof\ Namd of Firm .2C21't:220ETFNvI CmY,.irn r0p70 Cert.,\N7 MOMOWDEMDOVS 101I Of,(1100•DDpDO "I AS Of ADM NOflM No 2 Oou 7