Loading...
Backup Documents 03/14/2023 Item #16C2 16C ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to he forwarded to the County Attorney Office al the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed, If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1' N/A 2• N/A 3. County Attorney Office County Attorney Office 3) /). 4. BCC Office Board of County Commissioners OL ,/Je/S/ .3/2/F 3 5. Minutes and Records Clerk of Court's Office WV- 3- _!-2-3 ° PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Peter Schalt Phone Number X5343 Contact/ Department Agenda Date Item was Agenda Item Number Approved by the BCC 3.14.2023 16C2 Type of Document Change Order Number of Original Attached Documents Attached 1 PO number or account number if document is 4500207278 to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? PS 2. Does the document need to be sent to another agency for additional signatures? If yes, provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. N/A 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signed PS by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's Office and all other parties except the BCC Chairman and the Clerk to the Board PS 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the final negotiated contract date whichever is applicable. PS 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. PS 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain N/A time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 3/14/23 and all changes made during N/A is not the meeting have been incorporated in the attached document. The County PS an option for Attorney's Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the PS an option for Chairman's signature. this line. • t I6C ;2 CU Vir county Procurement Services M; v„x Change Order Form Contract Modification 0 Work Order Modification 0 Amendment Contract#: 20-7764 Change#: 1 Purchase Order#: 4500207278 Project#: 70148.10,4 Contractor/Firm Name: U.S.Water Services Corporation Contract/Project: NCWRF Aeration Basin 5&6 Diffuser system Replacement Project Manager Name: Peter Schalt Sub-Regional Utilities Division Name: Original Contract/Work Order Amount $ 610,915.05 9/6/2020;16C2 ;Original BCC Approval Date;Agenda Item# Current BCC Approved Amount $ 610,915.05�9/8/2020; 16C2 'Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $ 610,915.05 N/A SAP Contract Expiration Date(Master) Dollar Amount of this Change $ 16,302.96 2.67% Total Change from Original Amount Revised Contract/Work Order Total $ 627,218.01 2.67% Change from Current BCC Approved Amount Cumulative Changes $ 16,302.96 2.67% Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 10/19/20 Original 11/13/21 Last Approved 3/24/2023 Revised Date TBD Date Completion Date Date (Includes this change) Ii #of Days Added 120 Select Tasks ®Add new task(s) ❑Delete task(s) 0 Change task(s) ®Other(see below) Provide a response to the following:1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(if requested);2.)why this change was not included in the original contract;and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. 1. This project addresses rehabilitation work to the diffuser systems in Aeration Basin Nos.5 and 6 A through D zones.The first zone was known to need rehab and replacement work to the aeration system. The aeration system in the second zone was not Identified to need replacing until after the demolition of the first original zones.The original bid included replacement of diffusers and piping in only the first zone because it was known to be in disrepair.Upon commencing construction,it was found that an additional zone needed replacement and this change order addresses that work. 2. It would have been impossible to anticipate whether the second zones needed replacement due to them being full of sewage at the time of design,bidding,and award.The need to replace the aeration systems in the second zone was determined based on visual observations once the aeration basins were taken out of service,drained,and cleaned.Therefore,a change order is necessary to complete the project. 3. If this change order is not processed,the project would not be able to be completed and would not function to properly achieve compliant treatment capabilities. The contractor is on a Stop Work Notice effective December 21,2022.There are three(3)days remaining to substantial completion and ninety-three(93)days remaining to final completion. The original Board-approved allowance for the contract is$65,000,00.The new piping and diffusers to be installed to complete this project is proposed by the contractor to cost$61,302.96.We will apply the allowance amount of$65,000.00 and this change order adds the additional funds in the amount of$16,302.96 and 120 days to the contract to complete the project to be utilized as permitted by the FDEP, s c h a ti p-` Digitally signed by schait_p Prepared by: Date:2023.01.3009:58:15-05'00' Date: Peter Schalt,PMP,Project Manager Ill,Sub-Regional Utilities Engineering Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract!work order indicated above,as fully as if the same were stated in this acceptance. The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant I Design Professional arising out of or related to the change set forth herein,including claims for impact and delay costs. is Revised:1/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY AAmtn _ RPM BCC ES ih 16C2 ..7tA Acce `' '' pted by: 1. Date: vz 1/Z�z Steven Stanton,US Water Services orporation Cig'':, slpned by Dawn0.Barnard DN,cn-Dawn 0.Oamard,o=Hole Mome,. Approved by:Pawn R. Barnard Inc•uu,email=dnvnbarnard@hmeng.com, Dawn B.Barnard,Project Mailagef of't4IISMOtJtes,Inc. Date: KarlovichWayne Digitally signed by KarlovichWayne Approved by: Date:2023.01.30 11:26;48-05'00' Date: Wayne Karlovich,RE.,Sub-Regional Supervising Project Manager[Licensed) e a rC ra i J g Digitally signed by PajerCraig Date:2023.01.31 17:05:36-05'00' Approved by: Date: Craig Pajer, P.E.,Sub-Regional Utilities Director GaillardMegan Digitally signed by GaillardMegan Approved by: Date:2023.02,01 12:20:36-05'00' Date -Amia-tutty,PUD Finance Director Megan Gaillard,Interim DoriaPriscilla Digitally signed by DoriaPriscilla Approved by: Date:2023.02.06 09:21:46 05'00' Date: Sara Schneeberger,Procurement Strategist i A!"!'hST BOARD OF COUNTY COMMISSIONERS Crystal K.Kinzel,Cie'A(of Courts COLLIER COUNTY, FLORIDA .197) By: / By: 26' Dated: ,/ 3.- .f c�"."> Rick LoCastro, Chairman (SEAL) Attest as to Chairman's signature only Appro as to f n and e rty: By: G Y I . 1.I County Attorney Revised:1/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin Rpf BCC ES 16C2 4 Change Order/Amendment Summary COST TIME CO# AMD# Description Days New Justification Additive(+) Deductive(-) Added Amount Contractor's Proposal to Install Could not be determined prior to 1 N/A Additional Piping& $16,302.96 0 120 510 contract award due to being full of Diffusers in the sewage and is necessary to comply second Aeration with permitting requirements. Basin Zones Revised:1/1412021 (Divisions who may require additional signatures may Include on separate sheet.) PROCUREMENT USE ONLY Admin Rpte BCC ES 04,0 1 6C2 Estimate 4939 Cross Bayou Boulevard Project Number New Port Richey,FL,34852 Services Corporation J01269 2029 Collier County Date Account# 3393 Tamlaml Trail East,Suite 303 Naples Florida 34112 1/25/2023 J01269 NCWRF Aeration Basin 5&6 Diffuser System Replacement Contract No.20.7764 Project Contact Steve Stanton 239-209-6120 Effective Term Project Description 30 Days NCWRF Aeration Basin 5&6 Diffuser System Replacement Description Qty Unit Cost Total This is for. Collier County U,S,Water Services Corporation Is pleased to provide the following quote to: NCWRF Aeration Basin 5&6 Diffuser System Replacement This includes: Labor and construction materials necessary to complete the construction of a complete aeration system In the second zone. Fan rental 1 LS, $ 2,127.96 $ 2,127.96 Crane services 1 LS. $ 11,500.00 $ 11,500,00 Disposal of existing diffusers(Bays 6a,6b,8c,6d) 1 LS. $ 2,875.00 $ 2,875.00 Project Management 84 His. $ 120.00 $ 10,800.00 Labor 600 Hrs. $ 90.00 $ 54,000.00 This will add an additional 120 days to this project Price listed represents the specific scope of service stated above. • Proposal as quoted represents,labor,material and project management specific to the items listed. With exception of emergency circumstances,should it become necessary to perform additional services due to unforeseen circumstances,a change order will be required. Change order shag be executed by the owner prior to continuation of work, Payment is expected with in 30 days from receipt of invoices)related to work. Effective term is 30 days from date of proposal Thank You for allowing us to present this proposal. Total $ 81,302.96 Phone# Fax# Toll Free 727.848.8292 727449.8880 886.753.8292 Signature to begin work;