Loading...
Agenda 09/26/2023 Item #16A 8 (Approve the closure of Southbay Drive for Stock Development)09/26/2023 EXECUTIVE SUMMARY Recommendation that the Board approve the closure of Southbay Drive for Stock Development, the Developer of the Ritz Carlton Residences within the One Naples Planned Unit Development. OBJECTIVE: To have the Board approve the closure of Southbay Drive by Stock Development for the construction of Ritz Carlton Residences. CONSIDERATIONS: On March 1, 2021, the Board of County Commissioners (“Board”) approved the One Naples Mixed-Use Planned Unit Development (PUD; Ordinance 21-09). To construct the Ritz Carlton Residences (formerly known as One Naples), the Developer requests to close a portion of Southbay Drive for safety reasons from September 27, 2023 through September 30, 2025, through right -of-way permit PRROW20230834385. Southbay Drive separates the bayside residences from the primary tower residence. The road closure is vital for public safety due to the heavy equipment use that will be utilized between the two sides of the roadway during construction. Additionally, the road closure will also allow for a reduction of the overall construction timeline. Stock Development, responsible for the Ritz Carlton Residence project, has made substantial investments in right-of- way improvements for the immediate surrounding areas, as were required Developer Commitments per the PUD Ordinance. These investments include closed drainage systems, utility upgrades, new roads, bike lanes, brick paver sidewalks, landscape and hardscape enhancements, garage technology improvements, and installing a traffic signal at the intersection of Vanderbilt Beach Road and Gulf Shore Drive. Such extensive improvements signify Stock Development's commitment to enhancing the area's infrastructure and overall quality of life. Stock Development has spent over $5,260,829 completing these beneficial public projects and improving the area's public infrastructure. The closure of Southbay Drive is motivated by concerns for public safety. With ongoing construction activities for the Ritz Carlton Residences project, closing the road ensures a secure environment for construction workers and the general public. Establishing an unobstructed construction zone minimizes the risk of accidents and injuries, including to the public, and prioritizes the well-being of all parties involved. The road closure is mitigated by the availability of alternative routes in the immediate surrounding area, including Vanderbilt Beach Road and Gulf Shore Drive. The closure has been designed in such a way as to minimize disruptions for the surrounding residents and businesses. Stock Development approached Growth Management Community Development staff in July 2023 regarding this request and has made extensive efforts with the neighboring property owners, to include the residents of Barefoot Pelican and Vanderbilt Palms, Buzz’s Lighthouse Restaurant, Collier County Emergency Management Services, and the North Collier Fire District, all of whom have supported the road closure for public safety concerns (please see attached letters of support) for the two year period. If approved, the developer shall be responsible for all costs, enforcement, public concerns, and maintenance of traffic operations for the extent of the road closure period. FISCAL IMPACT: The applicant has paid the Right-of-Way permit fee ($2000) associated with this permit. Additionally, extension fees or approximately $8,000 (3 month-renewals at $1,000 per renewal) will be paid to the County to keep the permit active for the entire road closure. GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to this action. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires a majority vote for Board approval.-DDP RECOMMENDATION: To approve the road closure of Southbay Drive for the devel opment of the Ritz Carlton Residences in the interest of public safety. Prepared by: Jaime Cook, Director, Development Review Division, Growth Management Community 16.A.8 Packet Pg. 716 09/26/2023 Development Department ATTACHMENT(S) 1. RCRN-Logistics Plan 8-8-23 (PDF) 2. Letter of Support - Buzz's Lighhouse (PDF) 3. Letter of Support - Vanderbilt Palms (PDF) 4. Letter of Support - Barefoot Pelican (PDF) 5. Email of Support - North Naples Fire (MSG) 6. Resolution 2017-109 (PDF) 7. RCR ROW Improvements Hard Cost Summary (PDF) 8. ROW Improvements Hard Cost Summary Contracts (PDF) 16.A.8 Packet Pg. 717 09/26/2023 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.8 Doc ID: 26433 Item Summary: Recommendation that the Board approve the closure of Southbay Drive by Stock Development, the Developer of the Ritz Carlton Residences within the One Naples Planned Unit Development. Meeting Date: 09/26/2023 Prepared by: Title: Technician – Development Review Name: Lucia Martin 08/18/2023 3:13 PM Submitted by: Title: Environmental Specialist – Growth Management Community Development Department Name: Jaime Cook 08/18/2023 3:13 PM Approved By: Review: Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 08/18/2023 3:17 PM Operations & Regulatory Management Michael Stark Additional Reviewer Completed 08/18/2023 3:30 PM Development Review Brett Rosenblum Additional Reviewer Completed 08/18/2023 3:34 PM Growth Management Community Development Department Diane Lynch Growth Management DepartmentCompleted 08/18/2023 5:05 PM Growth Management Community Development Department Jaime Cook Division Director Completed 08/21/2023 11:12 AM Transportation Management Operations Support Evelyn Trimino Additional Reviewer Completed 08/29/2023 4:15 PM Growth Management Community Development Department James C French Growth Management Completed 08/29/2023 4:18 PM County Attorney's Office Derek D. Perry Level 2 Attorney Review Completed 09/06/2023 8:15 AM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 09/06/2023 8:41 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 09/06/2023 9:50 AM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 09/06/2023 12:47 PM County Manager's Office Amy Patterson Level 4 County Manager Review Completed 09/20/2023 11:18 AM Board of County Commissioners Geoffrey Willig Meeting Pending 09/26/2023 9:00 AM 16.A.8 Packet Pg. 718 UPDNUP DN UPDNUPDN T T T T T T T T TT T T T TTTT T TTTT T FDEP GENERAL PERMIT LINE (PER OFFICIAL RECORDS BOOK 4566 PAGE 1950) FDEP COASTAL CONSTRUCTION CONTROL LINE (AS PROVIDED BY THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION CAD DRAWING C009-DIGI-E ON 05/10/16) SOUTHBAY DRIVE (ZONED: RIGHT-OF-WAY) (PUBLIC COUNTY ROAD)GULF SHORE DRIVE(ZONED: RIGHT-OF-WAY)(PUBLIC COUNTY ROAD)VANDERBIL T B E A C H R O A D (ZONED: RIG H T - O F - W A Y ) (PUBLIC CO U N T Y R O A D )SOUTHBAY DRIVE(ZONED: RIGHT-OF-WAY)(PUBLIC COUNTY ROAD)VANDERBILT PALMS CONDOMINIUMS CENTER STREET (ZONED: RIGHT-OF-WA Y ) (PUBLIC COUNTY ROAD ) BUILDING 2 (WEST) (6 STORIES) (LOWEST FFE PARKING = 6.00 FT - NAVD LOWEST HABITABLE FLOOR = 21.50' - NAVD) BAREFOOT PELICAN CONDOMINIUMS BAREFOOT PELICAN CONDOMINIUMS SOTHEBY'S REAL ESTATE PROJECT BOUNDARY PROJECT BOUNDARY PROJECT BOUNDARY PROJECT BOUNDARY PROJECT BOUNDARY PROJECT BOUNDARY PROJECT BOUNDARY ONE NAPLES WAY (PR IVATE ) VANDERBILT CHANNEL BUILDING 1 (SOUTH) (LOWEST FFE PARKING = 6.00 FT - NAVD LOWEST HABITABLE FLOOR = 21.50' - NAVD) BUILDING #2 (EAST) (6 STORIES) (LOWEST FFE PARKING = 6.00 FT - NAVD LOWEST HABITABLE FLOOR = 21.50' - NAVD) RESORT POOL (BY OTHERS) BUILDING 1 (NORTH) (LOWEST FFE PARKING = 6.00 FT - NAVD LOWEST HABITABLE FLOOR = 21.50' - NAVD) SPA (BY OTHERS) LAP POOL (BY OTHERS) POOL (BY OTHERS) MARINA (FOR MORE INFORMATION REFERENCE THE PLANS PREPARED BY TURRELL HALL & ASSOCIATES) (FDEP PERMIT NO. 0143735-001 E1; SOVEREIGN SUBMERGED LANDS LEASE NO. 110011935) BUILDING 4 MARINA SHIP STORE (FLOATING STRUCTURE) (FFE = TIDE ELVATION +18") TRENCH DRAIN NDERGROUND CONCRETE STORMWATER VAULT (7,200 SF) STORMTECH CHAMBER SYSTEM (SEE STORMTECH PLANS ON SHEET C-29.00 FOR MORE INFORMATION) SEAWALL (BY OTHERS) 5,000 GALLON UNDERGROUND FUEL TANK (BY OTHERS) 30" RCP OUTFALL INV: 0.30' RETAINING WALL (BY OTHERS) ART SCULPTURE (BY OTHERS) RETAINING WALL (BY OTHERS) RETAINING WALL (BY OTHERS) EX 30" HDPE OUTFALL INV: (-)0.30' 360.0'12.9'EX 18" RCP EX 18" RCP EX 24" RCP EX 18" RCP EX 30" RCP EX 30" RCP EX 30" RCP EX 30" RCP EX 30" HDPE EX 30" RCP EX 24" RCP EX 24" RCP EX 15" RCP EX 18" RCP EX 18" RCP EX 24" RCP EX 30" RCP EX 24" RCP EX 18" RCP 10" HDPE 30" RCP CS-1 (SEE SHEET 26.02 FOR DETAILS) 30" RCP STR #14 30" RCP STR #15 EVANSONE NAPLESPROJECT #: SHEET: 00515-10 CHRISTOPHER R. MITCHELL P.E. FL. LICENSE NO. 56740 FL. COA # 29226# DATE REVISIONS1ST SUBMITTAL DATUM NOTE: ALL ELEVATIONS REFERENCE NAVD88 VERTICAL DATUM. APPROXIMATE CONVERSION FOR PROJECT AREA: NAVD88 + 1.24' = NGVD29 ANY DATUM CONVERSIONS SHOULD BE CONFIRMED BY A LICENSED SURVEYOR PRIOR TO USE.J.R. EVANS ENGINEERING, P.A.9351 CORKSCREW ROAD, SUITE 102ESTERO, FLORIDA 33928PHONE: (239) 405-9148FAX: (239) 288-2537WWW.JREVANSENGINEERING.COMQ:\LAND 2017\515. ONE NAPLES\00515-10 SDP RESIDENTIAL UNITS\00-AUTOCAD\00515-10 (SDP & ERP)\CURRENT PLANS\C-20.00 - MASTER SITE AND DRAINAGE PLAN.DWG 4/17/2023 3:45 PMMASTER SITE AND DRAINAGE PLAN0 SCALE: 1" = 15 40' 80' 40' N C-20.00 ONE NAPLES OPEN SPACE PER ZONING ORDINANCE 2021-09 N.T.S. SOUTHBAY DRIVE GULF SHORE DRIVEVANDERBILT B E A C H R O A D SOUTHBAY DRIVEACTIVE OPEN SPACE PASSIVE OPEN SPACE COMMON OPEN SPACE REQUIRED OPEN SPACE 5.42 AC @ 30%1.63 AC OPEN SPACE NOTES: 1. 30% OPEN SPACE REQUIRED FOR THE ONE NAPLES MPUD (5.42 AC) PER ZONING RESOLUTION 2021-09. 2. OPEN SPACE DEFINITIONS ARE BASED ON LDC SECTION 1.08.02 ·OPEN SPACE, COMMON: THOSE AREAS WITHIN OR RELATED TO A DEVELOPMENT, NOT IN INDIVIDUALLY OWNED LOTS, DESIGNED AND INTENDED TO BE ACCESSIBLE TO, AND FOR THE COMMON USE OR ENJOYMENT OF, THE RESIDENTS OF THE DEVELOPMENT, OR THE GENERAL PUBLIC. ·OPEN SPACE, USABLE: ACTIVE OR PASSIVE RECREATION AREAS SUCH AS PARKS, PLAYGROUNDS, TENNIS COURTS, GOLF COURSES, BEACH FRONTAGE, WATERWAYS, LAKES, LAGOONS, FLOODPLAINS, NATURE TRAILS AND OTHER SIMILAR OPEN SPACES. USABLE OPEN SPACE AREAS SHALL ALSO INCLUDE THOSE PORTIONS OF AREAS SET ASIDE FOR PRESERVATION OF NATIVE VEGETATION, REQUIRED YARDS (SETBACKS) AND LANDSCAPED AREAS, WHICH ARE ACCESSIBLE TO AND USABLE BY RESIDENTS OF AN INDIVIDUAL LOT, THE DEVELOPMENT, OR THE GENERAL PUBLIC. OPEN WATER AREA BEYOND THE PERIMETER OF THE SITE, STREET RIGHTS-OF-WAY, DRIVEWAYS, OFF-STREET PARKING AND LOADING AREAS, SHALL NOT BE COUNTED TOWARDS REQUIRED USABLE OPEN SPACE. OPEN SPACE CALCUATION (PER ZONING ORDINANCE 2021-09) 0.66 AC PROVIDED OPEN SPACE ACTIVE OPEN SPACE 0.86 ACPASSIVE OPEN SPACE 0.67 ACCOMMON OPEN SPACE TOTAL 2.19 AC MPUD BOUNDARY MPUD BOUNDARY MPUD BOUNDARY MPUD BOUNDARY LAND USE SUMMARY NOTES: 1. LAND USE SUMMARY REFLECTIVE OF THE UPLAND PORTIONS OF THE PROJECT SITE AND DOES NOT INCLUDE THE PROPOSED MARINA / DOCK AREAS (±0.63 AC). CATEGORY PAVEMENT / CURB / SIDEWALK / CONCRETE PERVIOUS / OPEN SPACE TOTAL EXISTING TOTAL ACREAGE (AC) PERCENTAGE OF TOTAL ACREAGE (%) 0.69 AC 11% 3.27 AC 36% BUILDING 2.26 AC 6.21 AC 53% 100% PROPOSED TOTAL ACREAGE (AC) PERCENTAGE OF TOTAL ACREAGE (%) 3.50 AC 56% 1.83 AC 14%0.88 AC 6.21 AC 30% 100% GENERAL NOTE: THE SITE DEVELOPMENT CONTRACTOR SHALL NOTIFY ENGINEERING INSPECTION SERVICES (JOE.BIANCHI@COLLIERCOUNTYFL.GOV) FOR AN INSPECTION OF THE STORM WATER CHAMBERS PRIOR TO FINAL BACKFILL TO ASSURE PROPER GRADATION OF STONE AND INSTALLATION OF FILTER FABRIC SURFACE WATER MANAGEMENT SUMMARY NOTES: 1. THE SUBJECT SITE DISCHARGES INTO A TIDALLY INFLUENCED WATERWAY, THEREFORE THE ALLOWABLE DISCHARGE WAS DETERMINED USING A PRE-DEVELOPMENT RUNOFF ANALYSIS. 2. THE MINIMUM FINISHED FLOOR ELEVATIONS (FFE) ARE CONTROLLED BY FDEP'S COASTAL CONSTRUCTION CONTROL LINE (CCCL) REQUIREMENTS. 10 YEAR, 1-DAY STORM RAINFALL (IN)6.80 PEAK STAGE (FT-NAVD)3.28 25 YEAR, 3-DAY STORM RAINFALL (IN)11.70 PEAK STAGE (FT-NAVD)4.22 ALLOWABLE DISCHARGE (CFS)1 38.36 DESIGN DISCHARGE (CFS)16.85 100 YEAR, 3-DAY STORM RAINFALL (IN)14.50 MINIMUM GARAGE / PARKING FINISHED FLOOR ELEVATION (FT-NAVD)6.00 LOWEST HABITABLE FINISHED FLOOR ELEVATION (FT-NAVD) 2 21.50 PEAK STAGE (FT-NAVD) - CONTROL STRUCTURE CLOSED 5.68 GENERAL SITE DATA CONTROL ELEVATION (FT-NAVD)0.30 FDEP CCCL ELEVATION (FT-NAVD)20.40 FEMA AE ELEVATION (FT-NAVD)11.00 - 12.00 WATER QUALITY ELEVATION (FT-NAVD)3.15 REVISED PER COLLIER COUNTY COMMENTS11 08/15/221 1 1 1 1 1 1 1 1 1 1 1 1 11 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 12/16/22 REVISED PER COLLIER COUNTY REVIEWER COMMENTS22 2 2 5 YEAR, 1-DAY STORM RAINFALL (IN)6.00 PEAK STAGE (FT-NAVD)3.24 22 03/01/23 REVISED PER COLLIER COUNTY REVIEWER COMMENTS33ONE NAPLES WAY 3 3 4 04/12/23 REVISED PER OWNER AND ENGINEER44 16.A.8.a Packet Pg. 719 Attachment: RCRN-Logistics Plan 8-8-23 (26433 : Southbay Drive Road Closure Fee Waiver) 1 Chris Johnson From:kevin dugan <kkdugan24@yahoo.com> Sent:Tuesday, August 15, 2023 11:40 AM To:Chris Johnson Cc:Keith Gelder; (cmitchell@jreeng.com) Subject:Re: RCR Naples Logistics Plan / Southbay Closure Hello Chris Yes, we are in agreement. That sounds like a good plan. Thanks Kevin Sent from my iPhone On Aug 15, 2023, at 11:36 AM, Chris Johnson <cjohnson@stockdevelopment.com> wrote: Kevin, We are going to install the gates and keep them secured in the open position that way if you need them they are already there. Please confirm you are in agreement. Thanks, CJ Christopher L. Johnson Vice President Stock Luxury Apartment Living 2639 Professional Circle, Suite 101 Naples, FL 34119 239-449-5225 Office 239-537-1904 Cell Email: cjohnson@stockdevelopment.com <image001.jpg> From: kevin dugan <kkdugan24@yahoo.com> Sent: Tuesday, August 15, 2023 11:23 AM To: Chris Johnson <cjohnson@stockdevelopment.com> Cc: Keith Gelder <kgelder@stockdevelopment.com>; (cmitchell@jreeng.com) <cmitchell@jreeng.com> Subject: Re: RCR Naples Logistics Plan / Southbay Closure Hello Chris Yes, you have my family’s support for closing of South Bay Dr. 16.A.8.b Packet Pg. 720 Attachment: Letter of Support - Buzz's Lighhouse (26433 : Southbay Drive Road Closure Fee Waiver) 2 If in the future we need to add the gate we will coordinate with you guys. Thanks Kevin Dugan Sent from my iPhone On Aug 11, 2023, at 3:45 PM, Chris Johnson <cjohnson@stockdevelopment.com> wrote: Kevin, As discussed, attached is the logistics plan for the project detailing the closure on Southbay Drive. Please confirm we have your support for the closure of Southbay. We will keep the westernmost gates on Southbay and they can remain open if you choose, but in any event if they are closed, as with all the gates, should there be a need for emergency services to gain access they will have a means to open the gates. If there are any questions or concerns please let me know. Thank you in advance for your support. CJ Christopher L. Johnson Vice President Stock Luxury Apartment Living 2639 Professional Circle, Suite 101 Naples, FL 34119 239-449-5225 Office 239-537-1904 Cell Email: cjohnson@stockdevelopment.com <image001.jpg> <RCRN-Logistics Plan 8-8-23.pdf> CAUTION This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. 16.A.8.b Packet Pg. 721 Attachment: Letter of Support - Buzz's Lighhouse (26433 : Southbay Drive Road Closure Fee Waiver) 1 Chris Johnson From:Tim H <theine88@gmail.com> Sent:Friday, March 10, 2023 3:11 PM To:Chris Johnson Subject:Re: RCR Naples Logistics Plan Feedback Hi CJ - Correct, Vanderbilt Palms is in support of the plan. Tim Heine Board President Vanderbilt Palms Condominium Owners Association. On Fri, Mar 10, 2023, 1:58 PM Chris Johnson <cjohnson@stockdevelopment.com> wrote: Good afternoon Tim. Hope all is well. Based on the below response, you are in support of the logistics plan Option 1B, PDF file “Logistics Plan to BFP VP 2023- 02-03”, I sent via e-mail on 2/3/23. I am trying to get the ball rolling with any permitting and coordination that may need to take place with the County. Appreciate your response. Please reach out at any time if there’s anything we need to discuss. Best Regards. CJ Christopher L. Johnson Director of Land Development Stock Development, LLC 2639 Professional Circle, Suite 101 Naples, FL 34119 (239) 449-5225 Office (239) 537-1904 Cell 16.A.8.c Packet Pg. 722 Attachment: Letter of Support - Vanderbilt Palms (26433 : Southbay Drive Road Closure Fee Waiver) 2 Email: cjohnson@stockdevelopment.com From: Tim H <theine88@gmail.com> Sent: Wednesday, February 22, 2023 7:25 PM To: Chris Johnson <cjohnson@stockdevelopment.com> Subject: Re: RCR Naples Logistics Plan Feedback Hi CJ - All went well at our annual meeting this afternoon. We showed your plan for the street closure and there was no objection. However, there was some comments and concerns about how the intersection at SouthBay and Vanderbilt beach road would work out. Some were suggesting there may be lots of congestion during construction timeframe, at the intersection, making it difficult to navigate. Just wanted to make you aware of some of the comments. Time will tell though. Much appreciate you keeping us in the loop. Thanks, Tim Heine Vanderbilt Palms Condon Association Board President On Wed, Feb 22, 2023, 11:05 AM Tim H <theine88@gmail.com> wrote: Morning CJ - We have not gotten any negative feedback to date. but we do have our annual meeting this afternoon. Very much not expecting any feedback to the negative at that meeting - as I know most of the people who actually attend. Furthermore, I know none of these regulars have any issues. So if ok - i will send you an email after that meeting 16.A.8.c Packet Pg. 723 Attachment: Letter of Support - Vanderbilt Palms (26433 : Southbay Drive Road Closure Fee Waiver) 3 stating our support. This way, if there is any feedback down the road, I have much documentation to show they had their ample chance to voice opinions. Thanks, Tim On Wed, Feb 22, 2023 at 10:59 AM Chris Johnson <cjohnson@stockdevelopment.com> wrote: Tim. I know we spoke briefly on this subject but wanted to verify the feedback from your residents, do you think you will be able to support what we have proposed? Or do you need more time to make that determination. Thanks, CJ Christopher L. Johnson Director of Land Development Stock Development, LLC 2639 Professional Circle, Suite 101 Naples, FL 34119 (239) 449-5225 Office (239) 537-1904 Cell Email: cjohnson@stockdevelopment.com CAUTION This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. 16.A.8.c Packet Pg. 724 Attachment: Letter of Support - Vanderbilt Palms (26433 : Southbay Drive Road Closure Fee Waiver) 4 CAUTION This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. 16.A.8.c Packet Pg. 725 Attachment: Letter of Support - Vanderbilt Palms (26433 : Southbay Drive Road Closure Fee Waiver) 1 Chris Johnson From:Owner@barefootpelicannaples.com Sent:Friday, March 10, 2023 1:16 PM To:Chris Johnson Subject:Logistics Plan Chris - Thank you for sharing your logistics plan with us. After reviewing it with the owners at our last board meeting, there were a few concerns. Specifically, several mentioned they were concerned about turning left onto Vanderbilt Beach Road from Southbay. Recognizing that there are challenges now with the traffic flow and how much worse it might be if they can't use the alternate exit from Southbay onto Gulf Drive. We discussed that the improvements being made by One Naples with the enhancement of the beach parking garage access, signage before 41 and Vanderbilt Drive, as well as the new traffic light at the corner of Gulf Drive and Vanderbilt Beach, there might not be a need to be concerned. There was also mention of the beach goers parking on either side of Southbay and how much worse that might get during Spring break, though we have already noticed an improvement since you added the no parking signs on the construction barrels. As a suggestion, it might be a good idea to indicate with signage that the road is closed so that we won't have people trying to turn around in our driveway. Aside from those few concerns, in general the owners at the Barefoot Pelican feel that you have sufficiently addressed our needs and we have no problem with the plan to close Southbay during construction of RCR. Regards, Kim Braham-Moody, President -- Barefoot Pelican Naples 271 Southbay Drive, Naples FL 34108 www.barefootpelicannaples.com owner@barefootpelicannaples.com Building a better community through better communication. CAUTION This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. 16.A.8.d Packet Pg. 726 Attachment: Letter of Support - Barefoot Pelican (26433 : Southbay Drive Road Closure Fee Waiver) 1 Geoffrey Willig From:Sean Lintz <sLintz@northcollierfire.com> Sent:Monday, August 21, 2023 9:24 AM To:Jaime Cook Subject:Fwd: Ritz Carleton Residences Naples - Southbay Drive Partial Closure EXTERNAL EMAIL:This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. FYI ----------Forwarded message --------- From: Sean Lintz <sLintz@northcollierfire.com> Date: Wed, Jul 12, 2023 at 2:19•PM Subject: Re: Ritz Carleton Residences Naples -Southbay Drive Partial Closure To: Alvaro Yusty <alvaro@jreeng.com> Cc: Chris Mitchell <cmitchell@jreeng.com>, Armando Negrin <anegrin@northcollierfire.com>, Bryan Horbal <bhorbal@northcollierfire.com> Yes, I approve. Please proceed and please ensure that if needed for an emergency response that all necessary majors are in place. County 911 CAD will be updated to reflect this temporary closure. Thank you gentleman and please be sure to update us with any changes. On Wed, Jul 12, 2023 at 2:10•PM Alvaro Yusty <alvaro@jreeng.com> wrote: Good afternoon Chief Lintz, Following up on the below email. Can you please confirm you have no objection to the proposed closure of northern portion of Southbay Drive? Feel free to give Chris or myself to discuss if needed. Thank you, Alvaro Yusty, P.E. Project Manager J.R.Evans Engineering, P.A. 9961 Interstate Commerce Drive, Suite 230 Fort Myers, Florida 33913 16.A.8.e Packet Pg. 727 Attachment: Email of Support - North Naples Fire (26433 : Southbay Drive Road Closure Fee Waiver) 2 O: (239) 405-9148 C: (239) 298-9085 EMAIL: Alvaro@jreeng.com WEBSITE: www.jrevansengineering.com COPYRIGHT AND DISCLAIMER PROVISION: This e-mail, along with any files transmitted with it, is for the sole use of the intended recipient(s) and may contain information that is confidential or privileged.If this e-mail is not addressed to you (or if you have any reason to believe that it is not intended for you), please notify the sender by return e-mail.The electronic data contained herein may be subject to change without notice.The responsibility for the accuracy of current conditions and/or digital transfers is solely that of the user. From:Alvaro Yusty Sent:Friday, July 7, 2023 12:23 PM To:Sean Lintz <slintz@northcollierfire.com> Cc:Chris Mitchell <cmitchell@jreeng.com> Subject:Ritz Carleton Residences Naples -Southbay Drive Partial Closure Chief Lintz, Hope all is well. We had several meetings a couple months to discuss the closure of a portion of Southbay Drive during the construction of the Ritz Carleton Residences Naples bay building. We realized that we did not send out meeting minutes after the meetings. We are moving forward with the required permitting and wanted to get your confirmation that the Fire Dept. has no objection to the proposed closure. I have attached the latest Southbay Drive closure plan, which incorporates the MOT, signage, and gates that were previously discussed for your reference. Please let me know if you have any questions. Hope you have a good weekend. Thank you! 16.A.8.e Packet Pg. 728 Attachment: Email of Support - North Naples Fire (26433 : Southbay Drive Road Closure Fee Waiver) 3 Alvaro Yusty, P.E. Project Manager J.R.Evans Engineering, P.A. 9961 Interstate Commerce Drive, Suite 230 Fort Myers, Florida 33913 O: (239) 405-9148 C: (239) 298-9085 EMAIL: Alvaro@jreeng.com WEBSITE: www.jrevansengineering.com COPYRIGHT AND DISCLAIMER PROVISION: This e-mail, along with any files transmitted with it, is for the sole use of the intended recipient(s) and may contain information that is confidential or privileged.If this e-mail is not addressed to you (or if you have any reason to believe that it is not intended for you), please notify the sender by return e-mail.The electronic data contained herein may be subject to change without notice.The responsibility for the accuracy of current conditions and/or digital transfers is solely that of the user. -- To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. Sean Lintz Battalion Chief of Life Safety & Fire Prevention North Collier Fire Control and Rescue District 6495 Taylor Road Naples, FL 34109 239-597-9227 https://northcollierfire.com Direct: 239-552-1373 16.A.8.e Packet Pg. 729 Attachment: Email of Support - North Naples Fire (26433 : Southbay Drive Road Closure Fee Waiver) 4 -- To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. Sean Lintz Battalion Chief of Life Safety & Fire Prevention North Collier Fire Control and Rescue District 6495 Taylor Road Naples, FL 34109 239-597-9227 https://northcollierfire.com Direct: 239-552-1373 Information contained in this email is subject to public records release pursuant to Florida Statute 119. This message, together with any attachments, is intended only for the addressee. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution, use or any action or reliance upon this communication is strictly prohibited. If you have received this e-mail in error, please notify the sender immediately by return e-mail, and delete the message and any attachments. 16.A.8.e Packet Pg. 730 Attachment: Email of Support - North Naples Fire (26433 : Southbay Drive Road Closure Fee Waiver) RESOLUTION NO. 2017- 10 9 A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY,FLORIDA, SUPERSEDING RESOLUTION 2012-225, WHICH ESTABLISHED A REVISED SCHEDULE OF FEES FOR RIGHT- OF-WAY PERMITS, TO INCLUDE A WIRELESS FACILITY APPLICATION FEE AND AN ANNUAL FEE FOR THE COLLOCATION OF SMALL WIRELESS FACILITIES ON COUNTY UTILITY POLES WITHIN THE COUNTY RIGHT-OF-WAY. WHEREAS, Collier County Resolution No. 2000-455 established a schedule of development-related review and processing fees; and WHEREAS, the fees established in Resolution No. 2000-455 were subsequently amended and revised pursuant to Resolution Nos. 2002-479, 2003-170, 2007-162 and 2012-225 and the established fees are reflective of the actual cost of processing,reviewing,inspecting and evaluating Collier County Right-of-Way permits as set forth in attached Exhibit "A;" and WHEREAS, in its 2017 Session, the Florida Legislature enacted the "Advanced Wireless Infrastructure Deployment Act" as codified in Section 337.401, Florida Statutes, which required local governments to allow small wireless facilities within the public right-of-way by either collocation on existing Utility Poles, or by establishing a new Utility Pole where collocation is not possible; and WHEREAS, the Act requires that the county establish nondiscriminatory and competitively neutral rates, fees, and terms in compliance with the Act, and sets a limit of$150 per pole for the annual rate for the collocation of small wireless facilities on County Utility Poles; and WHEREAS, at its meeting on the 27th of June, 2017 this Board adopted an Ordinance implementing the regulations and permitting process authorized by the Act. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that: 1. The Board of County Commissioners hereby declares and approves the fees set forth in the Schedule of Fees for Right-of-Way Permits, attached hereto and incorporated herein as Exhibit "A" as reasonable sums to be assessed to those who receive the benefits of those services,review, and inspections required by the Collier County Code of Laws and Ordinances, the Land Development Code and the County permitting process. 2. That all County Projects within or adjacent to the County Right-of-Way shall be exempt from the Lane Rental Fee as noted on Exhibit"A." 1 16.A.8.f Packet Pg. 731 Attachment: Resolution 2017-109 (26433 : Southbay Drive Road Closure Fee Waiver) BE IT FURTHER RESOLVED that this Resolution relating to the Right-of-Way permit fees is recorded in the minutes of this Board and that Resolution 2012-225 is hereby superseded by the adoption of this Resolution. THIS RESOLUTION is adopted after motion, second and majority vote favoring adoption this 27th day of June, 2017. ATTEST:BOARD OF COUNTY COMMISSIONERS DWIGHT E. BROCK, Clerk COLLIER COUNTY, FLORIDA t as to Chaifmput _Clerk Penny Taylor, AIRWO, mature only. Approved as to form and legality: Emily R. 4 Assistant County Attorney 2 16.A.8.f Packet Pg. 732 Attachment: Resolution 2017-109 (26433 : Southbay Drive Road Closure Fee Waiver) Exhibit "A" Right-of-way Permits Type Residential Non-residential Small Large Right-of-way Construction 200.00 $ 1000.00 (June-Nov) $2000.00 (June-Nov) 2000.00 (Dec-May) $4000.00 (Dec-May) Work in the ROW(Without Lane 50.00 (June-Nov) $ 100.00 (June-Nov) Closures), Cost Per Day 100.00 (Dec-May) $ 200.00 (Dec-May) Miscellaneous Events 200.00 PSC Regulated Franchise Utility $100.00 Application Fee+ $50/Day inspection fee Wireless Facilities in the County ROW 100 Collocation of Small Wireless Facility on a 150.00 per pole annually County Utility Pole Renewal/Modification of unexpired or 100.00 500.00 1000.00 incomplete Permit Re-inspection-First 100.00 100.00 100.00 Second 150.00 150.00 150.00 Third 200.00 200.00 200.00 All subsequent inspections $ 250.00 250.00 250.00 Jack-and-Bore/Directional Bore 500.00 1000.00 2000.00 Open-cut Construction 2000.00 4000.00 6000.00 Sprinkler Head Placement in R/W 50.00 200.00 400.00 Turn Lane Construction 500.00 1500.00 3000.00 County Engineering review on behalf of 500.00 1000.00 FDOT Drainage Permit,No Discharge into State System County Engineering review on behalf of 1000.00 2000.00 FDOT Drainage Permit, with Discharge into State System Temporary Directional Sign Permit for 75.00 Public Event After-the-Fact Permit 4 X Normal Fee ($24000.00 max) If the Renewal/Modification does not require additional staff time and field check unexpired permit only), there will not be any fees charged Development two (2) acres or less are considered small Page 1 of 4 16.A.8.f Packet Pg. 733 Attachment: Resolution 2017-109 (26433 : Southbay Drive Road Closure Fee Waiver) Exhibit "A" Right-of-way Permit Notes: 1.Unjustified delays meeting permitted deadlines shall require additional fees as authorized. 2.Small Commercial Development shall be defined as a non-residential (single-family or duplex) project generating 600 vehicles trips per day or less. 3.Large Commercial Development shall be defined as a non-residential (single-family or duplex) project generating greater than 600 trips per day. 4.A right-of-way use fee (chart attached) per day shall apply to all non-residential commercial projects requiring a lane closure on a major roadway or sidewalk closure on any roadway. (chart attached). A major roadway is defined herein as being one of the following Collier County maintained roadways: Roadway Name From To Immokalee Road Tamiami Trail North(US 41) SR 29(Immokalee) Vanderbilt Beach Road Tamiami Trail North(US 41) Collier Boulevard Pine Ridge Road Tamiami Trail North(US 41) Collier Boulevard Golden Gate Parkway Tamiami Trail North(US 41) Collier Boulevard Radio Road Airport Road Davis Boulevard Rattlesnake Hammock Road Tamiami Trail East(US 41) Collier Boulevard Goodlette-Frank Road Tamiami Trail East(US 41) Immokalee Road Airport Road Tamiami Trail East(US 41) Immokalee Road Livingston Road Radio Road Lee County Line Santa Barbara Boulevard Davis Boulevard Pine Ridge Rd Logan Boulevard Pine Ridge Road Lee County Line Collier Boulevard Judge Jolley Bridge Immokalee Road CR 29 Everglades City SR 90(US 41) Bayshore Drive U.S.41 Thomasson Drive Golden Gate Boulevard C.R. 951 Desoto Boulevard Vanderbilt Drive VBR Lee County Line Gulfshore Boulevard VBR Bluebill Ave. Oil Well Rd Immokalee Rd S.R.29 Randall Boulevard Immokalee Rd Desoto Boulevard Everglades Boulevard Golden Gate Boulevard Immokalee Rd Naples Boulevard Pine Ridge Road Airport Road County Barn Road Davis Boulevard Rattlesnake Hammock Road 5.No refunds of unused fees shall be allowed. 6.Lane use fees shall be calculated by Collier County and shall be due and payable at the time of permit application if a permit is issued. If a Notice of Intent to Issue a permit is provided by the County in lieu of a permit,then the lane use fee shall be due and payable at the time of issuance of the actual permit. 7.If work continues beyond the originally estimated lane use period, then additional lane use fees shall be due and payable within two working days of notice to the Permittee of such additional fees. Failure to provide the additional fees to the County within three working days of such notice shall be cause for the project to be"red-tagged"and shut down. Lane use fees shall continue to accrue during any period of shutdown and shall be added to the additional lane use fees calculated by Collier County. 8.Any deviation from the above must be approved by the ROW Permitting and Inspection manager or designee prior to implementation. 9.All future County Projects shall be exempt from the Lane Rental Fee Incentive Program. Page 2 of 4 16.A.8.f Packet Pg. 734 Attachment: Resolution 2017-109 (26433 : Southbay Drive Road Closure Fee Waiver) Exhibit "A" LANE RENTAL FEE (PER DAY) INCENTIVE PROGRAM 600 600 400 A' 300 $300 $300 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Page 3 of 4 16.A.8.f Packet Pg. 735 Attachment: Resolution 2017-109 (26433 : Southbay Drive Road Closure Fee Waiver) Exhibit "A" SIDEWALK RENTAL FEE (PER DAY) INCENTIVE PROGRAM 100 $100 $100 100 $100 $100 Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July Page 4 of 4 16.A.8.f Packet Pg. 736 Attachment: Resolution 2017-109 (26433 : Southbay Drive Road Closure Fee Waiver) Vendor Description Contract Amount Mitchell and Stark Southbay & Center St. ROW and Utility Improvements 2,324,034.95$ Mitchell and Stark Vanderbilt Beach Rd and Gulfshore Dr. ROW and Utility Improvements 1,409,254.58$ American Infrastructure Services VBR & GSD signal. DOT street lighting. Private street lighting. 913,525.50$ Pinnacle Parking Systems VBR County garage occupancy tracking system and sign. 248,612.25$ Pinnacle Parking Systems VBR garage offsite occupancy tracking signs.49,562.00$ IPS Group VBR County garage pay kiosks 49,634.79$ IPS Group VBR County garage pay kiosks replacement due to Hurricane Ian 20,589.41$ O'Donnell Landscapes Vanderbilt Beach Rd, Gulfshore Dr., Southbay Dr. Center St. Landscape and Irrigation 245,616.25$ Total 5,260,829.73$ The Ritz-Carlton Residences Naples (fka One Naples) ROW Improvements Hard Cost Summary 16.A.8.g Packet Pg. 737 Attachment: RCR ROW Improvements Hard Cost Summary (26433 : Southbay Drive Road Closure Fee Waiver) 16.A.8.hPacket Pg. 738Attachment: ROW Improvements Hard Cost Summary Contracts (26433 : Southbay Drive Road Closure APPLICATION AND CERTIFICATE FOR PAYMENTTO (OWNER): Vanderbilt Naples Holdings, LLC 92639 Professional Circle, Suite 101Vanderbilt and Gulf Shore Dr5/1/2023Naples, FL 34119M&S JOB #211527-A5/31/2023CONTRACT DATE: 6/25/2021FROM (CONTRACTOR):ENGINEER: JR Evans EngineeringPURCHASE ORDER DATE:MITCHELL & STARK CONST. CO., INC.6001 SHIRLEY STREETNAPLES, FLORIDA 34109CONTRACT FOR : CONTRACTORS APPLICATION FOR PAYMENTApplication is made for Payment, as shown below, in connection with theCHANGE ORDER SUMMARYContract, Continuation Sheet, AIA Document G703, is attached.Change Orders approved inprevious months by OwnerADDITIONS DEDUCTIONS1. ORIGINAL CONTRACT SUM ...................................1,271,719.82$ Approved this Month2. Net change by Change Orders .............................137,534.76$ NumberDate Approved3. CONTRACT SUM TO DATE ....................................1,409,254.58$ 116" DI WATERMAIN -16" DR ZINC WATERMAIN 13,550.16$ -$ 4. TOTAL COMPLETED & STORED TO DATE ........................1,274,074.58$ See Below123,984.60$ -$ 5. RETAINAGE:-$ -$ a. - % of Work Completed 26,569.86 -$ -$ b. % of Stored Material-$ -$ Total Retainage .........................................26,569.86$ TOTALS137,534.76$ -$ 6. TOTAL EARNED LESS RETAINAGE .............................1,247,504.72$ Net change by Change Orders137,534.76$ 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT ..................1,008,375.99$ The undersigned Contractor certifies that to the best of the Contractors8. CURRENT PAYMENT DUE .....................................239,128.73$ knowledge, information and belief the Work covered by this Application9. BALANCE TO FINISH, PLUS RETAINAGE ........................161,749.86$ for Payment has been completed in accordance with the Contract Documentsthat all amounts have been paid by the Contractor for Work for whichState of: Florida County of:COLLIERprevious Certifies for Payment were issued and payments received fromthe Owner, and that current payment shown herein is now due.Subscribed and sworn to before me this 6thday of June 2023CONTRACTOR: Mitchell and StarkNotary Public: ________________________________________________________By: Darin A. Brown - Project Manager Date: 5-Jun-23My Commission Expires:ENGINEER'S CERTIFICATE OF PAYMENTAMOUNT CERTIFIED ............................................239,128.73$ In accordance with the Contract Documents, based on on-site observa-tions and the data comprising the above application, the ArchitectENGINEER:certifies to the Owner that to the best of the Architect's knowledge,By: ___________________________________________________Date: ___________________________________information and belief the Work has progressed as indicated, theThis Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor namedquality of the work is in accordance with the Contract Documents, andherein. Issuance, payment and acceptance of payment are without prejudice to any rights of the the Contractor is entitled to payment of the AMOUNT CERTIFIED.Owner or Contractor under this Contract.9351 Corkscrew Road, Suite 102Estero, FL 33928PROJECT: One Naples Utility Relocation and ROW ImprovementsAPPLICATION NO:PERIOD FROM:PERIOD TO: (RESTART)OWNER P.O. #16.A.8.hPacket Pg. 739Attachment: ROW Improvements Hard Cost Summary Contracts (26433 : Southbay Drive Road Closure Fee Waiver) 16.A.8.hPacket Pg. 740Attachment: ROW Improvements Hard Cost Summary Contracts (26433 : Southbay Drive Road Closure Investment Summary EQUIPMENT QTY Description Price 1 EnsightFul Edge Server Kit $8,750.00 1 Wall-mounted Server Rack with surge protector and Network switch $2,000.00 6 FLI Counting Camera and Software $24,000.00 1 3 Level Dual Sided Monument Sign 49” H X 46” W X 7.5” D $29,500.00 2 Roadway Space Availability Sign with Custom Housing, custom color, Logo and Wireless $68,200.00 1 Sign Mounting Posts $4,425.00 1 Professional Services $12,000.00 1 Software Configuration, System Commissioning and Fine Tuning $7,800.00 PROPOSED PROJECT TOTAL Equipment & Software $156,675.00 Infrastructure – Garage only (As Outlined Below) $25,206.00 Installation & Technical Services $22,769.00 Design & Permits Rodway Signs (as outlined below) $29,495.00 Freight $3,500.00 Use Taxes $10,967.25 Total Cost $248,612.25 16.A.8.h Packet Pg. 741 Attachment: ROW Improvements Hard Cost Summary Contracts (26433 : Southbay Drive Road Closure Fee Waiver) Software and Support Services Agreement (SSSA) Software and Support Services Agreement QTY EnSightful Parking EcoSystem Portal:Single-Garage License 1 EnSight FLI Subscription 6 Remote Monitoring 1 Help Desk Services 1 Software support, updates and schedule upgrades 1 Mobile, Tablet and Web access for managing your EnSight System 1 EnSight Standard Web API API for 3rd party integration 1 EnSighful API Standard API for EnSight data integration to third party applications 1 Smart Sign Module 3 Total – Paid Annually (First Year included) $8,900.00 16.A.8.h Packet Pg. 742 Attachment: ROW Improvements Hard Cost Summary Contracts (26433 : Southbay Drive Road Closure Fee Waiver) INFRASTRUCTURE SCOPE OF WORK - Garage • Furnish and Install conduit and low voltage cable as required from existing ground floor cabinet to two proposed camera locations on the 2nd floor • Cut, Trench and Patch existing concrete island at entry to conceal conduits servicing proposed monument sign • Furnish and Install conduit and low voltage cable as required from existing cashier booth to proposed monument sign • Furnish and Install conduit and power cable as required from existing cashier booth electrical panel to proposed monument sign o Assumes panel exists and has adequate space / load capability for one 120v / 20a circuit servicing monument sign • Furnish and Install 6” thick concrete leveling pad onto existing concrete slab in preparation for monument sign installation • Provide crane services for sign erection • Excludes: o Engineering and Permits o Additional requirements of Engineer and/or Municipality DESIGN & PERMITS SCOPE OF WORK – Roadway Signs • Provide MOT design, permits and safety device implementation for Geotechnical sampling as required • Provide Geotechnical sampling and engineer’s report in preparation for sign structure design • Provide structural design provided by a licensed Professional Engineer • Provide electrical, low voltage and building permits for work located within the garage • Provide project management and supervision for Geotechnical and Engineering services • Excludes: o Engineering and permits for sign and structure installations o MOT design, permit and safety device implementation for sign and structure installations o Additional requirements of Municipality o Foundation and Superstructure required for proposed signs (requires costing upon final design) 16.A.8.h Packet Pg. 743 Attachment: ROW Improvements Hard Cost Summary Contracts (26433 : Southbay Drive Road Closure Fee Waiver) September 1, 2022 Keith Gelder Vice President of Land Stock Development, LLC 2639 Professional circle, suite 101 Naples, FL 34119 RE: Vanderbilt Parking Garage - Ensight Parking Occupancy Roadside Signs Dear Keith, Thank you for the opportunity to propose Phase 2 of the Ensight Parking Occupancy Management System for the Vanderbilt Parking Garage, Naples. Phase 2 represents the installation of two separately located roadside signs (currently warehoused in Fort Lauderdale) and the superstructure required to meet FDOT standards for signs placed within the county right of way. Reference Jorge Luis Calzada - Professional Engineer plans S1 thru S6, all dated July 6, 2022, and other documents. SCOPE OF WORK: •Coordinate with Sunshine 811 for existing utility locations •Provide survey services to locate 2 each roadside signs based on specific locations provided by Stock Development. Information at minimum shall include post locations closest to the road and sign angle position relative to the roadway for each sign •Furnish and Install reinforced concrete foundations as per plan for each sign •Furnish and Install steel superstructure with designed break aways as per plan for each sign •Install 2 each roadside signs as per all pertinent engineered design criteria •Restore grade with sod replacement. Maintenance of sod to maturity by others •Coordinate rough and final inspections for our work ASSUMPTION: •A MOT Plan is not required BY OTHERS: •All Permits •Maintenance of replacement sod to maturity •Electrical Installations to Sign and Cellular Services •Provide GPS Coordinates for column closest to roadside and angle of sign relative to roadway. Best Regards, Best Regards, Saed Sattel Douglas D. Tinklepaugh Managing Member Operations Manger 16.A.8.h Packet Pg. 744 Attachment: ROW Improvements Hard Cost Summary Contracts (26433 : Southbay Drive Road Closure Fee Waiver) 16.A.8.h Packet Pg. 745 Attachment: ROW Improvements Hard Cost Summary Contracts (26433 : Southbay Drive Road Closure Fee Waiver) 16.A.8.h Packet Pg. 746 Attachment: ROW Improvements Hard Cost Summary Contracts (26433 : Southbay Drive Road Closure Fee Waiver) 16.A.8.h Packet Pg. 747 Attachment: ROW Improvements Hard Cost Summary Contracts (26433 : Southbay Drive Road Closure Fee Waiver) 16.A.8.h Packet Pg. 748 Attachment: ROW Improvements Hard Cost Summary Contracts (26433 : Southbay Drive Road Closure Fee Waiver) 16.A.8.h Packet Pg. 749 Attachment: ROW Improvements Hard Cost Summary Contracts (26433 : Southbay Drive Road Closure Fee Waiver) 16.A.8.h Packet Pg. 750 Attachment: ROW Improvements Hard Cost Summary Contracts (26433 : Southbay Drive Road Closure