Agenda 04/25/2023 Item #16A 6 (Resolution - Final Plat of Maple Ridge- Phase 5B PL20180000568)04/25/2023
EXECUTIVE SUMMARY
Recommendation to approve a Resolution for final acceptance of the private roadway and drainage
improvements, and acceptance of the plat dedications, for the final plat of Maple Ridge Phase 5B, Second
Replat, Application Number PL20180000568, and authorize the release of the maintenance securities in the
amount of $454,837.97.
OBJECTIVE: To have the Board of County Commissioners (Board) grant final acceptance of the infrastructure
improvements associated with the subdivision and authorize the release of the maintenance security.
CONSIDERATIONS:
1) On October 17, 2019, the Growth Management Department granted preliminary acceptance of the roadway
and drainage improvements in Maple Ridge Phase 5B, Second Replat.
2) The roadway and drainage improvements will remain private and be maintained by Maple Ridge at Ave
Maria Homeowners Association, Inc., Ave Maria Utility Company, LLLP, Ave Maria Stewardship
Community District, and Ave Maria Master Association, Inc.
3) The required improvements have been constructed in accordance with the Land Development Code. The
Growth Management Department inspected the improvements on March 8, 2023, and is recommending
final acceptance of the improvements.
4) A resolution for final acceptance has been prepared by staff and approved by the County Attorney's Office.
The resolution is a requirement of Section 10.02.05 C of the Land Development Code. A copy of the
document is attached.
FISCAL IMPACT: The roadway and drainage improvements will be maintained by Maple Ridge at Ave Maria
Homeowners Association, Inc., Ave Maria Utility Company, LLLP, Ave Maria Stewardship Community District,
and Ave Maria Master Association, Inc. The existing security in the amount of $454,837.97 will be released upon
Board approval. The original security in the amount of $1,954,718.87 has been reduced to the current amount of
$454,837.97 based on the work performed and completed pursuant to the terms of the Construction and
Maintenance Agreements dated June 20, 2018.
GROWTH MANAGEMENT IMPACT: There is no growth management impact.
LEGAL CONSIDERATIONS: This item has been approved as to form and legality and requires a majority vote
for Board approval. - DDP
RECOMMENDATION: To grant final acceptance of the roadway and drainage improvements in Maple Ridge
Phase 5B Second Replat, Application Number PL20180000568, and authorize:
1. The Chairman to execute the attached resolution authorizing final acceptance of the improvements and plat
dedications.
2. The Clerk of Courts to release the maintenance securities.
Prepared by: Lucia S. Martin, Project Manager I, Development Review
ATTACHMENT(S)
1. Location Map (PDF)
2. Bond Basis (PDF)
3. Resolution (PDF)
4. Plat Map (PDF)
16.A.6
Packet Pg. 715
04/25/2023
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.6
Doc ID: 25035
Item Summary: Recommendation to approve a Resolution for final acceptance of the private roadway and
drainage improvements, and acceptance of the plat dedications, for the final plat of Maple Ridge Phase 5B, Second
Replat, Application Number PL20180000568, and authorize the release of the maintenance securities in the amount
of $454,837.97.
Meeting Date: 04/25/2023
Prepared by:
Title: Technician – Growth Management Development Review
Name: Lucia Martin
03/21/2023 3:28 PM
Submitted by:
Title: Environmental Specialist – Growth Management Department
Name: Jaime Cook
03/21/2023 3:28 PM
Approved By:
Review:
Growth Management Development Review Brett Rosenblum Additional Reviewer Completed
03/22/2023 1:05 PM
Growth Management Department Diane Lynch Growth Management Department Completed 03/23/2023 6:03 PM
Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 03/24/2023 1:52 PM
Growth Management Operations Support Evelyn Trimino Additional Reviewer Completed
03/28/2023 8:55 AM
Growth Management Operations & Regulatory Management Michael Stark Additional Reviewer Completed
03/28/2023 10:35 AM
Growth Management Department Jaime Cook Division Director Completed 03/28/2023 11:25 AM
Growth Management Department James C French Growth Management Completed 04/04/2023 11:32 AM
County Attorney's Office Derek D. Perry Level 2 Attorney Review Completed 04/07/2023 8:56 AM
Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 04/10/2023 9:35 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 04/12/2023 10:38 AM
Office of Management and Budget Laura Zautcke Additional Reviewer Completed 04/13/2023 4:00 PM
County Manager's Office Geoffrey Willig Level 4 County Manager Review Completed 04/14/2023 2:16 PM
Board of County Commissioners Geoffrey Willig Meeting Pending 04/25/2023 9:00 AM
16.A.6
Packet Pg. 716
MAPLE RIDGE PHASE 5B, SECOND REPLAT
LOCATION MAP
16.A.6.a
Packet Pg. 717 Attachment: Location Map (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION
IMPROVEMENTS
THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS
entered into this _____ day of / / , 20 18 between CCAVEMARA O hereinafter referred to as "Developer," and the Board of County Commissioners of Collier
County, Florida, hereinafter referred to as the "Board.
RECITALS:
A.Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the
Board of certain plat of a subdivision to be known as: Maple Ridge at Ave Maria Phase 5B
B.Chapter 4 and 10 of the Collier County Land Development Code required the Developer to post
appropriate guarantees for the construction of the improvements required by said subdivision
regulations, said guarantees to be incorporated in a bonded agreement for the construction of the
required improvements.
NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set
forth, Developer and the Board do hereby covenant and agree as follows:
1.Developer will cause to be constructed: Roadways, storm drainage and utility infrastructure.
within 36 months from the date of approval said subdivision plat, said improvements
hereinafter referred to as the required improvements.
2.Developer herewith tenders its subdivision performance security (attached hereto as Exhibit "A" and
by reference made a part hereof) in the amount of $1 954 718.87 -which amount represents 10% of
the total contract cost to complete the construction plus 100% of the estimated cost of to complete
the required improvements at the date of this Agreement.
3.In the event of default by the Developer or failure of the Developer to complete such improvements within
the time required by the Land Development Code, Collier may call upon the subdivision performance
security to insure satisfactory completion of the required improvements.
4 . The required improvements shall not be considered complete until a statement of substantial
completion by Developer's engineer along with the final project records have been furnished to be
reviewed and approved by the County Manager or his designee for compliance with the Collier County
Land Development Code.
5.The County Manager or his designee shall, within sixty (60) days of receipt of the statement of
substantial completion, either: a) notify the Developer in writing of his preliminary approval of the
improvements; or b) notify the Developer in writing of his refusal to approve improvements,
therewith specifying those conditions which the Developer must fulfill in order to obtain the County
Manager's approval of the improvements. However, in no event shall the County Manager or his
designee refuse preliminary approval of the improvements if they are in fact constructed and
submitted for approval in accordance with the requirements of this Agreement.
6.The Developer shall maintain all required improvements for a minimum period of one year after
preliminary approval by the County Manager or his designee. After the one year maintenance period by
the Developer has terminated, the Developer shall petition the County Manager or his desi gnee to
inspect the required improvements. The County Manager or his designee shall inspect the
improvements and, if found to be still in compliance with the Land Development Code as refle cted by
final approval by the Board, the Board shall release the remaining 10% of the subdivision per form ance
security. The Developer's responsibility for maintenance of the required improvements shall continue
unless or until the Board accepts maintenance responsibility for and by the County.
16.A.6.b
Packet Pg. 718 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
7.Six (6) months after the execution of this Agreement and once within every six (6) months thereafter
the Developer may request the County Manager or his designee to reduce the dollar amount of the
subdivision performance security on the basis of work complete, Each request for a reduction in the
dollar amount of the subdivision performance security shall be accompanied by a statement of
substantial completion by the Developer's engineer together with the project records necessary for
review by the County Manager or his designee. The County Manager or his designee may grant the
request for a reduction in the amount of the subdivision performance security for the improvements
completed as of the date of the request.
8.In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon
certification of such failure, the County Manager or his designee may call upon the subdivision
performance security to secure satisfactory completion, repair and maintenance of the required
improvements. The Board shall have the right to construct and maintain, or cause to be constructed
or maintained, pursuant to public advertisement and receipt and acceptance of bids, the
improvements required herein. The Developer, as principal under the subdivision performance
security, shall be liable to pay and to indemnify the Board, upon completion of such construction, the
final total cost to the Board thereof, including, but not limited to, engineering, legal and contingent
costs, together with any damages, either direct or consequential, which the Board may sustain on
account of the failure of the Developer to fulfill all of the provisions of this Agreement.
9.All of the terms, covenants and conditions herein contained are and shall be binding upon the
Developer and the respective successors and assigns of the Developer.
IN WITNESS WHEREOF, the Board and the Developer have caused this Agreement to be executed by
their duly authorized representatives this 4::Yr\.,. day of::J....:>n.<--/ ____ ./ ____ , 20_1a __
SIGNED IN THE PRESENCE OF:
Printed Name
ATTEST: __________ _
DWIGHT E. BROCK, CLERK
Assistant County Attorney
(Name of Entity) cc Ave Maria, LLC
. Printed Name/Title v· p 'd t(President, VP, or CEO) I Ce re SI en
(Provide Proper Evidence of Authority)
16.A.6.b
Packet Pg. 719 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
Exhibit "A"
PERFORMANCE BOND
No.106819621
KNOW ALL PERSONS BY THESE PRESENTS: that
CC Ave Maria, LLC
2020 Salzedo Street, Suite 200
Coral Gables, Florida 33134
(hereinafter referred to as "Owner") and
Travelers Casualty and Surety Company of America
One Tower Square, 3B
Hartford, CT 06813
(800)873-1477
(hereinafter referred to as "Surety") are held and firmly bound unto Collier County, Florida, (hereinafter
referred to as "County") in the total aggregate sum of One million nine hundred fifty-four thousand seven
hundred eighteen dollars and 87 cents ($1,954,718.87) in lawful money of the United States, payment of
which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors
and assigns, jointly and severally, firmly by these presents. Owner and Surety are used for singular or
plural, as the context requires.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for approval by
the Board a certain subdivision plat named Maple Ridge at Ave Maria Phase 5B and that certain
subdivision shall include specific improvements which are required by Collier County Ordinances and
Resolutions (hereinafter "Land Development Regulations"). This obligation of the Surety shall commence
on the date this Bond is executed and shall continue until the date of final acceptance by the Board of
County Commissioners of the specific improvements described in the Land Development Regulations
(hereinafter the "Guaranty Period")
NOW, THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and duties in
accordance with the Land Development Regulations during the guaranty period established by the
County, and the Owner shall satisfy all claims and demands incurred and shall fully indemnify and save
harmless the County from and against all costs and damages which it may suffer by reason of Owner's
failure to do so, and shall reimburse and repay the County all outlay and expense which the County may
incur in making good any default, then this obligation shall be void, otherwise to remain in full force and
effect,
PROVIDED, FURTHER, that the said Surety, for value received hereby, stipulates and agrees that
no change, extension of time, alteration, addition or deletion to the proposed specific improvements shall
in any way affect its obligation on this Bond, and it does hereby waive notice of any such change,
extension of time, alteration, addition or deletion to the proposed specific improvements.
PROVIDED FURTHER, that it is expressly agreed that the Bond shall be deemed amended
automatically and immediately, without formal and separate amendments hereto, so as to bind the Owner
and the Surety to the full and faithful performance in accordance with the Land Development Regulations.
The term "Amendment," wherever used in this Bond, and whether referring to this Bond, or other
documents shall include any alteration, addition or modification of any character whatsoever.
16.A.6.b
Packet Pg. 720 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
IN! WITNESS WHEREOF, the parties hereto have caused this PERFORMANCE BOND to be
executed this 17(h day of May, 2018
WITNESSES:
U^sL
/!
Printed Name t
UUMl.L PllM.
Printed Name ym^jlU CIIVA
CC Ave Maria,. LLC
bv: "7^- f~V-
8rian Goguen, Vice Prescient \ \ \\
Printed Name/Title
(Provide Proper Evidence of Authority)
ACKNOWLEDGEMENT
STATE OF FLORIDA
COUNTY OF COLLIER
jcyt^ THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS ]o_ DAY OF
i I Wii i BY Brian Goquen the Vice President OF CC Ave Maria. LLC WHO IS PERSONALLY
KNOW^i TO ME, OR HAS PRODUCED AS IDENTIFICATION.
Notary Public - State of Horide
(k-ZVL-t^ -
Printed Name
>t >-
w»
<1. .Hi — **• > ll fl Mi ~
KIM D DAVIDSON Notary Pubhc - Slale of Ponds CoT*rn:ssior. # GG154782 My Conm Expires fed 19,2022
Bcided irwo^gh Nal-crvj' Notary Ass"
(SEAL)
WITNESSES-
. vyLvZ/, tl'j
c
Travails Casualty and Surety Company of America
Printed Name LuVTCt IA *L U W, MS |'v\ v / (.\ v
Printed Name \Afis-H •V-
Charity A Moser, Attorney-in-Fact
(Provide Proper Evidence of Authority)
\j 11 r \
ACKNOWLEDGMENT
STATE OF Florida
COUNTY OF Collier
THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS J7th DAY OF
May,2018 , BY Charity A. Moser AS _Attorney-ln-Fact OF Travelers Casualty and Surety Company of
America WHO IS PERSONALLY KNOWN TO M£, OR HAS PRODUCED AS
IDENTIFICATION.
Notary Public - State of Florida / (SEAL)
1 I i H '
k)ij\L,( luL r
Printed Name: Kristin Neiert
KRISTIN M. NEIERT
0 MY COMMISSION #GG 079764
EXPIRES: May 5,2021 '"'•f/ofjtfy' Bonded Thru Notary Public Underwriters
16.A.6.b
Packet Pg. 721 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
TRAVELERS
WARNING: THIS POWER OF ATTORNEY IS INVALID W:~: IOUT THE RED BORDER
POWER OF ATTORNEY
Farmington Casualty Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc.
St, Paul Fire and Marine Insurance Company
St, Paul Guardian Insurance Company
St. Paul VIercury Insurance Company
Travelers Casualty and Surety Company
Travelers Casualty and Surety Company of America
United States Fidelity and Guaranty Company
Attorney-In Fact No, 229466 Certificate No 007003369
KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty npany. St Paul Fire ana Marine In« ny. St Pa:
Company. St Paul Mercury Insurance Company, Travelers Casualty and Surety Company. Travelers Casualty and Surety Company of America, and United States
Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut, that Fidelity and Guaranty Insurance Company is a
corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters. Inc.. :s a corporation duly organized under the
laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint
Huntley A. Hornbeck II. Kristin M. N'eiert. Marc E. Williams, Stephen J Benza, Charity A. Moser. and Dawn Y, Colecchio
of the City of Naples State of Florida __ . their true and lawful Attorneyspin• Fact.
each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and ail bonds, recognizances, conditional undertakings and
other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing .he oeri'ormancc of
contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by lav .
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and their co
October 2016
at set 5 th
Farmington Casualty Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc.
St. Paul Fire and Marine Insurance Company
St. Paul Guardian Insurance Company
St. Paul Mercury Insurance Company
Travelers Casualty and Surety Company
Travelers Casualty and Surety Company of America
United States Fidelity and Guaranty Company
If00",
<4.
WCOffPORftffo SVSVri % 1977 1951 %
: - - £\
i-J,...5c !i
t \
":V>
H ART FOR •.SEAL-* CCNA " Si OQf.ff hi
i'<C
krafsaec 13?=
Atb
State of Connecticut
City of Hartford ss.
By:
Robert L. Rare; Scnio" Vice President
Or. this the . 5th . day of. October 2016 . before :rc personally appeared Robert L. Rare;. who acknow ledged himself to
be the Senior Vice President of Farmington Casualty Company. Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters. Inc.. Si. Paul
Fire and Marine Insurance Company. St. Pau! Guardian Insurance Company. St. Paul Mercury Insurance Company. Travelers Casualty and Surety Company. Travelers
Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he. as such, being authorized so to do. executed the foregoing
instrument for the purposes therein contained by signing or. behalf of the corporations by himself as a duly authorized officer.
In Witness Whereof, I hereunto set my hand and official sea!.
My Commission expires the 30th day of June. 2021.
m $ ff rvsvfc. >
TV
^ Marie C. Tctrcaull. Notary Public
58440-5 16 Printed in U.S.A.
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
16.A.6.b
Packet Pg. 722 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
1 of 8
PI \
' * Project:
Task:
Maple Ridge Phase 5B (RevOO)
Engineer's OPC for Subdivision Fee Calculations
XT'- £ '*• « ». - * - » ' *ft * Jfc Prepared By: cw Date: 2/21/2018
t J \ I 1 || £ |\ | F%| Checked By: DCH Date: 2/28/2018
Calculation Summary SUB-TOTAL
CONTINGENCY
PERCENT DOLLAR TOTAL
EARTHWORK $ 190,200.00 0% $ $ 190,200.00
PAVING $ 484,833.55 0% $ $ 484,833.55
DRAINAGE $ 316,933.50 0% $ $ 316,933.50
POTABLE WATER $ 210,779.50 0% $ S 210,779.50
SANITARY SEWER $ 354,836.00 0% $ $ 354,836.00
IRRIGATION $ 130,634.60 0% 5 $ 130,634.60
LANDSCAPE AND LIGHTING $ 88,800.00 0% $ $ 88,800.00
TOTAL $ 1,777,017.15 0% $ $ 1,777,017.15
EARTHWORK, PAVING, DRAINAGE, LANDSCAPE AND LIGHTING:
POTABLE WATER, SANITARY SEWER, IRRIGATION:
TOTAL O.P.C. = $ 1,080,767.05
TOTAL O.P.C. = $ 696,250.10
Estimated 110% Bond Amount $ 1,954,718.87
NOTES:
1) This Opinion of Probable Cost shall be used for Review Fee Calculation Purposes Only.
2) All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at
this time due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor.
3) Review Fees for lake excavation provided in separate Review Fee, with the lake excavation permit.
vX\\U I"/////,
C°t£
^ 'C& E * V *. ^
Na 73943
; * c:
; or
inSt Hartle o
"tin f n
P:\Active_Projects\P-CCAM-014\001_MapleRidge_Ph5B\Design_Permit\OPC's\FeeCalc\Rev00\MR5B_OPC_FeeCalc(Rev00).xlsx
16.A.6.b
Packet Pg. 723 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
2 of 8
Project: Maple Ridge Phase 5B (RevOO)
Taek: Engineer's OPC for Subdivision Fee Calculations
Prepared By: CW Date: 2/21/2018
Checked By: DCH Date: 2/28/2018
EARTHWORK
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
EW-1
PROTECTION. CONSTRUCTION ENTRANCE.
SEED/MULCH) 1 LS $ 10,000.00 $ 10.000.00
EW-3 EMBANKMENT 127,000 CY $ 1.40 $ 177,800.00
EW-4 NDPES MAINTENANCE 6 MONTH $ 400.00 $ 2,400.00
$
$
$
$
$
$
$
SUB-TOTAL EARTHWORK = $ 190,200.00
P:\Active_Projects\P-CCAM-Ol 4\001_MapleRidge_Ph58\Design_Permit\OPC's\FeeCalc\Rev00\MR5B_OPC_FeeCalc(Rev00).xlsx
16.A.6.b
Packet Pg. 724 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
3 of 8
Project: Maple Ridge Phase 5B (RevOO)
Task. Engineer's OPC for Subdivision Fee Calculations
Prepared By: CW Date: 2/21/2018
Checked By: DCH Date: 2/28/2018
PAVING
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
PAV-1 3/4" ASPHALTIC CONCRETE TYPE S-lll (FIRST LIFT) 10,849 SY $ 5.95 $ 64,551.55
PAV-2 3/4" ASPHALTIC CONCRETE TYPE S-lll (SECOND LIFT) 10,849 SY $ 5.85 $ 63,466.65
PAV-3 8" LIMEROCK BASE 13,250 SY $ 6.95 $ 92,087.50
PAV-4 12" STABILIZED SUBGRADE 13,681 SY $ 1 55 $ 21,205.55
PAV-5 TYPE "A" CURB 180 LF $ 14.25 $ 2,565 00
PAV-6 TYPE 'F' CURB 397 LF $ 16.00 $ 6,352.00
PAV-7 2' VALLEY GUTTER 6,989 LF $ 8.25 $ 57,659.25
PAV-8 3' VALLEY GUTTER 237 LF $ 21.25 $ 5,036.25
PAV-9 CONCRETE SIDEWALK (4" THICK) 38,212 SF $ 3.65 $ 139,473.80
PAV-10 SODDING (BOC) 5,062 SY S 3.00 $ 15,186.00
PAV-11 GENOA ST. - PAVEMENT/CURB DEMO AND RESTORATK 1 LS $ 10,000.00 $ 10,000.00
PAV-12 SIGNAGE 1 LS $ 4,000.00 $ 4,000.00
PAV-13 ROADWAY STRIPING 1 LS $ 3,250.00 $ 3,250.00
SUB-TOTAL PAVING = $ 484,833.55
P:\Acti ve_Projects\P-CCAM-014\001_MapleRidge_Ph5B\Design_Permit\OPC's\FeeCalc\Rev00\MR5B_OPC_FeeCalc(Rev00).xlsx
16.A.6.b
Packet Pg. 725 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
4 of 8
Project: Maple Ridge Phase 5B (RevOO)
Task: Engineer's OPC for Subdivision Fee Calculations
Prepared By. CW Date: 2/21/2018
Checked By: DCH Date: 2/28/2018
DRAINAGE
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
DRA-1 10" HDPE SECONDARY DRAINAGE PIPE 1.411 LF $ 20.20 $ 28,502.20
DRA-2 12" HDPE SECONDARY DRAINAGE PIPE 563 LF $ 21.80 $ 12,273.40
DRA-3 15" RCP STORM SEWER 1.249 LF $ 34.10 $ 42,590.90
DRA-4 18" RCP STORM SEWER 794 LF $ 39.30 $ 31,204.20
DRA-5 24" RCP STORM SEWER 413 LF $ 57.60 $ 23,788.80
DRA-6 30" RCP STORM SEWER 550 LF $ 68.10 $ 37,455.00
DRA-7 12" MITERED END 1 EA $ 750.00 $ 750.00
DRA-8 15" FLARED END 1 EA $ 3,147.00 $ 3,147.00
DRA-9 18" FLARED END 3 EA $ 3,217.00 $ 9,651.00
DRA-10 24" FLARED END 2 EA $ 3,370.00 $ 6,740.00
DRA-11 30" FLARED END 2 EA $ 3,946.00 $ 7,892.00
DRA-12 VALLEY GUTTER INLET (DOUBLE) 17 EA $ 3,275.00 $ 55,675.00
DRA-13 DITCH BOTTOM INLET TYPE "C" 3 EA $ 2,762.00 $ 8,286.00
DRA-14 DITCH BOTTOM INLET TYPE "D" 1 EA $ 3,100 00 $ 3,100.00
DRA-15 JUNCTION BOX 3 EA $ 3,765.00 $ 11,295.00
DRA-16 THROAT INLET 1 EA S 3,170 00 $ 3,170 00
DRA-17 YARD DRAIN 41 EA $ 693.00 $ 28,413.00
DRA-18 STRUCTURE REMOVAL AND CONNECTION TO EX RCP 2 EA $ 1,500.00 $ 3,000.00
SUB-TOTAL DRAINAGE = $ 316,933.50
P:\Adive_Proj ects\P-CCAM-014\001_MapleRidge_Ph5B\Design_Permit\OPC's\FeeCalc\Rev00\MR58_C>PC_FeeCalc(Rev00).xlsx
16.A.6.b
Packet Pg. 726 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
5 of 8
Project: Maple Ridge Phase 5B (RevOO)
Task: Engineer's OPC for Subdivision Fee Calculations
Prepared By: CW Date: 2/21/2018
Checked By: DCH Date: 2/28/2018
POTABLE WATER
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
WAT-1 6" PVC WATER MAIN (C900, DR18) 3,523 LF $ 15.00 $ 52,845.00
WAT-2 6" PVC WATER MAIN (C900. DR14) 151 LF S 16.40 $ 2,476.40
WAT-3 8" PVC WATER MAIN (C900. DR18) 257 LF $ 17.50 $ 4,497.50
WAT-4 8" PVC WATER MAIN (C900, DR14) 54 LF $ 19.90 $ 1,074.60
WAT-5 6" GATE VALVE 8 EA $ 955.00 $ 7,640.00
WAT-6 8" GATE VALVE 2 EA $ 1.342 00 $ 2,684.00
WAT-7 AIR RELEASE VALVE 1 EA $ 1.540.00 $ 1,540.00
WAT-8 FIRE HYDRANT ASSEMBLY (COMPLETE) 14 EA $ 4,087.00 $ 57,218.00
WAT-9 TEMP. BACTERIAL SAMPLE POINT 5 EA $ 317.00 $ 1.585.00
WAT-10 PERM BACTERIAL SAMPLE POINT 1 EA $ 1.736.00 $ 1,736.00
WAT-11
1-1/2" DOUBLE WATER SERVICE (SHORT SIDE)
(COMPLETE) 22 EA $ 969.00 $ 21,318.00
WAT-12
1-1/2" DOUBLE WATER SERVICE (LONG SIDE)
(COMPLETE) 28 EA $ 1,155.00 $ 32,34000
WAT-13
1" SINGLE WATER SERVICE (SHORT SIDE)
(COMPLETE) 15 EA $ 536 00 $ 8,040.00
WAT-14 1" SINGLE WATER SERVICE (LONG SIDE) (COMPLETE) 4 EA $ 82300 $ 3,292.00
WAT-15 TEMP BLOW-OFF 1 EA $ 1.928.00 $ 1,928.00
WAT-16 TESTING 1 LS $ 2,500.00 $ 2,500.00
WAT-17
REMOVE EX BLOW-OFF AND CONNECT TO EX WATER
MAIN 5 EA $ 1,613.00 $ 8,065.00
$
SUB-TOTAL POTABLE WATER = $ 210, 779.50
P:\Active_Proiects\P-CCAM-014\001_MapleRidge_Ph5B\Design_Permit\OPC's\FeeCalc\Rev00\MR5B_OPC_FeeCa!c(Rev00).xlsx
16.A.6.b
Packet Pg. 727 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
6 of 8
Project: Maple Ridge Phase 5B (RevOO)
Task: Engineer's OPC for Subdivision Fee Calculations
Prepared By: CW Date: 2/21/2018
Checked By: DCH Date: 2/28/2018
SANITARY SEWER
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
SAN-1 8" SDR 26 PVC GRAVITY SEWER MAIN (0'-6' CUT) 664 LF $ 30.70 $ 20,384.80
SAN-2 8" SDR 26 PVC GRAVITY SEWER MAIN (6'-8' CUT) 523 LF $ 34.90 $ 18,252.70
SAN-3 8" SDR 26 PVC GRAVITY SEWER MAIN (8'-10' CUT) 1,224 LF $ 43.10 $ 52,754.40
SAN-4 8" SDR 26 PVC GRAVITY SEWER MAIN (10 -12 CUT) 605 LF $ 49.30 $ 29,826.50
SAN-5 8" SDR 26 PVC GRAVITY SEWER MAIN (12'-14' CUT) 359 LF $ 67.90 $ 24,376.10
SAN-6 4' SANITARY SEWER MANHOLE <6'-8" CUT) 6 EA $ 5,402.00 $ 32,412 00
SAN-7 4' SANITARY SEWER MANHOLE (8'-10' CUT) 4 EA $ 7.453.00 $ 29,812.00
SAN-8 4' SANITARY SEWER MANHOLE (10-12' CUT) 4 EA $ 8,598.00 $ 34,392.00
SAN-9 4' SANITARY SEWER MANHOLE (12 -14' CUT) 2 EA $ 10,500.00 $ 21,000.00
SAN-10 6" SERVICE LATERAL (SINGLE) 12 EA $ 950.00 $ 11,400.00
SAN-11 6" SERVICE LATERAL (DOUBLE) 54 EA $ 997.00 $ 53,838.00
SAN-12 TELEVISION INSPECTION 3,375 LF $ 5.30 $ 17,887.50
SAN-13 CORE BORE EX MANHOLE FOR CONNECTION 2 EA $ 1,000.00 $ 2,000.00
SAN-14 GENOA ST - DEMO AND CONNECTION TO EXISTING 1 LS $ 5,000.00 $ 5.000.00
SAN-15 TESTING 1 LS $ 1,500.00 $ 1,500.00
SUB-TOTAL SANITARY SEWER = $ 354,836.00
P.\Active_Projects\P-CCAM-014\001_Map!eRidge_Ph5B\Design_Permit\OPC's\FeeCa!c\Rev00\MR5B_OPC_FeeCalc(Rev00)-xlsx
16.A.6.b
Packet Pg. 728 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
7 of 8
Project: Maple Ridge Phase 5B (RevOO)
Task: Engineer's OPC for Subdivision Fee Calculations
Prepared By: CW Date: 2/21/2018
Checked By: DCH Date: 2/28/2018
IRRIGATION
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
IRR-1 4" PVC IRRIGATION MAIN (C900.DR18) 3,698 LF S 11.00 $ 40,678.00
IRR-2 4" PVC IRRIGATION MAIN (C900. DR14) 305 LF S 12.00 $ 3,660.00
IRR-5 4" GATE VALVE 10 EA $ 839.00 $ 8,390.00
IRR-7
1-1/2" DOUBLE IRRIGATION SERVICE (SHORT SIDE)
(COMPLETE) 28 EA $ 999.00 $ 27,972.00
IRR-8
1-1/2" DOUBLE IRRIGATION SERVICE (LONG SIDE)
(COMPLETE) 26 EA $ 1,191.00 $ 30,966.00
IRR-9
1" SINGLE IRRIGATION SERVICE (SHORT SIDE)
(COMPLETE) 8 EA $ 575.00 $ 4,600.00
IRR-10
1" SINGLE IRRIGATION SERVICE (LONG SIDE)
(COMPLETE) 6 EA , $ 702.10 $ 4,212.60
IRR-11
REMOVE EX BLOW-OFF AND CONNECT TO EX
IRRIGATION MAIN 5 EA $ 1,045.00 $ 5,225.00
IRR-12 TESTING 1 LS $ 2,000.00 $ 2,000.00
IRR-13 TEMPORARY BLOW-OFF 1 EA $ 1,390.00 $ 1,390.00
IRR-14 AIR RELEASE VALVE 1 EA $ 1,541.00 $ 1,541.00
IRR-15 $
SUB-TOTAL IRRIGATION = $ 130,634.60
P:\Active_Projects\P-CCAM-014\001_MapleRidge_Ph5B\Design_Pefmit\OPC's\FeeCalc\Rev00\MR5B_OPC_FeeCalc(Rev00).xlsx
16.A.6.b
Packet Pg. 729 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
8 of 8
Project: Maple Ridge Phase 5B (RevOO)
Task: Engineer's OPC for Subdivision Fee Calculations
Prepared By. CW Date 2/21/2018
Checked By: DCH Date: 2/28/2018
LANDSCAPE AND LIGHTING
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
LL-1 STREET LIGHTING 19 EA S 200.00 S 3,800.00
LL-2 LANDSCAPE (STREET TREES, CODE MIN.) 1 LS $ 85,000.00 $ 85,000.00
$
$
$
$
$
$
$
$
$
$
$
$
SUB-TOTAL LANDSCAPE AND LIGHTING = S 88,800.00
P:\Active_Proj ects\P-CCAM-014\001_MapleRidge_Ph5B\Design_Permit\OPC's\FeeCalc\Rev00\MR5B_OPC_FeeCalc(Rev00).xlsx
16.A.6.b
Packet Pg. 730 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
c,i["rc,outtw
Growlfr Management DMision
Planning & Regulation
Land Development Services
September 6,2019
RE: Your Performance Bond No. 106819621 / CC Ave Maria LLC
Maple fudge at Ave Maria Phase 5B, PL20180000568
Dear Ms. Strassel:
Please be advised that based on the work completed to date and the associated inspections which have been
conducted, the subject Performance Security may now be reduced by $1,a99,088.90, leaving an available
balance of $454,837.97.
The remaining security includes $177,701.72 as the required l07o maintenance security, plus $277,136.25
in uncompleted improvements. An original Bond Rider should be directed to this office, "all other terms
and conditions oforiginal Performance Bond to remain in full force and effect".
If I can be ofany further assistance to you in this regard, please let me know.
Sincerely,
loHN HOAASWORTH
John R Houldsworth
Senior Site Plans Reviewer
With authority in these matters
CC: David Hurst, PE
CityView file
Jack McKenna, PE, County Engineer
Land Ds€hprEnt s€rvhes . 2800 North Horseshoe Drive . Naples, Ftorida 34104 , 239-252-?400 . vtww.colliergov.net
Ms. Charity Strassel, Attomey-in-Fact
Travelers Casualty and Surety Company olAmerica
One Tower 38
Hartford, CT.06813
16.A.6.b
Packet Pg. 731 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
,-.
TRAYELERS J
Travelers Casualty and Surety Company of Amcrica
License No. xtl
RIDER
To be attached to and form part ol Bond No. t06819621
lssued on behalfof CC Ave Uaria, LLC - uaple tudge at A\ o \leria Phase 58
Collicr Countv Board ofCountv Commissioners, Collier County FLorida
as Principal, and in favor of
as Obligee
It is agreed that:
E l. The Surety hereby gives its consent to change the Name:
from:
to:
E 2. The Surety hereby gives its consent to change the Address
from:
to:
a 3. The Surety hereby gives its consent to change
tiom: One million nine hundred fifty three thousand nine hundred twent! six end 87/100 (S1,951,926.37)
to: Four hundred fifr\ foor lhousand righr hundred th irt\seveo rnd 97l100 (5454,837.97)
This rider shall become effeclive as of SeDtember 6.2019
PROVIDED, however. that lhe liability ofthe Surety under the attached bond as changed by this rider shall not be
cumulative.
Signed, sealed and dated September 6. 2019
By:
C A. Moscr
Accepted: c&...r rbd r c-r c......-4 cdn c.-iy !l,id.or
Attomey-in-Fact
(lC- A vr- (Y\art t; LL
Obligee Princi
By By
S-,tl I I (8/66)
the PENAL BoND AMou\T
16.A.6.b
Packet Pg. 732 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
WARNING:THIS POWER OF ATTORNEY lS INVALID WITHOUTTHE RED BOBDER
,-.
TRAYELERSJ
P()\\ hR ()F {TT()R\t.\'
I'armington Casualty Company
l'idelity and Guaranty Insursnce Company
l'idelity and Guarant, lnsuranc€ fhd€rwdt€rs, Inc.
St. Paul Fire and Nlarin€ Insurance Compan!'
St. Paul Guardian Insurance Companl
St. Paul Nlercury Insurance Companl
Travelors Casualty and Suretl Compan!
Trarelrrs Cssualty and Surelr Companr of \merica
United Slates t_idelit\ and (;uarantl Companl
AttorneJ-In Fact No.
229166
("r,ilic,,,,. \,,.0 0 7 0 0 3 3 I 1
KNOW ALL MEN BY TIIESE PRESENTS: That Farmington Casuahy Company. St. Poul Fire and Marinc Insurance Company. Sr. Paul Cuardian Insurance
Company. St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company. Trnvelers Casualty and Surety Company of America. and Unired Srarcs
Fidelity and Guaranty Company are corporations duly organized under the laws of the Srare of Connecticut. rhat Fidelity and Cuaranty Insumnce Company is a
corporation duly organized under the laws of lhe State of lowa. a.d thal Fidelity and Guaranly lnsurance Under\{'ritcrs.Inc.. is a corporation duly organized under the
laws of the Slale of Wisconsin (herein collectively called lhe 'Companies ). and that the Companies do hercby make. conslilule and ippornl
Hunlley A. Hombeck Il. Kristin M. Neiert. Marc E. Williams. Slcphcn J. Benza. Charity A. Moser. and Dawn Y. Colccchio
Florida their (ruc and lawful Attomey(s)-in-Fact
each in their separate capacity if more than one is named above. to si8n. execute, seal and acknowledge any and all bonds. recognizances. condilional undenakings and
other *rili.gs obligalory in the naturc ihereof on behalf of the Companies in their business of guaranteeing the fideliry of persons. guaranteeing the performance of
contracts and execuling or guaranteeing bonds and undenakings required or permitted in any actions or proccedings allowed bv Ia$.
IN WITNESS WHEREOtr. the Companies have caused this instrument ro b. signed and their corporatc scals ro b. hcrero affixcd. rhis 5rh
dry of (^Ltober 20r6
l'armington Casually Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, In(
St. Paul Fire snd luarine Iosurance Companr_
SI. Paul Guardian lnsurance Compan)
St. Paul l\lercury Insurancc Compan!
tavelcrs Casualty and Surety Company
Travelers Casualty and Surety Company of ..tmerica
Unit€d States Fidelit] and Guarant\ Compan\
State of Connecticut
City of Hartford ss.
I}\
ney. Scnn Yice President
on this the 5th day of October 2016 . 6s1616 ms personally appeared Roberr L. Rancy. who acknowtcdSed himself ro
be the Senior vice President of Farm inglon Casualty Company. Fide lily and Guaranty In surancc Company. Fideliry and Guaranry I nsurance Underwriter\. Inc ., St. pau I
Fire and Marine Insurance company. sl. Paul Guardian Insurance Company. sl. Paul Mercury Insurance Company. Travelers Casudty and Surely Conrpany. Travclers
Casualty and Surety Company ofAmerica, and United states Fidelity and Guaranty Company,.rnd thal he. as such. being authorized so to do. excculed lhe foregoinSinsrumenl for lhe purposes therein contained by signing on behalfof the corporarions by himself as a duly aulhorizcd oficer.
In Witness Whereof, I hereunto set my hand and omcial seal
My Commission expires the l0rh day ofJune.202l.
s]/u,n e J,lroo^^.u+
Mnne C. Tetrcaulr. Notan Public
1982
,95.1
58440-5-16 Printed in U.S.A
WARNING: THIS POWER OF ATToRNEY IS INVALID WITHOUTTHE BED BORDEB
of the City of Nanles , State ot-
/
16.A.6.b
Packet Pg. 733 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
This Power ofAllorney is Sranted undcr and by the authoritv of the following resolutions adopled by rhe Boards of Dircctors of Farmington Casuahy Company. Fidelity
and Guaranty Insurance Company, Fidelily and Guaranly Insurance Underwriters. lnc.. St. Paul Fire and Mrrinc Insurance Company. St. Paul Guardian Insurance
Company, St. Paul Mercury Insurancc Company, Travclcrs Casualty and Surety Company, Travelen Casualty rnd Surety Company of America. and tjnited States
Fidelity and Guaranly Company, which resoiurions are now in full forcc and effecr. readinS as fbllows:
RESOL\IED, that the Chairman. lhe President, any Vice Chairman. any Executive Vice President. any Senior Vice Presidenr. anv Vicc President. any Second vice
President. the Treasurer. any Assislanl Trcasurer,lhe Corporale Secretary or any Assislant Secretary may appoinr Altomeys-in-Facr and ASents to act for and on behalf
of the Company and may give such appointee such aulhority as his or her certificate of aurhoriry may prescribe to sign wirh rhe Company's name and seal with the
Company's seal bonds, rccognizanccs. contracts of indemnity, and othcr writings obligatory in rhe nature of a hond. recognizance. or condirional undenaking, and any
of said officers or lhe Board of Direclors al any time may remove any such appointee and revoke the power Sivcn him or her; and it is
FURTHER RESOL!'ED, thal the Chairman. the President. any Vice Chairman, any Executive vice Presidenr. any Seoior Vice President or any Vice President may
delegale all or any pan of lhe forcgoing authority to one or more officers or employees of rhis Company. provided rhar each such delegatioo is in writing and a copy
lhereofis filed in the office ofthe Secretary; ard it is
FURTHER RESOLVED, that any bond. recognizance, contract of indemnity. or writing obligatory in the nature of a bond, recognizancc. or conditional undenaking
shall be valid and binding upon the Company when (a) sisncd by lhe President. any Vice Chairman. any Execurive Vicc Prcsidenl. aoy Senior Vice Prcsident or any Vice
President. any Second Vice President. the Treasurer. any Assistanl Treasurer.lhe Corporale Secretary or any Assistant Secrelary and duly attested aod sealed with the
Company's seal by a Secrelary orAssisiant Secretary: or (b) duly executed (under seal. ifrequired) by one or more A(omeys in Fad and Agenrs pursuanr ro lhe power
prescribed in his or her ce(ificatc or lheir cenificates of aulhority or by one or more Company officers pursuanl to a wrillen delegation of authorhy; and it is
FURTHER RESOLVED. that the \ignature of each of thc following officers: Presidenl. any Exccutive Vice President. any Senior Vice President, any Vicc President.
any Assistanl Vice ftesidenl, any Secrclary. any Assistant Secrcury. and the seal of lhe Company may be affixed by facsimilc ro any Power of A omey or ro any
cenificate relating thercto appoinlinS Residenl Vice Presidents. Residenl Assistanl Secrelaries or Atromeys-in-Facl for purposes only of executing and anesting bonds
and undenakings and other writings obligatory in the nature thereof. and any such Power ofAtlomey or cenificate b€aring such facsimile signalure or facsimile seal
shall be valid and binding upon the Company and any such power so executed and cenified by such facsimile siSnarurc and facsimile seal shall be vatid and binding on
thc Company in the future with respccr to any bond or understanding to which it is anached.
I. Kevin E. Hughes. the undersigned. Assistant Secretnry. of Farminglon Casualty Company. Fideliry and Guaranry Insurance Compan). Fidelity and Guaranty Insurance
Underwriters, Inc.. Sl. Paul Firc and Marine lnsurancc Company. St. Paul Guardian Irsurance Company. Sr. Paul Mercury lnsurancc Company, Travelen Casualty and
Surety Company. Travelers Casuaky nnd Surety Company ofAmerica. and Uniled SraEs Fidelity and Guaranly Company do hcrcby cenify that the above and foregoing
is a lrue and correcl copy of the Power ofAllomey executed by said Companies, which is in full force and effecl and has not been revoked.
WARNING: THIS POWEB OF ATTORNEY lS INVALID WITHOUT THE REO BOBDER
d,-"
Kevin E. Hughes, Assistant
SSAL
WABNING FOF IS INV ITH THE RE
20p.
tary
To verify the authenticity of this Power of Attomey, call I-800-421-3880 or contacl us at www.travelersbondcom. Please refer to the Altomeyjn-Fact number, the
above-named individuals and the details of the bond to which lhe power is attached.
'1951
IN TESTIMoNY WHEREoF,l have hereunto ser my hand and arFxed rhe seals of said compa"n.,no {/to"r", S <-[Ulf,fn tCf.rt .
{
(ffi@@ffi
16.A.6.b
Packet Pg. 734 Attachment: Bond Basis (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
[23-EIS-04824/1777851/1] Page 1 of 1
RESOLUTION NO. 23 - ____
A RESOLUTION OF THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA
AUTHORIZING FINAL ACCEPTANCE OF CERTAIN
ROADWAY AND DRAINAGE IMPROVEMENTS AND PLAT
DEDICATIONS IN MAPLE RIDGE PHASE 5B, SECOND
REPLAT, ACCORDING TO THE PLAT THEREOF
RECORDED IN PLAT BOOK 68, PAGES 4 THROUGH 7, AND
RELEASE OF THE MAINTENANCE SECURITY.
WHEREAS, the Board of County Commissioners of Collier County, Florida, on March
24, 2020, approved the plat of Maple Ridge Phase 5B, Second Replat for recording; and
WHEREAS, the Developer has constructed and maintained the roadway and drainage
improvements in accordance with the approved plans and specifications as required by the Land
Development Code (Collier County Ordinance No. 04-41, as amended); and
WHEREAS, the Developer is requesting final acceptance of the roadway and drainage
improvements and release of the maintenance security; and
WHEREAS, the Development Review Division has inspected the roadway and drainage
improvements, and is recommending acceptance of said facilities.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that final acceptance is hereby
granted for those roadway and drainage improvements and plat dedications in Maple Ridge
Phase 5B, Second Replat, pursuant to the plat thereof recorded in Plat Book 68, pages 4 through
7, and the Clerk is hereby authorized to release the maintenance security.
BE IT FURTHER RESOLVED AND ORDERED that the roadway and drainage
improvements within Maple Ridge Phase 5B, Second Replat, will be maintained privately in the
future and will not be the responsibility of Collier County.
This Resolution adopted after motion, second and majority vote favoring same, this 25th
day of April 2023.
DATE: BOARD OF COUNTY COMMISSIONERS
ATTEST: COLLIER COUNTY, FLORIDA
CRYSTAL K. KINZEL, CLERK
__________________________ By: ________________________________
Deputy Clerk Rick LoCastro, Chairman
Approved as to form and legality:
__________________________
Derek D. Perry
Assistant County Attorney
CAO4/7/202316.A.6.c
Packet Pg. 735 Attachment: Resolution (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
16.A.6.d
Packet Pg. 736 Attachment: Plat Map (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
16.A.6.d
Packet Pg. 737 Attachment: Plat Map (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
16.A.6.d
Packet Pg. 738 Attachment: Plat Map (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)
16.A.6.d
Packet Pg. 739 Attachment: Plat Map (25035 : Final Acceptance - Maple Ridge Phase 5B, Second Replat)