Agenda 07/11/2023 Item #16B11 (Annual Progress Report of the Collier County Transit Development Plan)16.B.11
07/ 11 /2023
EXECUTIVE SUMMARY
Recommendation to approve the FY2023 Annual Progress Report of the Collier County Transit
Development Plan inclusive of the Annual Project Priority List and authorize submission of the Plan to the
Florida Department of Transportation.
OBJECTIVE: To obtain authorization to submit the FY2023 Annual Progress Report of the Transit Development
Plan to the Florida Department of Transportation (FDOT) to continue receiving State Block Grant funding to offset
the cost of the Transit system operation.
CONSIDERATIONS: In order to receive State Block Grant Funds for system operations, each transit agency must
develop a Transit Development Plan (TDP) Major Update every five (5) years and an annual progress report for all
other years. The deadline to submit all TDP updates to the Florida Department of Transportation for approval is
September 1, 2023. The requirements that must be met in the TDP Annual Progress Report are outlined in Rule 14-
731, Florida Administrative Code. The FY2022 TDP Annual Progress Report outlines the progress that Collier
Area Transit (CAT) has made in FY2023 toward achieving the goals and objectives identified in the last TDP
Major Update, which was approved on October 27, 2020.
The TDP Annual Progress Report is a ten-year planning document that recommends implementation strategies to
achieve identified goals and objectives. This document also evaluates where there were discrepancies in the
implementations that differ from the TDP Major Update. The funding shown in the Financial Section of the TDP
Annual Progress Report for FY 2024-2033 is for planning purposes only and should not be considered a proposed
budget.
The report documents changes that occurred in the system between July 1, 2022, through June 30, 2023. Collier
County completed a Comprehensive Operations Analysis (COA) in July 2021. The COA has set up a road map for
CAT system improvements over the next few years. Significant changes were introduced during the first quarter of
the County Fiscal Year 22-23 with the implementation of the Seasonal Schedule Change in November 2022. These
changes were identified as some of the COA short-term recommendations for the system and included route
consolidation and alignment modifications to six of the now sixteen routes, eliminating two routes through
consolidation. These changes were made to improve operational efficiencies, ensuring the remaining routes were
able to service the areas where routes were eliminated. Specifically, the changes were as follows:
• Routes 15 & 16: These routes had a short segment of the route adjusted to travel along Coronado Pkwy instead of
Golden Gate Pkwy. due to bridge construction expected to take one year to complete.
• Route 19 & 28: These two routes were consolidated, creating the existing Route 19. The route continues to
provide service between Immokalee and Naples while eliminating duplicative service with an increase to
frequency. The route will travel around, instead of through, Ave Maria while still providing service at the entrance
to the town.
• Route 20 & 26: These two routes were consolidated, creating the existing Route 20. The routes were combined
due to their similar service areas and relatively low ridership occurring on the routes separately. The merger of the
two routes improves the consistency of service, resulting in higher ridership along the adjusted path.
• Route 21: The path for Route 21 was adjusted to service the Walmart on Collier Blvd further north, allowing for
more connections traveling to Marco Island. A portion of the route path was removed on Marco Island had
consistently low ridership.
• Route 25: The path for Route 25 was realigned to travel north and south on US41 rather than Goodlette Frank Rd.
The route no longer services the CAT Headquarters and now turns the route around at the Walmart on Collier Blvd,
establishing a new connection with Route 21. This route was also realigned to Coronado Pkwy from Golden Gate
Pkwy due to the bridge construction along Golden Gate.
As these modifications were implemented, CAT has witnessed a steady re -growth in ridership over FY23 compared
Packet Pg. 481
07/ 11 /2023
to the previous year. Ridership has stabilized as residents feel more comfortable resuming normal activities.
Other activities during this annual update period include the construction of four (4) ADA-accessible transit stops,
including two (2) shelters throughout the county. Additional ADA and shelter improvements are planned for late
FY23, slated to reach twenty-one (21) total ADA Improvements and eleven (11) shelter installs. CAT was able to
attend many events and visited local schools to make presentations about the Fixed Route system. CAT completed
or continues to make progress on many of the goals and initiatives identified in the TDP.
The TDP Annual Progress Report has gone through the Collier Area Transit Public Participation Plan and was
presented to the Public Transit Advisory Committee (PTAC) on June 20t'', 2023. The TDP has undergone a fifteen -
day public comment period as required by the Collier Area Transit Public Participation Plan, running from May 18,
2023, through June 2, 2023, with copies distributed to buildings around the county, posted on our website, and
advertised in the local newspaper.
The Annual Progress Report includes CAT's updated Transit Priorities List, which comprises various approved
plans, including the Park and Ride Study, Transit Asset Management, and the Major Transit Development Plan.
The Public Transportation and Neighborhood Enhancement (PTNE) Division staff submits the new transit priorities
on an annual basis.
FISCAL IMPACT: The TDP is not a budget or a financial commitment. The potential alternatives and
recommendations are part of the vision for transit. If new funding is not identified, the services in the needs plan
will not move forward.
GROWTH MANAGEMENT IMPACT: This action supports the goals and objectives of the Transportation
Element of the Growth Management Plan.
LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to form and
legality and requires majority vote for approval. -JAK
RECOMMENDATION: To approve the Fiscal Year 2023 Annual Progress Report to the Transit Development
Plan for submittal to the Florida Department of Transportation and the submittal of the updated Transit Priority List
to the Metropolitan Planning Organization.
Prepared by: Alexander Showalter, Senior Planner, PTNE
ATTACHMENT(S)
1. [Linked] FY2023 Annual Progress Report (PDF)
2. Proposed 2023 Transit Priority List (PDF)
Packet Pg. 482
16.B.11
07/11/2023
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.B.11
Doe ID: 25671
Item Summary: Recommendation to approve the FY2023 Annual Progress Report of the Collier County Transit
Development Plan inclusive of the Annual Project Priority List and authorize submission of the Plan to the Florida
Department of Transportation.
Meeting Date: 07/11/2023
Prepared by:
Title: Planner, Senior — Public Transit & Neighborhood Enhancement
Name: Omar Deleon
05/30/2023 4:43 PM
Submitted by:
Title: — Public Transit & Neighborhood Enhancement
Name: Darren Hutton
05/30/2023 4:43 PM
Approved By:
Review:
Public Transit & Neighborhood Enhancement Caroline Soto
Public Transit & Neighborhood Enhancement Alexander Showalter
Public Transit & Neighborhood Enhancement Yousi Cardeso
Growth Management and Community Development Department Jeanne Marcella
Public Transit & Neighborhood Enhancement
Transportation Management Operations Support
Transportation Management Operations Support
Transportation Management Services Department
Grants
Office of Management and Budget
Grants
County Attorney's Office
Office of Management and Budget
County Manager's Office
Board of County Commissioners
Department
Darren Hutton
Omar Deleon
Nicole Diaz
Trinity Scott
Erica Robinson
Level 2 Grants Review
Debra Windsor
Level 3 OMB Gatekeeper Review
Therese Stanley
Additional Reviewer
Jeffrey A. Klatzkow Level 3 County Attorney's Office Review
Christopher Johnson Additional Reviewer
Amanda Barnwell
Level 4 County Manager Review
Geoffrey Willig
Meeting Pending
Additional Reviewer Completed
05/30/2023 5:03 PM
Additional Reviewer Completed
05/31/2023 8:56 AM
Additional Reviewer Completed
05/31/2023 6:35 PM
Transportation Management Services
Completed 06/02/2023 10:40 AM
Interim Director Review Completed
06/08/2023 5:36 PM
Additional Reviewer Skipped
06/13/2023 4:37 PM
Additional Reviewer Completed
06/14/2023 9:19 AM
Transportation Completed
06/27/2023 9:37 AM
Completed 06/27/2023 12:53 PM
Completed 06/27/2023 1:04 PM
Completed 06/28/2023 7:52 AM
Completed 06/28/2023 10:29 AM
Completed 07/01/2023 10:30 AM
Completed 07/05/2023 11:16 AM
07/11/2023 9:00 AM
Packet Pg. 483
16.B.11.b
Proposed 2023 Transit Priorities
Improvement
Route 15 from 90 to 45 minutes
Category
Increase Frequency
Ranking
1
Implementation
Year
2023
Annual Cost
$ 163,238
3-Year
Operating Cost
$ 489,715
0
Operating Cost
$ 1,632,384
$ 503,7i
Route 11 from 30 to 20 minutes
Increase Frequency
2
2023
$ 652 954
$ 1 958 861
$ 6 529 536
$ 503 71
Route 12 from 90 to 45 minutes
Increase Frequency
3
2023
$ 282,947
$ 848,840
$ 2,829,466
$ 503,7�
Administration/Passenger Station Roof Replacement
Transit Asset Management TAM
4
2023
$
$
$
$ 174 0(
Route 16 from 90 to 45 minutes
Increase Frequency
5
2023
$ 156,105
$ 468,316
$ 1,561,054
$ 503,7�
Route 14 from 60 to 30 minutes
Increase Frequency
6
2023
$ 243 915
$ 731 744
$ 2 439 146
$ 512 6S
Site SL-15 Creekside
Park and Ride
7
2023
$
$
$
$ 564,9,
Beach Lot Vanderbilt Beach Rd
Park and Ride
8
2023
$
$
$
$ 2,318,
Route 17/18 from 90 to 45 minutes
Increase Frequency
9
2023
$ 258,550
$ 775 649
$ 2 585 495
$ 503 7
Route 13 from 40 to 30 minutes
Increase Frequency
10
11
2023
$ 83,712
$ 251,135
$ 837,115
40' Fixed Route Bus Replacement
Transit Asset Management TAM
2023
$
$
$
t5OO'O(
Replacement of Support Truck
Transit Asset Management TAM
12
2023
$
$
$
Replace Cutaway Vehicle
Transit Asset Management TAM
13
2023
$
$
$
$ 150 O(
Replace Cutaway Vehicle
Transit Asset Management TAM
14
2023
$
$
$
$ 150,0(
Replace Cutaway Vehicle
Transit Asset Management TAM
15
2023
$
$
$
$ 150,0(
New Island Trolley
New Service
16
2024
$ 551,082
$ 1 653 246
$ 5 510 821
$ 864 3f
Study: Mobility on Demand
Other Im rovements
17
2024
$
$
$
$ 50,00(
Study: Fares
Other Improvements
18
2024
$
$
$
$ 50,00
Support Vehicle - Truck
Transit Asset Management TAM
19
2024
$
$
$
$ 30,00(
Replace Cutaway Vehicle
Transit Asset Management TAM
20
21
2024
$
$
$
E
Replace Cutaway Vehicle
Transit Asset Management TAM
2024
$
$
-LEE
$
$ 150,0(
Replace Cutaway Vehicle
Transit Asset Management TAM
22
2024
$
$
$
$ 150 0(
Replace Cutaway Vehicle
Transit Asset Management TAM
23
2024
$
$
$
$ 150,0(
New Ba shore Shuttle
New Service
24
2025
$ 201,000
$ 602,999
$ 2,009,995
$ 531,0:
Fixed Route Bus - Replacement
Transit Asset Management TAM
25
2025
$
$
$
$ 500 O(
Fixed Route Bus - Replacement
Transit Asset Management TAM
26
2025
$
$
$
$ 500,0(
Support Vehicle - Replacement
Transit Asset Management TAM
27
2025
$
$
$
$ 30 00(
Support Vehicle - Replacement
Transit Asset Management TAM
28
2025
$
$
$
$ 30,00(
Radio Rd Transfer Station Lot
Park and Ride
29
2026
$
$
$
$ 479 9f
Beach Lot Pine Ridge Rd
Park and Ride
30
2026
$
$
$
$ 2,587,
Immokalee Rd - Split Route 27 creating EW Route
Route Network Modifications
31
2027
$ 189,885
$ 569,654
$ 1,898,846
$ 550,0'
Collier Blvd - Split Route 27 creating NS Route
Route Network Modifications
32
2027
$ 189 885
$ 569 654
$ 1 898 846
$ 550 0
New Route 19/28 - Extend Hours to 10:00 PM
Service Expansion
33
2027
$ 29,288
$ 87,863
$ 292,876
$
Route 24 - Extend Hours to 10:00 PM
Service Expansion
34
2027
$ 30 298
$ 90 893
$ 302 976
$
Goodlette Frank Rd - Split Route 25 creating NS Route
Route Network Modifications
35
2027
$ 183,805
$ 551,416
$ 1,838,052
$ 550,0'
35' Fixed Route Bus Replacement
Transit Asset Management TAM
36
2024
$
$
$
$ 560 0(
35' Fixed Route Bus Replacement
Transit Asset Management TAM
37
2024
$
$
$
$ 560,0(
35' Fixed Route Bus Replacement
Transit Asset Management TAM
38
2024
$
$
$
O
EEO
35' Fixed Route Bus Replacement
Transit Asset Management TAM
39
2024
$
$
$
$ 560 O(
35' Fixed Route Bus Replacement
Transit Asset Management TAM
40
2024
$
$
$
$ 560,0(
40' Fixed Route Bus Replacement
Transit Asset Management TAM
41
2025
$
$
$
$ -'VI
40' Fixed Route Bus Replacement
Transit Asset Management TAM
42
2025
$
$
$
$ 580,0(
Replacement of 2 Support Vans
Transit Asset Management TAM
43
2026
$
$
$
$ 46 00(
Replacement of Support Truck
Transit Asset Management TAM
44
2026
$
$
$
$ 26,20(
MOD - North Naples
New Service
45
2030
$ 81 723
$ 245 169
$ 817,230
$ 81 96'
New Autonomous Circulator
New Service
46
2030
1 $ 52,411
$ 157,232
$ 524,105
$ 569,6!
MOD - Marco Island
New Service
47
2030
$ 108,912
$ 326 736
$ 1,089,119
$ 81,96'
MOD - Golden Gate Estates
New Service
48
2030
$ 163 446
$ 490 338
$ 1 634 460
$ 81 96
New Naples Pier Electric Shuttle
New Service
49
2030
$ 82,213
$ 246,638
$ 822,125
$ 569,6!
MOD - Naples
New Service
50
2030
$ 193,889
$ 581,666
$ 1,938,887
$ 81,96:
ti
t;D
L0
04
to
J
w+
L
O
L.
a
N
C
H
M
04
O
N
d
to
O
O
L
(L
c
a)
E
z
U
Q
Packet Pg. 484
Collier Area Transit
Transit Development Plan (TDP)
FY2023 Annual Progress Report
Prepared by:
Public Transit and Neighborhood Enhancement Division
8300 Radio Road
Naples, Florida 34104
(239) 252-5840
Collier Area Transit – Transit Development Minor Update 1-1 | P a g e
Collier Area Transit – Transit Development Minor Update 1-2 | P a g e
Section 1 – Introduction
Collier Area Transit Mission: “Collier Area Transit (CAT) is committed to providing safe, accessible, reliable,
convenient, and courteous mobility services to our customers.” Collier Area Transit (CAT) operates under
the supervision of the Collier County Public Transit & Neighborhood Enhancement Division (PTNE) for the
Collier County Transportation Management Services Department. CAT serves as the public transit provider
for Collier County, serving the Naples, Marco Island, and Immokalee areas.
TDP Annual Progress Report Requirements
The State of Florida Public Transit Block Grant Program was enacted by the Florida Legislature to provide
a stable source of funding for public transit. The Block Grant Program requires public transit service
providers to develop, adopt, and annually update a 10-Year Transit Development Plan (TDP). Based on
legislation that became effective February 20, 2007, the TDP must undergo a Major Update every five
years. In between the subsequent four years, an annual progress update is required to be submitted to
the Florida Department of Transportation (FDOT) District Office by September 1st annually. A TDP or an
annual update shall be used in developing the Florida Department of Transportation (FDOT) Five-Year
Work Program, the Transportation Improvement Program, and the Department’s Program and Resource
Plan. The most recent Major Update of the Collier County TDP was adopted by the Collier County Board
of County Commissioners (BCC) in October 2020 with an extension grant by FDOT. An approval of the TDP
was received from FDOT in December 2020. This 2023 TDP Progress Report is the third progress report to
the 2020 TDP Major Update and documents Collier County’s implementation activities since the 2020 TDP
Major Update. This progress report complies with all the requirements contained in Rule 14-73.001,
Florida Administrative Code (FAC) as represented in Table 1.
Table 1-1: TDP Progress Report Checklist
TDP Annual Progress Report Review Items Location in TDP Annual
Progress Report
Past year’s accomplishments compared to original TDP Section 2
Analysis of any discrepancies between plan and its
implementation for the past year
Section 3
Revisions to the Implementation Program for coming year
and the 10th year
Section 3
Added recommendations for the new tenth year of
updated plan
Section 3
Steps to be taken to attain Goals, Objectives, and Policies Section 4
Revised Financial Plan Section 5
List of projects or services needed to meet goals and
objectives
Section 5
Source: FDOT TDP Handbook, Version III, 2022 Update, page 119.
Collier Area Transit – Transit Development Minor Update 1-3 | P a g e
Report Organization
In addition to the Introduction Section, this progress report includes the following sections.
Section 2: Previous Year’s Accomplishments provides a review of the past year’s implementation actions
and describes improvements made since the last annual progress report.
Section 3: Revisions to Implementation Program provides a review of the past year’s accomplishments
compared to the original implementation plan. It also provides an analysis of the discrepancies between
the 2021-2031 Major Transit Development Plan and its implementation and any revisions to the steps that
will be taken to attain the original goals and objectives. This section addresses Rule 14-73.001, F.A.C., (4)(a),
past year’s accomplishments compared to the original implementation program; and Rule 14- 73.001,
F.A.C., (4)(c), any revisions to the implementation program for the coming year. This section also provides
recommendations for the new tenth year of the updated plan with any revisions or additions to the goals,
objectives, and implementations. This addresses both Rule 14-73.001, F.A.C. (4) (d) Revised
implementation program for the tenth year; and Rule 14-73.001, F.A.C. (4) (e) Added recommendations
for the new tenth year of the updated plan.
Section 4: Status of Goals and Objectives provides the status of the goals and objectives, including a
revised list of projects or services needed to meet the goals and objectives, which include projects with
funding that, may not have been identified. This section addresses Rule 14-73.001, F.A.C. (4) (b) Analysis
of any discrepancies between the plan and its implementation for the past year and steps that will be
taken to attain original goals and objectives.
Section 5: Financial Plan provides the revised financial plan of how the transit improvements will be
funded, with stated cost and revenue assumptions. This section will include a cost and revenue summary.
This section addresses both Rule 14-73.001, F.A.C. (4) (f) A revised financial plan; and Rule 14-73.001,
F.A.C. (4) (g) A revised list of projects or services needed to meet the goals and objectives, including
projects for which funding may not have been identified.
Collier Area Transit – Transit Development Minor Update 2-2 | P a g e
Section 2 – Previous Year’s Accomplishments
This section provides a review of each program and activity identified for implementation in the first three
years (2021, 2022, and 2023) of the TDP Program Elements and briefly describes the milestones or
achievements between July 1, 2022 and June 30, 2023. Additional noteworthy accomplishments over the
last year are also documented.
Planning and Service Operations
Service Improvements - Collier County completed Comprehensive Operation Analysis (COA) in July 2021,
shortly after completing its TDP Major Update. The COA set up a road map for improvements to the CAT
system over the next few years. Significant changes were introduced during the first quarter of the County
Fiscal Year 22-23 with the implementation of the Seasonal Schedule Change in November 2022. These
changes were identified as some of the COA short-term recommendations for the system and included
route consolidation and alignment modifications to six of the now sixteen routes, eliminating two routes
through consolidation. These changes were made to improve operational efficiencies, including ensuring
the remaining routes were able to service the areas where routes were eliminated. Specifically, the
changes were as follows:
• Routes 15 & 16: These routes had a short segment of the route adjusted to travel along Coronado
Pkwy instead of Golden Gate Pkwy. due to bridge construction slated to take a year for
completion.
• Route 19 & 28: These two routes were consolidated, creating the existing Route 19. The route
continues to provide service between Immokalee and Naples while eliminating duplicative service.
The route will travel around, instead of through, Ave Maria while still providing service at the
entrance to the town.
• Route 20 & 26: These two routes were consolidated, creating the existing Route 20. The routes
were combined due to their similar service areas and relatively low ridership occurring on each
separate route. The merge of the two routes improves consistency of service, resulting in higher
ridership along the adjusted path.
• Route 21: The path for Route 21 was adjusted to service the Walmart on Collier Blvd further North,
allowing for more connections travelling to Marco Island. A portion of the route path was removed
on Marco Island that had consistent low ridership.
• Route 25: The path for Route 25 was realigned to travel North and South on US41 rather than
Goodlette Frank Rd. The route no longer services the CAT Headquarters and now turns the route
around at the Wal-Mart on Collier Blvd. This route was also realigned to Coronado Pkwy from
Golden Gate Pkwy due to the bridge construction along Golden Gate.
With the implementation of these changes CAT have seen a steady growth in ridership for the months of
October 2022 through March 2023 compared to the year prior during the same months as depicted in
Figure 2-1. The route modifications allowed CAT to attain the following Service improvements
recommended in the Implementation Program for 2023:
Realign Routes 19 and 28 to eliminate portion of SR846
Realign Routes 20 and 26
Collier Area Transit – Transit Development Minor Update 2-3 | P a g e
Figure 2-1: Service Improvement Impact on Ridership
The changes implemented at the beginning of FY23 allowed CAT to complete each of the Route Network
Modifications planned for this year listed in the Implementation Plan. Off-season modifications were
implemented in April 2023, to adjust route timing in response to the traffic volume shifts. The changes
introduced in April had no changes to the routing of our busses.
ADA Bus Stop and Bus Shelter Improvements - CAT continues to implement its bus shelter
improvement plan with the construction of 2 new shelters, with another 9 shelters planned for later in
the year, and installation of benches at various stops throughout Collier County during County FY23.
Additional ADA improvements have been completed for 4 stops, and design has been completed for the
ADA improvement of 14 more stops slated to be complete before the end of FY23. The goal of completing
at least 10 bus shelters and 10 ADA improvements per year will be exceeded this fiscal year with the
ongoing construction of these improvements tallying up to 21 total ADA improvements.
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
October November December January February March
FY22 v FY23 -Monthly Ridership Comparison
FY22 Ridership FY23 Ridership
Collier Area Transit – Transit Development Minor Update 2-4 | P a g e
Hurricane Ian Response – On September 28, 2022, Hurricane Ian made landfall on the Southwestern portion
of Florida as a Category 4 Hurricane, just shy of a Category 5. This hurricane brought major devastation to Collier
County and all across Florida. With CAT’s preparedness, we were ready to react and swiftly supply support to
those in need within our county. Prior to the storm, we were transporting passengers to shelters and other
locations for safety. We were also working with our Emergency Operations Center (EOC) to contact all individuals
on a special needs list to ensure they were registered for transportation to shelters.
Post-storm, we were stationed at the EOC to take requests from the public and other county agencies for
transportation needs. Much of Marco Island was also underwater, but we were able to send busses down to
help evacuate residents the morning of the storm. We were able to dispatch vehicles and drivers for further
evacuations as well as transportation to medical services. As power was out across much of the county, we also
provided support to communities with buses for use as cooling stations for areas without generators.
Being prepared, along with great coordination across intergovernmental agencies, allowed CAT to provide
essential relief services throughout Collier County and resume service swiftly after the event. We closed service
only on the day of the hurricane and resumed service the day after. Fares were suspended as the hurricane was
making its approach, and suspended fares continued for an entire month until October 31, 2022. Although
prepared, our facilities were still subject to hurricane damage. Our Government Center Transfer Station office
was slightly flooded resulting in some maintenance needs for the facility, but the majority of our assets were
unharmed.
Title VI Program Update –CAT’s Title VI program is updated every three years on a date determined by the
FTA and reviewed by the FTA. As part of the Title VI Program, various CAT plans are reviewed including the
Language Assistance Plan (LEP) and the Public Participation Plan (PPP). CAT has submitted this report to FTA,
providing a program to ensure that transit services made available are equitably distributed, and provides equal
access and mobility to any person, without regard to race, color, or national origin. The Title VI Program has 8
objectives to ensure that the civil rights of users and nonusers are not violated in anyway.
CAT requested services from Atkins North America, Inc. to help complete the demographic and service profile
tables and mapping for the report, which were included in the final version of the program. All other info
provided in the program has been updated to present our current operations. The program went through a 30-
day public participation process, was approved by the Board of County Commissioners, and has been submitted
to both FTA and FDOT.
Collier Area Transit – Transit Development Minor Update 2-5 | P a g e
On-Demand Paratransit Service - On December 13, 2022, CAT launched an On-Demand Paratransit Voucher
service, CATConnect Select, that allows riders to make same day bookings with pick-ups within a 30-minute
window. This program was designed to provide more flexibility for our riders, allowing them to book trips in the
same day for situations that may not have been originally planned for.
The service runs from 6:00 a.m. to 10:00 p.m., 7 days a week. The customer only pays $4 for any trip under 8
miles. Trips farther than 8 miles are priced at $2.50 per mile and customers are told the cost when booking the
trip. Customers can call in or create an online booking to reserve their trips. A mobile app is also available for
the passengers to book their trips. The pilot program is only slated to run through June of 2023. But while the
program has been available, ridership has consistently increased and passengers really appreciate this type of
service. The information captured as a result of the pilot program will help plan future service provisions.
Perk Pass F.K.A. Corporate Pass Program - In February of 2022, CAT presented to the Public Transit Advisory
Committee (PTAC) regarding the existing Corporate Bus Pass Program and was it recommended to further
promote the program. The program currently allows employers with over 300 employees to register for the
Corporate Bus Pass providing employees a monthly bus pass at a 25% discount from the regular price.
CAT has identified the businesses in the area and we have mailers ready to go out for each of those identified.
CAT has also decided to rebrand the Corporate Bus Pass as the new Perk Pass.
New Beach Bus Route – In February 2023, CAT resumed the annual beach bus service providing free rides from
Conner Park to Vanderbilt Beach and Wiggins Pass Beach Access. Due to damage from Hurricane Ian, Wiggins
Pass State Park has been closed to vehicular traffic, forcing us to change the route path for the beach bus. As we
previously would drop off passengers in the park and circle back to the parking area, this was no longer an
option. CAT decided to add service to Vanderbilt Beach due to the large number of pedestrians and little
available parking in the area (Figure 2-4). The service saw tremendous ridership, running from Friday through
Monday, starting February 24 and ending April 29. The only time we saw a dip in ridership on this route was
Collier Area Transit – Transit Development Minor Update 2-6 | P a g e
when there was a large outbreak of red tide along the Collier beaches, causing a foul smell and allergic reactions
for visitors. Once that seemed to have cleared, riders came right back to attending the beach using our route.
Collier Area Transit – Transit Development Minor Update 2-7 | P a g e
Figure 2-3
System Map
Collier Area Transit – Transit Development Minor Update 2-8 | P a g e
Figure 2-4
Route 29 Beach Trolley
Collier Area Transit – Transit Development Minor Update 2-9 | P a g e
Capital Equipment, Facility Changes and Improvements
There are currently two (2) passenger transfer stations and five (5) passenger transfer points provided on
the CAT system, as shown in Figure 2-3. The two transfer stations are located at the Intermodal Transfer
Facility at the government complex and the CAT Radio Road Operations facility. Other transfer point
locations include: Walmart Plaza; Pine Ridge and Goodlette-Frank Rd (Magnolia Square Plaza); Coastland
Center; Creekside (Immokalee Road); and the Health Department in Immokalee.
Intermodal Transfer Facility CAT Operations and Transfer Station
CAT Operations and Transfer Station – 8300 Radio Road
In 2017, the CAT Operations and Maintenance Facility was severely damaged by Hurricane Irma. As a result of
the damage and the continual aging of the structure, CAT along with other professionals have concluded that
the facility has met its useful life and should be replaced on the existing site. In September 2020, Collier County
received notice of award from the Federal Transit Administration (FTA) for $9,020,000 under FTA’s Bus and Bus
Facilities Program which will be used in part to construct a new Operations & Maintenance facility on site. As
of April 2023, FTA has allocated an additional $10,671,225 to Collier as part of the Emergency Relief Funds from
Hurricane Irma directed to this project. The new facility will ensure an efficient and effective transit service to
meet the needs of passengers. Staff has begun the process towards constructing the facility by going out for bid
on the design of the site.
Collier Area Transit – Transit Development Minor Update 2-10 | P a g
Figure 2: CAT Operations and Maintenance Facility
In addition to the construction project, CAT staff obtained approval of its conditional use (CU) on the 8300 Radio
Road Facility to eliminate the limit on the number of allowable routes that could utilize the transfer facility. The
elimination of the cap has opened the CAT system up to connect with regional bus companies, allowing greater
regional access for transit dependent populations.
CAT Intermodal Transfer Facility - Immokalee
Collier County is planning to construct a transfer facility in the Immokalee Community on a vacant parcel owned
by Collier County. The proposed project site is a grassed field adjacent to a green wooded area with an
asphalt/concrete driveway providing vehicular access to the Health Department and a maintenance shed. The
property is approximately 1.7 acres in size and is zoned Residential Single Family-3 with a conditional use
providing for governmental facilities. The bus transfer station will include passenger and transit efficiency
enhancements including new bays for the buses to pull off the street; canopy cover for the sheltered transfer of
passengers; waiting platform with benches and trash receptacles; vending machines for food or a Food Truck
vendor; restroom facilities for passengers and drivers; and ADA improvements. Figure 3 below is a rendering of
the proposed improvements on that site. Currently, passengers transferring at this location are using a shelter
located in the parking lot shared by visitors to the Health Department, County Library and the David Lawrence
Center.
Figure 3: Recent Conceptual Plan of the Immokalee Transfer Facility
Collier Area Transit – Transit Development Minor Update 2-11 | P a g
Marketing and Public Involvement/Communications
CAT is always working towards promoting the service that it provides and educating the public about the
modifications made to the service for public awareness. As our previous TDP Annual Update did not
include events at the end of FY22, the following efforts were conducted between June 1, 2022 and May
2023.
2022 FPTA Annual Conference
The 2022 Florida Public Transportation Association Annual Conference was hosted by Collier Area Transit
here in Naples, Florida. The conference ran from September 18-20, 2022 and was held at the Naples
Grande Beach Resort. There were fun group activities leading up to the event including golf and bowling
along with an opening reception during sunset. The next two days were filled with a wealth of
informational presentations and networking for those involved. An awards ceremony was also held that
presented numerous awards to deserving transit systems and individuals from around the state.
Breakfast, Lunch, and Dinners were served to those in attendance with great speakers at each meal
representing different areas of transit. With great planning and execution, this year saw the highest
attendance of a stand-alone FPTA conference with 520 attendees!
Collier County Centennial
May 8, 2023 Marks the 100 year anniversary of Collier County becoming an official Florida county. To
celebrate the centennial for Collier County, the local government has planned numerous events and
activities throughout the year. For the May 8th celebration, CAT provided 3 busses as transportation for
those attending the ceremony in Everglades City from the Collier Government Center. CAT’s Marketing
Manager was selected to be on the planning committee where she has participated in planning for some
of the events. One of the scheduled events was the Senior Expo on February 15, 2023, directed at
educating elderly residents on programs and services to improve their lives. CAT staff was present at this
event to provide info regarding our CATConnect service.
Collier Area Transit – Transit Development Minor Update 2-12 | P a g
Presentations & Other Marketing Activities
CAT staff is continually trying to promote our services to the younger generations by giving presentations about
the Fixed Route system and providing bus rides when able. CAT was able to present at the following schools
and camps:
• June 9, 2022 – Eagle Lakes Summer Camp Presentation
• July 22, 2022 – North Collier Regional Park Presentation
• February 28, 2022 – Immokalee High School ESE Expo
• March 28, 2023 – Gulf Coast High School ESE Expo
• October 15, 2022 – Seasonal Change Public Info Workshop - Staff was stationed at the Intermodal
Transfer Station passing out information regarding the Season 2022 schedule changes, passing
out CAT branded items, promoting the new rideCAT app, and answering any questions about the
transportation system. Spanish and Creole speakers were also present.
• November 5, 2022 - Try Transit Day for Mobility Week with The Supervisor of Elections- Collier
Area Transit offered FREE RIDES on November 5th, 2022 as part of Mobility Week. CAT coordinated
this with Collier’s Supervisor of Elections to provide service for early voting and this was also our
tribute to Mobility Week 2022 which was scheduled the week prior. Both CAT and the Supervisor
of Elections promoted the event on social media as well as airing commercials on local radio
stations.
• December 10, 2022 - Immokalee Christmas
Parade – CAT participated in the annual
Christmas parade in Immokalee. We distributed
thousands of pieces of candy as well as a large
amount of CAT branded items.
• February 22, 2023 - Know Your County
Government Presentation - This is an annual
event that is sponsored by Collier County 4-H,
Collier County Schools, and League of Women
Voters. During this 4-day event, 35-40 youth
tour around Collier County Government and
the county to learn about services provided by
the local government. CAT was able to meet
with the group at our Intermodal Transfer
Station to educate the students on our services transporting people all over Collier County.
Collier Area Transit – Transit Development Minor Update 2-13 | P a g
•April 22, 2023 - Try Transit Day – CAT partnered with Lee,
Sarasota and Manatee Counties to offer Try Transit for FREE
regionally on Saturday, April 22, 2023, to commemorate
Earth Day, which takes place the same day. This was a great
opportunity to promote our services along with the
environmental and health benefits that go along with riding
transit.
Public Participation
As identified within Collier Area Transit’s Public Participation Plan (PPP), this annual update to the Transit
Development Plan (TDP) has gone through a 15-day public comment period. Drafts of the report along with
comment sheets were distributed to Libraries, City Halls, and other municipal buildings throughout the county.
Along with the physical copies distributed, we also posted the draft on the CAT website for public comment
and notified the public with a service alert. The public comment period was open from May 18th through June
2nd, 2023. There were no significant comments during this time related to the report.
Collier Area Transit – Transit Development Minor Update 3-2 | P a g e
Section 3 – Revisions to the Implementation Plan
Tenth Year Transit Implementation Plan
The 2021-2030 Collier County Major TDP Update included a very comprehensive list of activities leading
up to the creation of an implementation plan that would guide the County’s development of services over
a ten-year planning horizon.
With each annual update, an additional tenth year is added to the implementation plan. Although an
additional year was added, no improvements are scheduled to take place beyond what was identified in
the last TDP Major Update. Collier County will actively pursue funding opportunities to implement
recommendations from the 2021-2030 TDP.
The following items not listed in the implementation plan were addressed within the current reporting
period:
• Expand and improve bus stop infrastructure – Improved infrastructure at bus stops, including
benches, shelters, bicycle storage facilities, and other infrastructure, is included in the Cost
Feasible Plan to enhance the rider experience while waiting for a bus and potentially attract new
riders.
• Improve bus stop safety and ADA accessibility – Ensuring the safety all riders while accessing bus
stops and waiting for a bus and guaranteeing that ADA requirements are fulfilled for all transit
facilities are important to the overall safety and accessibility of the transit system.
As noted within the document a variety of bus stop and ADA accessible improvements have been
completed in FY23, Collier County will continue this effort to provide an accessible service for all.
This section provides an analysis of the discrepancies between the 2023-2032 Transit Development Plan
and its implementation. Many of the changes resulted in improvements being delayed by one year, which
are noted in the Implementation Plan.
Implementation Plan Accomplishments and Changes
We have made significant progress on many of the goals listed on the implementation plan shown in our
previous Major TDP Report. We have pushed back implementation of some of the route changes,
frequency enhancements, and service expansions by one year due to funding constraints. These changes
are noted in the implementation plan below, identifying the target years listed in our previous TDP
Update. There were a few projects listed in the Implementation Plan within the Major TDP that projected
an implementation year of 2022. CAT has completed and made progress on many of them with others
being evaluated for implementation later in the year.
During FY21, Collier Area Transit procured the services of Kimley-Horn to conduct a Comprehensive
Operations Analysis (COA). Through this process, recommendations have been made regarding the
frequency and realignment of our routes and a timeline for these changes. With the completed COA, the
years set out in the implementation plan for service improvements may be changed. We implemented
many of the near-term service enhancements recommended in the COA at the start of FY22 with plans to
continue implementation at the start of FY23. The last of the cost-neutral recommendations listed within
the COA were completed with our seasonal schedule change at the start of FY23. Re-alignment of Route
Collier Area Transit – Transit Development Minor Update 3-3 | P a g e
19 with removal of Route 28, Route consolidation of Routes 20 and 26, and alignment changes to Route
25 and Route 21. Routes 15 and 16 were also slightly re-aligned to avoid construction along Golden Gate
Parkway.
We have made significant progress in respect to the listed technology upgrades in our implementation
plan. In January of 2022, the onboard surveillance system on all buses were upgraded to have live feed
capability, event tagging, download tagging, and one unified component on the buses. The Board of
County Commissioners approved a contract March 8, 2022 that will allow the replacement and installation
of a wide array of Intelligent Technology Systems. In late FY22, CAT began the project installing upgrades
to much of our other software and onboard technology.
CAT is currently working with the Collier MPO, LeeTran, and Jacobs Engineering to complete a Regional
Service and Regional Fare Study. MPO selected Jacobs engineering as the consultant on the project and
began with a kick-off meeting in March 2023. When completed, this would include studying the UF/IFAS /
Lehigh Acres area for possible connection with our services. The study may also produce additional ideas
for regional connectivity and fare-sharing. The study is scheduled for tasks through the end of 2023 and
the final study to be completed within FY24.
Table 3-1 below provides a copy of the implementation plan included in the last TDP Update highlighting
those service improvements that are on target with the plan. We have completed the two route
modifications identified for completion within this year and are currently monitoring those changes for
future route or timing adjustments if necessary. As stated before, we have also begun the Regional Service
and Fares Study and Immokalee/Lehigh Acre Service on time with the date identified within our
implementation plan. Regarding the I-75 Managed Lanes Express Study, this action will be put further on
hold as FDOT lays out plans for improving I-75 running through Collier County. Based on current funding
constraints, the resources required to enact higher frequencies on our routes will not be feasible for the
next year, which led us to push the frequency enhancements further back in our timeline.
Collier Area Transit – Transit Development Minor Update 3-4 | P a g e
Table 3-1
CAT TDP 2023–2032 Implementation Plan
Previous Revised 10-Year 10-Year
Implementation Implementation Operating Cost Capital Cost Existing or New
Service Improvements Year Year YOE YOE Revenues
Maintain Existing Service $117,818,191 $20,769,768
Maintain Existing Fixed-Route Service 2022 2023 $68,693,299 $15,836,143 Existing
Maintain Existing Paratransit Service 2022 2023 $49,124,892 $4,742,027 Existing
Replacement of Support Vehicles 2022 2023 $0 $191,598 Existing
Route Network Modifications $9,441,652 $2,153,818
Extend Route 11 into Walmart Shopping Ctr 2024 2024 $0 $0 Existing
Extend Route 12 into Walmart Shopping Ctr 2024 2024 $0 $0 Existing
Realign Route 13 shorten to 40 min.
headway 2024 2024 $0 $0 Existing
Realign Route 14 operate at 60 min.
headway 2024 2024 $0 $0 Existing
Realign Route 17 eliminate portions of US 41 2022 2022 $0 $0 Existing
Eliminate Route 18 2022 2022 $0 $0 Existing
Realign Route 19/28 eliminate part of 846 2022 2022 $0 $0 Existing
Realign Route 20/26 eliminate Santa Barbara 2022 2022 $0 $0 Existing
Realign Route 21 create Marco Express 2025 2025 $0 $0 Existing
Realign Route 22 2022 2022 $0 $0 Existing
Realign Route 23 headway 60 to 40 minutes 2024 2024 $3,805,909 $503,771 Existing
Golden Gate Pkwy Split Route 25 E-W Route 2027 2028 $0 $0 Existing
Goodlette Frank Rd - Split Route 25 N-S
Route 2027 2028 $1,838,052 $550,016 Unfunded
Immokalee Rd - Split Route 27 E-W Route 2027 2028 $1,898,845 $550,015 Unfunded
Collier Blvd - Split Route 27 N-S Route 2027 2028 $1,898,846 $550,016 Unfunded
Increase frequency $22,092,501 $4,551,796
Route 15 from 90 to 45 min 2024 2024 $1,632,384 $503,771 Unfunded
Route 16 from 90 to 45 min 2024 2024 $1,561,054 $503,771 Unfunded
Route 24 from 85 to 60 minutes 2022 2022 $2,045,921 $503,771 Existing
Route 121 - add one AM, one PM 2024 2024 $1,632,384 $503,771 Unfunded
Route 14 from 60 to 30 min 2024 2024 $2,439,146 $512,698 Unfunded
Route 17/18 from 90 to 45 minutes 2024 2024 $2,585,495 $503,771 Unfunded
Route 11 from 30 to 20 mins 2024 2024 $6,529,536 $503,771 Unfunded
Route 12 from 90 to 45 mins 2024 2024 $2,829,466 $503,771 Unfunded
Route 13 from 40 to 30 min 2024 2024 $837,115 $512,698 Unfunded
Collier Area Transit – Transit Development Minor Update 3-5 | P a g e
CAT TDP 2023–2032 Implementation Plan – (cont.)
Previous Revised 10-Year 10-Year
Implementation Implementation Operating Cost Capital Cost Existing or New
Service Improvements Year Year YOE YOE Revenues
Service Expansion $2,404,181 $0
Route 17/18 - Extend to 10:00 PM 2024 2024 $1,202,011 $0 Existing
New Route 19/28 - Extend to 10:00 PM 2027 2028 $292,876 $0 Unfunded
Route 24 - Extend to 10:00 PM 2027 2028 $302,976 $0 Unfunded
Route 11 - Extend to 10:00 PM 2029 2030 $256,914 $0 Existing
Route 13 - Extend to 10:00 PM 2029 2030 $174,702 $0 Existing
Route 14 - Extend to 10:00 PM 2029 2030 $174,702 $0 Existing
New Service $14,346,741 $2,862,604
New Island Trolley 2024 2025 $5,510,821 $864,368 Unfunded
New Bayshore Shuttle 2025 2026 $2,009,995 $531,029 Unfunded
New Autonomous Circulator 2029 2030 $524,105 $569,681 Unfunded
New Naples Pier Electric Shuttle 2029 2030 $822,125 $569,681 Unfunded
MOD – Golden Gate Estates 2029 2030 $1,634,460 $81,961 Unfunded
MOD – North Naples 2029 2030 $817,230 $81,961 Unfunded
MOD – Naples 2029 2030 $1,938,887 $81,961 Unfunded
MOD – Marco Island 2029 2030 $1,089,119 $81,961 Unfunded
Route from UF/IFAS to Lehigh Acres 2029 2030 Unknown Unknown Unfunded
Express Premium Route to Lee County 2029 2030 Unknown Unknown Unfunded
Other Improvements $0 $2,950,758
Technology improvements* 2022 2022 $0 $2,720,920 Existing
Study: I-75 Managed Lanes Express 2025 2025 $0 $25,000 Existing
Study: Santa Barbara Corridor Service 2024 2024 $0 $25,000 Existing
Study: Immokalee/Lehigh Acres Service*** 2023 2023 $0 $25,000 Existing
Study: Regional Service and Fares 2023 2023 $0 $119,838 Existing
Other Technology improvements** 2022 2022 $0 $35,000 Existing
Study: Immokalee Road Transfer Hub TBD TBD Unfunded
Branding beach buses, other services TBD TBD Unfunded
Park and Ride Lots TBD TBD Unfunded
Collier Area Transit – Transit Development Minor Update 3-6 | P a g e
CAT TDP 2023–2032 Implementation Plan – (cont.)
Previous Revised 10-Year 10-Year
Implementation Implementation Operating Cost Capital Cost Existing or New
Service Improvements Year Year YOE YOE Revenues
Transit Asset Management $0 $23,157,400
40' Bus Replacement 2023 2023 $0 $489,000 Funded
Support truck replacement 2023 2023 $0 $26,200 Funded
Replace 3 Cutaway Vehicles 2023 2023 $0 $250,000 Funded
Five (5) 35ft Buses Replacement 2024 2024 $0 $2,800,000 Unfunded
Replace 4 Cutaway Vehicles 2024 2024 $0 $360,000 Unfunded
Replacement Maintenance and Operations
Facility 2024 2024 $0 $18,000,000 Partial Funding
two (2) 40ft Bus Replacement 2025 2025 $0 $1,160,000 Unfunded
Replacement of 2 Support Vans 2026 2026 $0 $46,000 Unfunded
Replacement of Support Truck 2026 2026 $0 $26,200 Unfunded
10-Year Funded Projects and Maintain Existing Service $123,670,021 $37,677,512
10-Year Total of Unfunded Projects $40,029,065 $18,768,628
Rows highlighted in orange indicate service improvement completion within the previous fiscal year.
*Avail Replacement, APC, Annunciators, Onboard Information Media, Farebox Replacement, paratransit scheduling software,
TSP, on-board surveillance, paratransit fare payment, IVR
**Fixed-route scheduling software
***To be completed as part of the Regional Study
Collier Area Transit – Transit Development Minor Update 3-7 | P a g e
Section 4 – Status of Goals and Objectives
Assessment of 2019 TDP Major Update Goals and Objectives
Goals and Objectives are an integral part of any transportation plan as they provide the policy direction
to achieve the community’s vision. CAT’s TDP contains seven goals, each with objectives and initiatives
designed to meet the corresponding goal.
An assessment of CAT’s goals, objectives, and initiatives, as outlined in the 2020 Major Update, was
conducted as part of this progress report. Importantly, several initiatives have been removed to eliminate
duplicates and streamline the assessment process. The goals, objectives, and initiatives contained in the
TDP Major Update were developed to support the service network redesign that was underway when the
Major Update was completed in 2019. Having implemented that new service design, revisions to goals,
objectives, and strategies were necessary to reflect the changing service delivery approach and operating
environment. Coupled with new initiatives to improve the CAT brand, expand services marketing, and
customer-facing technology enhancements, several of the prior objectives and targets may no longer
applicable or relevant.
Collier Area Transit – Transit Development Minor Update 4-1 | P a g e
- ASSESSMENT OF GOALS, OBJECTIVES, & INITIATIVES
Objective/
Initiative
Description Timeline/
Implemented
2022 Assessment
Target
Goal 1: Operate reliable, convenient, and cost-effective mobility services that safely and efficiently meet the mobility needs of Collier
County’s workers, residents, and visitors.
Objective 1.1 Improve efficiency, service quality, and level of service to adequately serve workers, residents, and visitors while
contributing to the economic vitality of the county.
Initiative 1.1.1
Operate east/west corridor
service to provide access to jobs,
education, healthcare and
community services, and
recreation.
Ongoing
CAT has several routes that further this
initiative. Route 27 runs along Immokalee
Road from Collier Boulevard to Creekside
Commerce Park; Route 25 provides service
along Golden Gate Parkway; Route 20
provides service along Pine Ridge Rd; and
Route 24 provides service along Tamiami
Trail E from the Government Center to 6 L’s
Farm and frequency has been enhanced.
Route 19 operates from the Government
Center out to Immokalee. CAT has exceeded
maintaining the 95% target.
Maintain 95% of
Existing Service
Initiative 1.1.2
Operate north/south corridor
service to provide alternative
access to jobs, education,
healthcare and community
services, and recreation.
Ongoing
Route 11 (US41) and Route 12 (Airport
Pulling Rd) currently provide service
north/south. Route 19 provides service
from Immokalee to the Government
Center. Route 121 runs an express route
from Immokalee to Marco Island. Route 25
now serves North/South for a portion of
Goodlette-Frank Rd. CAT
has exceeded maintaining the 95% target.
Maintain 95% of
Existing Service
Collier Area Transit – Transit Development Minor Update 4-2 | P a g e
Initiative 1.1.3
Improve peak weekday service
to 45 minutes or better on CAT
routes.
Partial
There were no frequency improvements
scheduled for FY23. The completion of
increased frequency along some routes is
not scheduled for implementation until
future progress reports. PTNE staff will
continue to seek additional funding to
accomplish our goal.
Implement 30% of
route frequency
enhancement
noted in the
Implementation
plan.
Initiative 1.1.4
Evaluate the feasibility of
premium transit services, such
as bus rapid transit (BRT) within
corridors where density of
demand and activity warrants
frequent service.
No
The Plan does not contain an
implementation year for this initiative. A
study has begun to look into regional
travel which may include BRT as an option
if warranted.
Complete Regional
Study by 2024 and
evaluate bus rapid
transit as part of
study.
Initiative 1.1.5
Provide mobility-on-demand
service in areas with lower
density of demand than is
productive for fixed-route
service and to access areas that
are not able to be served by
fixed-route.
2029
Areas have been identified for potential
MOD. This type of service will have to be
further evaluated and funding identified
before it can be implemented.
Implement 2 MOD
projects from the
implementation
plan by 2029.
Objective 1.2 Provide adequate bus stop amenities at all stops according to bus stop threshold and accessibility guidelines within
available fiscal capacity.
Initiative 1.2.1
Pursue funding to maintain and
improve existing bus stops.
Ongoing
Collier County pursues funding for
improvements to bus stops on an ongoing
basis. A portion of 5307 is dedicated to bus
stop improvements and 5339 has been
applied for the purpose of bus stop
improvements. Current Average OCR
Status is Good, which exceeds the target.
Maintain
Cartegraph Overall
Condition Rating
(OCR) of Average
as an accumulative
average of all bus
stops.
Initiative 1.2.2
Install and maintain bus stop
amenities according to an ADA
compliant Passenger Amenities
Ongoing
CAT has developed an Amenities Program,
to identify future bus stop improvements
and standards. As funding becomes
Install a minimum
of ten ADA-
Collier Area Transit – Transit Development Minor Update 4-3 | P a g e
Program and Bus Stop Amenities
Guidelines.
available the program will be followed.
More than 10 ADA-compliant
improvements are planned to be
completed by the end of FY23.
compliant bus stop
improvements.
Initiative 1.2.3
Install a minimum of ten ADA-
compliant, accessible bus stop
shelters per year.
Ongoing
In FY23, 2 new ADA-compliant shelters
have been completed. Further
construction of at least 9 more shelters
is planned within the fiscal year.
Install a minimum
of ten ADA-
compliant,
accessible bus stop
shelters per year.
Initiative 1.2.4
Coordinate with the Collier
County and local governments
to include sidewalks and bus
stop shelters in design and
construction of roadway
projects and new developments.
Ongoing
Coordination with FDOT as well Collier
County Transportation Planning occurs
monthly to evaluate potential stop
improvements in conjunction with roadway
improvements.
Meet a minimum
of monthly with
staff regarding
roadway and new
developments
Initiative 1.2.5
Monitor and implement the
recommendations from the CAT
Bus Stop ADA Assessment
report.
Ongoing
Refer to Initiatives 1.2.2 & 1.2.3
Install a minimum
of ten ADA-
compliant bus stop
improvements.
Objective 1.3 Structure transit service with a focus on providing job access for workforce and access to mobility for persons with no or
limited access to a private automobile.
Initiative 1.3.1
Improve transit service for areas
with high mobility needs per the
transit orientation index
identified in the latest TDP
Major Update.
Ongoing
CAT provides service to Very High and High
TOI areas noted in the Major TDP Update
and will continue to enhance service in
those areas. In FY23 CAT removed service
from Goodlette-Frank Rd. which was
identified as a Very High area, but may be
better suited for other types of transit.
Evaluate TOI once
new census data
becomes available.
Initiative 1.3.2
Provide efficient transit and
mobility access to major
employment centers,
development corridors, and
other significant activity centers
as funding allows.
Ongoing
Collier County continues to explore ways to
expand service within existing funding
limitations. No service expansions were
identified to be completed this fiscal year.
Implement at least
2 service
expansions from
the
implementation
plan.
Collier Area Transit – Transit Development Minor Update 4-4 | P a g e
Initiative 1.3.3
Focus transit and mobility
services in areas with high
employment and dwelling unit
densities and connect targeted
jobs-housing locations to serve
the workforce, including Golden
Gate Estates and areas located
in the eastern portion of the
county.
Ongoing
CAT currently provides service in these
areas but will continues to explore funding
opportunities for improved service to these
areas. Changes were made to service Route
21 closer to Golden Gate City allowing for
more workers to commute to Marco on the
bus.
By 2029,
implement MOD
or expanded
service for Golden
Gate Estates area
from
Implementation
plan.
Initiative 1.3.4
Focus improved service
frequency on transit routes that
serve high mobility needs
communities; target service
frequency of hourly or better
where demand and fiscal
capacity allow; apply mobility on
demand (MOD) solutions for
areas with lower population
densities and where fixed-route
service is not productive and
cost-effective.
2023, 2024, 2027,
2029
CAT implemented the Route 24 frequency
enhancement at the end of the previous
fiscal year which completes 22% of the
total listed frequency enhancements from
the Major TDP Update. CAT continues to
explore MOD options with plans for
implementation by 2029.
Implement 30% of
route frequency
enhancement or at
least 2 MOD areas
noted in the
Implementation
plan.
Objective 1.4 Create an optimized interconnected multimodal mobility network designed to fit the range of needs and conditions for the
service market.
Collier Area Transit – Transit Development Minor Update 4-5 | P a g e
Initiative 1.4.1 Refer to Initiative 1.3.4 Refer to Initiative 1.3.4
Initiative 1.4.2
Coordinate with FDOT
Commuter Services to enhance
and expand carpool and vanpool
strategies and services to
connect workforce communities
with employment locations
within the service area; identify
properties for park-and-ride lots
in areas with high mobility
demand as funding is available.
Implement recommendations
from the current park-and-ride
study.
Ongoing
CAT is working with Commuter Services to
continue promoting vanpooling as a great
option with major employers. A park and
ride study has been conducted identifying
potential properties suitable for these
facilities. We have developed one of the
park and ride lots along Immokalee Rd.
with parking for up to 20 cars. Funding
opportunities will be pursued for the
acquisition and/or development of further
lots.
Meet quarterly
with FDOT and
Commute
Connector to
discuss the
progress and
effectiveness of
the Vanpool
service. Pursue
Park and Ride
Study initiatives
towards
acquisition and
construction of
lots in the future.
Initiative 1.4.3
Coordinate with the CAT
Connect paratransit program to
identify and target areas with
high TD ridership and lower
density of demand and develop
programs to shift TD riders to a
mobility on demand for a
solution with connections to the
fixed-route network.
Ongoing
Collier County has obtained a grant through
Florida Developmental Disabilities Council
to provide on demand service, which has
provided valuable information regarding
how to operate this type of service.
Unfortunately, due to the cost of
maintaining the service, this service will not
continue after June 2023.
Implement at least
one MOD service
from
Implementation
plan based on
paratransit
ridership data.
Initiative 1.4.4
Require local governments and
FDOT to provide accessible
sidewalks, bus stops, and other
bus stop improvements within
roadway projects and all new
developments.
Ongoing
CAT staff currently attends the MPO’s
Bicycle and Pedestrian Advisory Committee
and Congestion Management Committee
(CMC) committee meetings and encourages
accessible sidewalks and bus stop
improvements be added as part of every
project. In addition, staff reviews sidewalk
construction projects for bus stops
improvements needed within the project
limits.
Continue regular
partnership
coordination with
the MPO, FDOT
and County
Division to provide
input of how
transit
improvements can
be incorporated in
Collier Area Transit – Transit Development Minor Update 4-6 | P a g e
applicable
roadway projects.
Initiative 1.4.5
Coordinate with community
improvement organizations that
support investments in
enhanced mobility such as: the
Immokalee CRA, Bayshore
Gateway Triangle CRA, Naples
CRA, Opportunity Naples,
Golden Gate Estates Civic,
Immokalee Chamber of
Commerce, and the Greater
Naples Chamber of Commerce
to affect improvements in
mobility through increased
funding, roadway and sidewalk
improvements, new
developments, to assure transit
and mobility services are
integral to
economic development planning
and decision-making.
Ongoing
Coordination occurs with the listed
organizations to see where and how we can
implement improvements within project
scopes to increase mobility options and
access within their respective communities.
In the past year we have attended 2
Immokalee CRA meetings.
Attend at least 2
Community
Improvement
Organization’s
meetings annually
to encourage
transit
improvements in
their applicable
district.
Initiative 1.4.6
Make transit and mobility
reviews a part of the
development and
redevelopment review and
approval process within the
county and cities. Require the
development community, as
part of the development review
and approval process, to follow
guidelines on bus stop siting and
design, land use, and roadway
Partial
The Bi-Weekly coordination meetings
previously attended by CAT have been
cancelled indefinitely. CAT is now notified
of any roadway, utilities, and or storm
water projects and participates in reviews
identified for transit needs. A
recommendation was put forth in our
Transit Impact Analysis to update the
Collier County LDC and GMP with verbiage
on transit improvement
associated with development projects, but
they have not been implemented yet.
Attend monthly
County
coordination
meetings.
Pursue Land
Development Code
(LDC) amendments
as applicable.
Collier Area Transit – Transit Development Minor Update 4-7 | P a g e
design factors that affect transit
design; and to coordinate with
CAT for transit services during
the development process.
Include CAT as a reviewing
agency within the development
review and approval process.
Consider adding a transit
component to traffic impact
studies.
Initiative 1.4.7
Develop and adopt a transit
level of service (LOS) policy and
guidance to provide a
framework and metrics for
improving, modifying, funding
transit services.
Completed 2021
The Comprehensive Operating Analysis
developed metrics to determine the
adequate level of service for each route
type and a process to take if levels are not
being met.
Objective 1.5
Provide coordinated transportation services between Collier and adjacent counties to support workforce commutes to
major employment centers and facilitate connections to both transit networks in support of regional economic and
community benefits.
Initiative 1.5.1
Identify high travel volumes
between Collier and adjacent
counties; develop regional
services for travel markets that
have high transit propensity and
support regional community and
economic benefits, including
Immokalee and East Naples
communities.
Ongoing
Since the inception and as a result of the
success of the LinC Route connecting Lee
and Collier County, discussions have
occurred regarding a secondary route. CAT
and the Collier MPO have begun a
Regional Transit and Fares Study to
explore options.
Complete Regional
Study by 2024.
Initiative 1.5.2
Coordinate with LeeTran and
FDOT to identify funding for
expanded cross county public
transportation services.
Ongoing
CAT and LeeTran have provided data to the
consultant for the Regional Transit and
Fares Study which will explore these
options.
Complete Regional
Study by 2024 and
pursue funding
recommendation
from the study.
Collier Area Transit – Transit Development Minor Update 4-8 | P a g e
Objective 1.6 Enhance transit services targeted at tourists, seasonal residents, and the workforce that supports this market.
Initiative 1.6.1
Broadcast CAT television
commercials, radio
advertisements, digital
advertisements, and social
media advertising, monitor
ridership vis-a-vis marketing and
advertising efforts to determine
ridership increases attributable
to marketing efforts.
Ongoing
CAT is continuously evaluating the best
means of broadcasting initiatives and
promotion of services, radio, social media
and digital advertising is consistently
published by our Marketing Coordinator.
Further effort is needed to monitor
ridership connected to marketing
campaigns.
2% increase in
ridership
attributable to
marketing and
advertising efforts.
Initiative 1.6.2
Develop CAT branded services
and amenities within the coastal
markets to better attract
ridership by visitors, seasonal
residents, and workers.
2024, 2029
CAT’s Beach Bus is a branded service
specific to fit the coastal theme. As services
associated with tourism branding will be a
key element. A previous attempt to pilot a
Trolley on Marco Island failed but CAT will
still explore options to expand targeted
services.
Brand routes that
are targeting
tourist.
Objective 1.7 Enhance awareness of CAT services and accessibility to service information for riders, workers, residents, and visitors.
Initiative 1.7.1
Continue to leverage technology
applications to increase and
enhance awareness of CAT
services and to connect riders
with CAT services, including
enhancing the access to fixed-
route through the introduction
of mobility-on-demand service
to the system.
Ongoing, 2029
The rideCAT and planCAT apps are available
to riders to view current routes and bus
locations as well as buy and use tickets. The
Transit App is also available which allows
users to track the routes with additional
capabilities. MOD was implemented as a
pilot paratransit service in FY23, but will not
continue due to funding constraints.
Implement MOD
software along
with MOD Service
to manage and
facilitate the use of
service.
Initiative 1.7.2
Obtain professional services for
a market study and
development of marketing
strategies and best practices to
increase awareness of CAT, CAT
services, CAT image, and
Partial
CAT initiated communications with a firm
for a market study and marketing strategies
in FY20, but the cost was not feasible at the
time. CAT however was able to rebrand the
website along with creating a mobile
application for using CAT services. Larger
Complete
Marketing
Strategies study by
2024.
Collier Area Transit – Transit Development Minor Update 4-9 | P a g e
increase market share in terms
of model split ridership. This
effort should leverage use of
technology, social media,
traditional media, branding, and
develop and provide strategies
to attract interest in CAT to build
choice ridership and generally
improve the image of CAT as a
service.
marketing strategies will continue to be
explored.
Initiative 1.7.3
Continue to partner with the
Chamber of Commerce to
develop and disseminate
information and materials to
businesses, residents, visitors,
about the value of CAT services,
the benefits of riding CAT, and
information about how to access
and use CAT services.
Ongoing
In FY23, CAT has attended multiple public
outreach activities/events but further
coordination with the Chamber of
Commerce is required to distribute CAT
service information. CAT has prepared a
reduction to the employee threshold for
the Corporate Bus Pass Program, which will
be distributed to large employers.
Develop material
to promote the
use of CAT geared
towards the
employer to be
completed by 2023
Initiative 1.7.4
Provide travel training for
persons interested in using the
CAT system.
Ongoing
CAT Travel Training is available to educate
riders on how to use the system whenever
requested. CAT's website also includes
detailed guides on how to use the system,
read our schedules, and the services
available.
Maintain CAT’s
website with the
latest information
regarding travel
training and
provide
information to
paratransit
passengers that
may be able to
utilized Fixed
Route services.
Initiative 1.7.5
Conduct outreach activities at
community events, schools, and
other organizations to teach
Ongoing
CAT staff has so far attended or hosted 6
events in FY23. Further outreach activities
are planned for the rest of the year.
Attend or host at a
minimum 6 events
Collier Area Transit – Transit Development Minor Update 4-10 | P a g e
students and the public how to
use CAT and the benefits of CAT
services.
throughout the
year.
Initiative 1.7.6
Garner relationships with local
media and news outlets to keep
the community aware and
involved.
Ongoing
CAT created radio advertisements on local
radio stations and will continue to explore
further marketing strategies with local
media outlets. CAT regularly advertises
any public participation periods through
local newspapers.
Submit news
release to media
outlets to promote
service change and
events.
Collier Area Transit – Transit Development Minor Update 4-11 | P a g e
Goal 2: Increase the resiliency of Collier County, protecting our man-made and natural resources, by providing attractive and
convenient mobility alternatives that will reduce adverse carbon and environmental impacts within our communities.
Objective 2.1 Provide services and programs to reduce vehicle miles traveled within Collier County.
Initiative 2.1.1 Refer to Initiative
1.4.2
Ongoing Refer to Initiative 1.4.2 Refer to Initiative 1.4.2
Initiative 2.1.2
Coordinate with the
Naples Pathway
Coalition, the MPO
Pathways Advisory
Committee, and local
non-profit and/or for-
profit groups to expand
the use of bicycles as a
commute and mobility
option, including bicycle
share programs.
Ongoing
As bike sharing program discussions
have surfaced, CAT staff has been at
the table to coordinate as needed.
Collier County staff currently attends
the MPO’s Bicycle and Pedestrian
Advisory Committee and the
Congestion Management Committee
(CMC) meetings and encourages
accessible sidewalks and bus stop
improvements be added as part of
every project.
Attend MPO Committee
meeting including BPAC and
CMC.
Initiative 2.1.3
Coordinate with Collier
County Driver License
and Motor Vehicle
Service Centers to
promote CAT fixed-route
Recommend target
implementation in
2025
Develop promotional
material and meet with
DMV to be completed by
2025
Collier Area Transit – Transit Development Minor Update 4-12 | P a g e
services to persons
unable to obtain a
driver’s license or with
an unsafe and/or
inoperable vehicle.
Initiative 2.1.4 Refer to Initiative 1.6.1 Ongoing Refer to Initiative 1.6.1 Refer to Initiative 1.6.1
Initiative 2.1.5
Develop partnerships
with employers and
major activity centers
(educational,
government, healthcare,
retail, residential,
commercial) to provide
education and
awareness of CAT
services and benefits,
and incentives to use
CAT services rather than
drive.
Ongoing
CAT is planning to increase awareness
of the corporate bus pass program with
an employee threshold reduction,
which will reach out to major
businesses in the area with information
about our services and a special rate on
the monthly pass for large businesses.
Develop marketing material
for corporate bus pass
program. Distribute to all
the qualified employers by
2023.
Objective 2.2 Design mobility services to reduce environmental impacts.
Initiative 2.2.1 Transition fleet to
alternative fuels vehicles.
2023, Ongoing
CAT is required to develop an
electrification plan and are preparing to
hire a consultant to help them prepare
Complete Electrification
Transition plan by 2023.
Collier Area Transit – Transit Development Minor Update 4-13 | P a g e
the plan. Recommended
implementation date is 2023 in order
to qualify for future grants. In FY20
CAT applied and was awarded the
5339 Bus and Bus
Facility Grant which includes
the purchase of 2 Electric
Vehicles.
Initiative 2.2.2
Transition to smaller
cleaner vehicles and
match service delivery to
demand by time of day
using a mobility on
demand strategy where
and when service area
and demand
characteristics warrant;
this may include
converting low
productivity fixed-route
service to mobility on
demand and/or
transitioning fixed-route
to mobility on demand at
certain times of the day.
2023, 2029
A smaller vehicle was purchased to
service Marco Island to match the
capacity requirements, the vehicle is in
use. CAT will continue to evaluate
routes to determine the need of vehicle
capacity. MOD has not been
implemented for fixed route service.
Complete Electrification
Transition plan by 2023.
Implement 1 MOD area
from the Implementation
Plan.
Objective 2.3 Improve resiliency for extreme weather events and changing environment.
Initiative 2.3.1
Use electric vehicles as
back-up power for
emergency facilities.
2023, 2024
In 2020 CAT was awarded the 5339 Bus
and Bus Facility Grant which includes
purchasing 2 Electric Vehicles to serve
as back-up power for emergencies.
Complete Electrification
Transition plan by 2023.
Initiative 2.3.2
Explore solar powered
canopies to energize the
maintenance building
and buses and provide
shade.
2024, 2025
Solar powered canopies are being
considered in the design of the new
maintenance facility, currently in
development.
Complete the construction
of solar canopies by FY25
Collier Area Transit – Transit Development Minor Update 4-14 | P a g e
Goal 3: Build meaningful partnerships that increase awareness and education of and about mobility options and increase the viability of
mobility services to promote livability and enhance economic and social well- being.
Objective 3.1 Develop marketing strategies to increase awareness of CAT services and to increase ridership.
Initiative 3.1.1
Participate in local job
fairs and outreach/
partnerships with
employers to increase
knowledge about the
transit system and to
encourage use.
Ongoing
CAT regularly participates in events
to promote Public Transit. None of
the events this fiscal year have been
specific to job/employer outreach.
Outreach to large employers will
occur with the change to our
corporate bus pass program.
Participate in a minimum of
2 job/employer outreach
events.
Initiative 3.1.2
Develop marketing
materials and programs
to demonstrate the value
and role of transit as a
mobility option,
including benefits
accruing to personal
finances, access to
opportunities, and
reduction of regional
carbon emissions.
Ongoing
CAT developed a flyer describing the
benefits of utilizing Public
Transportation which included
economic, health and environmental
benefits. Additional flyers will be
created with the corporate bus pass
program change, informing
employees and employers about the
benefits of transit.
Develop marketing
material.
Initiative 3.1.3
Distribute transit service
information and user-
friendly brochures to at
least 25% of businesses
within ¼-mile of existing
transit routes prior to
initiating the next TDP
Major Update.
2024
CAT has not made progress on this
initiative.
Develop marketing material
and distribute by 2024.
Collier Area Transit – Transit Development Minor Update 4-15 | P a g e
Initiative 3.1.4
Refer to Initiative
1.6.1
Ongoing
Refer to Initiative 1.6.1
Refer to Initiative 1.6.1
Initiative 3.1.5
Facilitate social media
tools and campaigns to
promote CAT awareness,
services, and benefits for
individuals, businesses,
organizations.
Ongoing
CAT is utilizing Facebook and Instagram
as social media tools to promote CAT
services.
Utilization of social media
ad placements to market
transit.
Initiative 3.1.6
Refer to Initiative
1.7.5
Ongoing
Refer to Initiative 1.7.5
Refer to Initiative 1.7.5
Objective 3.2 Build partnerships for participation in discussions relating to proposed future development and redevelopment.
Initiative 3.2.1
Refer to Initiative 1.5.2
Ongoing
Refer to Initiative 1.5.2
Refer to Initiative 1.5.2
Initiative 3.2.2
Refer to Initiatives 1.4.2
and 2.1.1
Ongoing
Refer to Initiatives 1.4.2 and 2.1.1
Refer to Initiatives
1.4.2 and 2.1.1
Goal 4: Coordinate the development and provision of mobility services with local, regional, state planning efforts and through public and
private partnerships.
Objective 4.1 Coordinate integrated land use and transportation planning efforts to incorporate transit needs into the development
review and approval process.
Initiative 4.1.1
Work with Collier County
to implement
recommendations listed
in the Collier County
Transit Impact Analysis
(TIA).
2023
CAT will coordinate with County
Planning Division to pursue inclusion of
the recommended changes listed in the
TIA into the Collier County Land
Development Code and Growth
Management Plan as applicable.
Implement
recommendations from TIA
by 2023.
Collier Area Transit – Transit Development Minor Update 4-16 | P a g e
Initiative 4.1.2
Participate in planning
and development review
meetings to ensure that
county and city policies
support transit services
and funding needs.
Ongoing
Collier County receives notices of
upcoming development review
meetings and participates as required.
The regular bi-weekly meetings have
been cancelled indefinitely.
Participate in bi-weekly
meetings to review future
developments.
Initiative 4.1.3
Require local
governments and FDOT
to provide accessible
sidewalks, bus stops, and
other bus stop
improvements within
roadway projects and for
all new developments.
Ongoing
Collier County participated in the
development of the Master Mobility
Plan. The Plan looked at options to
reduce vehicle miles traveled, including
transit-oriented development design.
Staff will work to ensure that transit-
oriented design is incorporated into the
planning process.
Implement
recommendations from TIA
by 2023.
Initiative 4.1.4
Make transit and
mobility reviews a part
of the development and
redevelopment review
and approval process
within the county and
cities. Require the
development
community, as part of
the
development review and
approval process, to
follow guidelines on bus
stop siting and design,
land use, and roadway
design factors that affect
transit design; and to
coordinate with CAT for
transit services during
the development
Ongoing
Collier County monitors development
meetings and responds to any request
to review development. Staff continues
to work hard to become more involved
in the review process. Coordination
with Transportation Planning is needed
to determine whether adding a transit
component to traffic impact studies is
feasible.
Implement
recommendations from TIA
by 2023.
Collier Area Transit – Transit Development Minor Update 4-17 | P a g e
process. Include CAT as a
reviewing agency within
the development review
and approval process.
Consider adding a transit
component to traffic
impact studies.
Initiative 4.1.5
Meet quarterly with staff
from the Collier County
Transportation
Engineering and Planning
departments to identify
upcoming utilities,
roadway, and /or
stormwater projects,
planning studies, and site
developments that will
affect the provision of
transit services.
Ongoing
CAT is notified of any roadway, utilities,
and or stormwater projects and
participates in meetings as required,
previous bi-weekly meetings have been
cancelled.
Meet monthly with
appropriate divisions.
Goal 5: Use technologies and innovations in service delivery to improve productivity, efficiency, reliability, and cost-effectiveness of
mobility services and operations.
Objective 5.1 Explore, monitor, test, and deploy technology applications to enhance mobility services, increase awareness of CAT services,
and ease of access to CAT services.
Initiative 5.1.1
Improve customer
information systems,
including website and
through directly curated
and through available
mobile applications, to
enhance availability of
and access to CAT service
information and trip
planning, to support
increased ridership.
Completed
Collier County continuously strives to
improve information systems. Already
in place are: A Mobile App and Website
functionality to display Real-time
arrival and departure per stop
information and also allowing riders to
buy tickets, view routes, and plan trips
for Fixed Route. CAT has developed
General Transit Feed Specifications that
were submitted to Google Transit and
approved. Passengers can plan their
Implement ITS initiatives
within the Implementation
Plan.
Collier Area Transit – Transit Development Minor Update 4-18 | P a g e
trip using Google Maps. A paratransit
app for Paratransit Service allowing
passengers to view and edit trips as
well as manage their account balance
on the app.
Initiative 5.1.2
Explore and acquire
cloud-based Software as
a Service (SaaS) and/or
Mobility as a Service
(MaaS) functionalities to
support mobility on
demand services, directly
operated and/or
operated through
contract or partnership,
to serve general public
and augment or replace
ADA paratransit services
where and when
warranted based on
costs, productivity, and
service quality.
2029
CAT Piloted an On-Demand Paratransit
service, allowing same day rides, but will
not continue into next year due to
funding constraints. CAT will work on this
initiative again closer to the initial
planned implementation.
Implement MOD software
along with MOD service to
manage and facility the use
of service by 2029.
Initiative 5.1.3
Explore use of account-
based payment systems
to reload smart cards
and other fare media as
part of a SaaS or MaaS
platform and to facilitate
compatible fare policy
and fare technology with
LeeTran.
2023
Account-based payment systems are
now in operation for our paratransit
riders, and fixed route riders can buy
fares on their RideCAT mobile
accounts. Fare technology
coordination will be a part of the
Regional Transit and Fares Study.
Implement ITS initiatives
within the Implementation
Plan by 2023
Initiative 5.1.4
Explore technology to
allow merchants and
employers to reduce
2023 CAT offers a corporate 30-Day Pass for
employers with more than 300
Implement ITS initiatives
within the Implementation
Plan by 2023.
Collier Area Transit – Transit Development Minor Update 4-19 | P a g e
fares for patrons and
employees using smart
cards and/or mobile pay
applications.
employees for a discounted rate. The
existing program threshold will be
reduced to 250 employees, allowing
further access to the program.
Collier Area Transit – Transit Development Minor Update 4-20 | P a g e
Goal 6 Monitor and improve mobility service quality and service standards.
Objective 6.1 Develop ongoing processes to measure and monitor service quality.
Initiative 6.1.1
Use a Route Monitoring
System to examine
fixed-route services on
an annual basis and
make revisions to low-
performing services as
needed, including
transitioning to
mobility on demand
solutions where and
when warranted.
Ongoing
Routes are monitored monthly at a
minimum and updated as needed when
route performance is not meeting desired
standards. CAT previously conducted a
Comprehensive Operations Analysis (COA)
to examine existing service and have acted
on the recommended cost-neutral
improvements. Further implementation is
planned.
Annual review of route
performance and compare to
the established level of
service.
Initiative 6.1.2
Conduct a survey at
least every two years to
obtain passenger
information including
user demographics,
travel behavior
characteristics, transfer
activity, and user
satisfaction.
2022, 2024,
2026
Surveys are developed and distributed or
advertised as necessary. Surveys have been
created to pull a variety of information
from transit users. CAT has most recently
conducted a survey regarding the
Paratransit rider needs concerning the
MOD Pilot.
Conduct passenger survey
every two years.
Initiative 6.1.3
Maintain an ongoing
public involvement
process to solicit and
assess input through
online reviews,
calls/comments cards,
discussion groups,
surveys, and CAT
booths at community
events.
Ongoing
CAT seizes every opportunity to solicit
information from the public at events. In
addition, CAT conducts frequent surveys to
evaluate the service provided as well as
soliciting suggestions/feedback.
Provide comment cards at all
events.
Maintain website to allow for
comments and suggests to
be submitted.
Collier Area Transit – Transit Development Minor Update 4-21 | P a g e
Initiative 6.1.4
Maintain an on-going
process for operators
to communicate transit
service comments and
suggestions to identify
passenger needs and
improve services and
service performance;
comments to be
reviewed monthly by
service planning and
operations.
Ongoing
Operators are available to make suggestions
and observations as they notice them. The
COA process incorporated operator
feedback into the route examinations and
service recommendations. Processes have
been expanded to include feedback from
senior drivers within our process to create
season and off-season schedules.
Conduct operator surveys to
obtain operational input
every two years.
Initiative 6.1.5
Manage the CAT fleet
of fixed-route vehicles
to maintain an average
fleet age of less than
seven years as funding
permits.
Completed/
Ongoing
Collier County replaces fixed-route vehicles
as they meet their useful life dependent
upon funding. The average age of the fleet is
5.
Maintain Fleet age of less
than seven years.
Initiative 6.1.6
Maintain an on-going
process for operators
to communicate
potential vehicle
maintenance problems
to be logged with the
preventative
maintenance program
to identify and
investigate problems
early.
Completed/
Ongoing
Collier County Fleet Management performs
scheduled maintenance activities for all
transit vehicles as required following the
preventative maintenance program. Drivers
conduct pre-and post-trip inspections on all
vehicles through the Zonar system and
supervisors report any issues to Collier
County Fleet Management. Fleet
Management addresses actual maintenance
problems before the bus leaving the
Operations facility.
Maintain inspection process
to allow for operator to
communicate concerns
regarding vehicles.
Goal 7 Maximize the use of all funding sources available, including through partnerships with businesses, employers, and other institutions
to increase and improve access to mobility services and mobility for workers, residents, visitors.
Objective 7.1 Increase and expand revenue sources.
Collier Area Transit – Transit Development Minor Update 4-22 | P a g e
Initiative 7.1.1
Explore opportunities
for generating
advertising revenue on
and inside the buses.
Ongoing
Collier Area Transit has an adopted
Advertising Policy, the selling of advertising
commenced in FY15. Our Marketing
coordinator is in contact with advertisers.
Exterior advertising is being explored.
Maintain advertising
program within the bus.
Modify program to allow for
wrapping vehicles by 23.
Initiative 7.1.2
Educate the general
public and local
decision-makers on the
importance of public
transportation and the
need for financial
support.
Ongoing
CAT educates the public and local decision-
makers on the importance of public
transportation and the need for financial
support at every opportunity, which
includes attending MPO and Commissioner
Board meetings throughout FY2023.
Attend Board meetings and
MPO Board meetings to
discuss transit initiatives and
general services.
Initiative 7.1.3
Submit grant
applications available
through Federal, State,
local, and private
sources.
Ongoing
Grants are submitted as required.
Annually submit FTA and
FDOT Grants.
Initiative 7.1.4
Annually seek to
identify and obtain
available alternative
revenue sources for the
provision of new and
improved transit
services.
Ongoing
CAT continuously searches for alternative
revenue sources for new and improved
transit services.
Evaluate Notice of Funding
Opportunities as they
become available.
Initiative 7.1.5
Serve on and
coordinate with the
Collier County Tourist
Development Council
(TDC) and to explore
the potential for using
tourist development
tax revenue to expand
and improve transit
service for Collier
No
Due to a lack of staff resources, this initiative
has not yet been implemented.
Serve on and coordinate with
the Collier County Tourist
Development Council (TDC)
by 2024
Collier Area Transit – Transit Development Minor Update 4-23 | P a g e
County’s tourists and
visitors, help enhance
awareness of CAT
services, develop
private-public
partnerships to design
and fund transit
services that serve
visitors and employees.
Initiative 7.1.6
Explore opportunities
to leverage and
enhance share of
funding from existing
taxes and fees to be
assigned to transit.
Explore means to
secure impact fees,
development fees, and
new taxes to be
secured for supporting
transit, maintenance,
and expansion of
transit services.
Partial
Refer to Initiative 4.1.1
Refer to Initiative 4.1.1
Initiative 7.1.7
Use a 501(c)(3) that
allows persons to
donate funds to CAT for
the purpose of
“adopting a shelter” or
“adopting a rider.”
2024
There is a current provision for interested
parties to participate in an “Adopt a Bench”
program but the program will have to be
enhanced and the opportunity for receive
funding from a “Friends of CAT” group will
have to be explored.
Modify advertising program
to allow funds to be
accepted via an
establishment of 501(c)(3).
By 2024.
Collier Area Transit – Transit Development Minor Update 5-1 | P a g e
Section 5 – Financial Plan
This section of the TDP presents the financial plan consisting of the capital and operating costs and
revenues associated with maintaining the existing system (status quo) and with the implementation of
the 10-year Needs Plan. The financial plan is a planning tool utilized to quantify the cost of service and
related capital enhancements but does not represent a commitment of funding or a requirement to
provide any identified service/project in the year shown.
There have been no commitments from local, state, federal, or other sources to increase transit funding
levels over the proposed amounts identified in the Collier County Fiscal Year (FY) 2022 Adopted Budget.
Based on currently identified funding, existing service levels and capital improvements are planned
through the first nine years of this Annual Progress Report, with needs-based improvements being added
to the tenth year. All improvements included in the tenth year related to addressing the transit needs will
require new revenue sources.
Numerous assumptions were made to project public transportation costs and revenues for this TDP
planning timeframe of FY 2023 through FY 2032 The assumptions made for operating and capital costs
and revenues are based on a variety of factors, including NTD data, trend data, operating characteristics,
planning documents, the FDOT Work Program, and the Collier MPO Transportation Improvement Plan.
The only difference between the table in this update and the tables contained in the Major TDP is the
addition of a new 10th year utilizing the assumption noted.
Transportation Improvement Program (TIP) FY 2022 - 2026, staff correspondence, and the Collier County
FY 2022 Adopted Budget. These assumptions are summarized below.
Cost Assumptions
Operating
Numerous cost assumptions were made to forecast transit costs for 2024 through 2033. These
assumptions are based on a variety of factors, including service performance data from CAT and
information from other recent Florida TDPs. These assumptions are summarized as follows:
• Annual operating costs for fixed-route and paratransit services are based on the most recent
validated NTD data. These costs include the cost to operate and maintain existing services and
facilities, such as administrative buildings, maintenance facilities, and transit hubs.
• An annual inflation rate of 2.28% was used for all operating cost projections, based on the average
Consumer Price Index (CPI) historical data from 2013–2022.
• Annual operating costs for future service enhancements are based on the projected annual service
hours and cost per revenue hour of $105.30 for fixed-route service and $49.14 for paratransit
service (both in FY23).
• Implementing the new route alignments represents increased levels of service in improvements
such as Route 14, Route 19/28, and Route 23 with no additional costs.
Collier Area Transit – Transit Development Minor Update 5-2 | P a g e
• As ADA paratransit service is not required for express routes or MOD, it is assumed that any
express and MOD would not require complementary ADA paratransit services if implemented.
Capital
Several assumptions were developed to project the costs for capital needs identified previously and are
summarized as follows:
• New vehicles planned to be purchased include those necessary to replace vehicles within the
existing fleet that have reached the end of their useful life and vehicles to implement the new
service.
• Vehicles are assumed to cost $495,000 for fixed-route bus and $82,600 for paratransit cutaway
vehicles, based on information provided by the CAT. Twenty-nine fixed-route vehicles and 58
paratransit vehicles will need to be purchased between 2020 and 2030.
• An annual growth rate of 2.28% was used for capital cost projections, based on average CPI
historical data from 2013 to 2022.
• A 20% spare ratio was factored into the vehicle replacement and expansion schedule.
• The useful life for motor bus replacement is assumed to be 12 years. The useful life for paratransit
vehicle replacement is assumed to be 7 years.
• The CAT FY 22/23 budget estimates 1% Enhancement Shelter Rehab to be $45,000. Bus shelter
expenses were assumed at the FY 2022 Collier County Government Requested Budget for the first
fiscal year but thereafter based on the cost to construct 10 shelters annually to be consistent with
the ADA Assessment Plan, with an annual inflation rate of 2.28%.
• Technology costs for Avail replacement, APCs, annunciators, onboard information media, and
farebox replace were obtained from the draft budget proposals received.
Revenue Assumptions
Revenue assumptions for fixed-route service are based on information from several state and local
agencies. Assumptions for different revenue sources, including annual operating revenues from existing
federal, state, and local sources, are based on the FDOT Adopted Five-Year Work Program (FY 2023–2027),
the CAT FY 2022 TDP Annual Progress Report, and the Collier County Government FY 2023 Requested
Budget. The distribution of 10-year operating revenues included in the 10-year Cost Feasible Plan.
Local revenues for CAT are anticipated to increase at a moderate rate of 1.8% annually starting in 2023.
Under this plan, there are no new local revenue sources in the 10-year period.
• Federal Grants 5307 and 5311 for operating assistance from FY 2021–FY 2025 reflects FDOT
Adopted Work Program FY 2023–2027 for Collier County; an annual growth rate (1.89%) is applied
after FY 2022, to reflect 10-year average CPI increase to the revenue source.
• Federal and State grant 5305 funds for planning was based on the FDOT Adopted Work Program
FY 2023–2027 for Collier County.
Collier Area Transit – Transit Development Minor Update 5-3 | P a g e
• Projected FDOT Block Grant revenues for 2023–2027 were obtained from the FDOT Adopted Work
Program FY 2023–2027 for Collier County. A conservative annual growth rate of 2.28% was used
to increase these revenues and thereafter were based on a 10-year average CPI. Projected fare
revenues for existing services are based on FY 2019 YTD Route Statistics data provided by CAT,
with a conservative 1.8% annual growth rate applied.
• Projected local contributions were obtained from the FDOT Adopted Work Program FY 2023–
2027 for Collier County. A conservative annual growth rate of 2.28% was used to increase
revenues and thereafter was based on a 10-year average CPI.
• Based on vehicle information provided by CAT staff, a total of $14.3 million in capital funds was
assumed in the 10-year plan to fund the existing fixed-route bus replacement program and $4.9
million for paratransit vehicles.
• New State Block Grant – The formula to allocate Block Grant funds is based on three components:
population of service area, ridership, and revenue miles. Block grant revenues are approximate
based on information provided by FDOT’s Public Transit Office. It is assumed these revenues will
increase when implementing new/expanded transit services, two years after the start of
new/expanded services.
• FTA Section 5307 – Revenues are based on federal formula funding criteria such as increased
ridership and passenger-miles. Funding levels are subject to change due to transit performance
relating to route revenue miles, passenger trips, and the performance of the whole system. For
expansion to existing routes and new services, it is assumed these revenues will increase and
would be realized two years from year of service expansion or new services.
• The detailed 10-year Cost Feasible Finance Plan is presented in Table 5-2. Table 5-2 includes all
services, facilities, and capital, existing and proposed, that is within the fiscal capacity of existing
revenue streams.
There are several projects identified through the TDP process that have no funding allocated for its
implementation. Annually, the Transit Staff presents a list of those unfunded projects to the Metropolitan
Planning Organization (MPO) so that if funding is identified these projects can be considered for funding.
Table 5-1 shown below, is the updated list of unfunded transit priorities approved by the MPO Board on
April 8, 2022.
Additional revenue sources will be required to balance the funding needs with the costs of the
improvements. Actual revenue to fund the alternatives may be secured for these activities from any
individual or combination of local, state, and federal sources, private contributions, or innovative financing
techniques. When revenue is secured, staff can proceed with the implementation of any listed service or
improvement.
Collier Area Transit – Transit Development Minor Update 5-4 | P a g e
Table 5-1
2023 Transit Priorities
Improvement
Category
Ranking Implementation
Year
Annual 3-Year 10-Year
Cost Operating Operating
Cost Cost
Capital
Cost
Maintenance and Operations
Facility Replacement
Transit Asset
Management
(TAM)
1
2025
$-
$ $
- -
$7,900,000
Administration/Passenger
Station Roof Replacement
Transit Asset
Management
(TAM)
2
2022
$-
$ $
- -
$357,000
Route 15 from 90 to 45
minutes
Increase
Frequency
3 2023 $163,238 $489,715 $1,632,384 $503,771
Route 11 from 30 to 20
minutes
Increase
Frequency
4 2023 $652,954 $1,958,861 $6,529,536 $503,771
Route 12 from 90 to 45
minutes
Increase
Frequency
5 2023 $282,947 $848,840 $2,829,466 $503,771
Route 16 from 90 to 45
minutes
Increase
Frequency
6 2024 $156,105 $468,316 $1,561,054 $503,771
Fixed Route Bus -
Replacement
Transit Asset
Management
(TAM)
7
2023
$-
$ $
- -
$520,000
Route 14 from 60 to 30
minutes
Increase
Frequency
8 2024 $243,915 $731,744 $2,439,146 $512,698
9 $ $- $ $564,940
Site SL-15 Creekside Park and Ride 2024 - -
Beach Lot Vanderbilt Beach 10 $ $- $ $2,318,200
Rd Park and Ride 2024 - -
Route 17/18 from 90 to 45
minutes
Increase
Frequency
11 2024 $258,550 $775,649 $2,585,495 $503,771
Route 13 from 40 to 30
minutes
Increase
Frequency
12 2024 $83,712 $251,135 $837,115 $512,698
New Island Trolley New Service 13 2025 $551,082 $1,653,246 $5,510,821 $864,368
Study: Mobility on Demand Other 14 2025 $ $- $ $50,000
Improvements - -
Study: Fares Other 15 2025 $ $- $ $50,000
Improvements - -
Support Vehicle -
Replacement
Transit Asset
Management
(TAM)
16
2024
$-
$ $
- -
$30,000
New Bayshore Shuttle New Service 17 2026 $201,000 $602,999 $2,009,995 $531,029
Support Vehicle -
Replacement
Transit Asset
Management
(TAM)
18
2025
$-
$ $
- -
$30,000
19 $ $- $ $479,961
Radio Rd Transfer Station Lot Park and Ride 2027 - -
Collier Area Transit – Transit Development Minor Update 5-5 | P a g e
Beach Lot Pine Ridge Rd
Park and Ride
20
2027
$ $-
-
$ $2,587,310
-
Immokalee Rd - Split Route
27 creating EW Route
Route
Network
Modifications
21 2028 $189,885 $569,654 $1,898,846 $550,016
Transit Asset 22 $- $525,000
Fixed Route Bus - Management $ $
Replacement (TAM) 2027 - -
Collier Blvd - Split Route 27
creating NS Route
Route
Network
Modifications
23 2028 $189,885 $569,654 $1,898,846 $550,016
Transit Asset 24 $- $525,000
Fixed Route Bus - Management $ $
Replacement (TAM) 2027 - -
New Route 19/28 - Extend
Hours to 10:00 PM
Service
Expansion
25 2028 $29,288 $87,863 $292,876 $0
Transit Asset 26 $- $525,000
Fixed Route Bus - Management $ $
Replacement (TAM) 2027 - -
Route 24 - Extend Hours to
10:00 PM
Service
Expansion
27 2028 $30,298 $90,893 $302,976 $0
Transit Asset 28 $- $525,000
Fixed Route Bus - Management $ $
Replacement (TAM) 2027 - -
Goodlette Frank Rd - Split
Route 25 creating NS Route
Route
Network
Modifications
29 2028 $183,805 $551,416 $1,838,052 $550,016
MOD – North Naples New Service 30 2030 $81,723 $245,169 $817,230 $81,961
New Autonomous Circulator New Service 31 2030 $52,411 $157,232 $524,105 $569,681
MOD – Marco Island New Service 32 2030 $108,912 $326,736 $1,089,119 $81,961
MOD – Golden Gate Estates New Service 33 2030 $163,446 $490,338 $1,634,460 $81,961
New Naples Pier Electric
Shuttle
New Service 34 2030 $82,213 $246,638 $822,125 $569,681
MOD – Naples New Service 35 2030 $193,889 $581,666 $1,938,887 $81,961
Collier Area Transit – Transit Development Minor Update 5-6 | P a g e
Proposed 2023 Transit Priorities
COSTS AND REVENUES SUMMARY
Table 5-2 provides a balanced status quo operating budget based on the best financial data available to
project future year costs and revenues. New funding would be required to realize any service or
improvement beyond maintaining the current level of service. Nevertheless, operating and capital costs
for the Needs Plan have been prepared in the event that additional funding is identified. The financials for
the Needs Plan are identified in Table 5-3.
Improvement Category Ranking Implementation
Year Annual Cost 3-Year
Operating Cost
10-Year
Operating
Cost
Capital Cost
Route 15 from 90 to 45 minutes Increase Frequency 1 2023 $ 163,238 $ 489,715 $ 1,632,384 $ 503,771
Route 11 from 30 to 20 minutes Increase Frequency 2 2023 $ 652,954 $ 1,958,861 $ 6,529,536 $ 503,771
Route 12 from 90 to 45 minutes Increase Frequency 3 2023 $ 282,947 $ 848,840 $ 2,829,466 $ 503,771
Administration/Passenger Station Roof Replacement Transit Asset Management (TAM)4 2023 $ -$ -$ -$ 174,000
Route 16 from 90 to 45 minutes Increase Frequency 5 2023 $ 156,105 $ 468,316 $ 1,561,054 $ 503,771
Route 14 from 60 to 30 minutes Increase Frequency 6 2023 $ 243,915 $ 731,744 $ 2,439,146 $ 512,698
Site SL-15 Creekside Park and Ride 7 2023 $ -$ -$ -$ 564,940
Beach Lot Vanderbilt Beach Rd Park and Ride 8 2023 $ -$ -$ -$ 2,318,200
Route 17/18 from 90 to 45 minutes Increase Frequency 9 2023 $ 258,550 $ 775,649 $ 2,585,495 $ 503,771
Route 13 from 40 to 30 minutes Increase Frequency 10 2023 $ 83,712 $ 251,135 $ 837,115 $ 512,698
40' Fixed Route Bus Replacement Transit Asset Management (TAM)11 2023 $ -$ -$ -$ 580,000
Replacement of Support Truck Transit Asset Management (TAM)12 2023 $ -$ -$ -$ 50,000
Replace Cutaway Vehicle Transit Asset Management (TAM)13 2023 $ -$ -$ -$ 150,000
Replace Cutaway Vehicle Transit Asset Management (TAM)14 2023 $ -$ -$ -$ 150,000
Replace Cutaway Vehicle Transit Asset Management (TAM)15 2023 $ -$ -$ -$ 150,000
New Island Trolley New Service 16 2024 $ 551,082 $ 1,653,246 $ 5,510,821 $ 864,368
Study: Mobility on Demand Other Improvements 17 2024 $ -$ -$ -$ 50,000
Study: Fares Other Improvements 18 2024 $ -$ -$ -$ 50,000
Support Vehicle - Truck Transit Asset Management (TAM)19 2024 $ -$ -$ -$ 30,000
Replace Cutaway Vehicle Transit Asset Management (TAM)20 2024 $ -$ -$ -$ 150,000
Replace Cutaway Vehicle Transit Asset Management (TAM)21 2024 $ -$ -$ -$ 150,000
Replace Cutaway Vehicle Transit Asset Management (TAM)22 2024 $ -$ -$ -$ 150,000
Replace Cutaway Vehicle Transit Asset Management (TAM)23 2024 $ -$ -$ -$ 150,000
New Bayshore Shuttle New Service 24 2025 $ 201,000 $ 602,999 $ 2,009,995 $ 531,029
Fixed Route Bus - Replacement Transit Asset Management (TAM)25 2025 $ -$ -$ -$ 500,000
Fixed Route Bus - Replacement Transit Asset Management (TAM)26 2025 $ -$ -$ -$ 500,000
Support Vehicle - Replacement Transit Asset Management (TAM)27 2025 $ -$ -$ -$ 30,000
Support Vehicle - Replacement Transit Asset Management (TAM)28 2025 $ -$ -$ -$ 30,000
Radio Rd Transfer Station Lot Park and Ride 29 2026 $ -$ -$ -$ 479,961
Beach Lot Pine Ridge Rd Park and Ride 30 2026 $ -$ -$ -$ 2,587,310
Immokalee Rd - Split Route 27 creating EW Route Route Network Modifications 31 2027 $ 189,885 $ 569,654 $ 1,898,846 $ 550,016
Collier Blvd - Split Route 27 creating NS Route Route Network Modifications 32 2027 $ 189,885 $ 569,654 $ 1,898,846 $ 550,016
New Route 19/28 - Extend Hours to 10:00 PM Service Expansion 33 2027 $ 29,288 $ 87,863 $ 292,876 $ -
Route 24 - Extend Hours to 10:00 PM Service Expansion 34 2027 $ 30,298 $ 90,893 $ 302,976 $ -
Goodlette Frank Rd - Split Route 25 creating NS Route Route Network Modifications 35 2027 $ 183,805 $ 551,416 $ 1,838,052 $ 550,016
35' Fixed Route Bus Replacement Transit Asset Management (TAM)36 2024 $ -$ -$ -$ 560,000
35' Fixed Route Bus Replacement Transit Asset Management (TAM)37 2024 $ -$ -$ -$ 560,000
35' Fixed Route Bus Replacement Transit Asset Management (TAM)38 2024 $ -$ -$ -$ 560,000
35' Fixed Route Bus Replacement Transit Asset Management (TAM)39 2024 $ -$ -$ -$ 560,000
35' Fixed Route Bus Replacement Transit Asset Management (TAM)40 2024 $ -$ -$ -$ 560,000
40' Fixed Route Bus Replacement Transit Asset Management (TAM)41 2025 $ -$ -$ -$ 580,000
40' Fixed Route Bus Replacement Transit Asset Management (TAM)42 2025 $ -$ -$ -$ 580,000
Replacement of 2 Support Vans Transit Asset Management (TAM)43 2026 $ -$ -$ -$ 46,000
Replacement of Support Truck Transit Asset Management (TAM)44 2026 $ -$ -$ -$ 26,200
MOD – North Naples New Service 45 2030 $ 81,723 $ 245,169 $ 817,230 $ 81,961
New Autonomous Circulator New Service 46 2030 $ 52,411 $ 157,232 $ 524,105 $ 569,681
MOD – Marco Island New Service 47 2030 $ 108,912 $ 326,736 $ 1,089,119 $ 81,961
MOD – Golden Gate Estates New Service 48 2030 $ 163,446 $ 490,338 $ 1,634,460 $ 81,961
New Naples Pier Electric Shuttle New Service 49 2030 $ 82,213 $ 246,638 $ 822,125 $ 569,681
MOD – Naples New Service 50 2030 $ 193,889 $ 581,666 $ 1,938,887 $ 81,961
Collier Area Transit – Transit Development Minor Update 5-7 | P a g e
Table 5-2 – Status Quo Financial Plan
Collier Area Transit – Transit Development Minor Update 5-8 | P a g e
Collier Area Transit – Transit Development Minor Update 5-9 | P a g e
Table 5-3 – Needs based Financial Plan
Collier Area Transit – Transit Development Minor Update 5-10 | P a g