Agenda 05/09/2023 Item #16A 3 (Esplanade by the Islands - Final Plat for Phase 3)16.A.3
05/09/2023
EXECUTIVE SUMMARY
This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held
on this item, all participants are required to be sworn in. Recommendation to approve for recording the final
plat of Esplanade by the Islands - Phase 3 (Application Number PL20220005192), the standard form
Construction and Maintenance Agreement and approval of the performance security in the amount of
$5,341,619.06.
OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat of
Esplanade by the Islands - Phase 3, a subdivision of lands located in Sections 18 and 19, Township 51 South, Range
27 East, Collier County, Florida, in accordance with the LDC Section 10.02.04.B.4. This procedure allows for the
Board to approve the plat and associated construction documents for construction purposes and recording purposes
concurrently.
CONSIDERATIONS: The Development Review Division of the Growth Management Department has completed
the review of the construction drawings, specifications, and final plat of Esplanade by the Islands - Phase 3. These
documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This
project is within the Marco Shores / Fiddler's Creek PUD, Ord. 84-42, as amended. All fees have been paid.
Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any
remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements,
shall be provided and accepted by the County Manager or designee and the County Attorney's Office prior to the
recording of the final plat. This procedure is in conformance with Section 10.02.04 F.2 of the Land Development
Code.
The Development Review Division recommends that the final plat of Esplanade by the Islands - Phase 3 be
approved for recording.
FISCAL IMPACT: The project cost is $4,856,017.33 (estimated) to be borne by the developer.
The cost breakdown is as follows:
a) Water & Sewer $2,164,580.00
b) Drainage, Paving, Grading $2,691,437.33
The Security amount, equal to 110% of the project cost, is $5,341,619.06
The County will realize revenues as follows:
Fund: Growth Management Fund 131
Agency: County Manager
Cost Center: 138327 -- Land Development Services
Revenue generated by this project: Total: $147,265.52
Packet Pg. 98
16.A.3
05/09/2023
The Review Fees are based on a construction estimate of $4,856,017.33 and were paid in August 2022.
The breakdown is as follows:
a)
Plat Review Fee ($1,000.00 + $5. /ac)
$ 1,585.00
b)
Construction Drawing Review Fee
Water & Sewer (.75% const. est.)
$16,234.35
c)
Drainage, Paving, Grading
(.75% const. est.)
$20,185.78
d)
Construction Inspection Fee
Water & Sewer (2.25% const. est.)
$48,703.05
e)
Drainage, Paving, Grading
(2.25% const. est.)
$60,557.34
GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities
(COA) prior to the issuance of the construction plan final approval letter and plat recordation, except when the
applicant elects to delay obtaining a COA for non-residential developments that are required to obtain approval of a
site development plan prior to the issuance of a building permit.
LEGAL CONSIDERATIONS: The applicant is requesting approval of the final subdivision plat and construction
and maintenance agreement. The Board shall consider the County Manager or designee's recommendation and
shall take evidence and testimony in regard to the final subdivision plat requirements identified in LDC sections
10.02.04 B, 10.02.04 C, and other provisions of the LDC, as well as Chapter 177, Florida Statutes. If the Board
denies or places conditions on the final subdivision plat, it shall state reasons for such denial or conditions.
In accordance with the LDC, the applicant is required to submit the final subdivision plat to the County Manager or
designee for recording within 18 months of the date of approval of the final subdivision plat by the Board.
However, following approval by the Board, but prior to recordation, the County Manager or designee may approve
minor insubstantial changes to the subdivision plat, and the Board may approve any changes that are not minor and
insubstantial.
This item has been approved as to form and legality and requires a majority vote for Board approval. -- DDP
RECOMMENDATION: To approve the final plat of Esplanade by the Islands - Phase 3 (Application Number
PL20220005192) for recording with the following stipulations:
1. Approve the amount of $5,341,619.06 as performance security for the required improvements, or such lesser
amount based on work completed, and as is approved by the Growth Management Department.
2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager or
designee:
a. To withhold Certificates of Occupancy until the required improvements have received preliminary
acceptance.
b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance
Agreement are approved and accepted by the County Attorney's Office and the Board of County
Commissioners or the County Manager or designee on behalf of the Board pursuant to Section 10.02.04
F.2 of the Land Development Code.
Prepared by: Lucia S. Martin, Project Manager I, Development Review Division
ATTACHMENT(S)
1. Location Map (PDF)
2. Plat Map (PDF)
3. Opinion of Probable Cost (PDF)
Packet Pg. 99
16.A.3
05/09/2023
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.3
Doc ID: 25063
Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a
hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording
the final plat of Esplanade by the Islands - Phase 3 (Application Number PL20220005192) approval of the standard
form Construction and Maintenance Agreement and approval of the performance security in the amount of
$5,341,619.06.
Meeting Date: 05/09/2023
Prepared by:
Title: Technician — Development Review
Name: Lucia Martin
03/24/2023 11:23 AM
Submitted by:
Title: Environmental Specialist — Growth Management and Community Development Department
Name: Jaime Cook
03/24/2023 11:23 AM
Approved By:
Review:
Growth Management and Community Development Department Diane Lynch
Engineering & Natural Resources Jack McKenna Additional Reviewer
Transportation Management Operations Support Evelyn Trimino
Operations & Regulatory Management Michael Stark Additional Reviewer
Development Review Brett Rosenblum Additional Reviewer
Growth Management and Community Development Department Jaime Cook
Growth Management and Community Development Department James C French
County Attorney's Office Derek D. Perry Level 2 Attorney Review
Corporate Compliance and Continuous Improvement Megan Gaillard
Office of Management and Budget
Office of Management and Budget
County Attorney's Office
County Manager's Office
Board of County Commissioners
Debra Windsor Level 3 OMB Gatekeeper Review
Laura Zautcke Additional Reviewer
Jeffrey A. Klatzkow Level 3 County Attorney's Office Review
Geoffrey Willig Level 4 County Manager Review
Geoffrey Willig Meeting Pending
Growth Management DepartmentCompleted
03/24/2023 12:39 PM
Completed 03/24/2023 3:02 PM
Additional Reviewer Completed
03/28/2023 9:01 AM
Completed 03/28/2023 11:02 AM
Completed 03/29/2023 12:57 PM
Division Director Completed
04/11/2023 1:07 PM
Growth Management Completed
04/11/2023 5:18 PM
Completed 04/24/2023 4:06 PM
Additional Reviewer Completed
04/24/2023 5:29 PM
Completed 04/25/2023 8:49 AM
Completed 04/27/2023 10:36 AM
Completed 04/28/2023 9:49 AM
Completed 05/01/2023 10:24 AM
05/09/2023 9:00 AM
Packet Pg. 100
0
Iq
a
(£ aseyd - spuelsl ayl Aq apeuelds3 - field IBUTA : £909Z)
°
an 11
a�
was
$
I
=aQ .
2
Q
ry
Z
W
>
>
s
5q,
is so
yrWi
zo
i£0s clod
UWSo
c
IIIIsB
Wo
III Ill
mal
I W
ry
mR
I �
a W��8
W�. ���
j J
ca— o r m a z
N
!
O
E m i J o
ovQa��
O N Z w O
J J�Q6]
-mow N�iw
HAP;
P;
OU=1O U�
W
"N0�0
Q li�2p-m
TH N
��¢r
O �
U Oio~ iHM"
dew field :1uaua40BPV
^W m�
moot
M six
19
a� o-
m6W
30 -
Woo
>gW
lips]
m
Clip g
IfT
k
�
3p oz�W
�.Ww-
>seQ�B
WSW
c hal o ¢aaa
j�m'aoW
Fg "Wa 8
k Jc=
to ° $ eR
�
IN
I�cW
y
� Wghp�oN N��o
2
2 IM6 2P4
�n ,Wa Cg,nW aa�o
Q
m I
?$a$
ego
2$>
F
g�4N
2
g
Ins
° Ig
PN
4
¢W`i
2N
W It
Ig
ie � I
W�a
jN2
icxieoo
g$
Wp
s
WW
pe
gm'
tog
e
z¢
II II
I
I lie I
lk
Ig I� �
I I I
I
IIIW
Ilic
Illy
g IW I�
�g� i
I� x
�W
li � WW ��l$� I
li � WW ��li`x
11"t —WAG z W ��aQ�� e � �� $t ag J
" 2 �`JQdI , 0 em m 1`
rr l �> xmg°W W°� as
gio ° zW coup two, W k a a aa°l
pm# WOQ �• gi �O g HAS S grog j AWW��o�$W "
s ?zW We Q� W o- -,z �§ o j AVON C
'�°O'wi
i zWg
°$ a`�W a ¢ ame° Im" W ,`ye 4 i two
�o Wr'aW`� �W"$� o � = W��;�g°gym a �� � � a qua W
tni ��x'^zaQiu' i a `S °z3
ha3 a gg°= �¢xao a �. giJ''.¢ ao Wi W $`;
o ? WW �s�W $o>g Ng e iWa
€�8 8 e o e8� W �iWWx ;e`m' W°' g8 °zJ Q R Rog
C ¢ o�z w 'c z � gW � ¢ xwWz°W$FO e °@ � $ u
e` oo$W tW 'm xWQ a> QQia ` i ssc`OgO�w N� jgz k=' `rc C;
g¢ °� 1m xx Q � w x $as � .ag Ws $
Q W iau > ° Q¢e`o oW Imo > W SW` x A$a e
W� i"zm & � " i W 4o'
� � o Q m�g° ggg� i �o oQ �gs W" � g
o m ° ¢e° ��
g °Wg U g � W � x god �gi `w � o Q�Wm3;�°o o� g a
i o$ g o >p Q m4 WeWg a W �x Q $ a@ a¢
W. Q & g m x W OWN
oW $� yz °
'a u o"i xm ` "ac g g" k ez$ i g ` _Q' WWg Q ,.zm egz
any WW s a.
zg � °", aQox � �p �'�;°` �'e�e� � $ W >,^ ��ggumeh� �` oN
a�`c>W,z� z s oW a�� W 2 .�aa i` ;
I Raley i 2 g W 0gmo W a^ iW �cWi 2 M
�� � i� �ox W � �`o°°`a\W J §
W§ .°U o_I a r; �`'y g�$mw � u W `�' WmeW>$o°d � `� 2' ag �z � WWI
WQ4� W �W o 2 W e ,� x 61� ' zm2Wg o Q i W ¢$8 h�, x ug u aW `W? W "o�
out ° N WE ae W W$° $ gzg 'lea, U W x` � , zS 9 .a � �¢W
'a W� o W a fat, wag, wa g, 1z g i Wg°�Wa�aC '� �^° T
W � 010
Q`g �gi � WgW,` wi �Q �e a� `Wz
>`
..W24 4 W �a o°w w ewe � � ��u ��mo
of ` °g2m 2>eOCa h 2'
�mg3q �� M� .a s g O cy�iQa J U a W U 3 �
W x,W e g °a 4 w ° ado: �g oo �g Q W mw mgou> og`z � �� VIE
g vgY=� e° � !? >�^� igz � $o hQ i QF x
$ Gz°` W°'4 � i" �e�z W��W � a� m
e`=k W$ i ��' Wa° 4ew� mWc � o� Q
o doe $ O 8z �^ ez a ° am u $ Wt ui Q gsw
g'^g wiz ei eim �i 3SWW z a$'$WY�, W °a ¢z g� eiemi¢
g O P `C a k i N u �a a o g y`x We uk �a ¢ Ja
aa°i o `er Qz ¢z o aNO :¢ O� 3Q Wa �' Wp H x�
M ¢ ¢ & a$W M`s e ha m 3iecWg woWm° ti ¢� aW M ai eai iW W W en v° _n. NW8 aoi hW
c/i
to
r
x
0
0
m
d
Pa.
(£ aseyd - spuelsl eqj Aq opeuelds3 - leld leU1d
IL I¢Q o
"S
� M zo��
�ti J6
W I W m 3
ti iCZ o
P Z jQrr(ioO
o
VJ WOO�aZN:z
m h 0 W O
U ? W ? cc)Q W W O U
r� WO W cr
U0 2 O
r� W ti J
W J C) m
RN 22 tin
Q W
£905Z) deal field :luaua43ePV
npngm
�O
Y�
o / UNPCATTEO
\\
__-_-- BCB � 'NUNPLATI£0
E. LINE C
SECRON rB-SI-2> / � �m sECnCN r9-51 £2J 4 /
/ /
/
/
/
W
/i
/
W
/
IN
/
N /
W
//
I
~ w
i
LU
LU
/co
1n"
\\
/
w
w
\
♦ //
LU
F-
w
TRACT 'LEI, 74°
�N e
. LINE OF THE S.W. i(p d vn' ^ �'1 'WE. LINE OP ]HE N.W.
/� � sccnav re-sr-z>w e^ o ,n e � � Nm laP sccnoN rs-sr-zi . s?
= 3/Jy� b y19� Ga
to m
d� ¢ W m. . aTMCTe°LEi-24" e
�'
zb 3S
oa
Mil
IS
V
8�o
^
i
=W
n i W 3
a ou gwa�w ao
�WZe
W2J
O
n
tea,
e
N
r=n
a R
P
g
AI�pNI
OJ
2W
j W01cZi2
���
R" �� ��° �iryo
io3 'yiWW OWR W
6"'Q
�iW
C5
00R0Q2�W.U40¢�J��J V2U4�- ®°
CIA
TRACT °4EI-23°
k
2
J
rl)
E
P.
Bill
I
20'TLA.E
OF 5568, PG 384]�
M
Z
BELLA 7ESORO
AN ESPLANADE COMMUNITY - PHASE 1
"LEI-20"
L365
I
Y
TRACT
(fi KL; L.M.EI
c356 a
L<
65.92
m
SO 63.92
L350
O
' ^
�
SFFJ ZiFJ CS43
2
�5 n
I 6
L]3 04'46'34" W
N
C.id9— 33
C25 21.66
I
O Z Q
ZLJ L28
TRACT
$ LJ4 L36 J
3AIHD NINNI (R.O.W,A.E,LE.C. U.E,PU E.&0E) L64 SS `
Lii lL�
s�
— LEFJ _OPE,] L745—
I
7
2
J5'
(n Q
z �
2
2
15.0' D.E. CS61
J9.J0' J83b, Z� OG J V 61.05' L
7^
U
W BfFJ 6Ff C346 C34J 1354
L7 L6
Z C10
}
_�BELLA
TESORO
¢ AN ESPLANADE COMMUNITY - PHASE 2 REPLAT
NONEXCLU8ll2 ND.E
OR. 5568, PG 386]
TWT J y Q p
e U
g l TRACT "LE7)
( A
N
= m
(PBXX PCSEXX) 20' -A.E
0.R 5568, PC.
S84] J
—
m
— — — — — — —
— — — — — — — — — —
Q O J
W o Z
UNPL A T IED
MM>
c -
-off
TESOROTr . PHASE I
� W U
BELLA
oO.
ESPL "L�
U
AN TRACT
(LAK pG5 32
6J.
L312 CJ13
C4 N
4
_TURIN DRIVE
'AC2 E.) 069 Jr34Z
rPpL c E p.0 ' 304-
d
1�� 41� L308 L309 9[fJ
/ cat➢ L29y C77
2
,'a�sh�h3hhae��N�
�heeo
om^Pm��hP
th
222�
z hum
h�h�ea�
O.0'c
CSC Gti
L2g6
_ — —r OLD W
Z
BELLA TESORO J
AN ESPLANADE COMMUNITY - PHASE 2 REPLAT =
/ )�� \es'.
/
TRACT "LEI-ZS' I U
(LAKE, L.M.E.) H
/ /
p
NONEXCLUBIV£ N.O.£
O.R 5568, PG 3B6]
C'a XX I— XX) <
5568, PG. 3847
_
\6
¢W2C�ek
UNPLA TTED
X�
mQ�bQbCm
U
1
ai
x
o .wp
p Ld
P
O =
W V)
E-F
6
a
a
(£ aseyd - spuelsl ay; Aq opeuelds3 - leld leU1d £9O5Z)
deal leld :IuGwg3elIv
s
n�L u
Qo
��
9ti
p� O <-
m
N p525�
po;NP
W 3wwwwW3wWwwwwwww
hh
vi,P
A
NN�v
n�m
TU2
22222222222
8�erye"
Bq.
s3
&amaaonMMa;�q
�J
;�g�p�MON�m��^�Mgg�Me
a
g$o$oo$$$$g$8g88$$$
N
W_0
0
m gge�g8888nnryn
lW3WW3W
a wNbhhaghn�Nb
W3WWwWW
bm'.
e. '.�lAwNl7i
f�i��r
ohNa
I
„�AP
NS
-4-m
�MMa
M� �oMhm
2222
2
`ko°jo
4 I
mom
�
1`___ 15 �
1�
�'3�9
�yeaohoea,:f�iN
H°ja
rvoM;
W
\�
�p229
000
o9i
J
�
_ _!t7
W33WWwWWW3WW3W
¢H � �f
I
`3WW
Z6
IR
ag=MMwao]_a
�bf
[pi P.�"Nn
f`fl�Phnl�l�
NN
I
22m�n222m22222222
z
~��
R��
m88'_
87
m i' 6Z'405
Zro;ahvhewm�e
U
ONtlNtll
IQ
«v!
.os'£91orez
zn
l'3l)
,6'{370 �
SELLA TESORO
AN ESPLANADE COMMUNITY - PHASE I
(P.S.. 67,, PGS. 32-54
(£ aseyd - spuelsl eqj Aq apeuelds3 - leld leUl= £909Z) deW leld :luauayaelly
M
hPPr"P"\P'? - "PAPA
nW\-"Sm
h����e��������������
@o
�22222222222222222222222222222===2222222222222222 22222222222222222222222222222222222222222222UZw
rd
�amNh
-
^n
^
��=-h•-"hh;-,
h
��
W='6
5<U6
Jm�.Nah3M<^;am�s�
p3"
k�
K.
^�"maaagg.aa.M
_M.M
ea"geongmIn
R�NN��
R;H�N$"°:ryonnM�MMM^^ryHne„M:
S�MMMhM°a
m
".'o_mMnn"�;
n
ZZ om Q
'-
�
=o"agYgi�me�$y�
eao�R$nn5m8Hh��_8o_o$�NouM8��P
M81n�.=g$n8avo8uar$m�Ng8
�Ogo�o$q:$^„$mh$e
g$^$ro_
oN8�B$h_s
�hv
Rf�$nf�$oAh8,n`:Oi
8.c:Oi8N�&g.$mRr<A�Rr�
�-
(,Q6�j.
(n
_
n
r�$R�mRf�$�rrohRr�2
F
$K$YKAgQY$�1
ah$Nhom_$
a"�r-$>-�$N_'$�e_
$''$w$�5gn$;��$O�
$mngaH$p�8a&oM$%'�ggeNno_�
hfmh=e$hfro$nrrohN�ehnfm$Hfw$N�roNf�$Hr.
$Rfro$2
$8YgI�hg$9:in$�n$
.
�3��������m��ah.""^""gao3
uu
uuu
G&G
mm�aa�a^"�RMRnM^MRMMMMM
Guu'Guu'Gcp',u
"N"
"
gR<aeRgg�@ag<
<
O�-L33HS 33S
I
Zl HDlY=
�~ I II WWW
Z pyeN rvn^°innh,�=o,��i
—
3 3�
I II
h
OO � W II ��nh^vwh
,.�i fo+�s
e c\040 '�'s1'
NNN CNN Nn
Q� U
4 I �22222222222222
2"y 4
J
I
Q Lu'q
2 ah
as
m
W
amtr oopa
"c'cca�
o U z W
W h anKK�Nro
�onufK�Nm
J
mmmmo
I .osF �
(n I
W
I W
N J O rc"enmmoNa
W
CL ILL
M
con
�<
3NV7 V1S3IH1
p ''
W ^^� ryy9
Ww w3Ww;;wwWWw
$ I�nnfv
J W
�
WW
K2
°� �Oj
22222222222
UOQ R 2
�
>• F� W -• U�
OJ K
-. yti
Q J O WJ� ���� W
FY. I �a j�hm,�mhn
riv{K6K KNK
Q x�
•J � Q IOOm �Wpp
q
W O Q
O I W v 4
..� W
O
U�WU m'ca,Q
7 _
IQ-
m
I �w
I
J U W .6Z'405
m
S44
J
,L4.SS.LZ
'o
I
^) U UJ �O91J 1 96f -sbf
jp05 Q
O
^ I ~ bG tJ 904 506 I n IW
¢ I Q 9440 1 O40
U1 � sZ4J pZ90 Lf40 I L ;06 _ a 2
G\I! / I I
g Noh�jnu0i�n"� =I
�P
ZI - ��
�BJ
'15, 6040 y 5T
OW gti% C�S I
14 BJ
RZO
�0 YL4 seJ 133N1S OI8011IA e
I
_
G.ogos
N
BELLA TESORO
AN ESPLANADE COMMUNITY - PHASE
7
(PS.. 6], PCS 32-54
(£ aseyd - spuelsl eqj Aq apeuelds3 - leld leui=l : £9O5Z) deW leld :luauayaePv
a wow
a �w
z MCA o�
" Q
ZO
_ 2oi oa
Wo�JOm
M V) N
�m
6
a
a
l 133HSS33 = —3NII H3=yW
M = I -T
U
W
O �
J 2 z n
1(A�ClW--1' W to �s oSF G6a
OOZJ
O W ry M s
OyJ ~
W QUZ � Iw
�o2Q
pe w w
h ' Ou QC N
ti
J C� V) OLSJ
N W O w I ~� Z959 695g o
V) m ~ I ,9FB<[ 3 „<O,HQSF N ZIZJ p9SJ
L49J 945J
= 1� roszs ,orzs ,ozzs cFSJ o4sJ o _ E
v) C
W M Z p I- 4 o'sl-o m o e
U W 00 w NN- go _o _m. a
I� O�Q~� N �Ihhv .K$u°JiB�$ m N$ a e=�
Z ti W of w
>= w 91
Z
\�/ Z II essJ ' S n
QO Q .OZ2S w'Z� �ZZS •L9BLSJ lbS� 945� --6450 ('34 - �EdaOZ 0 Li
ru >. Q) W o� ,Bo'Fzz-3.Lo:BaeF H - - - [4n 3Ntl-I V1S3TH1 , LSw \
m ~ Z o o .Lzrsl ellJ s ss�JsJ d
W J U c .�z'zs Wiz£ ,qz N Ltd zbsJ SbS� s- / o �\
,ITT 2 ti 2 W w
i�GQ Ww ego �$ $whg eg d. o$1n 8.�^�amr�/�
/-�/1
L,I"� yV = 2 S,SJ 595J L{ZO
IN
1 W U QW b<] 30
� \ ,OZ'LS ,OZ'ZS ,OZZS '<99FSJ F45J 94SJ l91ZJ
�'
~ W
WOZ � m Q �tig 330o%c"`5tt h`' �gpmN 3WWW WWw
U v=i
J Q I"30O1 o �/` K a�O M=."
W Z p05g2 bzzJ v6gJ 56"G /� -- ---M^m 'm �^o
SZZG LL9J 984J L89 � po'S'J a W h h 2 2 2 2 2 2 2 2 2
`a8a88888
J 1- IOZ 9ZZJ 699J 6 ¢ $ $ e e m
W h0 09aJ 94J
qtl
v e `I —azsJ —
(� �5L 601J aa7
e
I i499 (3'o8a'n'd"3:nJLgVyL _11 S. 888
z�ES. 1JVN1 o!{J Zo� .dos
bB9
,SF'F9 o S �0lJ _ �0� �
Jsl oze OT VO
64,
Gy6 9 ry 90lJ 991'-J� 3 to / /
M
�orysss�9sa �� TrstJ 1 ' o N '�'�, 8 � oWi gbyi / 5E1
I3.00fN N $ n S to o' M = 069Ji -469 v / �f " 1
SESM�ptiP,G�y�l
��' t7 _ iO I fLgJ 9L40 $4J P ptt`S PEG. 6
/ e z 9
10
l �m / 9�J SriJ B 0 0 � �Po4•pSg g5ys9 PG
�IyO 619 G,E3 gl� <SbJ bLID BELLA OMMNNOiY PHASE l U �P� lQ l\nA
1,Lj' a'o AN ESPLAN L� PCs 326. ¢ W P
h O W 7RA AKE. f M' 5a \
G
�NN$N.
;",$='M�oMhnMon��MooM�h.NBMhp�aB�M$�Mo��oH,"<ManMM;aBo�-MM^aM4��hghhooh
°ge
�7M
��pQP���abm„NNt�
o�Hpa
n���
-N�f
aP
Pn
.
��a
"mtitioKoo
HtieoKeo
Fim"+_�baN"^hNN"MM�88"m""85'NNM""�^Nb'"'�'hNN-°"a°'*NhNMM'b^"<'�RNmNN„jeb'°'^NN"�'aNb
a�nn�n88nnNu,N,-m.-mnmmnn
m8
8$��
mgmh
m3
may'
ABM
M��r�ry�a�n
n�
a�nM$�M
-
q�n�ry
m"ggm�aymomMa<ee<;
�Nape
PCKiN
hyylp�yi
n,�NiNYY^
PNI^�Y�,�i,�mi
Sv 5^ve
aP{m�h
nhN
M>Yhhfln,v�rah
�pf^vPp�ya
r-f
Pb �{^h
hhh
Sbv %KiN�m
�'O
r-r�rmh
a$$$o80$$$$$$$$$$$$$&aogg8ggg8$gg&$g$$$$$$$$$0o$$8$B88$g8$$$$g$$8o$ogo8$$$$$$$$$$$$$$$$$$$$$$
hnghh�he6
eery
���n��:h��nN�ne°vn�N�nnH���o
N nhn
6�K
KKK
mnn
KKK
K
KK�K�K
KnK
nnK
nKK
nKn
nbK
nn
n
h�abhn-�,o�nu�N�h�8H8n8un
�o'oo
Soo
uooF'ioc^�oa
000
oou
bou
u�m&'So
SGSG
GGvGSSGIIv'oo
cN,�uu�u
Guu��u�u�uuu
gwwwwwwwwwwwwwWW33wwwwwww
:$:':HrMMNm3°,.m,�m,nFn3nM3MMMM°,°M'M
wWwww
�ofR
�m���e
�Y�e
ePP
PPr��9�uuu'
g�hMNNKMNNNN_c--88887�"KMM"""�M
�zzzzzzzzzzzzzzz
zzzzz
zzz
zzz
zzz
EN�n
-NmbmK
��N
h38a�e
e8
�yF
nmHme$e���8an
h<h
<heXeh
Vo�b
,'.Nf^vBP�
?$$$8$$$o$$$a$$o8$$a$$88$$$$8$8
O
¢`ggnhmbN
KKbK„�o��ii
-^�inmsi�R�=o
,Qp
w`�'�giNN;oa
NnNb
bNnn
wma
o;;
�7°je$e�"$�mmamm
m
oPa
Nh�Phh
n�$NNn,^^�rvhe
emmfr
z
ixxzz
�xxxizxxzzxzxz
zix
dnebheh88hnKK�:��:°hh&��&hh
nnEw
iv it
ErMn
��ee�e�c"iu�v"iyh^n�nu�b�Uvbih�hh
1E asegd - spue151 aq} nq up
w an�ns<; aa> raa.
aoo„h MM
a,xemsommssaa--- ^ �P,a _'M' =
==z=z=z==zzzzzzzzzzzzz= = z = zzzzzzzzz =
-R
4�
�ee�
Ma
he
�
N 'aa$me�mM��M
amo
a�m
„maMMe�Mame�eena
m�a
,N•mN�
NmgmmN�b
ee
nMo
R
N�ed��m
omMA�
r��r
g� h
N�hh
�$osa
oggN
s"mhrkoa�m"obbs
kn"mam"oboao
k"mgb�oa0ei�o0sO�momabo
o<mgN
-NsM.
anaRaao�ma�m
o
oM
yEwl
�e
«g
aanaN
��NNmNmu
a"r_hb
m�
roo.boo,
brb
rb
rm"�"�r"m�r
IZ
O �
m Uti
J W
x
Uj
N W O ^
cNQ
/
con
u
/I\
�OcpOZ
w
J '
Qi
W DOJO
OQ U U
—fdSJ— m�sT
1'4�u
UZc�i'O
z, M
mw
664J
OOSJ L "
Q
m
T
O
FZ7
euelds3 - field leU1d £905Z) deal field :Iuaua43BPV
n?L
NO
_
ZL 133HS 33
W33
=ZOZJ olAt
(10' ; obsi sJ
zsJ eg
'
'
A
co 11
rR$ta5
E
•°8
\ Eb .S$ �a os�OatSN �Z
b P6SJ 2
BS
11,6
p+ 9
• b p8.
b C1249 u$YQ
O� q�y.
8
11
s' IN, o .
a
as �•v � 0,d �
d
ttSJ "ply �1 +
� v \
r��
� aoo 0 3
t
vo rr 3 0� 2
bah
r % rym 9s `•
c�-
_ra�.1 0.0.
00
3 ? h N H
N �m �m tI
vwi
Q O Q
rc
\ 3aZs `' �rh ryo ZrJ
\
�FA
ego
Id
� tFs
—249
—
ryryy`
\
`w
w<��<ao<«
w
W3www
www
�a�gMhaa3h�0000�5ooa<oNnMn=o
www3W
33ww3wwWww3ww
WwW
ww
333
m5t.a^OrP°Be�rey
oHo
�oh
dery
en"'n5
�'
mono
�zzzzzzzzzzzzzzzzzzzz
nT-'�..^e
:=?mNy2°':
aZ��NH�h
aM<
nN^aa�
e�h��amNa�
Qom
w
NN:ney�A
hhN
N.�Ni,uNi��PY�iMA
AY�:n
PY�NYNiM�NPN
hh��
rypA
Na��sMaNNaa���N���aa_Naa��a���NNm�e�nma
°ogo
o8o
08$$�ogo
a8o8$$$$ooks$o88g88o
�mo9�nn8mN�o&NNN��y�€i8N""^�&nna���N�n�
N
-nmmb-Nbn�"
G
M
� a
Srm$s 5
82'2,ryryy I
1AiO
^<.^.^«
MhpNh.Nn'n
v'+smvn�RHH�P
�zz
iii
zzzzzz
xxzzzzzzzz
���a�a<N'NN�aNnN�mo��4�
MM aMe
oOem
hgPP
N gihN
nCNiPN
=oaaa
aa$,2,2,8
aaga
RNOR*$e"
e�
�SNo$"g$22-N,.
��B
n
S68
"bnmm
�ww
wwWwwww
www
WW
m
,vi��Phh,^�i
Y1�Y{fe
Phrvh
__
b�Ne�"NON
hmN^"
U�SnvwNeRh
^8.d8
�
h ERR
h h n
NtreaoaS+N�
$$o$0Wl
0$$08$$$a
a'a a
n�n�„noBM
h8h
�NM<m
mm$
q
�
0
&�M- Mq
. . . . , . ..., .. .. , ,,
��������������������������������������� •�\\
s»i
i
aN�2;MM�
MATCH LINE SEE SHEET 14
F
U 20' T.C—
/
R w O.F. 6668, PC
Q/
C2p5
�2�
M
Q
ca
(£ aseyd - spuelsl ayl Aq apeuelds3 - field IBU1A £905Z)
deW field :Iuaua40ejjd
W
a48
w�
o�oPi �
9g o P M1ti .
LN
arta�
E
h
ry
�
Iw
3
N
N
� 4E
o
o�
�
w
wo
y:
N
MATCHLINE SEE SHEET 4
(£ aseyd - spuelsl ayl Aq apeuelds3 - field IBU1A £9O5Z) deW field :Iuaua40ejjd
O w
N �l 133HS 33S N ..
=NI� HOIM
s
Q W o
0
2 2 O w
O R CW NI
aw�N W
cn
NI
U
U W O O
I � v
ti O N w
Ql � tiz] w
W Qoo zl
O W a U U I
rn ��az 21Ld
I
W
N it W Q
LN D J I
J 6I
m Iz
Q� Q
�QI
Qa �
IW S9]
S
NI I W
q
1'
JIrcv. OW�'p^ Wh 1 Vx-
�d, Oe4n 1 R`J' I 1 ~ W�
�`o Z�
W
gm � 111� I U2
QW
_ � W
S 133HS 33S
3NIl HDiVW —
-q
(£ aseyd - spuelsl ayl Aq apeuelds3 - field IBU1A £909Z)
deW field :Iuaua40ejjd
Ci
w; wNYm
/
€�Qm
x
O
w
J
o
E
d
0..
£l 133HS 33S
3WH3IVW
e W
o
2 2
QW
Ld
o w ? N
i
Vl
VII
Nwo�
W m m Lo
wl \
w
e
r � �
u
o
Qom
\
W QUO
I
N , W
U �vWiO
I
\
W U
W
I
\
�
Qa
I
\
I
�lU
\
`r1
I
\ �
I�
� 133HS 33S�
3NIl
H7VW
-q
(£ aseyd - spuelsl ayl Aq apeuelds3 - field IBU1A £905Z)
deW field :Iuaua40ejjd
Ci
ca
aCE
x LLJ
mom=
�
Q �
U Q J C9
Vl � L h ti
U
N W O
ti W
U W O O
uvl � Q U
Z �
W Q O O
O W R U U
�Z ti?vW
Q
WW
/
U
Z � O
U
CL p
\ o
I Co
/9l
I
/
Qp
PSGd69/ �
/
3 /
¢w
"°P /
�\
w
�
ZL
J
/
I
/
l l BINS
a
33S
_
3NIl HS1VW
4's
Z6 133HS
3Nn HD1HW
M
Q
ca
I
x
o
~
w
o
w
=
�
a
I
�I
w
M
iz
wl
WI
r/1
ti U
0
COO
Z
z
Nwo�
�I
�
Wm=`�
U W O O
=Qyo¢o
ON
W ¢Oo
O W a U U
I
ID
W �
� O
J�
v
U
U 2 vWi O
J
v V
Q � ¢
V1rTl
� �
w
¢ a
(£ aseyd - spuelsl ayl Aq apeuelds3 - field IBU1A : £905Z) deW field :Iuaua40BPV
16.A.3.c
ESPLANADE BY THE ISLANDS PHASE 3
PPL
Rev02
February 3, 2023
Total
Wastewater $1,436,976.05
Potable Water $727,604.00
SUBTOTAL = $2,164,580.00
$22,113.00
Paving $1,463,668.33
Drainage $930,656.00
Lighting $100,000.00
Landscape $175,000.00
SUBTOTAL =
$2,691,437.33
TOTAL =
$4,856,017.33
10% O&M =
$485,601.73
W D TOTAL =
55341.619.06
1) Notes:
2) This Opinion of Probable Cost (OPC) shall be used for permitting purposes only.
3) This OPC is based on the engineer's understanding of the current rules, regulations, ordinances, and construction costs in effect on the
date of this document. Interpretations of these construction costs may affect this OPC, and may require adjustments to delete,
decrease, or increase portions of this OPC.
All costs provided in this OPC are based on recent contract prices, or the engineer's latest known unit costs. These costs cannot be
Nicholas R. Walters State of Florida
Professional Engineer, License No.
94383
This item has been digitally signed
and sealed by Nicholas R. Walters,
P.E., on 3/24/2023.
Printed copies of this document are
not considered signed and sealed
and the signature must be verified
on any electronic copies.
Digitally
Nicholas R. Walters, P.E. o�°�EriS�rF'''
F
srg�°red by
Nicholas
_ _
94383
=* *-
Walters
STATE OF
%9oo`.F<ORIOP..��"c
Date:
Date FS. ONAL ENG '
2023.03.24
IIM
Florida License # 94383
10:38:46-04'00'
COA #8636
a
Packet Pg. 116
16.A.3.c
Item # Description EstimatedUnit Unit Price Amount
Quantity
Vittorio Street
WW-1
8" PVC Sanitary Sewer SDR-26 (0-6')
377
LF
$26.00
$9,802.00
WW-2
8" PVC Sanitary Sewer SDR-26 (6-8')
439
LF
$33.00
$14,487.00
WW-3
8" PVC Sanitary Sewer SDR-26 (8-10')
435
LF
$38.00
$16,530.00
WW-4
8" PVC Sanitary Sewer SDR-26 (10-12')
39
LF
$43.00
$1,677.00
WW-5
4' Manhole (0-6')
2
EA
$5,200.00
$10,400.00
WW-6
4' Manhole (6-8')
1
EA
$6,300.00
$6,300.00
WW-7
4' Manhole (8-10')
3
EA
$7,300.00
$21,900.00
WW-8
6" Double PVC Sewer Service
22
EA
$1,200.00
$26,400.00
WW-9
6" Single PVC Sewer Service
5
EA
$900.00
$4,500.00
Television Inspection
1,290
LF
$5.00
$6,450.00
SUBTOTAL =
$118,446.00
Barcis Drive
WW-10
8" PVC Sanitary Sewer SDR-26 (10-12')
44
LF
$43.00
$1,892.00
WW-11
4' Manhole (10-12')
1
EA
$8,800.00
$8,800.00
WW-12
6" PVC Force Main (C900, DR-18)
1,152
LF
$25.00
$28,800.00
WW-13
6" PVC Force Main (C900, DR-14)
83
LF
$28.00
$2,324.00
WW-14
Television Inspection
44
LF
$5.00
$220.00
SUBTOTAL =
$42,036.00
Cassio Way
8" PVC Sanitary Sewer SDR-26 (0-6')
469
LF
$26.00
$12,194.00
WW-15
8" PVC Sanitary Sewer SDR-26 (6-8')
599
LF
$33.00
$19,767.00
WW-16
8" PVC Sanitary Sewer SDR-26 (8-10')
249
LF
$38.00
$9,462.00
WW-17
8" PVC Sanitary Sewer SDR-26 (10-12')
257
LF
$43.00
$11,051.00
WW-18
4' Manhole (0-6')
3
EA
$5,200.00
$15,600.00
WW-19
4' Manhole (6-8')
2
EA
$6,300.00
$12,600.00
WW-20
4' Manhole (8-10')
1
EA
$7,300.00
$7,300.00
WW-21
4' Manhole (10-12')
3
EA
$8,800.00
$26,400.00
WW-22
6" Double PVC Sewer Service
13
EA
$1,200.00
$15,600.00
WW-23
6" Single PVC Sewer Service
7
EA
$900.00
$6,300.00
WW-24
Television Inspection
1,574
LF
$5.00
$7,870.00
WW-25
4" PVC Force Main (C900, DR-14)
88
LF
$23.00
$2,024.00
WW-26
4" PVC Force Main (C900, DR-18)
1,641
LF
$20.00
$32,820.00
SUBTOTAL =
$178,988.00
Turin Drive
WW-27
8" PVC Sanitary Sewer SDR-26 (0-6')
250
LF
$26.00
$6,500.00
WW-28
8" PVC Sanitary Sewer SDR-26 (6-8')
289
LF
$33.00
$9,537.00
WW-29
8" PVC Sanitary Sewer SDR-26 (8-10')
489
LF
$38.00
$18,582.00
WW-30
8" PVC Sanitary Sewer SDR-26 (10-12')
542
LF
$43.00
$23,306.00
WW-31
8" PVC Sanitary Sewer SDR-26 (12-14')
46
LF
$48.00
$2,208.00
WW-32
4' Manhole (0-6')
3
EA
$5,200.00
$15,600.00
WW-33
4' Manhole (6-8')
2
EA
$6,300.00
$12,600.00
WW-34
4' Manhole (8-10')
3
EA
$7,300.00
$21,900.00
WW-35
6" Double PVC Sewer Service
16
EA
$1,200.00
$19,200.00
WW-36
6" Single PVC Sewer Service
9
EA
$900.00
$8,100.00
WW-37
Television Inspection
1,616
LF
$5.00
$8,080.00
SUBTOTAL =
$145,613.00
Trieste Lane
WW-38 8" PVC Sanitary Sewer SDR-26 (0-6') 906 LF $26.00 $23,556.00
Packet Pg. 117
16.A.3.c
WW-39
8" PVC Sanitary Sewer SDR-26 (6-8')
718
LF
$33.00
$23,694.00
WW-40
8" PVC Sanitary Sewer SDR-26 (8-10')
774
LF
$38.00
$29,412.00
WW-41
8" PVC Sanitary Sewer SDR-26 (10-12')
445
LF
$43.00
$19,135.00
WW-42
8" PVC Sanitary Sewer SDR-26 (12-14')
335
LF
$48.00
$16,080.00
WW-43
4' Manhole (0-6')
3
EA
$5,200.00
$15,600.00
WW-44
4' Manhole (6-8')
6
EA
$6,300.00
$37,800.00
WW-45
4' Manhole (8-10')
4
EA
$7,300.00
$29,200.00
WW-46
4' Manhole (10-12')
2
EA
$8,800.00
$17,600.00
WW-47
4' Manhole (12-14')
3
EA
$9,900.00
$29,700.00
WW-48
6" Double PVC Sewer Service
29
EA
$1,200.00
$34,800.00
WW-49
6" Single PVC Sewer Service
17
EA
$900.00
$15,300.00
WW-50
Television Inspection
3,178
LF
$5.00
$15,890.00
WW-51
4" PVC Force Main (C900, DR-18)
278
LF
$20.00
$5,560.00
WW-52
4" PVC Force Main (C900, DR-14)
36
LF
$23.00
$828.00
WW-53
Pump Station
1
LS
$406,457.00
$406,457.00
SUBTOTAL =
$720,612.00
Mazzini Street
WW-54
8" PVC Sanitary Sewer SDR-26 (6-8')
404
LF
$33.00
$13,332.00
WW-55
8" PVC Sanitary Sewer SDR-26 (8-10')
140
LF
$38.00
$5,320.00
WW-56
4' Manhole (6-8')
2
EA
$6,300.00
$12,600.00
WW-57
4' Manhole (8-10')
1
EA
$7,300.00
$7,300.00
WW-58
4' Manhole (10-12')
1
EA
$8,800.00
$8,800.00
WW-59
6" Double PVC Sewer Service
6
EA
$1,200.00
$7,200.00
WW-60
6" Single PVC Sewer Service
5
EA
$900.00
$4,500.00
WW-61
Television Inspection
544
LF
$5.00
$2,720.00
SUBTOTAL =
$61,772.00
Derna Street
WW-62
8" PVC Sanitary Sewer SDR-26 (0-6')
355
LF
$26.00
$9,230.00
WW-63
8" PVC Sanitary Sewer SDR-26 (6-8')
372
LF
$33.00
$12,276.00
WW-64
4' Manhole (0-6')
3
EA
$5,200.00
$15,600.00
WW-65
4' Manhole (6-8')
2
EA
$6,300.00
$12,600.00
WW-66
6" Double PVC Sewer Service
8
EA
$1,200.00
$9,600.00
WW-67
6" Single PVC Sewer Service
8
EA
$900.00
$7,200.00
WW-68
Television Inspection
727
LF
$5.00
$3,635.00
SUBTOTAL =
$70,141.00
Cortina Street
WW-69
8" PVC Sanitary Sewer SDR-26 (0-6')
354
LF
$26.00
$9,204.00
WW-70
8" PVC Sanitary Sewer SDR-26 (6-8')
448
LF
$33.00
$14,784.00
WW-71
8" PVC Sanitary Sewer SDR-26 (8-10')
82
LF
$38.00
$3,116.00
WW-72
4' Manhole (0-6')
2
EA
$5,200.00
$10,400.00
WW-73
4' Manhole (6-8')
2
EA
$6,300.00
$12,600.00
WW-74
4' Manhole (10-12')
1
EA
$8,800.00
$8,800.00
WW-75
6" Double PVC Sewer Service
10
EA
$1,200.00
$12,000.00
WW-76
6" Single PVC Sewer Service
6
EA
$900.00
$5,400.00
WW-77
Television Inspection
884
LF
$5.00
$4,420.00
SUBTOTAL =
$80,724.00
Gavello Street
WW-78
8" PVC Sanitary Sewer SDR-26 (0-6')
124
LF
$26.00
$3,224.00
WW-79
4' Manhole (6-8')
1
EA
$6,300.00
$6,300.00
WW-80
4' Manhole (8-10')
1
EA
$7,300.00
$7,300.00
WW-81
6" Double PVC Sewer Service
1
EA
$1,200.00
$1,200.00
WW-82
Television Inspection
124
LF
$5.00
$620.00
SUBTOTAL =
$18,644.00
TOTAL = $1,436,976.00
Packet Pg. 118
16.A.3.c
EstimatedUnit
Item #
Description
Unit Price
Amount
Quantity
Barcis Drive
PW-1
8" PVC Water Main (C900, DR-14)
107
LF
$30.00
$3,210.00
PW-2
8" PVC Water Main (C900, DR-18)
880
LF
$28.00
$24,640.00
PW-3
10" PVC Water Main (C900, DR-18)
64
LF
$35.00
$2,240.00
PW-4
12" PVC Water Main (C900, DR-18)
341
LF
$40.00
$13,640.00
PW-5
12" PVC Water Main (C900, DR-14)
46
LF
$43.00
$1,978.00
PW-6
12" Gate Valve
3
EA
$3,000.00
$9,000.00
PW-7
8" Gate Valve
5
EA
$2,000.00
$10,000.00
PW-8
Temporary Blow -Off
2
EA
$2,500.00
$5,000.00
PW-9
Fire Hydrant, Complete
4
EA
$5,000.00
$20,000.00
PW-10
Connect to Existing
1
EA
$2,500.00
$2,500.00
SUBTOTAL =
$92,208.00
Vittorio Street
PW-11
8" PVC Water Main (C900, DR-14)
32
LF
$30.00
$960.00
PW-11
8" PVC Water Main (C900, DR-18)
1,307
LF
$28.00
$36,596.00
PW-12
1.5" Double Water Service, Complete
24
EA
$1,200.00
$28,800.00
PW-13
1.5" Single Water Service, Complete
2
EA
$1,000.00
$2,000.00
PW-14
Fire Hydrant, Complete
2
EA
$5,000.00
$10,000.00
PW-15
Temporary Blow -Off
1
EA
$2,500.00
$2,500.00
PW-16
8" Gate Valve
2
EA
$2,000.00
$4,000.00
SUBTOTAL =
$84,856.00
Cassio Way
PW-17
12" PVC Water Main (C900, DR-18)
1630
LF
$40.00
$65,200.00
PW-18
1.5" Single Water Service, Complete
3
EA
$1,000.00
$3,000.00
PW-19
1.5" Double Water Service, Complete
15
EA
$1,200.00
$18,000.00
PW-20
Fire Hydrant, Complete
3
EA
$5,000.00
$15,000.00
SUBTOTAL =
$101,200.00
Turin Drive
PW-21
10" PVC Water Main (C900, DR-18)
1,687
LF
$34.00
$57,358.00
PW-22
1.5" Single Water Service, Complete
6
EA
$1,000.00
$6,000.00
PW-23
1.5" Double Water Service, Complete
17
EA
$1,200.00
$20,400.00
PW-24
10" Gate Valve
$1.00
EA
$2,500.00
$2,500.00
PW-25
Temporary Blow -Off
1
EA
$2,500.00
$2,500.00
PW-26
Fire Hydrant, Complete
4
EA
$5,000.00
$20,000.00
SUBTOTAL =
$108,758.00
Trieste Lane
PW-27
8" PVC Water Main (C900, DR-14)
137
LF
$30.00
$4,110.00
PW-28
8" PVC Water Main (C900, DR-18)
3,336
LF
$28.00
$93,408.00
PW-29
12" Gate Valve
1
EA
$3,000.00
$3,000.00
PW-30
8" Gate Valve
7
EA
$2,000.00
$14,000.00
PW-31
1.5" Single Water Service, Complete
7
EA
$1,000.00
$7,000.00
PW-32
1.5" Double Water Service, Complete
32
EA
$1,200.00
$38,400.00
Packet Pg. 119
16.A.3.c
PW-33
Temporary Blow -Off
1
EA
$2,500.00
$2,500.00
PW-34
Fire Hydrant, Complete
7
EA
$5,000.00
$35,000.00
SUBTOTAL =
$197,418.00
Mazzini Street
PW-35
8" PVC Water Main (C900, DR-18)
573
LF
$28.00
$16,044.00
PW-36
1.5" Single Water Service, Complete
3
EA
$1,000.00
$3,000.00
PW-37
1.5" Double Water Service, Complete
7
EA
$1,200.00
$8,400.00
PW-38
Temporary Blow -Off
1
EA
$2,500.00
$2,500.00
PW-39
Fire Hydrant, Complete
1
EA
$5,000.00
$5,000.00
SUBTOTAL =
$34,944.00
Derna Street
PW-40
8" PVC Water Main (C900, DR-18)
743
LF
$28.00
$20,804.00
PW-41
1.5" Single Water Service, Complete
3
EA
$1,000.00
$3,000.00
PW-42
1.5" Double Water Service, Complete
11
EA
$1,200.00
$13,200.00
PW-43
Temporary Blow -Off
1
EA
$2,500.00
$2,500.00
PW-44
Fire Hydrant, Complete
2
EA
$5,000.00
$10,000.00
SUBTOTAL =
$49,504.00
Cortina Way
PW-45
8" PVC Water Main (C900, DR-18)
909
LF
$28.00
$25,452.00
PW-46
1.5" Single Water Service, Complete
4
EA
$1,000.00
$4,000.00
PW-47
1.5" Double Water Service, Complete
11
EA
$1,200.00
$13,200.00
PW-48
Temporary Blow -Off
1
EA
$2,500.00
$2,500.00
PW-49
Fire Hydrant, Complete
1
EA
$5,000.00
$5,000.00
SUBTOTAL =
$50,152.00
Gavello Street
PW-50
8" PVC Water Main (C900, DR-18)
138
LF
$28.00
$3,864.00
PW-51
1.5" Double Water Service, Complete
1
EA
$1,200.00
$1,200.00
PW-52
1.5" Single Water Service, Complete
1
EA
$1,000.00
$1,000.00
PW-53
Temporary Blow -Off
1
EA
$2,500.00
$2,500.00
SUBTOTAL =
$8,564.00
TOTAL = $727,604.00
r
0
U
m
Z
c�
0
L
d
4-
0
c
0
.Q
O
r
c
m
E
t
R
.r
r
a
Packet Pg. 120
16.A.3.c
EstimatedUnit
Item #
Description
Unit Price
Amount
Quantity
EW-1 Single Row Silt Fence 9,564 LF $2.00 $19,128.00
EW-2 Sod (V Behind Curb) 1,194 SY $2.50 $2,985.00
SUBTOTAL = $22,113.00
Packet Pg. 121
16.A.3.c
Item # Description EstimatedUnit Unit Price Amount
Quantity
P-1
Signing & Marking - Entire Project
1
LS
$36,000.00
$36,000.00
SUBTOTAL =
$36,000.00
Vittorio Street
P-2
3/4" Asphaltic Concrete (Type S-III) First Lift
3,265
SY
$5.50
$17,957.50
P-3
3/4" Asphaltic Concrete (Type S-III) Second Lift
3,265
SY
$5.50
$17,957.50
P-4
6" Limerock Base (Compacted and Primed)
3,265
SY
$8.50
$27,752.50
P-5
12" Stabilized Subgrade
3,582
SY
$5.00
$17,910.00
P-6
2' Valley Gutter
2,202
LF
$13.00
$28,626.00
P-6
Type "F" Curb
438
LF
$17.00
$7,446.00
P-7
Type "A" Curb
166
LF
$15.00
$2,490.00
P-8
ADA Warning Pads
2
EA
$850.00
$1,700.00
P-9
5" Concrete Sidewalk
1,024
SY
$28.00
$28,672.00
SUBTOTAL =
$150,511.50
Barcis Drive
P-10
3/4" Asphaltic Concrete (Type S-III) First Lift
4,871
SY
$5.50
$26,790.50
P-11
3/4" Asphaltic Concrete (Type S-III) Second Lift
4,871
SY
$5.50
$26,790.50
P-12
6" Limerock Base (Compacted and Primed)
4,871
SY
$8.50
$41,403.50
P-13
12" Stabilized Subgrade
5,168
SY
$5.00
$25,840.00
P-14
Type "F" Curb
2,560
LF
$17.00
$43,520.00
P-15
ADA Warning Pads
8
EA
$850.00
$6,800.00
P-16
5" Concrete Sidewalk
1,399
SY
$28.00
$39,172.00
P-17
Temporary Cul De Sac
1
LS
$1,500.33
$1,500.33
SUBTOTAL =
$211,816.83
Cassio Way
P-18
3/4" Asphaltic Concrete (Type S-III) First Lift
3,584
SY
$5.50
$19,712.00
P-19
3/4" Asphaltic Concrete (Type S-III) Second Lift
3,584
SY
$5.50
$19,712.00
P-20
6" Limerock Base (Compacted and Primed)
3,584
SY
$8.50
$30,464.00
P-21
12" Stabilized Subgrade
3,948
SY
$5.00
$19,740.00
P-22
Type "F" Curb
361
LF
$17.00
$6,137.00
P-23
2' Valley Gutter
2,864
LF
$13.00
$37,232.00
P-24
5" Concrete Sidewalk
1,791
EA
$28.00
$50,148.00
SUBTOTAL =
$183,145.00
Trieste Lane
P-25
3/4" Asphaltic Concrete (Type S-III) First Lift
7,931
SY
$5.50
$43,620.50
P-26
3/4" Asphaltic Concrete (Type S-III) Second Lift
7,931
SY
$5.50
$43,620.50
P-27
6" Limerock Base (Compacted and Primed)
7,931
SY
$8.50
$67,413.50
P-28
12" Stabilized Subgrade
8,695
SY
$5.00
$43,475.00
P-29
2' Valley Gutter
4,546
LF
$13.00
$59,098.00
P-29
Type "A" Curb
166
LF
$15.00
$2,490.00
P-30
Type "F" Curb
2,058
LF
$17.00
$34,986.00
P-31
ADA Warning Pads
8
EA
$850.00
$6,800.00
P-32
5" Concrete Sidewalk
3,652
SY
$28.00
$102,256.00
SUBTOTAL = $403,759.50
r
a
Packet Pg. 122
16.A.3.c
Cortina Street
P-33
3/4" Asphaltic Concrete (Type S-III) First Lift
2,259
SY
$5.50
$12,424.50
P-34
3/4" Asphaltic Concrete (Type S-III) Second Lift
2,259
SY
$5.50
$12,424.50
P-35
6" Limerock Base (Compacted and Primed)
2,259
SY
$8.50
$19,201.50
P-36
12" Stabilized Subgrade
2,482
SY
$5.00
$12,410.00
P-37
2' Valley Gutter
1,824
LF
$13.00
$23,712.00
P-38
Type "A" Curb
166
LF
$15.00
$2,490.00
P-39
5" Concrete Sidewalk
1,025
SY
$28.00
$28,700.00
SUBTOTAL =
$111,362.50
Derna Street
P-40
3/4" Asphaltic Concrete (Type S-III) First Lift
1,905
SY
$5.50
$10,477.50
P-41
3/4" Asphaltic Concrete (Type S-III) Second Lift
1,905
SY
$5.50
$10,477.50
P-42
6" Limerock Base (Compacted and Primed)
1,905
SY
$8.50
$16,192.50
P-43
12" Stabilized Subgrade
2,094
SY
$5.00
$10,470.00
P-44
Type "A" Curb
166
LF
$15.00
$2,490.00
P-45
2' Valley Gutter
1,507
LF
$13.00
$19,591.00
P-46
5" Concrete Sidewalk
849
SY
$28.00
$23,772.00
SUBTOTAL =
$93,470.50
Mazzini Street
P-47
3/4" Asphaltic Concrete (Type S-III) First Lift
1,470
SY
$5.50
$8,085.00
P-48
3/4" Asphaltic Concrete (Type S-III) Second Lift
1,470
SY
$5.50
$8,085.00
P-49
6" Limerock Base (Compacted and Primed)
1,470
SY
$8.50
$12,495.00
P-50
12" Stabilized Subgrade
1,636
SY
$5.00
$8,180.00
P-51
2' Valley Gutter
1134
LF
$13.00
$14,742.00
P-52
Type "A" Curb
166
LF
$15.00
$2,490.00
P-53
5" Concrete Sidewalk
257
SY
$28.00
$7,196.00
SUBTOTAL =
$61,273.00
Gavello Street
P-48
3/4" Asphaltic Concrete (Type S-III) First Lift
34
SY
$5.50
$187.00
P-49
3/4" Asphaltic Concrete (Type S-III) Second Lift
34
SY
$5.50
$187.00
P-50
6" Limerock Base (Compacted and Primed)
34
SY
$8.50
$289.00
P-51
12" Stabilized Subgrade
35
SY
$5.00
$175.00
P-52
2' Valley Gutter
135
LF
$13.00
$1,755.00
P-53
Type "F" Curb
137
LF
$17.00
$2,329.00
P-54
5" Concrete Sidewalk
151
SY
$28.00
$4,228.00
P-55
Temporary Cul De Sac
1
LS
$2,000.00
$2,000.00
SUBTOTAL =
$11,150.00
Turin Drive
P-56
3/4" Asphaltic Concrete (Type S-III) First Lift
4,031
SY
$5.50
$22,170.50
P-57
3/4" Asphaltic Concrete (Type S-III) Second Lift
4,031
SY
$5.50
$22,170.50
P-58
6" Limerock Base (Compacted and Primed)
4,031
SY
$8.50
$34,263.50
P-59
12" Stabilized Subgrade
4,432
SY
$5.00
$22,160.00
P-60
2' Valley Gutter
3,421
LF
$13.00
$44,473.00
P-61
Type "A" Curb
166
LF
$15.00
$2,490.00
P-62
5" Concrete Sidewalk
1,909
SY
$28.00
$53,452.00
SUBTOTAL = $201,179.50
TOTAL = $1,463,668.33
Packet Pg. 123
16.A.3.c
EstimatedUnit
Item #
Description
Unit Price
Amount
Quantity
Barcis Road
D-1
15" RCP
164
LF
$35.00
$5,740.00
D-2
18" RCP
91
LF
$40.00
$3,640.00
D-13
36" RCP
212
LF
$100.00
$21,200.00
D-14
15" Flared End
1
EA
$2,100.00
$2,100.00
D-15
18" Flared End
1
EA
$2,300.00
$2,300.00
D-16
36" Flared End
2
EA
$3,700.00
$7,400.00
D-17
Type 9 Inlet
6
EA
$4,800.00
$28,800.00
D-18
Inlet Protection
6
EA
$1,000.00
$6,000.00
SUBTOTAL =
$77,180.00
Vittorio Street
D-19
12" HDPE
296
LF
$20.00
$5,920.00
D-20
15" RCP
20
LF
$35.00
$700.00
D-21
18" RCP
134
LF
$40.00
$5,360.00
D-22
24" RCP
448
LF
$55.00
$24,640.00
D-23
18" Flared End
1
EA
$2,300.00
$2,300.00
D-24
24" Flared End
2
EA
$2,500.00
$5,000.00
D-25
Valley Gutter Inlet
6
EA
$3,300.00
$19,800.00
D-26
Yard Drain
8
EA
$1,000.00
$8,000.00
D-27
Inlet Protection
6
EA
$1,000.00
$6,000.00
SUBTOTAL =
$77,720.00
Cassio Way
D-28
12" HDPE
478
LF
$20.00
$9,560.00
D-29
15" RCP
101
LF
$35.00
$3,535.00
D-30
18" RCP
36
LF
$40.00
$1,440.00
D-31
24" RCP
257
LF
$55.00
$14,135.00
D-32
36" RCP
806
LF
$56.00
$45,136.00
D-30
15" Flared End
1
EA
$2,100.00
$2,100.00
D-31
24" Flared End
1
EA
$2,500.00
$2,500.00
D-32
36" Flared End
4
EA
$3,700.00
$14,800.00
D-33
Type 9 Inlet
1
EA
$4,800.00
$4,800.00
D-31
Valley Gutter Inlet
5
EA
$3,300.00
$16,500.00
D-32
Yard Drain
3
EA
$1,000.00
$3,000.00
D-33
Grate Inlet
2
EA
$3,000.00
$6,000.00
D-34
Inlet Protection
7
EA
$1,000.00
$7,000.00
SUBTOTAL = $130,506.00
Packet Pg. 124
16.A.3.c
Turin Drive
D-35
18" RCP
70
LF
$40.00
$2,800.00
D-36
24" RCP
454
LF
$55.00
$24,970.00
D-37
36" RCP
512
LF
$100.00
$51,200.00
D-38
24" Flared End
2
EA
$2,500.00
$5,000.00
D-39
36" Flared End
2
EA
$3,700.00
$7,400.00
D-40
Valley Gutter Inlet
6
EA
$3,300.00
$19,800.00
D-41
Inlet Protection
6
EA
$1,000.00
$6,000.00
SUBTOTAL =
$117,170.00
Trieste Lane
D-42
12" HDPE
462
LF
$20.00
$9,240.00
D-43
15" RCP
63
LF
$35.00
$2,205.00
D-44
18" RCP
753
LF
$40.00
$30,120.00
D-45
24" RCP
86
LF
$55.00
$4,730.00
D-46
36" RCP
1,175
LF
$100.00
$117,500.00
D-47
12" Flared End
1
EA
$1,900.00
$1,900.00
D-48
18" Flared End
3
EA
$2,300.00
$6,900.00
D-49
24" Flared End
1
EA
$2,500.00
$2,500.00
D-50
36" Flared End
6
EA
$3,700.00
$22,200.00
D-51
Yard Drain
3
EA
$1,000.00
$3,000.00
D-52
Grate Inlet
2
EA
$3,000.00
$6,000.00
D-53
Type 9 Inlet
4
EA
$4,800.00
$19,200.00
D-54
Valley Gutter Inlet
10
EA
$3,300.00
$33,000.00
D-55
Inlet Protection
16
EA
$1,000.00
$16,000.00
SUBTOTAL =
$274,495.00
Cortina Street
D-56
12" HDPE
178
LF
$20.00
$3,560.00
D-57
15" RCP
20
LF
$35.00
$700.00
D-58
18" RCP
220
LF
$40.00
$8,800.00
D-59
36" RCP
472
LF
$100.00
$47,200.00
D-60
12" Flared End
1
EA
$1,900.00
$1,900.00
D-61
24" Flared End
1
EA
$2,500.00
$2,500.00
D-61
36" Flared End
2
EA
$3,700.00
$7,400.00
D-58
Grate Inlet
1
EA
$3,000.00
$3,000.00
D-59
Yard Drain
1
EA
$1,000.00
$1,000.00
D-60
Valley Gutter Inlet
4
EA
$3,300.00
$13,200.00
D-61
Inlet Protection
5
EA
$1,000.00
$5,000.00
SUBTOTAL = $94,260.00
r
0
U
m
M
c�
0
L
d
4-
0
c
0
.Q
O
r
c
m
E
t
R
.r
r
a
Packet Pg. 125
16.A.3.c
Derna Street
D-62
18" RCP
20
LF
$40.00
$800.00
D-63
24" RCP
235
LF
$55.00
$12,925.00
D-64
36" RCP
477
LF
$100.00
$47,700.00
D-65
24" Flared End
1
EA
$2,500.00
$2,500.00
D-66
36" Flared End
2
EA
$3,700.00
$7,400.00
D-67
Valley Gutter Inlet
4
EA
$3,300.00
$13,200.00
D-68
Inlet Protection
4
EA
$1,000.00
$4,000.00
SUBTOTAL =
$88,525.00
Mazzini Street
D-69
36" RCP
474
LF
$100.00
$47,400.00
D-70
36" Flared End
2
EA
$3,700.00
$7,400.00
D-71
Grate Inlet
1
EA
$3,700.00
$3,700.00
D-72
Valley Gutter Inlet
2
EA
$3,000.00
$6,000.00
D-73
Yard Drain
1
EA
$3,300.00
$3,300.00
D-74
Inlet Protection
3
EA
$1,000.00
$3,000.00
SUBTOTAL = $70,800.00
TOTAL = $930,656.00
a
Packet Pg. 126
16.A.3.c
EstimatedUnit
Item #
Description
Unit Price
Amount
Quantity
L-1 Street Lights 1 LS $100,000.00 $100,000.00
TOTAL = $100,000.00
Packet Pg. 127
16.A.3.c
Item # Description EstimatedUnit Unit Price Amount
Quantity
L-1 Code Minimum Landscape & Secondary Irrigation 1 LS $175,000.00 $175,000.00
TOTAL = $175,000.00
Packet Pg. 128