Agenda 12/12/2023 Item #16C 7 (After the fact payment to Allied Universal Corporation)12/12/2023
EXECUTIVE SUMMARY
Recommendation to approve an after-the-fact payment in the total amount of $10,901.37 to Allied Universal
Corporation for the purchase of a chemical necessary for the South Water Plant, which was erroneously
acquired from the secondary vendor under Agreement No. 21-7921, the Countywide Chemicals contract,
instead of the low bid primary vendor.
OBJECTIVE: To approve an after-the-fact payment for the purchase of a chemical necessary for the South Water
Plant production from the secondary vendor, Allied Universal Corporation (“Allied Universal”), in the total amount
of $10,901.37, instead of from the low bid primary vendor under Agreement No. 21 -7921, the Countywide
Chemicals contract.
CONSIDERATIONS: The Board approved Agreement No. 21-7921 (the “Agreement”) for Countywide
Chemicals on February 2, 2022 (Agenda Item 16.C.1), which allows for price modifications effective on March 1st
and September 1st on a semi-annual basis. The lowest bidder from the pool of contractors is determined by
Procurement Services Division to be the primary for that period.
On September 1, 2023, the primary vendor for 50% Sodium Hydroxide (Caustic Reg 50%) changed from Allied
Universal to Brenntag Mid-South, Inc. (“Brenntag”). After September 1, 2023, the South Water Plant staff
continued to order chemicals from the secondary vendor, Allied Universal, when it should have ordered the
chemical from Brenntag.
Per the modified pricing as of September 1, 2023, the unit price per ton from Allied Universal is $862 .45 and the
order placed by staff for 12.64 Dry tons totaled $10,901.37. Had the correct primary vendor (Brenntag) been used
to purchase the chemical, the total price for that same amount of product would have been $9,581.12 (based on unit
price of $758.00), which is $1,320.25 less.
Staff is requesting the after-the-fact approval of invoice I2887199 in the amount of $10,901.37 because it
inadvertently authorized the purchase of a chemical that did not follow the Agreement. The Water Division staff
has confirmed that the chemicals have been received, used, and the delivery was accepted as satisfactory.
FISCAL IMPACT: Funds in the amount of $10,901.37 are available to be paid from the Water/Sewer
Operating fund (4008) in the South Water Plant cost center (253211).
GROWTH MANAGEMENT IMPACT: No growth management impacts are associated with this action.
LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for
Board approval. -SRT
RECOMMENDATION: To approve an after-the-fact payment in the total amount of $10,901.37 to Allied
Universal Corporation for the purchase of a chemical necessary for the South Water Plant, which was erroneously
acquired from the secondary vendor under Agreement No. 21-7921, the Countywide Chemicals contract, instead of
the low bid primary vendor.
Prepared by: Howard Brogdon, Director, Water and
Megan Gaillard, Division Director, Corporate Compliance and Continuous Improvement
ATTACHMENT(S)
1. Allied Universal ATF form (PDF)
2. Allied Invoice # I2887199 9-14-2023 for $10,901.37 (PDF)
3. Contract 21-7921 bid tab Sept 1, 2023 (PDF)
4. 21-7921Contract_Allied (PDF)
16.C.7
Packet Pg. 1952
12/12/2023
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.C.7
Doc ID: 27280
Item Summary: Recommendation to approve an after-the-fact payment in the total amount of $10,901.37 to
Allied Universal Corporation for the purchase of a chemical necessary for the South Water Plant, which was
erroneously acquired from the secondary vendor under Agreement No. 21-7921, the Countywide Chemicals
contract, instead of the low bid primary vendor.
Meeting Date: 12/12/2023
Prepared by:
Title: Plant Manager – Water
Name: Howard Brogdon
11/15/2023 3:20 PM
Submitted by:
Title: Plant Manager – Water
Name: Howard Brogdon
11/15/2023 3:20 PM
Approved By:
Review:
Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 11/16/2023 1:24 PM
Public Utilities Operations Support Katrina Lin Additional Reviewer Completed 11/16/2023 3:20 PM
Public Utilities Department Mary Linhard Level 1 Department Review Completed 11/17/2023 11:57 AM
Procurement Services Sandra Herrera Level 1 Purchasing Gatekeeper Completed 11/21/2023 2:40 PM
Procurement Services Sandra Herrera Procurement Director Review Completed 11/21/2023 2:42 PM
County Attorney's Office Scott Teach Level 2 Attorney Review Completed 11/22/2023 11:51 AM
Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 11/27/2023 2:08 PM
Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 11/27/2023 2:21 PM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 11/27/2023 3:22 PM
Corporate Compliance and Continuous Improvement Megan Gaillard Additional Reviewer Completed
11/28/2023 7:51 AM
Office of Management and Budget Laura Zautcke Additional Reviewer Completed 11/30/2023 9:56 AM
County Manager's Office Dan Rodriguez Level 4 County Manager Review Completed 12/04/2023 7:57 PM
Board of County Commissioners Geoffrey Willig Meeting Pending 12/12/2023 9:00 AM
16.C.7
Packet Pg. 1953
After the Fact Form
Revised 06/17/2021
Instructions
As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement
Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or
contract terms, an After-the-Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order,
when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and
services not covered by the current contract or purchase order. All such “After the Fact Procurements” will be reported to the
County Manager.
Requester Name: Division:
Division Director: Vendor Name:
Amount: Contract #: Purchase Order:
Why is this deemed a non-compliant purchase? Choose one.
Contract Ordinance Manual P-Card Other
Details of Purchase: Explain the circumstances behind this purchase.
Action Required: What are you asking to be done to remedy the situation, include list of invoices if applicable?
Corrective/Preventive Action: What action is being taken to prevent this violation from re-occurring?
The requestor affirms that to the best of their knowledge the information provided in this document is true.
Requested by: Signature: Date:
Division Director: Signature: Date:
16.C.7.a
Packet Pg. 1954 Attachment: Allied Universal ATF form (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
INVOICE
Invoice Date:9/14/2023
Invoice No:I2887199
Order Date:9/6/2023
Ship Date:9/7/2023
Customer ID:122289000 015
Salesperson:TYRONE ELIAS
__________
__________
BILL TO:
COLLIER CTY UTILITY
3299 TAMIAMI TRAIL EAST
SUITE #700
NAPLES FL 34112
SHIP TO:
SCRWTP
Attn: TIM JAMES
3851 City Gate DR
NAPLES FL 34117
F.O.B. POINT CUSTOMER ORDER #SHIP VIA TERMS DELIVERY TICKET #
4500199238 4500220597 TSU NET 30 DAYS O3105603
SITE 02 ALLIED UNIVERSAL (MEDLEY)ORDERED BY:
PART NUMBER QTY ORDERED UNITS QTY SHIPPED QTY BO PRICE DISC %EXT. PRICE
2201 12.640 DTON 12.640 0.000 862.450 0.00 10,901.37
CAUSTIC "REG" 50%/ DRY TON
91467 1.000 EACH 1.000 0.000 0.000 0.00 0.00
FUEL SURCHARGE
REMIT TO Allied Universal Corporation
3901 N.W. 115th Avenue
Miami, FL, 33178
Phone: (305) 888-2623
Fax: (305) 885-4671
EIN: 59-0776285
Sales Total:10,901.37
Tax Total:0.00
3105603 TOTAL 10,901.37
Page: 1 of 1
16.C.7.a
Packet Pg. 1955 Attachment: Allied Universal ATF form (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
INVOICE
Invoice Date:9/14/2023
Invoice No:I2887199
Order Date:9/6/2023
Ship Date:9/7/2023
Customer ID:122289000 015
Salesperson:TYRONE ELIAS
__________
__________
BILL TO:
COLLIER CTY UTILITY
3299 TAMIAMI TRAIL EAST
SUITE #700
NAPLES FL 34112
SHIP TO:
SCRWTP
Attn: TIM JAMES
3851 City Gate DR
NAPLES FL 34117
F.O.B. POINT CUSTOMER ORDER #SHIP VIA TERMS DELIVERY TICKET #
4500199238 4500220597 TSU NET 30 DAYS O3105603
SITE 02 ALLIED UNIVERSAL (MEDLEY)ORDERED BY:
PART NUMBER QTY ORDERED UNITS QTY SHIPPED QTY BO PRICE DISC %EXT. PRICE
2201 12.640 DTON 12.640 0.000 862.450 0.00 10,901.37
CAUSTIC "REG" 50%/ DRY TON
91467 1.000 EACH 1.000 0.000 0.000 0.00 0.00
FUEL SURCHARGE
REMIT TO Allied Universal Corporation
3901 N.W. 115th Avenue
Miami, FL, 33178
Phone: (305) 888-2623
Fax: (305) 885-4671
EIN: 59-0776285
Sales Total:10,901.37
Tax Total:0.00
3105603 TOTAL 10,901.37
Page: 1 of 1
16.C.7.b
Packet Pg. 1956 Attachment: Allied Invoice # I2887199 9-14-2023 for $10,901.37 (27280 : Recommendation to approve an after-the-fact payment to Allied
Item Product Description Unit of
Measure Rank Vendor Cost
1 W-1 Ammonia lbs Primary Airgas Specialty $1.3800
1 W-1 Ammonia lbs Secondary Tanner Industries No Bid
1 W-1 Ammonia lbs Tiertary No Bid -
2 W-2 Carbon Dioxide ton Primary Matheson $336.6000
2 W-2 Carbon Dioxide ton Secondary No Bid -
2 W-2 Carbon Dioxide ton Tiertary No Bid -
3 W-3 Chlorine lbs Primary Brenntag $0.8695
3 W-3 Chlorine lbs Secondary Allied Universal $0.9750
3 W-3 Chlorine lbs Tiertary No Bid -
4 W-4 Corrosion Inhibitor (ortho-polyphosphate) 80-
20 lbs Primary Chemrite $0.7830
4 W-4 Corrosion Inhibitor (ortho-polyphosphate) 80-
20 lbs Secondary Carus $0.9300
4 W-4 Corrosion Inhibitor (ortho-polyphosphate) 80-
20 lbs Tiertary American Water $1.0800
5 W-5 Fluoride (Sodium Fluorsilicate)lbs Primary Chemrite $1.8600
5 W-5 Fluoride (Sodium Fluorsilicate)lbs Secondary No Bid
5 W-5 Fluoride (Sodium Fluorsilicate)lbs Tiertary No Bid
6 W-6 Lime lbs Primary No Bid
6 W-6 Lime lbs Secondary No Bid
6 W-6 Lime lbs Tiertary No Bid
7 W-7 Liquid PO4 lbs Primary Carus $1.2100
7 W-7 Liquid PO4 lbs Secondary Chemrite $1.2900
7 W-7 Liquid PO4 lbs Tiertary No Bid
8 W-8 Muriatic Acid lbs Primary Allied Universal $0.3480
8 W-8 Muriatic Acid lbs Secondary Harcros $0.3675
8 W-8 Muriatic Acid lbs Tiertary No Bid
9 W-9 Scale Inhibitor lbs Primary American Water $1.2400
9 W-9 Scale Inhibitor lbs Secondary No Bid -
9 W-9 Scale Inhibitor lbs Tiertary No Bid -
10 W-10 Sludge Polymer lbs Primary Polydyne $2.3000
10 W-10 Sludge Polymer lbs Secondary No Bid -
10 W-10 Sludge Polymer lbs Tiertary No Bid -
11 W-11 50% Sodium Hydroxide dry tons Primary Brenntag $758.00
11 W-11 50% Sodium Hydroxide dry tons Secondary Allied Universal $862.45
11 W-11 50% Sodium Hydroxide dry tons Tiertary Harcros $940.00
12 W-12 Sulfuric Acid lbs Primary Shrieve Chemical $0.09725
12 W-12 Sulfuric Acid lbs Secondary Sulphuric Acid $0.14225
12 W-12 Sulfuric Acid lbs Tiertary No Bid
13 W-13 Polymer lbs Primary Polydyne $2.3000
13 W-13 Polymer lbs Secondary No Bid -
13 W-13 Polymer lbs Tiertary No Bid
14 WW-1 Emulsion Polymer lbs Primary Polydyne $1.8500
14 WW-1 Emulsion Polymer lbs Secondary No Bid -
14 WW-1 Emulsion Polymer lbs Tiertary No Bid
15 WW-3 25% Sodium Hydroxide Solution gal Primary Harcos $1.5500
15 WW-3 25% Sodium Hydroxide Solution gal Secondary Allied Universal $1.7000
15 WW-3 25% Sodium Hydroxide Solution gal Tiertary Odyssey $1.9500
16 W/WW-1 Calcium Hypochlorite lbs Primary Brenntag $1.9310
16 W/WW-1 Calcium Hypochlorite lbs Secondary Chemrite $2.1500
16 W/WW-1 Calcium Hypochlorite lbs Tiertary Harcros $2.3900
17 W/WW-2 Sodium Hypochlorite gal Primary Allied Universal $1.3600
17 W/WW-2 Sodium Hypochlorite gal Secondary Odyssey $1.5500
17 W/WW-2 Sodium Hypochlorite gal Tiertary No Bid
18 PR-2 Sodium Bicarbonate lbs Primary Brenntag $0.4687
18 PR-2 Sodium Bicarbonate lbs Secondary Harcros $0.6000
18 PR-2 Sodium Bicarbonate lbs Tiertary No Bid
19 PR-3 Muriatic Acid gal Primary Brenntag $3.4900
19 PR-3 Muriatic Acid gal Secondary Harcros $3.5300
19 PR-3 Muriatic Acid gal Tiertary Odyssey $7.9500
20 PR-5 Calcium Chloride lbs Primary Harcros $0.4900
20 PR-5 Calcium Chloride lbs Secondary Brenntag $0.6400
20 PR-5 Calcium Chloride lbs Tiertary No Bid
21 PR-6 Cal-Hypo (100% Chlorine)lbs Primary Brenntag $1.9310
21 PR-6 Cal-Hypo (100% Chlorine)lbs Secondary Chemrite $2.1500
21 PR-6 Cal-Hypo (100% Chlorine)lbs Tiertary Harcros $2.3900
22 PR-8 Soda Ash lbs Primary Brenntag $0.4700
22 PR-8 Soda Ash lbs Secondary No Bid
22 PR-8 Soda Ash lbs Tiertary No Bid
23 PR-9 Chlorine Tablets lbs Primary Brenntag $3.0000
23 PR-9 Chlorine Tablets lbs Secondary No Bid
23 PR-9 Chlorine Tablets lbs Tiertary No Bid
21-7921 Countywide Chemicals effective September 1, 2023
16.C.7.c
Packet Pg. 1957 Attachment: Contract 21-7921 bid tab Sept 1, 2023 (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
FIXED TERM SERVICE MULTI-CONTRACTOR AWARD AGREEMENT
21-7921
for
COUNTYWIDE CHEMICALS
THIS AGREEMENT, made and entered into on this day of Fe10r001r 2022 ,
by and between Allied Universal Corp.
authorized to do business in the State of Florida, whose business address is
3901 NW 115 Avenue, Miami, FL 33178 the "Contractor")
and Collier County, a political subdivision of the State of Florida, (the "County"):
WITNESS ETH:
1. AGREEMENT TERM. The Agreement shall be for a three 3 ) year period,
commencing I or I I on March 1, 2022 and
terminating on three ( 3 ) year(s) from that date or until all outstanding Purchase
Order(s) issued prior to the expiration of the Agreement period have been completed or
terminated.
The County may, at its discretion and with the consent of the Contractor, renew the
Agreement under all of the terms and conditions contained in this Agreement for
two 2 ) additional one 1 ) year(s) periods. The County shall give the
Contractor written notice of the County's intention to renew the Agreement term prior to
the end of the Agreement term then in effect.
The County Manager, or his designee, may, at his discretion, extend the Agreement
under all of the terms and conditions contained in this Agreement for up to one hundred
and eighty (180) days. The County Manager, or his designee, shall give the Contractor
written notice of the County's intention to extend the Agreement term prior to the end of
the Agreement term then in effect.
2. COMMENCEMENT OF SERVICES. The Contractor shall commence the work upon
issuance of a Purchase Order
3. STATEMENT OF WORK. The Contractor shall provide services in accordance with the
terms and conditions of Invitation to Bid (ITB)
thcr 4# 21-7921
including all Attachment(s), Exhibit(s) and Addenda and the Contractor's proposal
referred to herein and made an integral part of this Agreement.
The Contractor shall also provide services in accordance with Exhibit A — Scope of
Services attached hereto.
Page 1 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.1
16.C.7.d
Packet Pg. 1958 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
3.1 This Agreement contains the entire understanding between the parties and any
modifications to this Agreement shall be mutually agreed upon in writing by the Parties,
in compliance with the County's Procurement Ordinance, as amended, and Procurement
Procedures in effect at the time such services are authorized.
3.2 110 The procedure for obtaining Work under this Agreement is outlined in Exhibit A —
Scope of Services attached hereto.
ID n OtieF
Exhibit/Attachment:
2r4
4. THE AGREEMENT SUM. The County shall pay the Contractor for the performance of
this Agreement based on Exhibit B- Fee Schedule, attached hereto and the price
methodology as defined in Section 4.1. Payment will be made upon receipt of a proper
invoice and upon approval by the County's Contract Administrative Agent/Project
Manager, and in compliance with Chapter 218, Fla. Stats., otherwise known as the "Local
Government Prompt Payment Act".
4.1 Price Methodology (as selected below):
hump c,&m iFixed P—raec : A firm fixed tE3
tr
satisfaction of the County's project manager before payment for the fixed price contract
is authorized.
n
of hours worked and billing rate by position (and not company (or subcontractor)
documentation for the project.
Unit Price: The County agrees to pay a firm total fixed price (inclusive of all costs,
including labor, materials, equipment, overhead, etc.) for a repetitive product or service
delivered (i.e. installation price per ton, delivery price per package or carton, etc.). The
invoice must identify the unit price and the number of units received (no contractor
inventory or cost verification).
Page 2 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.I
An
16.C.7.d
Packet Pg. 1959 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
4.2 Any County agency may obtain services under this Agreement, provided
sufficient funds are included in their budget(s).
4.3 Payments will be made for services furnished, delivered, and accepted, upon
receipt and approval of invoices submitted on the date of services or within six (6) months
after completion of the Agreement. Any untimely submission of invoices beyond the
specified deadline period is subject to non-payment under the legal doctrine of "lashes"
as untimely submitted. Time shall be deemed of the essence with respect to the timely
submission of invoices under this Agreement.
4.3 The County, or any duly authorized agents or representatives of the County, shall
have the right to conduct an audit of Contractor's books and records to verify the accuracy
of the Contractor's claim with respect to Contractor's costs associated with any Payment
Application, Change Order, or Work Directive Change.
4-5 n Travel and
Reimbursable Expenses must be approved in advance in writing by the County. Travel
expenses shall be reimbursed as per Section 112.061 Fla. Stats.
Reimbursements shall be at the following rates:
Mileage 0.44.5 per mile
Rfeakfa-st 6700
tuff&14-700
l+ r er 4-9 0.0
A+ffare
ee as.s-fare
Ra4-14
Taxi or Airport Limousine Actual cost of cithcr taxi or airport limousine
long distance charges, fax charges, photocopying charges and postage. Reimbursable
items will be paid only after Contractor has provided all receipts. Contractor shall be
undertaken pursuant to this Agreement.
5. SALES TAX. Contractor shall pay all sales, consumer, use and other similar taxes
associated with the Work or portions thereof, which are applicable during the performance
of the Work. Collier County, Florida as a political subdivision of the State of Florida, is
exempt from the payment of Florida sales tax to its vendors under Chapter 212, Florida
Statutes, Certificate of Exemption # 85-8015966531C.
Page 3 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.t
S
16.C.7.d
Packet Pg. 1960 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
6. NOTICES. All notices from the County to the Contractor shall be deemed duly served if
mailed or emailed to the Contractor at the following:
Company Name:Allied Universal Corp.
Address: 3901 NW 115 Avenue
Miami, FL 33178
Authorized Agent:
Attention Name & Title: Cristhianne Munguia
Telephone:305) 888-2623
E-Mail(s): Bids@allieduniversal.com
All Notices from the Contractor to the County shall be deemed duly served if mailed or
emailed to the County to:
Board of County Commissioners for Collier County, Florida
Division Director: Steve Messner
Division Name: Water Division
Address: 3339 Tamiami Trail East, Suite 303
Naples, FL 34112
Administrative Agent/PM: Howard Brogdon, Plant Manager
Telephone: 239) 252-5252
E-Mail(s): Howard.Brogdon@colliercountyfl.gov
The Contractor and the County may change the above mailing address at any time upon
giving the other party written notification. All notices under this Agreement must be in
writing.
7. NO PARTNERSHIP. Nothing herein contained shall create or be construed as creating a
partnership between the County and the Contractor or to constitute the Contractor as an
agent of the County.
8. PERMITS: LICENSES: TAXES. In compliance with Section 218.80, F.S., all permits
necessary for the prosecution of the Work shall be obtained by the Contractor. The County
will not be obligated to pay for any permits obtained by Subcontractors.
Payment for all such permits issued by the County shall be processed internally by the
County. All non-County permits necessary for the prosecution of the Work shall be
procured and paid for by the Contractor. The Contractor shall also be solely responsible
for payment of any and all taxes levied on the Contractor. In addition, the Contractor shall
comply with all rules, regulations and laws of Collier County, the State of Florida, or the
U. S. Government now in force or hereafter adopted. The Contractor agrees to comply
with all laws governing the responsibility of an employer with respect to persons employed
by the Contractor.
Page 4 of 17
Fixed Tenn Service Multi-Contractor Agreement 2022_Ver.1
Ll"0
16.C.7.d
Packet Pg. 1961 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
9. NO IMPROPER USE. The Contractor will not use, nor suffer or permit any person to use
in any manner whatsoever, County facilities for any improper, immoral or offensive
purpose, or for any purpose in violation of any federal, state, county or municipal
ordinance, rule, order or regulation, or of any governmental rule or regulation now in effect
or hereafter enacted or adopted. In the event of such violation by the Contractor or if the
County or its authorized representative shall deem any conduct on the part of the
Contractor to be objectionable or improper, the County shall have the right to suspend the
Agreement of the Contractor. Should the Contractor fail to correct any such violation,
conduct, or practice to the satisfaction of the County within twenty-four (24) hours after
receiving notice of such violation, conduct, or practice, such suspension to continue until
the violation is cured. The Contractor further agrees not to commence operation during
the suspension period until the violation has been corrected to the satisfaction of the
County.
10. TERMINATION. Should the Contractor be found to have failed to perform his services in
a manner satisfactory to the County as per this Agreement, the County may terminate
said Agreement for cause; further the County may terminate this Agreement for
convenience with a thirty (30) day written notice. The County shall be the sole judge of
non-performance.
In the event that the County terminates this Agreement, Contractor's recovery against the
County shall be limited to that portion of the Agreement Amount earned through the date
of termination. The Contractor shall not be entitled to any other or further recovery against
the County, including, but not limited to, any damages or any anticipated profit on portions
of the services not performed.
11. NO DISCRIMINATION. The Contractor agrees that there shall be no discrimination as to
race, sex, color, creed or national origin.
12. INSURANCE. The Contractor shall provide insurance as follows:
A. • Commercial General Liability: Coverage shall have minimum limits of
1,000,000 Per Occurrence, $2,000,000 aggregate for Bodily Injury Liability
and Property Damage Liability. This shall include Premises and Operations; Independent
Contractors; Products and Completed Operations and Contractual Liability.
B. Business Auto Liability: Coverage shall have minimum limits of$ 1,000,000
Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage
Liability. This shall include: Owned Vehicles, Hired and Non-Owned Vehicles and
Employee Non-Ownership.
C. Workers' Compensation: Insurance covering all employees meeting Statutory
Limits in compliance with the applicable state and federal laws.
The coverage must include Employers' Liability with a minimum limit of$ 1,000,000
for each accident.
Page 5 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.I
16.C.7.d
Packet Pg. 1962 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
I
Agreement. Contractor waivcs its right of rccovcry against County as to any claims under
claim and aggregate.
F. • Pollution Coverage
shall have minimum limits of$ 1,000,000 per Occurrence.
Coverage
e- 4Rimum limits of$ per claim.
I I Go erage
Special Requirements: Collier County Board of County Commissioners, OR, Board of
County Commissioners in Collier County, OR, Collier County Government shall be listed
as the Certificate Holder and included as an "Additional Insured" on the Insurance
Certificate for Commercial General Liability where required. This insurance shall be
primary and non-contributory with respect to any other insurance maintained by, or
available for the benefit of, the Additional Insured and the Contractor's policy shall be
endorsed accordingly.
Current, valid insurance policies meeting the requirement herein identified shall be
maintained by Contractor during the duration of this Agreement. The Contractor shall
provide County with certificates of insurance meeting the required insurance provisions.
Renewal certificates shall be sent to the County thirty (30) days prior to any expiration
date. Coverage afforded under the policies will not be canceled or allowed to expire until
the greater of: thirty (30) days prior written notice, or in accordance with policy provisions.
Contractor shall also notify County, in a like manner, within twenty-four (24) hours after
receipt, of any notices of expiration, cancellation, non-renewal or material change in
coverage or limits received by Contractor from its insurer, and nothing contained herein
shall relieve Contractor of this requirement to provide notice.
Contractor shall ensure that all subcontractors comply with the same insurance
requirements that the Contractor is required to meet.
13. INDEMNIFICATION. To the maximum extent permitted by Florida law, the Contractor
shall defend, indemnify and hold harmless Collier County, its officers and employees from
any and all liabilities, damages, losses and costs, including, but not limited to, reasonable
attorneys' fees and paralegals' fees, whether resulting from any claimed breach of this
Agreement by Contractor, any statutory or regulatory violations, or from personal injury,
property damage, direct or consequential damages, or economic loss, to the extent
caused by the negligence, recklessness, or intentionally wrongful conduct of the
Contractor or anyone employed or utilized by the Contractor in the performance of this
Page 6 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.1
16.C.7.d
Packet Pg. 1963 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
Agreement. This indemnification obligation shall not be construed to negate, abridge or
reduce any other rights or remedies which otherwise may be available to an indemnified
party or person described in this paragraph.
This section does not pertain to any incident arising from the sole negligence of Collier
County.
13.1 The duty to defend under this Article 13 is independent and separate from the duty to
indemnify, and the duty to defend exists regardless of any ultimate liability of the Contractor,
County and any indemnified party. The duty to defend arises immediately upon
presentation of a claim by any party and written notice of such claim being provided to
Contractor. Contractor's obligation to indemnify and defend under this Article 13 will survive
the expiration or earlier termination of this Agreement until it is determined by final judgment
that an action against the County or an indemnified party for the matter indemnified
hereunder is fully and finally barred by the applicable statute of limitations.
14. AGREEMENT ADMINISTRATION. This Agreement shall be administered on behalf of
the County by the Public Utilities Department Water Division
15. CONFLICT OF INTEREST. Contractor represents that it presently has no interest and
shall acquire no interest, either direct or indirect, which would conflict in any manner with
the performance of services required hereunder. Contractor further represents that no
persons having any such interest shall be employed to perform those services.
16. COMPONENT PARTS OF THIS AGREEMENT. This Agreement consists of the following
component parts, all of which are as fully a part of the Agreement as if herein set out
verbatim: Contractor's Proposal, Insurance Certificate(s), Exhibit A Scope of Services,
Exhibit B Fee Schedule, RF-P/ n ITB/n Other
21-7921 , including Exhibits, Attachments and Addenda/Addendum, n subsequent
quotes, and Other Exhibit/Attachment:
17. APPLICABILITY. Sections corresponding to any checked box ( ) expressly apply to
the terms of this Agreement.
18. SUBJECT TO APPROPRIATION. It is further understood and agreed by and between
the parties herein that this Agreement is subject to appropriation by the Board of County
Commissioners.
19. PROHIBITION OF GIFTS TO COUNTY EMPLOYEES. No organization or individual
shall offer or give, either directly or indirectly, any favor, gift, loan, fee, service or other
item of value to any County employee, as set forth in Chapter 112, Part III, Florida
Statutes, Collier County Ethics Ordinance No. 2004-05, as amended, and County
Administrative Procedure 5311. Violation of this provision may result in one or more of
the following consequences: a. Prohibition by the individual, firm, and/or any employee of
the firm from contact with County staff for a specified period of time; b. Prohibition by the
individual and/or firm from doing business with the County for a specified period of time,
Page 7 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.l
0
16.C.7.d
Packet Pg. 1964 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
including but not limited to: submitting bids, RFP, and/or quotes; and, c. immediate
termination of any Agreement held by the individual and/or firm for cause.
20. COMPLIANCE WITH LAWS. By executing and entering into this Agreement, the
Contractor is formally acknowledging without exception or stipulation that it agrees to
comply, at its own expense, with all federal, state and local laws, codes, statutes,
ordinances, rules, regulations and requirements applicable to this Agreement, including
but not limited to those dealing with the Immigration Reform and Control Act of 1986 as
located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be
amended; taxation, workers' compensation, equal employment and safety including, but
not limited to, the Trench Safety Act, Chapter 553, Florida Statutes, and the Florida Public
Records Law Chapter 119, if applicable, including specifically those contractual
requirements at F.S. § 119.0701(2)(a)-(b) as stated as follows:
IF THE CONTRACTOR HAS QUESTIONS REGARDING THE
APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE
CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO
THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS
AT:
Communications, Government and Public Affairs Division
3299 Tamiami Trail East, Suite 102
Naples, FL 34112-5746
Telephone: (239) 252-8999
Email: PublicRecordRequest(a colliercountvfl. Gov
The Contractor must specifically comply with the Florida Public Records Law to:
1. Keep and maintain public records required by the public agency to perform the
service.
2. Upon request from the public agency's custodian of public records, provide the
public agency with a copy of the requested records or allow the records to be
inspected or copied within a reasonable time at a cost that does not exceed the
cost provided in this chapter or as otherwise provided by law.
3. Ensure that public records that are exempt or confidential and exempt from public
records disclosure requirements are not disclosed except as authorized by law
for the duration of the contract term and following completion of the contract if the
Contractor does not transfer the records to the public agency.
4. Upon completion of the contract, transfer, at no cost, to the public agency all
public records in possession of the Contractor or keep and maintain public
records required by the public agency to perform the service. If the Contractor
transfers all public records to the public agency upon completion of the contract,
the Contractor shall destroy any duplicate public records that are exempt or
confidential and exempt from public records disclosure requirements. If the
Contractor keeps and maintains public records upon completion of the contract,
the Contractor shall meet all applicable requirements for retaining public records.
Page 8of17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.1
QD
16.C.7.d
Packet Pg. 1965 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
All records stored electronically must be provided to the public agency, upon
request from the public agency's custodian of public records, in a format that is
compatible with the information technology systems of the public agency.
If Contractor observes that the Contract Documents are at variance therewith, it shall
promptly notify the County in writing. Failure by the Contractor to comply with the laws
referenced herein shall constitute a breach of this Agreement and the County shall have
the discretion to unilaterally terminate this Agreement immediately.
21. OFFER EXTENDED TO OTHER GOVERNMENTAL ENTITIES. Collier County
encourages and agrees to the successful Contractor extending the pricing, terms and
conditions of this solicitation or resultant Agreement to other governmental entities at the
discretion of the successful Contractor.
22. PAYMENTS WITHHELD. The County may decline to approve any application for
payment, or portions thereof, because of defective or incomplete work, subsequently
discovered evidence or subsequent inspections. The County may nullify the whole or any
part of any approval for payment previously issued and the County may withhold any
payments otherwise due to Contractor under this Agreement or any other Agreement
between the County and Contractor, to such extent as may be necessary in the County's
opinion to protect it from loss because of: (a) defective Work not remedied; (b) third party
claims failed or reasonable evidence indicating probable fling of such claims; (c) failure of
Contractor to make payment properly to subcontractors or for labor, materials or
equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance
of the Contract Amount; (e) reasonable indication that the Work will not be completed
within the Contract Time; (f) unsatisfactory prosecution of the Work by the Contractor; or
g) any other material breach of the Contract Documents.
If any conditions described above are not remedied or removed, the County may, after
three (3) days written notice, rectify the same at Contractor's expense. The County also
may offset against any sums due Contractor the amount of any liquidated or unliquidated
obligations of Contractor to the County, whether relating to or arising out of this Agreement
or any other Agreement between Contractor and the County.
23. n CLEAN UP. Contractor agrees to keep the Project site clean at all times of debris,
rubbish and waste materials arising out of the Work. At the completion of the Work,
Contractor shall remove all debris, rubbish and waste materials from and about the Project
site, as well as all tools, appliances, construction equipment and machinery and surplus
materials, and shall leave the Project site clean.
24. STANDARDS OF CONDUCT: PROJECT MANAGER, SUPERVISOR, EMPLOYEES.
The Contractor shall employ people to work on County projects who are neat, clean,
well-groomed and courteous. Subject to the American with Disabilities Act, Contractor
shall supply competent employees who are physically capable of performing their
employment duties. The County may require the Contractor to remove an employee it
deems careless, incompetent, insubordinate or otherwise objectionable and whose
continued employment on Collier County projects is not in the best interest of the County.
Page 9 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.l
16.C.7.d
Packet Pg. 1966 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
25. n T-Y-, Contractor expressly warrants that the goods, materials and/or
the purpose intended. Goods shall be delivered free from any security interest or other
lien, encumbrance or claim of any third party. Any services provided under this Agreement
Documents:.
warranties to which the County is entitled as a matter of law.
26.TESTS AND INSPECTIONS. If the Contract Documents or any codes, laws,
ordinances, rules or regulations of any public authority having jurisdiction over the Project
requires any portion of the Work to be specifically inspected, tested or approved,
Contractor shall assume full responsibility therefore, pay all costs in connection therewith
and furnish to the County the required certificates of inspection, testing or approval. All
inspections, tests or approvals shall be performed in a manner and by organizations
acceptable to the County.
27. PROTECTION OF WORK.
A. Contractor shall fully protect the Work from loss or damage and shall bear the cost
of any such loss or damage until final payment has been made. If Contractor or
anyone for whom Contractor is legally liable is responsible for any loss or damage
to the Work, or other work or materials of the County or County's separate
contractors, Contractor shall be charged with the same, and any monies necessary
to replace such loss or damage shall be deducted from any amounts due to
Contractor.
B. Contractor shall not load nor permit any part of any structure to be loaded in any
manner that will endanger the structure, nor shall Contractor subject any part of the
Work or adjacent property to stresses or pressures that will endanger it.
C. Contractor shall not disturb any benchmark established by the County with respect
to the Project. If Contractor, or its subcontractors, agents or anyone, for whom
Contractor is legally liable, disturbs the County's benchmarks, Contractor shall
immediately notify the County. The County shall re-establish the benchmarks and
Contractor shall be liable for all costs incurred by the County associated therewith.
Page 10 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.1
CAS)
16.C.7.d
Packet Pg. 1967 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
28. SUBMITTALS AND SUBSTITUTIONS. Any substitution of products/materials from
specifications shall be approved in writing by the County in advance.
29. CHANGES IN THE WORK. The County shall have the right at any time during the
progress of the Work to increase or decrease the Work. Promptly after being notified of a
change, Contractor shall submit an estimate of any cost or time increases or savings it
foresees as a result of the change. Except in an emergency endangering life or property,
or as expressly set forth herein, no addition or changes to the Work shall be made except
upon modification of the Purchase Order by the County, and the County shall not be liable
to the Contractor for any increased compensation without such modification. No officer,
employee or agent of the County is authorized to direct any extra or changed work orally.
Any modifications to this Agreement shall be in compliance with the County Procurement
Ordinance and Procedures in effect at the time such modifications are authorized.
30. AGREEMENT TERMS. If any portion of this Agreement is held to be void, invalid, or
otherwise unenforceable, in whole or in part, the remaining portion of this Agreement shall
remain in effect.
31. ADDITIONAL ITEMS/SERVICES. Additional items and/or services may be added to this
Agreement in compliance with the Procurement Ordinance, as amended, and
Procurement Procedures.
32. DISPUTE RESOLUTION. Prior to the initiation of any action or proceeding permitted by
this Agreement to resolve disputes between the parties, the parties shall make a good
faith effort to resolve any such disputes by negotiation. The negotiation shall be attended
by representatives of Contractor with full decision-making authority and by County's staff
person who would make the presentation of any settlement reached during negotiations
to County for approval. Failing resolution, and prior to the commencement of depositions
in any litigation between the parties arising out of this Agreement, the parties shall attempt
to resolve the dispute through Mediation before an agreed-upon Circuit Court Mediator
certified by the State of Florida. The mediation shall be attended by representatives of
Contractor with full decision-making authority and by County's staff person who would
make the presentation of any settlement reached at mediation to County's board for
approval. Should either party fail to submit to mediation as required hereunder, the other
party may obtain a court order requiring mediation under section 44.102, Fla. Stat.
33. VENUE. Any suit or action brought by either party to this Agreement against the other
party relating to or arising out of this Agreement must be brought in the appropriate federal
or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction
on all such matters.
34. n KEY PERSON .
Page 11 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.1
16.C.7.d
Packet Pg. 1968 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
The Contractor shall make commercially r• sonablc efforts to notify Collier County within
seven (7) days of the change. The County retains final approval of proposed replacement
per-s-ennei,
0 AGREEMENT STAFFING. The Contractor's personnel and management to be utilized
for this Agreement shall be knowledgeable in their areas of expertise. The County
reserves the right to perform investigations as may be deemed necessary to ensure that
competent persons will be utilized in the performance of the Agreement. The Contractor
shall assign as many people as necessary to complete required services on a timely basis,
and each person assigned shall be available for an amount of time adequate to meet
required services.
35. ORDER OF PRECEDENCE. In the event of any conflict between or among the terms
of any of the Contract Documents, the terms of solicitation the Contractor's Proposal,
and/or the County's Board approved Executive Summary, the Contract Documents shall
take precedence.
v ivC r1C D]QC`CI'1 A1/'`G /L^r+n CrrnrlLlr\ In +ho oron of rnr nnnflinf ho4erc.g,n_,(\K
e
precedence over the Agreement. To the extent any conflict in the terms of the Contract
upplemental Conditions, if any, or
obligation under the Contract Documents upon the Contractor at County's discretion.
36. ASSIGNMENT. Contractor shall not assign this Agreement or any part thereof, without
the prior consent in writing of the County. Any attempt to assign or otherwise transfer this
Agreement, or any part herein, without the County's consent, shall be void. If Contractor
does, with approval, assign this Agreement or any part thereof, it shall require that its
assignee be bound to it and to assume toward Contractor all of the obligations and
responsibilities that Contractor has assumed toward the County.
37. SECURITY. The Contractor is required to comply with County Ordinance 2004-52, as
amended. Background checks are valid for five (5) years and the Contractor shall be
responsible for all associated costs. If required, Contractor shall be responsible for the
costs of providing background checks by the Collier County Facilities Management
Division for all employees that shall provide services to the County under this Agreement.
This may include, but not be limited to, checking federal, state and local law enforcement
records, including a state and FBI fingerprint check, credit reports, education, residence
and employment verifications and other related records. Contractor shall be required to
maintain records on each employee and make them available to the County for at least
four(4) years. All of Contractor's employees and subcontractors must wear Collier County
Government Identification badges at all times while performing services on County
facilities and properties. Contractor ID badges are valid for one (1) year from the date of
issuance and can be renewed each year at no cost to the Contractor during the time
Page 12 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.1
16.C.7.d
Packet Pg. 1969 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
period in which their background check is valid, as discussed below. All technicians shall
have on their shirts the name of the contractor's business.
The Contractor shall immediately notify the Collier County Facilities Management Division
via e-mail (DL-FMOPS@colliergov.net) whenever an employee assigned to Collier
County separates from their employment. This notification is critical to ensure the
continued security of Collier County facilities and systems. Failure to notify within four (4)
hours of separation may result in a deduction of$500 per incident.
38. n SAFETY. All Contractors and subcontractors performing service for Collier County are
required and shall comply with all Occupational Safety and Health Administration (OSHA),
State and County Safety and Occupational Health Standards and any other applicable
rules and regulations. Also, all Contractors and subcontractors shall be responsible for
the safety of their employees and any unsafe acts or conditions that may cause injury or
damage to any persons or property within and around the work site.
Collier County Government has authorized the Occupational Safety and Health
Administration (OSHA) to enter any Collier County Facility, property and/or right-of-way
for the purpose of inspection of any Contractor's work operations. This provision is non-
negotiable by any division/department and/or Contractor. All applicable OSHA inspection
criteria apply as well as all Contractor rights, with one exception. Contractors do not have
the right to refuse to allow OSHA onto a project that is being performed on Collier County
Property. Collier County, as the owner of the property where the project is taking place
shall be the only entity allowed to refuse access to the project. However, this decision
shall only be made by Collier County's Risk Management Division Safety Manager and/or
Safety Engineer.
Intentionally left blank-signature page to follow)
Page 13 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.I
16.C.7.d
Packet Pg. 1970 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
IN WITNESS WHEREOF, the parties hereto, by an authorized person or agent, have executed
this Agreement on the date and year first written above.
ATTEST: BOARD OF COUNTY COMMISSIONERS
Crystal K. Kinzel, Clerk of the Circuit COLLIER COU IDA
Court and,Corf '•troller
By: I1_._ LIN/i' By:
Willi L. McDaniel, Jr. hairman
Dated: .' ' A . +)II/_0h1
A t.a s
j
A / 's
signatre only.
Contractor's Witnesses: Allied Universal Corp.
Contractor
DBA
By:
Contractor's First Witness Signatur
15 V i a TType/print signature and titleT
TTyp / rint wit ss nameT
Contrac or's S
1\Q•COIS k-ttHrl'e
TType/print witness nameT
Aped as to F nd Legality:
1 L.--
gully County Attorney
Sot)- P T to L
Print Name
Page 14of17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.l
5
16.C.7.d
Packet Pg. 1971 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
Exhibit A
Scope of Services
n following this page (pages
1
through
3 )
this exhibit is not applicable
Page 15 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.1
e
16.C.7.d
Packet Pg. 1972 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
Invitation to Bid (ITB) # 21-7921 "Countywide Chemicals"
EXHIBIT A
SCOPE OF SERVICES
Collier County's Public Utilities Department manages two regional water plants, two regional wastewater treatment
plants, and several other sites where chemicals are stored and used to treat the County's water and wastewater supply.
The Parks and Recreation Division manages five aquatic/pool venues where bulk and non-bulk chemicals are stored
and used on a routine basis.
DETAILED SCOPE OF WORK
Suppliers shall provide the chemicals, inclusive of all storage tanks, charges and fees (including fuel surcharges)as
outlined on Exhibit B Fee Schedule of this Agreement, to the County Departments/Divisions for the duration of the
agreement period. The County, at its discretion, reserves the right to add additional delivery locations. Modification
to this scope or agreement is not required for any added location.
The terms"Supplier"and"Contractor"shall be used interchangeably throughout this scope and Agreement.
A. FACILITY LOCATIONS (informational purposes only):
Water Treatment Plants
North Collier Regional Water Treatment Plant(NRWTP)
8005 Vanderbilt Beach Road Extension
Naples, FL
South Collier Regional Water Treatment Plant(SRWTP)
3851 City Gate Drive
Naples, FL
Wastewater Treatment Plants
North Collier Wastewater Reclamation Facility(NCWRF)
10500 Goodlette Frank Road
Naples,FL
South Collier Wastewater Reclamation Facility (SCWRF)
5600 Warren Street(Lely Subdivision)
Naples, FL
Parks and Recreation Facilities:
North Collier Regional Park
Sun-N-Fun Lagoon
15000 Livingston Rd
Naples, FL 34109
Golden Gate Community Park
3300 Santa Barbara Blvd.
Naples, FL 34416
Page 1 of 3
Exhibit A—Scope of Services
16.C.7.d
Packet Pg. 1973 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
Invitation to Bid (ITB) #21-7921 "Countywide Chemicals"
Donna Fiala Eagle Lakes Community Park
11565 Tamiami Trail E
Naples, FL 34113
Immokalee Sports Complex
505 Escambia St
Immokalee, FL 34142
Big Corkscrew Island Regional Park
810 39th Ave NE
Naples, FL 34120
B. SUPPLIER RESPONSIBILITIES:
Supplier(s)are expected to comply with the following:
1. All chemical prices are to be inclusive of all costs associated,including the product, handling,transportation
and delivery, any containers to be used by the County and provided by the Supplier to house their supplied
chemicals on County property, fuel surcharges, etc.
2. Suppliers must comply with all Federal and State regulations associated with the safe and proper handling
and delivery of chemicals associated with this Agreement (e.g. DOT, Environmental Protection, OSHA,
etc.).
3. Consider the County Divisions/Departments as a "keep fill" or "empty out" customer with a minimum of
four(4)hour notice prior to delivery.
4. Signature and retainage of the Chemical Hazardous Material Delivery Checklist for each chemical delivery.
The checklist shall be completed in detail and accompany the delivery manifest(s)and be maintained within
the specific supplier's file for a period of no less than 5 years.
5. Safety Data Sheets(SDS)on all initial chemical deliveries,and any time thereafter when a chemical change
occurs.
6. Provide technical and safety assistance as requested by the County and as described on chemical sheets.
7. Test and performance data on chemicals identified by the County.
8. Semi Annual Business Reviews, along with usage reports, with Department/Division Managers to provide
an opportunity to:
Discuss chemical usage reports; reports must include, but not limited to type of chemicals purchased,
volume purchased by plant, manufacturer, fill rate, price,etc.,
To review current business processes, and consider "best practices" to help reduce future costs and
maximize efficiencies in the procurement and delivery of chemicals,
Consider possible pilot program efficiencies particularly around new technology or chemical
development.
C. PRICE MODIFICATIONS:
1. Price increase requests may be submitted bi-annually (After 180 calendar days from the agreement
commencement month/day). Retroactive price adjustments are not authorized.
2. Submit price increase requests in writing by email to the County Contract Administrator no later than 30 days
before the semi-annual contract anniversary date for consideration.
Page 2 of 3
Exhibit A—Scope of Services
0
16.C.7.d
Packet Pg. 1974 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
Invitation to Bid (ITB) #21-7921 "Countywide Chemicals"
Semi-Annual Date Price Increase
Documentation Required
March 1st February 1st
September 1st August 1st
3. Supplier shall provide supporting documentation justifying price increases (examples: supplier material
agreements, distributor invoices, proof of fuel increases, etc.).
4. County Contract Administrator shall analyze prices to determine increases are fair and reasonable using the
following methods: price competition(reviewing competitive bids or offers), market prices, historical prices,
or independent estimates, and provide an evaluation report and recommendation to the Procurement Services
Division.
5. Supplier shall continue to fill all purchase orders received at the current agreement prices during the review
process.
6. Approval of price changes will be made by the Procurement Services Division Director or designee. If
approved, an updated chemical price list with the modified pricing will be uploaded to the County's Finance
system.
7. Price increase requests are not guaranteed. If approved, the Procurement Services Division Director or
designee will notify the Supplier in writing with the effective date of any approved price increases.
D. NON-LINE-ITEM QUOTING:
1. Any item and/or service not listed on Exhibit B Fee Schedule, and is available for purchase, shall require
quoting among all Contractors under the agreement;the lowest quote will be awarded.
2. If there is only one (1) Supplier, the County Contract Administrator may negotiate a fair and reasonable
price. Pricing shall be firm for six(6)months from the quote or negotiated date.
Page 3 of 3
Exhibit A—Scope of Services
16.C.7.d
Packet Pg. 1975 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
Exhibit B
Fee Schedule
following this page (pages
1
through
1 )
Page 16 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.1
16.C.7.d
Packet Pg. 1976 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
ITB#21-7921 "COUNTYWIDE CHEMICALS"
EXHIBIT B
FEE SCHEDULE
Primary
Secondary
Tertiary
Line Allied Universal
Item
Product Description Unit of Measure
Corp.
1 W-1 Ammonia lbs.
2 W-2 Carbon Dioxide ton
3 W-3 Chlorine lbs. 0.749 Primary
Corrosion Inhibitor(ortho-
4
W 4
polyphosphate)80-20
lbs.
5 W-5 Fluoride(Sodium Fluorsilicate) lbs.
6 W-6 Lime lbs.
7 W-7 Liquid PO4 lbs.
8 W-8 Muriatic Acid lbs. 0.272 Primary
9 W-9 Scale Inhibitor lbs.
10 W-10 Sludge Polymer lbs.
11 W-11 50%Sodium Hydroxide dry ton 836.000 Primary
12 W-12 Sulfuric Acid lbs.
13 W-13 Polymer lbs.
14 WW-1 Emulsion Polymer lbs.
15 W W-3 25%Sodium Hydroxide Solution gal 2.240 Tertiary
16 W/WW-1 Calcium Hypochlorite lbs.
17 W/WW-2 Sodium H .ochlorite al 0.780 Primary
18
19 PR-2 Sodium Bicarbonate lbs.
20 PR-3 Muriatic Acid al
21
22 PR-5 Calcium Chloride lbs.
23 PR-6 Cal-H .o(100%Chlorine) lbs.
24
25 PR-8 Soda Ash lbs.
26 PR-9 Chlorine Tablets lbs.
27
16.C.7.d
Packet Pg. 1977 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
Other Exhibit/Attachment
Description:
following this page (pages I through 3 )
this exhibit is not applicable
Page 17 of 17
Fixed Term Service Multi-Contractor Agreement 2022_Ver.1
0
16.C.7.d
Packet Pg. 1978 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
ALLIUNI-01 SSIMEON
R CERTIFICATE OF LIABILITY INSURANCE DAT2/8/20 2YY)
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
CONTACT
NAME:
Collinsworth,Alter,Fowler&French, LLC PHONE
15050 NW 79th Court A/c,No,Ext):(305)822-7800
FAX1(A/C,No):(305)362-2443
Suite 200 E-MAILDSS:
Miami Lakes,FL 33016
INSURER(S)AFFORDING COVERAGE NAIC#_
INSURER A:Nautilus Ins Company 17370
INSURED INSURER B:Great Divide Insurance Co 25224
Allied Universal Corp. INSURER C:
3901 NW 115 Avenue INSURER D:
Miami,FL 33178
INSURER E:
INSURER F:
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
TYPE OF INSURANCE
ADDL SUER
POLICY NUMBER
POLICY EFF POLICY EXP
LIMITSLTRINSDWVD, IMM/DD/YYYYI (MM/DD/YYYYI
A COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE
1,000,000
X CLAIMS-MADE OCCUR X GLP202370314 8/31/2021 8/31/2022 PREM SESO(Ea occu
RENTED 1,000,000
X Retro Date 1/12/1988 MED EXP(Any one person) $
25,000
PERSONAL&ADV INJURY $
1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER. GENERAL AGGREGATE $
3,000,000
POLICY PRO- X LOCJECT PRODUCTS-COMP/OP AGG $
3,000,000
OTHER:
COMBINED SINGLE LIMIT 1,000,000BAUTOMOBILELIABILITYEaaccident)
X ANY AUTO X BAP202370414 8/31/2021 8/31/2022 BODILY INJURY(Per person) $
OWNED SCHEDULED
AUTOS ONLY AUTOS BODILY INJURY(Per accident) $
X HIRED X NON-OWNED PROPERTY DAMAGEAUTOSONLYAUTOSONLY
A _ UMBRELLA LIAB X OCCUR EACH OCCURRENCE
4,000,000
X EXCESS LIAB CLAIMS-MADE FFX202370614 8/31/2021 8/31/2022
AGGREGATE
4,000,000
DED RETENTION$
WORKERS COMPENSATION PER
AND EMPLOYERS'LIABILITY
Y/N
STATUTE ERH
ANYNYI PROPRIETOR/PARTNER/EEXCLUDEDX ECUTIVE
N/A
E.L.EACH ACCIDENT
O(
Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $
If yes,describe under
DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $
A Pollution Liability SSP202370514 8/31/2021 8/31/2022 Ech Poll Condition** 1,000,000
A Poll Retro 8/21/95 SSP202370514 8/31/2021 8/31/2022 Total Aggregate 3,000,000
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required)
Re:Bid#21-7921 for Countywide Chemicals
Collier County Board of County Commissioners,or,Board of County Commissioners in Collier County,or,Collier County Government,or,Collier County are
included as additional insured with respect to general liability and auto liability on a primary and non-contributory basis when required by written contract. 30
day notice of cancellation subject to policy terms and conditions.
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
Collier CountyBoard of CountyCommissioners
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
3295 Tamiami Trail E.
Naples,FL 34112
AUTHORIZED REPRESENTATIVE
ACORD 25(2016/03) 1988-2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
16.C.7.d
Packet Pg. 1979 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)
A La CERTIFICATE OF LIABILITY INSURANCE
DATE(MM/DD/VYYY)
2/8/2022
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
CONTACT
NAME: Lisa Neumayer
Arthur J. Gallagher Risk Management Services, Inc. lac No.Ext): 561-998-6782
FAX
No):305-592-40499155S. Dadeland Blvd.
MIAMI FL 33156 ADDRESS: Lisa_Neumayer@ajg.com
INSURER(S)AFFORDING COVERAGE NAIC#
INSURER A:Granite State Insurance Company 23809
INSURED ALLIUNI-03 INSURER B:
Allied Universal Corporation
3901 NW 115th Ave INSURER C:
Miami, FL 33178 INSURER D:
INSURER E:
INSURER F:
COVERAGES CERTIFICATE NUMBER:2022713590 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
TYPE OF INSURANCE
ADDL SUBR POLICY EFF POLICY EXP
W
LIMITSLTRINSDVDPOLICYNUMBERMM/DD/YYYY) (MM/DDIYYYY)
COMMERCIAL GENERAL LIABILITY EACH OCCURRENCEDAMAGE RENTED
CLAIMS-MADE OCCUR PREMISESO(Ea occurrence) $
MED EXP(Any one person) $
PERSONAL&ADV INJURY $
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $
POLICY
PRO-
JECT LOC PRODUCTS-COMP/OP AGG $
OTHER:
AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $
Ea accident)
ANY AUTO BODILY INJURY(Per person) $
OWNED SCHEDULED BODILY INJURY(Per accident) $
AUTOS ONLY AUTOS
HIRED NON-OWNED PROPERTY DAMAGE
AUTOS ONLY AUTOS ONLY Per accident)
UMBRELLA LIAB OCCUR EACH OCCURRENCE
EXCESS LIAB CLAIMS-MADE AGGREGATE
DED RETENTION$
A WORKERS COMPENSATION 039326857 6/30/2021 6/30/2022 X PER OTH-
AND EMPLOYERS'LIABILITY
STATUTE ER
YIN
ANYPROPRIETOR/PARTNER/EXECUTIVE
N/A
E.L.EACH ACCIDENT 1,000,000
OFFICER/MEMBER EXCLUDED?
Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000
If yes,describe under
DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000
DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required)
RE:21-7921 "Countywide Chemicals I For any and all Work Performed on behalf of Collier County.
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
Collier County Board of County Commissioners
3295 Tamiami Trail East AUTHORIZED REPRESENTATIVE
Naples FL 34112 c E.
lr„m4
1
1988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD
THIS CERTIFICATE SUPERSEDES PREVIOUSLY ISSUED CERTIFICATE
16.C.7.d
Packet Pg. 1980 Attachment: 21-7921Contract_Allied (27280 : Recommendation to approve an after-the-fact payment to Allied Universal)