Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Agenda 03/28/2023 Item #11B (Construction Engineering and Inspections services for the Golden Gate City Transmission Water Main Improvement Projects)
03/28/2023 EXECUTIVE SUMMARY Recommendation that the Board of County Commissioners, ex-officio of the Collier County Water-Sewer District, award Request for Professional Services (“RPS”) No. 22-8042 for “CEI Services for Golden Gate City Transmission Water Main Improvements,” to AIM Engineering and Surveying, Inc., in the amount of $1,817,423.25, and authorize the Chairman to sign the attached agreement. (Project 70253) (Companion to Items 11A and 11C) OBJECTIVE: To obtain professional Construction Engineering and Inspections (“CEI”) services for the Golden Gate City Transmission Water Main Improvement Projects. CONSIDERATIONS: Plans to expand potable water services to Golden Gate City residents require installation of the transmission water system. Currently approximately 70% of Golden Gate City is served by the Collier County Water Sewer District (“CCWSD”) regional water system, and approximately 30% is serviced by private wells. The first step to install new water mains within Golden Gate City is to construct transmission water mains in and around Golden Gate City. These transmission water mains will connect to the regional water mains on Collier Boulevard and Santa Barbara Boulevard/Radio Road. The CEI services under this agenda item will cover all three construction phases of the Golden Gate Transmission Water Main Improvements project (see attached phasing map). Phase 1A includes constructing the transmission water main, traveling through the golf course in Golden Gate City (Contract #23-8058 in the amount of $4,008,590.00, which is separately being presented for the Board’s consideration for award on today’s Agenda as a companion item under Section 11). Phase 1B is currently in the procurement bidding process and includes constructing of the transmission water main from the golf course to Santa Barbara Boulevard and connecting to the existing water main at Santa Barbara Boulevard and Radio Road (Construction Bid advertised in March 2023). The engineering probable opinion of construction cost for Phase 1B is $14,975,307.00. Phase 2 includes constructing the proposed transmission water main traveling near Santa Barbara Boulevard, Green Boulevard, 15th Avenue SW, and 48th Street SW (Contract #22-7965R in the amount of $6,737,736.00 awarded by the Board on November 8, 2022, Agenda Item 11.D). Separate from this agenda item, County Staff is currently preparing a Golden Gate City Master Plan. The master plan will include activities related to converting septic to sewer and well to municipal water, rehabilitation of the stormwater system to improve flood protection and water quality, as well as installation of sidewalks and lighting to enhance mobility. Specific items will include surveying the area, developing a master plan, identifying funding and any right-of- way needs, and developing an opinion of probable cost for construction. Future replacement of the existing 50-year-old Golden Gate City potable water distribution system will be necessary to continue to meet current demand, stay in compliance with regulations and requirements, and provide CCWSD customers with a compliant, reliable system. This work will be completed under a separate, future program that will be integrated with the transmission main being constructed under this project. On November 8, 2022 (Agenda Item 11.E), the Board approved the selection committee ranking for RPS No. 22- 8042, “CEI Services for Golden Gate City Transmission Water Main Improvements,” and authorized staff to enter negotiations with the top ranked firm, AIM Engineering and Surveying, Inc. County staff finalized negotiations on January 23, 2023, which resulted in the negotiated fee shown in the below table: 11.B Packet Pg. 272 03/28/2023 Task Description Fee Unit 1 Construction Observation & Documentation $881,186.25 Time & Materials 2 Construction Inspector & Project Oversight $881,215.50 Time & Materials 3 Additional Services (only as authorized in writing) $50,021.50 Time & Materials 4 Miscellaneous Reimbursable Expenses $5,000.00 Time & Materials TOTAL $1,817,423.25 Task 1. Construction Observation and Documentation: Under this task the construction inspector will provide written notifications of non-conforming work; issue/resolution logs; daily work reports; digital photos; coordination of project activities between the contractor, the Engineer of Record (“EOR”), the County Project Manager, and Public Information Officer, among other activities that are described in the agreement. Task 2. Construction Inspection and Project Oversight: This task includes general management and oversight that includes participation in pre-construction meetings; participation in progress meetings; reviewing the contractor’s monthly applications for payment; contractor’s red lines; as-builts; verification that all materials, equipment, and supplies installed or utilized on the Project are in accordance with the contract documents and approved shop drawings provided by the EOR; review and provide comments to the construction schedule provided by the contractor; and provide as-constructed field drawings in digital form. Task 3. Additional Services: This task includes, but is not limited to, the following: attending additional progress meetings; additional one-on-one meetings with residents; and additional inspection work. Those services will only be authorized in writing by the County Project Manager. These services require authorization in writing. It is intended for items not in the original or amended scope of work. The CEI will provide a proposal with details for why work was not included and the Project Manager may authorize these services. Task 4. Miscellaneous Reimbursable Expenses: This task includes, but is not limited to, copies; mailings; and printing. The Board’s approval of this agenda item will also be an acknowledgment of the cost reasonableness of the contract amount based upon staff’s competitive negotiation required by Florida Statutes, Section 287.055, the Consultant’s Competitive Negotiation Act. FISCAL IMPACT: On a separated agenda item 11.___ a budget amendment is proposed that is needed for this project. The construction award in agenda item 11.____ plus the CEI contract exceed the current budget in Project 70253 by $600,124. The source of funding for this project is the Water and Sewer Revenue Bonds, Series 2021, Fund 419, and the debt will be paid back from water impact fees. GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT RECOMMENDATION: That the Board awards RPS No. 22-8042 for “CEI Services for Golden Gate City Transmission Water Main Improvements,” to AIM Engineering and Surveying, Inc., in the amount of $1,817,423.25, and authorize the Chairman to sign the attached agreement. Prepared by: Liz Gosselin, Project Manager II, Public Utilities Engineering & Project Management Division ATTACHMENT(S) 1. 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (PDF) 2. 22-8042 Insurance_AIM Engineering &Surveying, Inc. (PDF) 11.B Packet Pg. 273 03/28/2023 3. 22-8042 COI- ProfLiab_AIM Engineering&Surveying, Inc. (PDF) 4. GGC TWM - Overall Phase Map (2022-11-03) (PDF) 5. GGC Transmission Water Main PH-1A & CEI Presentation R2 (PPTX) 11.B Packet Pg. 274 03/28/2023 COLLIER COUNTY Board of County Commissioners Item Number: 11.B Doc ID: 24777 Item Summary: Recommendation that the Board of County Commissioners, ex-officio of the Collier County Water-Sewer District, award Request for Professional Services (“RPS”) No. 22-8042 for “CEI Services for Golden Gate City Transmission Water Main Improvements,” to AIM Engineering and Surveying, Inc., in the amount of $1,817,423.25, and authorize the Chairman to sign the attached agreement. (Project 70253) (Companion to Items 11A and 11C) (Matt McLean, Public Utilities Engineering Division Director) Meeting Date: 03/28/2023 Prepared by: Title: Associate Project Manager – Public Utilities Planning and Project Management Name: Liz Gosselin 03/01/2023 2:46 PM Submitted by: Title: Director – Public Utilities Planning and Project Management Name: Matthew McLean 03/01/2023 2:46 PM Approved By: Review: Procurement Services Ana Reynoso Level 1 Purchasing Gatekeeper Completed 03/01/2023 3:41 PM Public Utilities Planning and Project Management Benjamin Bullert Additional Reviewer Completed 03/02/2023 7:40 AM Water Pamela Libby Additional Reviewer Completed 03/02/2023 7:44 AM Procurement Services Kristofer Lopez Additional Reviewer Completed 03/02/2023 8:34 AM Water Howard Brogdon Additional Reviewer Completed 03/03/2023 9:02 AM Public Utilities Planning and Project Management Matthew McLean Additional Reviewer Completed 03/06/2023 8:07 AM Procurement Services Sandra Herrera Additional Reviewer Completed 03/06/2023 10:42 AM Corporate Compliance and Continuous Improvement Megan Gaillard Additional Reviewer Completed 03/07/2023 5:36 AM Procurement Services Sue Zimmerman Additional Reviewer Completed 03/07/2023 10:54 AM Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 03/07/2023 2:08 PM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 03/08/2023 12:04 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 03/14/2023 10:13 AM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 03/14/2023 10:38 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 03/15/2023 4:09 PM Office of Management and Budget Susan Usher Additional Reviewer Completed 03/22/2023 10:21 AM County Manager's Office Amy Patterson Level 4 County Manager Review Completed 03/22/2023 10:57 AM Board of County Commissioners Geoffrey Willig Meeting Pending 03/28/2023 9:00 AM 11.B Packet Pg. 275 11.B.a Packet Pg. 276 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 277 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 278 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 279 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 280 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 281 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 282 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 283 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 284 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 285 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 286 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 287 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 288 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 289 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 290 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 291 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 292 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 293 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 294 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 295 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 296 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 297 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 298 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 299 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 300 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 301 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 302 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 303 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 304 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 305 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 306 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 307 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 308 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 309 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) 11.B.a Packet Pg. 310 Attachment: 22-8042 Contract_AIM Engineering & Surveying, Inc_VendorSigned (24777 : GGC Transmission Water Main CEI) ANY PROPRIETOR/PARTNER/EXECUTIVEOFFICER/MEMBER EXCLUDED? INSR ADDL SUBRLTR INSD WVD PRODUCER CONTACTNAME: FAXPHONE(A/C, No):(A/C, No, Ext): E-MAILADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY) AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATIONAND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE EACH OCCURRENCE $ DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence) MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER:GENERAL AGGREGATE $ PRO-POLICY LOC PRODUCTS - COMP/OP AGGJECT OTHER:$ COMBINED SINGLE LIMIT $(Ea accident) ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED BODILY INJURY (Per accident) $AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $AUTOS ONLY AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH-STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $ If yes, describe under E.L. DISEASE - POLICY LIMITDESCRIPTION OF OPERATIONS below INSURER(S) AFFORDING COVERAGE NAIC # COMMERCIAL GENERAL LIABILITY Y / N N / A (Mandatory in NH) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved.ACORD 25 (2016/03) CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) $ $ $ $ $ The ACORD name and logo are registered marks of ACORD 2/22/2023 (239) 208-3454 (239) 333-1760 23280 AIM Engineering and Surveying Inc 2161 Fowler Street, Suite 100 Fort Myers, FL 33901 10677 28665 27960 A 2,000,000 X EPP 0542628 7/1/2022 7/1/2023 500,000 10,000 2,000,000 4,000,000 4,000,000 General Aggregate 1,000,000B X EBA 0543260 7/1/2022 7/1/2023 5,000,000A EPP 0542628 7/1/2022 7/1/2023 5,000,000 C EWC 0542630 7/1/2022 7/1/2023 1,000,000N1,000,000 1,000,000 A Leased/Rented Equip EPP 0542628 7/1/2022 Limit 125,000 D Pollution G7361479A 001 7/26/2022 7/26/2023 Per Occ & Per Agg 1,000,000 Project: Collier County Contract 22-8042; Construction Engineering and Inspection (CEI) Services for Golden Gate City Transmission Water Main Improvements Project Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County, OR, Collier County Government, OR, Collier County included as Additional Insured under the captioned Commercial General Liability and Automobile Liability policies on a primary and non-contributory basis if and to the extent required by written contract. 30 Days notice of cancellation except 10 days for non-payment. Collier County Board of County Commissioners 3295 Tamiami Traile E. Naples, FL 34112 AIMENGI-01 MPOLITE Babb P&C, Ltd850 Ridge Avenue Pittsburgh, PA 15212 Margaret Polite mep@babbins.com Cincinnati Indemnity Company Cincinnati Insurance Companies Cincinnati Casualty Company Illinois Union Insurance Company X 7/1/2023 X X X X XX XX 11.B.b Packet Pg. 311 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 312 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 313 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 314 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 315 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 316 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 317 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 318 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 319 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 320 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 321 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 322 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 323 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 324 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 325 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 326 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 327 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 328 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 329 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 330 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 331 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 332 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 333 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 334 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 335 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.b Packet Pg. 336 Attachment: 22-8042 Insurance_AIM Engineering &Surveying, Inc. (24777 : GGC Transmission Water Main CEI) CERTIFICATE HOLDER © 1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010/05) AUTHORIZED REPRESENTATIVE CANCELLATION DATE (MM/DD/YYYY)CERTIFICATE OF LIABILITY INSURANCE LOCJECTPRO-POLICY GEN'L AGGREGATE LIMIT APPLIES PER: OCCURCLAIMS-MADE COMMERCIAL GENERAL LIABILITY GENERAL LIABILITY PREMISES (Ea occurrence)$DAMAGE TO RENTED EACH OCCURRENCE $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GENERAL AGGREGATE $ PRODUCTS - COMP/OP AGG $ $RETENTIONDED CLAIMS-MADE OCCUR $ AGGREGATE $ EACH OCCURRENCE $ UMBRELLA LIAB EXCESS LIAB DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) INSRLTR TYPE OF INSURANCE POLICY NUMBER POLICY EFF(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)LIMITS WC STATU-TORY LIMITS OTH-ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE E.L. DISEASE - POLICY LIMIT $ $ $ ANY PROPRIETOR/PARTNER/EXECUTIVE If yes, describe under DESCRIPTION OF OPERATIONS below (Mandatory in NH) OFFICER/MEMBER EXCLUDED? WORKERS COMPENSATION AND EMPLOYERS' LIABILITY Y / N AUTOMOBILE LIABILITY ANY AUTO ALL OWNED SCHEDULED HIRED AUTOS NON-OWNEDAUTOS AUTOS AUTOS COMBINED SINGLE LIMIT BODILY INJURY (Per person) BODILY INJURY (Per accident) PROPERTY DAMAGE $ $ $ $ THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL WVD SUBR N / A $ $ (Ea accident) (Per accident) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). The ACORD name and logo are registered marks of ACORD COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: INSURED PHONE(A/C, No, Ext): PRODUCER ADDRESS:E-MAIL FAX(A/C, No): CONTACTNAME: NAIC # INSURER A : INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : INSURER(S) AFFORDING COVERAGE SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 3ULYDWH &OLHQW ,QVXUDQFH 6HUYLFHV &RPPHUFH &HQWUH &W )RUW 0\HUV )/ 6DQG\ %DO]DULQL VEDO]DULQL#SFLVIOFRP (YDQVWRQ ,QVXUDQFH &R $,0( $,0 (QJLQHHULQJ 6XUYH\LQJ ,QF )RZOHU 6WUHHW 6XLWH )RUW 0\HUV )/ < $352)(66,21$/ /,$%,/,7< 0./93/(DFK &ODLP 3ROLF\ $JJUHJDWH 'HGXFWLEOH -RE 'HVFULSWLRQ &ROOLHU &RXQW\ &RQWUDFW &RQVWUXFWLRQ (QJLQHHULQJ DQG ,QVSHFWLRQ &(, 6HUYLFHV IRU *ROGHQ *DWH &LW\ 7UDQVPLVVLRQ :DWHU 0DLQ ,PSURYHPHQWV 3URMHFW 'D\V &ROOLHU &RXQW\ %RDUG RI &RXQW\ &RPPLVVLRQHUV 7DPLDPL 7UDLO ( 1DSOHV )/ 11.B.c Packet Pg. 337 Attachment: 22-8042 COI- ProfLiab_AIM Engineering&Surveying, Inc. (24777 : GGC Transmission Water Main CEI) 11.B.d Packet Pg. 338 Attachment: GGC TWM - Overall Phase Map (2022-11-03) (24777 : GGC Transmission Water Main CEI) Golden Gate City Transmission Water Main Improvements Phase 1A, CEI Services Phase 1A, 1B, & 2, & CWS Bond #2 Reallocation Public Utilities Department March 28, 2023 Collier County | Florida 11.B.e Packet Pg. 339 Attachment: GGC Transmission Water Main PH-1A & CEI Presentation R2 (24777 : GGC Transmission Companion Items Three companion executive summaries for the Golden Gate City Transmission Water Main Improvements Project are seeking Board approval: Construction of Phase 1A: New transmission water main, sewer force main and Irrigation Quality (IQ) main through the golf course. Construction, Engineering and Inspection (CEI) Services for the Golden Gate City Transmission Water Main Improvements projects (Phase 1A, 1B, 2) CWS Bond #2 Reallocation Budget Amendments: To optimize funding within the CWS Bond #2 Proceeds Fund (419). Public Utilities Department 2 11.B.e Packet Pg. 340 Attachment: GGC Transmission Water Main PH-1A & CEI Presentation R2 (24777 : GGC Transmission Project Location Public Utilities Department Collier Blvd Santa Barbara Blvd 3 Golden Gate Parkway Green Blvd Radio Road 11.B.e Packet Pg. 341 Attachment: GGC Transmission Water Main PH-1A & CEI Presentation R2 (24777 : GGC Transmission Objectives To construct new water, wastewater, and irrigation quality mains within Phase 1A to serve Golden Gate City and beyond. – Improve fire flow protection – Meet system demand – Continue compliance – Maintain reliability and sustainability To obtain professional Construction Engineering and Inspections (CEI) services for the Golden Gate City Transmission Water Main Improvement Projects. Public Utilities Department 4 11.B.e Packet Pg. 342 Attachment: GGC Transmission Water Main PH-1A & CEI Presentation R2 (24777 : GGC Transmission Considerations/Results Phase 1A – New transmission water main, sewer force main and Irrigation Quality (IQ) main through the golf course. GGC potable water service: – CCWSD regional water system – Approx. 70% – Private wells – Approx. 30% New transmission water mains allow for the installation of new distribution water mains in the neighborhoods. Increase system reliability Improve water quality Improve fire protection capability Obtaining Construction Engineering and Inspection services for the Golden Gate City Transmission Water Main Improvements projects Public Utilities Department 5 11.B.e Packet Pg. 343 Attachment: GGC Transmission Water Main PH-1A & CEI Presentation R2 (24777 : GGC Transmission Recommendation Recommendation to award Construction Invitation to Bid (“ITB”) No. 23- 8058, “Golden Gate City Transmission Water Main Improvements - Phase 1A - Golf Course” to Accurate Drilling Systems, Inc., in the amount of $4,008,590, and authorize the Chairman to sign the attached Agreement. (Project 70253) Recommendation to award Request for Professional Services (“RPS”) No. 22- 8042 for “CEI Services for Golden Gate City Transmission Water Main Improvements – Phase 1A, 1B, 2,” to AIM Engineering and Surveying, Inc., in the amount of $1,817,423.25, and authorize the Chairman to sign the attached agreement. (Project 70253) Recommendation to authorize all necessary budget amendments in the total amount of $16,173,628 to reallocate capital project funding and debt service payments within the various County Water-Sewer funds. Public Utilities Department 6 11.B.e Packet Pg. 344 Attachment: GGC Transmission Water Main PH-1A & CEI Presentation R2 (24777 : GGC Transmission