Loading...
Backup Documents 06/13/2023 Item #16B 7 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 1 68 7 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office ' 10 6/J/„ ) 4. BCC Office Board of County AL �/a� Commissioners Ai is/ , 6//3/a3 5. Minutes and Records Clerk of Court's Office NIP (o-ly-2 8:9-1 PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Dennis McCoy/Transportation Engineering Contact Information 239-252-5844 Contact/Depar lment Agenda Date Item was June 13,2023 Agenda Item Number 16.B.7 Approved by the BCC Type of Document Change Order Number of Original 1 Attached Documents Attached PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature STAMP OK N/A Stamp ok 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be DM signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's n Office and all other parties except the BCC Chairman and the Clerk to the Board Ni7� 5. The Chairman's signature line date has been entered as the date of BCC approval of the DM document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's DM signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip DM should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 6/13/2023 and all changes made during DM N/A is not the meeting have been incorporated in the attached document. The County an option for Attorney's Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the Seri N/A is not BCC, all changes directed by the BCC have been made,and the document is ready for the an option for Chairman's signature. this line: � 87 Procurement Services Co ler County Change Order Form ®Contract Modification ❑Work Order Modification Contract#: 19-7494 Change#: 4 Purchase Order#: 4500202325 Project#: 60199 Engineering Group En Contractor/Firm Name: g g Contract/Project: Vanderbilt Beach Road 6-Lane Widening Project Manager Name: Dennis F. McCoy Division Name: Transportation Engineering Division Original Contract/Work Order Amount $ 1,058,378.00 2/25/2020;11C Original BCC Approval Date; Agenda Item# Current BCC Approved Amount $ 1,541,042.004 2/14/2023,16A1 Last BCC Approval Date; Agenda Item# Current Contract/Work Order Amount $ 1,541,042.00 8/4/2024 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 78,928.00 53.06% Total Change from Original Amount Revised Contract/Work Order Total $ 1,619,970.00 5.12% Change from Current BCC Approved Amount Cumulative Changes $ 561,592.00 5.12% Change from Current Amount Completion Date, Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 3/18/2020 ***Original 9/9/2023 Last Approve 8/4/2024 Revised Date 8/4/2024 Date Completion Date Date (Includes this change) #of Days Added 0 Select Tasks ®Add new task(s) ❑ Delete task(s) ❑Change task(s) ❑ Other Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(if requested); 2.)why this change was not included in the original contract;and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. Task1 1. There is an existing 8-foot high privacy wall along the south side of Vanderbilt Beach Road(VBR)going west from Goodlette-Frank Road, approximately 2,800 feet in length,that needs replacement.This task will include the design to remove and replace the existing wall with a new 8-foot high concrete privacy wall(post and panel system).The total budget for Task I is$60,598. 2. The Collier County Road Maintenance Division maintains this wall and requested the replacement be included in this project.A 300-foot section was damaged by Hurricane Irma in 2017 and was already planned to be replaced with this project. However, Hurricane Ian in fall of 2022 contributed to the rapid deterioration of the remaining section, resulting in the need to replace the entire wall. 3. If the change is not processed,the wall replacement will need to be completed as a separate project. Replacement of the wall is less costly and more efficient if completed at the same time as the construction of the roadway widening project. Task 2 1 The full median opening at the intersection of Bay Laurel Drive (Pelican Marsh) and VBR is being removed as part of the roadway widening design.A channelized median(prohibiting left turns)is the preferred and safer design on a 6-lane roadway. As a result, a westbound U-Turn is needed within a reasonable distance between Bay Laurel Drive and the signalized intersection of VBR and Goodlette-Frank Road.Therefore,this change in design consists of adding a westbound U-Turn Lane on VBR just east of the intersection with Goodlette Frank Road.The total budget for Task 2 is$18,330. 2 The original design anticipated that U-turns would be available at the intersection of VBR and Goodlette-Frank Road. Recent design changes eliminated this option due to the geometric layout of the intersection and signalization requirements. During public outreach Pelican Marsh requested that we provide them with a U-turn in advance of the intersection. 3 If this change is not approved, a signal-protected U-Turn at the intersection would have to be accommodated which would negatively impact the traffic capacity at the intersection. Prepared by:M Cr s DDate igitally2023.05.11 signed by McCo1354.31yDenniso. Date: (Dennis F. McCoy, P.E. , Senior Project Manager,Transportation Engineering Division) Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/ Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY BCC Admin Rpt CAC 16S7 Kenneth Digitally signed by Kenneth Michael Wooten Michael Wooten Date:2023.05.0813:09:56 Wooten -oaoo Accepted by: Date: (Ken Wooten, P.E., Jacobs Engineering Group) AhmadJa Digitally signed b9 4:13:33 AhmadJay Date:2023.05.09 14:13:33 Approved by: -0400 Date: (Jay Ahmad, P.E., Director,Transportation Engineering Division) Digitally signed by MillerMarshal MillerMarshal Date:2023.05.0914:05:42 Approved by: -0a00' Date: (Marshal Miller, Director, Road Maintainance Division) Digitally signed by Sty ScottTrinity DatecottTrini 2023.05.15 Approved by: 08:36:24-04'00' Date: (Trinity Scott, Department Head, Growth Management Department) YilmazHeather Digitally signed by YilmazHeather Approved by: Date:2023.05.19 09:05:02-04'00' Date: (Sara Schneeberger,Procurement Strategist) Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin BCC 41110 Rpt CAO 1687 ATTEST: BOARD OF COUNTY COMMISSIONERS Crystal K. Kinzel, Clerk of Courts COLLIER COUNTY, FLORIDA & Comptroller VY7M4[V' / 2470 By: By: Attest as to Chairman' Rick LoCastro, Chairman alL s . Signature only , Dated: (SEAL) Approved as to form and legality: By: Scott R. Teach Deputy County Attorney Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin BCCRpt CAO 1 33 7 Change Order/Amendment Summary COST TIME CO# AMD# Description Days New Justification Additive(+) Deductive(-) Added Amount Added upsized stormwater Stormwater Improvements were crossing,additonal included in this project so new 1 permitting requirements $256,296 90 1360 roadway would not be and supplemental field reconstructed later. Permitting testing for asphalt design essential to project. Added dual turn lane north Best design options to relieve 2 to East and extended right $129,956 240 1600 current and future traffic turn lane east bound at intersection congestion. Design and Post-Design Best design option to complete 3 for relocation of ARV's and $96,412. 0 1600 services and not delay non-potable water line, construction process Design for replacement of More cost efficient to include Privacy wall and design of with construction than to try to 4 a directional U-Turn $78,928 0 replace as a separate westboung on VBR east of project.Improved traffic capacity. Goodlette Franf Road. Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin BCC 41111) Rpt cA A o I 7 • Jacobs Engineering Group,Inc 7 5811 Pelican Bay Boulevard Jacobs Suite305 Naples,FL 34108 Telephone: 239-431-9222 ATTACHMENT A SCOPE OF SERVICES For CHANGE ORDER NO. 4 PRIVACY WALL DESIGN& VBR U-TURN LANE DESIGN To Vanderbilt Beach Road 6 Lane Widening Project(Contract 19-7494) (East of US 41 to East of Goodlette Frank Road) County Project No. 60199 Purchase Order: 4500202325 April 23, 2023 PART 1:OVERVIEW Jacobs Engineering Inc. (CONSULTANT)has been requested and retained to provide additional engineering services associated with Collier County Project No. 60199, Vanderbilt Beach Road 6-Lane Widening Project(East of US 41 to East of Goodlette Frank Road) (PROJECT). These additional services are based upon a scope of work addition(s)requested by the Collier County Growth Management Department,Transportation Engineering Division. The required services will be incorporated into the Bid Plans Submittal. The Additional Scope of Services addresses the following: Task 1 • Vanderbilt Beach Road Privacy Wall Design: Design of privacy wall along the south side of Vanderbilt Beach Roach. Approximately 2,800 feet (+/-) in length to replace the existing failing wall. Task 2 • Vanderbilt Beach Road Westbound U-Turn Lane: Design of a U-Turn Lane for westbound Vanderbilt Beach Road to address stakeholder concerns and improve traffic operations at the Goodlette-Frank Road Intersection. The requested services are being performed under Contract 19-7494 and services are subject to the Terms and Conditions of that Agreement. This Change Order provides for the CONSULTANT'S services to be modified to add the following Scope of Services to Collier County Project No. 60199: CAO 16 i PART 2:SCOPE OF WORK Task 1: Privacy Wall Design: The existing 8-foot-high privacy wall which runs along the south side of Vanderbilt Beach Road from approximately 600 feet west of the Goodlette-Frank Road Intersection to Strada Place(a distance of approximately 2800 Feet), is in a state of disrepair and is failing in certain areas. The wall requires replacement. This task will provide plans, specifications, structural calculations, quantities and estimates to remove and replace the existing wall with a new 8-foot concrete privacy wall (Post and panel wall system). Services required include the following: 1.1: Field Review and Data Gathering—Site visit and documentation (Photos and field measurements when applicable)of existing conditions and layout (Horizontal and Vertical geometry)of existing 8-foot-high privacy wall. Existing drainage and utility infrastructure as well as vegetation adjacent to wall will be documented. 1.2: Horizontal Alignment Evaluation—Set Alignment(Best Fit Options)—Evaluate the existing horizontal alignment of the wall and prepare alternative for placement of new wall. Note: It is assumed that the placement of the new wall will approximate the alignment of the existing wall with minor modifications to better conforms to existing terrain and avoid impacts to vegetation, drainage and utilities. 1.3: Vertical Alignment Evaluation—Set Alignment(Best Fit Options) - Evaluate the existing vertical alignment of the wall and prepare alternative for placement of new wall.Note: It is assumed that the elevation of the new wall will approximate the elevation of the existing wall with minor modifications to better conforms to existing terrain. 1.4: Key Sheet(1)—Prepare Key Sheet for Privacy Wall plans. 1.5: General Notes and Summary of Pay Items Sheets(2)—Prepare a General Notes Sheet (1) and Summary of Pay Items Sheet(1) for Privacy Wall 1.6: Typical Section Sheet(1) -Develop (1)New Typical Section Sheet for the Privacy Wall Typical Sections and Details—(3) Wall Typical Sections are anticipated. 1.7: Plan and Profile Sheet(s)(5) -Develop (5)Plan and Profile Sheet defining the horizontal and vertical profile of new 8-foot wall. Top of Wall Elevations will be shown as well as approximated existing ground line and depth/diameter of footers for wall posts. It is assumed a 20 foot O.C. Post Spacing will be utilized for wall design. 1.8: Cross Sections—Prepare 30 Cross Sections for the new wall placement. Cross sections will show Top of Wall elevation, existing ground, Post Footer depth and diameter. 1.9: Miscellaneous Details (Drainage, Irrigation, End Treatment, Contractor Access)—Details will be prepared showing resolution of Drainage, Utility, Vegetation, irrigation impacts (as applicable). Access to proposed privacy wall alignment shall be indicated on Detail Sheet. 1.10: Right-of-Entry(ROE) Exhibit—A ROE Exhibit will be prepared which shows proposed construction limits/zone and anticipated access to wall location along the north and south sides of the wall. Access from the south side of the wall will require a Right-of-Entry from the adjacent development. Coordination will the Development and Costs associated with ROE Agreement(if applicable) will be the responsibility of the County. CA0 1 68 7 1.11: Structural Calculations, Quantities and Cost Estimates- Structural Calculations(as applicable) for the new Privacy Wall will be prepared and documented for the Privacy Wall Design. Note: Contractor will be responsible for preparing and furnishing Shop Drawings for the new wall (including Structural Calculations). This requirement will be included in the Project Specifications (Exhibit I). Quantities and Cost Estimates will be prepared for Privacy Wall components. 1.12: Project Management-QA/QC (Plans/Details/Calculations)-Provide project management and perform general coordination with County staff(Including Landscape Department). Provide QA/QC for all Plans and Calculations associated with Privacy Wall. Expenses: Survey: Data will be obtained for existing wall horizontal location and to determine elevation of Top of Wall. Geotechnical: Hand Augers will be taken periodically along the wall alignment and Data will be obtained to document existing soil conditions along the proposed alignment of the new wall. Task 2: Vanderbilt Beach Road Westbound U-Turn Lane Design of Westbound U-Turn Lane (Directional Median Opening(westbound only) for westbound Vanderbilt Beach Road just east of the Goodlette Frank Road Intersection. The U- Turn lane is being added to the design to address stakeholder concerns and improve traffic operations at the Goodlette-Frank Road Intersection. Services required include the following: 2.1: Drainage Map—Modify Drainage Map Sheet(1)to reflect new turn lane and associated impervious drainage areas. (Calculate Impervious/Pervious Area changes, revise Callouts etc.). 2.2: Typical Sections -Develop (1)New Typical Section for the section of Vanderbilt Beach Road adjacent to the new U-Turn Lane. Note: Median Width Varies, Segment is within Superelevated section of roadway. 2.3: Summary of Drainage Structures-Add the two (2)New Structures(Flanking S19) and associated data to the Summary Sheet 2.4: Plan and Profile Sheet(1)—Revise existing Plan and Profile Sheet to reflect the addition of a westbound U-Turn Lane just prior to Goodlett-Frank Road Intersection. Coordination with Traffic Operations Department will be required to obtain approval for proposed location prior to design beginning. Note: Due to wider median width at proposed U-turn location and proximity to adjacent Conservation Area along the south side of Vanderbilt Beach Road, no associated U-Turn"bulb out"will be designed at this location. 2.5: Intersection Detail Sheet(1)—Intersection Detail Sheet will be prepared to reflect the addition of a westbound U-Turn Lane just prior to Goodlett-Frank Road Intersection. Intersection Detail Sheet will show proposed grades within the median at required intervals to reflect design intent and provide proper slopes. Note: Median Width Varies, Segment is within Superelevated section of roadway. 2.6: Drainage Structure Sheet(1) - Develop (2)New Drainage Structure Cross Sections for the (*Ity 1687 new required facilities and display on (1)New Sheet. 2.7: Cross Sections—Modify (4) Cross Sections to reflect new U-Turn lane addition. 2.8: Traffic Control Plans -Revise(2)MOT Plan Sheets to show revised Design in Phase I and Phase II MOT Plans 2.9: Signing and Pavement Marking—Revise (1) Sheet to show revised Design. Modify Quantity Tables. 2.10: Quantities/Cost Estimate-Revisions to Quantities and Cost Estimate will be made to reflect modifications to the design and incorporate the new U-Turn Lane. 2.11: Drainage Calculations—Drainage Calculations will be prepared/performed to document new spread at each of the (2) new Inlets and S19 due to additional impervious area. 2.12: Project Management-QA/OC (Plans/Details/Calculations) - Provide project management and perform general coordination with County staff(Including Traffic Operations Department). Provide QA/QC for all Plans and Calculations associated with new U-Turn Lane. PART 3: EXCLUSIONS/ASSUMPTIONS: The following tasks are not included in the Scope of Work for this Change Order: 1) Services other than those specifically listed above. 2) ROE Acquisition Costs(COUNTY Responsibility) 3) ROW Maps,Title Searches are not included. PART 4: PROJECT SCHEDULE: Modification to Project Schedule • Note: Changes to Overall Project Schedule will not be required. • Project Bid Plan Milestone Delivery Schedule will require modification. Schedule change is required due to allow sufficient time for delivery of design. COUNTY and CONSULTANT shall meet to determine required schedule modifications and establish a new milestone date once NTP of Change Order No. 4 is delivered. PART 5: COMPENSATION: An estimated budget to be utilized for the above tasks has been established and is shown as Attachment A—Manhour and Cost Estimate Summary. A man-hour estimate for the above Scope of Services has been prepared for the sole purpose of establishing the maximum upset limit for this Task Work Order not to exceed $78,928.00 • The COUNTY will compensate the CONSULTANT a fee of$78,928.00 for TASK(S) 1 and 2 and Expenses on a LUMP SUM Basis The hourly labor rates shown for staff reflect the Rate Schedule agreed upon and match those recently approved under Contract 19-7494. C40 168 7 Jacobs Engineering Group,inn. Contrast 19-7494 4/23/2023 ATTACHMENT A-MANIIOUR AND COST SUMMARY ESTIMATE VANDERBILT BEACH ROAD 6 LANE WIDENING(East of US 41 to Eut of Gondkne Frank Road) CHANGE ORDER NO.4-Prtvary WW1 Dnign and VBR U-Tam lAne Dragn SUMMARY FEE SHEET TASK DESCRIPTION PRDK]PAL SENIOR PROJECT MARA°. SENIOR ENGINEER ENCOMIA SENIOR DESIGNER CLERICAL TOTAL ERR TOTAL Men Harry Men Nary Mnn I HCIaIy Aim Rawly Mn- Hourly Man Horly LABOR Man Rau ban Rae hour. kw bon Rae has. Rae bona ate ;Ask A Privacy Well On.•Aoneoalmn.l.2800 I.r 0 sari Sine) I.1.Field Review and Data Limbering . s2mm 0 flttm 0 sl5>m . fl2lm 0 fl Mm 0 S62m 8 SI,316m I:-HorizonM Aka..Evelutim.Set Mpment(B®FP 0111130) 2 5..00 0 $1ttm 4 Sli7.00 12 Silo® 0 5111m 0 562m 18 S2,51600 011 4157 0020 I 0IJ-Vertul Alignment Enlum•3a Alignment(Best Fit GNimp SDm flttm 3 fillm 56200 36 51,531.00 1<•Key SMeel.(I)Sheet 0 52U6m 0 SIR1 0 f15100 I Slllm I 511lm 0 $61.03 5 59<8.00 I.S•Omwml Noe.and Pry lama•(2)SbsN 0 SAX. 0 Sil4 515m $11. flllm0 f6l.m Id $3,032m 1.6•Typical Senima•(I)N.o Typal Salton SFan•l Wall Swims 0 Sbm SI SIS]. fl2lm 51 Mm S62m )6 31,6]O.m 1]•WW1 Men an Oo0le Snot.)•(5)Shxu(2.0LF) 5 S.03 S 511im II 1157.00 a S12l00 40 $1lam 0 16200 III 515.016.00 IT•Crags Sewiau.00 Saaims•(5)Sbeeu(Nunw65eaim Pa Sea) I Slmm I flRm . 315).m li 5123.m 8 flllm 0 S6200 N 54,116.00 19-Mixeluem.0.wiy(OnwSe,bripum,Did Tewtmen.CmOlaa Arran)•fli Rlb 3 fMrtm t fIP_m II f15)m 16 Sillm 10 Si/b® 0 363.m IS 54]So.m 1.10-Rp6Fnt7 hteENibit(NO Lepl Sketch andDe.aipiae LBtt i 0 S .m 0 flm 0 f15].m S SillN 0 flll.m 0 46200 5 5904.00 1.11-Slrunwl Glmdnim.,Qs...and Cut Eaim.m. . ISO® 16 Sin® 5 515Im S fli)m 0 Silam 0 S6200 m M f5,816 I.1_-Dol.MWSwun-QNQC(PlarsOwil&Glcrinion) 4 S206.00 Slttm Sil 51I 5111m 562.03 32 51,550m Tut I Taal: lC $6.1110.00 IS 54,i55.00 65 510AI0.0E IM SII,S50.00 55 510,e22.00 0 5190.00 30 503,505.00 J.h2.VIM Westbound II-Tura Lone Dnwn II man Won _I mmoe()iMW(camho new aeWGlluuno.) 0 S2mm 0 Shim 0 5157u 2 1121m 0 311Im 0 S62m 0 f2e6.m 2.2.Mr.,SSectiw�Develop(I)New Typical Sem. 0 1205.00 0 flRm 2 5152o I 5123.m 0 5111.m 0 S62m b 6806.00 Wu 23-Summe ®y oi .,ISpe 5v,WooI-Add(2)New Smirker.(fWdtl9) 0 32mm 0 flttm 0 $IS]I.I I SI23. 0 slm o 362.m 4 3192.m 21-R.nud Rile Sheet-Rename DO)Shea 0 4216.03 2 SITim 0 515Iw 12 SID.00 0 SHIN 0 562m 14 61.820.00 2.5-Internam Detail Sheri(Dinaimel Medan Cycling•.0AIy) I S2..03 0 Sllim 5 315]tn 20 Silo® 0 5114N 0 SOON 32 5I,550m 2.6•Iheirge N000,m Shen•0.v<bp(2)Nn RnwF Suaaurn 0 SB16_m 4 ;Ittm 4 51570iI 12 3121.m 0 5111I1i 0 SOON m 62 79200 ..]Crow&aiw•(I)Revived Croat Satiau.,0 now Design 0 Flt]5m 0 flttm 0 315]m s 5123.m 0 Sllim 0 46203 5 598I00 ..e Tra.Coraol Plow-Reviaao to SEwm(:) 0 im6.m 0 shim 2 315].m 6 Slllm 0 5111nI 0 S62m 5 6105200 2.9 re end Paveme,Marline-Reams to Sheet(I) 0 SAM. 0 Shim 2 515]m 0 SI23.m 0 611a00 0 S62m 5 SI052SO 210.Qoeniitis0C]l Estimate•Rei.ionw Quentin.aN Com Otis. Pim Cornrow.) 2 S206.03 0 sifW t 515].m 6 S12300 0 SI IIGO 0 56200 12 51.]]S.00 2II•Drama.Celclwtim.•ForA.MA.M.,PeemmlMlet Spwb m S2m l Sin m ai 6 Sillm 0 5123. 0 SIII.m S62m 5 51.256.00 212.Ryes Vmsisnen•GAQC(PwuDa.il✓Calmla,0u) I 5.00 2 S1T_m 2 515Im 0 1121m 0 SIIIm 0 562.00 5 SI,48200 Tea 2 IRS: 10 a:f0.00 10 SI,TMARD le 54,71600 MISS$lEm 0 *.m 0 50.00 130 518,330.00 P.ww.11.e.ylyl Sur,•TW 1 $3.600.CO OeaaMiwl-Tea 1 13,50003 Taal Expenses SI0000 Taal Labor 571,2500 Taal Eons.. 57,000.00 Total COSt Chonge Order No.6:(Lump Sum) S78,928.00 v539_uI_ Fn_052325_RI it. C40 1687 ftI,. EEC "r SOCOTEC April 23, 2023 JACOBS Attn: Mr. Bill Gramer, P.E. 5801 Pelican Bay Boulevard, Suite 505 Naples, FL 34108 Phone: 239.431.9216 Email: Bill.Gramer@jacobs.com Subject: Expansion of Scope—Shallow Hand Augers along Sound Wall (West Section) VANDERBILT BEACH ROAD 6-LANE WIDENING (CR 862) FROM US 41 TO AIRPORT-PULLING ROAD Naples, Collier County, Florida 34108 Socotec Consulting Inc. Project Number 564-025.01 Socotec Consulting, Inc. (SOCOTEC) is presenting this Expansion of Scope proposal to address the latest request regarding the sound wall in place along the western portion of the project. The soundwall is present along the south side of the road beginning at Strada Place in the west and extending to near Goodlette Frank Road for a distance of about 3,000 feet. You have requested that we complete a series of hand augers along the wall at a spacing of about 250 feet. Soils will be collected, identified, and subjected to selected lab testing. Results of our testing will be presented in our final report along with the other work we are currently completing. We propose to complete these services for a lump sum fee of$3,500. We appreciate working with you as your geotechnical consultant and look forward to working with you on the remainder of this project. Please contact us when we may be of further assistance, or if you have any questions regarding this report. Sincerely, SOCOTEC CONSULTING, INC. Ste�VPi/. Rancier R1;cha d P L Steve M. Rancier, E.I. Richard P. Lundberg, P.E. Project Engineer Senior Principal Engineer Distribution: 1 —Addressee (via e-mail), 1 — File 2224 Ti are Center Way Naples; FL 341?9 239.514.4100-F;x 2:9.514.415 www.Socotec.us C, 140 I 6 8 7 OH N S da SINCE 1946 ENGINEERING April 23,2023 Mr.Bill Gramer,P.E.,AICP Jacobs Engineering Group 5801 Pelican Bay Boulevard Suite 505 Naples Florida,34108 Re: Change Order No.4 for Vanderbilt Beach Road 6 Lane Widening Additional Existing Wall Survey Support Services Dear Mr. Gramer: Please accept this letter as our Change Order No. 4 proposal to provide Jacobs Engineering Group (CONSULTANT)with an additional top of existing wall survey in support of the wall replacement design for the above reference project. The assumed wall limits are defined as the existing wall on the south side of Vanderbilt Beach Road (C.R. 862), between U.S. 41 to Goodlette-Frank Road, within existing Collier County maintained right-of-way. OVERVIEW JOHNSON ENGINEERING (SUB-CONSULTANT)CHANGE ORDER NO.4 SCOPE OF SERVICES: Task 1—Additional Existing Wall Topographic Survey Support Services SUB-CONSULTANT shall obtain existing top of wall elevations for an approximately 2,700 LF existing wall on the south side of Vanderbilt Beach Road(C.R.862)between U.S.41 to Goodlette-Frank Road within existing Collier County maintained right-of-way. Elevations will be obtained at 100-foot approximate intervals, or at locations where wall the existing wall alignment changes, as deemed applicable by SUB-CONSULTANT. Horizontal data will be in feet and shall be projected on the Florida State Plane Coordinate System, East Zone, NAD83(2011). Vertical data will be in feet and shall be referenced to the North American Vertical Datum of 1988 (NAVD88).The topographic survey data will be provided in a MicroStation file.No additional survey is included in this scope of services. Task 1 Fee:$3,500(LUMP SUM) FEE SUMMARY TABLE Task Description Fee Type Fee Amount 1 Additional Existing Wall Topographic Survey Support Lump Sum $3,500.00 Services Total Lump Sum $3,500.00 Thank you for the opportunity to provide professional services for this project. We sincerely appreciate this opportunity and look forward to working with you. Sincerely, JOHNSON ENGINEERING,INC. 941.41"/ Joshua J.Hildebrand,P.E.,PTOE 2350 Stanford Court.Naples,Florida 34112 (239)434-0333•Fax(239)434-9320 CAO