Agenda 03/28/2023 Item #16C4 (Change order No. 15 to Collier County Sport Complex)03/28/2023
EXECUTIVE SUMMARY
Recommendation to approve Change Order No. 15 to Collier County Sport Complex Phase 2.1 and 2.2A
under the Sixth Amendment to Agreement No. 17-7198 with Manhattan Construction (Florida), Inc.,
resulting in a net reduction in the amount of $142,028.01.
OBJECTIVE: To approve Change Order No. 15 providing for needed projects elements and removing low priority
features for a net reduction of $142,028.01 to the approved Guaranteed Maximum Price.
CONSIDERATION: On February 13, 2018 (Agenda Item 16.D.21) the Board awarded Agreement No. 17-7198
(the “Agreement”) with Manhattan Construction (Florida), Inc. (“Manhattan”) for Construction Manager at Risk
services for all preconstruction phases for the Paradise Coast Sports Complex.
On December 8, 2020 (Agenda Item 11.B), the Board awarded the Sixth Amendment to the Agreement with
Manhattan for work for Phase 2.1 and 2.2A.
Change Order No. 15 requests the following:
a) Authorization Request: 7675.021R1 - Cove parking lot expansion
Addendum #10 was issued to update signage, stripping, stormwater, landscaping, and irrigation that was
not shown on the bid plans used to develop the Guaranteed Maximum Price. The missing elements are
required by code and were identified at the time of permitting. Increase to the project of $246,884.37.
b) Authorization Request: 7675.028 - Electrical conduits - Fortune Electric
Addendum #13 was issued to modify the design and layout of electrical conduits necessary for operation of
the Sports Complex. These conduits were not included in the bid plans used to develop the Guaranteed
Maximum Price. Increase to the project $147,989.69.
c) Authorization Request: 7675.029 - RFI #22- breakers - Fortune Electric
The electrical engineer revised the existing breaker size to accommodate new Musco lights to be funded
from Owner Contingency in the amount of $6,367.44. The breaker being upsized was installed in Phase 1
but is of insufficient capacity to supply the lighting installed as part of Phase 2.
d) Authorization Request: 7675.038 - Descope of RV Park
Per Collier County’s request, the RV park is removed from the CM scope for a deductive change in the
amount of $705,163.54.
e) Authorization Request: 7675.041 - Field 5-8 Curb change and fence - SCG Fields
Per Collier County’s request, modifications to the field curb and fence are needed to operate the new fields
for an increase to the project in the amount of $128,807.69. The curb and fencing are necessary elements to
properly separate the sports fields. As such, the Phase 1 fields include these elements and are needed for the
Phase 2 fields. This work is authorized under attached Work Directive #9. The bid plans used to develop
the Guaranteed Maximum Price failed to include these necessary project elements.
f) Authorization Request: 7675.049 - additional fencing
Modify the temporary chain-link fence to separate phase 2.1 from future phase 3 as outlined in addendum
#21 for an increase to the project in the amount of $39,453.78. The fencing is necessary to allow the public
to safety utilize the four fields constructed under phase 2.1 during construction of field 9 under phase 3.
This work is authorized under attached Work Directive #13.
FISCAL IMPACT: This change order results in a net contract reduction of $142,028.01. Funding for Sports
Complex Project No. 50156 is provided in Sports Complex Capital Improvement Fund (370). Funding for the
project is provided by bond proceeds, TDC funds and the General Fund.
16.C.4
Packet Pg. 1278
03/28/2023
GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to this
action.
LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for
Board approval. -SRT
RECOMMENDATION: Recommendation to approve Change Order No. 15 to Collier County Sport Complex
Phase 2.1 and 2.2A under the Sixth Amendment to Agreement No. 17-7198 with Manhattan Construction (Florida),
Inc., resulting in a net reduction in the amount of $142,028.01. (Project 50156)
Prepared by: Ayoub R. Al-Bahou, PE, Principal Project Manager, Facilities Management Division
ATTACHMENT(S)
1. sport complex2.1 change order #15 backup (PDF)
2. Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (PDF)
16.C.4
Packet Pg. 1279
03/28/2023
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.C.4
Doc ID: 24927
Item Summary: Recommendation to approve Change Order No. 15 to Collier County Sport Complex Phase 2.1
and 2.2A under the Sixth Amendment to Agreement No. 17-7198 with Manhattan Construction (Florida), Inc.,
resulting in a net reduction in the amount of $142,028.01.
Meeting Date: 03/28/2023
Prepared by:
Title: Principal Project Manager – Facilities Management
Name: Ayoub Al-bahou
03/09/2023 12:52 PM
Submitted by:
Title: – Facilities Management
Name: John McCormick
03/09/2023 12:52 PM
Approved By:
Review:
Facilities Management Ayoub Al-bahou Additional Reviewer Completed 03/09/2023 12:53 PM
Facilities Management John McCormick Director - Facilities Completed 03/09/2023 12:54 PM
Procurement Services Ana Reynoso Level 1 Purchasing Gatekeeper Completed 03/09/2023 4:03 PM
Procurement Services Priscilla Doria Additional Reviewer Completed 03/10/2023 1:24 PM
Procurement Services Sue Zimmerman Additional Reviewer Completed 03/14/2023 11:01 AM
Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 03/17/2023 8:37 AM
Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 03/17/2023 11:02 AM
Procurement Services Sandra Herrera Additional Reviewer Completed 03/17/2023 3:44 PM
County Attorney's Office Scott Teach Additional Reviewer Completed 03/20/2023 8:43 AM
Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 03/20/2023 8:56 AM
Corporate Compliance and Continuous Improvement Megan Gaillard Additional Reviewer Completed
03/20/2023 9:06 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 03/20/2023 10:23 AM
Office of Management and Budget Christopher Johnson Additional Reviewer Completed 03/21/2023 3:56 PM
Office of Management and Budget Susan Usher Additional Reviewer Completed 03/21/2023 4:20 PM
County Manager's Office Ed Finn Level 4 County Manager Review Completed 03/22/2023 1:17 PM
Board of County Commissioners Geoffrey Willig Meeting Pending 03/28/2023 9:00 AM
16.C.4
Packet Pg. 1280
16.C.4.a
Packet Pg. 1281 Attachment: sport complex2.1 change order #15 backup (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.a
Packet Pg. 1282 Attachment: sport complex2.1 change order #15 backup (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.a
Packet Pg. 1283 Attachment: sport complex2.1 change order #15 backup (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.a
Packet Pg. 1284 Attachment: sport complex2.1 change order #15 backup (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.a
Packet Pg. 1285 Attachment: sport complex2.1 change order #15 backup (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.a
Packet Pg. 1286 Attachment: sport complex2.1 change order #15 backup (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.a
Packet Pg. 1287 Attachment: sport complex2.1 change order #15 backup (24927 : Sport Complex Phase 2.1- CO#15)
2600 Golden Gate Parkway, Naples, Florida, 34105 Office 239.403.6700 Fax 239.261.1797
Fla Engineer CA 28275 Fla Landscape CA LC26000632
Page | 1
November 8, 2022
Collier County Board of Commissioners
3301 Tamiami Trail East
Naples, FL 34112
Re: Collier County Sports Complex and Events Center
Phase 2.1 – AR Review
AR 7675.021-R4 – ADDENDUM 10
To Whom It May Concern,
We have received and reviewed the documents referenced above from Manhattan Construction Company.
Regarding pricing, we find this work to be competitive and reasonable for the current market standards.
Thank you,
Josh Fruth
PENINSULA ENGINEERING
Vice President
16.C.4.b
Packet Pg. 1288 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
2410 Palm Ridge Road - Sanibel Island, FL 33957
239.478.2220 - CoastalVistaDesign@gmail.com
Page 1
LANDSCAPE ARCHITECTURE | DESIGN | CONSULTATION | CONSTRUCTION OBSERVATION
Date: November 10, 2022
Collier County Board of Commissioners
3301 Tamiami Trail East
Naples, FL 34112
Re: Collier County Sports Complex and Events Center
Addendum #10 - AR Review
Cove Parking Lot Landscaping
Collier County Sports Complex
Addendum #10 – AR Review
To Whom It May Concern,
We have received and reviewed the documents referenced above from Manhattan Construction Company with
regard to the landscape scope of work provided by Brightview Landscape Development, Inc. Regarding pricing, we
find this work to be competitive and reasonable for the current market standards.
Thank you,
Leigh A. Gevelinger, PLA, ASLA, LEED AP
Owner, Coastal Vista Design, Inc.
Florida Registered LA #6667171
16.C.4.b
Packet Pg. 1289 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
'HWDLOHG)RUP*URXSHGE\1XPEHUZLWK&(%UHDNGRZQ
$XWKRUL]DWLRQ5HTXHVW
&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
3URMHFW
$XWKRUL]DWLRQ5HTXHVW'DWH
7R$\RXE$OEDKRX 5REHUW7LHGHPDQ)URP
&ROOLHU&RXQW\ 0DQKDWWDQ&RQVWUXFWLRQ&RPSDQ\
:HVWYLHZ'5
1DSOHV)/
7DPLDPL7UDLO(DVW
1DSOHV)/
'HVFULSWLRQ &DWHJRU\ 6WDWXV
$GGHQGXP&RYH3DUNLQJ([SDQVLRQ 6XEPLWWHG'LUHFW&RVW
5HIHUHQFH 5HTXLUHG%\ 'D\V5HT $PRXQW5HTXHVWHG
1RWHV
7KLVSURSRVDOLVLQFOXVLYHRIWKHIROORZLQJVKHHWV
&GDWHG$XJXVW
&GDWHG$XJXVW
&GDWHG$XJXVW
&GDWHG$XJXVW
&GDWHG$XJXVW
&GDWHG$XJXVW
&GDWHG$XJXVW
&GDWHG$XJXVW
&GDWHG$XJXVW
&GDWHG$XJXVW
&GDWHG$XJXVW
&GDWHG$XJXVW
/GDWHG$XJXVW
/GDWHG$XJXVW
/GDWHG$XJXVW
/GDWHG$XJXVW
/GDWHG$XJXVW
/GDWHG$XJXVW
/GDWHG$XJXVW
5),,UULJDWLRQ&RQWUROOHU
5),$GGHQGXP/DQGVFDSLQJ&ODULILFDWLRQ7KH&RYH3DUNLQJ/RW
/ /
7HPSRUDU\&RQVWUXFWLRQ)HQFH6DIHW\
1RWH3OHDVHQRWHWKLV$GGHQGXPZDVLVVXHGDQGWKHVXEPLWWDOZDVDSSURYHG5HIHUHQFHVXEPLWWDO5HY7KH&RYH
SDUNLQJ/RW$GGHQGXP'UDLQDJH5HYLVLRQV
(;&/86,216
2II+RXUV :HHNHQGV
6FKHGXOH&RVW7LPH,PSDFWV
)LHOG&RQGLWLRQVH[FOXGHGIURPWKLV$GGHQGXP
&GDWHG$XJXVW
&GDWHG$XJXVW)3 //LJKWLQJ$UHD
6XEVWLWXWLRQGXHWRXQIRUVHHQFRQGLWLRQVPDWHULDOVKRUWDJHV
([RWLF5HPRYDO
6XUYH\LQJRIWKH&RYH3DUNLQJ/RW([SDQVLRQ
&(1R 'DWH 5HIHUHQFH 'D\V5HT$PRXQW3URSRVHG &DWHJRU\ 5HDVRQ
3URORJ0DQDJHU
3URMHFW&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
16.C.4.b
Packet Pg. 1290 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
$XWKRUL]DWLRQ5HTXHVW
'HWDLOHG)RUP*URXSHGE\1XPEHUZLWK&(%UHDNGRZQ
2ZQHU&KDQJH &KDQJH&RQGLWLRQ
'HVFULSWLRQ
$''(1'80&RYH3DUNLQJ([SDQVLRQ 3HUPLW
3HQLQVXOD(QJLQHHULQJDFTXLULQJSHUPLWIRU&RYH3DUNLQJH[WHQVLRQ
$GGHQGXP
6HH6HSWHPEHU0(025$1'80
7DE3KDVH)RXU±3DUNLQJ/RW([SDQVLRQ
$GGHQGXPWR7DE±&2//,(5&2817<632576&203/(;(9(176&(17(53+$6(
7KLV$GGHQGXPXSGDWHVVLJQDJHVWULSLQJDQGODQGVFDSLQJZLWKLQWKHDFUHSDUNLQJORWVSHFLILFDOO\DGGLQJFURVVZDONVDQGVWRSSLQJ
FRQGLWLRQVWKURXJKRXW$GGLWLRQDOO\FODULILFDWLRQRQGUDLQDJHKDVEHHQSURYLGHGZKLFKUHTXLUHVWKHUDLVLQJRIVWRUPVWUXFWXUHV7KLVDGGHQGXP
LQFOXGHVWKHILQDOVHWRIODQGVFDSLQJGRFXPHQWVWREHELGQRWSDUWRIRULJLQDOELGGRFXPHQWV7DEEXWDOORZDQFHVKRXOGEHUHYLHZHG
5HIHUWRXSGDWHVZLWKLQWKH)2//2:,1*$33529('3/$16
R$SSURYHG&LYLO3ODQV3/
R$SSURYHG/$3ODQV3/
1RWHV
&RVW(YHQW%UHDNGRZQ
,WHP1R ,WHP'HVFULSWLRQ $PRXQW3URSRVHG 5HIHUHQFH
(;&$9$7,21($57+029('
/$1'6&$3(
67250'5$,1$*(&+$1*(6
)(1&(&+$,1/,1.
7HPSRUDU\)HQFH
/HYHO 6',
/HYHO *HQHUDO/LDELOLW\
/HYHO %RQG
/HYHO &0)HH
,QRUGHUWRPLWLJDWHSRVVLEOHGHOD\VDQGH[SHGLWHWKHDSSURYDOIRUWKHGLUHFWFRVWRIZRUNUHODWHGWRWKLVFKDQJHXQOHVVVSHFLILFDOO\QRWHGDERYHZH
DUHVXEPLWWLQJWKLVFKDQJHUHTXHVWZLWKRXWVFKHGXOHWLPHFRVWLPSDFW:HUHVHUYHWKHULJKWWRVXEPLWIRUFRVWWLPHLPSDFWVUHODWHGWRWKLVFKDQJH
XQGHUVHSDUDWHFRYHUZKHQWKDWLQIRUPDWLRQLVDYDLODEOH
&RQWUDFWRUGRHVQRWUHOHDVHLPSDFWVWKDWDULVHRXWRI$FWVRI1DWXUHLQFOXGLQJILUHIORRGHDUWKTXDNHVWRUPKXUULFDQHRURWKHUQDWXUDOGLVDVWHU
ZDULQYDVLRQDFWRISXEOLFHQHPLHVKRVWLOLWLHVZKHWKHUZDULVGHFODUHGRUQRWFLYLOZDUUHEHOOLRQUHYROXWLRQLQVXUUHFWLRQPLOLWDU\RUXVXUSHG
SRZHURUFRQILVFDWLRQWHUURULVWDFWLYLWLHVULRWQDWLRQDOL]DWLRQJRYHUQPHQWDFWLRQVWDULIIVEORFNDJHHPEDUJRWUDQVSRUWDWLRQGHOD\VQRWUHDVRQDEO\
IRUHVHHDEOHODERUGLVSXWHVWULNHORFNRXWGLVHDVHRXWEUHDNHSLGHPLFVSDQGHPLFVTXDUDQWLQHUHVWULFWLRQVRULQWHUUXSWLRQRUIDLOXUHRISRZHU
VRXUFHV7RWKHH[WHQWWKHVHFRQGLWLRQVPD\RFFXUDQGLPSDFWWKH3URMHFWWKHUHVKDOOEHDQHTXLWDEOHDGMXVWPHQWWRWKH&RQWUDFW
6,*1$785( '$7($\RXE$OEDKRX±6U3URMHFW0DQDJHU
$SSURYHG%\
$XWKRUL]DWLRQ5HTXHVW
3URORJ0DQDJHU
3URMHFW&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
16.C.4.b
Packet Pg. 1291 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1292 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)Supporting Documents
16.C.4.b
Packet Pg. 1293 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)CE 016 - Item 001
Excavation - Earth Moved
16.C.4.b
Packet Pg. 1294 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1295 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)CE 016 - Item 002
Landscape
16.C.4.b
Packet Pg. 1296 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1297 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
BrightView Landscape Development, Inc.
TAMPA 2022
All work performed as time and material work in accordance with this sheet shall be payable in full within 30 days of invoice date, without retention.
5326 CR 579, Seffner, FL 33584 813.628.8116
EQUIPMENT RENTAL - LABOR RATE SHEET
Equipment Maintained - Moving Time, Operator, and Delivery at Extra Cost
ITEM #DESCRIPTION RATE
EQUIPMENT (E) DAILY RATE
LABOR (L) HOURLY RATE OT Rate
L.1 HardscapeForeman 62.00 83.00
L.2 HardscapeLeadman/Operator 54.00 72.00
L.3 HardscapeCraftsman/Finisher 49.00 66.00
L.4 HardscapeLaborer 45.00 61.00
L.5 LandscapeForeman 52.00 70.00
L.6 LandscapeLeadman/Operator 41.00 56.00
L.7 LandscapeLaborer 37.00 50.00
L.8 IrrigationForeman 50.00 67.00
L.9 IrrigationLeadman/Operator 43.00 58.00
L.10 Irrigation Laborer 37.00 50.00
L.11 Survey Crew 195.00 266.00
L.12 Superintendent 99.00 99.00
L.13 Project Manager 99.00 99.00
Equipment rates include fuel, maintenance, tax, and markup.
Labor rates are standard time and include burden and markup.
One day minimum charge on all equipment, plus delivery and pickup charge of $220.
NOTE: If directed, all night work (7 p.m. - 6 a.m.) required will be surcharged at 10% on the above listed items.
THIS LIST SUPERSEDES ALL PREVIOUS LISTS AND PRICES BECOME EFFECTIVE JANUARY 1, 2022
1/11/2022
E.1 Concrete Buggy Wheeled 150.00
E.2 Concrete Buggy Tracked 265.00
E.3 Golf Cart 170.00
E.4 Telehandler w/ Attachments 10k #920.00
E.5 Telehandler w/ Attachments 12k #1055.00
E.6 Telehandler w/ Attachments 15k #1475.00
E.7 Mini Excavator 7500#410.00
E.8 Mini Excavator 11000#525.00
E.9 Skid Steer mini 500# MT55 275.00
E.10 Skid Steer 3700# JD333 680.00
E.11 Wheel Loader w/Attachments 1 CY JD244 625.00
E.12 Wheel Loader w/Attachments 2 CY JD344 685.00
E.13 Wheel Loader w/Attachments 3 CY JD544 780.00
E.14 Wheel Loader w/Attachments 4 CY JD644 970.00
E.15 Dozer 70hp 815.00
E.16 Trencher Ride On 280.00
E.17 Water Truck 2000g (owner furnished water)510.00
E.18 Water Buffalo 500g (owner furnished water)155.00
E.19 Truck ¾Ton 235.00
E.20 Light Tower 4000W 160.00
E.21 Pressure Washer 3500 psi 135.00
E.22 Cut Off Saw and Blade 150.00
E.23 Air Compressor 185cfm 225.00
E.24 Breaker (air) w/ Bits 105.00
E.25 Breaker (electric) w/ Bits 115.00
E.26 Double Drum Roller 36”305.00
E.27 Plate compactor 300#120.00
E.28 Plate Compactor 1000#300.00
E.29 Mortar Mixer 6cf 95.00
E.30 Generator 5 kw 105.00
E.31 Sod Cutter 130.00
E.32 Solar Generator for irrigation controller 100.00
E.33 Ride On Deck Mower 225.00
E.34 Trash Pump and hoses 115.00
E.35 Floor Saw (control joints)120.00
E.36 Backhoe 80Hp 435.00
E.37 Pickup and Delivery of Equipment 220.00
16.C.4.b
Packet Pg. 1298 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
Collier County Sports Complex
Addendum #10
Date : 1/07/22
Lower Tier Subs
(A x B) (A x D) (A x F)
A BCDEFG H Total C + E + G + H
Item Description Qty Unit
Labor
Unit Price Labor Total Material
Unit Price Material Total Equipment
Unit Price Equip Total Subcontractor
Total Material + Labor +
Equipment + Subcontractor
Quote
Comments
0.00 $ - 0.00 $ - 0.00 $ - $ -
Irrigation
Valves 1.5" ICV-G full kit with boxes 8 ea $ - 200.00 $ 1,600.00 0.00 $ - $ 1,600.00
Valves 2" ICV-G full kit with boxes 1 ea $ - 250.00 $ 250.00 0.00 $ - $ 250.00
Decoders ICD-100 9 ea $ - 125.00 $ 1,125.00 0.00 $ - $ 1,125.00
Grounding 1 LS $ - 125.00 $ 125.00 0.00 $ - $ 125.00
PROS-12 Spray with nozzles 142 ea $ - 20.50 $ 2,911.00 0.00 $ - $ 2,911.00
Fittings, swing joints grounding 1 ea $ - 790.20 $ 790.20 0.00 $ - $ 790.20
PCB-10 Bubblers 90 ea $ - 4.00 $ 360.00 0.00 $ - $ 360.00
MP3000 PROS-12-PRS40-cv-f Rotator 72 ea $ - 6.05 $ 435.60 0.00 $ - $ 435.60
Laterals - PVC Class 200 SDR 21
2"40 lf $ - 1.81 $ 72.40 0.00 $ - $ 72.40
1.5"20 lf $ - 1.31 $ 26.20 0.00 $ - $ 26.20
1.25"712 lf $ - 1.06 $ 754.72 0.00 $ - $ 754.72
1.0"4430 lf $ - 0.66 $ 2,923.80 0.00 $ - $ 2,923.80
.75"634 lf $ - 0.50 $ 317.00 0.00 $ - $ 317.00
Fittings 1 ls $ - 1,280.00 $ 1,280.00 0.00 $ - $ 1,280.00
Mainline - PVC Sch 40
2"847 lf $ - 3.63 $ 3,074.61 0.00 $ - $ 3,074.61
1.5"142 lf $ - 2.68 $ 380.56 0.00 $ - $ 380.56
Fittings 1 ls $ - 660.00 $ 660.00 0.00 $ - $ 660.00
Sleeves - PVC Sch 40
4"236 lf $ - 7.86 $ 1,854.96 0.00 $ - $ 1,854.96
3"329 lf $ - 7.56 $ 2,487.24 0.00 $ - $ 2,487.24
2"1055 lf $ - 3.64 $ 3,840.20 0.00 $ - $ 3,840.20
Nibco T-113-K at POC 1 ea $ - 303.00 $ 303.00 0.00 $ - $ 303.00
POC Labor $897.00 includes ex. controller
tie in programming
Wire - 2-wire 1000 lf $ - 0.72 $ 720.00 0.00 $ - $ 720.00
misc irrigation materails 1 ls $ - 1,145.00 $ 1,145.00 0.00 $ - $ 1,145.00
exclude backflow (none shown) $ - 0.00 $ - 0.00 $ - $ -
Equipment (Trencher) 15 dy 265.00 $ 3,975.00
Misc delivery & fuel fees 1 ls $ - 1,275.00 $ 1,275.00
Irrigation Foreman 120 hr 49.00 $ 5,880.00
Irrigation Leadman 120 hr 42.00 $ 5,040.00
Irrigation Labor 120 hr 36.00 $ 4,320.00
Irrigation Labor 120 hr 36.00 $ 4,320.00
TAX 7.0%1,696.19$ 7.0%278.25$ 29,411$ check
Subtotal 19,560.00$ 29,132.68$ 5,528.25$ -$ 54,221$ Subtotal
Overhead & Profit - Materials 10%1,956.00$ 2,743.65$ 4,699.65$
Overhead & Profit - Equipment 10%397.50$ 397.50$
Overhead & Profit - Subs 10%-$ -$
Subtotal 21,516.00$ 31,876.33$ 5,925.75$ -$ 59,318$ Subtotal
Bond 0%-$ -$ -$ -$ -$
Total 21,516.00$ 31,876.33$ 5,925.75$ -$ 59,318.08$ Total
* On OCIP Projects the labor Rates and Lower Tier Subcontractor values used above are adjusted for OCIP. No future credit for OCIP is pending related to this estimate.
Labor Material Equipment
1 of 1
16.C.4.b
Packet Pg. 1299 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex
16.C.4.b
Packet Pg. 1300 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)CE 016 - Item 003
Storm Drainage
-(16(1 352326$/
81'(5*5281'87,/,7,(6,1&12
7$</2552$'1$3/(6)/'$7(
3+21()$;6+((712RI
&(57,),('81'(5*5281'87,/,7<&8& ),5(635,1./(5&2175$&7259
352326$/68%0,77('72:25.72%(3(5)250('$7
1$0(0DQKDWWDQ&RQVWUXFWLRQ&RPSDQ\,QF &ROOLHU&RXQW\6SRUWV&RPSOH[$GGHQGXP
675((7 :HVWYLHZ'ULYH 675((7 &LW\*DWH%OYG
&,7<1DSOHV &,7<1DSOHV
67$7()/'$7(2)3/$16 5HYLVHG
3+21()$; (1*,1((5 3HQLQVXOD(QJLQHHULQJ
:HKHUHE\SURSRVHWRIXUQLVKWKHPDWHULDOVDQGSHUIRUPWKHODERUQHFHVVDU\IRUWKHFRPSOHWLRQRI
352326('&+$1*(25'(5
'5$,1$*($''
($ 'LWFK%RWWRP,QOHW
($ &RQWURO6WUXFWXUH
($ 7\SH&XUE,QOHW
($ 0RGLI\ZLWK5LVHU )UDPH *UDWH
($ 0RGLI\ZLWK9DOOH\*XWWHU)UDPH *UDWH
($ 5RFN([FDYDWLRQIRU6WUXFWXUH
'5$,1$*(727$/$''
'5$,1$*('(/(7(
($ 7\SH&,QOHW
($ 6WRUP0DQKROH
($ 0LWHUHG(QG6HFWLRQZ5LS5DS
($ 5RFN([FDYDWLRQIRU6WUXFWXUH
'5$,1$*(727$/'(/(7(
&+$1*(25'(5727$/
127(
125(6725$7,212)(;,67,1*&21',7,216
$OOPDWHULDOLVJXDUDQWHHGWREHDVVSHFLILHGDQGWKHDERYHZRUNWREHSHUIRUPHGLQDFFRUGDQFHZLWKWKHGUDZLQJVDQGVSHFLILFDWLRQV
VXEPLWWHGIRUDERYHZRUN$Q\DOWHUDWLRQRUGHYLDWLRQIURPDERYHVSHFLILFDWLRQVLQYROYLQJH[WUDFRVWVZLOOEHH[HFXWHGXSRQZULWWHQ
RUGHUVDQGZLOOEHFRPHDQH[WUDFKDUJHRYHUWKHFRQWUDFWDPRXQW2ZQHUDJUHHVWRDFFHSWFXUUHQWLQVXUDQFHLQSODFHE\&RQWUDFWRU#
WLPHRIELG2ZQHUDJUHHVWREHDUDQ\FRVWIRUFKDQJHVRUDOWHUDWLRQVLQLQVXUDQFHFRYHUDJH7KLVSURSRVDOPD\EHZLWKGUDZQE\XV
LIQRWDFFHSWHGZLWKLQGD\V3D\PHQWVWREHPDGHDVIROORZV$VZRUNSURJUHVVHVSD\PHQWGXHZLWKLQWKLUW\GD\VRIELOOLQJ
5HVSHFWIXOO\VXEPLWWHG.HOO\(GZDUGV
-(16(181'(5*5281'87,/,7,(6,1&
$FFHSWDQFHRI3URSRVDO7KHDERYHSULFHVVSHFLILFDWLRQVDQGFRQGLWLRQVDUHVDWLVIDFWRU\DQGDUHKHUHE\DFFHSWHG<RXDUH
KHUHE\DXWKRUL]HGWRSHUIRUPWKHZRUN
'DWH 6LJQDWXUH
16.C.4.b
Packet Pg. 1301 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1302 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)CE 016 - Item 004
Fence
16.C.4.b
Packet Pg. 1303 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1304 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
2600 Golden Gate Parkway, Naples, Florida, 34105 Office 239.403.6700 Fax 239.261.1797
Fla Engineer CA 28275 Fla Landscape CA LC26000632
Page | 1
November 9, 2022
Collier County Board of Commissioners
3301 Tamiami Trail East
Naples, FL 34112
Re: Collier County Sports Complex and Events Center
Phase 2.1 – AR Review
AR 7675.028
To Whom It May Concern,
We have received and reviewed the documents referenced above from Manhattan Construction Company.
Regarding pricing, we find this work to be competitive and reasonable for the current market standards.
Thank you,
Josh Fruth
PENINSULA ENGINEERING
Vice President
16.C.4.b
Packet Pg. 1305 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
'HWDLOHG)RUP*URXSHGE\1XPEHUZLWK&(%UHDNGRZQ
$XWKRUL]DWLRQ5HTXHVW
&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
3URMHFW
$XWKRUL]DWLRQ5HTXHVW'DWH
7R$\RXE$OEDKRX 5REHUW7LHGHPDQ)URP
&ROOLHU&RXQW\ 0DQKDWWDQ&RQVWUXFWLRQ&RPSDQ\
:HVWYLHZ'5
1DSOHV)/
7DPLDPL7UDLO(DVW
1DSOHV)/
'HVFULSWLRQ &DWHJRU\ 6WDWXV
$GGHQGXP&RQGXLW/D\RXW)3/&RQGXLW9DXOWVDQG)XWXUH&RQQHFWLRQVIRU
3KDVH
5HYLVH 5HVXEPLW'LUHFW&RVW
5HIHUHQFH 5HTXLUHG%\ 'D\V5HT $PRXQW5HTXHVWHG
1RWHV
7KLV$5LQFOXGHVDOOFRVWDVVRFLDWHGZLWK$GGHQGXPGDWHG
(;&/86,216
2II+RXUV :HHNHQGV
6FKHGXOH&RVW7LPH,PSDFWV
7HVWLQJ
6XUYH\LQJ
*HRWHFKQLFDO5HSRUW
5RFN([FDYDWLRQ
%,00RGHOLQJ
)LHOG&RQGLWLRQVH[FOXGHGIURPWKLV$GGHQGXP
6XEVWLWXWLRQGXHWRXQIRUVHHQFRQGLWLRQVPDWHULDOVKRUWDJHV
&(1R 'DWH 5HIHUHQFH 'D\V5HT$PRXQW3URSRVHG &DWHJRU\ 5HDVRQ
2ZQHU&KDQJH 2ZQHU'LUHFWLYH
'HVFULSWLRQ
$GGHQGXP&RQGXLW3ODQ)3 /&ROOLHU)LEHU&RPFDVW&HQWXU\/LQN
5HYLVHG&RQGXLW3ODQ&
$GGHQGXP6KHHW& 5%(GLGQRWSURYLGHDFRQGXLWOD\RXWIRU:HOO :HOO
$GGHQGXP6KHHW&UHIOHFWHGWKHFRQGXLWOD\RXWVXSSRUWLQJ:HOO :HOO
$GGHQGXP1RWHGWKHEDVLVRIGHVLJQIRU)3 /5%(
$GGHQGXP6KHHW&UHIOHFWHGWKHFRQGXLWOD\RXWVXSSRUWLQJWKHXSGDWHGFRQGXLWSODQ
,WHP
%DVHGRQ)3/:('UDZLQJWKURXJKZLWKDOOPDWHULDOVXSSOLHGE\)3/IRUH[WUDZRUNQRWVKRZQRQFRQWUDFWGRFXPHQWV2ULJLQDOELG
GRFXPHQWGUDZLQJV5%(LVDWWDFKHGWRWKHSDFNDJHWRGHPRQVWUDWHWKHIDFWWKDWQRSULPDU\FRQGXLWVLQGLFDWHGDORQJZLWK&ZKLFK
VKRZVGUDZLQJZLWKQRSULPDU\FRQGXLWLQWKLVDUHIRU)3/
LWHP
&RQWUDFWGUDZLQJ5%(DGGGUDZLQJLVVKRZLQJWKHGXFWEDQNVWRSSLQJDWWKHFLW\JDWHLQWHUFRQQHFWURDG
'UDZLQJ&KDVDGGHGFRQGXLWVIURPWKHFLW\JDWHLQWHUFRQQHFWURDGDVIROORZV
7KLVLWHPH[FOXGHVURFNUHPRYDODQGODQGVFDSHRUJUDVVUHSODFHPHQWRUUHPRYDO
1RWHV
&RVW(YHQW%UHDNGRZQ
3URORJ0DQDJHU
3URMHFW&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
16.C.4.b
Packet Pg. 1306 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
$XWKRUL]DWLRQ5HTXHVW
'HWDLOHG)RUP*URXSHGE\1XPEHUZLWK&(%UHDNGRZQ
,WHP1R ,WHP'HVFULSWLRQ $PRXQW3URSRVHG 5HIHUHQFH
3URYLGHDGGLWLRQDOFRQGXLWVDVSHU)3/:5'UDZLQJV1R7KURXJK
ZLWKPDWHULDOVXSSOLHGE\)3/
/HYHO 6',
/HYHO *HQHUDO/LDELOLW\
/HYHO %RQG
/HYHO &0)HH
,QRUGHUWRPLWLJDWHSRVVLEOHGHOD\VDQGH[SHGLWHWKHDSSURYDOIRUWKHGLUHFWFRVWRIZRUNUHODWHGWRWKLVFKDQJHXQOHVVVSHFLILFDOO\QRWHGDERYHZH
DUHVXEPLWWLQJWKLVFKDQJHUHTXHVWZLWKRXWVFKHGXOHWLPHFRVWLPSDFW:HUHVHUYHWKHULJKWWRVXEPLWIRUFRVWWLPHLPSDFWVUHODWHGWRWKLVFKDQJH
XQGHUVHSDUDWHFRYHUZKHQWKDWLQIRUPDWLRQLVDYDLODEOH
&RQWUDFWRUGRHVQRWUHOHDVHLPSDFWVWKDWDULVHRXWRI$FWVRI1DWXUHLQFOXGLQJILUHIORRGHDUWKTXDNHVWRUPKXUULFDQHRURWKHUQDWXUDOGLVDVWHU
ZDULQYDVLRQDFWRISXEOLFHQHPLHVKRVWLOLWLHVZKHWKHUZDULVGHFODUHGRUQRWFLYLOZDUUHEHOOLRQUHYROXWLRQLQVXUUHFWLRQPLOLWDU\RUXVXUSHG
SRZHURUFRQILVFDWLRQWHUURULVWDFWLYLWLHVULRWQDWLRQDOL]DWLRQJRYHUQPHQWDFWLRQVWDULIIVEORFNDJHHPEDUJRWUDQVSRUWDWLRQGHOD\VQRWUHDVRQDEO\
IRUHVHHDEOHODERUGLVSXWHVWULNHORFNRXWGLVHDVHRXWEUHDNHSLGHPLFVSDQGHPLFVTXDUDQWLQHUHVWULFWLRQVRULQWHUUXSWLRQRUIDLOXUHRISRZHU
VRXUFHV7RWKHH[WHQWWKHVHFRQGLWLRQVPD\RFFXUDQGLPSDFWWKH3URMHFWWKHUHVKDOOEHDQHTXLWDEOHDGMXVWPHQWWRWKH&RQWUDFW
6,*1$785( '$7($\RXE$OEDKRX±6U3URMHFW0DQDJHU
$SSURYHG%\
$XWKRUL]DWLRQ5HTXHVW
3URORJ0DQDJHU
3URMHFW&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
16.C.4.b
Packet Pg. 1307 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1308 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)Supporting Documents
16.C.4.b
Packet Pg. 1309 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)CE 033 - Item 1
16.C.4.b
Packet Pg. 1310 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)Manhattan Note: Rates
are within set rates in the
Agreement
16.C.4.b
Packet Pg. 1311 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1312 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1313 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1314 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1315 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1316 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)Addendum # 13
Page | 1
MEMORANDUM
Date: December 1, 2021
To: Manhattan Construction Company
From: Peninsula Engineering
Regarding: Addendum #13 – Phase 2.1
Please refer to following information as an Addendum to the CD’s provided by Davidson
Engineering/Peninsula Engineering for the following WORK:
PHASE 2.1 – COLLIER COUNTY SPORTS COMPLEX AND EVENTS CENTER PHASE TWO includes the following Tab as
previously described within the Bid Memo dated June 19, 2020, and re-issued to the contractor on May 6, 2021
(no changes, simply re-issued all the documents):
Tab 5-7 - Collier County Sports Complex and Events Center – Phase Two
Tabs 5-7 - This addendum provides clarity on location of FPL Conduit and Vaults as it pertains to this portion of the
development and future connections.
1. Refer to updates within the FOLLOWING ATTACHMENT from the Collier County Sports Complex and Events
Center – Phase Two Plan Set:
o C-20.51 – Color coded conduit bank layouts for all public utility uses (overall high-level exhibit with
proposed conduit banks)
i.e. Comcast, FPL, County Fiber, Etc.
Upon pricing completion and coordination with County, PE will coordinate with FPL
for “dry” / future conduit and vault placement
All updates are attached for reference.
Attachments:
x Collier County Sports Complex and Events Center – Phase Two
o C–20.51
16.C.4.b
Packet Pg. 1317 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
MEMORANDUM
TO:Peninsula Engineering PROJECT:CCSC Ph 2.1
FROM:Brett L Sands, PE
RE: AR 7675.029 – RFI #22 – Breaker
Revisions for Musco Lighting
DATE:September 26, 2022
In response to the above referenced authorization request, we have the following comments:
Scope and cost increase appears reasonable as indicated.
16.C.4.b
Packet Pg. 1318 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
'HWDLOHG)RUP*URXSHGE\1XPEHUZLWK&(%UHDNGRZQ
$XWKRUL]DWLRQ5HTXHVW
&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
3URMHFW
$XWKRUL]DWLRQ5HTXHVW'DWH
7R$\RXE$OEDKRX )DGL7LEL)URP
&ROOLHU&RXQW\ 0DQKDWWDQ&RQVWUXFWLRQ&RPSDQ\
:HVWYLHZ'5
1DSOHV)/
7DPLDPL7UDLO(DVW
1DSOHV)/
'HVFULSWLRQ &DWHJRU\ 6WDWXV
5),%UHDNHU5HYLVLRQVIRU0XVFR/LJKWLQJ $SSURYHG&RQWLQJHQF\
5HIHUHQFH 5HTXLUHG%\ 'D\V5HT $PRXQW5HTXHVWHG
1RWHV
7KLV$5LQFOXGHVDOOFRVWDVVRFLDWHGZLWK5),
(;&/86,216
2II+RXUV :HHNHQGV
6FKHGXOH&RVW7LPH,PSDFWV
7HVWLQJ
6XUYH\LQJ
*HRWHFKQLFDO5HSRUW
5RFN([FDYDWLRQ
%,00RGHOLQJ
)LHOG&RQGLWLRQV
6XEVWLWXWLRQGXHWRXQIRUVHHQFRQGLWLRQVPDWHULDOVKRUWDJHV
$GGHQGXP55RU5
&(1R 'DWH 5HIHUHQFH 'D\V5HT$PRXQW3URSRVHG &DWHJRU\ 5HDVRQ
2ZQHU&RQWLQJHQF\ &KDQJH&RQGLWLRQ
'HVFULSWLRQ
5),%UHDNHU5HYLVLRQVIRU0XVFR/LJKWLQJ
5%(5),5HSODFHPHQWH[LVWLQJEUHDNHUVDVLQGLFDWHG
7KLV&(LVSHUWDLQLQJWRWKHUHVSRQVHRI5),ZKLFKUHTXHVWHGUHSODFHPHQWRIWKHH[LVWLQJ3$EUHDNHUVZLWKQHZ3$EUHDNHUV7KLV
LQFOXGHV3$('%WRUHSODFHWKHH[LVWLQJ64'3DQG3$%-$WRUHSODFHH[LWLQJ3$EUHDNHUV
,Q3KDVHGUDZLQJ:&(5HYGDWHGFKDQJHGWKHEUHDNHUVIURP3WR3ZKLFKLVFXUUHQWO\LQVWDOOHGKRZHYHUSKDVH
GUDZLQJ5((DGGLVVKRZLQJH[LVWLQJ3$EUHDNHUV7KHVHGUDZLQJVDUHLQFOXGHGLQWKLVSDFNDJHIRUHDV\UHIHUHQFH
1RWHV
&RVW(YHQW%UHDNGRZQ
,WHP1R ,WHP'HVFULSWLRQ $PRXQW3URSRVHG 5HIHUHQFH
3URYLGH5HSODFHPHQWRI([LVWLQJ3$%UHDNHUVZLWKQHZ3$
EUHDNHUVDVSHUWKHUHVSRQVHWR5),QXPEHU
5HGXFH2ZQHU
V&RQWLQJHQF\
3URORJ0DQDJHU
3URMHFW&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
16.C.4.b
Packet Pg. 1319 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
'HWDLOHG)RUP*URXSHGE\1XPEHUZLWK&(%UHDNGRZQ
$XWKRUL]DWLRQ5HTXHVW
,QRUGHUWRPLWLJDWHSRVVLEOHGHOD\VDQGH[SHGLWHWKHDSSURYDOIRUWKHGLUHFWFRVWRIZRUNUHODWHGWRWKLVFKDQJHXQOHVVVSHFLILFDOO\QRWHGDERYHZH
DUHVXEPLWWLQJWKLVFKDQJHUHTXHVWZLWKRXWVFKHGXOHWLPHFRVWLPSDFW:HUHVHUYHWKHULJKWWRVXEPLWIRUFRVWWLPHLPSDFWVUHODWHGWRWKLVFKDQJH
XQGHUVHSDUDWHFRYHUZKHQWKDWLQIRUPDWLRQLVDYDLODEOH
&RQWUDFWRUGRHVQRWUHOHDVHLPSDFWVWKDWDULVHRXWRI$FWVRI1DWXUHLQFOXGLQJILUHIORRGHDUWKTXDNHVWRUPKXUULFDQHRURWKHUQDWXUDOGLVDVWHU
ZDULQYDVLRQDFWRISXEOLFHQHPLHVKRVWLOLWLHVZKHWKHUZDULVGHFODUHGRUQRWFLYLOZDUUHEHOOLRQUHYROXWLRQLQVXUUHFWLRQPLOLWDU\RUXVXUSHG
SRZHURUFRQILVFDWLRQWHUURULVWDFWLYLWLHVULRWQDWLRQDOL]DWLRQJRYHUQPHQWDFWLRQVWDULIIVEORFNDJHHPEDUJRWUDQVSRUWDWLRQGHOD\VQRWUHDVRQDEO\
IRUHVHHDEOHODERUGLVSXWHVWULNHORFNRXWGLVHDVHRXWEUHDNHSLGHPLFVSDQGHPLFVTXDUDQWLQHUHVWULFWLRQVRULQWHUUXSWLRQRUIDLOXUHRISRZHU
VRXUFHV7RWKHH[WHQWWKHVHFRQGLWLRQVPD\RFFXUDQGLPSDFWWKH3URMHFWWKHUHVKDOOEHDQHTXLWDEOHDGMXVWPHQWWRWKH&RQWUDFW
6,*1$785( '$7($\RXE $OEDKRX±6U3URMHFW0DQDJHU
$SSURYHG%\
$XWKRUL]DWLRQ5HTXHVW
3URORJ0DQDJHU
3URMHFW&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
16.C.4.b
Packet Pg. 1320 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1321 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)Supporting Documents
16.C.4.b
Packet Pg. 1322 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)Sub-Contractor Change Order
16.C.4.b
Packet Pg. 1323 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1324 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1325 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1326 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)Phase 1 and Phase 2 Drawings
16.C.4.b
Packet Pg. 1327 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1328 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1329 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)RFI 22
16.C.4.b
Packet Pg. 1330 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1331 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1332 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1333 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1334 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1335 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1336 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1337 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1338 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1339 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1340 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1341 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1342 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1343 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1344 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1345 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1346 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1347 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1348 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1349 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1350 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1351 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1352 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1353 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1354 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
RFI 054 Docking Station Panel
RFI 110
RFI 103 16.C.4.b
Packet Pg. 1355 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1356 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
2600 Golden Gate Parkway, Naples, Florida, 34105 Office 239.403.6700 Fax 239.261.1797
Fla Engineer CA 28275 Fla Landscape CA LC26000632
Page | 1
January 27, 2023
Collier County Board of Commissioners
3301 Tamiami Trail East
Naples, FL 34112
Re: Collier County Sports Complex and Events Center
Phase 2.1 – AR Review
AR 7675.038
To Whom It May Concern,
We have received and reviewed the documents referenced above from Manhattan Construction Company.
Regarding pricing and considering this is a full deduct (100% refund) per the descoping of the project, we find
this to be acceptable.
Thank you,
Josh Fruth
PENINSULA ENGINEERING
Vice President
16.C.4.b
Packet Pg. 1357 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
'HWDLOHG)RUP*URXSHGE\1XPEHUZLWK&(%UHDNGRZQ
$XWKRUL]DWLRQ5HTXHVW
&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
3URMHFW
$XWKRUL]DWLRQ5HTXHVW'DWH
7R$\RXE$OEDKRX 5REHUW7LHGHPDQ)URP
&ROOLHU&RXQW\ 0DQKDWWDQ&RQVWUXFWLRQ&RPSDQ\
:HVWYLHZ'5
1DSOHV)/
7DPLDPL7UDLO(DVW
1DSOHV)/
'HVFULSWLRQ &DWHJRU\ 6WDWXV
$''(1'80593$5.5HPRYDORI6FRSH 6XEPLWWHG'LUHFW&RVW
5HIHUHQFH 5HTXLUHG%\ 'D\V5HT $PRXQW5HTXHVWHG
&(1R 'DWH 5HIHUHQFH 'D\V5HT$PRXQW3URSRVHG &DWHJRU\ 5HDVRQ
2ZQHU&KDQJH 2ZQHU'LUHFWLYH
'HVFULSWLRQ
$''(1'80593$5.5HPRYDORI6FRSH
7KLV$GGHQGXPGHQRWHVWKHUHPRYDORIWKH593DUNDVUHTXHVWHGE\&ROOLHU&RXQW\7KHUHDUH8WLOLWLHVWKDWUHPDLQDVQRWHGLQWKLV$GGHQGXP
127(3KDVH/$1'6&$3,1*(;&/8'(')520*03593$5.
5HIHUHQFH&ROOLHU&RXQW\$\RXE$OEDKRXHPDLOGDWHG)HEUXDU\
&ROOLHUFRXQW\ZLOOQRWPRYHIRUZDUGZLWKDQ\FRQVWUXFWLRQZLWKLQWKH59SDUNLQJDUHD
:HQHHGWRHOLPLQDWHWKHHQWLUHVFRSHH[FHSWIRU
:DWHUV\VWHP6WXERXWDWWKH59SDUNLQJDUHDOLPLWIRUIXWXUHGHYHORSPHQWRIWKLVDUHD
6DQLWDU\VHZHUV\VWHPVWXERXWDWWKH59SDUNLQJDUHDOLPLWIRUIXWXUHGHYHORSPHQWRIWKLVDUHD
0LQLPXPDPRXQWRIVWRUPZDWHUV\VWHPWRDOORZWKLVDUHDWRGUDLQDQGSURYLGHVWXERXWWRDOORZIRUIXWXUHGHYHORSPHQWRIWKLVDUHD
:HHOLPLQDWHGWKHFDUHWDNHUFRPSOHWHO\5()(5(1&(&()25&5(',7
1RWHV
&RVW(YHQW%UHDNGRZQ
,WHP1R ,WHP'HVFULSWLRQ $PRXQW3URSRVHG 5HIHUHQFH
(;&$9$7,21($57+029('
67250'5$,1$*(
(/(&75,&
/HYHO 6',
/HYHO *HQHUDO/LDELOLW\
/HYHO %RQG
/HYHO &0)HH
3URORJ0DQDJHU
3URMHFW&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
16.C.4.b
Packet Pg. 1358 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
'HWDLOHG)RUP*URXSHGE\1XPEHUZLWK&(%UHDNGRZQ
$XWKRUL]DWLRQ5HTXHVW
,QRUGHUWRPLWLJDWHSRVVLEOHGHOD\VDQGH[SHGLWHWKHDSSURYDOIRUWKHGLUHFWFRVWRIZRUNUHODWHGWRWKLVFKDQJHXQOHVVVSHFLILFDOO\QRWHGDERYHZH
DUHVXEPLWWLQJWKLVFKDQJHUHTXHVWZLWKRXWVFKHGXOHWLPHFRVWLPSDFW:HUHVHUYHWKHULJKWWRVXEPLWIRUFRVWWLPHLPSDFWVUHODWHGWRWKLVFKDQJH
XQGHUVHSDUDWHFRYHUZKHQWKDWLQIRUPDWLRQLVDYDLODEOH
&RQWUDFWRUGRHVQRWUHOHDVHLPSDFWVWKDWDULVHRXWRI$FWVRI1DWXUHLQFOXGLQJILUHIORRGHDUWKTXDNHVWRUPKXUULFDQHRURWKHUQDWXUDOGLVDVWHU
ZDULQYDVLRQDFWRISXEOLFHQHPLHVKRVWLOLWLHVZKHWKHUZDULVGHFODUHGRUQRWFLYLOZDUUHEHOOLRQUHYROXWLRQLQVXUUHFWLRQPLOLWDU\RUXVXUSHG
SRZHURUFRQILVFDWLRQWHUURULVWDFWLYLWLHVULRWQDWLRQDOL]DWLRQJRYHUQPHQWDFWLRQVWDULIIVEORFNDJHHPEDUJRWUDQVSRUWDWLRQGHOD\VQRWUHDVRQDEO\
IRUHVHHDEOHODERUGLVSXWHVWULNHORFNRXWGLVHDVHRXWEUHDNHSLGHPLFVSDQGHPLFVTXDUDQWLQHUHVWULFWLRQVRULQWHUUXSWLRQRUIDLOXUHRISRZHU
VRXUFHV7RWKHH[WHQWWKHVHFRQGLWLRQVPD\RFFXUDQGLPSDFWWKH3URMHFWWKHUHVKDOOEHDQHTXLWDEOHDGMXVWPHQWWRWKH&RQWUDFW
6,*1$785( '$7($\RXE $OEDKRX±6U3URMHFW0DQDJHU
$SSURYHG%\
$XWKRUL]DWLRQ5HTXHVW
3URORJ0DQDJHU
3URMHFW&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
16.C.4.b
Packet Pg. 1359 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1360 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)Supporting Documents
&KHULVVH7UDYLV
)URP&KHULVVH7UDYLV
6HQW0RQGD\$SULO30
7R0HJDQ3KLOOLSV
6XEMHFW):5(6&(&3+$6($''(1'8059&$5(7$.(5
7KDQN\RX
&KHULVVH$7UDYLV
6U3URMHFW0DQDJHU
0DQKDWWDQ&RQVWUXFWLRQ&RPSDQ\
:HVWYLHZ'ULYH
1DSOHV)/
ϮϯϵͲϰϬϰͲϵϲϱϯĐĞůů
ĐƚƌĂǀŝƐΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵ
ZZZPDQKDWWDQFRQVWUXFWLRQFRP
)ROORZ8V/LQNHG,Q_)DFHERRN_*RRJOH_7ZLWWHU
&ƌŽŵ͗ůͲďĂŚŽƵLJŽƵďфLJŽƵď͘ůͲďĂŚŽƵΛĐŽůůŝĞƌĐŽƵŶƚLJĨů͘ŐŽǀх
^ĞŶƚ͗&ƌŝĚĂLJ͕&ĞďƌƵĂƌLJϭϴ͕ϮϬϮϮϭϬ͗ϯϵD
dŽ͗ŝůů͘^njĐnjĞƉŬŽǁƐŬŝΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵ͖ƌĞƚƚsĂŶƚŽůфsĂŶƚŽůΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх͖ŚĞƌŝƐƐĞ
dƌĂǀŝƐфdƌĂǀŝƐΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх͖:ĂŵĞƐ͘,ĂůůΛĐŽůůŝĞƌĐŽƵŶƚLJĨů͘ŐŽǀ͖:ĞĨĨΛĚĂǀŝĚƐŽŶĞŶŐŝŶĞĞƌŝŶŐ͘ĐŽŵ͖
ũĨƌƵƚŚΛƉĞŶͲĞŶŐ͘ĐŽŵ͖DĂƌŝƐƐĂ͘ĂŬĞƌΛĐŽůůŝĞƌĐŽƵŶƚLJĨů͘ŐŽǀ͖DĞŐĂŶWŚŝůůŝƉƐфDWŚŝůůŝƉƐΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх͖
ZŝĐŚĂƌĚ͘WĂƋƵĞƚƚĞΛĐŽůůŝĞƌĐŽƵŶƚLJĨů͘ŐŽǀ͖^ƵƐĂŶ^ƚƵƌŐŝůůф^ƵƐĂŶ͘^ƚƵƌŐŝůůΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх͖
ƵƌŝŵĂ͘>ƵĨĨΛĐŽůůŝĞƌĐŽƵŶƚLJĨů͘ŐŽǀ
^ƵďũĞĐƚ͗Z͗^W,^Ϯ͘ϭͲEhDϭϱͲZsͬZd<Z
dŽĨŽůůŽǁƵƉŽŶŽƵƌĐŽŶǀĞƌƐĂƚŝŽŶƌĞŐĂƌĚŝŶŐƚŚĞZsƉĂƌŬŝŶŐ
ŽůůŝĞƌĐŽƵŶƚLJǁŝůůŶŽƚŵŽǀĞĨŽƌǁĂƌĚǁŝƚŚĂŶLJĐŽŶƐƚƌƵĐƚŝŽŶǁŝƚŚŝŶƚŚĞZsƉĂƌŬŝŶŐĂƌĞĂ͘
tĞŶĞĞĚƚŽĞůŝŵŝŶĂƚĞƚŚĞĞŶƚŝƌĞƐĐŽƉĞĞdžĐĞƉƚĨŽƌ
ϭ͘tĂƚĞƌƐLJƐƚĞŵ^ƚƵďͲŽƵƚĂƚƚŚĞZsƉĂƌŬŝŶŐĂƌĞĂůŝŵŝƚĨŽƌĨƵƚƵƌĞĚĞǀĞůŽƉŵĞŶƚŽĨƚŚŝƐĂƌĞĂ
Ϯ͘^ĂŶŝƚĂƌLJƐĞǁĞƌƐLJƐƚĞŵƐƚƵďͲŽƵƚĂƚƚŚĞZsƉĂƌŬŝŶŐĂƌĞĂůŝŵŝƚĨŽƌĨƵƚƵƌĞĚĞǀĞůŽƉŵĞŶƚŽĨƚŚŝƐĂƌĞĂ
ϯ͘DŝŶŝŵƵŵĂŵŽƵŶƚŽĨƐƚŽƌŵǁĂƚĞƌƐLJƐƚĞŵƚŽĂůůŽǁƚŚŝƐĂƌĞĂƚŽĚƌĂŝŶĂďĚĂůŽƉƌŽǀŝĚĞƐƚƵďͲŽƵƚƚŽĂůůŽǁĨŽƌĨƵƚƵƌĞ
ĚĞǀĞůŽƉŵĞŶƚŽĨƚŚŝƐĂƌĞĂ
ϰ͘tĞĂƌĞĞůŝŵŝŶĂƚŝŶŐƚŚĞĐĂƌĞƚĂŬĞƌĐŽŵƉůĞƚĞůLJ
>ĞƚŵĞŬŶŽǁŝĨLJŽƵŚĂǀĞĂŶLJĨƵƌƚŚĞƌƋƵĞƐƚŝŽŶƐ
dŚĂŶŬLJŽƵ
16.C.4.b
Packet Pg. 1361 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
ZĞƐƉĞĐƚĨƵůůLJ͕
LJŽƵď
Ayoub R. Al-Bahou, PE, LEEDΠ GA
WƌŝŶĐŝƉĂůWƌŽũĞĐƚDĂŶĂŐĞƌ
&ĂĐŝůŝƚŝĞƐDĂŶĂŐĞŵĞŶƚŝǀŝƐŝŽŶ
ϯϯϯϱdĂŵŝĂŵŝdƌĂŝůĂƐƚ
EĂƉůĞƐ͕&ůŽƌŝĚĂϯϰϭϭϮ
LJŽƵď͘ĂůͲďĂŚŽƵΛĐŽůůŝĞƌĐŽƵŶƚLJĨů͘ŐŽǀ
ϮϯϵͲϮϱϮͲϳϳϬϰ;ŽͿ
ϮϯϵͲϳϳϴͲϰϱϱϵ;ĐͿ
&ƌŽŵ͗ŚĞƌŝƐƐĞdƌĂǀŝƐфdƌĂǀŝƐΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх
^ĞŶƚ͗dƵĞƐĚĂLJ͕&ĞďƌƵĂƌLJϭϱ͕ϮϬϮϮϵ͗ϯϳD
dŽ͗:ŽƐŚƵĂ&ƌƵƚŚфũĨƌƵƚŚΛƉĞŶͲĞŶŐ͘ĐŽŵх͖ůͲďĂŚŽƵLJŽƵďфLJŽƵď͘ůͲďĂŚŽƵΛĐŽůůŝĞƌĐŽƵŶƚLJĨů͘ŐŽǀх͖>ƵĨĨƵƌŝŵĂ
фƵƌŝŵĂ͘>ƵĨĨΛĐŽůůŝĞƌĐŽƵŶƚLJĨů͘ŐŽǀх
Đ͗:ŽŚŶĞŐĂŶŝф:ĞŐĂŶŝΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх͖ŝůů^njĐnjĞƉŬŽǁƐŬŝ
фŝůů͘^njĐnjĞƉŬŽǁƐŬŝΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх͖DĞŐĂŶWŚŝůůŝƉƐфDWŚŝůůŝƉƐΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх
^ƵďũĞĐƚ͗Z͗^W,^Ϯ͘ϭͲEhDϭϱͲZsͬZd<Z
ydZE>D/>͗dŚŝƐĞŵĂŝůŝƐĨƌŽŵĂŶĞdžƚĞƌŶĂůƐŽƵƌĐĞ͘ŽŶĨŝƌŵƚŚŝƐŝƐĂƚƌƵƐƚĞĚƐĞŶĚĞƌĂŶĚƵƐĞĞdžƚƌĞŵĞĐĂƵƚŝŽŶǁŚĞŶ
ŽƉĞŶŝŶŐĂƚƚĂĐŚŵĞŶƚƐŽƌĐůŝĐŬŝŶŐůŝŶŬƐ͘
LJŽƵď͕
DĚŝĚŶŽƚƌĞĐŽŵŵĞŶĚŽƌĂĚǀŝƐĞƚŚĞZsͬĂƌĞƚĂŬĞƌďĞƌĞŵŽǀĞĚĨƌŽŵƚŚĞ'DW͕ƚŚĞƌĞĨŽƌĞƚŚĞĚĚĞŶĚƵŵǁĂƐŶŽƚ
ŝƐƐƵĞĚĨŽƌŽƵƌƐŽůĞƉƵƌƉŽƐĞƐ͘/ĨŽůůŝĞƌŽƵŶƚLJŝƐƌĞƋƵĞƐƚŝŶŐĂĐƌĞĚŝƚĨŽƌƐĐŽƉĞŽĨǁŽƌŬŶŽƚƌĞůĂƚĞĚƚŽĂŶĂůůŽǁĂŶĐĞĂŶ^/
ŽƌĚĚĞŶĚƵŵƐƵƉƉŽƌƚŝŶŐƚŚĞƌĞƋƵĞƐƚĞĚĐƌĞĚŝƚƐŚŽƵůĚďĞƉƌŽǀŝĚĞĚ͘dŚŝƐŝƐƚƌĂĚŝƚŝŽŶĂůƉƌĂĐƚŝĐĞ͘
/ĨƚŚĞĐƌĞĚŝƚLJŽƵĂƌĞŽďƚĂŝŶŝŶŐŝƐŶŽƚǁŚĂƚLJŽƵĂƌĞĞdžƉĞĐƚŝŶŐLJŽƵĂƌĞŐŽŝŶŐƚŽĞdžƉĞĐƚĂĐůĞĂƌĞdžƉůĂŶĂƚŝŽŶ͘
7KDQN\RX
&KHULVVH$7UDYLV
6U3URMHFW0DQDJHU
0DQKDWWDQ&RQVWUXFWLRQ&RPSDQ\
:HVWYLHZ'ULYH
1DSOHV)/
ϮϯϵͲϰϬϰͲϵϲϱϯĐĞůů
ĐƚƌĂǀŝƐΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵ
16.C.4.b
Packet Pg. 1362 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
ZZZPDQKDWWDQFRQVWUXFWLRQFRP
)ROORZ8V/LQNHG,Q_)DFHERRN_*RRJOH_7ZLWWHU
&ƌŽŵ͗:ŽƐŚƵĂ&ƌƵƚŚфũĨƌƵƚŚΛƉĞŶͲĞŶŐ͘ĐŽŵх
^ĞŶƚ͗&ƌŝĚĂLJ͕&ĞďƌƵĂƌLJϭϭ͕ϮϬϮϮϳ͗ϰϵD
dŽ͗ŚĞƌŝƐƐĞdƌĂǀŝƐфdƌĂǀŝƐΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх͖ůͲďĂŚŽƵLJŽƵďфLJŽƵď͘ůͲďĂŚŽƵΛĐŽůůŝĞƌĐŽƵŶƚLJĨů͘ŐŽǀх͖
>ƵĨĨƵƌŝŵĂфƵƌŝŵĂ͘>ƵĨĨΛĐŽůůŝĞƌĐŽƵŶƚLJĨů͘ŐŽǀх
Đ͗:ŽŚŶĞŐĂŶŝф:ĞŐĂŶŝΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх͖ŝůů^njĐnjĞƉŬŽǁƐŬŝ
фŝůů͘^njĐnjĞƉŬŽǁƐŬŝΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх͖DĞŐĂŶWŚŝůůŝƉƐфDWŚŝůůŝƉƐΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх
^ƵďũĞĐƚ͗Z͗^W,^Ϯ͘ϭͲEhDϭϱͲZsͬZd<Z
dŚĞŚŝŐŚůŝŐŚƚĞĚĂĚĚĞŶĚƵŵǁĂƐƚŽĂƐƐŝƐƚǁŝƚŚLJŽƵĂŶĚ:ĞŶƐĞŶ;ƚŽĐůĞĂƌůLJƐŚŽǁǁŚĂƚƵƚŝůŝƚŝĞƐĂƌĞďĞŝŶŐƌĞŵŽǀĞĚĨƌŽŵƚŚĞ
ŝƐ'DWĂƐŝƚƌĞůĂƚĞƐƚŽƚŚĞZsĂƌĞĂͿ͘^ŝŶĐĞƚŚĞůŝĞŶƚƌĞƋƵĞƐƚĞĚϭϬϬйŝŶĨƌĂƐƚƌƵĐƚƵƌĞƌĞůĂƚĞĚƚŽǁĂƚĞƌĂŶĚƐĞǁĞƌ
ƌĞŵŽǀĞĚ͕ƚŚĂƚĂůƐŽŝŶĐůƵĚĞƐƌĞŵŽǀŝŶŐĂůůŽƚŚĞƌŝƚĞŵƐƉƌŽƉŽƐĞĚĨƌŽŵƚŚĞ'DW͘dŚĞZsĂƌĞĂǁŝůůďĞĂƐƚĂŶĚͲĂůŽŶĞƉŚĂƐĞ
ŝŶƚŚĞĨƵƚƵƌĞďĞĐĂƵƐĞŝƚĐĂŶŶŽƚďĞĐŽŶƐƚƌƵĐƚĞĚƉƌŽƉĞƌůLJǁŝƚŚŽƵƚǁĂƚĞƌĂŶĚƐĞǁĞƌ͘
dŚĂŶŬLJŽƵ͕
WWE/E^h>E'/EZ/E'
:ŽƐŚ&ƌƵƚŚ
sŝĐĞWƌĞƐŝĚĞŶƚŽĨŶŐŝŶĞĞƌŝŶŐ
ϮϲϬϬ'ŽůĚĞŶ'ĂƚĞWĂƌŬǁĂLJ
EĂƉůĞƐ͕&ůŽƌŝĚĂϯϰϭϬϱ
WŚŽŶĞ͗Ϯϯϵ͘ϰϬϯ͘ϲϳϬϬ
ŝƌĞĐƚ͗Ϯϯϵ͘ϰϬϯ͘ϲϳϯϵ
ũĨƌƵƚŚΛƉĞŶͲĞŶŐ͘ĐŽŵ
KŶůLJĐƵƌƌĞŶƚ͕ƐŝŐŶĞĚ͕ĂŶĚƐĞĂůĞĚƉůĂŶƐƐŚĂůůďĞĐŽŶƐŝĚĞƌĞĚǀĂůŝĚĐŽŶƐƚƌƵĐƚŝŽŶĚŽĐƵŵĞŶƚƐ͘ĞĐĂƵƐĞŽĨƚŚĞĐŽŶƐƚĂŶƚůLJĐŚĂŶŐŝŶŐŶĂƚƵƌĞŽĨĐŽŶƐƚƌƵĐƚŝŽŶĚŽĐƵŵĞŶƚƐ͕ŝƚŝƐ
ƚŚĞƌĞĐŝƉŝĞŶƚ͛ƐƌĞƐƉŽŶƐŝďŝůŝƚLJƚŽƌĞƋƵĞƐƚƚŚĞůĂƚĞƐƚĚŽĐƵŵĞŶƚƐĨƌŽŵWĞŶŝŶƐƵůĂŶŐŝŶĞĞƌŝŶŐĨŽƌƚŚĞŝƌƉĂƌƚŝĐƵůĂƌƚĂƐŬ͘
&ƌŽŵ͗ŚĞƌŝƐƐĞdƌĂǀŝƐфdƌĂǀŝƐΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх
^ĞŶƚ͗dŚƵƌƐĚĂLJ͕&ĞďƌƵĂƌLJϭϬ͕ϮϬϮϮϭϬ͗ϭϮWD
dŽ͗:ŽƐŚƵĂ&ƌƵƚŚфũĨƌƵƚŚΛƉĞŶͲĞŶŐ͘ĐŽŵх͖ůͲďĂŚŽƵLJŽƵďфLJŽƵď͘ůͲďĂŚŽƵΛĐŽůůŝĞƌĐŽƵŶƚLJĨů͘ŐŽǀх͖>ƵĨĨƵƌŝŵĂ
фƵƌŝŵĂ͘>ƵĨĨΛĐŽůůŝĞƌĐŽƵŶƚLJĨů͘ŐŽǀх
Đ͗:ŽŚŶĞŐĂŶŝф:ĞŐĂŶŝΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх͖ŝůů^njĐnjĞƉŬŽǁƐŬŝ
фŝůů͘^njĐnjĞƉŬŽǁƐŬŝΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх͖DĞŐĂŶWŚŝůůŝƉƐфDWŚŝůůŝƉƐΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵх
^ƵďũĞĐƚ͗&t͗^W,^Ϯ͘ϭͲEhDϭϱͲZsͬZd<Z
:ŽƐŚ͕
dŽĐůĂƌŝĨLJͬĐŽŶĨŝƌŵĂůůƐĐŽƉĞǁŝƚŚŝŶƚŚĞ'DWƌĞůĂƚĞĚƚŽƚŚĞZsWĂƌŬ;ƉĂǀŝŶŐ͕ƐƚƌŝƉŝŶŐ͕ůĂŶĚƐĐĂƉŝŶŐ͕ĞůĞĐƚƌŝĐĂůͿŝƐƚŽƌĞŵĂŝŶ
ĂŶĚǁĞĂƌĞKE>zƌĞŵŽǀŝŶŐƚŚĞǁĂƚĞƌĂŶĚƐĂŶŝƚĂƌLJ͘
/ĂŵĂƐŬŝŶŐďĞĐĂƵƐĞǁĞƐƉĞĐŝĨŝĐĂůůLJďƌŽŬĞŽƵƚƚŚĞZsĂƌĞĂǁŝƚŚŝŶŽƵƌŽƌŝŐŝŶĂů'DWĞƐƚŝŵĂƚĞĨŽƌƚŚĞƐĞƐĐŽƉĞƐĂŶĚƚŚĞ
ǀĂůƵĞŽĨƚŚĞǁĂƚĞƌĂŶĚƐĂŶŝƚĂƌLJƐĞǁĞƌƌĞŵŽǀĂůŝƐƐŝŐŶŝĨŝĐĂŶƚůLJůĞƐƐƚŚĂŶƚŚĞƐĐŽƉĞŽĨƚŚĞZsƉĂƌŬ͘LJŽƵďŝƐĞdžƉĞĐƚŝŶŐ
ΨΨΨΨΨΨƌĞƚƵƌŶĞĚ͘
7KDQN\RX
16.C.4.b
Packet Pg. 1363 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
&KHULVVH$7UDYLV
6U3URMHFW0DQDJHU
0DQKDWWDQ&RQVWUXFWLRQ&RPSDQ\
:HVWYLHZ'ULYH
1DSOHV)/
ϮϯϵͲϰϬϰͲϵϲϱϯĐĞůů
ĐƚƌĂǀŝƐΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵ
ZZZPDQKDWWDQFRQVWUXFWLRQFRP
)ROORZ8V/LQNHG,Q_)DFHERRN_*RRJOH_7ZLWWHU
&ƌŽŵ͗:ŽƐŚƵĂ&ƌƵƚŚфũĨƌƵƚŚΛƉĞŶͲĞŶŐ͘ĐŽŵх
^ĞŶƚ͗&ƌŝĚĂLJ͕:ĂŶƵĂƌLJϳ͕ϮϬϮϮϱ͗ϮϮWD
dŽ͗ďŝůů͘ƐnjĐnjĞƉŬŽǁƐŬŝΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵ͖dƌĂǀŝƐΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵ͖
sĂŶƚŽůΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵ͖ŵƉŚŝůůŝƉƐΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵ͖
<^ĂŶƚŝĂŐŽΛŵĂŶŚĂƚƚĂŶĐŽŶƐƚƌƵĐƚŝŽŶ͘ĐŽŵ
Đ͗ĂLJŽƵď͘ĂůͲďĂŚŽƵΛĐŽůůŝĞƌĐŽƵŶƚLJĨů͘ŐŽǀ
^ƵďũĞĐƚ͗^W,^Ϯ͘ϭͲEhDϭϱͲZsͬZd<Z
ůů͕
WĞƌŽƵƌƉƌŽĚƵĐƚŝŽŶŵĞĞƚŝŶŐLJĞƐƚĞƌĚĂLJ͕ĂƚƚĂĐŚĞĚŝƐĚĚĞŶĚƵŵϭϱĨŽƌWŚĂƐĞϮ͘ϭ;ƌĞŵŽǀĂůŽĨZsĂƌĞĂƵƚŝůŝƚŝĞƐ͕
ĂƌĞƚĂŬĞƌͿ͘WůĞĂƐĞƌĞǀŝĞǁĂŶĚůĞƚŵĞŬŶŽǁŝĨLJŽƵŚĂǀĞĂŶLJƋƵĞƐƚŝŽŶƐ͘
dŚĂŶŬLJŽƵ͕
WWE/E^h>E'/EZ/E'
:ŽƐŚ&ƌƵƚŚ
sŝĐĞWƌĞƐŝĚĞŶƚŽĨŶŐŝŶĞĞƌŝŶŐ
ϮϲϬϬ'ŽůĚĞŶ'ĂƚĞWĂƌŬǁĂLJ
EĂƉůĞƐ͕&ůŽƌŝĚĂϯϰϭϬϱ
WŚŽŶĞ͗Ϯϯϵ͘ϰϬϯ͘ϲϳϬϬ
ŝƌĞĐƚ͗Ϯϯϵ͘ϰϬϯ͘ϲϳϯϵ
ũĨƌƵƚŚΛƉĞŶͲĞŶŐ͘ĐŽŵ
ydZE>D/>KEKd>/<ůŝŶŬƐŽƌĂƚƚĂĐŚŵĞŶƚƐƵŶůĞƐƐLJŽƵƌĞĐŽŐŶŝnjĞƚŚĞƐĞŶĚĞƌĂŶĚŬŶŽǁƚŚĞĐŽŶƚĞŶƚŝƐƐĂĨĞ͘
8QGHU)ORULGD/DZHPDLODGGUHVVHVDUHSXEOLFUHFRUGV,I\RXGRQRWZDQW\RXUHPDLODGGUHVVUHOHDVHGLQUHVSRQVHWRD
SXEOLFUHFRUGVUHTXHVWGRQRWVHQGHOHFWURQLFPDLOWRWKLVHQWLW\,QVWHDGFRQWDFWWKLVRIILFHE\WHOHSKRQHRULQZULWLQJ
16.C.4.b
Packet Pg. 1364 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1365 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)CE 042 - Item 001
Excavation
16.C.4.b
Packet Pg. 1366 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1367 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)CE 042 - Item 002
Storm Drainage
16.C.4.b
Packet Pg. 1368 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1369 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1370 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)CE 042 - Item 003
Electrical
16.C.4.b
Packet Pg. 1371 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex
16.C.4.b
Packet Pg. 1372 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport ComplexRV Park Total $51,000
2600 Golden Gate Parkway, Naples, Florida, 34105 Office 239.403.6700 Fax 239.261.1797
Fla Engineer CA 28275 Fla Landscape CA LC26000632
Page | 1
November 8, 2022
Collier County Board of Commissioners
3301 Tamiami Trail East
Naples, FL 34112
Re: Collier County Sports Complex and Events Center
Phase 2.1 – AR Review
AR 7675.041
To Whom It May Concern,
We have received and reviewed the documents referenced above from Manhattan Construction Company.
Regarding pricing, we find this work to be competitive and reasonable for the current market standards.
Thank you,
Josh Fruth
PENINSULA ENGINEERING
Vice President
16.C.4.b
Packet Pg. 1373 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
G:\!01-PROJECTS-ACTIVE\Sports Complex - Phase 2.1\06-Construction\08-Change order\Work Directive\09-CUrb and
Fencing\20220623-CC Sports & Events Complex 2-WDC009-sport fields curb and fencing.docx
Division/Department Name
WORK DIRECTIVE CHANGE
CONTRACT #17-7198 Sixth Amendment /PROJECT NAME: CC Sports and Special Events Complex
CHANGE # 09
DATE OF ISSUANCE: 6/24/2022 EFFECTIVE DATE: 4/8/2022
OWNER: Collier County Board of Commissioners PROJECT#: 50156
CONTRACTOR: Manhattan Construction Florida, Inc. ENGINEER/DESIGN PROFESSIONAL:
Davidson Engineering
You are directed to proceed promptly with the following change(s):
Description: The Contract is being modified to include the additional scope as outlined in addendum #17 for the
construction of the cove sport fields and more specifically outlined below:
Funding: Funds for this work directive shall come from Project 50156.
Purpose of Work Directive Change: To direct the Contractor to supply any necessary materials and labor to install or
complete the following:
x Increase the size of curbs from 6” to 12” to accommodate the additional field fencing.
x Additional of approximately 1,470 linear feet of 4’ high black vinyl coated chain link fence along the south side
of fields 5 and 6 and along the north and south sides of fields #7 & 8 as outlined in addendum #17 in the amount
not to exceed $145,000 (from project fund 50156). Final cost and back-up documents shall be provided at time of
issuing the required change order.
Attachments:
Authorization request #7675.041, dated 6/22/2022.
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a
Change Order based thereon will involve one or more of the following methods of determining the effect of the
changes(s).
Method of determining change in Contract Price: Method of determining change in Contract Times:
Unit Prices Contractor’s records
Lump Sum Engineer’s record
Other Other
Estimated increase (decrease) in Contract Price Estimated change in Contract Time:
$145,000.00 Increase or decrease by 0 calendar days.
RECOMMENDED: AUTHORIZED:
By: By:
Consultant
5(&200(1'('
By:
&RQVXOWDQW Principal Project Manager
ACCEPTED: AUTHORIZED:
By: By:
Contractor Division Director
16.C.4.b
Packet Pg. 1374 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
'HWDLOHG)RUP*URXSHGE\1XPEHUZLWK&(%UHDNGRZQ
$XWKRUL]DWLRQ5HTXHVW
&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
3URMHFW
$XWKRUL]DWLRQ5HTXHVW'DWH
7R$\RXE$OEDKRX 5REHUW7LHGHPDQ)URP
&ROOLHU&RXQW\ 0DQKDWWDQ&RQVWUXFWLRQ&RPSDQ\
:HVWYLHZ'5
1DSOHV)/
7DPLDPL7UDLO(DVW
1DSOHV)/
'HVFULSWLRQ &DWHJRU\ 6WDWXV
3K)LHOGV&XUE&KDQJHDQG)HQFLQJ 6XEPLWWHG'LUHFW&RVW
5HIHUHQFH 5HTXLUHG%\ 'D\V5HT $PRXQW5HTXHVWHG
&(1R 'DWH 5HIHUHQFH 'D\V5HT$PRXQW3URSRVHG &DWHJRU\ 5HDVRQ
2ZQHU&KDQJH &KDQJH&RQGLWLRQ
'HVFULSWLRQ
3K)LHOGV&XUE&KDQJHDQG)HQFLQJ
1RWHV
&RVW(YHQW%UHDNGRZQ
,WHP1R ,WHP'HVFULSWLRQ $PRXQW3URSRVHG 5HIHUHQFH
3URYLGHOIRI;&RQFUHWH5LEERQ&XUELQ/LHXRI;&XUE
3URYLGHOIRI
KLJK%ODFN9LQ\OFRDWHGFKDLQOLQNIHQFHDWWKHHQGVRI
ILHOGV
/HYHO 6',
/HYHO *HQHUDO/LDELOLW\
/HYHO %RQG
/HYHO &0)HH
,QRUGHUWRPLWLJDWHSRVVLEOHGHOD\VDQGH[SHGLWHWKHDSSURYDOIRUWKHGLUHFWFRVWRIZRUNUHODWHGWRWKLVFKDQJHXQOHVVVSHFLILFDOO\QRWHGDERYHZH
DUHVXEPLWWLQJWKLVFKDQJHUHTXHVWZLWKRXWVFKHGXOHWLPHFRVWLPSDFW:HUHVHUYHWKHULJKWWRVXEPLWIRUFRVWWLPHLPSDFWVUHODWHGWRWKLVFKDQJH
XQGHUVHSDUDWHFRYHUZKHQWKDWLQIRUPDWLRQLVDYDLODEOH
&RQWUDFWRUGRHVQRWUHOHDVHLPSDFWVWKDWDULVHRXWRI$FWVRI1DWXUHLQFOXGLQJILUHIORRGHDUWKTXDNHVWRUPKXUULFDQHRURWKHUQDWXUDOGLVDVWHU
ZDULQYDVLRQDFWRISXEOLFHQHPLHVKRVWLOLWLHVZKHWKHUZDULVGHFODUHGRUQRWFLYLOZDUUHEHOOLRQUHYROXWLRQLQVXUUHFWLRQPLOLWDU\RUXVXUSHG
SRZHURUFRQILVFDWLRQWHUURULVWDFWLYLWLHVULRWQDWLRQDOL]DWLRQJRYHUQPHQWDFWLRQVWDULIIVEORFNDJHHPEDUJRWUDQVSRUWDWLRQGHOD\VQRWUHDVRQDEO\
IRUHVHHDEOHODERUGLVSXWHVWULNHORFNRXWGLVHDVHRXWEUHDNHSLGHPLFVSDQGHPLFVTXDUDQWLQHUHVWULFWLRQVRULQWHUUXSWLRQRUIDLOXUHRISRZHU
VRXUFHV7RWKHH[WHQWWKHVHFRQGLWLRQVPD\RFFXUDQGLPSDFWWKH3URMHFWWKHUHVKDOOEHDQHTXLWDEOHDGMXVWPHQWWRWKH&RQWUDFW
6,*1$785( '$7($\RXE$OEDKRX±6U3URMHFW0DQDJHU
$SSURYHG%\
$XWKRUL]DWLRQ5HTXHVW
3URORJ0DQDJHU
3URMHFW&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
16.C.4.b
Packet Pg. 1375 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1376 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1377 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1378 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1379 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1380 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
2600 Golden Gate Parkway, Naples, Florida, 34105 Office 239.403.6700 Fax 239.261.1797
Fla Engineer CA 28275 Fla Landscape CA LC26000632
Page | 1
February 8, 2023
Collier County Board of Commissioners
3301 Tamiami Trail East
Naples, FL 34112
Re: Collier County Sports Complex and Events Center
Phase 2.1 – AR Review
AR 7675.049
To Whom It May Concern,
We have received and reviewed the documents referenced above from Manhattan Construction Company.
Regarding pricing, we find this work to be competitive and reasonable for the current market standards.
Thank you,
Josh Fruth
PENINSULA ENGINEERING
Vice President
16.C.4.b
Packet Pg. 1381 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
G:\!01-PROJECTS-ACTIVE\Sports Complex - Phase 2.1\06-Construction\08-Change order\Work Directive\13-additional fencing
addendum 21
Division/Department Name
WORK DIRECTIVE CHANGE
CONTRACT #17-7198 Sixth Amendment /PROJECT NAME: CC Sports and Special Events Complex
CHANGE # 13
DATE OF ISSUANCE: 2/8/2023 EFFECTIVE DATE: 2/8/2023
OWNER: Collier County Board of Commissioners PROJECT#: 50156
CONTRACTOR: Manhattan Construction Florida, Inc. ENGINEER/DESIGN PROFESSIONAL:
Davidson Engineering
You are directed to proceed promptly with the following change(s):
Description: The Contract is being modified to include the additional scope as outlined in AR#7675.049; more
specifically outlined below:
Funding: Funds for this work directive shall come from Project 50156.
Purpose of Work Directive Change: To direct the Contractor to supply any necessary materials and labor to install or
complete the following:
x AR#7675.049 – modify the temporary chain-link fence to separate phase 2.1 from future phase 3 as outlined in
addendum #21 in the amount not to exceed $50,000. Final cost and back-up documents shall be provided at time
of issuing the required change order.
Attachments:
Authorization request #7675.049, dated 1/25/2023.
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a
Change Order based thereon will involve one or more of the following methods of determining the effect of the
changes(s).
Method of determining change in Contract Price: Method of determining change in Contract Times:
Unit Prices Contractor’s records
Lump Sum Engineer’s record
Other Other
Estimated increase (decrease) in Contract Price Estimated change in Contract Time:
$50,000 Increase or decrease by 0 calendar days.
RECOMMENDED: AUTHORIZED:
By: By:
Consultant
AUTHORIZED:
By:
&RQVXOWDQW
$&&(37('
Principal Project Manager
ACCEPTED: AUTHORIZED:
By: By:
Contractor Division Director
16.C.4.b
Packet Pg. 1382 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
'HWDLOHG)RUP*URXSHGE\1XPEHUZLWK&(%UHDNGRZQ
$XWKRUL]DWLRQ5HTXHVW
&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
3URMHFW
$XWKRUL]DWLRQ5HTXHVW'DWH
7R$\RXE$OEDKRX &UDLJ%U\DQW)URP
&ROOLHU&RXQW\ 0DQKDWWDQ&RQVWUXFWLRQ&RPSDQ\
:HVWYLHZ'5
1DSOHV)/
7DPLDPL7UDLO(DVW
1DSOHV)/
'HVFULSWLRQ &DWHJRU\ 6WDWXV
$''(1'807HPSRUDU\
3HULPHWHU&KDLQ/LQN)HQFH VXEPLWWHG
5HIHUHQFH 5HTXLUHG%\ 'D\V5HT $PRXQW5HTXHVWHG
&(1R 'DWH 5HIHUHQFH 'D\V5HT$PRXQW3URSRVHG &DWHJRU\ 5HDVRQ
2ZQHU&KDQJH &KDQJH&RQGLWLRQ
'HVFULSWLRQ
$''(1'80
%ODFN&KDLQ/LQN3HULPHWHU7HPS)HQFH
7KLVFRVWHYHQWLQFOXGHVWKHFRVWDVVRFLDWHGZLWKWKHDGGLWLRQRID
KLJKFRQVWUXFWLRQFKDLQOLQNIHQFHWRHQFORVHWKHILHOGVIURPSKDVHZLWK
WKHUHVWRIWKHVSRUWVFRPSOH[DVVKRZQRQ$GGHQGXP7KLVDOVRLQOFXGHVDGHGXFWIRUEODFNYLQ\OFRDWHGFKDLQOLQNIHQFHDQGJDWHWKDWZDV
LQFOXGHGZLWKWKLVDGGHQGXP
1RWHV
&RVW(YHQW%UHDNGRZQ
,WHP1R ,WHP'HVFULSWLRQ $PRXQW3URSRVHG 5HIHUHQFH
&RQVWUXFWLRQ)HQFH
%ODFN9LQ\O&RDWHG)HQFH
/HYHO 6',
/HYHO *HQHUDO/LDELOLW\
/HYHO %RQG
/HYHO &0)HH
,QRUGHUWRPLWLJDWHSRVVLEOHGHOD\VDQGH[SHGLWHWKHDSSURYDOIRUWKHGLUHFWFRVWRIZRUNUHODWHGWRWKLVFKDQJHXQOHVVVSHFLILFDOO\QRWHGDERYHZH
DUHVXEPLWWLQJWKLVFKDQJHUHTXHVWZLWKRXWVFKHGXOHWLPHFRVWLPSDFW:HUHVHUYHWKHULJKWWRVXEPLWIRUFRVWWLPHLPSDFWVUHODWHGWRWKLVFKDQJH
XQGHUVHSDUDWHFRYHUZKHQWKDWLQIRUPDWLRQLVDYDLODEOH
&RQWUDFWRUGRHVQRWUHOHDVHLPSDFWVWKDWDULVHRXWRI$FWVRI1DWXUHLQFOXGLQJILUHIORRGHDUWKTXDNHVWRUPKXUULFDQHRURWKHUQDWXUDOGLVDVWHU
ZDULQYDVLRQDFWRISXEOLFHQHPLHVKRVWLOLWLHVZKHWKHUZDULVGHFODUHGRUQRWFLYLOZDUUHEHOOLRQUHYROXWLRQLQVXUUHFWLRQPLOLWDU\RUXVXUSHG
SRZHURUFRQILVFDWLRQWHUURULVWDFWLYLWLHVULRWQDWLRQDOL]DWLRQJRYHUQPHQWDFWLRQVWDULIIVEORFNDJHHPEDUJRWUDQVSRUWDWLRQGHOD\VQRWUHDVRQDEO\
IRUHVHHDEOHODERUGLVSXWHVWULNHORFNRXWGLVHDVHRXWEUHDNHSLGHPLFVSDQGHPLFVTXDUDQWLQHUHVWULFWLRQVRULQWHUUXSWLRQRUIDLOXUHRISRZHU
VRXUFHV7RWKHH[WHQWWKHVHFRQGLWLRQVPD\RFFXUDQGLPSDFWWKH3URMHFWWKHUHVKDOOEHDQHTXLWDEOHDGMXVWPHQWWRWKH&RQWUDFW
6,*1$785( '$7($\RXE$OEDKRX±6U3URMHFW0DQDJHU
$SSURYHG%\
$XWKRUL]DWLRQ5HTXHVW
3URORJ0DQDJHU
3URMHFW&ROOLHU&RXQW\6SRUWV (YHQWV&RPSOH[
16.C.4.b
Packet Pg. 1383 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1384 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
16.C.4.b
Packet Pg. 1385 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
COLLIER COUNTY
ON-SITE PRESERVE
(4.37 ACRES)
COLLIER COUNTY
OFF-SITE PRESERVE PER
PUD ORD. 20-13
(9.28 ACRES)
COLLIER COUNTYTYCOLLIER COUNTYY 1" = 150'COLLIER COUNTY
SPORTS COMPLEX
AND
EVENTS CENTER
MAY 2021
REVISIONS:
No: Revision: Date:
OWNER/CLIENT/CONSULTANT:
PROFESSIONAL SEALS:
File Number:
Project Number:
Vertical Scale:
Horizontal Scale:
Date:
Drawn by:
Designed by:
City
B
1
1
E
D
C
A
County:[Save Date: 8/12/2022 8:49:37 AM] [Saved By: SCarlisle] [Plot Date: 8/12/2022 10:02:08 AM] [Plotted By: Shawn Carlisle] [Original Size: 24x36] [Drawing Path: Z:\ActiveProjects\CC SPORTS COMPLEX\DWG\Sheetfiles - PHASE 2\EX02 PAVILION GMD UPDATED.dwg]2
2
3
3
4
4
5
5
6
6
PROFESSIONAL ENGINEER:
FLORIDA LICENSE NUMBER:
SEC: RGE:TWP:
NAPLES COLLIER
TITLE:
PROJECT:
JENNA A. WOODWARD
84212
CIVIL ENGINEERING · LANDSCAPE ARCHITECTURE ·
ENVIRONMENTAL CONSULTING · LAND PLANNING ·
SITE PLANNING · CONSTRUCTION MANAGEMENT ·
OWNER REPRESENTATIVE
2600 Golden Gate Parkway
Naples, FL. 34105
Phone: 239.403.6700 Fax: 239.261.1797
Email: info@pen-eng.com Website: www.pen-eng.com
Florida Certificate of Authorization # 28275
JAW
DJS
---
---
35 49 26
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
3335 TAMIAMI TRAIL EAST,
SUITE 101
NAPLES, FL 34112
MASTER PHASING
PLAN SHEET
C-19.00
PHASE 1 PHASE PLAN
x
x
x
x
x
x
x
x
x
x
x
x
PHASE 2 PHASE PLAN
xx
x
x
x
xx
x
x
xx
x
xx
xx
xx
x
x
x
x
x
x
x
x
x
x
xx
xx
x
x
xx
x
1:150
1
PHASE 4 PHASE PLAN
PHASE 3 PHASE PLAN
x
xx
x
16.C.4.b
Packet Pg. 1386 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport ComplexADD FENCING
(GREEN AREA FROM
EXISTING TO GATE 3
AND THEN TO LAKE)
GATE 2
GATE 3
EXISTING FENCING
LIMITS TO REMAIN 3-9-BUTTON SIGNS
FOR CLOSED
ACCESS
GATE 1
6'-0" TYP.6'-0" TYP.2'-6"2'-6"
MIDFIELD LINE
12'-0"12'-0"12'-0"12'-0"L24'-0"6'-0"2'-0"2'-0"6'-0"12'-0"6'-0"4'-0"10'-0"5'-0"5'-0"SHEET TITLE:
PROJECT:
REVISIONS:
CLIENT:
DATEREV.DESCRIPTION
COLLIER COUNTY
SPORTS COMPLEX AND
EVENTS CENTER
SITE LOCATION MAP
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
3335 TAMIAMI TRAIL EAST,
SUITE 101
NAPLES, FL 34112
PROJECT NO.:
18-0097
18-0098
18-0099
SHEET NO:
NOTES:
SCALE:
A B
D C
E F
H G8/10/2022 10:36 AM4365 Radio Road, Suite 201
Naples, Florida 34104
P: 239.434.6060
Company Cert. of Authorization No. 00009496
2600 GOLDEN GATE PARKWAY
NAPLES, FLORIDA 34105
PHONE: 239.403.6700
FLORIDA ENGINEERING CERTIFICATE OF
AUTHORIZATION: #28275
JEFF L. DAVIDSON, P.E NO. 47161
ANDREW E. RATH, P.E. NO. 73996
CARL M. THRUSHMAN P.E. NO. 86499
RYAN A. WHITE, P.E. NO. 67400
JENNA A. WOODWARD, P.E. NO. 84212
0
SCALE: 1" = 20'-0"
4010 20
1" = 20'
AREA B SITE LAYOUT &
MATERIALS PLAN
SD1.02
LANDSCAPE
AREA
RE: LANDSCAPE
PLANS
CONSTRUCT
STANDARD DUTY
GRAY CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
LEGEND
COL FENCE CORNER COLUMN
RE: K/SD4.01
LA
CONSTRUCT
HEAVY DUTY
STANDARD GRAY
CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
HD
L# / C#SITE LAYOUT
GUIDELINE
RE: SD1.00
BV SAWCUT JOINT
WITH 45° BEVELED
EDGE
RE: E/SD4.01
PHASE 2A LIMIT
LINE
SD SERIES PLANS
LIMIT OF SCOPE
6' HT TEMPORARY
CHAIN-LINK
CONSTRUCTION
FENCING
LAMATCHLINE - SD1.01MATCHLINE - SD1.03 MATCHLINE - SD1.03MATCHLINE - SD1.011
BVBVBV
DG
LIMIT OF SCOPE - SD SERIES PLANS
MULTI-PURPOSE
FIELD 6
RE: PF SERIES PLANS
INSTALL 6' HT. VINYL COATED CHAIN-LINK FENCE
COLOR: BLACK
RE: SD1.01 FOR LENGTH & CONTINUATION
RE: J/SD4.01
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
EDGE OF PARKING LOT PAVEMENT
RE: CIVIL PLANS
RE: CIVIL PLANS
LA
LA
MULTI-PURPOSE
FIELD 5
RE: PF SERIES PLANS
LIMIT OF SCOPE - SD SERIES PLANS
LIMIT OF SCOPE - SD SERIES PLANS6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
LAKE
RE: CIVIL PLANSA/SD4.01
A/SD4.01
1 07/24/2020 ADDENDUM 1-2.1
1
RE: CIVIL PLANS LIMITS OF PHASE 2.11
03/18/2022 CONFORMED SET
2 08/12/2022 ADDENDUM 21
2
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION
FENCING 1' FROM AND TO PARALLEL PLAYING FIELD CURB
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCING
SURROUNDING PLAYING FIELD LIGHT POLE
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION
FENCING 3' FROM AND TO PARALLEL PLAYING FIELD CURB
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION
FENCING AT EDGE OF STORMWATER BASIN TO PARKING LOT
2
SD1.03SSDD000033SSDD11..0033 SD1.03SD103SD103
SD1.00SD1.01SD1.011100001111DDSSSD1.01
A/AA//SD444SSDD44
A///SD4SSDD44
//SD4.0SD4 0
K/SD4.
E/SD4
16.C.4.b
Packet Pg. 1387 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTIONAIN-LINK CONSTRU
FENCING AT EDGE OF STORMWATER BASIN TO PARKING LOTG AT EDGE OF STO
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCINGK CONSTRUCTION F
SURROUNDING PLAYING FIELD LIGHT POLESURR
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTIONAIN-LINK CONSTRU
FENCING 1' FROM AND TO PARALLEL PLAYING FIELD CURBNG 1' FROM AND T
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTIONAIN-LINK CONSTRU
FENCING 3' FROM AND TO PARALLEL PLAYING FIELD CURBG 3' FROM AND T
2'-6"6'-0" TYP.EQ.EQ.20'-0"6'-0" TYP.L2L32'-6"2'-6"2'-6"4'-0"6'-0" TYP.6'-0" TYP.6'-0" TYP.20'-0"12'-0"2'-0"2'-0"
2'-6"2'-6"
R1
5
'
-
0
"R15'-0"6'-0" TYP.L3
R
1
5
'
-
0
"
-9"
SHEET TITLE:
PROJECT:
REVISIONS:
CLIENT:
DATEREV.DESCRIPTION
COLLIER COUNTY
SPORTS COMPLEX AND
EVENTS CENTER
SITE LOCATION MAP
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
3335 TAMIAMI TRAIL EAST,
SUITE 101
NAPLES, FL 34112
PROJECT NO.:
18-0097
18-0098
18-0099
SHEET NO:
NOTES:
SCALE:
A B
D C
E F
H G8/10/2022 10:36 AM4365 Radio Road, Suite 201
Naples, Florida 34104
P: 239.434.6060
Company Cert. of Authorization No. 00009496
2600 GOLDEN GATE PARKWAY
NAPLES, FLORIDA 34105
PHONE: 239.403.6700
FLORIDA ENGINEERING CERTIFICATE OF
AUTHORIZATION: #28275
JEFF L. DAVIDSON, P.E NO. 47161
ANDREW E. RATH, P.E. NO. 73996
CARL M. THRUSHMAN P.E. NO. 86499
RYAN A. WHITE, P.E. NO. 67400
JENNA A. WOODWARD, P.E. NO. 84212
0
SCALE: 1" = 20'-0"
4010 20
1" = 20'
AREA C SITE LAYOUT &
MATERIALS PLAN
SD1.03
LANDSCAPE
AREA
RE: LANDSCAPE
PLANS
CONSTRUCT
STANDARD DUTY
GRAY CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
LEGEND
COL FENCE CORNER COLUMN
RE: K/SD4.01
LA
CONSTRUCT
HEAVY DUTY
STANDARD GRAY
CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
HD
L# / C#SITE LAYOUT
GUIDELINE
RE: SD1.00
BV SAWCUT JOINT
WITH 45° BEVELED
EDGE
RE: E/SD4.01
PHASE 2A LIMIT
LINE
SD SERIES PLANS
LIMIT OF SCOPE
6' HT TEMPORARY
CHAIN-LINK
CONSTRUCTION
FENCING
MULTI-PURPOSE
FIELD 5
RE: PF SERIES PLANSMATCHLINE - SD1.04MATCHLINE - SD1.06 MATCHLINE - SD1.06MATCHLINE - SD1.04MATCHLINE - SD1.02 MATCHLINE - SD1.02
HD
1
1 07/24/2020 ADDENDUM 1-2.1
MULTI-PURPOSE
FIELD 6
RE: PF SERIES PLANS
LIMIT OF SCOPE - SD SERIES PLANS6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
12" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
BV
BV
BVBVBVBVBVBV
BV
LA
LA
LIMIT OF SCOPE - SD SERIES PLANSLAKE
RE: CIVIL PLANS
LAKE
RE: CIVIL PLANS
A/SD4.01
A/SD4.01
1
1
LA
LA
LA
LIMITS OF
P
H
ASE 2.1
2
2 01/28/2022 ADDENDUM 14R2-2.1
2
2
03/18/2022 CONFORMED SET
3
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION
FENCING 3' FROM AND TO PARALLEL PLAYING FIELD CURB
RE: SD1.03 FOR LENGTH AND CONTINUATION
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION
FENCING 1' FROM AND TO PARALLEL PLAYING FIELD CURB
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCING
SURROUNDING PLAYING FIELD LIGHT POLE
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION
FENCING 1' FROM AND TO PARALLEL PLAYING FIELD CURB
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCING
SURROUNDING PLAYING FIELD LIGHT POLE
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION
FENCING 3' FROM AND TO PARALLEL PLAYING FIELD CURB
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION
FENCING 4' FROM AND TO PARALLEL PLAYING FIELD CURB
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION
FENCING 1' FROM AND TO PARALLEL PLAYING FIELD CURB
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION
FENCING 1' FROM EDGE OF SIDEWALK
3 08/12/2022 ADDENDUM 21
3
SD1.06SSDD110066S1.06DD1.06 SD1.06SD1.04444400001111DDDDSSSSSD1.04444400000000DDSSSSSD1.02000022SSDDDD110022 SD1.02SD1.002SD2
SD1.00
A/AA////SD4SSDD4444SSDDDD44
A///AA//SD4SSDD44SSDDDD44
K/SD4.
E/SD4
16.C.4.b
Packet Pg. 1388 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCINGK CONSTRUCTION F
SURROUNDING PLAYING FIELD LIGHT POLESURR
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTIONAIN-LINK CONSTRU
FENCING 1' FROM AND TO PARALLEL PLAYING FIELD CURBG 1' FROM AND T
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTIONCONSTRUC
FENCING 3' FROM AND TO PARALLEL PLAYING FIELD CURBTO PARALL
RE:RE SD1.03 FOR LENGTH AND CONTINUATION
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTIONAIN-LINK CONSTRU
FENCING 1' FROM AND TO PARALLEL PLAYING FIELD CURBG 1' FROM AND T
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCINGK CONSTRUCTION F
SURROUNDING PLAYING FIELD LIGHT POLESURR
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTIONAIN-LINK CONSTRU
FENCING 3' FROM AND TO PARALLEL PLAYING FIELD CURBNG 3' FROM AND T
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION
FENCING 1' FROM EDGE OF SIDEWALK
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTIONAIN-LINK CONSTRU
FENCING 4' FROM AND TO PARALLEL PLAYING FIELD CURBG 4' FROM AND T
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTIONAIN-LINK CONSTRU
FENCING 1' FROM AND TO PARALLEL PLAYING FIELD CURBG 1' FROM AND T
6' 0" TYP
2'-6"
12'-0"
TYP.
6'-0"6'-0"20'-0"2'-6"2'-6"10'-0"10'-0"R15'-0"SHEET TITLE:
PROJECT:
REVISIONS:
CLIENT:
DATEREV.DESCRIPTION
COLLIER COUNTY
SPORTS COMPLEX AND
EVENTS CENTER
SITE LOCATION MAP
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
3335 TAMIAMI TRAIL EAST,
SUITE 101
NAPLES, FL 34112
PROJECT NO.:
18-0097
18-0098
18-0099
SHEET NO:
NOTES:
SCALE:
A B
D C
E F
H G8/10/2022 10:37 AM4365 Radio Road, Suite 201
Naples, Florida 34104
P: 239.434.6060
Company Cert. of Authorization No. 00009496
2600 GOLDEN GATE PARKWAY
NAPLES, FLORIDA 34105
PHONE: 239.403.6700
FLORIDA ENGINEERING CERTIFICATE OF
AUTHORIZATION: #28275
JEFF L. DAVIDSON, P.E NO. 47161
ANDREW E. RATH, P.E. NO. 73996
CARL M. THRUSHMAN P.E. NO. 86499
RYAN A. WHITE, P.E. NO. 67400
JENNA A. WOODWARD, P.E. NO. 84212
0
SCALE: 1" = 20'-0"
4010 20
1" = 20'
AREA F SITE LAYOUT &
MATERIALS PLAN
SD1.06
LANDSCAPE
AREA
RE: LANDSCAPE
PLANS
CONSTRUCT
STANDARD DUTY
GRAY CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
LEGEND
COL FENCE CORNER COLUMN
RE: K/SD4.01
LA
CONSTRUCT
HEAVY DUTY
STANDARD GRAY
CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
HD
L# / C#SITE LAYOUT
GUIDELINE
RE: SD1.00
BV SAWCUT JOINT
WITH 45° BEVELED
EDGE
RE: E/SD4.01
PHASE 2A LIMIT
LINE
SD SERIES PLANS
LIMIT OF SCOPE
6' HT TEMPORARY
CHAIN-LINK
CONSTRUCTION
FENCINGMATCHLINE - SD1.05MATCHLINE - SD1.07 MATCHLINE - SD1.07MATCHLINE - SD1.05MATCHLINE - SD1.03 MATCHLINE - SD1.03
1
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION
FENCING 3' FROM AND TO PARALLEL PLAYING FIELD CURB
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
HD BV
BV LIMITS OF SCOPE - SD SERIES PLANSMULTI-PURPOSE
FIELD 8
RE: PF SERIES PLANS
BV
BV
HD
LAKE
RE: CIVIL PLANS
LAKE
RE: CIVIL PLANS
1 07/24/2020 ADDENDUM 1-2.1
1 LIMITS OF PHASE 2.1LIM
ITS
OF
PHASE
2
.1
2
2 01/28/2022 ADDENDUM 14R2-2.1
2
03/18/2022 CONFORMED SET
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION
FENCING 1' FROM AND TO PARALLEL PLAYING FIELD CURB
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCING
1' FROM AND PARALLEL TO EDGE OF SIDEWALK
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCING
SURROUNDING PLAYING FIELD LIGHT POLE
3
3 08/12/2022 ADDENDUM 21
3
SD1.07 SD1.07SD1.055555550000DDDDSSSS0SD1.05SD1.03SSDD110033SSDDDD0000331100 SD1.03
SD1.00
K/SD4.
E/SD4
16.C.4.b
Packet Pg. 1389 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTIONAIN-LINK CONSTRU
FENCING 1' FROM AND TO PARALLEL PLAYING FIELD CURBG 1' FROM AND T
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTIONAIN-LINK CONSTRU
FENCING 3' FROM AND TO PARALLEL PLAYING FIELD CURBG 3' FROM AND T
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCINGK CONSTRUCTION F
SURROUNDING PLAYING FIELD LIGHT POLESURR
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCING
1' FROM AND PARALLEL TO EDGE OF SIDEWALK
L46'-0" TYP.
2'-0"2'-0"12'-0"6'-0" TYP.6'-0" TYP.MIDFIELD LINE
4'-0"6'-0" TYP.6'-0" TYP.2'-6"2'-6"6'-0" TYP.6'-0" TYP.
6
2'-6"2'-6"20'-0"EQ.EQ.6'-0" TYP.R15'-0"R
1
5
'
-
0
"
SHEET TITLE:
PROJECT:
REVISIONS:
CLIENT:
DATEREV.DESCRIPTION
COLLIER COUNTY
SPORTS COMPLEX AND
EVENTS CENTER
SITE LOCATION MAP
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
3335 TAMIAMI TRAIL EAST,
SUITE 101
NAPLES, FL 34112
PROJECT NO.:
18-0097
18-0098
18-0099
SHEET NO:
NOTES:
SCALE:
A B
D C
E F
H G8/10/2022 10:37 AM4365 Radio Road, Suite 201
Naples, Florida 34104
P: 239.434.6060
Company Cert. of Authorization No. 00009496
2600 GOLDEN GATE PARKWAY
NAPLES, FLORIDA 34105
PHONE: 239.403.6700
FLORIDA ENGINEERING CERTIFICATE OF
AUTHORIZATION: #28275
JEFF L. DAVIDSON, P.E NO. 47161
ANDREW E. RATH, P.E. NO. 73996
CARL M. THRUSHMAN P.E. NO. 86499
RYAN A. WHITE, P.E. NO. 67400
JENNA A. WOODWARD, P.E. NO. 84212
0
SCALE: 1" = 20'-0"
4010 20
1" = 20'
AREA E SITE LAYOUT &
MATERIALS PLAN
SD1.05
LANDSCAPE
AREA
RE: LANDSCAPE
PLANS
CONSTRUCT
STANDARD DUTY
GRAY CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
LEGEND
COL FENCE CORNER COLUMN
RE: K/SD4.01
LA
CONSTRUCT
HEAVY DUTY
STANDARD GRAY
CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
HD
L# / C#SITE LAYOUT
GUIDELINE
RE: SD1.00
BV SAWCUT JOINT
WITH 45° BEVELED
EDGE
RE: E/SD4.01
PHASE 2A LIMIT
LINE
SD SERIES PLANS
LIMIT OF SCOPE
6' HT TEMPORARY
CHAIN-LINK
CONSTRUCTION
FENCING
HD MATCHLINE - SD1.06MATCHLINE - SD1.08 MATCHLINE - SD1.08 MATCHLINE - SD1.06MATCHLINE - SD1.04 MATCHLINE - SD1.04
1
LIMIT OF SCOPE - SD SERIES PLANSSITE CENTERLINESITE CENTERLINELIMITS OF PHASE 2.1PHASE 1A
MULTI-PURPOSE
FIELD 7
RE: PF SERIES PLANS
EXISTING PHASE 1A ORNAMENTAL FENCE
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
BV
BV BV
BV
BV
BV
BVBVHD
LA
LA LA BVBVMULTI-PURPOSE
FIELD 8
RE: PF SERIES PLANSLIMITS OF PHASE 2.1PHASE 1A
PHASE 1A
LIMITS OF PHASE 2.1A/SD4.01
A/SD4.01
1 07/24/2020 ADDENDUM 1-2.1
1
2
2 01/28/2022 ADDENDUM 14R2-2.1
03/18/2022 CONFORMED SET
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCING
1' FROM AND PARALLEL TO EDGE OF SIDEWALK
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCING
1' FROM AND PARALLEL TO EDGE OF SIDEWALK
3 3 08/12/2022 ADDENDUM 21
3
SD1.08SD1.08 SD1.08 SD1.0666660000DDSSSS0SD1.06SD1.04 SD1.04SSDDDD000044SSDD110044
SD1.00
A/AA////SD4SSDDDD44SSDD44
A/AA//AA SD4SSDDDD44SSDD4444
K/SD4.
E/SD4
16.C.4.b
Packet Pg. 1390 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCING
1' FROM AND PARALLEL TO EDGE OF SIDEWALK
INSTALL 6' HT. TEMPORARY CHAIN-LINK CONSTRUCTION FENCING
1' FROM AND PARALLEL TO EDGE OF SIDEWALK
16.C.4.b
Packet Pg. 1391 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15) Item 002
Black Vinyl Coated Fence and Gate
Sheet1
Date: July 28, 2021
Project:Manahattan 6' Black Vinyl
Collier Sports Complex / Phase II
QTY DESC SIZE COST TOTAL QTY DESC SIZE COST TOTAL
8 B. Band 3" 0.71 5.71 948 Fabric 6' #6 ga 9.64 9,141.43
4 B. Band 2-1/2" 0.64 2.57 95 LinePost 2-1/2" x 9' 80.50 7,647.50
20 T. Band 3" 0.71 14.29 4 TermPost 3" x 9' 120.00 480.00
8Rail End1-5/8" 1.79 14.29 966 TopRail 1-5/8" 5.19 5,009.40
4 T. Tightener 1.43 5.71 4 TenBar 1002 8.57 34.29
46 Sleeve 1-5/8" 1.79 82.14 1 TenWire 178.57 178.57
100 Loop Cap 2-1/2" 2.50 250.00 4 TrussRod 14.29 57.14
4Dome Cap 3" 4.29 17.14
50 Bolts 0.17 8.57 Equipement
150 TieWire 0.29 42.86 450 expenses 2.86 1,285.71
8 Quikrete 142.86 1,142.86
1,586.14
Subcontract 23,834.04
948 6' w/ BTW 4.29 4,062.86
4 Bars / Brace 7.14 28.57
-
MATERIAL 25,420.19
TAX 1,779.41
LABOR 4,091.43
TOTAL 31,291.03
948' 33.01$
Page 1
16.C.4.b
Packet Pg. 1392 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
Date: July 28, 2021
Project: Manahattan 6' Ornamental Gate
Collier Sports Complex / Phase II
QTY DESC SIZE COST TOTAL QTY DESC SIZE COST TOTAL
4 B. Band 3" 0.71 2.86 2 TermPost 3" x 9' 120.00 240.00
10 T. Band 3" 0.71 7.14 2 TenBar 1002 8.57 17.14
2Rail End1-5/8" 1.79 3.57 2 TrussRod 14.29 28.57
2 Dome Cap 3" 4.29 8.57 1 Gate 6'h x 16'w DD 754.29 754.29
20 Bolts 0.17 3.43
0.5 Quikrete 142.86 71.43 Subcontract 1,040.00
97.00
1 Gate Installation 150.00 150.00
MATERIAL 1,137.00
TAX 79.59
LABOR 150.00
TOTAL 1,366.59
16.C.4.b
Packet Pg. 1393 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
6'-0" TYP.6'-0" TYP.2'-6"2'-6"
MIDFIELD LINE
12'-0"12'-0"12'-0"12'-0"L24'-0"6'-0"2'-0"2'-0"6'-0"12'-0"6'-0"
10'-0"
10'-0"10'-0"10'-0"
10'-0"10'-0"4'-0"10'-0"5'-0"5'-0"10'-0"EQ.EQ.0+001+002+00BP: 0+00.00
PC: 0+10.00
PR
C
:
0
+
4
0
.
5
0
PRC: 0+77.99L12C14C15
C166'-0"
6'-0"
SHEET TITLE:
PROJECT:
REVISIONS:
CLIENT:
DATEREV.DESCRIPTION
COLLIER COUNTY
SPORTS COMPLEX AND
EVENTS CENTER
SITE LOCATION MAP
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
3335 TAMIAMI TRAIL EAST,
SUITE 101
NAPLES, FL 34112
PROJECT NO.:
18-0097
18-0098
18-0099
SHEET NO:
NOTES:
SCALE:
A B
D C
E F
H G3/4/2022 12:19 PM4365 Radio Road, Suite 201
Naples, Florida 34104
P: 239.434.6060
Company Cert. of Authorization No. 00009496
2600 GOLDEN GATE PARKWAY
NAPLES, FLORIDA 34105
PHONE: 239.403.6700
FLORIDA ENGINEERING CERTIFICATE OF
AUTHORIZATION: #28275
JEFF L. DAVIDSON, P.E NO. 47161
ANDREW E. RATH, P.E. NO. 73996
CARL M. THRUSHMAN P.E. NO. 86499
RYAN A. WHITE, P.E. NO. 67400
JENNA A. WOODWARD, P.E. NO. 84212
0
SCALE: 1" = 20'-0"
4010 20
1" = 20'
AREA B SITE LAYOUT &
MATERIALS PLAN
SD1.02
LANDSCAPE
AREA
RE: LANDSCAPE
PLANS
CONSTRUCT
STANDARD DUTY
GRAY CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
LEGEND
COL FENCE CORNER COLUMN
RE: K/SD4.01
LA
CONSTRUCT
HEAVY DUTY
STANDARD GRAY
CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
HD
L# / C#SITE LAYOUT
GUIDELINE
RE: SD1.00
BV SAWCUT JOINT
WITH 45° BEVELED
EDGE
RE: E/SD4.01
PHASE 2A LIMIT
LINE
SD SERIES PLANS
LIMIT OF SCOPE
LAMATCHLINE - SD1.01MATCHLINE - SD1.03 MATCHLINE - SD1.03MATCHLINE - SD1.011
BVBVBV
LIMIT OF SCOPE - SD SERIES PLANS
DG
LIMIT OF SCOPE - SD SERIES PLANS
MULTI-PURPOSE
FIELD 6
RE: PF SERIES PLANS
INSTALL 6' HT. VINYL COATED CHAIN-LINK FENCE
COLOR: BLACK
RE: SD1.01 FOR LENGTH & CONTINUATION
RE: J/SD4.01
INSTALL 398 L.F. 6' HT. VINYL COATED CHAIN-LINK FENCE
FENCE TO PARALLEL PLAYING FIELD CURB
COLOR: BLACK
RE: SD1.03 FOR CONTINUATION
RE: J/SD4.01
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
EDGE OF PARKING LOT PAVEMENT
RE: CIVIL PLANS
RE: CIVIL PLANS
LA
LA
LA
CONSTRUCT 10' W. ASPHALT TRAIL
RE: SD1.00 FOR CENTERLINE ALIGNMENT
MULTI-PURPOSE
FIELD 5
RE: PF SERIES PLANS
LIMIT OF SCOPE - SD SERIES PLANS
LIMIT OF SCOPE - SD SERIES PLANS6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
LAKE
RE: CIVIL PLANSA/SD4.01
A/SD4.01
LA
1 07/24/2020 ADDENDUM 1-2.1
1
RE: CIVIL PLANS LIMITS OF PHASE 2.11
03/18/2022 CONFORMED SET
A/AA//SD444SSDD44DD
A///SD4SSDD44SS
//SD4.0SD4 0
/SD4.0
K/SD4.
E/SD4
SD1.03SSDD000033SSDD11..0033 SD1.03SD103SD103
SD1.03
SD1.00D1.00
SD1.00SD1.01SD1.011100001111DDSSSD1.01
16.C.4.b
Packet Pg. 1394 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
2'-6"6'-0" TYP.EQ.EQ.20'-0"6'-0" TYP.L2L32'-6"2'-6"2'-6"4'-0"6'-0" TYP.6'-0" TYP.6'-0" TYP.
10'-0"20'-0"12'-0"2'-0"2'-0"
2'-6"2'-6"7'-6"8'-8"7'-6"8'-8"6'-0"21'-3"25'-9"6'-0"
R1
5
'
-
0
"R15'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"
6'-0" TYP.L3
R
1
5
'
-
0
"3+004+005+00
6+007+00PCC: 4+35.37
PCC: 4+75.07PRC: 5+32.87PRC: 6+07.60 C17C18
C19C20-9"R15'-0"R15'-0"2'-6"2'-6"2'-6"R
1
5
'
-
0
"
R
1
5
'
-
0
"3'-0"SHEET TITLE:
PROJECT:
REVISIONS:
CLIENT:
DATEREV.DESCRIPTION
COLLIER COUNTY
SPORTS COMPLEX AND
EVENTS CENTER
SITE LOCATION MAP
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
3335 TAMIAMI TRAIL EAST,
SUITE 101
NAPLES, FL 34112
PROJECT NO.:
18-0097
18-0098
18-0099
SHEET NO:
NOTES:
SCALE:
A B
D C
E F
H G3/4/2022 12:19 PM4365 Radio Road, Suite 201
Naples, Florida 34104
P: 239.434.6060
Company Cert. of Authorization No. 00009496
2600 GOLDEN GATE PARKWAY
NAPLES, FLORIDA 34105
PHONE: 239.403.6700
FLORIDA ENGINEERING CERTIFICATE OF
AUTHORIZATION: #28275
JEFF L. DAVIDSON, P.E NO. 47161
ANDREW E. RATH, P.E. NO. 73996
CARL M. THRUSHMAN P.E. NO. 86499
RYAN A. WHITE, P.E. NO. 67400
JENNA A. WOODWARD, P.E. NO. 84212
0
SCALE: 1" = 20'-0"
4010 20
1" = 20'
AREA C SITE LAYOUT &
MATERIALS PLAN
SD1.03
LANDSCAPE
AREA
RE: LANDSCAPE
PLANS
CONSTRUCT
STANDARD DUTY
GRAY CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
LEGEND
COL FENCE CORNER COLUMN
RE: K/SD4.01
LA
CONSTRUCT
HEAVY DUTY
STANDARD GRAY
CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
HD
L# / C#SITE LAYOUT
GUIDELINE
RE: SD1.00
BV SAWCUT JOINT
WITH 45° BEVELED
EDGE
RE: E/SD4.01
PHASE 2A LIMIT
LINE
SD SERIES PLANS
LIMIT OF SCOPE
MULTI-PURPOSE
FIELD 5
RE: PF SERIES PLANSMATCHLINE - SD1.04MATCHLINE - SD1.06 MATCHLINE - SD1.06MATCHLINE - SD1.04MATCHLINE - SD1.02 MATCHLINE - SD1.02
HD
1
1 07/24/2020 ADDENDUM 1-2.1
MULTI-PURPOSE
FIELD 6
RE: PF SERIES PLANS
MULTI-PURPOSE
FIELD 8
RE: PF SERIES PLANS LIMIT OF SCOPE - SD SERIES PLANSRESTROOMS
INSTALL 421 L.F. 6' HT. VINYL COATED CHAIN-LINK FENCE
FENCE TO PARALLEL PLAYING FIELD CURB
COLOR: BLACK
RE: SD1.06 FOR CONTINUATION
RE: J/SD4.01
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
INSTALL 6' HT. VINYL COATED CHAIN-LINK FENCE
FENCE TO PARALLEL PLAYING FIELD CURB
COLOR: BLACK
RE: SD1.02 FOR LENGTH AND CONTINUATION
RE: J/SD4.01
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
INSTALL 123 L.F. 6' HT. VINYL COATED CHAIN-LINK FENCE
FENCE TO PARALLEL PLAYING FIELD CURB
COLOR: BLACK
RE: J/SD4.01
12" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
HD
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
BV
BV
BVBVBVBVBVBV
BV
LA
LA
LIMIT OF SCOPE - SD SERIES PLANSLAKE
RE: CIVIL PLANS
LAKE
RE: CIVIL PLANS
A/SD4.01
A/SD4.01
CONSTRUCT 10' W. ASPHALT TRAIL
RE: SD1.00 FOR CENTERLINE ALIGNMENT
CONSTRUCT 10' W. ASPHALT TRAIL
RE: SD1.00 FOR CENTERLINE ALIGNMENT
1
1
LA
LA
LA
LA
LA
LA
LA
LA
LA
LIMITS OF
P
H
ASE 2.1
2
2 01/28/2022 ADDENDUM 14R2-2.1
2
2
03/18/2022 CONFORMED SET
A/AA////D44444DD44DDDSDSSSSDDDD
A///AA//SD4DD44SSDDDD44SSS
/SD4.0
/SD4.0
/SD4.0
K/SD4.
E/SD4
SD1.06
SDSSDD1.06110066S1.06DD1.06 SD1.06SD1.04444400001111DDDDSSSSSD1.04444400000000DDSSSSSD1.02000022SSDDDD110022 SD1.02SD1.002SD2
SD1.0202
SD1.00D1.00
SD1.00D1.00
SD1.00
16.C.4.b
Packet Pg. 1395 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)
6' 0" TYP
2'-6"
12'-0"
TYP.
6'-0"6'-0"20'-0"2'-6"2'-6"10'-0"10'-0"10'-0"10'-0"10'-0"
10'-0"10'-0"10'-0"
CENTER OF COLUMN
N: 666437.83
E: 436690.03
CENTER OF COLUMN
N: 666459.83
E: 436689.73R15'-0"8+009+0010+0011+0012+00PRC: 9+79.70
PRC: 10+60.62C20C21-9"R15'-0"R
1
5
'
-
0
"
41'-10"CENTER OF FOOTING
N: 666381.55
E: 436581.90
CENTER OF FOOTING COOOG
CENTER OF FOOTING
N: 666382.64
E: 436661.89
8'-0"8'-0"6'-0"39'-0"SHEET TITLE:
PROJECT:
REVISIONS:
CLIENT:
DATEREV.DESCRIPTION
COLLIER COUNTY
SPORTS COMPLEX AND
EVENTS CENTER
SITE LOCATION MAP
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
3335 TAMIAMI TRAIL EAST,
SUITE 101
NAPLES, FL 34112
PROJECT NO.:
18-0097
18-0098
18-0099
SHEET NO:
NOTES:
SCALE:
A B
D C
E F
H G3/4/2022 12:20 PM4365 Radio Road, Suite 201
Naples, Florida 34104
P: 239.434.6060
Company Cert. of Authorization No. 00009496
2600 GOLDEN GATE PARKWAY
NAPLES, FLORIDA 34105
PHONE: 239.403.6700
FLORIDA ENGINEERING CERTIFICATE OF
AUTHORIZATION: #28275
JEFF L. DAVIDSON, P.E NO. 47161
ANDREW E. RATH, P.E. NO. 73996
CARL M. THRUSHMAN P.E. NO. 86499
RYAN A. WHITE, P.E. NO. 67400
JENNA A. WOODWARD, P.E. NO. 84212
0
SCALE: 1" = 20'-0"
4010 20
1" = 20'
AREA F SITE LAYOUT &
MATERIALS PLAN
SD1.06
LANDSCAPE
AREA
RE: LANDSCAPE
PLANS
CONSTRUCT
STANDARD DUTY
GRAY CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
LEGEND
COL FENCE CORNER COLUMN
RE: K/SD4.01
LA
CONSTRUCT
HEAVY DUTY
STANDARD GRAY
CONCRETE
PAVEMENT
RE: CIVIL PLANS
FOR PROFILE
HD
L# / C#SITE LAYOUT
GUIDELINE
RE: SD1.00
BV SAWCUT JOINT
WITH 45° BEVELED
EDGE
RE: E/SD4.01
PHASE 2A LIMIT
LINE
SD SERIES PLANS
LIMIT OF SCOPEMATCHLINE - SD1.05MATCHLINE - SD1.07 MATCHLINE - SD1.07MATCHLINE - SD1.05MATCHLINE - SD1.03 MATCHLINE - SD1.03
1
INSTALL 6' HT. VINYL COATED CHAIN-LINK FENCE
FENCE TO PARALLEL PLAYING FIELD CURB
COLOR: BLACK
RE: SD1.03 FOR LENGTH AND CONTINUATION
RE: J/SD4.01
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
COL
COL
INSTALL 16' W. X 6' HT. DOUBLE SWING GATE
WITH CANE BOLTS AND LOCKING LATCHING MECHANISM
(2) 8' W. GATE LEAFS
RE: G/SD4.02
HD BV
BV
LIMITS OF SCOPE - SD SERIES PLANSMULTI-PURPOSE
FIELD 8
RE: PF SERIES PLANS
BV
BV
HD
MULTI-PURPOSE
FIELD 9
RE: PF SERIES PLANS
INSTALL 420 L.F. 6' HT. VINYL COATED
CHAIN-LINK FENCE PARALLEL TO
PLAYING FIELD CURB
COLOR: BLACK
RE: SD1.07 FOR CONTINUATION
RE: J/SD4.01
6" W. PLAYING FIELD ATTACHMENT CURB
RE: PF SERIES PLANS FOR LAYOUT
LAKE
RE: CIVIL PLANS
LAKE
RE: CIVIL PLANSLIMITS OF SCOPE - SD SERIES PLANSCONSTRUCT 10' W. ASPHALT TRAIL
RE: SD1.00 FOR CENTERLINE ALIGNMENT
CONSTRUCT 10' W. ASPHALT TRAIL
RE: SD1.00 FOR CENTERLINE ALIGNMENT
1 07/24/2020 ADDENDUM 1-2.1
1
1 LIMITS OF PHASE 2.1LIM
ITS
OF
PHASE
2
.1
PEMB FOOTINGS
BELOW
PEMB FOOTINGS
BELOW
PRE-ENGINEERED METAL
BUILDING (ABOVE)
2
2 01/28/2022 ADDENDUM 14R2-2.1
PRE-ENGINEERED
METAL BUILDING
RE: ARCHITECTURAL
2
03/18/2022 CONFORMED SET
K/SD4.
E/SD4
J/SD4
J/SD4
G/G/SD4SD4
SD1.07SD
SD1.07SSDD110077 SD1.07SD1.00000DDDDSSSS55555550SD1.055555000000DDDDSSSS1.03110033000033SDSSDDSSDDDD101100 SD1.03
SD1.0303
SD1.00D1.00
SD1.00D1.00
SD1.00
16.C.4.b
Packet Pg. 1396 Attachment: Sports Complex 2 - Change Order#15-ARs-20230227-back up doc (24927 : Sport Complex Phase 2.1- CO#15)