Loading...
Agenda 07/11/2023 Item #16F7 (Reduced Roads and Parks impact fee calculations for the Town of Ava Maria)16.F.7 07/ 11 /2023 EXECUTIVE SUMMARY Recommendation to approve an alternative impact fee demand reduction analysis rate study and the associated reduced Roads and Parks impact fee calculations for the Town of Ave Maria, in accordance with the provisions of Section 74-204 of the Collier County Code of Laws and Ordinances. OBJECTIVE: To approve the use of an alternative impact fee demand reduction analysis rate study, calculated specifically for the Town of Ave Maria, in accordance with the provisions of Section 74-204 of the Collier County Code of Laws and Ordinances. CONSIDERATIONS: Section 74-204 of the Collier County Code of Laws and Ordinances provides for submittal of an alternative impact fee calculation study by the applicant if he/she believes the nature, timing or location of the proposed development makes it likely to generate infrastructure impacts costing less than the amount generated by application of the adopted fee schedule. Ave Maria Development, LLLP is currently developing the Town of Ave Maria, a 5,928-acre master planned development in Collier County's Rural Land Stewardship Area. The Town of Ave Maria SRA was recently amended to add 901 net acres and revise the development parameters. At full build -out, the Town of Ave Maria is entitled to a total of 11,000 residential units, consisting of 8,850 single-family units and 2,150 multi- family units. In addition, the Town of Ave Maria is entitled to 300 hotel rooms, 1,078,943 square feet of commercial, 184,000 square feet of civic, governmental, and institutional, 40,400 square feet of mini - warehouse, and 711,000 square feet of industrial space. Data collection for the alternative rate study took place in September of 2021, at which time Ave Maria Development, LLLP had constructed approximately 3700 residential units, 164,000 square feet of commercial, and 354,460 square feet of industrial space. As of the most recent monitoring report submitted in June of 2023, Ave Maria Development, LLLP has constructed 4,141 residential units, approximately 37.5% of the maximum residential units allowable. In addition to the residential and commercial development planned in the Town of Ave Maria, Ave Maria Development, LLLP has committed to constructing a number of additional park facilities throughout the Town of Ave Maria. Ave Maria Development, LLLP has programmed in excess of $25,000,000 of park improvements and expansions in the five-year capital improvement plan. These improvements and facilities include $14,570,957 for lakes and trail space in Trail Park; $2,954,000 for soccer fields, dog parks, and pickleball courts in North Park; $1,155,000 on tennis courts in South Park; $1,155,000 on tennis courts in Water Park; $3,243,100 on a flex field, tennis courts, basketball courts, a dog park, gazebos, parking spaces, a playground, and a walking trail in a Neighborhood Park; $2,046,000 on Tennis courts, a pool, a cafe, and a fitness center in the National Golf and Country Club. Alfred Benesch & Company (Benesch), formerly Tindale-Oliver & Associates, has been retained by Ave Maria Development LLLP to conduct a study to analyze the demand reduction attributable to parks and recreation facilities provided by the Town of Ave Maria, and evaluate the internal capture rate within the Town. The Benesch study conducted research into the community and regional parks levels of service in the County -wide service area as compared with the current and projected levels of service in the Town of Ave Maria. Additionally, Benesch analyzed the internal capture rates for trips associated with residential and non- residential land uses in Ave Maria. The report also includes a potential fee schedule based on these internal capture rates. Benesch concluded that, "Given its distance from other activity centers within the county and the availability retail, restaurant, recreational amenities, it is likely that the development's impact is reduced on certain infrastructure." Key findings in Benesch's report include the following suggestions with regard to transportation impact fees: • Residential land uses continue to travel to other office and commercial sites throughout the county, however • Non-residential land uses have a higher internal trip capture rate, particularly with 89% internal capture Packet Pg. 1138 16.F.7 07/ 11 /2023 observed for smaller retail/restaurant establishments and 74% capture rate for other non-residential land uses. The demand reduction associated with a higher internal capture rate is only applicable to a select group of non- residential lands uses, as defined in the Ave Maria Development Transportation Impact Fee Analysis. The full road impact will be collected for all residential land uses. With regard to parks impact fees, the key findings from Benesch's report were as follows: Ave Maria provides sufficient inland park land but does not provide any beach land, The parks located in the development are projected to provide several recreational facilities at a level similar or higher than what is provided by Collier County on a per capita basis, and Adjusting for the land and facilities provided within Ave Maria results in a fee schedule that is approximately 5 percent of the full fee for community parks impact fees and 55 percent of the full fee in the case of regional parks impact fees. As stated previously, the Town of Ave Maria has more than $25,000,000 of park facility improvements and expansions programmed in their five-year capital improvement plan. All operation and maintenance costs associated with parks within Ave Maria are the sole responsibility of the Town of Ave Maria. To be legally defensible, the dollar amount assessed must represent no more than proportional share of the cost of the public facilities needed to accommodate a new development. In order to achieve this standard and avoid overcharging, experts in the field recommend that jurisdictions base estimates of facility usage on the most current and locally sensitive data available. A dual rational nexus test has evolved from Florida case law whereby jurisdictions are required to ensure that impact fees are calculated to reflect no more than the cost of infrastructure necessitated by new development, and impact fees collected are expended to directly benefit the development for which the fees are paid. FISCAL IMPACT: If the alternative impact fee rate study and reduced impact fee calculations are approved as proposed, the resulting rate is 95% lower than the current rate for Community Parks and 45% lower than the current rate for Regional Parks. Meanwhile, selected land uses (including restaurants, movie theaters, banks, hotels, etc.) have been individually identified for an alternative road impact fee calculation across the commercial rate schedule. Each rate reduction was independently formulated based on the internal capture rates observed and noted in the Benesch study for that particular land use, with internal capture rates ranging from 89% for small retail/restaurant to 74% for office space and others, with an average of 78% overall. These internal capture rates equate to reductions ranging from 86% for low turnover restaurants to 52% for convenience stores with gas stations. GROWTH MANAGEMENT IMPACT: Impact fees provide financial resources for the construction and/or expansion of the County's capital infrastructure, as necessary to accommodate growth. Consistent with Objective 2 of the Capital Improvement Element (CIE) of the Collier County Growth Management Plan (GMP), development is required to contribute its fair share of the costs of providing public facilities necessitated by growth, however impact fees may not be collected in excess of the amount reasonably anticipated to fund such improvements. The proposed alternative road and parks impact fee calculations for the Town of Ave Maria are based on an alternative impact fee study which represents a current, localized and accurate assessment of the development's impact and associated cost of providing related road and parks capital facilities attributable to the new development. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to form and legality and requires majority vote for approval. -JAK RECOMMENDATION: To approve the use of an alternative rate schedule and impact fee demand reduction analysis study, calculated for the Town of Ave Maria, in accordance with the provisions of Section 74-202 of the Collier County Code of Laws and Ordinances. Packet Pg. 1139 16.F.7 07/ 11 /2023 Prepared by: Ian Barnwell, Impact Fee Manager Capital Project Planning, Impact Fees and Program Management Division ATTACHMENT(S) 1. Ave Maria Parks Final Report 04.07.23 (3) (PDF) 2. Ave Maria Transportation Final Report 04.07.23 (i) (PDF) Packet Pg. 1140 16.F.7 07/11/2023 COLLIER COUNTY Board of County Commissioners Item Number: 16.17.7 Doe ID: 26012 Item Summary: Recommendation to approve an alternative impact fee demand reduction analysis rate study and the associated reduced Roads and Parks impact fee calculations for the Town of Ave Maria, in accordance with the provisions of Section 74-204 of the Collier County Code of Laws and Ordinances. Meeting Date: 07/11/2023 Prepared by: Title: Senior Grants and Housing Coordinator — Capital Project Planning, Impact Fees, and Program Management Name: Gino Santabarbara 07/05/2023 1:29 PM Submitted by: Title: Division Director - Capital Proj Plan, Impact Fees — Capital Project Planning, Impact Fees, and Program Management Name: Beth Johnssen 07/05/2023 1:29 PM Approved By: Review: Capital Project Planning, Impact Fees, and Program Management Ian Barnwell Capital Project Planning, Impact Fees, and Program Management Ian Barnwell Transportation Management Services Department Ian Barnwell Department Transportation Management Services Department Trinity Scott County Attorney's Office Office of Management and Budget Community & Human Services County Manager's Office Board of County Commissioners Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Debra Windsor Level 3 OMB Gatekeeper Review Maggie Lopez Additional Reviewer Amy Patterson Level 4 County Manager Review Geoffrey Willig Meeting Pending Additional Reviewer Completed 07/05/2023 2:20 PM Additional Reviewer Skipped 07/05/2023 2:40 PM Transportation Management Services Skipped 07/05/2023 2:41 PM Transportation Completed 07/05/2023 3:13 PM Completed 07/05/2023 3:14 PM Completed 07/05/2023 3:15 PM Completed 07/05/2023 3:50 PM Completed 07/05/2023 4:10 PM 07/11/2023 9:00 AM Packet Pg. 1141 1 6.F.7.a benesch Ave Maria Development Park Impact Fee Analysis Final Report April 6, 2023 Prepared for: Ave Maria Development, LLLP 2600 Golden Gate Parkway Ave Maria, FL 34142 ph (239) 262-2600 Prepared by: Benesch 1000 N. Ashley Dr., Suite 400 Tampa, Florida 33602 ph (813) 224-8862 E-mail: nkamp@benesch.com 1032001-00.20 Packet Pg. 1142 1 6.F.7.a Ave Maria Development Impact Fee Calculations Table of Contents I. INTRODUCTION......................................................................................................... 1 r II. PARKS AND RECREATIONAL FACILITIES IMPACT FEE ANALYSIS ................................... 4 r Background...................................................................................................................... 4 R a Park Land Inventory and Level of Service....................................................................... 5 E d Recreational Facilities...................................................................................................... 6 > w Total Cost Analysis........................................................................................................... 13 a� r Adjusted Parks and Recreation Impact Fee Schedule 14 R III. SUMMARY & CONCLUSIONS 1s a� Q Appendices: N T- Appendix A: Ave Maria Site Build Out Map Benesch Ave Maria Development March 2023 i Impact Fee Calcidations, -- I Packet Pg. 1143 16.F.7.a I. Introduction Ave Maria is a 5,027-acre master planned development in Collier County's Rural Land Stewardship Area in the eastern part of the County, approximately 50-minute drive from Naples. The community is a mixed -use development with retail, restaurants, hotel, other convenience, and industrial land uses located within the development in addition to residential units. In addition, the community also has a university. Table 1-1 shows the current development built on the site and the entitlements approved for full build -out of the site for key land uses in the development that inform mixed -use analysis. Benesch determined current development levels by land use from Florida Department of Revenue data reported in 2021 and building square footage recorded in parcel records on the Collier County Property Appraiser website, accessed in November of 2021, in conjunction with developer maps and Google maps to determine land use type classifications. In addition to these uses, the community's university is currently operational and planned for 6,000 students on 956 acres. In addition, there are public -school sites which are ultimately planned for 48 acres of the development, along with other existing and planned community and civic uses. Table 1-1 Existing Development and Full Build -Out Development Program for Key Uses in Ave Maria Ave Maria Existing n— nn--.- EMI o 717 —.a *100,000 sf of retail assumed to be restaurant at build -out. Note: "sf' indicates square footage. Sources: Existing development based on Florida Department of Revenue data reported in 2021 and building square footage estimates from Collier County Property Appraiser records, accessed in November of 2021, in conjunction with developer maps and Google maps to determine land use type classifications; full build -out based on entitlement information received from Ave Maria Development, LLLP. Map 1-1 on page 3 presents the planned layout of land uses in the development. Retail, office, and restaurant developments to -date are located in the Town Core, Town Center 1, and Town Center 3; these areas are collectively referred to as the Ave Maria "Commercial Area" for the purposes of this report. The Arthrex facility site, the current industrial use in the community, is located in Town Center 2b. The remainder of Town Center 2b and Town Center 2a is not yet developed. Ave Maria Development includes two larger parks with several recreational facilities, including sports fields, swimming pool, water park, among others. Benesch Ave Maria Development April 2023 1 Impact Fee Calc Packet Pg. 1144 16.F.7.a Given the size, amenities, and location of the development, the residents are more likely to use parks that are located within the development than driving longer distances for other public pa rks. To evaluate these variables and calculate associated impact fees, in collaboration with Collier County, the Ave Maria Development, LLLP retained Benesch (formerly Tindale Oliver). This technical report provides results of this analysis for the parks and recreation impact fees. Benesch Ave Maria Development April 2023 2 Impact Fee Calcylatiom Packet Pg. 1145 (Apn}s ael pedwi an14euaa41e elJeW any: Z609Z) (£) £Z'LO'ti0:podeN leui=l smJed eiaeW eAV :}uauayoe;;d m a m C 0 V a) O Exhibit A f. E a a o 75 a�aa�a d C z a a n vmrvv vv g > C6 P N mm a)U 2mR L ~ 0 N N n �i OVO2 113M 110 4- t LP f>f E m M t N U O v N a — C i a Q co Q 1 6.F.7.a II. Parks and Recreational Facilities Impact Fee Analysis This section addresses the analysis used in developing an appropriate parks and recreation impact fee reduction levels for Ave Maria Development. The elements addressed in this section include: • Background • Park Land Inventory & Level of Service • Recreational Facilities Inventory & Level of Service • Total Impact Cost • Adjusted Parks and Recreation Impact Fee Schedule Background Collier County has two types of parks and recreation impact fees: one for community parks and another for regional parks. Given that the County does not have an adopted definition for each type of parks, the following criteria was evaluated in comparing parks located in Ave Maria: • Size of parks: The County's regional parks inventory includes parks with acreage ranging from 0.5 acres to over 200 acres. The size of community parks range from 3 acres to 120 acres. • Recreational facilities: While both community parks tend to provide some of the activity based facilities, such as ballparks, basketball courts, etc., regional parks provide more passive recreation or specialty facilities, such boating, fishing, water parks, etc. According to information provided by Ave Maria Development, LLLP, Ave Maria has two parks totaling nearly 84 acres. These parks, North Park and South Park, provide many similar facilities to those of Collier County's community and regional parks. Due to their location and available parks amenities within the immediate area, it is likely that developments within Ave Maria place less of a burden on parks owned by the County. The following paragraphs provide the analysis completed to document this differential. It is the intent of the Ave Maria Development to require new residential units to pay the full community and regional parks impact fees with the fee differential being allocated to enhance parks within the Ave Maria development. The Development will be responsible for the collection of the differential fee. Benesch Ave Maria Development April 2023 4 Impact Fee Calculations Packet Pg. 1147 16.F.7.a Park Land Inventory and Level of Service The first step in the analysis is to compare the inventory and level of service (LOS) for park land owned Collier County and Ave Maria Development. Collier County's current parks and recreation impact fees were calculated in the technical report titled "Collier County Parks and Recreation Impact Fee Update Study Final Report, September25, 2015,"by Tindale Oliver. As shown in Table III-1, the County's achieved LOS is 1.35 acres per 1,000 residents for community parks and 1.82 acres per 1,000 residents for regional parks. Collier County's adopted level of service is 1.20 acres per 1,000 residents for community parks and 2.70 acres per 1,000 residents for regional parks. To determine the LOS for Ave Maria, the total acreage of each park is divided by 2020 and build - out population and multiplied by 1,000. Ave Maria's overall 2020 LOS is 13 acres per 1,000 residents, which decreases to 3.63 acres per 1,000 residents at build -out assuming no new parks are developed. As shown in Table III-1, Ave Maria's achieved LOS for park land exceeds the LOS used in the calculation of Collier County's parks impact fees both with the current and build -out populations. In addition, the current achieved LOS also exceeds the County's adopted LOS standards and achieved LOS at build -out exceeds the adopted LOS standard for community parks. However, in the case of regional parks, a portion of the County's land inventory is associated with beach access. Ave Maria's park land inventory lacks this component. Benesch Ave Maria Development April 2023 5 Impact Fee Calculations Packet Pg. 1148 1 6.F.7.a Table III-1 LOS Comparison of Land (Acres per 1,000 residents) nventory Achieved Adopted • .. Collier County LOS• . Community 503.34 1.35 1.20 1.20 Regional 759.42 1.82 2.70 1.82 Total 1,262.76 3.17 3.90 3.02 Ave Maria Inventory (Acres) ill Achieved LOSI2J Current Pop Build -out Pop North Park 63.40 10.16 2.76 South Park 20.101 3.22 0.87 Total 83.501 13.38 3.63 Population Collier County Community Parks Service Area Population (4) 373,211 Collier County Regional Parks Service Area Population (4) 418,048 Ave Maria Development 2020 Population (5) 6,242 Ave Maria Development Build -out Population (6) 22,977 1) Source: Collier County Parks and Recreation Impact Fee Update Study, Final Report September 25, 2015 and Ave Maria Development 2) Inventory acres (Item 1) divided by each park classification associated population (Item 4, Item 5 or Item 6) multiplied by 1,000 3) Source: Collier County Parks and Recreation Impact Fee Update Study, Final Report, September 25, 2015 4) Source: Collier County Parks and Recreation Impact Fee Update Study, Final Report September 25, 2015 5) Source: U.S. Census Bureau 2020 Estimates 6) Source: D1 Regional Planning Model v2 Benesch Ave Maria Development April 2023 6 Impact Fee Calculations Packet Pg. 1149 1 6.F.7.a Recreational Facilities The second step in the analysis is assessing Collier County's recreational facility inventory and identifying the recreational facilities also provided at Ave Maria's parks. Table III-2 presents a parks and recreation facility comparison between Collier County and Ave Maria Development. Green highlighted cells indicate availability of the facility. As shown in Table II-2, many of the recreational facilities offered at Collier County community and regional parks are also available at Ave Maria's North and South Park. For example, both Collier County and Ave Maria parks offer a water park and swimming pools to their residents. Additionally, both communities offer a range of sports facilities which can host regional tournaments. In 2023, Ave Maria will be hosting a softball tournament in which most of the participants are from outside Ave Maria. These amenities, amongst others reduce the demand for Ave Maria residents to seek parks and recreation in the broader county. Benesch Ave Maria Development April 2023 7 Impact Fee Calculations Packet Pg. 1150 16.F.7.a Table II-2 Facility Comparison Assets Acres Collier County Community 3.0 - 120.0 Parks(i) Regional 0.5 - 207.7 Ave Maria North Park 63.40 Parks (2) South Park 20.10 Amphitheater Bath House Boardwalk Boat Ramp Lane Bocce Ball Cover Cabana Concession Area/Stand/ Trailer/Bldgs Courts - Basketball - Bocce/Shuffleboard - Handball - Racquetball - Tennis - Volleyball Disc Golf Dockmaster Dog Park Fields - Baseball - Little League Field - Multiuse (Football/Soccer) - Softball Garden Cover Gazebo / Pier Learning Center Maintenance Building/ Shed Benesch Ave Maria Development April 2023 8 Impact Fee Calculations Packet Pg. 1151 16.F.7.a Table II-2 (Continued) Facilitv Comparison Assets Acres Collier County Parks(i) Community Regional 3.0 - 120.0 0.5 - 207.7 Ave Maria North Park 63.40 Parks (2) South Park 20.10 Parking Garage Parking Space (Boat/ Trailer) Parking Space (Car) Paved Multiuse Pathway/ Trail Pavilion - Basketball Pavilion - Picnic Pavilion - Picnic Cover - Picnic Shelter Playground Recreation Facility (Indoor) Restroom Roller Hockey Rink Skate Park Sun n Fun Lagoon Swimming Pool 1) Source: Collier County Parks and Recreation Impact Fee Update Study, Final Report, September 25, 2015 2) Source: Ave Maria Development Recreational Facilitv Level of Service Comparison The next step is to determine whether recreational facilities available in Ave Maria's parks meet the County's achieved LOS for the same types of facilities. To determine the facility LOS, the total unit count of each facility is divided by the population and multiplied by 1,000. As shown in Table II-3, Ave Maria's LOS for these facilities greatly exceeds the County's LOS. This analysis suggests that the Ave Maria Development is mitigating its recreational facility needs by providing them at levels higher on a per capita basis than those provided by Collier County within unincorporated county or countywide. Given this, the value of these facilities is removed from the impact cost calculated for Ave Maria residents. Benesch Ave Maria Development April 2023 9 Impact Fee Calculations Packet Pg. 1152 16.F.7.a Table II-3 Recreational Facility LOS Comparison Population • 0• residents F 373,211 • ••• residents 418,048 • 1,000 residents 6,242 Acres acres 1.35 1.82 13.38 Amphitheater amphitheater 0.01 0.00 0.16 Baseball Field/Softball Field field 0.06 0.01 0.48 Basketball Court court 0.06 0.00 0.32 Bocce/ Shuffleboard Court court 0.07 0.00 1.28 Concessions/Restrooms sq. ft. 19.40 14.18 783.56 Disc Golf course 0.00 0.00 0.16 Dog Park pa rk 0.00 0.00 0.16 Little League Field field 0.02 0.00 0.16 Multiuse Field (Football/ Soccer) field 0.06 0.02 0.48 Paved Multiuse Pathway/ Trail mile of trail 0.03 0.02 4.01 Picnic Pavilion pavilion 0.07 0.05 0.32 Playground playground 0.03 0.01 0.16 Recreation Facility (Indoor) sq. ft. 292.21 100.97 801.03 Sun n Fun Lagoon count 0.00 0.00 0.16 Swimming Pool pool 0.01 0.00 0.16 Tennis Court court 0.11 0.00 0.32 Volleyball Court court 0.00 0.00 0.16 1) Source: Collier County Parks and Recreation Impact Fee Update Study, Final Report September 25, 2015 2) Source: Ave Maria Development Recreational Facility Cost Component Table II-4 presents the recreational facilities provided by Collier County, which are not provided by the Ave Maria Development. This lack of availability would require Ave Maria residents to travel to County -owned parks to benefit from these facilities. The total value of recreational facilities that not provided by Ave Maria is approximately $27.2 million, of which $7.2 million is for community parks and $20.0 million is for regional parks. These values divided by total recreational facility values provided by the County results in approximately 9 percent for community parks and 55 percent for regional parks. Benesch Ave Maria Development April 2023 10 Impact Fee Calculations Packet Pg. 1153 (Apn;s eej;oedual ani;euaa;le elaeW any: Z409Z) (£) £Z'LO'ti0:podeN leUl=l smJed elaeW eAV :;ugwLjoe;;v N N .--I T m O wm tD m wI, N O O O O rl 00 m rl to r,n O n rl to 'T r' aq 00 tD I- 00 M M O O W M tD O '1 lD V Cl M V V V n O� lD M N O n �--t N 00 V tD 00 VI N N wm rl r-I M't N M r O —1 tT VI m N O 10 r CO" IM 00 1-1N1 V1 M V1 V1 rI V r, N M V 00 00 M rlV V1 tD ID m tD t0 01 N V V} P to rl t/). V 6 V} V1 t4 LD VT to Vf rl V). V? VT CO N V} G r V} V ri V? rl rl t4 I` "r' V1 r-I J). t0 N V N Vn "I rl N tD tD ei V4 t/T rl V? O N eq N O o 00 01 O co O I\ N O O O O o O le R t/} rl o I� t . ID VI' t/} 00 V T I- O1 (l m VA t/} to O ut ut co M V M N ' n tD N 00 I� c-I 1n 00 M 01 Vt 0) rl 00 V rV M O V rI a) N o w VI 00 a 0) V7 V1 V I, ID N V 00 n n V to rl 00 V1 I, t/f rq VT N V1 VT t/T VT ei t/T Vf O r1 O1 ^ r1 e•I C 00 '4 01 M O %D' N VT VT Vf 11 VT rl cn V! VF N l0 'O l0 � O V . O M N c o r O c � O O O 00 m M N rl N tD o V a) m m V1 r, No V1 0 o V V) N m N O M 0) 00 m Ol N 00 N N I, n R 00 W w N r,N m m I, tD O V N .--I m m-*- t0 m m O r1 T a V m w N n V7 ei M M -4 t4 -1 V} M M N VT N -Zr ei N V} 00 VT N a to V VT Ch M V Vl ri t/? V? N N O O N m O O O wO 00 O O O O O O r, M r,N n VT V} O rl V} V? V? rl VT tD VT m V} VT O O ID fn rl m tD rl V a m It N o0 V t•1 O ei N Q1 l0 M M r, rl M O t0 r' O of M 00 06 V1 Q Ol to rl VT m to 00 to t0 Il V1 c-I tD rl wM Ln N V/ t0 W a••I O VT 4^ rl e-I to i--I w M• n O a/f t/T t/T V� v* 00 V> 0 O O O O N N M V1 c-I N -* N rl m r-I o wm 00 N M r, Ln r, V1 O Ol r, tD N N m lD m V1 rl V I, N w01 I� W f\ V lD V V M V1 c-I rl rl n Ol lD m N O1 O 00 V c inVi w rn v m rj Di Lr o r It,m -4 r, m ry V) v V r � m c-I to c-I V) N M N to V} M r N} Vr 00 to coOo tD V to co m N to V� V4 V� V> 4^ +n Vr to O O O O O O O O O O O O O O O O O O O 00 rl N O 0o O O wV O O O O Lr O 01 O N O -1 O N -4 r-I O o O '1 O O O O O tD 00 t/} <D V1 N M .--I 00 n Q) 1p V) � m O O N M rl N M e-I V).V} rl O m N V) N N rl e-I VI. n t/T rl NV). t? tD m Q1 V V} V} trT VT to ^ V} V? V} y0 Y v v [1 u w M @ o v G o OV mon OV E N N6 N E Ou R Y OV R 0) 6 R Q o t0 N OA i !d ao a u w LL CL O E W r-I- C_ a O C O — y O N u 3 ap CL a 3!� w `>>'° v " > E EAL a' F W v c CI \ c E W U v OI W W ° a v m u m m> > > O t' 0) m a) N 0 >• W W N N a c0 J N 0 N ` U y 0) a+ aa)i Y CL tO+ o U ( j C t0 p_ N U �e c00 3 = o N f0 (0 H V \- 00 C - e O M to V ; V s o 3 m m ° c o o m c v oc ao ar = D_ O ti ti 0 O Y v Y •L c_ r t r�0 O "6 0) N '� L i Q m •V u Y a@+ t O N m f0 m O m O m O m m U 0 N (� N ('J (O (� N 2 J d Cl OC K to ti Q F H a V) C C v Q E Q O � U > f6 N U 0 � [6 v •� LL G f0 v � Q to to 41 N � N U f0 Q Ln Ln Q Ln E Ln N (U N N N N N N 0 N N - >_ N N N Q N E fl CL N V) Ln bD Ln O V) Y O O v a O -0O a n I1 N N U Y N E r OC 4• 'a N u 2 N a o O u `� a v a +� N �L LL N T Li. T •O N u -2 -2 U 42 � N 1! Q > � � CL -0 ++ CL� to Q C Q c 0 N N 2 N O> 2 N O L t L2 L2 -0 t2 a(6 c. o a� oQ) a�u, E Z ZZ Z >T .--. Z >- `--' o a N p-0 CV O-0 In i E i E i- Y U U O U N O U O) fa CL T a s= a E z a E M Lo E a a s a a a E E a a a E E O v v° v 7 _3 f0 w _5 f6 O) f6 L L > L > L -a > �+ C f+ f6 U c U D v V E D v V a 0 2 U U U U > U U > O L O c +' c E N N t° LnVOY tN O to tN D V) _ C Q ri N M � In lD I� 00 01 CO Q /pn7eel ped w!aImu mmelaemOAV:ZL0 Z )EZ10jVo podeN mm]saedelaeyya V:}emLj3e n¥ } ( y 8 E \ \ o / \ » < \ 5 �Ln e e u C) \ ƒ \ \ \ \ ) \ E ® •s % E < - - � w ro m E E \ E e ± _ � rz }\ u / 2 §e \ \ / m j \ \ m & ƒ \ / E u _ _ u \ k E t § a g E 0. k u / { ®\ \ � k u � % ƒ \ [ % S z _ \Lu ®/ \ LL ®�\ j \ \ 3 •7 2 = k < \ / � \ \ k W < � 5 -0 / 0 » m u > t y -0 o ° E w / & - ( % 0- > % o ± 5 t _ 4 § _ _ _ = o � + Ea) ° = E u \ + cc \ ƒ / f & \ / ( / E \ .e j _ > o m { » \ E / _ k 7U Lu m ° 2 _ _\ § 2 5 > m 0 £ % \ \ / \ 2 \ 2 } \ / % Z z= U) m o= m Q g co < 2 a. \ IL 16.F.7.a Total Cost Analysis The capital cost associated with parks and recreation facilities consists of two components: recreational facilities and park land (both the cost of purchasing the land and the cost of site preparation/development). As previously discussed, Ave Maria Development's LOS of inland park land exceeds Collier County's adopted and achieved LOS of park land, which implies that Ave Maria Development provides sufficient inland park land to mitigate its residents' needs. However, Collier County's regional park land value includes beach land which is likely to be used by Ave Maria residents. The value of the beach land is approximately $542 per resident. As shown in Table II-5, the total parks and recreation value not provided by Ave Maria for community parks is $17 per resident, which is entirely for recreational facilities. The total parks and recreation value not provided by Ave Maria for regional parks is $590 per resident; of which $542 per resident is for land, and $48 per resident is for facilities. The portion of the impact fee to assess within Ave Maria Development is calculated based on the ratio of parks land and recreational facility value not provided in Ave Maria to the total value used to calculate the County's current adopted parks impact fees. As presented, the portion to assess is 5 percent for community parks and 55 percent for regional parks. Table II-5 Total Impact Cost Der Resident Component Community Regional Collier County Land Value per Resident(�) $149.53 $986.33 Recreational Facilities Value per Resident (2) 190.84 54 .83 Parks & Recreation Total Impact Cost per Resident(3) $340.37 $1,074.16 Ave Maria Development Land Value per Resident (not provided by Ave Maria)(4) $0.00 $542.48 Recreational Facilities Value per Resident (not provided by Ave Maria)(5) 17.12 547.89 Total Parks and Recreation Value per Resident (not provided by Ave Maria)(6) $17.12 $590.37 Portion of Impact Fee to assess within Ave Maria Development(') 5% 55% 1) Source: Collier County Parks and Recreation Impact Fee Update Study, Final Report, September 25, 2015, increased by 6.5 percent for community parks and 10.6 percent for regional parks to reflect indexing applied to the impact fees. 2) Source: Collier County Parks and Recreation Impact Fee Update Study, Final Report, September 25, 2015, increased by 6.5 percent for community parks and 10.6 percent for regional parks to reflect indexing applied to the impact fees. 3) Sum of the land cost per resident (Item 1) and recreational facilities value per resident (Item 2) 4) Inland park land is mitigated. Reflects beach park land value. Benesch Ave Maria Development April 2023 13 Impact Fee Calculations Packet Pg. 1156 16.F.7.a 5) Portion of recreational facilities value not provided by Ave Maria Development (Table II-4, Item 14) multiplied by recreational facilities value per resident (Item 2) 6) Sum of land value per resident (Item 4) and recreational facilities value per resident (Item 5) 7) Ave Maria parks and recreation impact cost (Item 6) divided by Collier County total impact cost (Item 3) Adjusted Parks and Recreation Impact Fee Schedule Table II-6 presents the adjusted parks and recreation facilities impact fee schedule for Ave Maria for residential land use categories based on the assessment percentages presented in Table II-5. Also presented is Collier County's current adopted fee. As mentioned previously, the full fee would be paid by the Ave Maria Development, with the understanding that the fees above those shown in Table II-6 would be dedicated to parks within the Ave Maria development. Table II-6 sted Parks and Recreation Impact Fee Schedule Single Family: <4,000 sf of living space $934 $2,694 $3,628 $47 $1,482 $1,529 4,000 sf or more living space $1,068 $3,081 $4,149 $53 $1,695 $1,748 Multi -Family $455 $1,230 $1,685 $23 $677 $700 Mobile Home $716 $2,145 $2,861 $36 $1,180 $1,216 1) Source: Collier County Growth Management Division, Impact Fee Schedule effective March 30, 2021 2) Source: Collier County Growth Management Division, Impact Fee Schedule effective March 30, 2021 3) Sum of Collier County's impact fees for community parks (Item 1) and regional parks (Item 2) 4) Portion of impact fee to assess within Ave Maria Development for community parks (Table II-5, Item 7) multiplied by the Collier County's community parks impact fee (Item 1) 5) Portion of impact fee to assess within Ave Maria Development for regional parks (Table II-5, Item 7) multiplied by the Collier County's regional parks impact fee (Item 2) 6) Sum of adjusted parks impact fee for community parks (Item 4) and regional parks (Item 5) Benesch Ave Maria Development April 2023 14 Impact Fee Calculations Packet Pg. 1157 16.F.7.a III. Summary & Conclusions Ave Maria is an over 5,000-acre master planned development located in the eastern Collier County, approximately 50-minute drive from Naples. In addition to residential subdivisions, the development also includes commercial properties, parks and recreational amenities, among others. Given its distance from other activity centers within the county and the availability of large parks facilities, it is likely that the development's impact is reduced on the parks infrastructure. Ave Maria Development, LLLP, in collaboration with Collier County, retained Benesch to review park amenities available on site to determine the level of reduced demand for parks and recreation facilities, and therefore, parks impact fees. Findings of this analysis include the following: o Ave Maria provides sufficient inland park land but does not provide any beach land. o The parks located in the development also provide several recreational facilities at a level similar or higher level than what is provided by Collier County on a per capita basis. o Adjusting for the land and facilities provided within Ave Maria results in a fee schedule that is approximately 5 percent of the full fee for community parks impact fees and 55 percent of the full fee in the case of regional parks impact fees. o In addition, the Ave Maria Development, LLLP proposes to continue to collect the full parks impact fees, with revenues associated with the difference allocated to enhancing parks in Ave Maria. The Development will be responsible for the collection of differential fee. Benesch Ave Maria Development April 2023 15 Impact Fee Calculations Packet Pg. 1158 1 6.F.7.a Appendix A Ave Maria Site Buildout Map Packet Pg. 1159 16.F.7.a Source: Ave Maria Development, LLC Benesch Ave Maria Development April 2023 B-17 Impact Fee Calculations Packet Pg. 1160 N Walkirf Biking Paths Welcome to the town of Ave Maria. Ave Maria is a master -planned community developed by Barron Collier Companies, the founding family of Collier County. This self -sustained town includes several residential neighborhoods, a vibrant Town Center with shopping and dining, active lifestyle amenities, business parks office space, a university and schools, ; and thousands of acres of preserved environmental lands. -A significant network of parks and recreational areas is in the master plan of Ave Maria. About 45% of the total town area is devoted to lakes and open space. There are over 100 miles of walking, biking, and nature paths within the community of Ave Maria. These paths are utilized by many running events throughout the year. { F1 At Cross-country Meets are organized for regional high schools and also university students bringing hundreds of runners and their families to town for each meet. Lipman Family Farms 5K fundraiser is located in Ave Maria and brings local and distant walkers, runners and community members. Future plans include nature trails in Ave Maria where visitors can enjoy more of the natural environment. NO,, Ave Mara A BIG KIND OF SMALL TOWN t.� REGIONAL PARKS IN AVE MARIA North Park 1y\ North Park offers visitors recreational amenities such as soccer and baseball fields, picnic pavilions, tennis and basketball courts, recently renovated tot lot and playground, walking/running trail, disc golf, restrooms, and concessions. North Park is home to pick-up soccer, basketball, flag football and disc golf games. Disc golf is difficult to find in the area and many teams meet up on a regular basis to play this sport. A non- resident soccer league meets on the weekend as well as Little League games that attract players from Ave Maria and the surrounding areas. North Park is home to Ave Maria University and Donahue Academy cross-country meets which brings athletes and families from across the state of Florida. The Ave Maria Master Association puts on many popular events throughout the year including an annual yard sale event, health and wellness fair, Memorial Day Parade, Easter event, Fall festival and more. There is no "entrance fee" to these events; anyone is welcome. r 4 ' yr+ _. Jim WHAT'S TO COME Two additional baseball fields 8-12 pickleball courts 2 additional dog parks 1 additional regulation size sports field (football, soccer, lacrosse) Ave Maria A BIG KIND OF SMALL TOWN 14 REGIONAL PARKS IN AVE MARIA Sout-h Park South Park in Ave Maria is located towards the main entrance off of Ave Maria Blvd. The park features a softball Field, 8 Bocce Ball Courts, Tennis Courts, Walking/Running Trail, Amphitheater, Picnic Pavilions, Large and Small Dog Park and Restrooms. The park hosts weekly co-ed softball games, walking groups, and large live music events. -a . ,t6 Fitness groups such as Ave Bootcamp utilize this space for group exercises, runs and other weekly workouts on the fields, courts and running trails. A traveling softball league practices and plays games on the field, and the dog park is a popular spot for residents and beyond. AvelMaria A BIG KIND OF SMALL TOWi I ir rI F d # # i The water park features a resort -style •.= pool, cascading spa, water volleyball area, �• * -' ,. water aerobics area, four 25-meter lap '�� '.'• • •' '` :} : - � i lanes, interactive play features, open tube '-'•� water slide, enclosed tube water slide, k -, .' beach volleyball court, picnic pavilions, ' restrooms, and concessions. The Water ; Park is an ideal venue to host reoccurring • 5 : ; ,; _ aqua exercise classes, poolside yoga, ' swim lessons and community events' throughout the year. �. # ' ,; Y{ + dP AveMaria A BIG KIND OF SMALL TOWN i REGIONAL PARKS IN AVE MARIA �- ■ ionsh'ip Cham F_L�__ours = -Golf r Ave Maria offers the public two 18-hole championship golf courses designed by Gordon Lewis. Panther Run, located in Del Webb Naples, and The National Golf & Country Club is situated in The National community by Lennar. a4ii .5 i1 �{� 7e Del Webb offers guests a spot to dine and enjoy the view at the Rusty Putter Restaurant. The amenity center also includes two Clubhouses, The Oasis Club and The Grand Hall,12 pickleball courts, resort -style pool and so much more. aL._ TV I In The National Golf & Country Club, the golf course will soon be accompanied by har-tru tennis courts, a resort pool and cafe, and a state-of-the-art fitness center. The National hosts golf events, including annual fundraisers that brings the Southwest Florida community together. AvelMar-i1 a A BIG KIND OF SMALL TOWN r . �Ir F J tar + ii RV � THE CLUB AT DEL WEBB NAPLES Del Webb is Ave Maria's active adult (55+) community. Amenities currently include a recently renovated 18-hole championship golf course, complete with practice greens and aqua range, a Pro Shop, and PGA professionals ready to help you with your swing. The 12,000 sq. ft. Oasis clubhouse features a resort pool, lap pool, 12 pickleball courts, 4 Bocce ball courts, fitness center, locker rooms, steam room and sauna, as well as tennis courts, fire pit, library, arts & crafts room, and catering kitchen for private events. Grand Hall boasts 14,000 sq. ft. Grand Hall. The Oasis Club is exclusive to Del Webb residents and features a resort and lap pool, fitness center and locker rooms, steam room & sauna, bocce ball, pickleball courts, tennis courts, fire pit, library, arts & crafts room, and catering kitchen for private events. The Del Webb brand is synonymous with lifestyle. The full-time lifestyle director creates a world of things & social activities for residents. Popular Club and Activities in Del Webb include: fitness and dance clubs, art & book club, technology clubs, golf leagues, events, and excursions. k THE CLUB AT MAPLE RIDGE is a luxury amenity center exclusive to its residents. Inside you will find a fitness center with aerobics studio, sauna, and massage rooms, as well as elegant gathering spaces such as billiards and card rooms and an exhibition kitchen and children's playroom. Outside you will find a resort style pool with outdoor grilling and entertaining area, playground, and outdoor fitness stations and pickleball courts. A full-time lifestyle director organizes fun activities for all ages in Maple Ridge. THE NATIONAL GOLF AND COUNTRY CLUB BY LENNAR offers a resort lifestyle. The golf course designed by Gordon Lewis is complete with a chipping area, driving range, putting green, and a Pro Shop. Other outdoor amenities will include a resort -style pool and spa, chickee bar, pickleball, bocce ball, and tennis courts with a tennis center and Pro Shop. The Sports Club will offer a state -of -the art fitness center, yoga/ aerobics room, saunas, spa/massage rooms, and a nail and beauty salon. The main Clubhouse will have a grille room, formal dining room, and plenty of social gathering spaces. L=J RL .. WI 170 46 t • l Over 3,000 visitors come to each of these signature events. Farmers Markets are every Saturday January - end of April and offer over 30 vendors to browse from. The Sunshine State Steak Cook -Off is another popular event and The Ave Maria Town Center hosts over 60 serves as a fundraiser to Donahue Academy, businesses serving Ave Maria and surrounding the K-12 private school in town. The Fitness communities. These businesses include dining Center in the Town Center not only services and shopping, services and also healthcare residents but also services Arthrex employees, services. The Town Center is also the location and other town employees. for many Ave Maria Development events such as Taste of Ave, Blues, Brews & BBQ Festival, Margarita & Taco Festival and the Arts & Crafts ` Festival. I� Ln yk k - AveMaria + A BIG KIND OF SMALL TOWp=mm=d (Apn)s eel )oedwi ani)euaa)1e eiaew any : ZL09Z) (£) £Z•LO•ti0 podeN leuid sued eiaew any :jUOWLj3e))y ❑ Y O r Z) 0w F Y m Z Z) 1: OOQa w z ❑ J w - m U U ry Q U) LO p �. W Q w Y Q J O OQ 0 w w �r co K C[ W W Y Q 7 L J • 0 co r r a aD Y V m a ti r (Apn;s eej;oedual ani;euaa;le elaeW any: Z409Z) (£) £Z'LO'ti0:podeN leUl=l smJed elaeW eAV :;ugwLjoe;;d r-Q L u ICI IPM I n n �.._..1 �.._..� H U W >D) (Apn;s aelpedwi OA14BUJO41e elJeW OAV: Z409Z) (C) EZ'LO'-PO:podeN leui=l SmJed elJew 8AV:4uqtuLl3ellv Al 11 LLU U </ D CL LL U) LU D ti r (Apn;s eej;oedual ani;euaa;le elaeW any: Z409Z) (£) £Z'LO'ti0:podeN leUl=l smJed elaeW eAV :;ugwLjoe;;d • 0 O OJ x¢ Ow mz = w C7 C� LL I ir IZ w Y g 91r * O .� �1'j F , � 4r I� spot� /'A X Ilk y r co Of w D (Apn;s eej;oedual ani;euaa;le elaeW any: Z409Z) (£) £Z'LO'ti0:podeN leUl=l smJed elaeW eAv :;ugwLjoe;;d • (Apn;s eel }oedwi ani;euaa;le ei.aew any: ZL09Z) (£) CZ-10'ti0 podeN leui=l sued eiaew any :jUeWLjoe};d 0 J W_ LL x W J LL �1'•J O m w w N Q 0 Y Q LL CD 0 O O m w w N Q 0 Y Q LL CD 0 O m ZOR) (£) £Z'10'VO:podeM Ieui=l sued eiaeW any :}uawy3ellV I* � � a ;-.4 0 caa a CM/1) C/� a� M cd ct v� ct N bA N bA ct cl O cl U U 4 v� C� MR) W £Z'LO"PO :podem Ieui=l sued eiaew any :4U8Wg3e44y+ ti as a1 cd N c,3 N bA N CIO rU 7d ^� W O O l{ 4Asi U09Z) W £Z'LOTO }aodeN Ieui=l sued eiaeW any :}uauay3,Mv C ..r.r y� x Q �low? o ct � � O ul r U O ct ,.4 O � � U i 17� � � o o�v� U09Z) W £Z'LO't O :podeN Ieuid sued eiaew any :}uawy3e4}y 00 a a) o � � Z CID C.2 ♦� v I L. Z609Z) (£) £Z'10'ti0:podem IBUTA seed eiaew any :}ua •o � � O O o � a� U � 171 v ? I 4-a C CA t a r. 3 ogZC7 oi a cqs U r�r 6 bA bq Q, cal uo9Z) (£) £Z'LO'ti0 o ct o 3 U un C's O �" ti) 0 O V '- U r �O � U48 cn C's o Ln o o a 3 0 4.- 03 b � •) Ct rn uid s)Iced BIJBW any :IUGW14 4• •� rti- .. -.. 0.�Y �I Cd -1 Cd o 140 cn 'b Cd 140 a ° a � ° o cd o C,3 o 3 •� � � ,:d ° � rd C,3 w 4.0 a Cd ° ° � z o z Cd A rn cd --� C O Cd 'd v a cd w 16.F.7.a Ave Maria 1111i BARRON COLLIER C L- P H. ICI I C J Ave Maria Jaclyn Canerdy 13-Mar-23 Parks and Recreation Summary I Regional Parks Future Trail Park $ 14,570,957.00 North Park $ 12,102,884.00 South Park $ 6,331,099.90 Water Park $ 12,018,900.00 Lake Park $ 5,280,069.35 Future Neighborhood Park $ 3,243,100.10 Total $ 53,547,010.35 Champion Golf Course Panther Run Golf Course $ 15,400,000.00 Total $ 15,400,000.00 Champion Golf Course & Community The National Golf and County Club by Lennar $ 22,284,740.00 Total $ 22,284,740.00 Community Parks The Club at Del Webb Naples $ 29,523,960.00 The Club at Maple Ridge $ 8,729,000.00 Total $ 38,252,960.00 Town - General Ave Maria Town Center $ 1,500,000.00 Fitness Facility $ 460,000.00 Total $ 1,960,000.00 Total $ 131,444,710.35 Packet Pg. 1185 1 6.F.7.a Ave Maria BARRON COLLIER C) 'V' P to N I L :_ Description Amount Unit WRA Trail Park, Total Size 528.9 AC Regional Parks Future Trail Park Jaclyn Canerdy 13-Mar-23 Programmed in 5 Year CIP Amount Unit Cost -Per -Unit Total Lakes 67.81 AC $ 96,800.00 $ 6,564,008 35' Trail 8.5 MI $ 941,994.00 $ 8,006,949 Total $ 14,570,957.00 v- Packet Pg. 1186 16.F.7.a I Jaclyn Canerdy 'J j I i h 13-Mar-23 Ave Maria BARRON COLLIER Regional Parks North Park Description Amount Unit North Community Park, Total Size 40.6 AC Currently Ezisiting Amount Unit Cost -Per -Unit Total Large Pavilion 1 EA $ 75,000.00 $ 75,000.00 Small Pavilion 2 EA $ 45,000.00 $ 90,000.00 9- Hole Disc Golf Course 1 EA $ 90,000.00 $ 90,000.00 Baseball Field 2 EA $ 1,072,500.00 $ 2,145,000.00 Team Dugout 8 EA $ 27,500.00 $ 220,000.00 Child Playground 1 EA $ 132,000.00 $ 132,000.00 Basketball Court 2 EA $ 55,000.00 $ 110,000.00 Restroom Facility 2 EA $ 495,000.00 $ 990,000.00 Soccer Field 2 EA $ 1,250,000.00 $ 2,500,000.00 Parking Spaces 355 EA $ 5,200.00 $ 1,846,000.00 Lake 3.87 AC $ 96,800 $ 374,616 Concessions 1 EA $ 82,500.00 $ 82,500 Walking Trail 2 MI $ 246,884.00 $ 493,768 Total $ 9,148,884 Programmed In S Year CIP Amount Unit Cost -Per -Unit Total Soccer Field 2 EA $ 1,250,000.00 $ 2,500,000.00 Dog Park 2 EA $ 75,000.00 $ 150,000.00 Pickleball Court 8 EA $ 38.000.00 $ 304.000.00 Total $ 2,954,000 Total Development Amount Unit Cost -Per -Unit Total Large Pavilion I EA $ 75,000.00 $ 75,000.00 Small Pavilion 2 EA $ 45,000.00 $ 90,000.00 9- Hole Disc Golf Course 1 EA $ 90,000.00 $ 90,000.00 Baseball Field 2 EA $ 1,072,500.00 $ 2,145,000.00 Team Dugout 8 EA $ 27,500.00 $ 220,000.00 Soccer Field 4 EA $ 1,250,000.00 $ 5,000,000.00 Walking Trail 2 MI $ 246,884.00 $ 493,768.00 Lake 3.87 AC $ 96,800 $ 374,616.00 Parking Spaces 355 EA $ 5,200.00 $ 1,846,000.00 Restroom Facility 2 EA $ 495,000.00 $ 990,000.00 Basketball Court 2 EA $ 55,000.00 $ 110,000.00 Child Playground 1 EA $ 132,000.00 $ 132,0W.00 Concessions I EA $ 82,500.00 $ 82,500.00 Pickleball Court 8 EA $ 38,000.00 $ 304,000.00 Dog Park 2 EA $ 75,000.00 $ 150,000.00 Total $ 12,102,884.00 LAKE Packet Pg. 1187 1 6.F.7.a IIIII Jaclyn Canerdy AveMar a BARRON 13-Mar-23 COLLIER Regional Parks COMPANIES South Park Description Amount Unk South Community Park, Total Size 18.7 AC I Currently EVlslting Amount Unk Cost-Per-Unk Total Softball Field I EA $1,072,500.00 $1,072,500.00 Bocce Ball Court 8 EA [[ $ 20,2$ 161,0.00 r Tennis Court 2 EA $ 115,540A000.00 $ 231,92000.00 Walking/Running Trail 0.35 MI $ 570,514.00 $ 199,679.90 Ampitheater I EA $1,705,0D0.00 $1,705,000.00 Picnic Pavilion 2 EA $ 75,000.00 $ 150,000.00 Large Dog Park 1 EA $ 165,000.00 $ 165,000.00 Small Dog Park 1 EA $ 85,000.00 $ 85,000.00 Restroom Facility 2 EA $ 495,000.00 $ 990,000.00 Parking Spaces 80 EA $ 5,200.00 $ 416,000.00 Total $S,176,099.9D Programmed In S Year CIP Amount Unk Cost-Per-Unk Total Tennis Court 10 EA $ 115,500.00 $1,155,000.00 Total $I,1SS,000.00 Total Development Amount Unk Cost-Per-Unk Total Softball Field 1 EA $ 1,072,500.00 $ 1,072,500.00 Bocce Ball Court 8 EA $ 20,240.00 $ 161,920.00 Tennis Court 12 EA $ 115,500.00 $ 1,386,000.00 Walking/Running Trail 0.35 MI $ 570,514.00 $ 199,679.90 Ampitheater 1 EA $ 1,705,000.00 $ 1,705,000.00 Picnic Pavilion 2 EA $ 75,000.00 $ 150,000.00 Large Dog Park 1 EA $ 165,000.01 $ 165,000.00 Small Dag Park 1 EA $ 85,000.00 $ SS,000.00 Restroom Facility 2 EA $ 495,000.00 $ 990,000.00 Parking Spaces 80 EA $ 5,200.00 $ 416,000.00 Total $ 6,331,099.90 VP COI, (18.7, m \ � -R 3B O � AVE MARIA SW L BOUNDARY(M d CG: i Q N O O N Packet Pg. 1188 1 6.F.7.a 1111i Ave Maria BARRON COLLIER Description Amount Unit Water Park, Total Size 24 AC Jaclyn Canerdy 13-Mar-23 Regional Parks Water Park Currently Exisiting Amount Unit Cost -Per -Unit Total Resort Style Pool 1 EA $ 1,650,000.00 $ 1,650,000.00 Cascading Spa 1 EA $ 825,000.00 $ 825,000.00 25-Meter Lap Lanes 4 EA $ 770,000.00 $ 3,080,000.00 Open Tube Waterslide 2 EA $ 350,000.00 $ 700,000.00 Enclosed Tube Waterslide 1 EA $ 350,000.00 $ 350,000.00 Beach Volleyball Court A $ 75,000.00 $ 75,000.00 Picnic Pavilions 1 EA $ 75,000.00 $ 75,000.00 Restrooms 1 EA $ 495,000.00 $ 495,000.00 Concessions 1 EA $ 82,500.00 $ 82,500.00 Tennis Court A $ 115,500.00 $ 115,500.00 Lockers 1 EA $ 55,000.00 $ 55,000.00 Children Pool 1 EA $ 1,072,500.00 $ 1,072,500.00 Parking Spots 267 EA $ 5,200.00 $ 1,388,400.00 Paver Cool Deck 1 EA $ 900,000.00 $ 900,000.00 Total $ 10,863,900.00 Programmed in 5 Year CIP Amount Unit Cost -Per -Unit Total Tennis Court 10 EA $ 115,500.00 $ 1,155,000.00 Total $ 1,155,000.00 Total Development Amount Unit Cost -Per -Unit Total Resort Style Pool 1 EA $ 1,650,000.00 $ 1,650,000.00 Cascading Spa 1 EA $ 825,000.00 $ 825,000.00 25-Meter Lap Lanes 4 EA $ 770,000.00 $ 3,080,000.00 Open Tube Waterslide 2 EA $ 350,000.00 $ 700,000.00 Enclosed Tube Waterslide 1 EA $ 350,000.00 $ 350,000.00 Beach Volleyball Court A $ 75,000.00 $ 75,000.00 Picnic Pavilions 1 EA $ 75,000.00 $ 75,000.00 Restrooms 1 EA $ 495,000.00 $ 495,000.00 Concessions 1 EA $ 82,500.00 $ 82,500.00 Tennis Court 11 EA $ 115,500.00 $ 1,270,500.00 Lockers 1 EA $ 55,000.00 $ 55,000.00 Children Pool 1 EA $ 1,072,500.00 $ 1,072,500.00 Parking Spots 267 EA $ 5,200.00 $ 1,388,400.00 Paver Cool Deck 1 EA $ 900,000.00 $ 900,000.00 Total $ 12,018,900.00 Packet Pg. 1189 1 6.F.7.a III 'I Jaclyn Canerdy 13-Mar-23 Ave Maria BARRON COLLIER Regional Parks Lake Park Description Amount Unit Lake Park, Total Size 60.7 AC Currently Exisiting Amount Unit Cost -Per -Unit Total Lakes 41.4 AC $ 96,800.00 $ 4,007,520.00 12'Lighted Path 2.35 MI $ 350,021.00 $ 822,549.35 Spa Pool 1 EA $ 350,000.00 $ 350,000.00 Restrooms 1 EA $ 100,000.00 $ 100,000.00 Total $ 5,280,069.35 Packet Pg. 1190 16.F.7.a ' 1 I 1 i Jaclyn Canerdy Ave Maria B A R R o N 13-Mar-23 COLLIER Neighborhood General Future Neighborhood Park Description Amount Unit Future Neighborhood Park 9.7 AC Programmed in 5 Year CIP Amount Unit Cost -Per -Unit Total Flex Field 1 EA $ 1,200,000.00 $ 1,200,000.00 Tennis Court 4 EA $ 115,500.00 $ 462,000.00 Basketball Court 2 EA $ 55,000.00 $ 110,000.00 Dog Park 1 EA $ 95,000.00 $ 95,000.00 Gazebo 2 EA $ 145,000.00 $ 290,000.00 Parking Spaces 161 EA $ 5,200.00 $ 837,200.00 Children Playground 1 EA $ 132,000.00 $ 132,000.00 10' Walking/Running Trail 0.45 MI $ 259,778.00 $ 116,900.10 Total $ 3,243,100.10 1— Packet Pg. 1191 16.F.7.a Ave Maria 11111 BARRON COLLIER C_ _ . PA N I _ S Jaclyn Canerdy 13-Mar-23 Champion Golf Courses Panther Run Golf Course Currently Exisiting Amount Unit Cost -Per -Unit Total 18-Hole Championship Golf Course 1 EA $ 15,400,000.00 $ 15,400,000.00 Total $ 15,400,000.00 Packet Pg. 1192 16.F.7.a 11111 Ave Maria BARRON COLLIER C 0 V P A N I Lz S Jaclyn Canerdy 13-Mar-23 Championship Golf Courses & Community Parks The National Golf and Country Club Lennar Currently Exisiting Amount Unit Cost -Per -Unit Total 18-Hole Championship Golf Course 1 EA $ 15,400,000.00 $ 15,400,000.00 Resort -Style Pool 1 EA $ 975,000.00 $ 975,000.00 Spa/Massage Room 1 EA $ 800,000.00 $ 800,000.00 Chickee Bar 1 EA $ 15,000.00 $ 15,000.00 Pickelball 1 EA $ 38,000.00 $ 38,000.00 Bocce Ball 1 EA $ 20,240.00 $ 20,240.00 Tennis Court 1 EA $ 115,500.00 $ 115,500.00 Fitness Center 1 EA $ 750,000.00 $ 750,000.00 Yoga/Aerobics Room 1 EA $ 250,000.00 $ 250,000.00 Saunas 1 EA $ 50,000.00 $ 50,000.00 Nail and Beauty Salon 1 EA $ 500,000.00 $ 500,000.00 Grille Room 1 EA $ 75,000.00 $ 75,000.00 Formal Dining Room 1 EA $ 1,050,000.00 $ 1,050,000.00 Social Gathering Spaces 1 EA $ 200,000.00 $ 200,000.00 Total $ 20,238,740.00 Programmed in 5 Year CIP Amount Unit Cost -Per -Unit Total Har-Tru Tennis Court 2 EA $ 115,500.00 $ 231,000.00 Resort -Style Pool 1 EA $ 975,000.00 $ 975,000.00 Cafe 1 EA $ 90,000.00 $ 90,000.00 Fitness Center 1 EA $ 750,000.00 $ 750,000.00 Total $ 2,046,000.00 Total Development Amount Unit Cost -Per -Unit Total 18-Hole Championship Golf Course 1 EA $ 15,400,000.00 $ 15,400,000.00 Resort -Style Pool 2 EA $ 975,000.00 $ 1,950,000.00 Spa/Massage Room 1 EA $ 800,000.00 $ 800,000.00 Chickee Bar 1 EA $ 15,000.00 $ 15,000.00 Pickelball 1 EA $ 38,000.00 $ 38,000.00 Bocce Ball 1 EA $ 20,240.00 $ 20,240.00 Tennis Court 3 EA $ 115,500.00 $ 346,500.00 Fitness Center 2 EA $ 750,000.00 $ 1,500,000.00 Yoga/Aerobics Room 1 EA $ 250,000.00 $ 250,000.00 Saunas 1 EA $ 50,000.00 $ 50,000.00 Nail and Beauty Salon 1 EA $ 500,000.00 $ 500,000.00 Grille Room 1 EA $ 75,000.00 $ 75,000.00 Formal Dining Room 1 EA $ 1,050,000.00 $ 1,050,000.00 Social Gathering Spaces 1 EA $ 200,000.00 $ 200,000.00 Cafe 1 EA $ 90,000.00 $ 90,000.00 Total $ 22,284,740.00 Packet Pg. 1193 16.F.7.a 1111i Ave Maria BaRRo N COLLIER COY PA. N I t S Jaclyn Canerdy 13-Mar-23 Community Parks The Club at Del Webb Naples Currently Exisiting Amount Unit Cost -Per -Unit Total Rusty Putter Restaurant 1 EA $ 3,000,000.00 $ 3,000,000.00 The Oasis Club 1 EA $ 2,100,000.00 $ 2,100,000.00 The Grand Hall 1 EA $ 1,250,000.00 $ 1,250,000.00 Pickleball Courts 12 EA $ 38,000.00 $ 456,000.00 Resort -Style Pool 1 EA $ 975,000.00 $ 975,000.00 18-hole Championship Golf Course 1 EA $ 15,400,000.00 $ 15,400,000.00 Pro Shop 1 EA $ 150,000.00 $ 150,000.00 Lap Pool 2 EA $ 770,000.00 $ 1,540,000.00 Bocce Ball Court 4 EA $ 20,240.00 $ 80,960.00 Fitness Center 2 EA $ 750,000.00 $ 1,500,000.00 Locker Rooms 2 EA $ 55,000.00 $ 110,000.00 Steam Room 2 EA $ 50,000.00 $ 100,000.00 Sauna 2 EA $ 50,000.00 $ 100,000.00 Tennis Court 4 EA $ 115,500.00 $ 462,000.00 Fire Pits 2 EA $ 50,000.00 $ 100,000.00 Library 2 EA $ 500,000.00 $ 1,000,000.00 Arts & Crafts Room 2 EA $ 500,000.00 $ 1,000,000.00 Catering Kitchen 2 EA $ 100,000.00 $ 200,000.00 Total $ 29,523,960.00 Packet Pg. 1194 16.F.7.a Aire Maria 11111 BARRON COLLIER Jaclyn Canerdy 13-Mar-23 Community Parks The Club at Maple Ridge Currently Exisiting Amount Unit Cost -Per -Unit Total Amenity Center 1 EA $ 4,000,000.00 $ 4,000,000.00 Fitness Center 1 EA $ 750,000.00 $ 750,000.00 Aerobics Studio 1 EA $ 250,000.00 $ 250,000.00 Sauna 1 EA $ 50,000.00 $ 50,000.00 Massage Rooms 1 EA $ 80,000.00 $ 80,000.00 Billards Room 1 EA $ 900,000.00 $ 900,000.00 Card Room 1 EA $ 600,000.00 $ 600,000.00 Exhibition Kitchen 1 EA $ 100,000.00 $ 100,000.00 Children's Playroom 1 EA $ 70,000.00 $ 70,000.00 Resort -Style pool 1 EA $ 975,000.00 $ 975,000.00 Outdoor Grilling 1 EA $ 400,000.00 $ 400,000.00 Entertaining Area 1 EA $ 150,000.00 $ 150,000.00 Playground 1 EA $ 132,000.00 $ 132,000.00 Outdoor Fitness Stations 1 EA $ 120,000.00 $ 120,000.00 Pickleball Court 4 EA $ 38,000.00 $ 152,000.00 Total $ 8,729,000.00 Packet Pg. 1195 Jaclyn Canerdy 13-Mar-23 1 6.F.7.a Ave Maria BARRON COLLIER Town General r_O?IPANIES Ave Maria Town Center Park Currently Exisiting Amount Unit Cost -Per -Unit Total Center Park with Benches, Landscape, and 1 EA $ 1,500,000.00 $ 1,500,000.00 Total $ 1,500,000.00 M Q Packet Pg. 1196 1 6.F.7.a Aire Mari a 11111 BARRON COLLIER P A N I E S Jaclyn Canerdy 13-Mar-23 Town General Ave Maria Center Fitness Facility Currently Exisiting Amount Unit Cost -Per -Unit Total Fitness Facility 1 EA $ 460,000.00 $ 460,000.00 Total $ 460,000.00 Packet Pg. 1197 1 6.F.7.b benesch Ave Maria Development Transportation Impact Fee Analysis Final Report April 6, 2023 Prepared for: Ave Maria Development, LLLP 2600 Golden Gate Parkway Ave Maria, FL 34142 ph (239) 262-2600 Prepared by: Benesch 1000 N. Ashley Dr., Suite 400 Tampa, Florida 33602 ph (813) 224-8862 E-mail: nkamp@benesch.com 1032001-00.20 Packet Pg. 1198 1 6.F.7.b Ave Maria Development Impact Fee Calculations Table of Contents I. INTRODUCTION......................................................................................................... 1 r II. TRANSPORTATION IMPACT FEE ANALYSIS.................................................................. 4 Q. Overview of Analytical Approaches 4 E aD Internal Capture Rate Calculations................................................................................. 15 M Adjusted Transportation Impact Fee Schedule 18 ............................................................... L III. SUMMARY & CONCLUSIONS 22 �L C� G Appendices: > Q Appendix A: Ave Maria Site Build Out Map N r Appendix B: Survey Documentation coo N Benesch Ave Maria Development April 2023 i Impact Fee Calc Packet Pg. 1199 1 6.F.7.b I. Introduction Ave Maria is a 5,027-acre master planned development in Collier County's Rural Land Stewardship Area in the eastern part of the County, approximately 50-minute drive from Naples. The community is a mixed -use development with retail, restaurants, hotel, other convenience, and industrial land uses located within the development in addition to residential units. The community also has a university. Table 1-1 shows the current development built on the site and the entitlements approved for full build -out of the site for key land uses in the development that inform mixed -use analysis. Benesch determined current development levels by land use from Florida Department of Revenue data reported in 2021 and building square footage recorded in parcel records on the Collier County Property Appraiser website, accessed in November of 2021, in conjunction with developer maps and Google maps to determine land use type classifications. In addition to these uses, the community's university is currently operational and planned for 6,000 students on 956 acres. In addition, there are public -school sites which are ultimately planned for 48 acres of the development, along with other existing and planned community and civic uses. Table 1-1 Existing Development and Full Build -Out Development Program for Key Uses in Ave Maria Ave Maria Existing n— nn--.- EMI o 717 —.a *100,000 sf of retail assumed to be restaurant at build -out. Note: "sf' indicates square footage. Sources: Existing development based on Florida Department of Revenue data reported in 2021 and building square footage estimates from Collier County Property Appraiser records, accessed in November of 2021, in conjunction with developer maps and Google maps to determine land use type classifications; full build -out based on entitlement information received from Ave Maria Development, LLLP. Map 1-1 on page 3 presents the planned layout of land uses in the development. Retail, office, and restaurant developments to -date are located in the Town Core, Town Center 1, and Town Center 3; these areas are collectively referred to as the Ave Maria "Commercial Area" for the purposes of this report. The Arthrex facility site, the current industrial use in the community, is located in Town Center 2b. The remainder of Town Center 2b and Town Center 2a is not yet developed. Given the size, amenities, and location of the development, it is likely that there is a higher rate of internal capture for trips associated with non-residential land uses. Benesch Ave Maria Development April 2023 1 Impact Fee Calc Packet Pg. 1200 1 6.F.7.b To evaluate these variables and calculate associated transportation impact fees, in collaboration with Collier County, the Ave Maria Development, LLLP retained Benesch (formerly Tindale Oliver). This technical report provides results of this analysis. Benesch Ave Maria Development April 2023 2 Impact Fee Calc Packet Pg. 1201 eel joedua! OA14BUJO418 eueW and : Z�09Z) SZ'LO'V0:podab !eu!=l uo!}e}aodsueal eueW and :;uauayoejjV N 0 N ♦2 a+ d C 0 V a) O Exhibit A 2 o f a o 75 a�aa�a d C z a a n vmrvv vv n g > [6 P N mm a)U 2mR L ~ 0 N N n �i OVO2 113M 110 4- f>f E m cn t N U C) v) N (3) — C i a Q co Q 1 6.F.7.b II. Transportation Impact Fee Reduction Analysis Benesch used four different analytical methods to study the internal capture rate of the Ave Maria development for residential and commercial developments, with more emphasis on non- residential land uses. This information was used to determine whether the development's internal capture rates are higher than the countywide averages used to develop Collier County's transportation impact fee and the resulting effect on the transportation impact fee schedule for non-residential land uses. The following paragraphs provide a detailed explanation of the analysis completed. Overview of Analytical Approaches The four internal capture analyses review different geographic boundaries and focus on different combinations of land uses to evaluate which land uses should receive a discount. • The NCHRP 684 approach included all developments and concluded that there was not enough support to provide a discount to residential land uses. In other words, there are not enough non-residential developments to support the residential developments, and therefore, residents will still have to travel to other parts of the county for work or services. • The D1 Regional Model approach also considered all land uses and reached a similar conclusion as the NCHRP model. • The Replica model focused on where non-residential land uses are concentrated. Therefore, the internal capture of this area is different than when all residential land uses are included. • Finally, the travel characteristics surveys focused on convenience retail, which is even a smaller area and demonstrates the highest capture rate. Trip Characteristics Surveys Trip characteristics surveys were conducted at select commercial sites and provided an estimate for trip capture information for a typical weekday. Surveys were conducted at a sample of four smaller commercial sites in Ave Maria. The survey included questions on where a customer of a commercial establishment had just come from prior to visiting the site and where they were headed just after. A sample survey is provided in the Appendix. A team of at least two surveyors was stationed at each of four survey sites in the Town Core or Town Centers of the development, as shown in Map II-2. Surveyors counted the number of people entering the establishment and collected responses to surveys during the regular business Benesch Ave Maria Development April 2023 4 Impact Fee Calculations Packet Pg. 1203 1 6.F.7.b hours of the four establishments beginning Tuesday, September 28 through Thursday, September 30, 2021. Survey teams were instructed not to continue to ask for information if a person did not show interest, declined to participate, or wanted to discontinue their participation in the survey. Establishments were chosen to provide a mix of office and restaurant uses. Publix was planned as a fifth site to provide representation for large retail; however, corporate approval from Publix could not be obtained for conducting the survey. The survey team standardized location labels and information in survey responses (e.g., addresses and intersections); label and provided location information, along with additional online research in some cases, were used to verify the correct origin/destination location. Responses were excluded when there was not enough information to determine whether origin and/or destination was inside or outside of the development, when location information was contradictory, or response information was highly unlikely (e.g., a primary trip to/from Miami, FL or Pensacola, FL to visit a survey site). Additional responses were excluded for specific analytical purposes, such as determining trip capture shares when there was not adequate detail to determine these characteristics based on the information in the response. Benesch Ave Maria Development April 2023 5 Impact Fee Calculations Packet Pg. 1204 eel joedua! OA14BUJO418 eueW and : Z�09Z) (!) SZ'LO'V0:podeN !eu!=l uo!}e}aodsueal eueW and :;uauayoejjV M I �'4 41 loop • ._' LN lo' �c 'a c E 1 6.F.7.b Table II-1 shows the share of survey responses by site compared to total customers counted at each site, and in turn what share of the responses were usable in some capacity (determining internal versus external trips, determining trip capture levels, etc.). Responses from at least a third of the customers were captured at each site and overall; usable survey shares were 95 percent or above of total responses. An additional consideration is that most of the overall and usable survey responses came from the Tropical Smoothie Cafe, which also had the most customers overall of all four sites. Table II-1 Survey Response Counts Compared to Customer Counts by Travel Characteristics Survey Site Tropical smoothie 955 323 34% 320 99% Faithful Friends Animal Hospital 72 37 51% 36 97% Braden Clinic 165 79 48% 75 95% Dog Gone Cleaners 96 59 61% 56 95% Total 1 1,288 1 498 39%1 487 98% Table II-2 Customer Count and Survev Response Shares by Travel Characteristics Survey Site Survey Lacatio4j% Tropical Smoothie Share 011' - Sh - ;t 74% WSite 65% NRespponses by WSfte 66% Faithful Friends Animal Hospital 6% 7% 7% Braden Clinic 13% 16% 15% Dog Gone Cleaners 7% 12% 11% Total 100% IDO% I100f Results of this analysis suggested an internal capture rate of 89 percent for smaller retail establishments. These results will be discussed further later in this section. NCHRP Report 684 Mixed -Use Model The Institute of Transportation Engineers (ITE) has developed an approach to quantify internal capture. The initial approach focused on three land use categories: • Residential; • Office; and Benesch Ave Maria Development April 2023 7 Impact Fee Calculations Packet Pg. 1206 1 6.F.7.b • Retail. Internal capture calculations focus on trip reduction, especially between residential and retail uses. The data is available for weekday P.M. peak hour, midday, and "daily," which is based on data collection between noon and 6:30 PM. Several publications by NCHRP made improvements to the original ITE approach used to calculate internal capture, which were summarized in the NCHRP Report 684.1 This improved estimate method was developed based on existing survey data from prior studies plus three pilot data collection surveys conducted as part of the report study. • Although the model developed as part of NCHRP Report 684 continued to focus on trip reduction, three land uses were added: restaurant, hotel, and cinema/entertainment. These resulted for a higher internal capture percentage. The authors caution users to limit their applications to these six uses, and that the model was not tested for any additional land uses. • NCHRP Report 684 also added weekday A.M. peak hour and created a land use classification structure that would permit disaggregation of the six land uses to more detailed categories should enough data become available. • The report included the effects of proximity (convenient walking distance) between interacting land uses to represent both compactness and design. It stated that several planners and architects recommend X-mile or longer walking distances. However, developers contacted for the study reported that acceptable walking distances range from 600 to 1,000 feet. The study found that when the major uses were within a convenient (e.g., covered walkways, etc.) and short walking distance, the capture rate increased. • This method reduced the estimation error by half compared to the original ITE method, resulting in an error rate of about one-fourth of the raw trip generation rates. The report included limitations on the applicability of the model, indicating it should only be used for development up to 300 acres. The model is also not recommended for use on suburban activity centers or "new town" development due to differences in scale and reduced levels of interconnectivity. The report also states: "...it cannot be concluded that the methodology will be appropriate for MXDs that differ significantly from those surveyed in this project in terms of. 1Bochner, Brian S. and additional authors (2011) Enhancing Internal Trip Capture Estimation for Mixed -Use Development, NCHRP Report 684, Transportation Research Board: Washington, D.C. Benesch Ave Maria Development April 2023 8 Impact Fee Calculations Packet Pg. 1207 1 6.F.7.b • Regional context, including competing opportunities outside the development, - Access and parking, • Scale of the development, • Complementary land uses, including specific pairs of business types; • Specific residence types; • Other component characteristics within each land use category; • Proximity and connectivity between each pair of land uses, especially the layout of the land uses relative to each other; • Other characteristics such as proximity to transit and pedestrian access within and around the site; and • Colder locations that might limit or constrain pedestrian traffic" The criteria used to select mixed -use developments for study in the report included, for example, that the developments include at least four land uses and be "economically successful (by appearance) and mature (fully occupied for at least a year and in an area that is mostly developed)."3 Consequently, there are some limitations in applying this model to the Ave Maria development, given that it is very large (5,027 acres) relative to the mixed -use developments targeted for the model. It is also a relatively new development in a suburban context with limited non-residential options (aside from those within the development itself) nearby. With these limitations in mind, trip capture was estimated using this model for both full build - out of the development and existing development in Ave Maria, previously presented in Table I- 1. Full build -out is based on entitlements information provided by Ave Maria Development, LLLP. Florida Department of Revenue data is a typical source for existing development units and square footage; however, due to the collection of many buildings/businesses within single parcels of the development and the generalized documentation of various non-residential uses in a single "shopping center" category, Benesch developed an alternative way to calculate existing building square footage by land uses needed for the model. The project team reviewed building square footage reported with individual building diagrams on the Collier County Property Appraiser website and compared the buildings with maps from Ave Maria Development, LLLP and Google Maps to calculate building square footage by non-residential establishment; by categorizing the Z Bochner and additional authors (2011), p 5. 3 Bochner and additional authors (2011), p 4. Benesch Ave Maria Development April 2023 9 Impact Fee Calculations Packet Pg. 1208 1 6.F.7.b establishment by land uses in the model, the team calculated a building square footage by land use. Furthermore, Benesch conducted a sensitivity analysis of this model in 2018, which identified optimized development programs to maximize trip capture based on the model from NCHRP Report 684.4 These hypothetical scenarios are referenced in the trip capture discussion for comparison to the Ave Maria development program. Results of NCHRP model suggested limited internal capture due to heavy presence of residential land uses, which will be discussed further later in this section. Review of District 1 Regional Planning Model for Travel Demand Benesch developed a travel demand model with existing -conditions and future buildout- conditions model scenarios that can estimate traffic conditions and forecast the use of future area roadways within and in proximity to Ave Maria. This model was based on the current adopted FSUTMS regional planning model, the D1RPM v. 2.0, using the 2023 Existing plus Committed (E+C) Network scenario and the Cost Affordable 2045 scenario as the bases for each scenario modeled. Existing and proposed development levels (including residential, hotel, commercial, service, industrial, school, and university uses) were converted to model socio- economic data (SE Data) to be added to the model; existing development was based on the calculations using building square footage reported on the Collier County Property Appraiser website in conjunction with developer maps and Google maps to determine land use type classifications, described in the previous section on the NCHRP Report 684 model. To accommodate this data, two new Traffic Analysis Zones (TAZs) were added to the model representing the water park and sports fields in the north of the Ave Maria development area, and the future services sub -area near the middle of the development. Table II-3 and Table II-4 summarize the land uses by TAZ from documents and data provided by the County, the NCHRP Report 684 model, and the site developer. 4 Tindale Oliver (2018) Collier County Mixed -Use Development Impact Fee Calculations. Benesch Ave Maria Development April 2023 10 Impact Fee Calculations Packet Pg. 1209 1 6.F.7.b Table II-3 2021 Ave Maria TAZ Area 2604 University district SFDU 190 Land Use by TAZ for D1RPM SF •., IVIFDU IVIF Pop Hotel DU 433 1,052 1,052 0 Travel Demand Model Ind. Empl. Com. Empl. Svc. Empl. Tot. Empl. School Univ. 0 0 43 43 0 1122 2878 Town Core/ TC1 0 0 240 240 0 0 228 352 580 0 0 2879 NE of Town Center 290 664 0 0 0 0 6 34 40 340 0 2880 SE of Town Center 995 2,279 70 161 0 123 4 6 133 0 0 2881 SE (National G&CC area) 300 687 48 110 0 9 9 36 54 0 0 2882 SW (Panther Run GC area) 500 1,1451 251 571 01 91 91 361 541 0 0 2444 South (Arthrex area) 0 0 0 01 01 527 01 01 527 01 0 2338* North sports fields & water park 0 01 01 01 01 21 21 211 251 01 0 Notes: MFDU includes university residence as applicable by TAZ. Employment adjustments made for ALF, school, university, hotels, and golf courses. TAZ 2238 added to Ave Maria development area for locational trip generation purposes. Employment converted from s.f. @ 2/1 k.s.f. Industrial, 3/1 k.s.f. Commercial, 4/1 k.s.f. Services. Table II-4 Ave Maria Land TAZ Area 2604 University district Use at Buildout SFDU SF Pop 400 1,028 MFDU 3000 by TAZ for IVIF Pop Hotel DU 3000 0 D1RPM Travel Demand Ind. Empl. Corn. Empl. 0 60 Svc. Empl. 600 Model Tot. Empl. School Univ. 660 0 6000 2878 Town Core / TC1 0 0 300 300 0 0 600 500 1,100 0 0 2879 NE of Town Center 1,800 4,608 500 1255 0 0 500 500 1,000 1162 0 2880 SE of Town Center 1,800 4,608 100 251 0 76 500 400 976 0 0 2881 SE (National G&CC area) 1,800 4,608 100 252 400 2 50 600 652 0 0 2882 SW (Panther Run GC area) 1,076 2,7551 1241 3121 01 21 501 1501 2021 01 2444 South (Arthrex area) 0 0 0 0 0 1200 108 203 1511 0 0 2338* North sports fields & water park 0 0 0 0 0 2 2 21 25 0 0 2239* West service area 0 0 0 0 0 0 200 606 806 0 Notes: MFDU includes university residence as applicable by TAZ. Employment adjustments made for ALF, school, university, hotels, and golf courses. TAZs 2238 and 2239 added to Ave Maria development area for locational trip generation purposes. Employment converted from s.f. @ 2/1 k.s.f. Industrial, 3/1 k.s.f. Commercial, 4/1 k.s.f. Services. Socio-economic data assigned to the TAZs in the above tables are based on data that was provided by Ave Maria as the full Land Use Entitlements. The assignment of land uses assumes full buildout according to these entitlements. Employment is converted from square footage to number of employees for use in the D1RPM model using standard convention for FSUTMS models in Florida. Additional adjustments to employment were made to accommodate employment types associated with ALF, schools, university, hotels, golf courses, and sports/recreational complexes. Other modifications to the travel demand model included edits to the model roadway network. These edits included collector roadways internal to the Ave Maria development, and TAZ connector links to connect the land uses to the roadway network. These edits were made in a manner that was consistent with the Ave Maria Site Buildout Map, provided by the Ave Maria Development, LLLP (see Map 1-1). Internal roads that are gated or are local (sub -Collector) use Benesch Ave Maria Development April 2023 11 Impact Fee Calculations Packet Pg. 1210 1 6.F.7.b only, were not added to the model and are considered to be represented by the zonal connector links. The final model network, including modifications to the roadway network and TAZs, can be seen in Map II-2. Similar to the NCHRP model results, this analysis suggested limited internal capture when residential land uses are taken into consideration. Results will be discussed further in this section. Benesch Ave Maria Development April 2023 12 Impact Fee Calculations Packet Pg. 1211 1 6.F.7.b Map II-2 Ave Maria Road Network and Zonal Structure at Buildout for D1RPM Travel Demand Model lmmokalee Ra — 2238 }hem Pkvey 2$79 ■ aj It Blvd 25(A 8 P ■ 2880 ■ C7 v a 2239 n 2882 2881 A ■ k m m m 2444 ■ oil Well Rd Legend Ave Maria Collectors ■ Ave Maria TAZ Centroid Ave Maria Model Network D1 RP M v2 - 2045 Cost Feasible Other Model Roads Centroid Added to Model with Development Collector Collectors Added to Model Ave Maria Site Roads Added TAZ Centroid Connectors Benesch Ave Maria Development April 2023 13 Impact Fee Calculations Packet Pg. 1212 1 6.F.7.b Replica The Replica model tool is based on a synthetic nationwide population combined with travel patterns derived from empirical data. The population component is created from the Census and consumer market data. Travel data is based on samples of mobile device, freight delivery, and in -dash navigation data; samples are large enough to create a statistically valid model, while not compromising privacy. Additional data inputs include Longitudinal Household -Employment Dynamics, credit transaction data, and land use/real estate data. The resulting model can be used to determine movements of individuals on a typical weekday in terms of the sequence of activities they do, where they are going, and the mode used to make trips (which also accounts for the transportation network available); it can be applied to customized geographies but not individual sites due to privacy protections. Model outputs are compared to aggregate control group data (e.g., observed auto and freight volumes, transit ridership, bicycle and pedestrian counts) for model calibration. Replica data indicated a relatively high capture rate for non-residential trips (excluding industrial); findings are discussed in more detail in the following sections. Commercial vs Residential Triq Counts To contextualize the study of the transportation impact fee reduction, the project team reviewed the number of trips for residential and certain non-residential (retail, office, and restaurant) land uses in the Ave Maria development. This information helps illustrate the impact of a trip capture rate in providing the magnitude of trips to which the rate applies; it is useful in looking at trip capture by specific uses since an impact fee reduction can be applied by specific land uses. Table II-5 shows trip generation estimates by residential, hotel, and other commercial uses, based on ITE trip generation rates from the 11th edition of the Trip Generation Manual. Regarding existing development, estimated residential trips generated are 2.8 times as many as commercial trips; regarding development at full build -out, estimated residential trips are 1.8 times as many as estimated commercial trips. The higher volume of residential trips will have implications for trip capture that can be obtained overall for the development and the impact of trip capture for residential and commercial uses, as discussed in the following section. Benesch Ave Maria Development April 2023 14 Impact Fee Calculations Packet Pg. 1213 1 6.F.7.b Table II-5 Trip Generation Estimates by Key Land Use for Ave Maria Existing Development and Full Build -Out Development Program Ave Maria Existing Residential Single- Family 2,275 units Residential Multi- Family 1,453 units Hotel 0 rooms Retail 44,365 sf Office 1 106,672 sf Restaurant 13,050 sf Total Trips Generated (ITE 11th Ed) 17,879 1 9,389 n/a 70221 11601 1608 37,058 27,268 n/a 9,790 37,058 74% n/a 26% 100% Ave Maria Full Build -Out 6,876 units 4,124 units 400 rooms 590,000 sf* 1 545,000 sf 100,000 sf Trips Generated (ITE 11th Ed) 49,460 26,510 3912 212691 64641 10934 118,549 75,970 3912 38,667 118,549 64% 3% 339/. 100% *100,000 sq ft of retail assumed to be restaurant at build -out Data sources: trip generation rates are from ITE's Trip Generation Manual, 11th ed.; existing development is based on FDOR data reported in 2021 and building square footage estimates from Collier County Property Appraiser records, accessed in November of 2021, in conjunction with developer maps and Google Maps to determine land use type classifications; full build -out development is based on entitlement information provided by Ave Maria Development, LLLP. Internal Capture Rate Calculations General Trip Capture The NCHRP Report 684 model was used to estimate trip capture for the existing development in Ave Maria and the full build -out of Ave Maria based on approved entitlements; the resulting estimated average internal trip capture shares (10 percent and 18 percent, respectively) are relatively low when compared to the maximized trip capture share (49 percent) that can be obtained in the model via an optimized development program determined from the 2018 sensitivity study (see Table II-6). Additionally, the results from the D1RPM v2 model (Table II-7) indicate that the internal capture of total VMT generated by the Ave Maria development is approximately 14 percent for existing development and 19 percent for full build -out development, comparable to shares for average internal trip capture. These findings suggest that the capture share is affected by the high share of residential development relative to the non-residential development in Ave Maria's existing and full build - out development, when compared to the optimized development program. Given this, adjusting the transportation impact fees for residential land use categories is not recommended. Benesch Ave Maria Development April 2023 15 Impact Fee Calculations Packet Pg. 1214 1 6.F.7.b Table II-6 NCHRP Report 634 Model Trip Capture - Ave Maria & Optimized Development Program Residential Hotel Retail (Wice Restaurant Average Secnario Family Ws Rooms Sq Ft Sq Ft Sq Ft Internal Capture I Ave Maria Existing 3,728 0 44,365 106,672 13,050 113% Ave Maria Full Build -Out 1 11,0001 4001 590,000* 1 545,0001 100,0001 18% Optmized Program from 5,000 50 3,000,000 3,000,000 400,000 49% 2018 Sensitivity Study *100,000 sq ft of retail assumed to be restaurant at build -out Data sources: existing development is based on FDOR data reported in 2021 and building square footage estimates from Collier County Property Appraiser records, accessed in November of 2021, in conjunction with developer maps and Google maps to determine land use type classifications; full build -out development is based on entitlement information provided by Ave Maria Development, LLLP. The optimized development program is from Tindale Oliver's 2018 Collier County Mixed -Use Development Impact Fee Calculations report. Table II-7 VMT Capture in Ave Maria Ave Maria Generated VMT of Total Ave Maria generated 31,645.82 14.17 Ave Maria Generated VMT 109,043.73 of Total Ave Maria generated 18.76% Note: Analysis accounts for roads in the D1RPM v2 plus added Ave Maria Collector Roads. Internal local roads and/or gated roads are not included. Commercial -Based Trip Capture Trip capture share estimates become significantly higher when trip capture is assessed for commercial -based trips alone. Using the travel characteristics surveys and Replica, the project team analyzed trips that included a stop in the Ave Maria Commercial Area. Those trips that started and/or ended in Ave Maria, with a stop in the Commercial Area in-between, were considered captured trips since additional travel to reach the survey site was contained within the Ave Maria development. Table II-8 shows that the share of these trips relative to all the trips with a stop in the Commercial Area is 78 percent based on Replica data and 89 percent based on survey data. Benesch Ave Maria Development April 2023 16 Impact Fee Calculations Packet Pg. 1215 1 6.F.7.b Table II-8 Captured Commercial Area Trips that Start and/or End in Ave Maria Total trips that include a stop in Ave Maria 3,426 100% 487 100% Commercial Area Trips that start and/or end in Ave Maria with 2,688 78% 432 89% a stop in Commercial Area Since trips that start and end outside of Ave Maria with a stop in the Commercial Area could also potentially be captured trips (e.g., if additional travel taken to reach the Commercial Area is essentially contained in the Ave Maria development), the project team also analyzed a further breakdown of these trips, shown in Table II-9. The additional captured trips from trips starting and ending outside the development did not affect the overall commercial -based trip capture rate. The following notes describe the components of Table II-9, with additional explanation and illustrations of trip type categories in the Appendix: • "Primary trips" are trips where the origin and destination of the trip are the same location. • "Non -primary trips" are trips where the origin and destination of the trip are different locations. • Trips "inside Ave Maria" are those where the origin and destination are both in the Ave Maria development. • Trips "partially inside Ave Maria" are those where either the origin or the destination (not both) is in Ave Maria. • Trips "outside Ave Maria" are those where the origin and destination are both outside of Ave Maria. • Trips "outside Ave Maria" were considered captured if the additional travel taken to visit the Commercial Area was essentially contained within the Ave Maria development. • Four survey responses had origin/destination locations with enough information to indicate that they were outside the development but were general enough that capture could not be determined; these trips are categorized as "undetermined" in terms of capture. The project team also reviewed the commercial -based trip capture rate by travel characteristic survey site to see if there were large variations in capture by establishment (Table II-10). Trip capture rates ranged from 78 percent to 96 percent, all indicating significant capture. Benesch Ave Maria Development April 2023 17 Impact Fee Calculations Packet Pg. 1216 1 6.F.7.b Table II-9 Trip Capture Shares from Travel Characteristics Surveys for Commercial -Based Trips Non -Primary Inside Ave Maria 1 1 119 Primary Inside Ave Maria yes 258 89% Non -Primary Partially Inside Ave Maria 55 Non -Primary Outside Ave Maria 3 Primary Outside Ave Maria No 39 1D% Non -Primary Outside Ave Maria 9 Non -Primary Outside Ave Maria Undetermined 4 1% Total 487 1DD% Table II-10 Captured Trip Shares by Travel Characteristic Survey Site Tropical Smoothle Braden Clinic Faithful Friends Trip Type Captured? Trip Capture Trip Capture Trip Capture Dog Gone Trip Cleaners Capture Non -Primary Inside Ave Maria Counts 75 Counts Share 22 Counts Share 12 Counts Share 10 Share Primary Inside Ave Maria Yes 173 90% 36 B7% 16 78% 33 96% Non -Primary Partially Inside Ave Maria 39 5 0 11 Non -Primary Outside Ave Maria 1 2 0 0 Primary Outside Ave Maria No 24 9% 8 13% 6 22% 1 4% Non -Primary Outside Ave Maria 4 2 2 1 Non- Primary Outside Ave Maria Undetermined 4 1% 0 0% 0 0% 0 0% Total 320 100% 1 751 1o0% 36 1o0% 56 100% Adjusted Transportation Impact Fee Schedule As shown in Table II-8, the small retail/restaurant surveys indicated internal capture of approximately 89 percent, while the Replica data indicated internal capture of approximately 78 percent for all non-residential land uses in the Ave Maria commercial area. Using these results and the square footage of developments within the commercial area, the internal capture for office/other land uses was estimated at 74 percent. Table II-11 shows this calculation. Benesch Ave Maria Development April 2023 18 Impact Fee Calculations Packet Pg. 1217 1 6.F.7.b Table II-11 Internal Capture Estimates 1) Source: Ave Maria Development, LLLP and Collier County Property Appraiser 2) Source: On -site surveys for small retail/restaurants; Replica analysis for total. Capture rate for office/other is calculated as weighted square footage for office/other divided by total square footage for office/other. 3) Square footage (Item 1) multiplied by capture rate (Item 2) for small retail/office and total. Figure for office/other is calculated by subtracting small retail/restaurant from total square footage. These percentage are used to calculate potential transportation impact fees that could be used for non-residential developments in Ave Maria for Collier County's consideration. Table II-12 presents the resulting potential fee rates compared to the full rates. Table II-12 Transportation Impact Fee Rates for Non -Residential Development Transportation Impact Fee Rates Land Use Unit Full Transp. IF Ave Maria Ave Maria Percent (Ave 0/20 Non -Residential Auto Sales - Luxury 1,000 sf $12,380.00 11% $1,599.00 13% Auto Sales - New/Used 1,000 sf $16,622.00 11% $2,314.00 14% Bank/Savings: Drive -In 1,000 sf $21,254.00 11% $5,085.00 24% Bank Savings: Walk -In 1,000 sf $12,300.00 11% $2,941.00 24% Business Park 1,000 sf $11,301.00 26% $3,299.00 29% Car Wash - Automatic 1,000 sf $38,303.00 11% $6,196.00 16% Car Wash - Self -Service service bay $11,848.00 11% $1,921.00 16% Church seat $286.00 26% $80.00 28% College/Univ. <7,501 Students student $1,973.00 269/o $578.00 29% College/Univ. >7,500 Students student $1,483.00 26% $430.00 29% Conv. Store (24 hours) 1,000 sf $82,170.00 11% $22,049.00 27% Conv. Store w/Gas Pumps <2,000 sq ft fuel position $6,910.00 11% $3,307.00 48% Conv. Store w/Gas Pumps 2,000-2,999 sq ft fuel position $8,252.00 11% $3,949.00 48% Conv. Store w/Gas Pumps 3,000+ sq ft fuel position $9,262.00 11% $4,426.00 48% Dance Studios/Gymnastics 1,000 sf $9,325.00 26% $3,022.00 32% Day Care student $1,097.00 26% $385.00 35% Furniture Store 1,000 sf $3,674.00 11% $522.00 14% General Light Industrial 1,000 sf $4,584.00 26% $1,287.00 28% Golf Course 18 holes $199,146.00 26% $57,536.00 29% Golf Course - Bundled 18 holes $59,741.00 26% $17,253.00 29% Home Improvement Store 1,000 sf $8,514.00 11% $1,447.00 17% Hospital 1,000 sf $9,168.00 26% $3,061.00 33% Hotel room $3,702.00 26% $1,461.00 39% Hotel - All Suites room $2,974.00 26% $1,178.00 40% Manufacturing 1,000 sf $3,629.00 26% $1,024.00 28% Benesch Ave Maria Development April 2023 19 Impact Fee Calculations Packet Pg. 1218 1 6.F.7.b Table II-12 (continued) Transportation Impact Fee Rates for Non -Residential Development Non -Residential Marina berth (dry/wet) $2,376.00 26% $681.00 29% Mine/Commercial Excavation 1,000 cy $14.00 26% $0.00 0% Mini -Warehouse 1,000 sf $891.00 26% $245.00 27% Motel room $2,074.00 26% $702.00 34% Movie Theater screen $40,887.00 26% $12,076.00 30% Nursing Home bed $1,276.00 26% $375.00 29% Office 6,000 sq ft or less 1,000 sf $8,605.00 26% $2,428.00 28% Office 6,001-100,000 sq ft 1,000 sf $8,605.00 26% $2,428.00 28% Office 100,001-200,000 sq ft 1,000 sf $8,605.00 26% $20428.00 28% Office 200,001-400,000 sq ft 1,000 sf $8,605.00 26% $2,428.00 28% Office >400,000 sq ft 1,000 sf $8,605.00 26% $2,428.00 28% MedicaIOffice >10,000sgft 1,000 sf $31,444.00 26% $9,179.00 29% Medical Office 10,000 sq ft or less 1,000 sf $21,955.00 26% $6,412.00 29% Pharmacy/Drug Store 1,000 sf $12,618.00 11% $4,341.00 34% Quick Lube service bay $12,198.00 11% $1,867.00 15% Restaurant - Fast Food w/Drive-Thru 1,000 sf $104,272.00 11% $19,776.00 19% Restaurant - High Turnover seat $1,814.00 11% $280.00 15% Restaurant - Low Turnover seat $1,163.00 11% $162.00 14% Restaurant - Fast Casual 1,000 sq ft $68,107.00 11% $12,915.00 19% Restaurant - Fast Food (2 meals) 1,000 sq ft $95,762.00 11% $17,849.00 19% Retail 6,000 sq ft or less 1,000 sf $5,737.00 11% $1,622.00 28% Retail 6,001- 25,000 sq ft 1,000 sf $10,568.00 11% $2,327.00 22% Retail 25,001- 50,000 sq ft 1,000 sf $13,774.00 11% $2,039.00 15% Retail 50,001- 100,000 sq ft 1,000 sf $13,774.00 11% $2,039.00 15% Retail 100,001- 150,000 sq ft 1,000 sf $13,774.00 11% $2,039.00 15% Retail 150,001- 200,000 sq ft 1,000 sf $13,774.00 11% $2,039.00 15% Retail 200,001- 400,000 sq ft 1,000 sf $13,774.00 11% $2,039.00 15% Retail 400,001- 600,000 sq ft 1,000 sf $13,774.00 11% $2,039.00 15% Retail 600,001- 1,000,000 sq ft 1,000 sf $13,774.00 11% $2,039.00 15% Retail >1,000,000 sq ft 1,000 sf $13,774.00 11% $2,039.00 15% RV Park site $1,383.00 26% $354.00 26% School - Elementary student $815.00 26% $264.00 32% School - Middle student $921.00 26% $303.00 33% School - High student $983.00 26% $287.00 29% Supermarket 1 1,000 sf 1 $22,569.00 11% $4,437.00 20% Tire store I service bay 1 $9,318.001 11%1 $1,427.00 15% Warehouse 1 1,000 sf 1 $1,599.00 26% $461.00 29% 1) Source: Collier County Growth Management Department. Rates effective March 30, 2022 2) Source: Adjusted percent new trips based on the calculated Ave Maria internal capture rates 3) Source: Full rates for Collier County (Item 1) with the internal capture reductions applied 4) Ave Maria rates (Item 3) divided by the full rates (Item 1) = Collier County and Ave Maria Development, LLLP have agreed that these uses should not receive a fee reduction. Benesch Ave Maria Development April 2023 20 Impact Fee Calculations Packet Pg. 1219 1 6.F.7.b To clarify the calculations presented in Table II-12, a comparison of the impact fee rate calculation for the Collier County full rate and the Ave Maria adjusted rate are shown below for small retail category. Total Impact Cost = ([Trip Rate x Trip Length x % New Trips] /2) x (1— Interstate/Toll Facility Adjustment Factor) x (Cost per Vehicle -Mile of Capacity) Annual Capital Improvement Credit = ([Trip Rate x Total Trip Length x % New Trips] /2) x (Effective Days per Year x $/Gallon to Capital) / Fuel Efficiency Capital Improvement Credit = Present Value (Annual Capital Improvement Credit), given 4.00% interest rate & a 25-year facility life Full Transportation Impact Fee: Total Impact Cost = ([75.05 * 0.80 * 0.39] /2) * (1 — 0.144) * ($706.47) = $7,080 Annual Cap. Improv. Credit = ([75.05 * 1.30 * 0.39] /2) * 365 * (0.231 /18.74) = $86 Capital Improvement Credit = $86 * 15.6220 = $1,343 Net Impact Fee = $7,080 - $1,343 = 5 737 Ave Maria Transportation Impact Fee: Total Impact Cost = ([75.05 * 0.80 * 0.11] /2) * (1— 0.144) * ($706.47) = $1,997 Annual Cap. Improv. Credit = ([75.05 * 1.30 * 0.11] /2) * 365 * (0.231 /18.74) = $24 Capital Improvement Credit = $24 * 15.6220 = $375 Net Impact Fee = $1,997 - $375 = $1,622 Benesch Ave Maria Development April 2023 21 Impact Fee Calculations Packet Pg. 1220 1 6.F.7.b III. Summary & Conclusions Ave Maria is a over 5,000-acre master planned development located in the eastern Collier County, approximately 50-minute drive from Naples. In addition to residential subdivisions, the development also includes commercial properties, parks and recreational amenities, among others. Given its distance from other activity centers within the county and the availability retail, restaurant, recreational amenities, it is likely that the development's impact is reduced on certain infrastructure. Ave Maria Development, LLLP, in collaboration with Collier County, retained Benesch to review internal capture achieved due to these characteristics which may then reduce the impact fees for transportation. Findings of this analysis include the following: • Benesch used four different methods to measure internal capture, which suggested the following: o Dominance of residential units in relation to non-residential square footage suggest that the fee reductions are appropriate only for non-residential land uses. Residential land uses continue to travel to other office and commercial sites throughout the county. o In the case of non-residential land uses, trip characteristics surveys conducted suggested an internal capture rate of 89 percent for smaller retail/restaurant establishments and 74 percent capture rate for other non-residential land uses. This indicates that these establishments are being used primarily by Ave Maria residents. o The report includes a potential fee schedule based on these internal capture rates for discussion purposes. Benesch Ave Maria Development April 2023 22 Impact Fee Calculations Packet Pg. 1221 1 6.F.7.b Appendix A Ave Maria Site Buildout Map Packet Pg. 1222 1 6.F.7.b Source: Ave Maria Development, LLLP Benesch Ave Maria Development April 2023 A-1 Impact Fee Calclilations -- I Packet Pg. 1223 1 6.F.7.b Appendix 6 Survey Documentation El r a Packet Pg. 1224 1 6.F.7.b Appendix B: Survey Documentation Survey Form Survey responses were collected in an electronic form; the final question on manually mapping locations was optional and used as a reference to determine more accurate location information to record for preceding questions. Date and Time 1 1/30/2021 03-03 PM Starting Location* -Please Select - What is the name of the place you just came from? If home, just say home.* 1000 Did you stop anywhere between here and where you said you came from? (If yes, then adjust the previous response to the last place they came from.) What is the address or nearest 'intersection ( major and minor street) of this location? (For a home location, just use the nearest intersection.)* 10 0C Benesch Ave Maria Development April 2023 B-1 Impact Fee Calculations Packet Pg. 1225 1 6.F.7.b What is the name of where you are going directly after this? if home, just say home.* 1000 /X° Do you plan to stop anywhere between here and where you said you are going? (If yes, then adjust the previous response to the place they are going next.) What is the address or nearest intersection (major and minor street) of this location? (For a home location, just use the nearest intersection.)* We'll now mark the location you just came from and the location you're going next on the map. Again, if a home location, just use the nearest intersection. Benesch Ave Maria Development April 2023 B-2 Impact Fee Calculations Packet Pg. 1226 1 6.F.7.b Captured Trips Primary Trips - Start and End Inside Ave Maria These trips had the same origin and destination point, which was in Ave Maria. Consequently, all travel occurred in Ave Maria. The route is shown in red. Non -Primary Trips -Start and End Inside Ave Maria The origin for these trips was different from the destination, but both were in Ave Maria. Consequently, all travel occurred in Ave Maria. The route that includes the survey site stop is shown in red. The route in yellow shows the route that likely would have been taken if no stop at the survey site was made. Benesch Ave Maria Development April 2023 B-3 Impact Fee Calculations Packet Pg. 1227 1 6.F.7.b Non -Primary Trips - Start or End in Ave Maria The origin for these trips was different from the destination, and either the origin or destination (not both) was in Ave Maria. Consequently, additional travel to reach the survey site was contained within the Ave Maria development. The route that includes the survey site stop is shown in red. The route in yellow shows the route that likely would have been taken if no stop at the survey site was made. Non -Primary Trips - Start and End Outside Ave Maria The origin for these trips was different from the destination, and both were outside of the Ave Maria development. However, the additional travel to reach the survey site was mostly contained within the Ave Maria development. The route that includes the survey site stop is shown in red. The route in yellow shows the route that likely would have been taken if no stop at the survey site was made. Benesch Ave Maria Development April 2023 B-4 Impact Fee Calculations Packet Pg. 1228 1 6.F.7.b Non -Captured Trips Primary Trips — Start and End Outside Ave Maria The origin and destination of these trips were the same and were outside the development. The route is shown in red. Non -Primary Trips — Start and End Outside Ave Maria The origin for these trips was different from the destination and both were outside Ave Maria. The additional travel to reach the survey site was mostly not contained within Ave Maria. The route that includes the survey site stop is shown in red. The route in yellow shows the route that likely would have been taken if no stop at the survey site was made. Benesch Ave Maria Development April 2023 B-5 Impact Fee Calculations Packet Pg. 1229 — (Cpn)s as;;oedw! ang u.WpegueW an : U09Z) (!) CZ-LOTO poday leuid uo!)e;jodsueal eueW any:;uswyaeuy ... ... ,.. W ,.. ... ,.. Q Q Q Q Q Q Q W Q (D O N LL g t W W Iy Co V E Y ° a-G c ro 2 E 3 N 1. Q H Y$ „_ 0 y LL V V c a E _ y Co •- N E m r z Q 0 v O 12 0 E E 1201 m of V 0 V lot _ — m z u � ' o m - � o w a ° N m_ W �p l'I ZN �` �_ z W U p► ,. .. w z O i- 1 c low— �o m o� �I 0p o LLp 0 � so. o O Q rV r Z v 0 0 C