Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Agenda 01/09/2024 Item #16B 7 (Accept the Immokalee Transportation Network Plan)
01/09/2024 EXECUTIVE SUMMARY Recommendation that the Board accept the Immokalee Transportation Network Plan that identifies opportunities to improve the transportation network in Immokalee. OBJECTIVE: To improve the transportation network in Immokalee. CONSIDERATIONS: The Immokalee Area Master Plan recommended that Collier County Transportation Management Services Department (TMSD) complete a transportation planning study to identify potential connectivity improvements of both the collector and local street grid, as well as the sidewalk network, to improve pedestrian and bicycle safety and connect residential areas to community facilities and commercial services. To comply with this direction, TMSD contracted with Atkins to complete the planning study. The goal of this effort was to identify missing gaps in the sidewalk and roadway network to improve mobility, connectivity and the multimodal network while also establishing priorities for those improvements. A gap analysis is significant to the sidewalk and roadway network as it focuses on smaller projects which can connect a larger network of existing facilities. These projects provide the opportunity for Immokalee area residents to safely walk or ride bicycles to get to transit, work, school, and other destinations. Recognizing that many studies have been completed in the Immokalee area, the Immokalee Transportation Network Plan compiled the analysis from previous studies, looked at what projects were existing, committed, or planned and focused on recommendations to complete infrastructure connections. The goal of this report was to support prior studies and projects and help with setting future priorities and grant development. This review focused on the goals and objectives set in the Immokalee Area Master Plan which included supporting transportation and mobility, specific community policies, and identifying key connections to destinations with transportation and mobility improvements. Additionally, data, maps, and projects from prior studies were compiled. To gain a better understanding of the existing mobility-related conditions in the study area, the study team conducted several field reviews throughout the study area, held two workshops and formed a stakeholder’s advisory group (SAG) consisting of groups and agencies working in Immokalee. The draft study was also presented to the Collier MPO’s Bicycle and Pedestrian Advisory Committee, the Immokalee Community Redevelopment Agency (CRA) and the Immokalee Beautification MSTU. With input from these groups and the SAG, an initial list of sidewalk and roadway projects was developed. This included all the projects identified in previous studies as well as projects Atkins identified that would close gaps in the network, create better connections, expand the network, and address safety and operational issues. The sidewalk projects consist of projects that expand and complete the sidewalk network allowing for safer walking conditions throughout the study area. The roadway connection projects provide for improved inter connections, increase safety for all users and improve emergency access. The study team recognized the need to prioritize these projects. To accomplish this, evaluation criteria were developed to prioritize the proposed sidewalk and roadway projects. Clos ing gaps in the network, creating better connections, expanding a connected network, and addressing safety and operational issues were ranked with the focus on directing future investments. The evaluation criteria for unfunded proposed sidewalks included six (6) categories: connectivity to the existing network, proximity to a major activity center, proximity to a shopping/retail center, proximity to a bicycle/pedestrian crash that occurred within the last five years, proximity to a school, and proximity t o a transit stop. The evaluation criteria for roadway projects included five (5) categories: connectivity to the existing roadway network, funding status, project status, proximity to evacuation routes, and right-of-way availability. The criteria when applied to each of the 122 sidewalk and 27 roadway projects, produced a list of projects ranked as high, medium, or low. It should be noted that strict adherence to the ranking is not advised. As funding becomes 16.B.7 Packet Pg. 759 01/09/2024 available through the County, the Florida Department of Transportation, the Metropolitan Planning Organization, grants, and other sources, some lower-ranked projects may meet the funding criteria better than others. In these cases, it is advisable to capitalize on the available funding and advance the qualifying project or projects. The identified sidewalk and roadway evaluation criteria used for the analysis in the study and the lists of projects to improve the current network gaps, and corresponding maps meet the intent of the recommendation in the Immokalee Area Master Plan. The Immokalee CRA and MSTU both accepted the plan at their Joint meeting on November 15, 2023. They recognized that the identification of gaps in the network, connecting a multimodal network that includes walking, bicycling, transit, along with pathways in this study will help to coordinate activities and may assist with future funding activities. FISCAL IMPACT: There is no Fiscal impact associated with this Executive Summary. The plan was completed in accordance with the scope for $192,296. Subsequent projects or grant requests developed from the plan, if applicable, would be brought to the Board for approval and for authorization of a future funding request. GROWTH MANAGEMENT IMPACT: This project is consistent with the County’s Growth Management Plan, the Immokalee Area Master Plan and the MPO’s Long Range Transportation Plan. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, raises no legal issues at this time and requires majority vote for acceptance of the Plan. -JAK RECOMMENDATION: That the Board accept the Immokalee Transportation Network Plan that identifies opportunities to improve the transportation network in Immokalee Prepared by: Lorraine Lantz, AICP, Transportation Planning Manager; Capital Project Planning, Impact Fees and Program Management ATTACHMENT(S) 1. [Linked] Immokalee Transportation Network Plan (PDF) 16.B.7 Packet Pg. 760 01/09/2024 COLLIER COUNTY Board of County Commissioners Item Number: 16.B.7 Doc ID: 26174 Item Summary: Recommendation that the Board accept the Immokalee Transportation Network Plan that identifies opportunities to improve the transportation network in Immokalee. Meeting Date: 01/09/2024 Prepared by: Title: Project Manager – Capital Project Planning, Impact Fees, and Program Management Name: Lorraine Lantz 12/01/2023 5:02 PM Submitted by: Title: Division Director - Capital Proj Plan, Impact Fees – Capital Project Planning, Impact Fees, and Program Management Name: Beth Johnssen 12/01/2023 5:02 PM Approved By: Review: Transportation Engineering Valerie Fleming Additional Reviewer Completed 12/04/2023 8:49 AM Transportation Management Services Department Jeanne Marcella Transportation Management Services Department Completed 12/04/2023 1:40 PM Capital Project Planning, Impact Fees, and Program Management Beth Johnssen Additional Reviewer Completed 12/05/2023 3:43 PM Transportation Management Operations Support Tara Castillo Additional Reviewer Completed 12/08/2023 3:21 PM Road Maintenance Ellen Sheffey Additional Reviewer Completed 12/12/2023 9:51 AM Transportation Management Services Department Trinity Scott Transportation Completed 12/12/2023 11:14 AM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 12/12/2023 11:25 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 12/13/2023 4:23 PM Office of Management and Budget Christopher Johnson Additional Reviewer Completed 12/30/2023 11:53 AM County Manager's Office Amy Patterson Level 4 County Manager Review Completed 01/02/2024 10:13 AM Board of County Commissioners Geoffrey Willig Meeting Pending 01/09/2024 9:00 AM 16.B.7 Packet Pg. 761 November Immokalee Transportation Network Plan Prepared for: Collier County Transportation Management Services Department Capital Project Planning Division Prepared by: Immokalee Transportation Network Plan This Page Left Intentionally Blank Immokalee Transportation Network Plan Page I i Table of Contents Executive Summary ....................................................................................................................... ES1 Sidewalk Project List ............................................................................................................... ES5 Sidewalk Project Maps .......................................................................................................... ES15 Roadway Project List ............................................................................................................ ES20 1.0 Introduction ............................................................................................................. 1 1.1 Study Purpose ..................................................................................................................... 1 1.2 Study Background ............................................................................................................... 1 1.3 Study Goals ......................................................................................................................... 1 1.4 Study Area .......................................................................................................................... 1 1.5 Stakeholder Advisory Group ................................................................................................ 3 1.6 Study Process......................................................................................................................4 2.0 Previous Studies Analysis .......................................................................................... 5 Plans and Resources Reviewed .................................................................................................... 5 Key Trends ................................................................................................................................. 5 Key Topics ................................................................................................................................. 6 2.1 Bus Stop and Facility Accessibility Study ..............................................................................8 2.2 CAT Comprehensive Operations Analysis ............................................................................ 9 2.3 CAT Transit Development Plan (TDP) ................................................................................. 10 2.4 Complete Streets TIGER Application and Grant .................................................................. 11 2.5 Park-and-Ride Study ......................................................................................................... 12 2.6 Bicycle and Pedestrian Master Plan .................................................................................... 13 2.7 Pedestrian and Bicycle Safety Study................................................................................... 14 2.8 Local Road Safety Plan ...................................................................................................... 15 2.9 Immokalee Pedestrian Crosswalk Improvement Study ........................................................ 16 2.10 Immokalee Walkable Community Study ............................................................................. 17 2.11 Immokalee CRA Redevelopment Plan Update – Sidewalk Master Plan Element ................... 18 2.12 SR 29 Loop Road from CR 846 to SR 29 North Terminus ..................................................... 19 3.0 Existing Conditions ................................................................................................. 20 3.1 Background Information and Demographics ....................................................................... 20 Zoning ..................................................................................................................................... 20 Vehicle Availability ................................................................................................................... 21 Means of Transportation ........................................................................................................... 21 Immokalee Transportation Network Plan Page I ii Commute to Work .................................................................................................................... 21 Demographics and Income ........................................................................................................ 21 Bicycle and Pedestrian Crashes ................................................................................................. 22 3.2 Roadway Conditions .......................................................................................................... 22 3.3 Major Activity Centers ....................................................................................................... 22 3.4 Retail and Shopping Centers .............................................................................................. 24 3.5 Schools ............................................................................................................................. 25 3.6 Street Grid ........................................................................................................................ 26 3.7 Sidewalks and Mid-Block Crossings .................................................................................... 27 Sidewalks ................................................................................................................................. 27 Mid-Block Crossings.................................................................................................................. 29 3.8 Bicycle Facilities ................................................................................................................ 29 3.9 Transit Systems and Operation .......................................................................................... 30 Operational Ridership ............................................................................................................... 31 Bus Transfer Facility .................................................................................................................. 31 3.10 On-Street Parking Lanes.................................................................................................... 33 4.0 Gap Analysis and Project Identification .................................................................... 34 4.1 Project Evaluation ............................................................................................................. 34 Sidewalk Evaluation Criteria ...................................................................................................... 34 Roadway Evaluation Criteria ..................................................................................................... 40 5.0 Recommendations and Final Project List ................................................................. 43 5.1 Overall Project Lists ........................................................................................................... 44 Sidewalk Project List ................................................................................................................. 44 Roadway Project List ................................................................................................................ 54 6.0 Conclusion ............................................................................................................. 56 Immokalee Transportation Network Plan Page I iii List of Figures Figure ES-1. Sidewalk Projects Map ......................................................................................... ES15 Figure ES-2. Quadrant 1 Sidewalk Project Map ......................................................................... ES16 Figure ES-3. Quadrant 2 Sidewalk Projects Map ....................................................................... ES17 Figure ES-4. Quadrant 3 Sidewalk Projects Map........................................................................ ES18 Figure ES-5. Quadrant 4 Sidewalk Projects Map ....................................................................... ES19 Figure ES-6. Roadway Projects Map ......................................................................................... ES22 Figure 1. Immokalee Study Area ..............................................................................................2 Figure 2. Study Process ............................................................................................................4 Figure 3. Immokalee Zoning Categories .................................................................................. 20 Figure 4. Zoning by Category .................................................................................................. 21 Figure 5. Major Activity Centers .............................................................................................. 24 Figure 6. Immokalee Retail and Shopping Centers ................................................................... 25 Figure 7. Immokalee Schools .................................................................................................. 26 Figure 8. Immokalee Street Grid ............................................................................................. 27 Figure 9. Existing Sidewalk Network ....................................................................................... 28 Figure 10. Example of a Sidewalk Gap Along a Residential Street ............................................... 28 Figure 11. Mid-Block Crossing along SR 29 between 7th Street and 6th Street ........................... 29 Figure 12. Unbuffered Bicycle facility found at the intersection of SR 29 and Lake Trafford Road ........................................................................................................................ 30 Figure 13. Immokalee Transit Corridors Map ............................................................................. 31 Figure 14. Existing Transfer Facility........................................................................................... 32 Figure 15. Proposed Bus Transfer Facility Design ....................................................................... 32 Figure 16. Location of Proposed Bus Transfer Facility ................................................................ 33 Figure 17. On-street Parking Found Along SR 29 within the Central Business District of Immokalee............................................................................................................... 33 Figure 18. Proposed Sidewalks by Study ................................................................................... 34 Figure 19. Overview of Proposed Sidewalks by Ranking ............................................................. 37 Figure 20. Proposed Sidewalks by Ranking (Quadrant 1) ............................................................ 38 Figure 21. Proposed Sidewalks by Ranking (Quadrant 2) ........................................................... 38 Figure 22. Proposed Sidewalks by Ranking (Quadrant 3) ............................................................ 39 Figure 23. Proposed Sidewalks by Ranking (Quadrant 4) ........................................................... 39 Figure 24. Proposed Roadway Projects by Ranking .................................................................... 42 Immokalee Transportation Network Plan Page I iv List of Tables Table ES- 1. Sidewalk Project List .............................................................................................. ES5 Table ES- 2. Roadway Project Listing ....................................................................................... ES20 Table 1. Plan Review Matrix .................................................................................................... 6 Table 2. Crashes by Type and Severity (January 2017-December 2021) .................................... 22 Table 3. Ridership by Route Number from April 2018 to April 2019 .......................................... 31 Table 4. Ridership by Route number from April 2021 to April 2022 .......................................... 31 Table 5. Sidewalk Project Evaluation Criteria ......................................................................... 36 Table 6. Roadway Projects Evaluation Criteria ........................................................................ 41 Table 7 Sidewalk Project List ................................................................................................ 44 Table 8. Roadway Project List ................................................................................................ 54 Appendices APPENDIX A. Summary of Meetings with Community Representatives APPENDIX B. Vehicle Availability APPENDIX C. Means of Transportation to Work APPENDIX D. Commute to Work APPENDIX E. Demographics APPENDIX F. Technicial Memorandum 1 Immokalee Transportation Network Plan Executive Summary Immokalee Transportation Network Plan Page I ES 1 EXECUTIVE SUMMARY To help create a more sustainable, liveable, and equitable community for all residents of Immokalee, Collier County embarked on the development of a multi-modal master plan. A significant segment of Immokalee’s residents use public transit, walks, or bicycles to work, school, and other destinations . This multi-modal transportation planning study will compile transportation and mobility projects and programs identified in other studies and identify additional projects and studies that are needed to complete connections and expand mobility for all. The goal of this effort is to determine community mobility needs and important connections to identify missing gaps, set priorities for need ed improvements, and recommend improvements to address the mobility needs and create a plan to provide accessibility for all. The sidewalk and roadway projects included in this report are particularly important to the Immokalee area. This area has househo lds with very low vehicle availability. The American Community Survey (2020) concludes that of the approximately 6,800 households in Immokalee, 22.5% are without access to a vehicle, 21.5% with access to one (1) vehicle, 35.2% with access to two (2) vehicles, and 20.9% with access to three (3) or more vehicles. These statistics show the importance of the projects identified in this study as many of the residents of Immokalee walk or ride bicycles to get to work, stores, school, etc. This effort consulted with external stakeholders and service providers with the goal of developing recommendations that identify enhancements to mobility for the citizens of Immokalee. The Immokalee Transportation Network Plan Stakeholder Advisory Group (SAG) were individuals with direct knowledge of transportation needs and issues in the community. The study team was provided a list of stakeholders to contact and engage with the team during the study process and meetings. Some of the SAG committee members attended the initial kickoff meeting or were contacted by the team during project research. The Previous Studies Analysis section provides a summary of all previous studies performed within the Immokalee urban area. This review focused on the goals and objectives that support transportation and mobility plans, specific community policies, and the identification of key connections, destinations, and priority transportation and mobility improvements. The Stakeholder Advisory Group includes the following: A. Internal Members ▪ Code Enforcement ▪ Collier County Development Review Division ▪ Collier County Parks & Recreation Division ▪ Collier County Sheriff’s Office - Safety Officer ▪ Collier County Stormwater Division ▪ Collier County Traffic Operations Division ▪ Collier County Transportation Planning Division ▪ Immokalee Fire Department B. Agency/Governmental Members ▪ Collier Area Transit Staff ▪ Collier Metropolitan Planning Organization (MPO) Staff Immokalee Transportation Network Plan Page I ES 2 ▪ Florida Department of Transportation (FDOT) Planning Staff ▪ FDOT Commuter Services/Vanpool Services ▪ Immokalee Chamber of Commerce Staff ▪ Immokalee CRA Advisory Board Staff ▪ Immokalee Health Department Staff ▪ Immokalee MSTU Advisory Board Staff ▪ Immokalee Regional Airport Staff ▪ Immokalee Technical Institute, Collier County Public Schools Staff ▪ LeeTran Staff ▪ Southwest Florida Regional Planning Council (SWFRPC) Staff C. Advocacy Groups ▪ Bicycle & Pedestrian Groups, Pathways ▪ Blue Zones – Immokalee Committee ▪ Complete Streets Coalition ▪ Immokalee Fair Housing Alliance/Community Foundation of Collier County ▪ Seminole Tribe of Florida ▪ Unmet Needs Coalition The need for this effort is called for in the county’s Growth Management Plan which calls for the creation of a multi-modal transportation system that is safe, efficient, and accessible to all residents. Policy 1.3.6 requires the county consider a variety of transportation modes. The need was also identified in the Immokalee Master Plan. This master plan identified many needs throughout the community including the need to improve transportation options by expanding transit service, enhancing pedestrian and bicycle infrastructure. Finally, as data was being sought to support the TIGER Grant application, it became clear that with the number of previous mobility studies that had been done or were underway in the Immokalee area, a master plan that pulled all of those plans together in one document would be valuable. The analysis of this report is to support prior projects and help with future priority setting, grant development, etc. Atkins prepared an initial technical memo and a preliminary literature search and report on previous studies related to transportation issues and the needs of the Immokalee community. Please see Appendix F for a copy of the technical memo. Later discussions and interviews with the County and CRA staff members provided additional studies and data that proved to be essential to the study effort. A total of 12 plans and resources were reviewed as part of the previous studies analysis: Collier Area Transit (CAT) Bus Stop & Facility Accessibility Study CAT Comprehensive Operations Analysis CAT Transit Development Plan (TDP) Collier County/Immokalee Complete Streets TIGER 2016 Application and Grant Collier MPO and CAT Park-and-Ride Study Collier MPO Bicycle & Pedestrian Master Plan Collier MPO Pedestrian and Bicycle Safety Study Collier MPO Local Road Safety Plan (LRSP) Immokalee Transportation Network Plan Page I ES 3 Immokalee Pedestrian Crosswalk Improvements Study Immokalee Walkable Community Study Immokalee CRA Redevelopment Plan - Sidewalk Master Plan Element SR 29 Loop Road from CR 846 to SR 29 North Terminus This review focused on the goals and objectives that support transportation and mobility plans, specific community policies, and the identification of key connections, destinations, and priority transportation and mobility improvements. Additionally, data, maps, and projects from these studies were compiled and are presented in detail in Section 4 of this report. To gain a better understanding of the existing mobility-related conditions in the study area, the study team conducted several field reviews throughout the study area. The study team was able to observe residents as they traveled around the area and was able to see what transportation facilities are currently in place, and where facilities were missing or in need of repair. This information was the foundation of the study upon which the needed projects would be added. Outreach and input from the SAG were critical to identifying related mobility studies and projects were identified for this effort. It was also important to hear from the groups and agencies that are currently working in Immokalee and with the residents to understand the transportation needs and desires of the citizens. Workshops were held in May and July 2022 to present findings to the SAG and receive their feedback. Additionally, Atkins staff conducted an extensive field review in May of the street and sidewalk network. In addition to the SAG, the study team made a presentation to the Collier MPO’s Bicycle and Pedestrian Advisory Committee. The plan was well received by the committee and the discussion centered around the need to implement and complete as many of the sidewalk projects as possible as the committee recognized the importance of walking in the Immokalee area. One-on-one meetings were held with the following groups and agencies to gain their perspectives on mobility needs in the community: • Immokalee CRA • Guadalupe Center • Lipman Family Farms • Redlands Christian Migrant Association • Immokalee Fire Control District • MSTU Advisory Board A summary of these meetings may be found in Appendix A of this report. With input from these groups and the SAG, an initial list of si dewalk and roadway projects was developed. This included all of the projects identified in previous studies as well as projects Atkins identified that would close gaps in the network, create better connections, expand the network, and address safety and operational issues. The sidewalk projects consist of projects that expand and complete the sidewalk network allowing for safer walking conditions throughout the study area. The roadway connection projects provide for improved interconnections, increase safety for all users and improve emergency access. Immokalee Transportation Network Plan Page I ES 4 The study team recognized the need to prioritize these projects. To accomplish this, evaluation criteria were developed to prioritize the proposed sidewalk and roadway projects. The evaluation criteria for unfunded proposed sidewalks included six categories as shown below: 1. Connectivity to the existing network 2. Proximity to a major activity center 3. Proximity to a shopping/retail center 4. Proximity to a bicycle/pedestrian crash that occurred within the last five years 5. Proximity to a school 6. Proximity to a transit stop The evaluation criteria for roadway projects included five (5) categories as shown below: 1. Connectivity to the Existing Roadway Network 2. Funding Status 3. Project Status 4. Proximity to Evacuation Routes 5. Right-of-Way Availability The ranking criteria presented in Section 4 were applied to each project producing a ranking of High, Medium, or Low. It should be noted that strict adherence to the ranking is not advised. As funding becomes available through the County, the Florida Department of Transportation, grants, and other sources, some lower-ranked projects may meet the funding criteria better than others. In these cases, it is advisable to capitalize on the available funding and advance the qualifying project or projects. The study provides tools (including lists and maps) that will allow stakeholders to easily identify mobility projects in the Immokalee area, coordinate resources, and direct investment efforts thereby delivering projects to the area’s residents. The tables and maps on the following pages present the mobility projects recommended for the Immokalee area. The maps are presented in quadrants to allow for greater detail and easier project identification. It should be noted that several of these projects are in various stages of implementation while others will need additional study to determine their feasibility, right-of-way needs, costs, etc. All roadways identified are currently maintained by Collier County or the Florida Department of Transportation (FDOT). Page I ES 5 Immokalee Transportation Network Plan Sidewalk Project List Table ES- 1. Sidewalk Project List Page I ES 6 Immokalee Transportation Network Plan Table ES-1. Sidewalk Project List, Cont. Page I ES 7 Immokalee Transportation Network Plan Table ES-1. Sidewalk Project List, Cont. Page I ES 8 Immokalee Transportation Network Plan Table ES-1. Sidewalk Project List, Cont. Page I ES 9 Immokalee Transportation Network Plan Table ES-1. Sidewalk Project List, Cont. Page I ES 10 Immokalee Transportation Network Plan Table ES-1. Sidewalk Project List, Cont. Page I ES 11 Immokalee Transportation Network Plan Table ES-1. Sidewalk Project List, Cont. Note: Project 76 is a roadway project that will include the addition of sidewalks. Page I ES 12 Immokalee Transportation Network Plan Table ES-1. Sidewalk Project List, Cont. Page I ES 13 Immokalee Transportation Network Plan Table ES-1. Sidewalk Project List, Cont. Page I ES 14 Immokalee Transportation Network Plan Table ES-1. Sidewalk Project List, Cont. Page I ES 15 Immokalee Transportation Network Plan Sidewalk Project Maps Figure ES-1. Sidewalk Projects Map Page I ES 16 Immokalee Transportation Network Plan Figure ES-2. Quadrant 1 Sidewalk Project Map Page I ES 17 Immokalee Transportation Network Plan Figure ES-3. Quadrant 2 Sidewalk Projects Map Page I ES 18 Immokalee Transportation Network Plan Figure ES-4. Quadrant 3 Sidewalk Projects Map Page I ES 19 Immokalee Transportation Network Plan Figure ES-5. Quadrant 4 Sidewalk Projects Map Page I ES 20 Immokalee Transportation Network Plan Roadway Project List Table ES- 2. Roadway Project Listing Page I ES 21 Immokalee Transportation Network Plan Table ES-2. Roadway Project List, Cont. Page I ES 22 Immokalee Transportation Network Plan Roadway Project Map Figure ES-6. Roadway Projects Map Immokalee Transportation Network Plan Page I 1 1.0 INTRODUCTION 1.1 Study Purpose Recognizing that a significant segment of Immokalee’s population uses public transit, walks or bicycles to work, school, and other destinations, Collier County has initiated a multi -modal transportation planning study that will compile transportation and mobility projects and programs identified in other studies, identify additional projects and studies that are needed to complete connections and expand mobility for all. This project will consult with external stakeholders and service providers with the goal of developing recommendations that identify enhancements to mobility for the residents of Immokalee and may include potential routes to improve the connectivity of the collector and local street network to expand public transit service, and bicycle and pedestrian access. The study will deliver tools (including lists and maps) that will allow stakeholders to identify opportunities to advance projects, coordinate resources and address gaps, and direct investments and efforts. 1.2 Study Background The Immokalee Transportation Network Plan was initiated by Collier C ounty as a multi-modal transportation planning study that investigates the transportation mobility needs of the community, recognizing that a significant segment of Immokalee’s population uses public transit, walks, or bicycles to work, school, and other destinations. 1.3 Study Goals The goal of this effort is to determine community mobility needs and important connections to address missing gaps, set priorities for needed improvements, and recommend improvements to address the mobility needs providing accessibility for all. Through the implementation of the projects in this plan, the residents of Immokalee will able to travel throughout the community eaiser. Obstacles to mobility will be identified and addressed, accessibility and walkability will be increased and gaps in the transportation network will be identified, and necessary projects identified. This project will support all transportation needs within Immokalee with an emphasis on walkability. It will plan for interconnecting local streets to enhance tr ansit, walking, and cycling and allow for coordination with FDOT on state roadway projects. 1.4 Study Area The study area comprises the extent of Immokalee, which is a Census Designated Place (CDP) located in unincorporated Collier County (see Figure 1). Per the 2020 census, the Immokalee CDP is 14,540.8 acres or 22.72 square miles. For planning purposes, Collier County identifies the Immokalee area as consisting of approximately 21,306 acres (Collier County- Planning Communities data). Maps contained within this report utilize the Collier County data for the urban boundary. Maps depicting the sidewalk projects divide the study area into quadrants allowing for better visualization of the pro posed projects. Immokalee Transportation Network Plan Page I 2 Figure 1. Immokalee Study Area Immokalee Transportation Network Plan Page I 3 1.5 Stakeholder Advisory Group The Immokalee Transportation Network Plan Stakeholder Advisory Group (SAG) were individuals with direct knowledge of transportation needs and issues in the community. The Atkins team was provided a list of stakeholders to contact and participate with the team during the study process and meetings. The Stakeholder Advisory Group includes the following: A. Internal Members ▪ Code Enforcement ▪ Collier County Development Review Division ▪ Collier County Parks & Recreation Division ▪ Collier County Sheriff’s Office - Safety Officer ▪ Collier County Stormwater Division ▪ Collier County Traffic Operations Division ▪ Collier County Transportation Planning Division ▪ Immokalee Fire Department B. Agency/Governmental Members ▪ Collier Area Transit ▪ Collier Metropolitan Planning Organization (MPO) Staff ▪ Florida Department of Transportation (FDOT) ▪ FDOT Commuter Services/Vanpool Services ▪ FDOT Planning Studio ▪ Immokalee Chamber of Commerce ▪ Immokalee CRA Advisory Board ▪ Immokalee Health Department ▪ Immokalee MSTU Advisory Board ▪ Immokalee Regional Airport ▪ Immokalee Technical Institute, Collier County Public Schools ▪ LeeTran ▪ Southwest Florida Regional Planning Council (SWFRPC) C. Advocacy Groups ▪ Bicycle Pedestrian, and Pathways Groups ▪ Blue Zones – Immokalee Committee ▪ Complete Streets Coalition ▪ Immokalee Fair Housing Alliance/Community Foundation of Collier County ▪ Seminole Tribe of Florida ▪ Unmet Needs Coalition Meeting #1, May 6, 2022: Project Kick-off meeting was held via Teams. The major topics for discussion were as follows: o Introductions of the Collier County team, the consultant team, and the Stakeholders o Discussion of the project Goals and Objectives o Review of the project schedule o Review of the preliminary list of previous studies to be reviewed o Review of data and issues that will influence the development of the plan o Approach to public input and outreach Immokalee Transportation Network Plan Page I 4 Meeting #2, July 11, 2022: The second stakeholders' meeting reviewed the initial recommendations to expand the roadway and sidewalk networks. At the workshop, the participants reviewed large-scale plots and provided comments on the projects shown and the ones that should be added. These recommendations sought to fill the gaps in the sidewalk network, expand the sidewalk network to allow for safer access to points of interest and replace substandard sidewalk sections. The roadway expansion recommendations identified roadway improvements that would connect and/or expand the existing roadway system. This also includes numerous intersection and operational improvements as well as the identification of potential roadway or lane repurposing projects. Meeting with the Collier MPO County Bicycle and Pedestrian Advisory Committee (BPAC): A presentation was made to the BPAC on February 21, 2023. The committee was given an overview of the study process and the top ten sidewalk and roadway projects included in the plan. The plan was well received by the committee and the discussion centered around the need to complete as many of the sidewalk projects as possible as the committee recognized the importance of walking in the Immokalee area. In addition to the SAG, meetings with community representatives were held. A summary of these meetings is included in Appendix A. 1.6 Study Process The study team consulted with community stakeholders, service providers, and citizens with the goal of developing recommendations that identify mobility enhancements for the citizens of Immokalee . The study is intended to include potential routes to improve the connectivity of the collector and local street network and bicycle and pedestrian access. The study includes project lists, exhibits, and maps that will allow stakeholders to identify future opportunities to evaluate and advance projects, coordinate resources and address gaps, and prioritize and direct investments and efforts. Figure 2. Study Process Step 1 Previous Studies Step 2 Existing Conditions Step 3 Gap Analysis and Project Identification Step 4 Final Project List and Recommend ations Immokalee Transportation Network Plan Page I 5 2.0 PREVIOUS STUDIES ANALYSIS A key element in developing the Immokalee Transportation Network Plan was conducting a comprehensive review of previous studies. This review focused on the goals and objectives that support transportation and mobility plans, specific community policies, and the identification of key connections, destinations, and priority transportation and mobility improvements. Atkins prepared a literature search and report on previous studies related to transportation issues and the needs of the Immokalee community. Later discussions and interviews with the County and CRA staff member s provided additional previous studies and data that proved to be essential to the study effort. Additionally, data, maps, and projects from these studies were compiled in further detail in Section 3.0. Existing Conditions and Section 4.0 Gap Analysis and Project Identification portion of this study. Plans and Resources Reviewed A total of 12 plans and resources were reviewed as part of the previous studies analysis: Collier County/Immokalee Complete Streets TIGER 2016 Application and Grant Award Collier Area Transit (CAT) Bus Stop & Facility Accessibility Study CAT Comprehensive Operations Analysis (COA) CAT Transit Development Plan (TDP) Collier MPO and CAT Park-and-Ride Study Collier MPO Bicycle & Pedestrian Master Plan Collier MPO Pedestrian and Bicycle Safety Study Collier MPO Local Road Safety Plan (LRSP) Immokalee Pedestrian Crosswalk Improvements Study Immokalee Walkable Community Study Immokalee CRA Redevelopment Plan - Sidewalk Master Plan Element SR 29 Loop Road from CR 846 to SR 29 North Terminus Key topics and one-page summary sheets for each of these plans are included in this section. Key Trends Common trends in the literature reviewed included bicycle and pedestrian infrastructure improvements, the identified need for increased transit service from CAT in the Immokalee area, and the documentation of the environmental justice needs of Immokalee. Immokalee Transportation Network Plan Page I 6 Key Topics The matrix below provides an overview of key topics covered in each of the documents reviewed. The key topics are color-coded and tagged throughout the document and are defined as follows: Table 1. Plan Review Matrix Plan/Document Connections Infrastructure Safety ADA Equity Transit Bike/Ped Bus Stop & Facility Accessibility Study X X X X CAT COA X X X CAT TDP X X X Complete Streets TIGER Grant X X X X X X Park-and-Ride Study X X X Bicycle and Pedestrian Master Plan X X X X X X X Pedestrian/Bicycle Safety Study X X Local Road Safety Plan X X X X Pedestrian Crosswalk Improvements Study X X X X X Walkable Community Study X X X X X Topic Tag Description Key Connections Identified key connections and destinations within the Immokalee area. Infrastructure Recommendations Includes project lists or maps for multi- modal infrastructure improvements. Safety Includes crash data, analysis, and/or recommended safety improvements. Accessibility/ADA Specifically addresses accessibility and/or ADA. Environmental Justice/Equity Includes environmental justice/equity analysis and recommendations. Transit Includes transit-specific recommendations. Bicycle/Pedestrian Includes bicycle and pedestrian-specific recommendations. Connections Infrastructure Safety ADA Equity Transit Bike/Ped Immokalee Transportation Network Plan Page I 7 Plan/Document Connections Infrastructure Safety ADA Equity Transit Bike/Ped CRA Redevelopment Plan – Sidewalk Master Plan Element X X X X X X X SR 29 Loop Road PD&E Study X X Immokalee Transportation Network Plan Page I 8 2.1 Bus Stop and Facility Accessibility Study Document Title: Collier Area Transit Bus Stop ADA Assessment Final Report Document Cover: Responsible Agency: Collier Area Transit (CAT)/Collier MPO Jurisdiction: CAT Service Area Document Year: 2014 Document Summary: Reviewed the accessibility and safety/security of the 524 active bus stops in the CAT system. Bus stops were categorized as high, medium or low in terms of accessibility and safety/security and notable stops within the Immokalee routes were identified in each evaluation category. Some bus stops were also recommended to be r elocated and/or combined. Key Findings: Accessibility, safety, and security were rated by the following elements: Bus stop location; Presence of a marked and controlled pedestrian crossing; Presence of a curb and compliant curb ramp; Ability to maneuver a wheelchair through shelter; Bench obstruction; Presence and compliance of a sidewalk; Presence and compliance of landing area; Presence and compliance of the bus stop sign. Landing area in a safe location; Presence of lighting; and Presence of other potential safety or security hazards. Bus stop scores: Bus stops in Immokalee with the lowest accessibility scores were Bus Stop 377 at Winn Dixie and Lake Trafford Road; 337 Taylor Terrace and Bass Road; 358 S. 5th Street and W. Delaware Avenue; 285 1St Street and Eustis Avenue E.; and S 6th Street and Colorado Avenue. Bus stops in Immokalee with the lowest safety/security scores were Bus Stop 358 at S. 5th Street and W. Delaware Avenue; 321 Farm Worker Way and Agricultural Way; 336 Lake Trafford Road and Christian Terrace; and 377 Winn Dixie and Lake Trafford Road. Transit Infrastructure Safety ADA Immokalee Transportation Network Plan Page I 9 2.2 CAT Comprehensive Operations Analysis Document Title: Collier County Area Transit Comprehensive Operations Analysis Document Cover: Responsible Agency: CAT/Collier County Jurisdiction: CAT Service Area Document Year: 2021 Tags: Document Summary: Evaluated the operational efficiency of the transit system and its components. Recommendations in the COA regarding routes, service, and stops in Immokalee. Key Findings: CAT operates vehicles to Immokalee from its administrative and operations headquarters located on Radio Road. The one-way distance between the Health Department transfer location in Immokalee and the Radio Road facility is approximately 35 miles. Five (5) fixed bus routes operate either within or to Immokalee. Over the last year, two (2) additional buses, not shown on the published schedule, have been added to supplement early AM demand for service between Immokalee and Government Center. Immokalee is situated just beyond a growing eastward expansion of the County, positioning the community in a location that is too close for limited transit operations, but also too far to serve efficiently. A cost/benefit assessment should be considered to determine the return on investment of a satellite operations facility located in Immokalee. Benefits include: ◊ Reduced fuel and maintenance costs; ◊ Potential retainment and retention of operations staff; and ◊ Mobile ticket app vs. bus pass availability. Recommended service alternatives are shown in Table 9. The demand for public transportation demonstrates that Immokalee has effectively become workforce housing for the communities to the west and the demand for transportation to connect to those jobs continues to grow. The AM express bus services connecting Immokalee to Marco Island and Government Center are some of the most productive services in the CAT system. Connections Infrastructure Immokalee Transportation Network Plan Page I 10 2.3 CAT Transit Development Plan (TDP) Document Title: Collier Area Transit Ten-Year Transit Development Plan 2021-2030 Document Cover: Responsible Agency: CAT Jurisdiction: Collier County Document Year: 2020 Tags: Document Summary: This document is an update to the TDP for CAT services in Collier County, as currently required by State law. This TDP resulted in a 10-year plan for transit and mobility needs, cost and revenue projections, and community transit goals, objectives, and policies. Key Findings: Based on population growth analysis, Immokalee is expected to see sligh tly more growth than other parts of the county through 2045 due to redevelopment efforts. As of 2020, Immokalee has medium-range employment densities. Commute times: Immokalee residents who travel to Lee County by transit must first travel to Naples to connect with one of the CAT Routes (11, 12, or 27) to connect to LinC. These time travel requirements present barriers to residents who make this trip by transit. The two most common route suggestions for express buses during public involvement were Naples to Miami and Immokalee to Naples. Overall, a need for more transit services in Immokalee was expressed during the public involvement effort and public transit advisory committee. The Immokalee Health Department had higher-than-average boardings based on Automatic Passenger Count data. A more direct connection from Immokalee to Lee County is needed based on travel behavior. Recommends realigning Routes 19 and 28 which provide service from the Health Department in Immokalee to the Government Center. Connections Equity Immokalee Transportation Network Plan Page I 11 2.4 Complete Streets TIGER Application and Grant Document Title: Immokalee Complete Streets – Growing Connections to Create Mobility Opportunities Document Cover: Responsible Agency: Collier County Jurisdiction: Immokalee Document Year: 2016 Tags: Document Summary: Collier County submitted the Immokalee Complete Streets—Growing Connections to Create Mobility Opportunities in the FY 2017 grant cycle. Key Findings: The complete streets program will include: 20 miles of concrete sidewalks; 1-mile of multi-use pathway; 20 miles of upgraded drainage ditch and swales; 9 enhanced bus stop amenities/shelters which include bus shelters, benches, and bike racks; Construction of a Bus Transfer Station next to the Collier County Health Department; Comprehensive street lighting improvements within the project area; and 5-mile bicycle boulevard network with traffic calming and signage. The bicycle boulevard treatments are proposed for Madison Avenue, Jefferson Avenue, Lee Street, Jackson Street, Escambia Street, Broward Street, and the portion of Lake Trafford Road within the TIGER complex of street improvements. Safety ADA Immokalee Transportation Network Plan Page I 12 2.5 Park-and-Ride Study Document Title: Collier MPO and CAT Park-and- Ride Study Document Cover: Responsible Agency: CAT/Collier MPO Jurisdiction: Collier County Document Year: 2020 Tags: Document Summary: The Collier MPO completed a park-and-ride study for CAT, published in November 2020. The study reviewed potential sites for park-and-ride facilities throughout the county. Key Findings: In previous studies, park-and-ride facilities were recommended 200 feet south of the governmental facilities location on Immokalee Road, and at the Immokalee Health Center. In this study the Health Center location was recommended over the government facilities site since the Health Center site has TIGER grant funding for a CAT transfer station. CAT has also coordinated with LeeTran to investigate connections with a proposed LeeTran park-and-ride facility in Lehigh Acres. Immokalee Transportation Network Plan Page I 13 2.6 Bicycle and Pedestrian Master Plan Document Title: Collier MPO Bicycle & Pedestrian Master Plan Document Cover: Responsible Agency: Collier MPO Jurisdiction: Collier Metropolitan Planning Area Document Year: 2019 Tags: Document Summary: This plan built off prior efforts from the original 1994 Comprehensive Pathway Plan and updates in 2006 and 2012 to develop a “first-class” bicycle and pedestrian network in Collier County with the purpose of unifying planning efforts and influencing facility improvement priorities at the county level. Key Findings: Vision: “To provide a safe and comprehensive bicycle and pedestrian network that promotes and encourages community use and enjoyment”. Goals: To pursue strategies that improved and/or protected safety, connectivity, health, and the economy. The Plan is for the entirety of Collier County with specific details and map insets for Immokalee. Environmental Justice (EJ) in Immokalee was ranked “high” (northwest neighborhoods) or “very high” (south, east neighborhoods, and downtown neighborhoods). Includes existing facilities inventory for Immokalee, most of which are either paved shoulders or connector sidewalks. Common themes in community engagement were to “increase connectivity…between Immokalee and the rest of the county” and to “develop multi-use paths where possible”. Transit Equity ADA Immokalee Transportation Network Plan Page I 14 2.7 Pedestrian and Bicycle Safety Study Document Title: Collier MPO Pedestrian and Bicycle Safety Study Document Cover: Responsible Agency: Collier MPO Jurisdiction: Collier Metropolitan Planning Area Document Year: 2013 Tags: Document Summary: The study summarized the tasks of the Collier MPO’s pedestrian and bicycle safety project providing an analysis of bicycle and pedestrian crash data that will allow the MPO to identify future pathways improvement projects and other safety initiatives to im prove the safety of walkers and bicyclists. Key Findings: Immokalee accounted for 11% of total bike/ped crashes in Collier County. The most common crash cause was Failure to Yield the Right-of-Way. About 1/3 of bike/ped crashes occurred at an intersection. High Crash Locations (Immokalee): ◊ The highest crash cluster identified was in Immokalee along West Main Street from South 9th Street to South 1st Street with accounting for 26% of all severe crashes. Medium-Moderate Crash Locations (Immokalee) ◊ North 15th Street from Immokalee Drive to 8th Avenue. ◊ Charlotte Street from Madison Avenue to 1st Street. ◊ Eden Avenue from Pear Street to Carson Road. Potential next steps identified in the plan included: the development of a Pedestrian/Bicycle Safety Action Plan, applying FHWA’s pedestrian and bicycle safety audit methodologies to high crash areas, supporting the continuing education for law enforcement, and engineering personnel for bicycle and pedestrian safety issues. Immokalee Transportation Network Plan Page I 15 2.8 Local Road Safety Plan Document Title: Collier MPO Local Road Safety Plan (LRSP) Document Cover: Responsible Agency: Collier MPO Jurisdiction: Collier Metropolitan Planning Area Document Year: 2021 Tags: Document Summary: A plan that identifies transportation safety issues and provides a framework for reducing fatalities and serious injuries on highways and local public roads. Key Findings: Identified four emphasis areas for further analysis Non-Motorized (Bicycle and Pedestrian Crashes): are a state-wide Emphasis Area and an important component of traffic safety challenges in Collier County. These crashes account for only 2% of all reported crashes in Collier County but constitute 15% of the county’s severe injury crashes and 24% of the county’s crash fatalities. Intersection (Left-Turn and Angle Crashes). Lane Departure (Hit Fixed Object, Single Vehicle, Head-On, and Run-Off-Road Crashes). Same Direction (Rear-End and Sideswipe Crashes). Key focus areas in Immokalee: SR-29 through Immokalee Lake Trafford Road—Carson Road to SR-29 Immokalee Road—Stockade Road to SR-29 SR-29—Immokalee Drive to CR-29A North Immokalee Transportation Network Plan Page I 16 2.9 Immokalee Pedestrian Crosswalk Improvement Study Document Title: Immokalee Pedestrian Crosswalk Improvements Study Document Cover: Responsible Agency: Collier County Jurisdiction: Immokalee Document Year: 2014 Tags: Document Summary: Evaluated the pedestrian crossing movements on SR 29 (Main Street) from 9 th Street to CR 846 (1st Street) and 1st Street from Main Street to north of Delaware Avenue. Volume counts for vehicles, pedestrian counts and qualitative assessments were all conducted for a weekday and a weekend during the peak harvest months. Key Findings: There have been 42 reported bike/ped crashes in the past seven years within the project area, with three resulting in fatalities. There are four schools within the project area. Major modes of transportation include walking, bicycles, and buses. Main Street/1st Street Recommendations include: Install fences/railings/barriers to direct pedestrians to use crosswalks; Install in-pavement lights at crosswalks and RRFBs; replace burned-out lighting; Update landscape to ensure visibility in medians and near crosswalks; and Use high-emphasis markings at all crosswalks. Main Street Recommendations include: Change 2,700 feet of Main Street into a pedestrian zone and reduce the speed limit to 30 mph; and Add crosswalk at 2nd Street. 1st Street Recommendations include: Install additional crossing at Colorado Avenue. Equity ADA Immokalee Transportation Network Plan Page I 17 2.10 Immokalee Walkable Community Study Document Title: Immokalee Walkable Community Study Document Cover: Responsible Agency: Collier MPO Jurisdiction: Collier Metropolitan Planning Area Document Year: 2011 Tags: Document Summary: The study assessed pedestrian conditions or “walkability” within Immokalee, identified facility needs for public roadways, and prioritized future improvements. The results of the study were incorporated into the Comprehensive Pathways Plan and will ultimately assist the Collier MPO and its Pathway Advisory Committee (PAC) to plan and program facility improvements in Immokalee and throughout Collier County. Key Findings: Collier County Transportation Planning staff conducted extensive walking surveys of almost every single roadway in Immokalee. On-the- ground conditions were documented, Level of Service (LOS) scores were assigned, and recommended physical improvements were identified. These improvements were divided into two phases to allow flexibility for construction, and to distinguish between immediate needs and desirable enhancements. The findings presented in this study demonstrate that Immokalee has approximately 73 linear miles of public roads of which 27 miles or 37% contain sidewalks on at least one side of the road. Conversely, this means that approximately 63% of public roadways have no sidewalks. ADA Immokalee Transportation Network Plan Page I 18 2.11 Immokalee CRA Redevelopment Plan Update – Sidewalk Master Plan Element Document Title: Immokalee CRA Redevelopment Plan Update – Sidewalk Master Plan Element Document Cover: Responsible Agency: Immokalee CRA Jurisdiction: Immokalee Document Year: 2022 Tags: Document Summary: The 2022 Immokalee Redevelopment Plan provides an updated vision and approach to redevelopment of the Immokalee Community Redevelopment Area (ICRA). The Plan is based on data and analysis and community input, serving as a framework to guide future redevelopment activities to eliminate blighted conditions that were identified in 2000 and continue today. It includes a list of potential capital projects and programs that could be funded by tax increment revenues generated within the ICRA. Key Findings: The master plan mapping provides an inventory of existing sidewalks, by sidewalk types, and locations on one side of the street or both sides. The current Immokalee Transportation Network Plan began with the data provided by the TIGER mapping, and Sidewalk Master Plan inventory, and proposes completing gaps in the network to provide full pedestrian network interconnectivity for the community. The current network plan also proposes completing the street network, with sidewalks, where linkage gaps exist in the transportation network. Immokalee Transportation Network Plan Page I 19 2.12 SR 29 Loop Road from CR 846 to SR 29 North Terminus Document Title: SR 29 Loop Road PD&E Document Cover: Responsible Agency: Florida Department of Transportation (FDOT) Jurisdiction: Immokalee Document Year: 2018 Tags: Document Summary: The Florida Department of Transportation (FDOT), District One, conducted a Project Development and Environment (PD&E) Study for improvements to SR 29 in Collier County, FPID 417540-1- 22-01. The project limits extend a distance of approximately 17 miles along SR 29 from Oil Well Road to SR 82. The proposed roadway improvements considered consisted of increasing capacity on SR 29 by evaluating the widening of the existing two-lane undivided segment of SR 29 to four lanes, as well as the study of an alternative corridor that bypasses downtown Immokalee. Key Findings: The PD&E Study concluded the Loop Road was the preferred alternative. The proposed SR 29 loop road east of Immokalee will provide important traffic congestion advantages to the community that can translate into bicycle, pedestrian, and transit accessibility benefits. Removing trucks from community and neighborhood streets and reducing pass-through traffic will result in reductions in traffic conflicts along SR 29-Main Street. The intent of the loop road is to remove much of the truck traffic from SR 29 through Immokalee on Main Street and New Market Road West where the western portion of that street is primarily residential. The loop road interconnections on Airport Access Road and Alachua Street will provide direct access from the loop road to the intensive industrial, grower, packing, and shipping district along New Market Road. The SR 29 Loop Road typical section is proposed to be a four-lane divided roadway with sidewalks and bike lanes. The five connecting streets will have directional median openings and the corridor will also include U-turn median openings. The SR 29 PD&E Study began in the summer of 2007. FDOT and the project team are finalizing coordination & documentation with the US Fish & Wildlife Service. The study is anticipated to be completed by a date To Be Determined. Safety Infrastructure Page I 20 Immokalee Transportation Network Plan 3.0 EXISTING CONDITIONS 3.1 Background Information and Demographics Zoning The Immokalee area has six (6) zoning categories that are found within the Collier County Land Development Code (LDC) as shown in Figure 3, below. The majority of the Immokalee area is designated for agricultural uses. Figure 4 provides a breakdown of each zoning category by acreage and percentage. The zoning categories are comprised of approximately 13,849 acres of agricultural land, 98 acres of civic and institutional, 596 acres of commercial, 733 acres of industrial, 3,215 acres of Planned Unit Developments (PUD), and 2,661 acres of residential land. Figure 3. Immokalee Zoning Categories Page I 21 Immokalee Transportation Network Plan Figure 4. Zoning by Category Vehicle Availability Per data obtained from the American Community Survey (2020), there are 22.5% of households without access to a vehicle, 21.5% with access to one (1) vehicle, 35.2% with access to two (2) vehicles, and 20.9% with access to three (3) or more vehicles within the Immokalee Census Designated Place (CDP). *Data obtained from 2020 ACS - 5-year estimates- Commuting Characteristics (See Appendix B for table) Means of Transportation Per data obtained from the American Community Survey (2020), 78.5% of workers 16 year s and over commuted by car, truck, or van. Other means of transportation listed include 9.9% of people utilizing public transportation, 4.6% walking, 0.1% biked, 2% commuted by taxicab, motorcycle, or other means, and 4.9% working from home within the Immokalee CDP. *Data obtained from 2020 ACS- 5-year estimates- Commuting Characteristics (See Appendix C) Commute to Work Typical work commute times differ, 44.9% of work commutes are under 25 minutes, 20.7% of work commutes are 25-45 minutes, and 34.5% of work commutes are greater than 45 minutes. The mean travel time to work is 36.4 minutes. (See Appendix D) Demographics and Income The population from the 2020 census indicated 24,557 people living in the Immokalee CDP. The 2010 census denoted a population of 24,154 people. The median age is 29.4 years old, far lower than the county median age of 52.7 years old and state median age of 42.8 years old. Median household income is $33,249, well below the county average of $74,215 and state average of $63,062. The majority of the Immokalee population is of Hispanic descent at 70.8% of the population. (See Appendix E) 65.5% 0.5% 2.8% 3.5% 15.2% 12.6%Zoning Agriculture (13,849 acres) Civic and Institutional (98 acres) Commercial (596 acres) Industrial (733 acres) PUD (3,215 acres) Residential (2,661 acres) Page I 22 Immokalee Transportation Network Plan Bicycle and Pedestrian Crashes Crash data for bicyclists and pedestrians used for this report was obtained from Signal4 Analytics and was from January 1, 2017, to December 31, 2021. In total, there were 169 bicycle and pedestrian crashes during this time within the Immokalee urban area. 14 total crashes resulted in fatalities, 37 total crashes resulted in incapacitating injuries, 55 total crashes resulted in non-incapacitating injuries, 45 total crashes resulted in possible injuries, and 18 total crashes were reported without an injury. Table 2, below, shows the breakdown of crashes by type (bicycle or pedestrian) and severity (fatality, incapacitating injury, non-incapacitating injury, possible injury, and no injury). Table 2. Crashes by Type and Severity (January 2017-December 2021) Crash Severity Crash Type Bicyclist Pedestrian Fatality 3 11 Incapacitating Injury 11 26 Non-Incapacitating 22 33 Possible Injury 18 27 No Injury 8 10 3.2 Roadway Conditions The Immokalee area is served by one state road (SR 29), a north/south roadway, with a urban typical section, providing a connection to I-75. Within the study area, SR 29 is a four-lane divided facility. Other roadways within the study are local county roads, the majority of which are two-lane undivided facilities. 1st Street, also known as Immokalee Road, is a four-lane divided facility. Many have sidewalks on one or both sides, and none have paved shoulders or bicycle lanes. 3.3 Major Activity Centers Immokalee Regional Airport The Immokalee Regional Airport (IMM), situated on 1,333 acres of land located approximately 35 miles northeast of Naples and 110 miles northwest of the Port of Miami, provides tremendous business advantages. The Airport is in a designated Florida Rural Enterprise Zone and HUB Empowerment Zone. The Florida Rural Enterprise Zone Program supports economic revitalization in high unemployment or otherwise economically disadvantaged areas within the state by offering tax incentives to businesses located within the Enterprise Zone. Seminole Casino and Hotel Located in southwest Immokalee, the facility consists of 51,000 square feet of casino space and offers table games, a poker room, and over 1,000 slot machines. There are 3 restaurants, plus a coffee shop. Other amenities include an outdoor pool, regular live entertainment, a 24 -hour fitness room, and a business center. The hotel offers 19 suites and 80 deluxe rooms. The Seminole Casino Hotel is one of seven casinos owned and operated by the Seminole Tribe of Florida. It is the largest employer in Immokalee, with more than 900 employees. Lake Trafford and Anne Olesky Park Lake Trafford encompasses approximately 1,500 acres. Aquatic vegetation consists of cattail, America n lotus, and eelgrass. Fish species present in the lake include largemouth bass, black crappie, bluegill, redear sunfish, and large brown bullheads. Anne Olesky Park is located at the eastern end of Lake Page I 23 Immokalee Transportation Network Plan Trafford and the western end of Lake Trafford Road (County Road 890). Access to the lake is granted by a 200-foot public fishing pier or public boat ramps. Services available from the marina include boat rentals, guide service, airboat tours, and bait and tackle. No swimming is allowed due to the presence of alligators. Immokalee Branch Library The Immokalee Branch library offers the community a wide array of services and is in a centralized location within the community. Services offered include public internet stations, printing, photocopying, Wi-Fi, and 24/7 book drop for returns. Immokalee Community Park Immokalee Community Park is a staple in the community. It is placed in the heart of Immokalee. At this park, the community can enjoy park amenities, programs, and events throughout the year. Park grounds consist of: basketball courts, a baseball/softball field, a playground, tennis courts, racquetball courts, a picnic shelter, and a walking trail. Some of the community’s most popular events consist of breakfast with Santa and Easter Egg-Stravaganza, which draw large crowds year after year. Pepper Ranch Preserve Pepper Ranch Preserve is a 2,512-acre County-owned and managed conservation property located west of Immokalee and just north of Lake Trafford. It is home to native wildlife including F lorida panther, black bear, bobcat, alligator, sandhill crane, and numerous species of wading birds in addition to being a working cattle ranch. There are approximately 15 miles of trails and firebreaks at the preserve maintained for hiking, horseback riding, and mountain biking. A small tent-only campground and group campsite are available as well as a Lake Trafford overlook. Immokalee State Farmers Market This open-air farmer’s market is open to the public almost every day of the year rain or shine. It offers produce grown around the state but typically features locally grown fruits and vegetables. It is located on New Market Road at 9th Street East. Collier County Health Department The Immokalee location of the Collier County Health Department is specifically focused on serving the healthcare needs of the rural and agricultural communities in the area. They offer services such as migrant health clinics, prenatal care, and nutrition education, as well as outreach programs to educate the community on various health issues. See Figure 5, below, for the general location of the Major Activity Centers. Page I 24 Immokalee Transportation Network Plan Figure 5. Major Activity Centers 3.4 Retail and Shopping Centers Winn-Dixie Supermarket Located at the intersection of State Road 29 and Lake Trafford Road, Winn -Dixie is the only national supermarket in the Immokalee Area. Azteca Supercenter Provides residents of Immokalee with multicultural food and attached to the building is access to laundry, a movie theater, a game room, and a restaurant. Chain Stores Scattered throughout the Immokalee area are various chain stores. They include but are not limited to CVS, Walgreens, and Family Dollar. See Figure 6, below, for the general location of the Major Retail and Shopping Centers. Page I 25 Immokalee Transportation Network Plan Figure 6. Immokalee Retail and Shopping Centers 3.5 Schools Guadalupe Center The center provides the children of Immokalee access to high-quality educational opportunities. Their mission is to break the cycle of poverty through education with an unwavering commitment to excellence. The Center offers the only National Association for the Education of Young Children (NAEYC)-accredited Early Childhood Education Program in Collier County, an After -school Tutoring & Summer Enrichment Program for students K-2, and a college-preparatory Tutor Corps Program. Combined, the three core programs serve more than 1,700 students annually. Elementary Schools There are currently five (5) elementary schools serving the Immokalee urban area. These schools include Eden Park Elementary, Lake Trafford Elementary, Highlands Elementary, Pinecrest Elementary, and Village Oaks Elementary. Immokalee Middle School Located at 401 N 9th Street. Immokalee Middle School serves 6-8th grades and has approximately 1,433 students as of October 2022. Immokalee High School Located at 701 Immokalee Drive. Immokalee High School serves 9-12th grade and has approximately 2,766 students as of October 2022. Page I 26 Immokalee Transportation Network Plan Immokalee Technical College Located at 508 N 9th Street. A fully accredited college by the Commission of Council on Occupational Education (COE), the Immokalee Technical College provides career and technical education programs for high school students and adults. ABE/GED and adult literacy courses are also offered. PACE Center for Girls- Collier at Immokalee Located at 160 N 1st Street. The PACE Center for Girls has served over 2,000 girls throughout Collier County through its academic DAY Program and Pace Reach programs. RCMA Immokalee Community School Located at 123 N 4th Street. The RCMA Immokalee Community School is a bilingual public charter school serving students from kindergarten to 7 th grade. See Figure 7, below, for the general location of schools in the Immokalee area. Figure 7. Immokalee Schools 3.6 Street Grid As can be seen in Figure 8, below, the Immokalee area has a robust grid system of roadways. There are effectively two grid systems in Immokalee: The New Market area grid and the Immokalee Street grid. The existence of the grid has several benefits; it allows for the streets to be smaller and still accommodate all modes of travel, allows for multiple routes to reach one’s destination, and fosters walkable neighborhoods even without sidewalks. Immokalee is historically an agricultural town with a need to support freight traffic. Challenges have occurred where large trucks and pedestrian traffic is heavy, and using the same corridors, particularly along Main Street (SR 29). Immokalee has a fairly well - Page I 27 Immokalee Transportation Network Plan connected roadway network, however, there are some local street interconnections needed to better enhance transit service and pedestrian and bicycle access. Figure 8. Immokalee Street Grid 3.7 Sidewalks and Mid-Block Crossings Sidewalks A majority of sidewalks within the Immokalee area are existing along major roadways. However, sidewalks within residential areas can be scattered and do not provide connectivity for pedestrians. See Figure 9 for the existing extent of the sidewalk network and Figure 10 for an example of a sidewalk gap within the Immokalee area. Page I 28 Immokalee Transportation Network Plan Figure 9. Existing Sidewalk Network Figure 10. Example of a Sidewalk Gap Along a Residential Street Page I 29 Immokalee Transportation Network Plan Mid-Block Crossings FDOT has installed a total of (3) mid-block crossings within the central business district of Immokalee . Two (2) are located along West Main Street (State Road 29) and utilize Rectangular Rapid Flashing Beacons (RRFBs) to increase the visibility of vulnerable road users (bicyclists and pedestrians). The two mid-block crossing utilize a pedestrian refuge island (median) to create a two-stage crossing for pedestrians. This refuge island provides vulnerable road users with the option of waiting in the median area before beginning the next stage of the crossing, thus improving safety. Per the Federal Highway Administration (FHWA), pedestrian refuge islands can reduce pedestrian crashes by 32%. They are located between 7th Street and 6th Street and between 5th Street and 4th Street along the West Main Street (State Road 29) corridor. A third mid-block crossing is located along 1St Street between Boston Avenue and State Road 29. This mid-block crossing utilizes static (non-flashing) signage to warn motorists of crossing bicyclists and pedestrians and does not implement a refuge island. Figure 11. Mid-Block Crossing along SR 29 between 7th Street and 6th Street 3.8 Bicycle Facilities Designated bicycle facilities are only found along State Road 29 (west of 9th Street and east of County Road 846) in the Immokalee area. The portion of State Road 29 from 9th Street to Country Road 846 does not have a designated bicycle facility. Instead, bicyclists must use the existing travel lanes for motorists. While bicycles are a primary mode of transportation for many residents, they can safely operate on the local roadway network without separate facilities due to the low volumes and low speeds found on the majority of the local roadway network. Page I 30 Immokalee Transportation Network Plan Figure 12. Unbuffered Bicycle facility found at the intersection of SR 29 and Lake Trafford Road 3.9 Transit Systems and Operation The Immokalee area is served by Collier Area Transit (CAT). Currently, four (4) routes provide service in the Immokalee area: Routes 19, 22, 23, and 121. • Route 19 provides Immokalee with a main connection to the Collier County Governmental Center in Naples, Florida. • Routes 22 and 23 are circulator routes with stops providing coverage to the majority of the Immokalee area. • Route 121 is an express route that provides a connection to Marco Island that leaves Immokalee at 5:40 am and returns at 4:58 pm . See Figure 13, below, for the localized map indicating the overview of the routes serving the Immokalee area. Page I 31 Immokalee Transportation Network Plan Figure 13. Immokalee Transit Corridors Map Operational Ridership Ridership for routes that serve the Immokalee area were analyzed to determine usage. Due to the COVID-19 pandemic, ridership numbers have decreased by approximately 27%. Comparison of the routes are broken down in Table 3 and Table 4, found below. Table 3. Ridership by Route Number from April 2018 to April 2019 Route Number 19 22 23 28 121 Total Passengers 70,401 55,483 29,278 28,358 22,708 Table 4. Ridership by Route number from April 2021 to April 2022 Route Number 19 22 23 28 121 Total Passengers 55,771 30,415 18,608 23,047 23,388 Bus Transfer Facility Figure 14 below shows the existing conditions of the Bus Transfer Facility next to the Collier County Public Health Department, located at 419 North 1st Street. The county has proposed an upgrade to the existing facilities and is to build a more robust facility as a multi-modal transit hub. The design for the proposed facility is shown in Figure 15 and the location of the proposed facility is shown in Figure 16. Page I 32 Immokalee Transportation Network Plan Figure 14. Existing Transfer Facility Figure 15. Proposed Bus Transfer Facility Design Page I 33 Immokalee Transportation Network Plan Figure 16. Location of Proposed Bus Transfer Facility 3.10 On-Street Parking Lanes On-street parking is found along State Road (SR) 29 in the central business district. While there are instances of unofficial parking lanes in portions of the study area, SR 29 is the only roadway with official parallel parking spaces. Figure 17. On-street Parking Found Along SR 29 within the Central Business District of Immokalee Page I 34 Immokalee Transportation Network Plan 4.0 GAP ANALYSIS AND PROJECT IDENTIFICATION An initial gap analysis was conducted to identify deficiencies within the existing system and to provide potential connections to mitigate these deficiencies. As such, an initial evaluation by the project team of the current network system was performed and a list of projects was identified. These projects were vetted through stakeholder meetings. After this vetting process, projects were moved forward into the evaluation criteria process and scored based on the methodology listed in the next section. The analysis provides a process to score potential network connections and prioritize them accordingly. Figure 18. Proposed Sidewalks by Study 4.1 Project Evaluation Sidewalk Evaluation Criteria The evaluation criteria for unfunded proposed sidewalks included six categories as shown below: 1. Connectivity to the existing network 2. Proximity to a major activity center 3. Proximity to a shopping/retail center 4. Proximity to a bicycle/pedestrian crash that occurred within the last five years 5. Proximity to a school 6. Proximity to a transit stop Connectivity to the existing network was ranked in the following manner. If the proposed sidewalk connects to a current gap in the network (connects to existing sidewalk on both ends), the proposed sidewalk receives a score of three (3). If the proposed sidewalk extends the existing network (connects Page I 35 Immokalee Transportation Network Plan to existing sidewalk on one end) the proposed sidewalk receives a score of two (2). It should be noted that a score of zero (0) or one (1) is not achievable. All other categories listed above (proximity to a major activity center, proximity to a shopping/retail center, proximity to a bicycle/pedestrian crash that occurred with the last five years, proximity to a school, and proximity to a transit stop) involve a ranking based off a buffer dista nce from a point on the map. The closest buffer, ¼ of a mile, receives the highest score of three (3); ½ of a mile receives a ranking of two (2); and ¾ of a mile receives a score of one (1). If the proposed sidewalk segment is not within the buffer distance, a score of zero (0) is given. The maximum score possible for proposed sidewalks is 18. Table 5 provides a breakdown of the ranking categories for sidewalk projects. Page I 36 Immokalee Transportation Network Plan Table 5. Sidewalk Project Evaluation Criteria Sidewalk Network Plan Project Evaluation Criteria Category Criteria Score Connectivity Connectivity to the existing network Connects a current gap between existing sidewalks (connects to existing sidewalk on both ends) 3 Extends an existing sidewalk (connects to existing sidewalk on one end) 2 Major Destinations (Activity Centers) Proximity to a major activity center Within 1/4 mile 3 Within 1/2 mile 2 Within 3/4 mile 1 Beyond 3/4 mile 0 Major Destinations (Shopping/Retail) Proximity to a shopping/retail center Within 1/4 mile 3 Within 1/2 mile 2 Within 3/4 mile 1 Beyond 3/4 mile 0 Safety Proximity to a bike/ped crash within the last five years Within 1/4 mile 3 Within 1/2 mile 2 Within 3/4 mile 1 Beyond 3/4 mile 0 School Safety Proximity to a school Within 1/4 mile 3 Within 1/2 mile 2 Within 3/4 mile 1 Beyond 3/4 mile 0 Transit Proximity to a transit stop Within 1/4 mile 3 Within 1/2 mile 2 Within 3/4 mile 1 Beyond 3/4 mile 0 Maximum Score 18 Page I 37 Immokalee Transportation Network Plan Sidewalk segments with a score of 0-6 received a “Low” priority ranking, sidewalk segments with a score of 7-12 received a “Medium” priority ranking, and sidewalk segments with a score of 13-18 received a “High” priority ranking. The evaluation resulted in 37 sidewalk segments ranked as having a “High” priority, 74 sidewalk segments ranked as having a “Medium” priority, and 12 sidewalk segments ranked as having a “Low” priority. Figure 19, below, shows the overview of the proposed sidewalks within the Immokalee area, while Figure 20 through Figure 23 divide the Immokalee area into four (4) quadrants and indicate a priority ranking for each proposed sidewalk segment labeled with a Feature Identification Number (FID). The FID number can be used to reference the Sidewalk Project List in the next section. These tables provide detailed information pertaining to the street name, the extent of the segment, project notes, length in miles of each segment, the priority ranking details, and total priority ranking. Figure 19. Overview of Proposed Sidewalks by Ranking Page I 38 Immokalee Transportation Network Plan Figure 20. Proposed Sidewalks by Ranking (Quadrant 1) Figure 21. Proposed Sidewalks by Ranking (Quadrant 2) Page I 39 Immokalee Transportation Network Plan Figure 22. Proposed Sidewalks by Ranking (Quadrant 3) Figure 23. Proposed Sidewalks by Ranking (Quadrant 4) Page I 40 Immokalee Transportation Network Plan Roadway Evaluation Criteria The evaluation criteria for roadway projects included five (5) categories as shown below: 1. Connectivity to the Existing Roadway Network 2. Funding Status 3. Project Phase 4. Proximity to Evacuation Routes 5. Right-of-Way Availability Provided below are the descriptions of each roadway project evaluation criteria category. Connectivity involved the ranking of expansions of the existing roadway network. Roadway projects that would promote connectivity by expanding the existing roadway network received a score of one (1). If the project did not expand the existing roadway network, the project received a score of zero (0). Funding status involved projects that are currently listed in a Capital Improvement Program (CIP), the Transportation Improvement Program (TIP), the FDOT Five-Year Work Program, or the Long-Range Transportation Plan (LRTP) Cost Feasible Plan. If the proposed roadway project is funded through a Capital Improvement Plan (CIP), FDOT Work Program, or the TIP, the segment received a score of two (2), if the proposed roadway project is funded through the LRTP Cost Feasible Plan, the segment received a score of one (1), and if the project has not yet received funding, it received a score of zero (0). Project Phase was used to rank projects based on engineering, design, or planning. Projects that are closer to construction received a higher ranking. The project phase of Engineering received a score of three (3); Design received a score of two (2); and if the project is in the planning phase, the project received a score of one (1). Roadway projects were also ranked based on their proximity to e vacuation routes. Proposed roadway improvements that connect to existing evacuation routes received a score of one (1). If the proposed roadway project does not connect to an existing evacuation route, the project receives a score of zero (0). The final category used to rank roadway projects was right-of-way need/availability. Parcel data was used to determine if additional Right-of-Way (ROW) acquisition would or would not be required for each roadway project. The parcel data used does not represent a legal survey and further analysis would be required for final determination if ROW acquisition would be required. If the project did not require additional ROW acquisition, per the parcel data, the project received a score of one (1) and if the project required ROW acquisition, per the parcel data, the project received a score of zero (0). The maximum possible score for proposed roadway projects is 8. Table 6, below, provides a breakdown of the ranking categories for roadway projects. Page I 41 Immokalee Transportation Network Plan Table 6. Roadway Projects Evaluation Criteria Roadway Projects Evaluation Criteria Category Criteria Score Connectivity Project expands existing roadway network and promotes increased connectivity 1 Project does not further connectivity of the roadway network 0 Funding Project is funded in CIP, FDOT Work Program, or TIP 2 Project is funded within the LRTP (Cost Feasible Element) 1 No funding allocated 0 Project Status Engineering 3 Design 2 Planning 1 Evacuation Route Connects to an existing evacuation route 1 No connection to an existing evacuation route 0 Right-of-Way (ROW) Project has ROW available or does not require additional acquisition 1 Project has no ROW available and requires additional acquisition 0 Maximum Score 8 Roadway segments with a ranking of 0-2 received a “Low” priority ranking, roadway segments with a ranking of 3-5 received a “Medium” priority ranking, and roadway segments with a ranking of 6-8 received a “High” priority ranking. The evaluation resulted in zero (0) roadway segments ranked as having a “High” priority, 11 roadway segments were ranked as having a “Medium” priority, and 16 roadway segments were ranked as having a “Low” priority. Figure 24, below, shows the priority ranking of each proposed roadway segment labeled with a Feature Identification Number (FID). The FID number can be cross-referenced with the Roadway Project List Table, Table 8. This table provides detailed information pertaining to the roadway name, the extent of the segment, project notes, length in miles of each segment, the priority ranking details, and total priority ranking. Page I 42 Immokalee Transportation Network Plan Figure 24. Proposed Roadway Projects by Ranking Page I 43 Immokalee Transportation Network Plan 5.0 RECOMMENDATIONS AND FINAL PROJECT LIST The tables on the following pages present the sidewalk and roadway project recommendations. These projects are a combination of projects that were identified in previous transportation and mobility studies with projects that were identified in the gap analysis that was completed as part of this study. The ranking criteria presented in the previous section were applied to each project producing the ranking seen below. It should be noted that strict adherence to the ranking is not advised. As funding becomes available through the County, the Florida Department of Transportat ion, the Collier County Metropolitan Planning Organization (MPO), grants, and other sources, some lower-ranked projects may meet the funding criteria better than others. In these cases, it is advisable to capitalize on the available funding and advance the qualifying project or projects. All roadways identified in the tables below are currently maintained by Collier County or the Florida Department of Transportation (FDOT). Page I 44 Immokalee Transportation Network Plan 5.1 Overall Project Lists Sidewalk Project List Table 7 Sidewalk Project List Page I 45 Immokalee Transportation Network Plan Table 7 Sidewalk Project List, Cont. Page I 46 Immokalee Transportation Network Plan Table 7 Sidewalk Project List, Cont. Page I 47 Immokalee Transportation Network Plan Table 7 Sidewalk Project List, Cont. Page I 48 Immokalee Transportation Network Plan Table 7 Sidewalk Project List, Cont. Page I 49 Immokalee Transportation Network Plan Table 7 Sidewalk Project List, Cont. Page I 50 Immokalee Transportation Network Plan Table 7 Table Sidewalk Project List, Cont. Page I 51 Immokalee Transportation Network Plan Table 7 Sidewalk Project List, Cont. Page I 52 Immokalee Transportation Network Plan Table 7 Sidewalk Project List, Cont. Page I 53 Immokalee Transportation Network Plan Table 7 Sidewalk Project List, Cont. Page I 54 Immokalee Transportation Network Plan Roadway Project List Table 8. Roadway Project List Page I 55 Immokalee Transportation Network Plan Table 8. Roadway Project List, Cont. Page I 56 Immokalee Transportation Network Plan 6.0 CONCLUSION This study developed complete street solutions for the Immokalee area. The study process included an existing conditions analysis, a review of previous study efforts, a safety review, field reviews, and public outreach. The study process yielded a set of mobility improvements that were developed to enhance livability, mobility, and safety in the Immokalee area. Investing in the types of projects presented in this report creates a transportation system that serves users of all ages and abilities including bicycles, pedestrians, transit riders, and other travel modes. These projects will increase the safety of roadways, increase the quality of life of the surrounding community, and encourage economic development. The sidewalk and roadway projects included in this report are particularly important to the Immokalee area. This area has households with very low vehicle availability. The American Community Survey (2020) concludes that 22.5% of households in the study area are without acces s to a vehicle, 21.5% with access to one (1) vehicle, 35.2% with access to two (2) vehicles, and 20.9% with access to three (3) or more vehicles. These statistics show the importance of the projects identified in this study as many of the residents of Immokalee walk or ride bicycles to get to work, stores, school, etc. The primary purpose of this study is to serve as a master document for mobility projects in the Immokalee area. As mentioned above, the development of this study included a review of the transportation studies completed in the study area. The mobility projects identified in these studies were compiled and listed here along with other projects that fill in the gaps and expand the transportation network. This plan will serve as a one-stop resource for agencies that are working to implement mobility projects in the Immokalee area. This may be the CRA as they apply for grants, the Collier MPO as they develop the Long Range Transportation Plan, or the FDOT as they develop the Loop Road and SR 29. The listing of projects included in this study should be updated as new studies are completed and as projects are implemented. In addition to updating the project list, public outreach should continue to solicit inp ut on projects and identify new needs that may develop. This will ensure a current master project list for the study area is always available to the stakeholders allowing for coordination across modes to improve, advance, and deliver an efficient and effective multimodal network that serves all of the residents of Immokalee and is integrated with Collier County. Immokalee Transportation Network Plan APPENDIX A. SUMMARY OF MEETINGS WITH COMMUNITY REPRESENTATIVES Immokalee Transportation Network Plan Page I A-1 Throughout this process, Atkins’ team members met with community representatives to get their input on mobility issues faced by residents they represent and groups they work with. Below is the summary of those meetings. Meeting with Dawn Montecalvo, President at Guadalupe Center, Inc. Atkins staff met with Dawn Montecalvo on Friday, May 27, 2022, to discuss the operation of the Guadalupe Center facilities, the programs they provide, and transportation to and from their facilities. The Guadalupe Center is a philanthropy-supported educational facility (upwards of 75% of their funding) seeking to “break the cycle of poverty through education” serving over 1,500 students. Their programs include early learning for children ages six weeks to five years, and a high school college prep program (100% of the program students graduate from high school, 100% attend college, and 95% graduate). Their donor base is in Naples, and they are currently seeki ng $100,000 in funding to be used generally for transportation needs. Notable is that all students attending their facilities are transported by parents or guardians. Guadalupe Center has a new school opening on Westclox Street across from Eden Park Elementary School. While visiting the in-town facility on 5th Street, transportation access and student delivery issues were noted. At the new Westclox Street school site observations were made that may be recommended in the TNP that would better connect the new school to and from Eden Park Elementary School, if access and filtration is required or desired. Meeting with Jaime Weisinger, Lipman Family Farms Atkins staff met with Jaime Weisinger, via TEAMS on June 1, 2022, to discuss the operations of the Lipman growers, packers, and shippers associated with their farms and businesses. Lipman Family Farms are strong supporters of the community and have provided backpacks and school supplies to 10,000 students in an annual backpack giveaway over an eight-year period, have provided scholarships to Immokalee High School students, and have given a $300,000 gift to the RCMA Immokalee Community Schools. Lipman also provides healthy food to families through their Brighter Bites mission. Lipman Family Farms was also recognized locally as the “Outstanding Philanthropic Organization of 2019”. Mr. Lipman was appointed in 2017 by Governor Rick Scott for a four -year term on the Board of the District 7 South Florida Water Management District. Mr. Weisinger described their facilities including truck access to six 6 packing houses on site with the major site along Roberts Ave. Lipman also has two sites along Main St and one along New Market Road. Vehicular traffic at the sites involves field trucks and loaded semi -trucks that leave the sites. He noted that the Nixon Drive and New Market Road intersections are not an issue for truck access, however, he did advise that turning left from New Market Road to Main Street is difficult at times. Mr. Weisinger noted that most field workers live at site locations. He said packing house workers live in Immokalee and travel by vehicle or bike. There is a need to help to increase personal mobility in Immokalee and he said residents travel to LaBelle or Fort Myers for destinations such as Walmart. The workers use limited CAT services and private taxis. Redlands Christian Migrant Association—RCMA Atkins staff visited with Gloria Moorman in an on-the-street interview in front of the RCMA street-front offices at 402 W. Main Street, before morning opening hours. Ms. Moorman gave a full description of Immokalee Transportation Network Plan Page I A-2 their K-7 charter school located on 4th Street within the same block (RCMA Immokalee Community School), the proposed expansion of that school, and their issues with student transportation. The RCMA facility is one of the two locations on Main Street that is accessed by a mid -block signalized pedestrian crosswalk. Observations in the field indicate strong compliance in use by both pedestrians and drivers. RCMA describes the organization: “The Redlands Christian Migrant Association is a 501(c)(3) non -profit organization, non-sectarian voluntary organization, which focuses on the well -being and care of impoverished immigrant children throughout the state of Florida. RCMA provides high -quality childcare and early education for children of migrant farmworkers and other rural, low -income families. Programs include Head Start, Migrant Head Start, and before and after-school activities in 21 Florida Counties. In addition, we involved parents by encouraging their civic participation, through voting and working for the organization through their committees and associations.” Meetings with the CRA Staff The Atkins staff met with Debrah Forester, CRA Director, on May 26, 2022, to discuss the CRA’s initiatives for complete streets, walkability, community needs, and the TIGER grant program. She noted that the TIGER open house gave the community a first look at what is approved and programmed. She noted that QE is the contractor and Q Grady Minor is the design c onsultant. Capital Consulting Solutions completed the concepts and design-build design criteria package. Improvements are to include new sidewalks, lighting, and a transit transfer station. The MSTU is renting the streetlights and paying for the electricity under a 10-year service agreement. She noted that the Atkins TNP study would fill in any gaps in the system not included in the TIGER grant system. Ms. Forester also emphasized that the CRA favors the proposed loop road. The Atkins staff also met with Christie Betancourt, Immokalee CRA Operations Manager, on the afternoon of May 26, 2022, to discuss details regarding the needs in the community, recent and current plans and programs and recommendations regarding other individuals in the communit y to interview. She noted that we should obtain the recently approved Johnson Engineering digital files for the Sidewalk Master Plan. David Dowling volunteered to contact JEI to get the files. She noted that included in the master plan was a proposed extension of Little League Road that would tie into Lamm Road and be further extended to SR 82. Atkins staff spoke with Christie about the lack of bicycle facilities in the community. She explained that she has discussed this with community members and believes they would not be used as many residents are not from the US and where they came from does not have bike lanes and as such, would not use them. We discussed the low speeds and low traffic volumes on most residential streets, and all agreed that bike facilities would not be a prudent use of funds, except for SR 29. Meeting with the Immokalee Fire Control District On July 8, 2022, Atkins meet with Thomas Cunningham, Deputy Fire Chief, and Josh Bauer, Battalion Chief to review the preliminary recommendations in the Transportation Network Plan and to get their input on needed improvements in the Immokalee area. The recommendations of interest to the fire district included the proposed roundabouts along Jefferson and Madison to eliminate existing sharp Immokalee Transportation Network Plan Page I A-3 turns and odd angles at the intersections, and the proposed intersection improvement (roundabout) at the intersection of Westclox Street and New Market Road. These were generally found to be acceptable as long as the design will accommodate fire trucks. Additional comments include the following: • Group acknowledged the need for additional midblock crossings along SR29 and First St. • Fire Dept very supportive of the potential Little League extension to cut response times (9 minutes) • Little League and the new loop road are game changers for the fire dept. • Eden has no turnaround; needs to extend to Apple or at least to Sanders Pine Apts. Street access around the scrub jay habitat is limited which impacts adequate structure protection. • Some private roads become public roads; some areas of private roads are in severe drivable conditions particularly during heavy rains, increasing response time. • There are poor-condition roads including in the area of Little League to Trafford Farms, Virno, Myers, & Christian Terrace, increasing response time. • There is a need for a second access point along Westclox Street where the new school is planned. • Habitat for Humanity (large, planned area of 350 homes) has one way in and out. Immokalee High School Crossing Guard Atkins staff spoke with a crossing guard for Immokalee High School to get her observations on how the majority of the students get to and from school. She was of the opinion that the majority of students either walk or ride a bike, with the majority of those walking to get to and from school. Given the location of the schools in Immokalee relative to the residential area, it is easy and safe for students to walk or ride bicycles to and from school. MSTU Advisory Board Meeting Atkins staff attended the Immokalee MSTU Advisory Board Meeting on Wednesday, May 25, 2022. During the meeting a quorum was not present, however, the chair asked Mr. Haight to briefly present the purposes of the study and the proposed schedule of future meetings. Several of the members present commented on how much they anticipated the findings of the study and Plan. CRA TIGER Grant Update Open House The Akins team also attended the TIGER Grant Open House on the evening of May 25, 2022, to listen to a presentation on program initiatives and alternatives. The team also met with several interested advocates that provided input into the Transportation Network Plan. Immokalee Transportation Network Plan A PPENDIX B. VEHICLE AVAILABILITY Immokalee Transportation Network Plan Page I B-1 Vehicles Available (American Community Survey, 2020) Total Male Female Estimate Margin of Error Estimate Margin of Error Estimate Margin of Error Workers 16 years and over 11,718 ±1,005 7,374 ±819 4,344 ±601 VEHICLES AVAILABLE Workers 16 years and over in households 11,385 ±1,001 7,226 ±874 4,159 ±571 No vehicle available 22.5% ±7.3 26.1% ±10.9 16.2% ±5.5 1 vehicle available 21.5% ±4.3 20.7% ±5.2 22.8% ±6.0 2 vehicles available 35.2% ±6.4 32.2% ±7.6 40.4% ±8.2 3 or more vehicles available 20.9% ±5.1 21.0% ±6.2 20.6% ±5.6 PERCENT ALLOCATED Means of transportation to work 24.7% (X) (X) (X) (X) (X) Private vehicle occupancy 31.6% (X) (X) (X) (X) (X) Place of work 26.3% (X) (X) (X) (X) (X) Time of departure to go to work 38.8% (X) (X) (X) (X) (X) Travel time to work 38.8% (X) (X) (X) (X) (X) Vehicles available 1.2% (X) (X) (X) (X) (X) Immokalee Transportation Network Plan A PPENDIX C. MEANS OF TRANSPORTATION TO WORK Immokalee Transportation Network Plan Page I C-1 Means of Transportation to Work (American Community Survey, 2020) Total Male Female Estimate Margin of Error Estimate Margin of Error Estimate Margin of Error Workers 16 years and over 11,718 ±1,005 7,374 ±819 4,344 ±601 MEANS OF TRANSPORTATION TO WORK Car, truck, or van 78.5% ±4.2 80.8% ±4.9 74.6% ±7.2 Drove alone 50.9% ±5.2 47.0% ±6.8 57.4% ±7.3 Carpooled 27.6% ±4.9 33.8% ±6.5 17.2% ±4.5 In 2-person carpool 12.8% ±3.1 12.2% ±3.5 13.6% ±4.4 In 3-person carpool 3.0% ±1.8 4.1% ±2.7 1.1% ±1.1 In 4-or-more person carpool 11.9% ±3.5 17.5% ±5.2 2.4% ±1.6 Workers per car, truck, or van 1.29 ±0.06 1.38 ±0.10 1.15 ±0.04 Public transportation (excluding taxicab) 9.9% ±2.9 11.2% ±3.9 7.7% ±3.1 Walked 4.6% ±1.7 3.8% ±2.5 6.0% ±2.2 Bicycle 0.1% ±0.2 0.2% ±0.3 0.0% ±1.1 Taxicab, motorcycle, or other means 2.0% ±1.4 2.3% ±2.1 1.4% ±1.2 Worked from home 4.9% ±3.3 1.7% ±2.0 10.2% ±6.7 Immokalee Transportation Network Plan A PPENDIX D. COMMUTE TO WORK Immokalee Transportation Network Plan Page I D-1 Place of Work (American Community Survey, 2020) Total Male Female Estimate Margin of Error Estimate Margin of Error Estimate Margin of Error Workers 16 years and over 11,718 ±1,005 7,374 ±819 4,344 ±601 PLACE OF WORK Worked in state of residence 99.3% ±0.7 99.5% ±0.9 99.1% ±1.4 Worked in county of residence 84.7% ±3.5 81.2% ±5.2 90.8% ±3.8 Worked outside county of residence 14.6% ±3.4 18.3% ±5.2 8.3% ±3.7 Worked outside state of residence 0.7% ±0.7 0.5% ±0.9 0.9% ±1.4 Living in a place 100.0% ±0.4 100.0% ±0.6 100.0% ±1.1 Worked in place of residence 43.8% ±5.5 38.3% ±6.7 53.2% ±7.6 Worked outside place of residence 56.2% ±5.5 61.7% ±6.7 46.8% ±7.6 Not living in a place 0.0% ±0.4 0.0% ±0.6 0.0% ±1.1 Living in 12 selected states 0.0% ±0.4 0.0% ±0.6 0.0% ±1.1 Worked in minor civil division of residence 0.0% ±0.4 0.0% ±0.6 0.0% ±1.1 Worked outside minor civil division of residence 0.0% ±0.4 0.0% ±0.6 0.0% ±1.1 Not living in 12 selected states 100.0% ±0.4 100.0% ±0.6 100.0% ±1.1 Immokalee Transportation Network Plan Page I D-2 Travel Time to Work (American Community Survey, 2020) Total Male Female Estimate Margin of Error Estimate Margin of Error Estimate Margin of Error Workers 16 years and over who did not work from home 11,147 ±1,031 7,248 ±871 3,899 ±544 TIME OF DEPARTURE TO GO TO WORK 12:00 a.m. to 4:59 a.m. 6.5% ±2.4 4.7% ±2.1 9.8% ±6.5 5:00 a.m. to 5:29 a.m. 10.5% ±3.5 14.0% ±5.1 3.9% ±2.3 5:30 a.m. to 5:59 a.m. 8.8% ±3.1 12.1% ±4.5 2.8% ±1.6 6:00 a.m. to 6:29 a.m. 14.7% ±3.6 17.6% ±5.3 9.2% ±3.3 6:30 a.m. to 6:59 a.m. 8.9% ±2.6 7.7% ±3.6 11.2% ±3.4 7:00 a.m. to 7:29 a.m. 16.3% ±3.8 17.2% ±5.7 14.6% ±4.9 7:30 a.m. to 7:59 a.m. 5.1% ±1.6 3.6% ±2.0 7.9% ±2.6 8:00 a.m. to 8:29 a.m. 9.0% ±2.2 7.2% ±2.4 12.3% ±4.5 8:30 a.m. to 8:59 a.m. 4.7% ±1.8 4.6% ±2.2 4.8% ±3.3 9:00 a.m. to 11:59 p.m. 15.5% ±2.8 11.2% ±3.1 23.5% ±5.6 Immokalee Transportation Network Plan Page I D-3 Total Male Female Estimate Margin of Error Estimate Margin of Error Estimate Margin of Error TRAVEL TIME TO WORK Less than 10 minutes 11.8% ±2.4 8.2% ±1.9 18.5% ±5.3 10 to 14 minutes 13.5% ±3.0 10.7% ±3.6 18.6% ±5.5 15 to 19 minutes 10.1% ±3.0 7.4% ±3.8 15.0% ±4.7 20 to 24 minutes 9.5% ±3.2 6.0% ±3.0 16.1% ±7.6 25 to 29 minutes 4.4% ±2.1 5.4% ±2.9 2.4% ±1.6 30 to 34 minutes 11.3% ±3.5 12.2% ±4.8 9.8% ±3.6 35 to 44 minutes 5.0% ±2.1 7.1% ±3.3 1.3% ±0.9 45 to 59 minutes 11.1% ±3.0 12.9% ±4.0 7.6% ±3.5 60 or more minutes 23.4% ±4.4 30.2% ±6.2 10.8% ±3.8 Mean travel time to work (minutes) 36.4 ±3.5 42.6 ±4.9 25.0 ±3.7 Immokalee Transportation Network Plan A PPENDIX E. DEMOGRAPHICS Immokalee Transportation Network Plan Page I E-1 Population by Age (American Community Survey, 2020) Estimate Margin of Error Percent SEX AND AGE Total population 28,060 ±1,838 28,060 Male 14,971 ±1,201 53.4% Female 13,089 ±1,011 46.6% Sex ratio (males per 100 females) 114.4 ±10.0 (X) Under 5 years 2,305 ±407 8.2% 5 to 9 years 2,409 ±393 8.6% 10 to 14 years 2,568 ±403 9.2% 15 to 19 years 2,738 ±515 9.8% 20 to 24 years 2,350 ±589 8.4% 25 to 34 years 4,009 ±728 14.3% 35 to 44 years 3,798 ±582 13.5% 45 to 54 years 3,734 ±548 13.3% 55 to 59 years 1,139 ±322 4.1% 60 to 64 years 1,081 ±359 3.9% 65 to 74 years 1,479 ±344 5.3% 75 to 84 years 367 ±168 1.3% 85 years and over 83 ±76 0.3% Median age (years) 29.4 ±2.4 (X) Under 18 years 8,882 ±1,043 31.7% 16 years and over 20,063 ±1,331 71.5% 18 years and over 19,178 ±1,274 68.3% 21 years and over 17,534 ±1,269 62.5% 62 years and over 2,571 ±528 9.2% 65 years and over 1,929 ±385 6.9% 18 years and over 19,178 ±1,274 19,178 Male 10,603 ±1,077 55.3% Female 8,575 ±660 44.7% Sex ratio (males per 100 females) 123.7 ±15.5 (X) 65 years and over 1,929 ±385 1,929 Male 1,037 ±265 53.8% Female 892 ±216 46.2% Sex ratio (males per 100 females) 116.3 ±34.8 (X) Immokalee Transportation Network Plan Page I E-2 Population by Race (American Community Survey, 2020) Estimate Margin of Error Percent RACE Total population 28,060 ±1,838 28,060 One race 24,269 ±1,601 86.5% Two or more races 3,791 ±1,239 13.5% One race 24,269 ±1,601 86.5% White 16,376 ±1,549 58.4% Black or African American 6,378 ±1,045 22.7% American Indian and Alaska Native 419 ±191 1.5% Cherokee tribal grouping 0 ±27 0.0% Chippewa tribal grouping 0 ±27 0.0% Navajo tribal grouping 0 ±27 0.0% Sioux tribal grouping 0 ±27 0.0% Asian 86 ±193 0.3% Asian Indian 0 ±27 0.0% Chinese 0 ±27 0.0% Filipino 86 ±193 0.3% Japanese 0 ±27 0.0% Korean 0 ±27 0.0% Vietnamese 0 ±27 0.0% Other Asian 0 ±27 0.0% Native Hawaiian and Other Pacific Islander 0 ±27 0.0% Native Hawaiian 0 ±27 0.0% Chamorro 0 ±27 0.0% Samoan 0 ±27 0.0% Other Pacific Islander 0 ±27 0.0% Some other race 1,010 ±445 3.6% Two or more races 3,791 ±1,239 13.5% White and Black or African American 195 ±182 0.7% White and American Indian and Alaska Native 174 ±166 0.6% White and Asian 8 ±16 0.0% Black or African American and American Indian and Alaska Native 0 ±27 0.0% Immokalee Transportation Network Plan Page I E-3 Race alone or in combination with one or more other races Estimate Margin of Error Percent Total population 28,060 ±1,838 28,060 White 20,163 ±1,828 71.9% Black or African American 6,573 ±1,053 23.4% American Indian and Alaska Native 597 ±146 2.1% Asian 98 ±194 0.3% Native Hawaiian and Other Pacific Islander 0 ±27 0.0% Some other race 4,424 ±1,335 15.8% HISPANIC OR LATINO AND RACE Total population 28,060 ±1,838 28,060 Hispanic or Latino (of any race) 19,855 ±1,810 70.8% Mexican 15,498 ±1,821 55.2% Puerto Rican 475 ±267 1.7% Cuban 231 ±228 0.8% Other Hispanic or Latino 3,651 ±1,246 13.0% Not Hispanic or Latino 8,205 ±1,087 29.2% White alone 1,288 ±421 4.6% Black or African American alone 6,296 ±1,057 22.4% American Indian and Alaska Native alone 399 ±190 1.4% Asian alone 86 ±193 0.3% Native Hawaiian and Other Pacific Islander alone 0 ±27 0.0% Some other race alone 0 ±27 0.0% Two or more races 136 ±162 0.5% Two races including Some other race 0 ±27 0.0% Two races excluding Some other race, and Three or more races 136 ±162 0.5% Total housing units 6,823 ±425 (X) CITIZEN, VOTING AGE POPULATION Citizen, 18 and over population 10,754 ±1,138 10,754 Male 5,683 ±935 52.8% Female 5,071 ±563 47.2% Immokalee Transportation Network Plan A PPENDIX F. TECHNICIAL MEMORANDUM 1 I IMMOKALEE TRANSPORTATION NETWORK PLAN Technical Memorandum No. 1 Atkins July 21, 2022 Revised November 21, 2022 Technical Memorandum No. 1 i Table of Contents 1.0 Introduction 1 2.0 Purpose 1 3.0 Stakeholder Advisory Group 1 4.0 Research 2 4.1 Literature Review 2 4.2. Collier County/Immokalee Complete Streets TIGER 2016 Application and Grant 2 4.3. Related Studies 4 4.4. Immokalee Pedestrian Crosswalk Improvements Study (March 2014) 4 4.5. Collier Area Transit Bus Stop & Facility Accessibility Study (October 2014) 5 4.6. Collier MPO Bicycle & Pedestrian Master Plan (March 2019) 6 4.7. Collier MPO and CAT Park-and-Ride Study (November 2020) 8 4.8. Collier MPO Local Road Safety Plan (LRSP) (May 2021) 8 4.9. Immokalee Sidewalk Master Plan (May 2021) 10 4.10. Collier County Area Transit Comprehensive Operations Analysis (July 2021) 11 4.11. SR 29 Loop Road from CR 846 to SR 29 North Terminus (December 2022) 11 5. Public Meetings and Outreach 13 5.1. Project Kick-off Meeting 13 5.2. Kickoff Meeting Summary 13 5.3. Additional comments received are summarized below: 15 5.4. Immokalee CRA Advisory Board Meeting 15 5.5. Atkins Team Field Review 15 5.6. Meetings with the CRA Staff 16 5.7. Meetings with Community Representatives 16 5.8. Second Stakeholders Workshop 18 6. Existing Conditions and Gap Analysis 22 6.1. Sidewalks 22 6.2. Bicycle Facilities 23 6.3. Transit Systems and Operation 23 6.4. On-Street Parking Lanes 24 6.5. Gap Analysis and Project Identification 24 7. Project Evaluation 24 7.1. Sidewalk Evaluation Criteria 24 7.2. Roadway Evaluation Criteria 26 8. Next Steps 28 APPENDIX Technical Memorandum No. 1 1 1.0 Introduction This Technical Memorandum No. 1 describes the initial data gathering process, the data sources, the network analysis, network mapping, and preliminary findings and recommendations for the Immokalee Transportation Network Plan (the “Plan” or “TNP”). 2.0 Purpose Recognizing that a significant segment of the community’s population uses public transit, walks or bicycles to work, school, and other destinations, Collier County has initiated a multi-modal transportation planning study that will compile transportation and mobility projects and programs identified in other studies, identify additional projects and studies that are needed to complete connections and expand mobility for all. This project will consult with external stakeholders and se rvice providers with the goal of developing recommendations that identify enhancements to mobility for the citizens of Immokalee and may include potential routes to improve the connectivity of the collector and local street network to expand public transit service, and bicycle and pedestrian access. The study will deliver tools (including lists and maps) that will allow stakeholders to identify opportunities to advance projects, coordinate resources and address gaps and direct investments and efforts. 3.0 Stakeholder Advisory Group The Immokalee Transportation Network Plan Stakeholder Advisory Group (SAG) introduced the members of the SAG recognized by the County Project Manager and CRA staff as individuals with direct knowledge of transportation needs and issues in the community. The Atkins team was provided the list of stakeholders to contact and participate with the team during the study process and meetings. Some of the SAG committee attended the initial kickoff meeting or were contacted by the team during project research. The SAG members were invited to the workshop scheduled for July. The Stakeholder Advisory Group includes the following: A. Internal Members ▪ Code Enforcement ▪ Collier County Development Review Division ▪ Collier County Parks & Recreation Division ▪ Collier County Sheriff’s Office - Safety Officer ▪ Collier County Stormwater Division ▪ Collier County Traffic Operations Division ▪ Collier County Transportation Planning Division ▪ Immokalee Fire Department B. Agency/Governmental Members ▪ Collier Area Transit ▪ Collier Metropolitan Planning Organization (MPO) Staff ▪ Florida Department of Transportation (FDOT) ▪ FDOT Commuter Services/Vanpool Services ▪ Immokalee Chamber of Commerce ▪ Immokalee CRA Advisory Board ▪ Immokalee Health Department ▪ Immokalee MSTU Advisory Board ▪ Immokalee Regional Airport ▪ Immokalee Technical Institute, Collier County Public Schools ▪ LeeTran Technical Memorandum No. 1 2 ▪ Southwest Florida Regional Planning Council (SWFRPC) C. Advocacy Groups ▪ Bicycle & Pedestrian Groups, Pathways ▪ Blue Zones – Immokalee Committee ▪ Complete Streets Coalition ▪ Immokalee Fair Housing Alliance/Community Foundation of Collier County ▪ Seminole Tribe ▪ Unmet Needs Coalition 4.0 Research Below is a summary of the key studies and reports reviewed for the Transportation Network Plan development a full listing of the literature search will be included in the Final Report. 4.1 Literature Review Atkins prepared a preliminary literature search and report on previous studies related to transportation issues and the needs of the Immokalee community. Later discussions and interviews with the County and CRA staff members provided additional previous studies and data that proved to be essential to the study effort. The most important initial data obtained included the grant documents listing the programmed improvements proposed by the TIGER complete streets grant, and the Sidewalk Master Plan. With the awarding of this grant, mobility opportunities and priorities were reordered to capitalize on the grant. These maps were the starting elements of the GIS maps prepared for the study. 4.2. Collier County/Immokalee Complete Streets TIGER 2016 Application and Grant Collier County submitted the Immokalee Complete Streets—Growing Connections to Create Mobility Opportunities in the FY 2017 grant cycle. The Complete Street grant of $13,132,691 was awarded in March 2018. With 20% match contributions, the total project budget will be $16,415,864. The complete streets program will include 20 miles of concrete sidewalks, 1 mile of multi-use pathway, 20 miles of upgraded drainage ditch and swales, nine enhanced bus stop amenities/shelters which include bus shelters, benches and bike racks, construction of a Bus Transfer Station next to the Collier County Health Department on Immokalee Drive, comprehensive street lighting improvements within the project area, and a 5-mile bicycle boulevard network with traffic calming and signage. The bicycle boulevard treatments are proposed for Madison Avenue, Jefferson Avenue, Lee Street, Jackson Street, Escambia Street, Broward Street, and the portion of Lake Trafford Road within the TIGER complex of street improvements. Construction on Area 1 is planned for late fall 2022. Area 1 is bounded on the north by Rose Avenue, on the east by School Drive, on the south by Eustis Avenue E., and on the west by S. 1st Street, Immokalee Road. Construction times for Areas 2-4 have not been determined. Technical Memorandum No. 1 3 Technical Memorandum No. 1 4 4.3. Related Studies A key element in developing the Immokalee Transportation Network Plan was conducting a comprehensive review of previous studies. This review focused on the goals and objectives that support transportation and mobility plans, specific community policies, and the identification of key connections, destinations, and priority transportation and mobility improvements. Additionally, data, maps, and projects from these studies will be compiled in further detail in the Final Report. Below is a summary of the reviews. 4.4. Immokalee Pedestrian Crosswalk Improvements Study (March 2014) The Immokalee Pedestrian Crosswalk Improvements Study was prepared in March 2014 by Collier County. The limits of the study were SR 29 (Main Street) from 9th Street to CR 846 (1st Street) and CR 846 (1st Street) from SR 29 (Main Street) to north of Delaware Avenue. The study noted that in the previous seven years prior to the study date there had been 42 reported pedestrian/bicycle crashes with three of them resulting in fatalities. The study also noted the mode predominance of walking, bicycling, and transit due to the high number of low-income migrant housing in the neighborhoods along the corridors. It also noted the three schools on 9th Street and one school on Main Street in the vicinity of the study. The study traffic counts were done during the peak harvest months. The consultant provided a list of recommendations for improvements to the two corridor locations: Main Street and 1st Street ▪ Install fences/railings/barriers in the medians at least four feet away from the back of curb. If the four feet cannot be obtained, the barriers must be installed with a breakaway base. The barriers will direct pedestrians to use crosswalks, full and channelized median openings. Not Implemented ▪ Install in-pavement lights at the crosswalks that would be activated by an automatic detection device and have either highlighted pedestrian crossing signs or Rectangular Rapid Flash Beacons (RRFB). This will alert motorists that someone is entering or waiting to enter the crosswalk. Currently, landscaping planters on the sidewalk at 5thStreet hide the pedestrian from approaching motorists. These lights would alert motorists to pedestrians wanting to cross. RRFBs have been installed ▪ Landscaping in the medians should be kept to low shrubs at least 100 feet approaching the mid- block crossings. ▪ Conduct a Bike Lights program with the Florida Department of Transportation (FDOT) and the local Sheriff’s office to distribute bicycle lights. Not yet implemented ▪ Mark all side street crosswalks with high emphasis markings because of the high number of pedestrians. Not 100% complete ▪ Have maintenance replace the burned-out lighting. Ongoing Main Street ▪ Change 2,700 feet of Main Street into a “Pedestrian Zone” and lower the speed limit to30miles per hour (mph). The30mphspeed limit is recommended based on the results of a spot speed study in which the 85th-percentile speed is 33 mph on Main Street. The survival rate of a pedestrian being struck by a vehicle would increase from 40 percent at 35 mph to 60 percent at 30 mph, based on National Highway Traffic Safety Administration data. Remove the flashing beacon “Pedestrian Crossing Ahead” signs if the posted speed is lowered to 30 mph and designate this area as a pedestrian zone. ▪ Add a crosswalk at 2nd Street. Based on the pedestrian counts and with the barrier in place, the 343 pedestrians crossing in the median, between crosswalks will be forced to either use the crosswalk at 3rdStreet or will cross at 2ndStreet. There is a harvester’s bus pick-up and drop-off lot just south Technical Memorandum No. 1 5 of Main Street with openings on 2ndStreet and 3rd Street. This is a large pedestrian generator. The grocery store/restaurant is a large pedestrian generator as well because it is open in the mornings and many buses use that parking lot to pick up and drop off pedestrians. 1st Street ▪ Install an additional crossing at Colorado Avenue. There are over 750 pedestrians (combined total) crossing in this area during the peak hours of a typical weekday and weekend day. There is an apartment complex on the east side of 1stStreet that generates a large amount of pedestrian traffic. The draft Transportation Network Plan has recommended a lane repurposing study for Main Street from 14th Street to Hancock Street north of 9th Street encompassing the same study limits as the 2014 Pedestrian Crosswalk Improvements Study. For the lane repurposing study, new traffic and pedestrian counts would be required, and new traffic crash data would be obtained to support and j ustify new safety and traffic calming changes to the roadway section, and for vehicle, bicycle, and pedestrian facilities. One expected future change would be a reduction in heavy vehicle and truck traffic along the in-town portion of SR 29 after the loop road is constructed, as well as a total reduction of pass-through traffic on SR 29. Those changes likely would reduce the interactions of vehicular traffic with pedestrians and bicyclists in the central business district. 4.5. Collier Area Transit Bus Stop & Facility Accessibility Study (October 2014) Published in October 2014, the Collier Area Transit (CAT) Bus Stop & Facility Accessibility Study reviewed the accessibility and safety/security of the 524 active bus stops in the CAT system at that time. Bus stops were categorized as high, medium or low in terms of accessibility and safety/security and notable stops within the Immokalee routes were identified in each evaluation category. Some bus stops were also recommended to be relocated and/or combined. Accessibility, safety/security, and location criteria were reviewed in relationship to sidewalk and roadway multimodal interconnections recommended in this Immokalee Transportation Network Plan and some street interconnections and sidewalk recommendations in this plan were made to enable safe and efficient bicycle and pedestrian access to existing bus stops. Accessibility was rated by the following elements: ▪ bus stop location; ▪ presence of a controlled pedestrian crossing; ▪ presence of a curb and compliant curb ramp; ▪ ability to maneuver a wheelchair through shelter; ▪ bench obstruction; ▪ presence and compliance of a sidewalk; ▪ presence and compliance of landing area; and ▪ presence and compliance of the bus stop sign. Bus stops in Immokalee with the lowest accessibility scores were Bus Stop 377 at Winn Dixie and Lake Trafford Road; 337 Taylor Terrace and Bass Road; 358 S. 5th Street and W. Delaware Avenue; 285 1St Street and Eustis Avenue E.; and S 6th Street and Colorado Avenue. Technical Memorandum No. 1 6 Safety/security was rated by the following elements were used to develop the safety/security score: ▪ bus stop location; ▪ presence of a controlled pedestrian crossing; ▪ presence of detectible warnings on the curb ramp; ▪ presence of marked crosswalk(s); ▪ landing area in a safe location; ▪ presence of lighting; and ▪ presence of other potential safety or security hazards. Bus stops in Immokalee with the lowest safety/security scores were Bus Stop 358 at S. 5th Street and W. Delaware Avenue; 321 Farm Worker Way and Agricultural Way; 336 Lake Trafford Road and Christian Terrace; and 377 Winn Dixie and Lake Trafford Road. The study also recommended relocating or consolidating several stops: 358 S. 5th Street at W. Delaware Avenue consolidate with 357, and relocate 347 Lake Trafford Road at Ringo Lane move 600 feet east; 353 Roberts Avenue at N 9th Street move 400 feet east; and 372 Roberts Avenue relocate 250 feet East. 4.6. Collier MPO Bicycle & Pedestrian Master Plan (March 2019) The Collier MPO Bicycle & Pedestrian Master Plan, adopted on March 8, 2019, built off the original 1994 Comprehensive Pathway Plan and updates in 2006 and 2012. The 2019 Plan stated: “The purpose of this Plan is to build on prior efforts to develop a first‐class bicycle and pedestrian network throughout Collier County. This Plan is not intended to duplicate or conflict with existing local plans and ongoing bicycle and pedestrian projects, but rather, to unify planning efforts and influence facility improvement priorities at the county level. The Vision of the Plan is: “To provide a safe and comprehensive bicycle and pedestrian network that promotes and encourages community use and enjoyment.” The goals of the Master Plan are to pursue strategies that improved and/or protected safety, connectivity, health, the economy, and the environment. The Plan is for the entirety of Collier County with specific details and map insets for Immokalee. Figure 2 indic ated that the Environmental Justice (EJ) Communities in Collier and Immokalee w ere ranked “high” (northwest neighborhoods) or “very high” (south and east neighborhoods, and the downtown neighborhoods). This data supports the importance of providing a high level of interconnected, multimodal transportation services to the Immokalee community. The Plan also noted: “Multiple Community Redevelopment Associations (CRA) in Collier County, in collaboration with the County, identify infrastructure needs and develop funding strategies. Collier County was recently awarded a $13 million federal TIGER Grant that will construct 20 miles of sidewalk, upgrade 32 intersections, add or upgrade bus shelters and lighting, and make drainage improvements in Immokalee. Many roads identified for improvements in the grant application also have been identified in other plans such as the Collier MPO 2012 Comprehensive Pathways Plan and the 2011 Immokalee Walkable Community Study.” Table 1. Vehicle Availability, Income, and Means of Transportation to Work showed comparative data supporting and justifying the extensive needs for transportation facilities in Immokalee. Technical Memorandum No. 1 7 1 US Census, American Community Survey, 2016 5-year estimates, Tables S0802, B08101, B17001, DP03 The Plan also notes five bicycle/pedestrian high-crash corridors within the Collier MPO with SR 29-Main Street from 9th Street to 1st Street ranked 4th in the FDOT District 1 ranking (FDOT 2013-2015 bicycle and pedestrian high crash list for Collier MPO). This corridor has more recently had pedestrian push - button signalized crosswalks installed to address the high level of both vehicular traffic and pedestrian activity in the downtown central business district. This current Immokalee Transportation Network Plan is addressing this high crash danger caused by the intensive mixing of vehicular and pedestrian traffic on the SR 29 corridor through downtown by suggesting a “lane repurposing” to apply context-sensitive, complete streets treatments and countermeasures to calm traffic and reduce conflict points. Examples of these safe streets measures are promoted by the National Association of City Transportation Officials (NACTO), and FHWA’s Safe Transportation for Every Pedestrian (STEP) and Pedestrian Safety Guide and Countermeasure Selection System (PEDSAFE) programs. https://nacto.org/ https://www.fdot.gov/safety/safetyengineering/countermeasures http://www.pedbikesafe.org/PEDSAFE/ Technical Memorandum No. 1 8 4.7. Collier MPO and CAT Park-and-Ride Study (November 2020) The Collier MPO completed a park-and-ride study for CAT, published in November 2020. The study reviewed potential sites for park-and-ride facilities throughout the county. In previous studies , park-and- ride facilities were recommended 200 feet south of the governmental facilities location on Immokalee Road, and at the Immokalee Health Center. In the 2020 study, the Health Center location was recommended over the government facilities site since the Health Center site has TIGER grant funding for a CAT transfer station. This current Immokalee TNP will recommend sidewalk improvements at the Health Center location where the onsite sidewalk system does not fully connect to the existing bus stop at the front entrance to the building. CAT has also coordinated with LeeTran to investigate connections with a proposed LeeTran park -and- ride facility in Lehigh. 4.8. Collier MPO Local Road Safety Plan (LRSP) (May 2021) The Collier MPO LSRP was adopted by the MPO Board on May 14, 2021. A summary of the findings follows. Key Conclusions and Recommendations Based on the data analysis conducted as part of the Collier MPO LRSP, four key emphasis areas were identified for further analysis and identification of high-crash corridors. The following crash types were identified as having a high severity ratio (constituting a greater percentage of severe crashes than all crashes) and accounting for a high overall number of severe crashes (more than 5% of total severe crashes): ▪ Bicycle ▪ Pedestrian ▪ Left-turn ▪ Angle ▪ Hit fixed object Additionally, rear-end, single-vehicle, head-on, and run-off-road crash types either account for a high frequency of severe crashes or have a high severity ratio. Based on similar characteristics and countermeasure profiles, these crash types can be combined to form the following Emphasis Areas: ▪ Non-Motorized (Bicycle and Pedestrian Crashes) ▪ Intersection (Left-Turn and Angle Crashes) ▪ Lane Departure (Hit Fixed Object, Single Vehicle, Head-On, and Run-Off-Road Crashes) ▪ Same Direction (Rear-End and Sideswipe Crashes) The LRSP developed an Emphasis Area 1: Non-Motorized Crashes, and described the severity of the outcomes: Non-motorized crashes (crashes in which a pedestrian or bicyclist are involved) are a statewide Emphasis Area and an important component of traffic safety challenges in Collier County. These crashes account for only 2% of all reported crashes in Collier County but constitute 15% of the county’s severe injury crashes and 24% of the county’s crash fatalities. Technical Memorandum No. 1 9 Table 2-6 shows a list of major roadway corridors with the most non-motorized crashes, and Figure 2-8 is a “heat map” of non-motorized user crashes (not shown here). Consistent with prior Collier MPO bicycle/pedestrian safety analyses, key focus areas include the area defined by US-41 (Tamiami Trail), Airport Road, Davis Boulevard and SR-29 through Immokalee. Other critical corridors are listed in Table 2-7 and highlighted in Figure 2-9 with three locations noted in Immokalee, Lake Trafford Road—Carson Road to SR-29; Immokalee Road—Stockade Road to SR-29, and SR-29—Immokalee Drive to CR-29A North. These locations are where special treatments will be recommended. An additional area of analysis in the Collier LRSP is to consider Alternative Intersection design using the FHWA “Intersection Control Evaluation” (ICE) process. ICE is a data-driven process to objectively identify optimal geometric and control solutions for roadway intersections. Factors considered in the ICE process include capacity/operational analysis, safety, and feasibility/cost. ICE is required for new intersections and substantial changes to existing intersections on FDOT roadways. The MPO’s member agencies apply the ICE process used by FDOT to County and City-maintained roadways as well.” The LRSP includes a section on roundabouts that explains the advantages. Since one safety and traffic calming feature recommended in the Immokalee TNP is to utilize roundabouts at particularly angular intersections, or for traffic calming instead of four-way stops, the LRSP description is important to include here: FHWA’s informational guide on roundabouts (FHWA- DR-00-067) explains that: roundabouts are circular intersections with specific design and traffic control features. These features include yield control of all entering traffic, channelized approaches, and appropriate geometric curvature to ensure that travel speeds on the circulatory roadway are typically less than 30 mph.” Modern roundabouts may connect three or more roadway approaches and may have one or more circulating lanes. The key safety benefit of roundabouts is that they eliminate high-energy “crossing” conflicts and have fewer overall conflicts than conventional intersections. Figure 3-25, from FHWA-DR-00-067, shows and explains the Technical Memorandum No. 1 10 difference in conflict points between roundabouts and conventional intersections. Attention is directed to the fact that whereas traffic signals assign right-of-way to crossing conflicts, these conflicts are not eliminated by signals in cases of red-light-running and permissive left-turn movements. Merge conflicts also exist in the context of right-turn-on-red movements. Properly designed roundabouts also are generally easier/safer to navigate for pedestrians and bicyclists, and pedestrian crossings at mu lti-lane roundabouts can be supplemented with various mid-block crossing devices (see discussion on pedestrian mid-block crossing elsewhere in this section). Because of these motorized and non - motorized user safety benefits, roundabouts have been found to reduce crashes overall by about 37% and reduce injury crashes by 51%. The principal constraint of roundabouts is that they often require a greater right-of-way footprint than conventional intersections of equivalent capacity. This is especially challenging in retrofit scenarios along commercial corridors where right-of-way costs may make roundabout retrofits cost-prohibitive. Because the safety benefits of roundabouts diminish as more circulating lanes are added, most roundabouts are limited to two circulating lanes. Accordingly, they are most commonly used at the intersections of either two 2-lane roadways or a 4-lane roadway and a 2-lane roadway. 4.9. Immokalee Sidewalk Master Plan (May 2021) A Sidewalk Master Plan was completed for portions of Immokalee in September 2021, which was adopted in May 2021. The master plan mapping provides an inventory of existing sidewalks, by sidewalk types, and locations on one-side of the street or both sides. The current Immokalee Technical Memorandum No. 1 11 Transportation Network Plan began with the data provided by the TIGER mapping, and Sidewalk Master Plan inventory, and proposes completing gaps in the network to provide full pedestrian network interconnectivity for the community. The current network plan also proposes completing the street network, with sidewalks, where linkage gaps exist in the transportation network. 4.10. Collier County Area Transit Comprehensive Operations Analysis (July 2021) Completed in July 2021, the Collier County Area Transit Comprehensive Operations Analysis (COA) Final Report evaluated the operational efficiency of the transit system and its components. Recommendations in the COA regarding routes, service, and stops in Immokalee include the followi ng shown in COA Table 9: Service Alternatives—Realignment. The COA also makes recommendations regarding locating important CAT facilities within Immokalee for efficiency purposes stating: Satellite Operations Facility Every day CAT operates vehicles to Immokalee from its administrative and operations headquarters located on Radio Road. The one-way distance between the Health Department transfer location in Immokalee and the Radio Road facility is approximately 35 miles. Five (5) fixed bus routes operate either within or to Immokalee. Over the last year, two (2) additional buses, not shown on the published schedule, have been added to supplement early AM demand for service between Immokalee and Government Center. This brings the total number of vehicles t o seven (7) which amounts to 33 percent of the daily peak vehicle requirement. Revenue service hours amounted to approximately 25 percent of total revenue service hours for the entire fixed -route network in FY 2019. In terms of productivity, the AM express bus services connecting Immokalee to Marco Island and Government Center are some of the most productive services in the CAT system. The demand for public transportation demonstrates that Immokalee has effectively become workforce housing for the communities to the west and the demand for transportation to connect to those jobs continues to grow. Immokalee is situated just beyond a growing eastward expansion of the County, positioning the community in a location that is too close for limited transit operations, but also too far to serve efficiently. The COA recommends completing a cost/benefit assessment to determine the return on investment of a satellite operations facility located in Immokalee. Some of those benefits include reductions in vehicle maintenance and fueling costs and retainment and retention of operations staff, many of which travel from Lee County to report to Radio Road. For customers, a significant benefit is afforded to those unable to use the mobile ticket application as they could now be able to purchase bus passes in Immokalee without having to travel to Radio Road or Government Center. 4.11. SR 29 Loop Road from CR 846 to SR 29 North Terminus (December 2022) The proposed SR 29 loop road east of Immokalee will provide important traffic conge stion advantages to the community that can translate into bicycle, pedestrian, and transit accessibility benefits. Technical Memorandum No. 1 12 Removing trucks from community and neighborhood streets and reducing pass-through traffic will result in reductions in traffic conflicts along SR 29-Main Street. A Project Development and Environmental (PD&E) environmental assessment has been completed by the Florida Department of Transportation (FDOT) for the SR 29 loop road from CR 846 to the SR 29 north terminus north of New Market Road. The study’s Central Alternative #2 has been selected to go forward to further planning, right-of-way acquisition, and design. The concept design was provided by FDOT and added to the GIS base map for the current Transportation Network Plan to show proposed interconnections to the existing community network within the TIGER system streets. In addition to the south and north termini at SR 29, five roadways are proposed to interconnect with the loop road route: Airport Access Road; Alachua Street; Flagler Street; Lee Street; and Heritage Boulevard (FSU campus). The intent of the bypass is to remove much of the truck traffic from SR 29 through Immokalee on Main Street and New Market Road West where the western portion of that street is primarily residential. The loop road interconnections on Airport Access Road and Alachua Street will provide direct access from the loop road to the intensive industrial, grower, packing, and shipping district along New Market Road. The SR 29 Loop road typical section is proposed to be a four-lane divided roadway with sidewalks and bike lanes. The five connecting streets will have directional median openings and the corridor will also include U-turn median openings. The EA report states the following regarding Central Alternative #2 route and typical section alternatives: Central Alternative #2 has been selected as the Recommended Alternative. It follows the existing alignment of SR 29 from the start of the project at Oil Well Road to the north of Seminole Crossing Trail. From this point, the loop road portion of the Central Alternative #2 travels north from SR 29 on a new alignment along the west side of the Immokalee Regional Airport to avoid the commercial/industrial areas of Immokalee and the State Farmers Market to the west. The loop road portion of Central Alternative #2 then turns to the northwest just past Gopher Ridge Road to parallel Madison Avenue and New Market Road. It then travels along the east side of Collier Health Services Medical Center and the Florida State University College of Medicine before reconnecting to SR 29 north of Westclox Street/New Market Road W. Finally, Central Alternative #2 travels from north of Westclox Street/New Market Road W to the project terminus near SR 82. A partial two-lane roundabout is proposed at SR 29 and Westclox Street/New Market Road W. The SR 29 Loop road typical section is proposed to be a four-lane divided roadway with sidewalks and/or shared-use paths. The five connecting streets will have directional median openings and the corridor will also include u-turn median openings. The FDOT anticipates the PD&E to be approved by December 30, 2022. Technical Memorandum No. 1 13 5. Public Meetings and Outreach 5.1. Project Kick-off Meeting The project kick-off meeting was held on May 6, 2022, at 10 am via Teams. The agenda is included in the appendix. The major topics for discussion were as follows: • Introductions of the Collier County team, the consultant team, and the Stakeholders • Discussion of the project Goals and Objectives • Review of the project schedule • Review of the preliminary list of previous studies to be reviewed • Review of data and issues that will influence the development of the plan • Approach to public input and outreach 5.2. Kickoff Meeting Summary The Atkins team led the meeting after introductions and a project overview provided by Collier County staff. Using a PowerPoint presentation (included in the appendix), the Atkins team provided an overview of the items listed above and facilitated a discussion of the same. The discussion of the goals and objectives centered around compiling previous mobility studies into one report or project listing which would enable people to easily identify projects in the Immokalee area. This study will also develop projects needed to complete and expand the transportation (roadways and sidewalks) network to better sever the residents of Immokalee. Atkins reviewed the project schedule which included miles tone meetings and deliverables. Atkins reviewed the list of studies and reports that will be reviewed as part of this effort. They include the following: • Collier Area Transit Ten-Year Transit Development Plan 2021-2030 • Collier Area Transit Bus Stop ADA Assessment Final Report • Collier Area Transit Comprehensive Operational Analysis Technical Memorandum No. 1 14 • Collier MPO Bicycle/Pedestrian Master Plan • Immokalee Walkable Community Study • Collier MPO Pedestrian and Bicycle Safety Study • Collier MPO Local Roads Safety Plan 2021 • Collier County Opportunity Zone Program • Immokalee Complete Street TIGER Grant • CRA Community Redevelopment Plan Proposed Amendment February 2022 • Collier County LDC: Appendix B—Typical Street Sections and Right-of-Way Design Standards • Collier County LDC—Zoning Districts • Collier County Planning and Zoning Maps Library • Collier County Transportation Planning Development Guidebook • Collier County Airport Authority Newsletter • Immokalee Complete Streets • Immokalee Master Plan; RMPK, 2005 The stakeholders were asked to review this list and provide any other reports or data they felt would add value to this effort. Atkins also reviewed the demographics of the Immokalee area and discussed the lack of auto availability throughout the community. This is as high as 50% of households without access to an automobile. The lack of personal vehicles forces reliance on the bicycle, pedestrian, and transit facilities. Atkins briefly discussed the different types of facility designs that could be considered as part of this effort. A summary of the bicycle and pedestrian crashes since 2010 was presented to the group. The majority of these crashes occurred on SR 29 in the vicinity of the commercial business district. A summary of the initial findings is presented below: • Bicycle crash hot spots tend to be at intersections • Pedestrian crashes are at both intersections and mid-block • A large cluster of crashes of both types have been in the Central Business District • Bicycle rider deaths per 100,000 are higher (0.62) than for the state (0.57) Notable among the discussion comments was information provided by Omar Deleon, Collier County Transit Manager, regarding the local transit routes to and from Immokalee including direct express routes to/from Naples and Marco Island to provide employment ac cess. Discussion of transit routes also noted the counter-circulating Routes 22 and 23 with substantially the same stops opposite each other. Later discussions determined that a Transit Development Plan has been completed and a Comprehensive Operations Plan is underway. Also noted was the need for efficient planning to keep routes on time. Nelson Galeano, MsM, P.E, PTP, PTOE, Transportation Planning Manager, also provided extensive comments regarding expectations for the TNP, including five particular points summarized here: 1. What are the important activity centers in the community and where are they? 2. How intensely used are these activity centers? 3. Are the activity centers interconnected? 4. Can we support the interaction of these facilities through the plan, meaning social interaction on a human scale, and not by driving? And 5. Can we determine safety conditions based on the crash data? Mr. Galeano also noted he understands that a decision matrix will be used and that equity will be an important criterion. Technical Memorandum No. 1 15 5.3. Additional comments received are summarized below: CREATE IMMOKALEE AS A DESTINATION • Can’t continue to be auto-centric • Develop a plan to recognize the human form • Use technical standards for urban form, perhaps referring to NACTO • Focus on activities and activity centers and locations • Are activities interconnected? • Create social interaction through bike/ped, not by driving • Determine the multimodal potential of the airport SAFETY CONSIDERATIONS • Crash data to drive solutions to remove unsafe locations • The safety evaluation matrix should not focus on speed and volume • Can the proposed loop road bypass be a solution? (or a problem?) • Follow up on Loop Road PD&E TRANSIT DATA • Determine all linkages between CAT and LeeTran and the advantages • Add information on Route 19 and Route 27 • Reconsider transit stops and efficiency based on current COA modifications OTHER ISSUES • The four E’s: Add equity, evaluation, and ease of use 5.4. Immokalee CRA Advisory Board Meeting Atkins staff attended the Immokalee CRA Advisory Board Meeting, virtually, on Wednesday, May 18, 2022. Much of the discussion related to an extended presentation by Collier County Schools representatives and was the first presentation by the district’s representative s in quite some time. The information was well-received by the Board members. Christie Betancourt responded to Atkins’ request to receive a copy of the school district’s PowerPoint presentation and forwarded a copy to the team. Notable presentation items included an update on the new Immokalee High School Innovation Center nearing completion. It will open for the 2022-23 school year and will include five academies, aviation, finance and entrepreneurship, information technology, engineering, and biomedical. Also discussed was the overcrowding at Immokalee High School (109% of capacity) and the community's concern about a potential new high school in Ave Maria which is located approximately five miles south of Immokalee. 5.5. Atkins Team Field Review The Atkins team was in Immokalee from Wednesday, May 24, 2022, through Friday, May 27, 2022, for a field review of the street and sidewalk network and needs, and meetings with the CRA staff, project advocates, and local agencies. David Haight, Wiley Page, and David Dowling with Atkins met with Christie Betancourt (5/26) for a discussion of community needs and project priorities, and on future Technical Memorandum No. 1 16 schedules, and with Debrah Forester and Yvonne Blair that day (5/26) for the same purposes. The meetings gave the Atkins team additional comments and provided contacts in the community. The team was advised to contact Johnson Engineering Inc., to obtain digital files for the Sidewalk Master Plan (adopted by BCC on May 10, 2022) to use as a base of information regarding a current sidewalk inventory by type. 5.6. Meetings with the CRA Staff Atkins staff met with Debrah Forester, CRA Director, on May 26, 2022, to discuss the CRA’s initiatives for complete streets, walkability, community needs, and the TIGER grant program . She noted that the TIGER open house gave the community a first look at what is approved and programmed. She noted that QE is the contractor and Q Grady Minor is the design consultant. Capital Consulting Solutions completed the concepts and design-build design criteria package. Improvements are to include new sidewalks, lighting, and a transit transfer station. The MSTU is renting the streetlights and paying for the electricity under a 10-year service agreement. She noted that the Atkins TNP study would fill in any gaps in the system not included in the TIGER grant system. Ms. Forester also emphasized that the CRA favors the proposed loop road as discussed previously for SR29. Atkins staff also met with Christie Betancourt, Immokalee CRA Operations Manager, on the afternoon of May 26, 2022, to discuss details regarding the needs in the community, recent and current plans and programs and recommendations regarding other individuals in the community to interview. She noted the Atkins team should obtain the recently approved Johnson Engineering digital files for the Sidewalk Master Plan. David Dowling, with Atkins, volunteered to contact JEI to get the files. She noted that included in the master plan was a proposed extension of Little League Road that would tie into Lamm Road and be further extended to SR 82. 5.7. Meetings with Community Representatives Throughout this process, Atkins’ team members met with community representatives to get their input on mobility issues faced by residents they represent and groups they work with. Below is the summary of those meetings. 5.7.1. Meeting with Dawn Montecalvo, President at Guadalupe Center, Inc. Atkins staff met with Dawn Montecalvo on Friday, May 27, 2022, to discuss the operation of the Guadalupe Center facilities, the programs they provide, and transportation to and from their facilities. The Guadalupe Center is a philanthropy-supported educational facility (upwards of 75% of their funding) seeking to “break the cycle of poverty through education” serving over 1,500 students. Their programs include early learning for children ages six -weeks to five-years old, and a high school college prep program (100% of the program students graduate from high school, 100% attend college, and 95% graduate). Their donor base is in Naples, and they are currently seeking $100,000 in funding to be used generally for transportation needs. Notable is that all students attending their facilities are transported by parents or guardians. Guadalupe Center has a new school opening on Westclox Street across from Eden Park Elementary School. While visiting the in-town facility on 5th Street, transportation access and student delivery issues were noted. At the new Westclox Street school site Technical Memorandum No. 1 17 observations were made that may be recommended in the TNP that would better connect the new school to and from Eden Park Elementary School, if access and filtration is required or desired. 5.7.2. Meeting with Jamie Weisinger, Lipman Family Farms Atkins staff met with Jaime Weisinger, via TEAMS on June 1, 2022, to discuss the operations of the Lipman growers, packers, and shippers associated with their farms and businesses. Lipman Family Farms are strong supporters of the community and have provided backpacks and school supplies to 10,000 students in an annual backpack giveaway over eight years, have provided scholarships to Immokalee High School students, and have given a $300,000 gift to the Redlands Christian Migrant Association (RCMA) Immokalee Community Schools. Lipman also provides healthy food to families through their Brighter Bites mission. Lipman Family Farms was also recognized locally as the “Outstanding Philanthropic Organization of 2019”. Mr. Lipman was appointed in 2017 by Governor Rick Scott for a four-year term on the Board of the District 7 South Florida Water Management District. Mr. Weisinger described their facilities including truck access to six (6) packing houses on site with the major site along Roberts Ave. Lipman also has two sites along Main St and one along New Market Road. Vehicular traffic at the sites involves field trucks and loaded semi-trucks that leave the sites. He noted that the Nixon Drive and New Market Road intersections are not an issue for truck access, however, he did advise that turning left from New Market Road to Main Street is difficult at times. Mr. Weisinger noted that most field workers live at site locations. He said packing house workers live in Immokalee and travel by vehicle or bike. There is a need to help to increase personal mobility in Immokalee and he said residents travel to LaBelle or Fort Myers for destinations such as Walmart. The workers use limited CAT services and private taxis. 5.7.3. Meeting with Redlands Christian Migrant Association (RCMA) Atkins staff visited with Gloria Moorman in an on-the-street interview in front of the RCMA street-front offices at 402 W. Main Street, before morning opening hours. Ms. Moorman gave a full descr iption of their K-7 charter school located on 4th Street within the same block (RCMA Immokalee Community School), the proposed expansion of that school, and their issues with student transportation. The RCMA facility is one of the two locations on Main Street that is accessed by a mid-block signalized pedestrian crosswalk. Observations in the field indicate strong compliance in use by both pedestrians and drivers. https://www.google.com/maps/@26.4185485,- 81.4214078,3a,75y,102.41h,91.92t/data=!3m6!1e1!3m4!1sx2I4W20F qybmnI2sDbTdjQ!2e0!7i16384!8i8 192 RCMA describes the organization: “The Redlands Christian Migrant Association is a 501©(3) non-profit organization, non-sectarian voluntary organization, which focuses on the well-being and care of impoverished immigrant children throughout the state of Florida. RCMA provides high-quality childcare and early education for children of migrant farmworkers and other rural, low-income families. Programs include Head Start, Migrant Head Start, and before and after-school activities in 21 Florida Counties. In addition, we involved parents by encouraging their civic participation, through voting and working for the organization through their committees and associations.” 5.7.4. Meeting with the Immokalee Fire Control District On July 8, 2022, Atkins meet with Thomas Cunningham, Deputy Fire Chief and Josh Bauer, Battalion Chief to review the preliminary recommendations in the Transportation Network Plan and to get their Technical Memorandum No. 1 18 input on needed improvements in the Immokalee area. The recommendations of interest to the fire district included the proposed roundabouts along Jefferson and Madison to eliminate existing sharp turns and odd angles at the intersections, and the proposed intersection improvement (roundabout) at the intersection of Westclox Street and New Market Road. These were generally found to be acceptable as long as the design will accommodate fire trucks. Additional comments include the following: • Group acknowledged the need for additional midblock crossings along SR29 and First St. • Fire Dept very supportive of the potential Little League extension to cut response times (9 minutes) • Little League and the new bypass are game-changers for the fire dept. • Eden has no turnaround; need to extend to Apple or at least to Sanders Pine Apts. Street access around the scrub jay habitat is limited which impacts adequate structure protection. • Some private roads become public roads; some areas of private roads are in severe drivable condition particularly during heavy rains, increasing response time. • There are poor-condition roads including in the area of Little League to Trafford Farms, Virno, Myers, & Christian Terrace, increasing response time. • There is a need for a second access point along Westclox Street where the new school is planned. • Habitat for Humanity (large, planned area of 350 homes) has one way in and out. 5.7.5. MSTU Advisory Board Meeting Atkins staff attended the Immokalee MSTU Advisory Board Meeting on Wednesday, May 25, 2022. During the meeting a quorum was not present, however, the chair asked Mr. Haight to briefly present the purposes of the study and the proposed schedule of future meetings. Several of the members present commented on how much they anticipated the findings of the study and Plan. 5.7.6. CRA TIGER Grant Update Open House The Akins team also attended the TIGER Grant Open House on the evening of May 25, 2022, to listen to a presentation on program initiatives and alternatives. The team also met with several interested advocates that provided input into the Transportation Network Plan. 5.8. Second Stakeholders Workshop On July 11, 2022, a workshop was held with the project stakeholders (sign-in sheet included in the appendix) to review the initial recommendations to expand the roadway and sidewalk networks. At the workshop, the participants reviewed large-scale plots and provided comments on the projects shown and the ones that should be added. These recommendations sought to fill the gaps in the sidewalk network, expand the sidewalk network to allow for safer access to points of interest and replace substandard sidewalk sections. The roadway expansion recommendations identified roadway improvements that would connect and/or expand the existing roadway system. This also includes numerous intersection and operational improvements as well as the identification of potential roadway or lane repurposing projects. Technical Memorandum No. 1 19 Below is a summary of comments made by participants: • A suggestion was made to add health and safety as a ranking for the next phase of the study. • Add a map insert for the Habitat for Humanity area. • The complete street area shown on the map is to be determined (some options include re-purpose lanes for buffer bike lanes or wide shared-use paths along both sides of the roadway. • A suggestion was made to distinguish the TIGER Grant improvements on the map. • No new improvements are permitted for the TIGER Grant project. • A top goal of the study is a plan that shows everything to aid the County and CRA in segregating individual projects and to help reduce throw away of recent improvements. • New Market from Second to 9th bulb-outs will be removed where recommended. • Roundabouts shown are potential locations; need to rank the locations to establish one as a pilot project. • Examine changing access points to the bypass that would link to a better grid street. • Loop sidewalks around the pond and provide removable locked-down bollards for fire access (south area). • Crosswalks are needed along Colorado for school traffic. • A suggestion was made to have a CAT bus stop at the Lake entrance. • Private Roads – only some have limited maintenance. • A question was raised on ownership between the school and the reservation land. • FDOT has a 3R programmed soon along Main Street (Handcock to Lake Trafford). • School bus stop locations TBD in August before the start of school; maybe opportunities to improve access at and to the stops. • Examine improving large bike station locations • MSTU and CRA to hold a joint meeting in the fall. The draft network maps shown below were presented at the Stakeholder Advisory Group workshop for discussion and revision as needed after the workshop. Technical Memorandum No. 1 20 Draft Pedestrian Facilities Network Technical Memorandum No. 1 21 Draft Network Roadway Connections and Alternatives Technical Memorandum No. 1 22 As not all of the Stakeholders could attend the workshop, the maps were published online and made available for all the Stakeholders to review and provide comments. 6. Existing Conditions and Gap Analysis The Immokalee area is served by one state road (SR 29), a north/south roadway providing a connection to I-75. Within the study area, SR 29 is a four-lane divided facility. Other roadways within the study are local county roads. Without exception, they are two-lane undivided facilities. Many have sidewalks on one or both sides, none have paved shoulders or bicycle lanes. The Immokalee area has a robust grid system of roadways. There are effectively two grid systems in Immokalee: The New Market area grid and the Immokalee Street grid. The existence of the grid has several benefits; it allows for the streets to be smaller and still accommodate all modes of travel, allows for multiple routes to reach one’s destination, and fosters walkable neighborhoods even without sidewalks. Immokalee is historically an agricultural town with a need to support freight traffic. Challenges have occurred where large trucks and pedestrian traffic is heavy, and using the same corridors, particularly along Main Street (SR 29). Immokalee has a fairly, well-connected roadway network, however, there are some local street interconnections needed to better enhance transit service and pedestrian and bicycle access. An analysis of the existing roadway and bicycle/pedestrian network was completed to identify gaps in the existing network as well as opportunities for new interconnections of roadways, sidewalks, and trails. During the study, the Atkins team identified the network of existing roads and sidewalks, and the types and locations of sidewalks (one side, both sides, and types of materials). 6.1. Sidewalks A majority of sidewalks within the Immokalee area are existing along major roadways. However, sidewalks within residential areas can be scattered and do not provide connectivity for pedestrians. See the Figure below for the existing extent of the sidewalk network. Technical Memorandum No. 1 23 6.2. Bicycle Facilities Bicycle facilities are only found along State Road 29 (west of 9th Street and east of County Road 846) in the Immokalee area. The portion of State Road 29 from 9th Street to Country Road 846 does not have a designated bicycle facility. Instead, bicyclists must use the existing travel lanes for motorists. While bicycles are a primary mode of transportation for many residents, they can safely operate on the local roadway network without separate facilities due to the low volumes and low speeds found on the majority of the local roadway network. The study team received numerous comments that except for SR 29, bicycle lanes would not be used and should not be included in the local roadways. 6.3. Transit Systems and Operation The Immokalee area is served by Collier Area Transit (CAT). Currently, five (5) routes provide service in the Immokalee area: Routes 19, 22, 23, 28, and 121. • Route 19 provides Immokalee with the main connection to Naples, Florida. • Routes 22 and 23 are circulator routes with stops providing coverage to the majority of the Immokalee area. • Route 28 provides a connection from the Collier County Government Center located in Naples, Florida to the Immokalee Health Department. • Route 121 is an express route that provides a connection to Marco Island that leaves Technical Memorandum No. 1 24 6.4. On-Street Parking Lanes On-street parking is found along State Road (SR) 29 in the central business district. While there are instances of unofficial parking lanes in portions of the study area, SR 29 is the only roadway with official parallel parking spaces. Immokalee at 5:40 am and returns at 4:58 pm. 6.5. Gap Analysis and Project Identification An initial gap analysis was conducted to identify deficiencies within the existing system and to provide potential connections to mitigate these deficiencies. As such, an initial evaluation by the project team of the current network system was performed and a list of projects was identified. This list of initial projects was presented to the Stakeholders at their July 11 th meeting. Some feedback was provided at that time, but several members took hard copies with them and indicated they would provide comments at a later time. Additionally, several members were unable to attend, and information was sent to them with a request to provide feedback to the team. Once those comments are received, they along with the feedback from the meeting were used to finalize the list of proposed projects. After this vetting process, projects were moved forward into the evaluation criteria process and scored based on the methodology lis ted in the next section. The analysis provides a process to score potential network connections and prioritize them accordingly. 7. Project Evaluation Evaluation criteria were drafted for both sidewalk and roadway projects. This section presents the draft criteria that as of the time this report was developed, were still under review and are subject to change as comments are received. 7.1. Sidewalk Evaluation Criteria The evaluation criteria for unfunded proposed sidewalks included six (6) categories as shown below: • Connectivity to the existing network • Proximity to a major activity center • Proximity to a shopping/retail center • Proximity to a bicycle/pedestrian crash that occurred within the last five years • Proximity to a school • Proximity to a transit stop Connectivity to the existing network was ranked in the following manner. If the proposed sidewalk connects to a current gap in the network (connects to the existing sidewalk on both ends), the proposed sidewalk receives a score of three (3). If the proposed sidewalk extends the existing network (connects to the existing sidewalk on one end) the proposed sidewalk receives a score of two (2). All other categories listed above (proximity to a major activity center, proximity to a shopping/retail center, proximity to a bicycle/pedestrian crash that occurred within the last five years, proximity to a school, and proximity to a transit stop) involve a ranking based off a buffer distance from a point on the Technical Memorandum No. 1 25 map. The closest buffer, ¼ of a mile, receives the h ighest score of three (3); ½ of a mile receives a ranking of two (2), and ¾ of a mile receives a score of one (1). If the proposed sidewalk segment is not within the buffer distance, a score of zero (0) is given. The maximum score possible for proposed sidewalks is 18. Sidewalk Network Plan Project Evaluation Criteria Category Criteria Score Connectivity Connectivity to the existing network Connects a current gap between existing sidewalks (connects to existing sidewalk on both ends) 3 Extends an existing sidewalk (connects to existing sidewalk on one end) 2 Major Destinations (Activity Centers) Proximity to a major activity center Within 1/4 mile 3 Within 1/2 mile 2 Within 3/4 mile 1 Beyond 3/4 mile 0 Major Destinations (Shopping/Retail) Proximity to a shopping/retail center Within 1/4 mile 3 Within 1/2 mile 2 Within 3/4 mile 1 Beyond 3/4 mile 0 Safety Proximity to a bike/ped crash within the last five years Within 1/4 mile 3 Within 1/2 mile 2 Within 3/4 mile 1 Beyond 3/4 mile 0 School Safety Proximity to a school Within 1/4 mile 3 Within 1/2 mile 2 Within 3/4 mile 1 Beyond 3/4 mile 0 Transit Proximity to a transit stop Within 1/4 mile 3 Within 1/2 mile 2 Within 3/4 mile 1 Beyond 3/4 mile 0 Maximum Score 18 points Technical Memorandum No. 1 26 Sidewalk segments with a ranking of 0-6 received a “Low” priority, sidewalk segments with a ranking of 7-12 received a “Medium” priority, and sidewalk segments with a ranking of 13-18 received a “High” priority ranking. The evaluation resulted in 25 sidewalk segments ranked as having a “High” priority, 85 sidewalk segments ranked as having a “Medium” priority, and 12 sidewalk segments ranked as having a “Low” priority. 7.2. Roadway Evaluation Criteria The evaluation criteria for roadway projects included five (5) categories as shown below: • Connectivity to the Existing Roadway Network • Funding Status • Project Status • Proximity to Evacuation Routes • Right-of-Way Availability Provided below are the descriptions of each roadway project evaluation criteria category. Connectivity involved the ranking of expansions of the existing roadway network. Roadway projects that w ould promote connectivity by expanding the existing roadway network received a score of one (1). If the project did not expand the existing roadway network, the project received a score of zero (0). Funding status involved projects that are currently listed in a Unified Planning Work Program (UPWP), the Transportation Improvement Program (TIP), or the Long-Range Transportation Plan (LRTP). If the proposed roadway project is funded through a UPWP or the TIP, the segment received a score of two (2), if the proposed roadway project is funded through the LRTP, the segment received a score of one (1), and if the project has not yet received funding, it received a score of zero (0). Project Status was used to rank projects based on engineering, design, or planning. Projects that are closer to construction received a higher ranking. The project phase of Engineering received a score of three (3); Design received a score of two (2); and if the project is in the planning phase, the project received a score of one (1). Roadway projects were also ranked based on their proximity to evacuation routes. Proposed roadway improvements that connect to existing evacuation routes received a score of one (1). If the proposed roadway project does not connect to an existing evacuation route, the project received a score of zero (0). The final category used to rank roadway projects was right-of-way availability. Parcel data was used to determine if additional Right-of-Way (ROW) acquisition would or would not be required for each roadway project. The parcel data used does not represent a legal survey and further analysis would be required for final determination if ROW acquisition would be required. If the project did not require additional ROW acquisition, per the parcel data, the project received a score of one (1) and if the project required ROW acquisition, per the parcel data, the project received a score of zero (0). The maximum possible score for proposed roadway projects is 8. Technical Memorandum No. 1 27 Roadway Projects Evaluation Criteria Category Criteria Score Connectivity Project expands existing roadway network and promotes increased connectivity 1 Project does not further connectivity of the roadway network 0 Funding Project is funded in UPWP or TIP 2 Project is funded within the LRTP (Cost Feasible Element) 1 No funding allocated 0 Project Status Engineering 3 Design 2 Planning 1 Evacuation Route Connects to an existing evacuation route 1 No connection to an existing evacuation route 0 Right-of-Way (ROW) Project has ROW available and does not require additional acquisition 1 Project has no ROW available and requires additional acquisition 0 Maximum Score 8 points Roadway segments with a ranking of 0-2 received a “Low” priority, roadway segments with a ranking of 3-5 received a “Medium” priority, and roadway segments with a ranking of 6-8 received a “High” priority. The evaluation resulted in zero (0) roadway segments ranked as having a “High” priority, 10 roadway segments ranked as having a “Medium” priority, and 16 roadway segments ranked as having a “Low” priority. These draft criteria have been applied to the list of projects developed as a result of reviewing previous studies, meetings with the stakeholder group and discussions with community leaders. The draft results are included in the appendix. Technical Memorandum No. 1 28 8. Next Steps The next steps in this effort will include refinement of the evaluation matrix for the projects and scoring the projects to determine an initial ranking. This will be shared with the stakeholders and once accepted will be finalized. Development of the final report will be the final step in this process with a draft being presented in January 2023. APPENDIX Stakeholder Kick-Off Meeting Agenda A-1 IMMOKALEE TRANSPORTATION NETWORK PLAN KICKOFF MEETING MAY 6, 2022, 10:00 AM AGENDA 1. INTRODUCTIONS 2. PROJECT GOALS AND OBJECTIVES a. Defining mobility b. What is multi-modal transportation c. Defining connectivity d. Assuring equitable access to public transportation (CAT) e. Transit demand response services (CATConnect) f. Private Transit g. Bicycle, pedestrian facilities h. Handicap accessibility i. Uber, Lyft, Taxis, and others j. Immokalee Airport 3. SCHEDULE a. Kickoff Meeting b. Stakeholder Advisory Group (SAG) Charrette/Workshop c. SAG Follow-Up Meeting d. SAG Final Meeting 4. CONFIRM CRITICAL DATA/ISSUES THAT WILL INFLUENCE PLAN DEVELOPMENT a. Demographic data b. Traffic counts c. Crash data d. FDOT Context Sensitive Complete Streets. e. City streets and roadway base map needs f. Existing sidewalks and bike lanes g. Handicap access facilities h. Transit route map(s) i. Access management j. Unpaved streets 5. PRELIMINARY LITERATURE REVIEW 6. VERIFICATION OF CONTACT LIST 7. APPROACH TO PUBLIC INPUT AND OUTREACH 8. OPEN DISCUSSION Stakeholder Kick-Off Meeting Sign-In Sheet (Virtual Meeting) Meeting Summary Total Number of Participants 11 Meeting Title Immokalee Transportation Plan Kick Off Meeting Start Time 3/1/2022, 2:26:54 PM Meeting End Time 3/1/2022, 3:21:30 PM Meeting Id cbaa7d21-7123-46d1-bdcb-4d921681506d Full Name Join Time Leave Time Duration Email Haight, David M 3/1/2022, 2:26:54 PM 3/1/2022, 3:21:30 PM 54m 36s David.Haight@atkinsglobal.com Bowers, Wiatt F 3/1/2022, 2:27:10 PM 3/1/2022, 3:18:51 PM 51m 41s Wiatt.Bowers@atkinsglobal.com Page, Wiley C 3/1/2022, 2:27:21 PM 3/1/2022, 2:58:24 PM 31m 3s Wiley.Page@atkinsglobal.com McLaughlin, Anne 3/1/2022, 2:29:25 PM 3/1/2022, 3:21:22 PM 51m 56s Anne.McLaughlin@colliercountyfl.gov Lantz, Lorraine 3/1/2022, 2:29:30 PM 3/1/2022, 3:21:22 PM 51m 51s Lorraine.Lantz@colliercountyfl.gov Dowling, David 3/1/2022, 2:29:31 PM 3/1/2022, 3:21:22 PM 51m 51s David.Dowling@atkinsglobal.com Showalter, Alexander 3/1/2022, 2:30:20 PM 3/1/2022, 3:21:25 PM 51m 4s Alexander.Showalter@colliercountyfl.gov Tisch, Michael 3/1/2022, 2:34:46 PM 3/1/2022, 3:21:28 PM 46m 42s Michael.Tisch@colliercountyfl.gov Chrisitie Betancourt 3/1/2022, 2:35:29 PM 3/1/2022, 3:21:20 PM 45m 51s Deleon Omar 3/1/2022, 2:37:06 PM 3/1/2022, 3:21:21 PM 44m 15s Omar.Deleon@colliercountyfl.gov Debrah Forester 3/1/2022, 3:01:24 PM 3/1/2022, 3:21:22 PM 19m 57s Stakeholder Meeting Number 2 Agenda B-1 IMMOKALEE TRANSPORTATION NETWORK PLAN STAKEHOLDER MEETING JULY 22, 2022 AGENDA 1. INTRODUCTIONS 2. OVERVIEW OF PROJECT 3. REVIEW OF WORK EFFORT TO DATE 4. SCHEDULE a. Kickoff Meeting b. Stakeholder Advisory Group (SAG) Charrette/Workshop c. SAG Follow-Up Meeting d. SAG Final Meeting 5. EXPLANATION OF WORKSHOP ACTIVITIES a. Proposed Sidewalk Improvements b. Proposed Roadway Improvements 6. BREAKOUT SESSION 7. SUMMARY OF COMMENTS 8. NEXT STEPS Stakeholder Meeting Number 2 Sign-In Sheet C-1 Sidewalk Project List D-1 Sidewalk Project List D-2 Sidewalk Project List D-3 Sidewalk Project List D-4 Sidewalk Project List D-5 Roadway Project List D-6