Loading...
Backup Documents 04/11/2023 Item #16C10 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 16 C 1. U TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date I. County Attorney Office County Attorney Office l � .3 & ) a 2. BCC Office Board of County / Commissioners Chairman P1./iv131� y/!//t3 3. Minutes and Records Clerk of Court's Office 914- PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Bendisa E.Zela, Facilities Phone Number 239-252-8440 Contact/ Department Division Email Bendisa.Zelagcolliercountyfl.gov Agenda Date Item was April 11,2023 Agenda Item Approved by the BCC Number 16.C.10 Type of Document Change Order Number of Original Attached Documents I Attached PO number or account Facilities Division is requesting a number if document is to completed copy be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A (Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? N/A 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information (Name; Agency; Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signed BEZ by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the BEZ document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on April 11,2023 N/A is not and all changes made during the meeting have been incorporated in the attached an option for document. The County Attorney's Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the an option for Chairman's signature. this line,. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16 C10 [' this exhibit is not applicable EXHIBIT F CHANGE ORDER ® Contract Modification ❑Work Order Modification Contract#: 17-7198 Change#: 16 Purchase Order#: 4500209838 Project#: 50156 Contractor/Firm Name: Manhattan Construction Florida Inc. Project Name: Phase 2.1 Collier County Sports Complex Project Manager Name: Ayoub Al-bahou, P.E.,ADAC,LEED GA Department: Facilities Management Original Contract/Work Order Amount $ 32,998,449.06' 11.8 12/8/20 Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 29,546,824.42i 11.6 12/8/20 Last BCC Approval Date; Agenda Item# Current Contract/Work Order Amount $ 29,546,824.42 4/14/2023 SAP Contract Expiration Date(Master) Dollar Amount of this Change $ 0.00 -10.46% Total Change from Original Amount Revised Contract/Work Order Total $ 29,546,824.42 0.00% Change from Current BCC Approved Amount Cumulative Changes $ (3,451,624.58) 0.00% Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 319121 Original Last Approved Revised Date 6/8/224/14/23 5/29/23 Date Completion Date Date Includes this change) #of Days Added 45 Select Tasks ❑Add new task(s) ❑Delete task(s) ❑Change task(s) ®Other(see below) Provide a response to the following:1.)a detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(if requested);2.)why this change was not included in the original contract;and,3.) describe the impact of this change is not processed. Attach additional information from the Design Professional and Contractor if needed. 1)This change order requests the following:This Change Order is for additional time only adding forty-five(45)days to Contract time as an update to previously approved changed order for extension of time,Florida Power&Light(FP&L)continues to impact the contractor ability to complete the project. FP&L is a direct vendor to Collier County, MCC has no control over their performance, and they have,on multiple occasions,failed to deliver necessary materials to the project so that contract work to install the material can be completed. This is the 3rd of such delays by FP&L and the contract has been previously extended for these events. According to the last FP&L latest update,there continues to be outstanding work to be completed by FP&L as follows: a) Lighting: FP&L is on-site and proceeding with lights for South Stadium parking lots,Cove parking lot, north parking lot, City Gate Boulevard South,pedestrian lighting internal to park,and City Gate Boulevard North. FPL estimated to be completed by middle of March. b) Primary feed:the electrical design for irrigation pumps and lights for City Gate Boulevard North are underway. Estimated completion of the design and construction work is estimated to be end of April. The delay in providing these items has again an estimated schedule impact of 45 days as stated in Manhattan request in its Notice of Claim dated 3/9/2023 2)The changes were not included in the original contract because F.P.&L. is direct vendor of Collier County and Construction Manager does not have any control over their performance. 3) If the Change Order is not processed the contractor will not be credited for additional project time needed because of factors outside of the contractor's control. Al-ba h o uAyo u b Digitally signed by Al-bahouAyoub Date: 2023.03.10 19:56:57 -05'00' Prepared by: Date: (Ayoub Al-bahou,P.E.,ADAC, LEED GA, Principal Project Manager,Facilities Management Division) Acceptance of this Change Order shall constitute a modification to the contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above, as fully as if the same were stated in this acceptance. The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. CIO 16C1L] Digitally signed by Craig Bryant Craig Bryant DN C=US,E=cbryantamenahattanconstmaion.com,O=Manhattan Construction Company,cU=Vice President,CN=Craig Bryant Date:2023,03,13 16 15 12-04'00' Accepted by: Date: (Manhattan Construction Florida,Inc.) ensiJelt Davidson.o-Davnison .., Engineering.ou=Eng near ng DAVIDSON email jeffedevidsonengineerng. �.,,IPP,,.... corn.c=US ':nrgamM. 2023.03.13 10.07.51-04'00' Approved by: Date: (Davidson Engineering)M CCo rm i CkJ oh n Digitally signed by McCormickJohn Date: 2023.03.14 10:21:10 -04'00' Approved by: Date: (John McCormick, Interim Division Director) D o r i a Priscilla b Digitallysigned Y DoriaPriscilla Date: 2023.03.21 10:49:04-04'00' Date: Approved by: (Procurement Professional) **Change Order#16 is contingent upon final Board approval of Change Order#15 under PO#4500209838. Board approval of Change Order#15 has not been issued as of the date approved by Procurement official above. If no Board approval to Change Order#15 is issued,this Change Order#16 shall be null and void. • • • CAO 16C1Q ATTEST: BOARD OF COUNTY COMMISSIONERS Crystal K. Kinzel, Clerk of Courts COLLIER COUNTY, FLORIDA & Comptroller • By: XLI.A4. i\-644.44441 By: Rick LoCastro, Chairman Dated: 4//z I 7-3 (SEAL), Approve o arm and legalit : By: Scott R. Teach Deputy County Attorney 16C1U Change Order/Amendment Summary COST TIME CO# AMD# Description Days Justification Additive(+) Deductive(-) Added New Amount To deduct builders'risk The use of the owner's 1 insurance and ( 146 80;;(10) allowance and deduction for the approve the use builder's risk insurance would of owners survey not be recognized. allowance. To approve the The use of the subcontractor's use of the allowance would not be 2 subcontractor's recognized allowance. To approve the The use of the owner's 3 use of owners allowance would not be testing allowance. recognized. To deduct and approve Direct To take advantage of sales tax 4 Material ($Ib3,385.80) g savin s. Purchases. To approve the The use of the owner's use of Owner contingency would not be 5 Contingency for ($1,627,901.54) recognized.To take advantage price escalation. of sales tax savings. DMP Turf 6 reallocate SDI to To reconcile/reallocate SDI the proper line To deduct and approve Direct To take advantage of sales tax 7 Material (5,189,635.66) savings. Purchases.Core &Main To deduct and approve Direct Material 8 Purchases. (,a,t 095 1'l! :i1) To take advantage of sales tax Conrad savings. Yelvington and Sportsfield Specialties Project time will be lost due to 9 To extend the 60 516 both material shortages and time by 60 days shipping delays, ripple effects of the COVID-19 pandemic Deduct allowances that Deductive change and Project are not being increase amounts would not be utilized. Extended recognized.Project time will be 10 GCs and GRS. (3,008 63) 145 661 lost due to both material Increase to the shortages and shipping delays, project due to ripple effects of the COVID-19 materials delays pandemic And to extend the time by 145 days c o s 16C1U Change Order/Amendment Summary fE COST TIME CO# AMD# Description Days Justification Additive(+) Deductive(-) Added New Amount To approve the use of Owner The use of the owner's 11 Contingency for 0 661 contingency would not be changes to the recognized. project Reversed of DMP 12 originally $506,395.57 0 661 A local supplier cannot provide approved on CO the required material. #8 Hurricane Ian Adding 60 days due to the 13 Impact 0 0 60 721 Impact of Hurricane Ian on the site. FP&L schedule Adding 45 days due to lack of 14 impact 0 0 45 766 FP& L material Modifications to bid documents 15 Modification to bid 142,028.01 0 are required to achieve final site documents approval and enhance the operation of the fields. 16 FP&L schedule 0 0 45 811 Adding 45 days due to lack of impact FP& L material CAD I6C1U Manhattan Construction Group 239,643.6000(office) 3705-1 Westview Drive 239.643.0090(facsimile) Naples,FL 34104 www.manhattanconstructiongroup.com Manhattan lhrrildinil excrellence __.__....._....--_.._.. March 9,2023 Facilities Management Division Ayoub Al-Bahou Principal Project Manager 3335 Tamiami Trail East Naples,FL 34112 ( RE: Notice of Claim for Delay and Impacts, FPL#4 Collier County Sports Complex Dear Mr. Al-Bahou, As an update to our previously sent letter dated January 25, 2023, Florida Power&Light continues to impact our ability to complete the project. As a direct vendor to Collier County,MCC has no control over their performance and they have,on multiple occasions, failed to deliver necessary materials to the project so that our contract work to install the material can be completed. This is the 3"'of such delays by FPL and our contract has been previously extended for these events. According to the last FPI..,update from Davidson Engineering, dated March 1, 2023,there continues to be ( outstanding work to be completed by FPL as follows: LIGHTING • Ferrara(FPL sub) is on-site and proceeding with Areas 2 (South Stadium parking lots), 3 (Cove Parking).4(fields 5/6 north parking lot),and I (Phase I CGBS),6(Phase 2.1 CGBS),7 (pedestrian lighting internal to park), 8 (CGB.N). • County to provide updated signed agreement (3 poles added). • FPL will have Ferrara replace one 17" 1-IH with a 24'' HH at the 3-pole addition location (FPL mistake) • Engineering has completed full reviews for AREAS 1,2 3,4, and 6. AREAS 5.7, and 8 are pending(FYI 5 and 7 are descoped AREAS). FPi_,is reviewing and will follow-up. PRIMARY • Engineering will be completed this week, • Schedule release should be out next week. • Primary impacts irrigation pumps and a portion of lighting for CGEN extension. All of this work will be required to be finished by FPL in order for MCC to pass final inspections on the site and achieve Substantial Completion. While there are concerns for FPL's ability to furnish material and labor to complete their work, the full impact to MCC's ability to achieve Substantial Completion is not currently known due to FPL's inability to provide a schedule. it's due to these conditions that MCC 5 ( CAO r:.r,r,s %a ryr: 16C10 respectfully requests an extension of time of 45 days now and further reserves its rights to additional time as additional delays occur. R „ar se,✓r/'7 ,ra������� fy�t�C Vic(.: .'�ent Manhattan con. ruction Company /f ': AR Cho \ 1y♦•I