#20-7800 (Sanitation Road Culvert Replacement)
WORK ORDER/PURCHASE ORDER Contract 20-7800"Underground Contractor Services" Contract Expiration Date: June 21, 2026 This Work Order is for professional underground utility services for work known as: Project Name: Sanitation Road Culvert Replacement Project No: 60143.9.2 The work is specified in the proposal dated May 26, 2023 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, this Work Order/Purchase Order is assigned to: Coastal Concrete Products, LLC. dba Coastal Site Development. Scope of Work: As detailed in the attached proposal and the following: * Task 1 Replace Sanitation Road Culvert * Task 2 Owners Allowance Schedule of Work: Complete work within 75 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement#20-7800 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above, the County will compensate the Firm in accordance with following method(s): ®Negotiated Lump Sum (NLS) Lump Sum Plus Reimbursable Costs (LS+RC) ®Time & Material (T&M) (established hourly rate— Schedule A) ❑ Cost Plus Fixed Fee (CPFF), (define which method will be used for which tasks) as provided in the attached proposal. Task 1 NLS $474,824.00 Task 2 T&M $50,000.00 TOTAL FEE $524,824.00 cxtxa+n na. an ui qin%.„ HernandezDayan == �M..a.a�aro.��.— PREPARED BY: a'.� .`>.",..u�.,� 1w=woaun uaiaseaor Dayan Hernandez, Project Manager I Date CPP—Stormwater Management APPROVED BY: RomanDaniel Daniel Roman,P.E., Supervisor—Project Mgmt. Date CPP—Stormwater Management Johnssen b Digitally signed by Johnssen b APPROVED BY: — Date:2023.09.20 08:48:36 44'00' Beth Johnssen,Division Director Date CPP—Transportation Management Services Page 1 of 2 0 Digitally signed by Sily S cottTri n ity DalecoltTrin;2023.09.27 APPROVED BY: 10 29:32-04'00' Trinity Scott,Department Head Date CPP—Transportation Management Services By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses,that,to the best of their knowledge and belief,all relevant facts concerning past,present, or currently planned interest or activity(financial,contractual,organizational, or otherwise)which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed, Additionally,the Firm agrees to notify the Procurement Director,in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration, ACCEPTED BY: Coastal Concret' Pro 6 'ts,4,`LC�/�~ • David Tones r Date President, Coasta oncrete Products,LLC (Remainder of page intentionally left blank) Page 2 of 2 IN WITNESS WHEREOF, the parties hereto, have each,respectively, by an authorized person or agent, have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS L R y STA C_ V. k;0 7e�Clerk of Courts COLLIER COUNTY, FLORIDA may: Ltic. By. (--- -- Dated: H 'ILL] /.23 Rick LoCastro, Chairman ( ". ) Attest as to Chairman's. signature only. Name of Firm By: First Witness Signature TType/print signature and titleT t Type/print witness nameT Second Witness TType/print witness nameT A Approved a.''to r�o ' _art 1 . .,d.Le y: I.. L..rt Coy` ty A` �.•ney I Ii. # i Prin ame 1 Page 1 of 1 Sc LazoBrittany From: LazoBrittany Sent: Wednesday, May 24, 2023 10:43 AM To: 'maguiar@coastalconcreteproducts.com'; 'dmachado@coastalsitework.com'; `david@torrescompanies.com';'Dewey Noble'; 'andrew@cougarcontractingllc.com'; 'Kwilkie2000@dnhiggins.com';'Mark Heath'; DANH@dnhiggins.com; 'mikel@dnhiggins.com'; 'tammyl@dnhiggins.com'; 'Rmacphee@haskinsinc.net'; Kyleconstinc@Aol.com; 'BPenner@mitchellstark.com'; `Kmarkhardt@pwc-Ilc.com 'brett@swutility.net'; 'shane@swutility.net'; 'Igaudio@geusa.com; 'Marcie Cohen' Cc: ZordanMark; RomanDaniel; DunhamNadine Subject: RE:Time Sensitive: Request for Quote"Sanitation Road Culvert Replacement" (Utilizing CC 20-7800)Addendum 3 Attachments: Bid Schedule RFQ 60143.9.1 Sanitation Road Culvert Replacement.xlsx; 20230524- SanitationRdCulvertReplacement.pdfi Addendum 3_Sanitation Rd_5-24-2023.docx Good Day All: Attached is Addendum #3 which answers the following question below. • Question#1—Why is Type B Stabilization have such a high quantity?The roadway is only 321 SY, but Stabilization is 2,392 SY? • Answer#1 -Please note that there was a typo in the quantity of Type B Stabilization, please refer to the revised bid schedule for the corrected quantity. • Question#2—48" RCP (To include flowable fill backfill)there is nothing on drawings to show the limits of the flowable fill, confused on where and how much of this is required? • Answer#2 - Plan sheet#6 clearly indicates the limits of the flowable fill. • Question#3—Is the FOOT FY 2017-18 design standards Side drain mitered end section what your requiring for the Quadruple Concrete End Section,48" RCP? • Answer#3—See project plan set—FDOT 2022-23 Standard Plans "Cross Drain Mitered End Section"Sheet 2 of 3 &3 of 3 for detail. • Bid Schedule-(See attached) Provides a modified excel spreadsheet see update in highlighted orange. • Revised Plan set with detail sheets- (See attached) Brittany Lazo Project Manager II Stormwater Management Go l -` County Transportation Management Services Capital Project Planning,Impact Fees&Program Management 2685 South Horseshoe Drive Naples FL 34104 Tel: 239 252 5728 Brittany.LazoJa colliercounty l.pov 1 From: LazoBrittany Sent: Monday, May 22,2023 1:05 PM To:'maguiar@coastalconcreteproducts.com'<maguiar@coastalconcreteproducts.com>; 'dmachado@coastalsitework,com' <dmachado@coastalsitework.com>; 'david@torrescompanies.com' <david@torrescompanies.com>; 'Dewey Noble'<DNoble@qeusa.com>; 'andrew@cougarcontractingllc.com' <andrew@cougarcontractingllc.com>; 'Kwilkie2000@dnhiggins.com'<Kwilkie2000@dnhiggins.com>; DANH@dnhiggins,com; 'mikei@dnhiggins,com'<mikel@dnhiggins.com>; 'tammyl@dnhiggins.com' <tammyl@dnhiggins.com>; 'Rmacphee@haskinsinc.net' <Rmacphee@haskinsinc.net>; Kyleconstinc@Aol.com; 'BPenner@mitchellstark.com`<BPenner@mitchellstark.com>; 'Kmarkhardt@pwc-llc.com`<Kmarkhardt@pwc-llc.com>; 'brett@swutility.net'<brett@swutility.net>; `shane@swutility.net'<shane@swutility.net>; 'lgaudio@geusa.com` <Igaudio@geusa.com>; 'Marcie Cohen'<mcohen@qeusa.com> Cc:ZordanMark<Mark.Zordan@colliercountyfl.gov>; RomanDaniel<Daniel.Roman@colliercountyfl.gov>; DunhamNadine<Nadine.Dunham@colliercountyfl.gov> Subject: RE:Time Sensitive: Request for Quote "Sanitation Road Culvert Replacement" (Utilizing CC 20-7800)Addendum 2 Good Day All: Attached is Addendum#2 which answers the following question below. • Question#1—Do you want us to bid that we will be doing this in the raining season considering we are the start of it, or can this be pushed to this fall not during the raining season? • Answer#1-A limited notice to proceed (LNTP)will be issued in Summer to give the opportunity to the contractor to order the required material. An NTP will be issued in Fall to commence construction. This will be coordinated with the contractor and the County. The intent is to allow for the materials to be delivered and start construction after the rainy season. Brittany Lazo Project Manager II Stormwater Management 1.' Ot ierCounty Transportation Management Services Capital Project Planning,Impact Fees&Program Management 2685 South Horseshoe Drive Naples FL 34104 Tel: 239 252 5728 Brittany.Laza@colliercount yfl.,go_v From: LazoBrittany Sent: Monday, May 15,2023 3:31 PM To:maguiar@coastalconcreteproducts.com; drnachado()coastalsitework.com; david@torrescompanies.com; 'Dewey Noble' <DNoble@geusa.com>; andrew@cougarcontractingllc.com; Kwilkie2000@drihiggins.cotn; DANH�cPdnhigginsscom;mikel(a dnhiggins.com;tammyl@dnhiggins^com; Rmacphee@haskinsinc.net; Kyleconstinc@Aol.corn; BPenner@rnitchellstark,com; Kmarkhardt@pwc-llc.corn; hrett@swutilitynet; shane@swutilitv.net; Igaudio(c0cgeusa.com; Marcie Cohen<mcohen(Jgeusa.com> Cc: ZordanMark<Mark.Zordan2colliercountyfl,.gov>; RomanDaniel <Daniel:Roman@colliereountvfl.gov>; DunhamNadine<Nadine.Dunharn@colliercnuntyfl.gov> Subject: RE:Time Sensitive: Request for Quote "Sanitation Road Culvert Replacement" (Utilizing CC 20-7800)Addendum 1 2 Good Day All: Attached is Addendum#1 which modifies/adds the following documents listed below, • Response Form (see attached)—Extends Due date for quotes and questions, • Bid Schedule (see attached)—Provides a modified excel spreadsheet see updates highlighted yellow. Stormwater Management requests quotes for"Sanitation Road Culvert Replacement" utilizing Collier County Agreement No. 20-7800" Underground Contractor Services." If the firm is not interested in bidding on this project, reply to this email—to me only with "NO BID." Bid schedule submissions should be in Microsoft Excel format and PDF. The Updated schedule of events for this project is provided below. If you have questions, please email me. Schedule of Events Project Name:'Sanitation Road Culvert Replacements" RFQ Release Date: 5 05t2023 Pre-Bid Meeting(Non-Mandatory): 5;22/2023 C 9:00 a,ru.l Pre-Bid Meeting Location: 1020 Sanitation Rd,Immokalee Questions Due: 5124'2023 if1 3.00 p.m. Quotes Due 5/26I2023 i 0t)'p.m,:EDP' Documentation Included: Scope of Work,Plans,Bid Schedule Number of Days to Final Completion: 75 days(Substantial 45 days Y 30 Final Completion days) Liquidated Damages: Payment&Performance Bonds: Quotes over$200,000 Interested,Contractors shall fill in the Request for Quotation Form and Bid Schedule and email them to Brittany Lazo(Brittany,lazor?tttlliet'couut _fi,go9 by the Quote due date and time. From: LazoBrittany Sent: Friday, May 5,2023 10:55 AM To: maguiar@coastalconcreteproducts,com; dmachado@coastalsitework.com;david@torrescompanies.com; andrew(a?cougarcontractingllc.com; I<wilkie2000@dnhiggins.com; DANH a dnhiggins.com; mikel(cdnhiggins.com; tar-imyl@cinhiggins.carn;Rm4cphesc@haskinsinc_net; Kyleconstinc@Aol.com;BPenner@mitchellstark.corn; I<markhardt@pwc-llc.com;brett@swutility,net;shanenswutilitv.net; Igaudio@cieusa,com; Marcie Cohen <mcohen@geusa,com> Cc:ZordanMark<Mark.Zordan@colliercountv_fl.gov>; RomanDaniel<Daniel,Roman@ colliercountyfl.gov>; DunhamNadine<Nadine.Dunham@colliercountyfl.gov> Subject:Time Sensitive: Request for Quote"Sanitation Road Culvert Replacement" (Utilizing CC 20-7800) Good Day All: Stormwater Management requests quotes for"Sanitation Road Culvert Replacement" utilizing Collier County Agreement No, 20-7800 " Underground Contractor Services." If the firm is not interested in bidding on this project, reply to this email—to me only with"NO BID." Bid schedule submissions should be in Microsoft Excel format and PDF. The schedule of events for this project is provided below. If you have questions, please email me, 3 Schedule of£Teuts Project Name "Sanitation Road Celli-ert Replacements" RFQ Release Date: 5105 2023 Pre-Bid Meeting(Non-Mandatory): N/A Pre-Bid Meeting Location: N/A Questions Due: 5116i2023 @ 3:00 p.in. Quotes Due: 5/1912023: xt 3:00 p 311.EDT Documentation Included: Scope of Work;Plans,Bid Schedule Number of Days to Final Completion: 75 days(Substantial 45 days±30 Final Completion days) Liquidated Damages: N'A Payment&Performance Bonds: Quotes over$200,000 Interested Contractors shall fill hi the Request for Quotation Form and Bid Schedule and email them to Brittany Lazo(I3rttiariy,lazogeolliercotttttyfS.e,oy)by the Quote due date and time. Brittany Lazo Project Manager II Stormwater Management C;c)i -ter Cleol/tnty Transportation Management Services Capital Project Planning, Impact Fees&Program Management 2685 South Horseshoe Drive Naples FL 34104 Tel: 239 252 5728 E3rittony.Lazof colliercountyfl.gov 4 LazoBrittany From: Maritza Aguiar <maguiar@coastalconcreteproducts.com> Sent: Friday, May 26, 2023 1:30 PM To: LazoBrittany Subject: Sanitation Road Bid Attachments: Bid Schedule RFQ 60143.9.1 Sanitation Road Culvert Replacement.pdf; Sanitation Rd signed docs.pdf Follow Up Flag: Follow up Flag Status: Completed [X"II::RNAL EMAIL:This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Good Afternoon Enclosed is our quote for the above referenced. Thank you Maritza Sent via the Samsung Galaxy S23 Ultra SG, an AT&T SG smartphone Get Outlook for 1 rr Gou.' try }._:...:::.:.:..: ....._..4,,::.,;. RESPONSE FORM Transportation Management: AGREEMENT NO.20-7800 Services Dwllal'ttlli.ltt "UNDERGROUND CONTRACTOR SERVICES" Capital Project:Planning.1 inpa ct Fees& TERM ENDS: 06/21/2026 Program Management Division To: tllaguiar(fltcoa.talconcreteproduc1s.com;l'1niacIlado(a).coastalSitework.conl; david(a)AorrescompaIlies.Com; andrew(U)coui_>arcontractingllc.com;Kwilkie2000@dnhiggins.com;danh(ii),dnlliggins.com; mikel(ildnhiggins,com; tans nyl.(i dnhiggins.coin; Rnlacpilce(r)iaslcinsinc.net;Kvleconsti.nc(i aol.com; BPenner(winitchellstark.com:1Cmarkliardt(ip«c-lic.com; brett(ii.;swutility.nel;shane(rr?swutility.net; Igauclioggeusa.coln; mcohen(a),cicusa.coln Contact: Brittany Lazo,Project Manager II Brittany.lazo(c colligrconntyfl.gov Direct line: 239.252.5728/Cell: 239.919.0919 Schedule of Events Project Name:"Sanitation Road.Culvert Replacements".I RFQ Release Date: 5/05/2023 Pre-Bid Meeting(Non-Mandatory): 5/22/2023 @ 9:00 a.m. Pre Bid Meeting Location: 1020 Sanitation Rd,Immokalee(southern parking lot at Immokalee Water and Sewer District office) Questions Due: 5/24/2023 @ 3:00 p.m. Qtsiltc3 f3ii4: Documentation Llcluded: Scope of Work,Plans,Bid Schedule Number of Days to Final Completion: 75 clays(Substantial 45 days+30 Final Completion days) Liquidated Damages: N/A Payment&Performance Bonds: Quotes over$200,000 Interested Contractors shall fill in the Request for Quotation Form and Bid Schedule and email them to Brittany Lazo(Brittany.lazoajeolliercountvil.gov)by the Quote due date and time. Firm Name:Coastal Concrete Products,LLC dba Coastal Site Development Quote Submission Date: 05/26/2023 Quote Valid for: 90 days Print Name&Title: David E.Tomes-Manager Signature: ,ITV/(E. Ton-es Email: David@turescompanies.com toirescompanies.com Direct Line: 239.208.4079 Cell Phone: 904,762-4454 From: Maritza Aauiar To: Pric Ovares;"davidittorrescomoanies,com" Cc: Pavan Hernandez;Daniel Roman; Jisa Taylor Subject: RE:Quote Extension Request(Sanitation Rd) Date: Thursday,September 21,2023 9:38:10 AM I Xl I RNAl, L MIAII,: This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Good Morning Please accept this email as our agreement to extend our quote for another 90 days. Thank you, Maritza Aguiar Project Manager Coastal Concrete Products, LLC dba Coastal Site Development 7742 Alico Road Fort Myers, FL 33912 239.404.8705 Cell Coastal Site Development A Division of Co;ah l Concrete Product,,LLC From: Eric Ovares<Eric.Ovares@colliercountyfl.gov> Sent:Thursday, September 21, 2023 09:05 AM To: david@torrescompanies.com; Maritza Aguiar<maguiar@coastalconcreteproducts,com> Cc: Dayan Hernandez<Dayan.Hernandez@colliercountyfl.gov>; Daniel Roman <Daniel.Roman@colliercountyfl.gov>; Lisa Taylor<Lisa.Taylor@colliercountyfl.gov> Subject:Quote Extension Request(Sanitation Rd) Good morning, I attached a copy of the original quote for Sanitation Road Culvert Replacement, unfortunately this quote has expired. Can you extend the quote another 90 days to allow our board to approve project funds? Respectfully,tf/ &iP Uarr2eo Project Manager II �r.4 it7 ler County Stormwater Management 2685 South Horseshoe Dr.Suite 103,14oples,Florida 34104 Office:239.252.5728 Cell:239.821.0556 garrizZ , cowpcom r!Wei Honda 3.aw.,'-mail addr,.,sire puhius rccoids.Ir yoo do not.«'»n;s-nor a..rrrart rdc3rt,i rokaseAl nr puhlil.rr:crrrda rcqurar,di:n<<r::en a,ih:rrr.:nic nail to this entil4.In re d.c nrtara rir+s office:t+} tc:l,:plx+ne Or III Wril'in From: Daniel Roman <Daniel.Rom an d)colliercountyfL€uu> Sent:Thursday,September 21, 2023 8:28 AM To: Eric Ovares<Eric.Ovares(Q)colliercountvfl.gov.> Cc: Dayan Hernandez<Dayan.l-Iernaj.uiez(0colliercountyfl,gov> Subject: FW:STO-9.18.23-WO Sanitation Coastal.pdf Can you assist Dayan on this request? Regards, 'Da:n.iel J. Roman, PT 'P W,!' Project Management Supervisor Stormwater Management ; 7► er County ✓ y L Transportation Management Services Department Capital Project Planning,Impact Fees&Program Management 2685 South Horseshoe Dr.,Suite 103,Naples,Florida 34104 Office:239-252-5181 Cell:239-359-8445 Daniel.Roman()collier countyfl.gov From: Lisa Taylor<Lisa. aXlorg0colliercv_l fyfl,gov> Sent:Wednesday,September 20, 2023 12:29 PM To: Dayan Hernandez<Dayan.Hernanded@kolliercourityLgov> Cc: Daniel Roman<Daniel,Roman(lcoliiercountyfi,gj,t>; Nadine Dunham <Nadine.DunharnPcolliercountyfl.gov>; Raquel Ovares<Raguel Oyare,c(�;ol�iert:ol.urtyfl.gov> Subject:STO-9.18.23-WO Sanitation Coastal.pdf Hi Dayan, We will need an email from the winning bidder to extend their proposal. The proposal is only good for 90 days. I believe procurement will accept the bond as it was recorded. However it doesn't have the board approval date on it. We are going to try and that. Respectfully, 7a0m, es Budget Analyst II CO 10r COLIJAV Transportation Management Services 2885 S Horseshoe Dive Naples,FL 34104 Phone:(239)252-5813 Fax(239)252-6617 Under Florida Law, e-mail tdresses are public records. if you do not want your e-mail address released in response to a public records request, do not send electronic;mail to this entity. inslead, contact lhis office by telephone or in writing. , ir rt� Email: $rittanvJazo(acolliereountytl.gov eta °i 'r County Direct:239.252.5728 Transportation Management ADDENDUM 1 Services Department Capital Pro feet Planning,impact Fees& Program Management.Division Date:May 15,2023 To:Awarded Contractors/Agreement No. 20-7800"Underground Contractor Services" From: Brittany Lazo,Project Manager II RE: Sanitation Road Culvert Replacement Subject:Bid document modifications Addendum I modifies/adds the following documents as listed below and provides responses to questions. Please sign and fill in the addendum below and submit it with the firm's bid submission. • Response Form—addition of non-mandatory pre-bid meeting on 5/22/2023 @ 9:00 a.m.at 1020 Sanitation Rd, Immokalee southern parking lot of Immokalee Water and Sewer District office. • Bid Schedule—Provides a modified excel spreadsheet(see highlighted lines) Sign below and return the addendum with the firm's bid submission for the above-referenced quote. Firm Name; Coastal Concrete Products,LLC dba Coastal Site Development Date: 05/24/2023� Signature: ,wt.Vie 5. Tetra David E Torres—Manager f//t.`' Email: Brittany.lazoin;colliercouutyfl.gov 1/4.:.0111ar ' rt3VIII }1 Direct:239.252.5728 Transportaaiion t�•{anagenent ADDENDUM 2 Services Depart-inept Capital Project.Planning,Iwpart Fees& Program Management Division Date: May 22, 2023 To: Awarded Contractors/Agreement No. 20-7800"Underground Contractor Services" From: Brittany Lazo,Project Manager II RE: Sanitation Road Culvert Replacement Subject:Bid document modifications Addendum 2 which answers the following question below, • Question#1--Do you want us to bid that we will be doing this in the raining season considering we are the start of it,or can this be pushed to this fall not during the raining season? • Answer#1-A limited notice to proceed (LNTP)will be issued in Summer to give the opportunity to the contractor to order the required material. An NIP will be issued in Fall to commence construction. This will be coordinated with the contractor and the County. The intent is to allow for the materials to be delivered and start construction after the rainy season. Sign below and return the addendum with the firm's bid submission for the above-referenced quote. Finn Name: Coastal Concrete Products,LLC dba Coastal Site Development Date: 05/26/2023�, 7 Signature: J VIA E. !OII David E.Torres-Manager • Cat --.itr Email:Brittany.)azcniicollicrcouttivt1_gov .O1�"Iei' t,�U14►n('1' Direct:239.252.5728 Transportation Management ADDENDUM 3 Services Department capital Praiect Planning,impact Fee:F. Programu Managenient Division Date: May 24, 2023 To: Awarded Contractors/Agreement No. 20-7800"Underground Contractor Services" From: Brittany Lazo, Project Manager II RE: Sanitation Road Culvert Replacement Subject: Bid document modifications Addendum 3 which answers the following question below. • Question#1—Why is Type B Stabilization have such a high quantity?The roadway is only 321 SY, but Stabilization is 2,392 SY? • Answer#1-Please note that there was a typo in the quantity of Type B Stabilization, please refer to the revised bid schedule for the corrected quantity. • Question#2—48" RCP (To include flowable fill backfill)there is nothing on drawings to show the limits of the flowable fill, confused on where and how much of this is required? • Answer#2- Plan sheet#6 clearly indicates the limits of the flowable fill. • Question#3—Is the FDOT FY 2017-18 design standards Side drain mitered end section what your requiring for the Quadruple Concrete End Section,48" RCP? • Answer#3—See project plan set—FDOT 2022-23 Standard Plans"Cross Drain Mitered End Section" Sheet 2 of 3 & 3 of 3 for detail. • Bid Schedule-(See attached) Provides a modified excel spreadsheet see update in highlighted orange. • Revised Plan set with detail sheets- (See attached) Sign below and return the addendum with the firm's bid submission for the above-referenced quote. Firm Name: Coastal Concrete Products,LLC dba Coastal Site Development Date: 05/24/2023 Signature: ,( V/p(E T n-es Project: Sanitation Road Culvert Replacements Project No.: 60143,9.1 Agreement: 20-7800"Underground Utility Contractors" BID SCHEDULE Contractor: COASTAL CONCRETE PRODUCTS,LLC DBA COASTAL SITE DEVELOPMENT 3 Vld E.TOMS Bid Submission Date: 5/26/2023 Item Item Description Unit Estimated Unit Price Total Price Number Quantities l MOBILIZATION LS I $ 47,500.00 $ 47,500.00 2 MAINTENANCE OF TRAFFIC LS 1 $ 14,500.00 $ 14,500,00 3 CLEARING&GRUBBING LS 1 $ 28,500.00 $ 28,500.00 4 LICENSED SURVEYOR LS 1 $ 9,500.00 $ 9,500.00 5 PERFORM 2 TEST HOLE FOR MUCK INVESTIGATION LS 1 $ 8,750.00 $ 8,750.00 6 TYPE III TURBIDITY BARRIERS/SILT FENCE LS 1 $ 4,000.00 $ 4,000.00 7 EMBANKMENT CY 100 $ 155.00 $ 15,500.00 8 TYPE B STABILIZATION SY 398 $ 60.00 $ 23,880.00 9 OPTIONAL BASE,BASE GROUP 04 SY 321 $ 70.00 $ 22,470.00 10 SUPERPAVE ASPHALTIC CONCRETE,TRAFFIC B TN 26 $ 950.00 $ 24,700.00 ]1 PIPE CULVERT,OPT MATERIAL,ROUND,48"S/RCP(TO INCLUDE LF 108 $ 750,00 $ 81,000.00 FLOWABLE FILL BACKFILL) 12 QUADRUPLE CONCRETE END SECTION,48"RCP EA 2 $ 24,800.00 $ 49,600.00 13 RIPRAP,RUBBLE,F&I,DITCH LINING TN 136 $ 125.00 $ 17,000,00 14 PERFORMANCE TURF,SOD SY 658 $ 18.00 $ 11,844.00 15 SELECT BEDDING MATERIAL-#57 STONE(2'MINIMUM DEPTH) CY 84 $ 125.00 $ 10,500.00 16 PROTECTION AND SUPPORT OF EXISTING UTILITIES LS 1 $ 5,500.00 $ 5,500.00 17 MUCK EXCAVATION AND DISPOSAL CY 358 $ 75.00 $ 26,850.00 18 SUBSOIL EXCAVATION CY 160 $ 45.00 $ 7,200.00 19 EMBANKMENT TMCY 224 $ 95.00 $ 21,280.00 20 SELECT BEDDING MATERIAL-#57 STONE(REPLACEMENT OF MUCK) CY 358 $ 125.00 $ 44,750.00 21 PROJECT ALLOWAN T&M 1 $50,000.00 Total Bid(Bid Subtotal&Allowance) $ 524,824.00 .=- N. f/ 7 SpanS June 22,2023 ENGINE 111i1NG, INC. Brittany Lazo Project Manager II Collier County Stormwater Management Transportation Management Services 2685 Smith Horseshoe Drive Naples, FL 34104 239-252-5728 RE: Sanitation Road Culvert Replacement Project No.60143.91 Bid Results Review and Recommendation Ms.Lazo, HighSpans Engineering,Inc.,as Engineer of Record for the Sanitation Road Culvert Replacement, has reviewed the bid results for consistency with generally expected pricing. The submitted bids were generally in line with the EOR's Estimate for current market pricing,with three of the bidders submitting pricing under the EOR's estimate and one bidder that was over the EOR's estimate by approximately 22%. Based on our review of all the bids, HighSpans Engineering, Inc. recommends award to the Apparent Low Bidder,Coastal Site Development. Sincerely, 04/22/2, Mica S. .lacksnn, P.R. 86615 Project Manager HighS pans Engineering, Inc. II 2121 McGregor Blvd. N200 Dort Myers,FL 33901 Tel.239.433.3000 , sf r - 8 8 8 8 8 8 8 , 8 8 8 8 .- E'-44 w a w o 'n e9. ri 21 _ F n h h h h h h h an in in h h h h h h w h w h h h a m o DO&• & Z ry nF,o'c a `�v,ev as`O ^'�o P I, N P P � 69 N e•'h N N w w w w w w w w w w w w w w w g. '. Op o 0 8 0 8. 8 E o0 _ e Q555 5S� 58a $ V '° J 4 _ - _ ry,8 k '' v r-,' h ry o P R 2 h F bh w w w w h w h h w w h h w h h h.n h h h h U a 8 8 O E 8 0 0 0 O O 8 8 8 0 0 0 8 8 0 3 z o o8'288 ..o.2o ?r8o o,2o a a g 2 a _ nm �� - Ow O w G h w Cw N p in N O w O M h N w In w N h w w 8 8 88 8 8 dE 8 88 8 88 8 8 8 8 8 8 o _8 8 8 0 8 �a V m v _ _ _ r> - -nl n W w h h h w h h h h h w w h w N h h x 3 0 0 0 c o 'o'c aa°2 8 2 c o c o 0 p' j O,O p O.m �^P.GO,O m b a i ri P w h w w w h N h w h w w N In w h h w h h 88 8 8 8 8 8 8 8 8 8 ti 4c g & -'ter 8 § 'S, $ a 3 E g�1'Fn- $ m tR R - r� m n, r., P. m o g �. 4 no fi C 2 P. e p Z h h h w w h h h w h VI w IA y, w h h h w h h .x 8, 8 8 '3 '.3 88 8 8. 8 8 8 8 x 8 8. S. 23 c 8 8 m 3 V 3 v n, °cc, v ry �. h ,7 w w w w w w w w w w w w V,w h w h h w w 88 6 m m 2 o n w _ - o S c o v a n N I F N N w h h h h h h h h h h h h h h 6,w h h h w , 888 8 _o v qw h 0. _ - Nt m — P. N N n V _ O Wk O a V h h h h h h h h VI h VI h h h h w h in.11 E." o a^id I.n`De <o h N•n r,_ N to d 6 d 3 9 1 a1 a Q 5 . g w g 3 z▪� O u + O 2- w k "i u O 4 5 GOaF z O LW0. ll 14 �'w x u m, CDz Ii h'• H = K V C r•L4 h C .��, w 4,,' O W U tCC� O aWI2{a� c E a e w6 w z40U a ONO 0.a z F- c i P 01 W x [m a Z 4.p_Q 0 6 _ e �� a o'w'va m~ s �•, Auo7d>umod o >a ..� w uwSwF- ? c � z6e, '.?2 -za a>x mcE,w, , ri.t g a Eff,,Oaual.ou uOdu 4 :a. 1 4 S V:W � Oe,aoo'2 "N'a5L>r,,wvia w c C p Z F-ry ,n R v.„, m P 0-N<n O N.r » , CaY `�4 R I Sri ., INSTR 6417384 OR 6259 PG 809 E-RECORDED 6/16/2023 12:42 PM PAGES 8 CLERK OF THE CIRCUIT COURT AND COMPTROLLER, COLLIER COUNTY FLORIDA REC $69.50 ALTER SURETY GROUP, INC. Bond Department-Public Works Bond In compliance with Florida Statute Chapter 255.05,the provisions and limitations of section 255.05 Florida Statutes,including but not limited to,the notice and time limitations in Sections 255.05(2) and 255.05(10)are incorporated in this bond by reference. Bond Number: 1102940 Contractor Coastal Concrete Products,LLC Address& 7742 Alico Road Fort Myers,FL 33912 Phone No.:(239)263-9700 Surety The Hanover Insurance Company Address & 440 Lincoln Street Worcester,MA 01653 Phone No.: 508-855-2742 Owner Name:Collier County Board of County Commissioners Address & 3299 Tamlaml Trail East Naples,FL 34112 Phone No,: 239-252-8999 Contracting Public Entity (if different from the owner) Address & Phone No.: Contract/Project Number: Contract 20-7800/Protect Number 60143.9.1 Project Name: Sanitation Road Culvert Replacements;Underground Contractor Services-Annual Contract Project Location: Collier County,Florida Legal Description And Street Address: Collier County,Florida Description of Improvement:Sanitation Road Culvert Replacements This bond is given to comply with section 255.05 Flnririn Statutes and any action instituted by a claimant undcr this bond run payment must be in accordance with the notice and time limitation provisions in Section 255,05(2)and(10),Florida Statutes. Any provision of this bond which conflict with or purports to grant broader or more expanded coverage in excess of the minimum requirements of the applicable statute shall be deemed deleted herefrom, This bond is a statutory bond,not a common law bond. This is the front page of the bond. All other page(s)are deemed subsequent to this page regardless of any page number(s)that may be pre-printed thereon. OR 6259 PG 810 Exhibit C•1 ❑this exhibit is not applicable PUBLIC PAYMENT BOND Bond No, 1102940 Contract No. 20-7800 Coastal Concrete Products, LLC dba KNOW ALL MEN BY THESE PRESENTS: That Coastal Site Development , as Principal, and The Hanover Insurance Company , as Surety,located at 440 Lincoln Street, Worcester, MA 01653-0002 (Business Address). are oheld TQond andht fi`rmly undro bound to Board of Countycoer tasloners Collia,County,Ronda as Oblige In the sum of Fl.k rdnr,"et tno ($ 524.82400 ) for the payment whereof We bind ourselves, our heirs, executors, personal representatives, successors and assigns,jointly and severally, WHEREAS, Principal has entered Into a contract dated as of the�thday of June ,2023 with Oblige for Sanitation Road Culvert Replacements,Project Number 60143.9.1; Underground ContractorSeivices-Annual Contract in accordance with drawings and specifications,which contract Is Incorporated by reference and made a part hereof, and is referred to as the Contract THE CONDITION OF THIS BOND Is that if Principal: Promptly makes payment to all claimants as defined In Section 255,05(1), Florida Statutes, supplying Principal with labor, materials or supplies, used directly or Indirectly by Principal In the prosecution of the work provided for in the contract, then this bond Is void; otherwise It remains In full force. Any changes In or under the Contract and compliance or noncompliance with any formalities , connected with the Contract or the changes do not affect sureties'obligation under this Bond. The provisions of this bond are subject to the time limitations of Section 256.0592, In no event will the Surety be liable in the aggregate to claimants for more than the penal sum of this Payment Bond, regardless of the number of sults that may be filed by claimants. IN WITNESS WHEREOF, the above parties have executed this Instrument this 15th day of June , 2023, the name of under-signed representative, pursuant to authority of Its governing body, The provisions and limitation of section 255.05 Florida Statutes,including but not limited to the notice and time limitations in sections 255.05(2)and 255.05(10),are incorporated In this bond by reference. • Page 19 of 33 Multi•Oontractor Award Agrearneni 12021_ver.1) l OR 6259 PG 811 lIt! n t S ne ,s d and delivered the p e.e e of: PRINCIPAL: Coastal Concretespto ctgLL rvia; a,;,;, C astal Site ev lob ty ti 1 Witnesses as to Principal Na a 1/ft i1\\. Its: STATE OF FLORIDA COUNTY OF LEE The foregoing Instrument was acknowledged before me by means of 13I physical presence or 0 online notarization,this 15th of June 20_23 ,by David E.Torres ,as - ..Managnr of 5 A?.X a.o°#4monfC ,a Flnrtrl . corporation, on behalf of the corporation. He/she is personally known to me OR has produced as Identification and did(did not)take an oath, My Commission Expires: 2114\ ( gn r of Notary Pulp-State of Florida) VNotary Public Soto of Florida l {.1FhLa U0/1( 4 My CommissionAr Name:(Legibly Printed) • ""'ill HH 2O7499 Exp,12/14/2025 (AFFIX trmrterle Sr tr. Notary Public, State of 'rL©(LA 0 Commission No.: 1-4f4 a01 U�-6 ATTEST: SURETY: The Hanover Insurance Company (Printed Name) 440 Lincoln Street,Worcester,MA 01653-0002 (Business Address) (Authorized Signature) • Witness as to Surety (Printed Name) OR Page 20 or 33 liuIU Oonlruotor Award'Agreament I2021_ver.11 • �;r-- OR 6259 PG 812 u- • n Dowlin Wit es As Attorney In Fact VV rren M. Alter (Attach Power of Attorney) finesses wn Auspitz,Witness 5979 NW 151st#202, Mialmi Lakes, FL 33014 (Business Address) Warren M.Alter (Printed Name) 305-517-3803 (Telephone Number) STATE OF Florida COUNTY OF Miami-Dade The foregoing Instrument was acknowledged before me by means ofcphyslcai presence or 0 online notarization,this,15th of June 20 73,by Warren M.Alter ,ea Aftnrnsy-In-Fact Of The Hanover Insurance Comn.arty a New Hampshire corporation, on behalf of the corporation, He/she Is personally known to me OR has produced pejsonallyknaWn as identification and did(did not)take an oath, My Commission Expires: Signature tary Public-State of Florida) Name: Dawn Auspitz (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public,State of Florida DAWNAIJSPITX Commission No.: HHIn8669 NOTARY PUBLIC STATE OF FLORIDA NO.1tH188668 MY COMMISSION EXPIRES NOV.16,2025 • • Page 21 or 23 Mu IU•Conlreotor Award Agreement(2021 ver.1) OR 6259 PG 813 []this exhibit is not applicable EXHIBIT C-2 PUBLIC PERFORMANCE BOND Bond No, 1102040 Contract No, 20-7800 Coastal Concrete Products,LLC dba KNOW ALL MEN BY THESE PRESENTS; That Coastal Site Development ,as Principal,and The Hanover tnsuranre(:nmpAny ,as Surety, located at 440 Lincoln street, Nnrrastar,MA 0165't 00a2 (Business Address)are held and firmly bound to Board of County Commissioners Collier County Florida ,as Oblige In the sum of Five Hundred Twenty Four Thousand Rant Hundred Twenty Four and No/100($ 594 A24 nn )for the payment whereof we bond ourselves,our heirs,executors, personal representatives, successors and assigns,Jointly and severally. WHEREAS, Principal has entered Into a contract dated as of the15lklay of June 20 23 ,with Oblige for Sanitation Road Culvert Replacements, Proiect Number 60143.9.1; Underground Contractor SPrviraS-Annual Contract in accordance with drawings and specifications,which contractor Is incorporated by reference and made a pat hereof,and Is referred to as the Contract, THE CONDITION OF THIS BOND is that If Principal; • 1. Performs the Contract at the times and In the manner prescribed in the Contract, and 2, Pays Oblige any and all losses, damages,costs and attorneys'fees that Oblige sustains because of any default by Principal under the Contract,Including,but not limited to,all delay damages,whether liquidated or actual, Incurred by Oblige;and 3, Performs the guarantee of all work and materials furnished under the Contract for the lime specified in the Contract,then this bond Is void;otherwise it remains in fell force, Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the • changes do not affect Sureties obligation under this bond. The Surety, for value received, hereby stipulates and agrees that no changes, extensions of time, alterations or additions to the terms of the Contractor other work to be performed hereunder,or the specifications referred to therein shall in anywise affect Its obligations under this bond,end It does hereby waive notice of any such changes, extensions of time, alternations or additions to the terms of the Contract or to work or to the specifications, Page 22 of as Mu1I Oonlrector Award Agreement[2021_ver.1 i ' OR 6259 PG 814 This Instrument shall be construed In all respects as a common law bond, it is expressly understood that the time provisions and statute of limitations under Section 265.05,Florida Statutes,shalt not apply to this bond. In no event will the Surety be liable In the aggregate to Oblige for more than the penal sum of this Performrance bond regardieas of the number of sults that may be filed bynblJDe. IN WITNESS WHEREOF,the above parties have executed this instrument this . 15th day of June 20 23 ,the name of each party being affixed and these presents duly signed by its undpl'. l�V� `; ;,, representative,pursuant to authority of its governing body, vAr.s' it;. • Sig d s le a d delivered 7>q4,,k ,V1-4`' c?�. r F j,•�2, ) rt l in t e pres nc f; PRINCIPAL: '7 ,'''3` r++t` ?i,, n 4,, —._____ Coastal Concrete Produ µ ; i ;d () �� 4s scat Site Dev%ophlse��v4; It i k <,;,s!Q 41 ?, ��4� / Graf '� .IiMO,agc, q JJ ¢p � I� •ld Witnesses as Princ pal • Na David E.Torres f �: °�. 'a-'s`:' Its HM�111 STATE OF. FLORIDA COUNTY OF LEE The foregoing instrument was acknowledged before me by means or el physical presence or tJ online notarization,this 15th of June 20 23 ,by David E.Torres ,as Manager 10f4oastal se Eemveu eLntt-4^•,a Fro Ida c rpora#Eon, on behalf of the corporation, He/she Is persona y known to me OH has produced as identification and did(did not)take an oath. My Commission Expires: \7.\ IL L) (Slgnatu a ary Public-St a of Florida) Name; t r • (AFFIX OFFICIAL SEAL) (Legibly Prin etl) rr Notary Public, State of fi.,0 t��1 4 OP( I Notary Public State of Florida ,. Maritza Aguler i (ff'ij My Commission I Commission No,; ii 9(�� ""•`Ill!""k HH 207493 Exp.12114/2025 I Page 23 or 33 Will Contractor Award Agreement t2021„vor.11 oR 6259 PG 815 ATTEST: SURETY: The Hanover Insurance Company (Printed Name) 44u Lincoln Street,Worcester, MA 01653.0002 (Business Address) (Authorized Signature) Witness as to Surety (Printed Na ) OR ` '� Dowfin As Attorney In Fact Warren M.Alter ," (Attach Power of Attorney) itne mosses n Auspitz,Witness 5979 NW 151 st#202,Mialmi Lakes, FL 33014 (Business Address) Warren M.Alter (Printed Name) 305.517-3803 (Telephone Number) STATE OF Florida COUNTY OF Miami-Dade The foregoing Instrument was acknowledged before me by means of tfphyslca{presence or Cl online notarization,this of 20 ,by Warren M Alter ,as Attorney-in-Fact ofThe Hanover Insurance Company,a New Hampehira corporation, on behalf of the corporation, He/she Is personally known to me OR has produced personally known as identification and did(did not)take en oath. My Commission Expires: Ignature of ary Public-State of Florida) Name: Dawn Auspltz (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public,State of Florida DAWN A.1SPITZ NOTARY PUSUC Commleslon No•: H8188669 STATE OF FLORIDA NO.HH188669 MY COMMISSION EXPIRES NOV.18,2033 Page 24 of 33 MulU Contractor Award Agreement t2021_vee11 *** OR 6259 PG 816 *'* THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSURANCE COMPANY OF AMERICA • POWER OF ATTORNEY THIS Power of Attorney limits the acts of those named herein,and they have no authority to bind lho Company except In the manner and to the extent herein stated, KNOW ALL PERSONS BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY,both being corporations organized and existing under the laws of the State of Item Hampchiro,and CITIZENC INSURANCC COMPANY OF AMERICA,a corporation urganlzed and existing under the laws of It1e State of Michigan,(hereinafter individually and collectively the"Company")does hereby constitute and appoint, Warren M.Alter and/or David T,Satins Of Alter Surety Group Inc.of Miami Lakes,FL each Individually,if there be more than one named,as its true and lawful attorney(s)-in-fact to sign,execute,seal, acknowledge and deliver for,and on Its behalf,and as its act and deed any place within the United States,any and all surety bonds,recognlzances,undertakings,or other surety obligations.The execution of such surely bonds,recognizances,undertakings or surety obligations,in pursuance of these presents,shall be as binding upon the Company as If they had been duly signed by the president and attested by the secretary of the Company,In their own proper persons.Provided however, that this power of attorney limits the acts of those named herein;and they have no authority to bind the Company except in the manner stated and to the extent of any limitation stated below; Any such obligations In the United States,not to exceed Twenty Million and No/100(520,000,000)In any single Instance That this power Is made and executed pursuant to the authority of the following Resolutions passed by the Board of Directors of said Company,and said Resolutions remain in full force and effect: RESOLVED; That the President or any Vice President,in conjunction with any Vice President,be and they hereby are authorized and empowered to appoint Attorneys-in-fact of the Company,In Its name and as II acts,to execute and acknowledge for and on Its behalf as surety,any and all bonds, recognizances,contracts of indemnity,waivers of citation and all other writings obligatory in the nature thereof,with power to attach thereto the seal of the Company.Any such writings so executed by such Attorneys-In-fact shall be binding upon the. Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company in their own proper persons. RESOLVED:That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification In respect thereto,granted and executed by the President or Vice President In conjunction with any Vice President of the Company,shall be binding on the Company to the same extent as If all signatures therein were manually affixed,even though one or more of any such signatures thereon may be facsimile.(Adopted October?,1981— The Hanover insurance Cnmpany:Adopted April 14,1082--Maccoebueetto Boy Inaurance Company;Adopted 3epternber 7,2001—Citizens Insurance Company of America and affirmed by each Company on March 24,2014) IN WITNESS WHEREOF,THE HANOVER INSURANCE COMPANY,MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals,duly attested by two Vice Presidents,this 2"day of March,2022. THE HANOVER INSU E COMPANY THE HANOVER INSURANCE COMPANY MASSACHUSETTS Y 19URANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZEN8INSURA E C MPANY OF AMERICA CITIZENS INSURANCE COMPANY OF AMERICA Bryan J a,6NO0U a Vloo President J m H.KawIecki,V ce President r a ereu '1ty" THE COMMONWEALTH OF MASSACHUSET'fS ) COUNTY OF WORCESTER )ss. On this 2"d day of March, 2022 before me came the above named Executive Vice President and Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America.tome personally known to be the individuals and officers described herein, and acknowledged that the seals affixed to the preceding instrument are the corporate seals of The Hanoverinsurance Company,Massachusetts Bay Insurance Company and Citizens Insurance Company of America,respectively,and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said instrument by the authority and direction of said Corporations. El., ARLEEN V. SIMONSaeloc,"C ,/ Notary Public f VCOttliONWEAL1110f siASSACItt>SET15 Arleen V.Simons,Notary FTu is My Commission E■pirae Junrr 16, soza My Commission Expires June 18,2023 I,the undersigned Vice President of The Hanover Insurance Company,Massachusetts Bay Insurance Company and Citizens Insurance Company of America, hereby certify that the above and foregoing is a full,true and correct copy of the Original Power of Attorney Issued by said Companies,and do hereby further certify that the said Powers of Attorney are still in force and effect. GIVEN under my hand and the seals of said Companies,at Worcester,Massachusetts,this_ __day of_ THE HANOVER INSURANCE COMPANY M •HU5ETTS BAY INSURANCE COMPANY • V � %C9r/PANY OF AMERICA CERTIFIED COPY _ ohm A.RmYrdawr,J Vt VIGo Prost QM 9123 10/23 11/23 12123 01/24 Replace Sanitation Road Culvert 75 mfii-e.-..6-4., --,.e,f-.,,...,z---4..imi,,,,,...--•. ,.....—-.,. .. n411-.1:,,RAW-ii.1,--0.00414:0-5,00,01V-10.0Agrt*Z`.0' .,,,.......-...,-...,..tp„,-- ,-.,•,,,c,z.-,.,-..,,,,,2.4.,,>,:y..„,.,...4,,a,-...-fi,-.',;---,,,,o,,,p**,.....,,, ,,,,.., , „. ,,, ..,....,-,„.„,....,,4,4,4.,,,,• , ,. LazoBrittany From: Dewey Noble <DNoble@qeusa.com> Sent: Friday, May 26, 2023 1:24 PM To: LazoBrittany Cc: Lou Gaudio; Marcie Cohen Subject: Quote Attached - Sanitation Road Culvert Replacement Attachments: QE Quote Submission - Sanitation Road Culvert Replacement.pdf; Bid Schedule RFQ 60143,9.1 Sanitation Road Culvert Replacement,xlsx Follow Up Flag: Follow up Flag Status: Completed EXTERNAL EMAIL:This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Hello Brittany, Attached are the completed Request for Quote Form, Revised Bid Schedule and (3)Addendums acknowledged for Sanitation Road Culvert Replacement. Please provide the bid results at your earliest convenience. Thanks and have a good Memorial Day weekend. Dewey Noble Chief Estimator c:239-571-5254 o:239-435-7200 e:dnoblengeusa.com 3494 Shearwater Street, Naples, FL 34117 1 (gin i€r ::a()yiOLLY Transportation Management; Services Department AGREEMENT NO.20-7800 I "UNDERGROUND CONTRACTOR SERVICES" Capital Project Planning,Impact fees& TERM ENDS:06/21/2026 Program Management Division To: maguiar@coastalconcreteproducts.com;dmachado(d),coastalsitework.cum;david@torrescompanies.com; andrew(c cougarcontractingllc.com;Kwilkie2000@dnhiggins.com; danh(<Nnhiggins.com; mikel(n)dnhiggins.com; tammyl@dnhiggins_com;lttnac_pliee().haskinsinc.net; lc.yleconstin aol.com; BPenner@milchellstark,com; Kmarlchardt r),pwc-Ilc.com; bred aswutility.net;shane(i swutility.net lgaudioOdgeusa.com; meohenC igeusa,com Contact: Brittany Lazo, Project Manager II Brittany.lazo(acol liercounlyfl.gov_ Direct line: 239.252.5728/Cell:239.919.0919 Schedule of Events Project Name:"Sanitation Road Culvert Replacements" REQ Release Date: 5/05/2023 Pre-Bid Meeting(Non-Mandatory): 5/22/2023 @ 9:00 a.m. Pre-Bid Meeting Location: 1020 Sanitation Rd,Immokalec(southern parking lot at Immokalee Water and Sewer District office) Questions Due: 5/24/2023 @ 3:00 p.m. Quotes Due: 5/26/2023 @ 3:00 pan.,EDT Documentation Included: Scope of Work,Plans,Did Schedule Number of Days to Final Completion: 75 days(Substantial 45 days-f 30 Final Completion clays) Liquidated Damages: N/A Payment&Performance Bonds: Quotes over$200,000 Interested Contractors shall fill In the Request for Quotation Form and Bid Schedule and email them to Brittany Lazo dtttany.Iazo(izeolliercount ff l gov)by the Quote due date and time. Firm Name: Quality Enterprises USA, Inc. Quote Submission Date: 5/26/23 Quote Valid for: 60 Days Print Name&Title: Louis J. Gaudio, Vice President stl;uatt�rf'"+ 5 y---- Email; LGAUDIO@QEUSA.COM Direct Line: 239-435-7200 Cell Phone: 239-207-0660 � Email: Brittany.lazo(a colliercounty l.Gov COI Ter County Direct:239,252,5728 Transportation Management ADDENDUM 1 Services Department Capital Project Planning.Impact Pees& Program Management Division Date:May 15,2023 To: Awarded Contractors/Agreement No.20-7800"Underground Contractor Services" From:Brittany Lazo,Project Manager II RE: Sanitation Road Culvert Replacement Subject: Bid document modifications Addendum 1 modifies/adds the following documents as listed below and provides responses to questions.Please sign and fill in the addendum below and submit it with the firm's bid submission. • Response Form—addition of non-mandatory pre-bid meeting on 5/22/2023 @ 9:00 a.m. at 1020 Sanitation Rd, Immokalee southern parking lot of Immokalee Water and Sewer District office. • Bid Schedule--Provides a modified excel spreadsheet(see highlighted lines) Sign below and return the addendum with the firm's bid submission for the above-referenced quote. Firm Name: Quality Enterprises USA, Inc. Date: 5/15/23 signature: Louis J. Gaudio, Vice President yM. Email: Brittany,lazoZUcotliercauutyfl,gov iar County Direct; 239.252.5728 Transportation Management ADDENDUM 2 Services Department Capital Project Planning,Impact Fees& Program Management Division Date: May 22,2023 To: Awarded Contractors/Agreement No. 20-7800"Underground Contractor Services" From; Brittany Lazo,Prujcct Manager II RE: Sanitation Road Culvert Replacement Subject: Bid document modifications Addendum 2 which answers the following question below. • Question#i—Do you want us to bid that we will be doing this in the raining season considering we are the start of it, or can this be pushed to this fall not during the raining season? • Answer t1-A limited notice to proceed (LNTP)will be issued in Summer to give the opportunity to the contractor to order the required material. An NTP will be issued in Fall to commence construction. This will be coordinated with the contractor and the County. The intent is to allow for the materials to be delivered and start construction after the rainy season. Sign below and return the addendum with the firm's bid submission for the above-referenced quote. Firm Name: Quality Enterprises I.ESA,Inc. Date; May 22,2023 Signature; f-- Louis J.Gaudio,Vice President Email: Brittany,lazo@colliercountyfLgov Cofer County Direct:239.252.5728 Tramp ortation Management ADDENDUM 3 Services Department Capital Project Planning,Impact Fees& Program Management Division Date:May 24, 2023 To: Awarded Contractors/Agreement No,20-7800"Underground Contractor Services" From: Brittany Lazo,Project Manager II RE: Sanitation Road Culvert Replacement Subject: Bid document modifications Addendum 3 which answers the following question below. • Question#1—Why Is Type B Stabilization have such a high quantity?The roadway is only 321 SY, but Stabilization is 2,392 SY? • Answer#1-Please note that there was a typo In the quantity of Type B Stabilization, please refer to the revised bid schedule for the corrected quantity. • Question#2 48" RCP (To include flowable fill backfill)there is nothing on drawings to show the limits of the flowable fill,confused on where and how much of this is required? • Answer#2-Plan sheet#6 clearly Indicates the limits of the flowable fill. • Question#3—Is the FDOT FY 2017-18 design standards Side drain mitered end section what your requiring for the Quadruple Concrete End Section,48"RCP? • Answer#3—See project plan set—FDOT 2022-23 Standard Plans"Cross Drain Mitered End Section"Sheet 2 of 3&3 of 3 for detail. • Bid Schedule-(See attached) Provides a modified excel spreadsheet see update in highlighted orange. • Revised Plan set with detail sheets-(See attached) Sign below and return the addendum with the firm's bid submission for the above-referenced quote. Firm Name: Quality Enterprises USA,Inc. Date: May 24,2023 Signature: Louis J,Gaudio,Vice President — Project: Sanitation Road Culvert Replacements Project No.: 60143,9.1 Agreement: 20-7800"Underground Utility Contractors" BID SCHEDULE Contractor: Quality Enterprises USA,Inc. Bid Submission Date: 5/26/2023 Item Item Description Unit Estimated Unit Price Total Price Number Quantities 1 MOBILIZATION LS 1 $ 66,914.00 $ 66,914.00 2 MAINTENANCE OF TRAFFIC LS I $ 8,238.00 $ 8,238,00 3 CLEARING&GRUBBING LS I $ 97,21 1.00 $ 97,211,00 4 LICENSED SURVEYOR LS I $ 6,069.00 $ 6,069.00 5 PERFORM 2 TEST HOLE FOR MUCK INVESTIGATION LS 1 $ 8,218.00 $ 8,218,00 6 TYPE III TURBIDITY BARRIERS/SILT FENCE LS 1 $ 4,501.00 $ 4,501.00 7 EMBANKMENT CY 100 $ 62.00 $ 6,200.00 8 TYPE B STABILIZATION SY 39$ $ 11.00 $ 4,378.00 9 OPTIONAL BASE,BASE GROUP 04 SY 321 $ 21.00 $ 6,741,00 10 SUPERPAVE ASPHALTIC CONCRETE,TRAFFIC B TN 26 $ 527.00 $ 13,702.00 l l PIPE CULVERT,OPT MATERIAL,ROUND,48"S/RCP(TO INCLUDE LF 108 $ 790.00 $ 85,320.00 FLOWABLE FILL BACKFILL) 12 QUADRUPLE CONCRETE END SECTION,48"RCP EA 2 $ 34,976.00 $ 69,952.00 13 RIPRAP,RUBBLE,F&I,DITCH LINING TN 136 $ 131.00 $ 17,816.00 14 PERFORMANCE TURF,SOD SY 658 $ 12.00 $ 7,896.00 15 SELECT BEDDING MATERIAL-#57 STONE(2'MINIMUM DEPTH) CY 84 $ 128.00 $ 10,752.00 16 PROTECTION AND SUPPORT OF EXISTING UTILITIES LS I $ 9,104.00 $ 9,104.00 17 MUCK EXCAVATION AND DISPOSAL CY 358 $ 39.00 $ 13,962.00 18 SUBSOIL EXCAVATION CY 160 $ 39.00 $ 6,240.00 19 EMBANKMENT TMCY 224 $ 62.00 $ 13,888.00 20 SELECT BEDDING MATERIAL-#57 STONE(REPLACEMENT OF MUCK) CY 358 $ 91.00 $ 32,578,00 21 PROJECT ALLOWANCE T&M 1 $50,000.00 Total Bid(Bid Subtotal&Allowance) $ 539,680.00 LazoBrittany From: Mark Heath <mheath@pwc-Ilc.com> Sent: Friday, May 26, 2023 11:13 AM To: LazoBrittany Subject: Request for Quote "Sanitation Road Culvert Replacement" (Utilizing CC 20-7800) Attachments: Signed Bid Docs Sanitation Road Culvert Replacement.pdf; PWC Bid Schedule RFQ 60143,9.1 Sanitation Road Culvert Replacement.xlsx EXTERNAL EMAIL: This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Brittany,thanks for the opportunity. Thanks again! Mark J. Heath Senior Estimator PWC, LLC, 5256 Summerlin Commons Way Suite 203 Bldg#2 Fort Myers, FL 33907 Cell: 803-602-2671 Office: 239-270-5907 Fax: 239-270-5943 Website: www.pwc-11c.com CGC1523067 41G1.0 This transmission is confidential and intended solely for the person(s) or organization(s)to whom it is addressed. It may contain privileged and/or confidential information, If you are not the intended recipient,you are not authorized to copy, distribute or take any action in reliance on it. If you have received this transmission in error,please notify the sender by reply email and delete this transmission. . a I r County RESPONSE FORM Transportation Management Services Department AGREEMENT NO.20-7800 "UNDERGROUND CONTRACTOR SERVICES" Capital Project Planning,Impact Fees& TERM ENDS:06/21/2026 Program Management Division To: ma�.uiar_a'coastalconcreteproducts.com;dmachadoTcoastalsitework.com;davvid torrescomi}anies.com; andrewa_cou"arcontractinLllc.com,Kwilkie2000 a dnh1L nis corn, danh a dnhiLL }inscorn, mikeI i dnluz',oins,com;tamm\I r dnhiuuins.con?;Rmacphee r1 haskinsinc.net,K\leconstinc rraol.com; BPenner mitchellstarkcomKmarkhardt a pwc-llc corn brett a swutilk.net;Shane ar;swut►lit :net lgaudio rr,geusa.com;mcohen°r. eusa.com Contact: Brittany Lazo,Project Manager II Brittany azy rcolhercounty Direct line: 239.252.5728/Cell:239.919.0919 —__—_-- Schedule of Events Project Name:"Sanitation Road Culvert Replacements" RFQ Release Date: 5/05/2023 Pre-Bid Meeting(Non-Mandatory): 5/22/2023 @ 9:00 a.m. Pre-Bid Meeting Location: 1020 Sanitation Rd,Immokalee(southern parking lot at Immokalee Water and Sewer District office) • Questions Due: 5/24/2023 @ 3:00 p.m. Quolt,.,v Due, _ 5/264024 3:#0.Pm;EDT Documentation Included: Scope of Work,Plans,Bid Schedule Number of Days to Final Completion: 75 days(Substantial 45 days+30 Final Completion days) Liquidated Damages: N/A Payment&Performance Bonds: Quotes over$200,000 Interested Contractors shall fill in the Request for Quotation Form and Bid Schedule and email them to Brittany Lazo(Brittany:lazow.coiliercauntN flip ovj by the Quote due date and time. Firm Name: PWC Joint Venture, LLC, Quote Submission Date: Quote Valid for: 5/26/2023 Print Name&Title: Signature: Kevin Markhardt, Senior Vice President \•/ Email: kmarkhardt@pwc-11c.com Direct Line: Cell Phone: (239) 270-5907 (239) 270-5907 ti;se Email:Brittany.I aZiDcolIiercountvfI.gov CO. COI/int-1y Direct:239.262.6728 Transportation Management ADDENDUM t Services Department Capital Project Planning,impact Pees ffi Program Management Division Date: May 15,2023 Toc Awarded Contractors/Agreement No.20-7800"Underground Contractor Serviced' From: Brittany Lazo,Project Manager I€ RE: Saiitetion Road Culvert Replacement Subject: Bid document modificions Addendum 1 modifies/adds the fol fowl ng documents as listed below and provides responses to questions.Please sign and fill in the addendum below card submit it with the fi rm's bid submission. • Re once Farm—addition of non-mandatory pre-bid meeting on 5/22/2023 @ 9:00 am.et 1020 Sanitation Rd, I mmokaiee southern parking lot of I mmokalee Water and Sewer District office. • Bid Schedule—Providesa modified excel spreadsheet(see highlighted lines) Sign beimvand return the addendum with the flrm'sbld eubmieetanfor theabo+releferenoed qude ' Flrm Names PWC Joint Venture, LLC. Dete 5-23-2023 Signature Project: Sanitation Road Culvert Replacements Project No.: 60143.9.1 Agreement: 20-7800"Underground Utility Contractors" BID SCHEDULE Contractor: PWC Joint Venture,LLC Bid Submission Date: 5/26/2023 Item Item Description Unit Estimated Unit Price Total Price Number Quantities 1 MOBILIZATION LS l $ 15,000.00 $ 15,000,00 2 MAINTENANCE OF TRAFFIC LS 1 $ 5,000.00 $ 5,000.00 3 CLEARING&GRUBBING LS 1 $ 8,000.00 $ 8,000.00 4 LICENSED SURVEYOR LS 1 $ 15,000.00 $ 15,000,00 5 PERFORM 2 TEST HOLE FOR MUCK INVESTIGATION LS 1 $ 7,000.00 $ 7,000.00 6 TYPE III TURBIDITY BARRIERS/SILT FENCE LS 1 $ 1,700.00 $ 1,700,00 7 EMBANKMENT CY 100 $ 180.00 $ 18,000.00 8 TYPE B STABILIZATION SY 398:j $ 30.00 $ 11,940,00 9 OPTIONAL BASE,BASE GROUP 04 SY 321 $ 50.00 $ 16,050.00 10 SUPERPAVE ASPHALTIC CONCRETE,TRAFFIC B TN 26 $ 1,200.00 $ 31,200.00 11 PIPE CULVERT,OPT MATERIAL,ROUND,48"S/RCP(TO INCLUDE LF 108 $ 1,860.00 $ 200,880.00 FLOWABLE FILL BACKFILL) 12 QUADRUPLE CONCRETE END SECTION,48"RCP EA 2 $ 13,000.00 $ 26,000,00 13 RIPRAP,RUBBLE,F&I,DITCH LINING TN 136 $ 150.00 $ 20,400.00 14 PERFORMANCE TURF,SOD SY 658 $ 7.00 $ 4,606.00 15 SELECT BEDDING MATERIAL-#57 STONE(2'MINIMUM DEPTH) CY 84 $ 200.00 $ 16,800,00 16 PROTECTION AND SUPPORT OF EXISTING UTILITIES LS 1 $ 7,000.00 $ 7,000.00 17 MUCK EXCAVATION AND DISPOSAL CY 358 $ 70.00 $ 25,060.00 18 SUBSOIL EXCAVATION CY 160 $ 70.00 $ 11,200.00 I EMBANKMENT TMCY 224 $ 90.00 $ 20,160.00 20 SELECT BEDDING MATERIAL-#57 STONE(REPLACEMENT OF MUCK) CY 358 $ 120,00 $ 42,960,00 21 PROJECT ALLOWANCE T&M 1 $50,000.00 Total Bid(Bid Subtotal&Allowance) $ 553,956.00 From:Tammy Ludwig<tammyl@clnhiggins.com> Sent:Thursday, May 25, 2023 1:27 PM To: LazoBrittany<Brittany.Lazo@colliercountvfl.gov>;ZordanMark<Mark.7-ordan@colliercountyfl.gov>; RomanDaniel <Daniel.RomaIPcolliercountyfl.gov>; DunhamNadine<Nadine.Dunham@colliercountyfl.gov> Cc: DANH@dnhip iins.corn; Mike Lobello<rnikel@dnhiggins.com> Subject:Sanitation Road Culvert Replacements-Quote EXTERNAL EMAIL:This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Brittany, Attached is our quote for the Sanitation Road Culvert Replacements project. Have a great afternoon! Tammy Ludwig Office Manager Douglas N. Higgins, Inc. 4485 Enterprise Ave. Naples, FL 34104 Phone: (239)774-3130 Fax: (239)774-4266 Email: tammvl@dnhiggins.com Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic::mail to this entity. Instead, contact this office by telephone or in writing, 2 LazoBrittany From: Tammy Ludwig <tammyl@dnhiggins.com> Sent: Thursday, May 25, 2023 2:02 PM To: LazoBrittany Subject: RE:Sanitation Road Culvert Replacements - Quote Attachments: Add 3 - Bid Schedule RFQ 60143.9.1 Sanitation Road Culvert Replacement.xlsx Follow Up Flag: Follow up Flag Status: Completed EXTERNAL EMAIL.:This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Brittany, Attached is the excel format you requested. Tammy Ludwig Office Manager Douglas N. Higgins, Inc. 4485 Enterprise Ave. Naples, FL 34104 Phone: (239) 774-3130 Fax: (239) 774-4266 Email: tammyl@dnhiggins.com From: LazoBrittany<Brittany.Lazo@colliercountyfl.gov> Sent:Thursday, May 25,2023 2:00 PM To:Tammy Ludwig<tammyl@dnhiggins.com> Subject: RE: Sanitation Road Culvert Replacements-Quote Tammy, Do you mind send the excel format also? Brittany Lazo Project Manager II Stormwater Management ier County Transportation Management Services Capital Project Planning,Impact Fees&Program Management 2685 South Horseshoe Drive Naples FL 34104 Tel: 239 252 5728 Brittany.lazo{5.colliercountvf!.gov 1 (3 Ter Ct:ll:.. 11y RESPONSE FORM "I'ransportafirm Management AGRI.L N1L.N'I'NO.20-7800 Capital iil'1't]1P]tt; "IINDRRGR(111N I)CONTRACTOR�SI�;RVKTS" Capital Project Planning.Impact Fees vf, '1'EHMY1 ENDS: 06/21/2026 Program Management Division To: I1,r[1,gniu legastalet)nerele lroducls.coin;t ivachadu tl cousialsiiework.com;davi(1@torrescompantes.conl; tndrety(/i)eounmt'coniraotingllc.com; Kwilkie2000@ nlilsgg.ins.goitl;c, inh titdi ig tns.ccm; nti lam nyl,(irklnlii�r�.ins.c_trn; Ri MTheefil)has kinsincnet; 1:.yt:crmstii�c�rrf���l.cc�Iti; 1il:ennerki)milcheilslark,com;Kinarl.harc.lt{rr:myc—tic.,com1_lii'ettci:3swutiliiv, n±tslittro4/2.swutility.net; I=attcliorcir1gettsa_com;nrcohen(Cdq u a.Com Contact: Brittany Lazo,Project Manager II 131:144JIY,.1?4.4P,cnllicrc011111 il.,0v,, Direct line: 239.252,5728/Cell: 239.919.0919 Schedule of Events Project Name:"Nanitatinn Road Culvert Replacements" RPQ Release Date: 5/05/2.023 Pre-Bid Meeting(Non-Mandatory): 5/22/2023 9:00 a.m. Pre-Bid Meeting Location: 1020 Sanitation Rd,Iuinrokalee(southern parking lot m al itnukalee Water and Sewer District office) Questions Due: 5/24/2023 a,3:00 p.m. Documentation included: Scope of Work,Plans,Bid Schedule Number of Days to Final Completion: 75 days(Substantial 45 days+30 Final Completion days) Liquidated Damages: N/A Payment&Performance Bonds: Quotes over$200,000 interested Contractors shall fill in the Request for Quotation Form and Bid Schedule and entail them to Brittany Lazo@rittan z [lcoll cr•tottrtf bl'1" of by the Quote due date and time. Firm Naine: Douglas N.Higgins,Inc. Quote Submission Date: • S .) Quote Valid for: G0 Days j Print Name R.Title: Daniel Higgins,President Signature: V t A,... L'1 ,s. Email: DanII cr,dnhiggins.com Direct Line: 73,1-996-9500 Cell Phone: 239-253-3701 r�. �'3 Bi-ittanvtlazoPeu.11ieNtiuntyLLgst Direct:239,252,5728 Tramp Manageiner'it ADDENDUM 1 Service6 DeptlY'tnierii • Capital Project Planning.I nips et fees& Progr:urr NIcaIgigeltie•nt I)ivisitni Date:May 15,2023 To: Awarded Contractors/Agreement No.20-7800"CJndergrnund Contractor Services" From; Brittany Lazo, Project Manager II RE: Sanitation Road Culvert Replacement Subject: Bid document modifications Addendum 1 modifies/adds the following documents as listed below and provides responses to questions.Please sign and fill in the addendum below and submit it with the firnfs bid submission. • Response Form—addition of non-mandatory pre-bid meeting on 5/22/2023 @ 9:00 a.m. at 1020 Sanitation Rd, Inirnokaiee southern parking lot of Immoka Ice Water and Sewer District office. • Bid Schedule—Provides a modified excel spreadsheet(see highlighted lines) Sign below and return the addendum with the firm's bid submission for the above-referenced quote. Firm Nnmc: tf; ' Date: C� i ,2 3 Signature: f -—L(MtAP,r yi "j r Email: Brittany.IaZo(pcglj-icrcotltityf go' 6,:i()47t;)' T)irect:23I.252.5728 Transportation Management AT)1)T,Nt)TJ14't 2 Services Department Capital Project Planning.Impact Fee:& Program Management Division Date: May 22,2023 '1'o: Awarded Contractors/Agreement No.20-7800"Underground Contractor Services" Trom: Brittany Lazo, Project Manager II RE: Sanitation Road Culvert Replacement Subject: Bid document modifications Addendum 2 which answers the following question below. • _Question_4—Du you want us to bid that we will tie doing this in the raining season considering we are the start of it,or can this be pushed to this fall not during the raining season? • Answer#J1-A limited notice to proceed(LNTP)will be issued in Summer to give the opportunity to the contractor to order the required material. An NTP will be issued in Fall to commence construction. This will he coordinated with the contractor and the County. The intent Is to allow for the materials to he delivered and start construction after the rainy season. Sign below and return the addendum with the firm's bid submission for the above-referenced quote. Date: , r 1 Signalurr.: e '1 ' Email: Brittat�.y.lai:o(i�coliie....rcouittyfl,gov .. oti ' (.)m.tity Direct:239.252.5728 Tt'ansportalion Management ADD ENI)UM3 Services Department Capital Project Planning.Impact Fees Sc Pragratn tMAnage.mi nt i)ivision. Date: May 24, 2023 To: Awarded Contractors/Agreement No.20-7800"Underground Contractor Services" From:Brittany Lazo,Project Manager TI RE: Sanitation Road Culvert Replacement Subject:Bid document modifications Addendum 3 which answers the following question below, • • Question#1.—Why is Type B Stabilization have such a high quantity?The roadway is only 321 SY, but Stabilization is 2,392 SY? • Answer#1-Please note that there was a typo in the quantity of Type B Stabilization, please refer to the revised bid schedule for the corrected quantity. • Question#2—48" RCP(To include flowable fill backfill)there is nothing on drawings to show the limits of the flowable fill,confused on where and how much of this Is required? • Answer#2- Plan sheet#6 clearly indicates the limits of the flowable fill. • Question#3—Is the FOOT FY 2017-18 design standards Side drain mitered end section what your requiring for the Quadruple Concrete End Section,48" RCP? • Answer#3—See project plan set FOOT 2022-23 Standard Plans"Cross Drain Mitered End Section"Sheet 2 of 3&3 of 3 for detail. • Bid Schedule-(See attached) Provides a modified excel spreadsheet see update in highlighted orange. • Revised Plan set with detail sheets-(See attached) Sign below And return the addendum with the firm's bid submission for the above-referenced quote. Firm Notne: i v.G e f _ Date: !t,/ ) Signature. ja/pluo„1,1re: it t� .rlr' Project: Sanitation Road Culvert Replacements Project No.: 60143.9.1 Agreement: 20-7800"Underground Utility Contractors" B1D SCHEDULE Contractor: Douglas N.HiggMs,Inc, -_—__-- Bid Submission Date: 5/25/2023 item Estimated ilhrnnhcr Item Description Unit Unit Price Total Price Qi nntitles I MOBILIZATION IS I $ 61,000.00 $ 61,000,00 2 MAINTENANCE OP TRAFFIC LS I $ 43,000.00 $ 43,000,00 3 C;I,PARING&,ORI.IRRING 1.3 i $ 32,000.00 $ 32,000.00 4 LICENSED SURVEYOR LS I $ 12,000.00 $ 12,000,00 i 5 PERFORM 2 TI S'I'HOLE FOR MUCK INVESTIGATION LS 1 $ 9,000.00 $ 9,000,00 6 TYPE III TURBIDITY BARRIERS/SILT FENCE LS I $ 6,000.00 $ 6,000.00 7 .M13ANKMENT CY 100 $ 80.00 $ 8,000,00 8 TYPE B STABILIZATION SY •.':: i9/I.l...'` $ 16,00 $ — 6,368,00 9 OPTIONAL BASE,BASE GROUP 04 SY 321 $ 38.00 $ 12,198,00 10 SUPERPAVI3 ASPHALTIC CONCRETE,TRAFFIC B 'IN 26 $ 980,00 $ 25,480.00 1 f PIPE CULVERT,OPT'MATERIAL,ROUND,,I8"SIRCP(TO INCLUDE LP I08 $ 1,600.00 $ 172 800.00 PLOWABLE FILL 13AC.KFILL) 12 QUADRUPLE CONCRETE END SECTION,48"RCP _ _ EA 2 $ 38,000.00 $ 76,000.00 13 RIPRAP,RUBBLE,P&l,DITCH LINING TN 136 $ 320.00 $ 43,520,00 14 PERFORMANCE TURF,SOD SY 658 $ 13.00 $ 8,554.00 15 SELECT BEDDING MATERIAL-1157 STONE(2'MINIMUM DEPTH) CY R4 $ 135.00 $ 11,340.00 16 I'RO'ITCTION AND SUPPORT OF EXISTING UTILITIES LS I $ 9,000.00 $ 9,000,00 17 MUCK EXCAVATION AND DISPOSAL CY 358 $ 80.00 $ 28,640.00 18 SUBSOIL EXCAVATION CY 160 $ 70.00 $ 11,200.00 I9 EMBANKMENT TMCY 224 $ R0,00 $ 17,920.00 20 SELECT BEDDING MATERIAL-P57 STONE(REPLACEMENT OF MUCK) CY 353 $ 80.00 $ 28,6,10.00 21 PROJECT ALLOWANCE LS 1 $50,000.00 Total Bid(Bid Subtotal&Allowance) $ 672,660,00 •