Parcel 261TCE Project: 51029 Golden Gate City Stormwater
Parcel: 261TCE
Folio: 35981040002
TEMPORARY CONSTRUCTION EASEMENT AGREEMENT
THIS TEMPORARY CONSTRUCTION EASEMENT AGREEMENT (hereinafter
referred to as the "Agreement") is made and entered into on this ` ' day of
, 201 -kSy and between PIERRE L. RAYMOND, a single person,
whose mailing address is PO Box 2041, Immokalee, FL 34143, (hereinafter"Owner") and
COLLIER COUNTY, a political subdivision of the State of Florida, its successors and
assigns, whose mailing address is 3299 Tamiami Trail East, do the Office of the County
Attorney, Suite 800, Naples, Florida 34112 (hereinafter "the County").
WHEREAS, the County requires a Temporary Construction Easement (hereinafter
"the Easement") over, under, upon and across the lands described in Exhibit "A"
(hereinafter "the Property"), which is attached hereto and made a part of this Agreement,
for the purpose of replacing and constructing drainage and related facilities within the
public right of way and drainage and utility easement immediately adjacent thereto,
together with the right to place, excavate, use, store, remove, and dispose of soil, trees,
landscaping and other materials and improvements as shall be required to construct said
drainage facilities; subject to the restrictions contained herein; and
WHEREAS, Owner recognizes the benefit to Owner and desires to convey the
Easement to the County for the stated purposes, on the terms and conditions set forth
herein, said terms including that no compensation shall be due and payable for the
Easement requested by County.
NOW THEREFORE, in consideration of these premises, the sum of Ten Dollars
($10.00), and other good and valuable consideration, the receipt and sufficiency of which
are hereby mutually acknowledged, it is agreed by and between the parties as follows:
1. RECITALS - All of the above RECITALS are true and correct and are hereby
expressly incorporated herein by reference as if set forth fully below, and all Exhibits
referenced herein are made a part of this Agreement.
2. CLOSING DOCUMENTS - Owner shall convey the Easement to the County, in a
form acceptable to the County and at no cost to the County, unless otherwise stated
herein. Said conveyance (Owner's delivery to the County of a properly executed
easement instrument) is hereinafter referred to as the "Closing." The County shall
pay all Easement instrument recording fees.
3. TIME IS OF THE ESSENCE - Both Owner and the County agree that time is of the
essence. Therefore, Closing shall occur within 30 days of the date of execution of
this Agreement or within 30 days of the County's receipt of a properly executed
Temporary Construction Easement, whichever is the later. This agreement shall
remain in full force and effect until Closing shall occur, until and unless it is
terminated for other cause.
4. TERM OF EASEMENT - The term of the Easement shall commence upon the
issuance of the County's official Notice to Proceed to its contractor for the
construction of Golden Gate City Stormwater Project 51029 and shall automatically
terminate one year therefrom.
5. EFFECTIVE DATE - This Agreement and the terms and provisions hereof shall be
effective as of the date this Agreement is executed by both parties and shall inure to
the benefit of and be binding upon the parties hereto and their respective heirs,
executors, personal representatives, successors, successor trustee, and/or
assignees, whenever the context so requires or admits.
6. ENTIRE AGREEMENT - Conveyance of the Easement, or any interest in the
Property, by the Owner is contingent upon no other provisions, conditions, or
premises other than those so stated herein; and this written Agreement, including all
exhibits attached hereto, shall constitute the entire agreement and understanding of
the parties, and there are no other prior or contemporaneous written or oral
agreements, undertakings, promises, warranties, or covenants not contained herein.
No modification, amendment or cancellation of this Agreement shall be of any force
or effect unless made in writing and executed and dated by both Owner and the
County.
7. SEVERABILITY - Should any part of this Agreement be found to be invalid, then
such invalid part shall be severed from the Agreement, and the remaining provisions
of this Agreement shall remain in full force and effect and not be affected by such
invalidity.
8. VENUE - This Agreement is governed and construed in accordance with the laws of
the State of Florida.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the
date first above written.
AS TO THE COUNTY:
DATED:
ATTEST:
CRYSTAL K. KINZEL, Clerk of the BOARD OF COUNT COMMISSIONERS
Circuit Court & Comptroller COLLIER COUNTY, FLORIDA
r •
BY: BY:
Attest as to Chairman's Dgputy Cler RICK LoCASTRO, Chairman
signature only
AS TO OWNER:
DATED: 0/2
/df
Witness (Signature) PIERRE L. RAYMOND
--/Z,„v-
Na r T e)
Witness (Signature)
Name (Print or Type)
Apr ved as to form and legality:
D REK D. PERRY, ESQ.
Assistant County Attorney
Last Revised 11/14/22
�2
Exhibit A
Page 1 of 1
i 1 NOTES:
TE-ROW 261 TCE 1. THIS IS NOT A BOUNDARY SURVEY, NOR IS IT INTENDED TO
BE USED AS ONE.
12/19/22 2. COORDINATES AND HORIZONTAL DATA SHOWN HEREON ARE
N89°30'47"E 6.0' IN FEET AND ARE PROJECTED ONTO THE FLORIDA STATE
PLANE COORDINATE SYSTEM, EAST ZONE, NORTH AMERICAN
r ____ _ . 12'DE& PUE 'l r-� DATUM OF 1983 (NAD63), 2011 ADJUSTMENT.
(PER PLAT) 0 3. BEARINGS SHOWN HEREON ARE BASED ON FIXING THE WEST
,�rn • LINE OF LOT 30, BLOCK 81, GOLDEN GATE UNIT 3,
6' '- WHEREIN SAID WEST LINE BEARS N00'29'13"W.
I M to
4. PARCEL CONTAINS 681 SQUARE FEET, MORE OR LESS.
I� 12' c`'>O v 5. P.O.C. = POINT OF COMMENCEMENT
- I- -cv�y 6. P.O.B. = POINT OF BEGINNING
�� co Z LLI�O cn 7. ORB = OFFICIAL RECORDS BOOK
„ ri N V DapJ 8. PG = PAGE
W 9.1
IW- d 10. DE = DRAINAGE EASEMENT
M CO <Y obi C 11. PUE = PUBLIC UTILITY EASEMENT
31 O> C. O h N 29 12.R/W = RIGHT-OF-WAY
N M W O in 13. SQ. FT. = SQUARE FEET
T O . O CO • p 14. PID = PARCEL IDENTIFICATION NUMBER
1_,O_
I N -j 0 V" Digitally
' DESCRIBED PARCEL OF LAND 0
d - signed by
E CONTAINS 678 SQ.FT.,t Mark A.
Texter
1 —J �L N8930'47 E 6.0' I_.1J L Date:
�W N00'29'131Y 6.0' IN S89°30'47"W 6.0' RAW-- R\\ 2022.12.16
13:25:49
€ P.O.C. P.O.B. -05'00'
SOUTHWEST CORNER OF 24TH PLACE SW I NOT A SURVEY
1v LOT 30, BLOCK 61,
GOLDEN GATE UNIT 3 I HEREBY CERTIFY, TO THE BEST OF MY KNOWLEDGE
AND BELIEF, THAT THE LEGAL DESCRIPTION AND
(PLAT BOOK 5, PAGE 105) a 10 20 40 ATTACHED SKETCH WERE PREPARED IN ACCORDANCE
i WITH THE APPLICABLE PROVISIONS OF CHAPTER
(INTENDED DISPLAY SCALE: 1"=40') 5J-17.05, FLORIDA ADMINISTRATIVE CODE, PURSUANT
TO CHAPTER 472, FLORIDA STATUTES.
1
DESCRIPTION
'8 R
THAT PORTION OF OF LOT 30, BLOCK 81, GOLDEN GATE UNIT 3, PLAT BOOK 5, PAGE 105 IN THE PUBLIC RECORDS
R OF COLLIER COUNTY, FLORIDA, LYING IN SECTION 27, TOWNSHIP 49 SOUTH, RANGE 26 EAST. BEING MORE K A. TEXTERFOR THE FIRM L.B.
N PARTICULARLY DESCRIBED AS FOLLOWS: MA ( 642)
COMMENCING AT THE SOUTHWEST CORNER OF SAID LOT 30, THENCE RUN N00'29'13"W ALONG THE WEST LINE PROFESSIONAL SURVEYOR AND MAPPER
OF SAID LOT 30 FOR 6.0 FEET; THENCE RUN N89'30'47"E FOR 6.0 FEET TO THE POINT OF BEGINNING. FLORIDA CERTIFICATE NO. 6392
FROM SAID POINT OF BEGINNING THENCE RUN N00'29'13"W FOR 113.0 FEET; THENCE RUN N89'30'47"E FOR DATE SIGNED:
6.0 FEET; THENCE RUN S00'29'13"E FOR 113.0 FEET; THENCE RUN S89'30'47'W FOR 6.0 FEET TO THE POINT
§ OF BEGINNING. NOT VALID WITHOUT THE SIGNATURE AND ORIGINAL
RAISED SEAL OF A FLORIDA LICENSED SURVEYOR
PARCEL OF LAND CONTAINS 681 SQUARE FEET, MORE OR LESS. AND MAPPER.
GOLDEN GATE CITY-ALIGNMENT M =nem
JOHNSON ENGINEERING, INC. SKETCH AND DESCRIPTION-PARCEL OF LAND LYING IN
2122 JOHNSON STREET LOT 30,BLOCK 81,GOLDEN GATE UNIT 3
TEMPORARY CONSTRUCTION EASEMENT FORT MYER P.O.
FORX D15503902-i55o SECTION 27,TOWNSHIP 49 SOUTH,RANGE 26 EAST
FOR STORMWATER IMPROVEMENTS PHONE: (239) 334-0046 COLLIER COUNTY,FLORIDA
COLLIER COUNTY,FLORIDA ENGINEERING FAX: (239) 334- fi42 PROJECT NO. FILE NO.12SCALE SHEET
E.B. #642 & LB. 12/12/2022 20203244-000 27-49-26 1:40 1 OF 1