Agenda 03/14/2023 Item #16E1 (Provide tranparentcy to the public and gain the Board's approval for various procurment-related transactions)16.E.1 03/14/2023 EXECUTIVE SUMMARY Recommendation to approve the administrative report prepared by the Procurement Services Division for After -the -Fact procurements requiring Board approval to ratify/approve other items as determined by the County Manager or designee in accordance with Procurement Ordinance 2017-08 and Procurement Manual, as well as, to approve payment of $3,433.06 in expenditures that have been incurred that were out of compliance with the contracts or procurement requirements and the associated invoices that have not been paid. OBJECTIVE: To promote accountability and provide transparency to the public and gain the Board's approval/ratification for various procurement -related transactions that were not incompliance contract terms or procurement requirements. CONSIDERATIONS: In accordance with the Board's Procurement Ordinance 2017-08 and the Procurement Manual, the Procurement Services Division produces a regular administrative report which provides for Board approval for After -the -Fact Procurements from various County Divisions, which were inconsistent with County ordinance, policy, procedure, or contract terms. This administrative report includes the following: 1. This After -the -Fact request is submitted by the Fleet Management Division due to staff not opening a valid purchase order prior to requesting services in the amount of $1,608.06 because Fleet staff believed that a single source waiver was in place and this was a valid transaction. These services were necessary for capital asset CC2-2793 for an annual crane inspection and certification for operational safety and compliance, as well as, to continue to be able to use the capital asset for operations. 2. This After -the -Fact request is submitted by the Facilities Management Division due to the sub -sub- contractor continuing to provide services in the amount of $1,825.00 in good faith and at risk prior to changer order or contract amendment being, reviewed, processed, and approved by the County, as required by contract. FISCAL IMPACT: The net total for the two (2) items is $1,608.06 (additional fiscal impact). The amount of $1,825.00 does not have a fiscal impact because it was already accounted for as part of a change order and does not require an issuance of a Purchase Order. The total amount of outstanding invoices is $3,433.06. LEGAL CONSIDERATIONS: This item is approved for form and legality and requires a majority vote for Board action. -JAK GROWTH MANAGEMENT IMPACT: There is no Growth Management Impact associated with this action. RECOMMENDATION: To approve the administrative report prepared by the Procurement Services Division for After -the -Fact procurements requiring Board approval to ratify/approve other items as determined by the County Manager or designee in accordance with Procurement Ordinance 2017-08 and Procurement Manual, as well as, to approve payment of $3,433.06 in expenditures that have been incurred that were out of compliance with the contracts or procurement requirements and the associated invoices have not been paid. Prepared By: Jennifer Ziglar, Operations Support Specialist II, Procurement Services ATTACHMENT(S) 1. Attachment 1 ATF summary final (PDF) Packet Pg. 1180 16.E.1 03/14/2023 2. ATF Hydraulic Machinery 02.27.23 FINAL Combined (PDF) 3. ATF Q.Grady Minor Associates 03.03.23 FINAL Combined (PDF) Packet Pg. 1181 16. E.1 03/14/2023 COLLIER COUNTY Board of County Commissioners Item Number: 16.E.1 Doe ID: 24771 Item Summary: Recommendation to approve the administrative report prepared by the Procurement Services Division for After -the -Fact procurements requiring Board approval to ratify/approve other items as determined by the County Manager or designee in accordance with Procurement Ordinance 2017-08 and Procurement Manual, as well as, to approve payment of $3,433.06 in expenditures that have been incurred that were out of compliance with the contracts or procurement requirements and the associated invoices that have not been paid. Meeting Date: 03/14/2023 Prepared by: Title: — Procurement Services Name: Jennifer Ziglar 02/28/2023 12:51 PM Submitted by: Title: Manager - Procurement — Procurement Services Name: Sandra Herrera 02/28/2023 12:51 PM Approved By: Review: Procurement Services Sandra Herrera Additional Reviewer Procurement Services Sandra Herrera Level 1 Purchasing Gatekeeper Corporate Compliance and Continuous Improvement Jennifer Ziglar Community & Human Services Maggie Lopez Additional Reviewer County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Office of Management and Budget Christopher Johnson Additional Reviewer Corporate Compliance and Continuous Improvement Megan Gaillard County Manager's Office Ed Finn Level 4 County Manager Review Board of County Commissioners Geoffrey Willig Meeting Pending Completed 03/06/2023 10:20 AM Completed 03/06/2023 10:20 AM Additional Reviewer Skipped 03/02/2023 2:50 PM Completed 03/06/2023 10:43 AM Completed 03/06/2023 10:45 AM Completed 03/06/2023 10:45 AM Completed 03/06/2023 11:58 AM Additional Reviewer Completed 03/06/2023 4:13 PM Completed 03/06/2023 6:53 PM 03/14/2023 9:00 AM Packet Pg. 1182 (spodeja mmWp smAja4u_aGod:Lt#)zj®■Ajeww-:I.L¥L4u_pejj¥J_pejj¥ 16.E.1.b CoIL-ier County Instructions After the Fact Form As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or contract terms, an After -the -Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order, when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and services not covered by the current contract or purchase order. All such `After the Fact Procurements" will be reported to the County Manager. Requester Name: James Fasulo Division: Fleet Management Division Director: John King Vendor Name: Hydraulic Machinery 117120 Amount: $1608.06 Fccontract #: Purchase Order: Why is this deemed a non -compliant purchase? Choose one. Contract Ordinance Manual P-Card ❑ Other ❑ Details of Purchase: Explain the circumstances behind this purchase. Asset CC2-2793 requires an annual crane inspection & certification. To ensure crane asset operational safety and compliance, these repairs and maintenance were needed and could not be delayed. Upon approving the service, Hydraulic Machinery had been the only available service center in the area for many years. Fleet believed a single source waiver was in place at the time this was completed. Action Required: What are you asking to be done to remedy the situation, include list of invoices if applicable? Authorization for payment of the attached outstanding invoice # 8393 from Hydraulic Machinery, Inc. for services performed in November 2022, totaling $1,608.06. Corrective/Preventive Action: What action is being taken to prevent this violation from re -occurring? In the future, Fleet Management will request proper quotes and will open purchase orders prior to authorizing services. Additional training will be provided to Fleet staff to ensure that they understand the procurement requirements. The requestor affirms that to the best of their knowledge the information provided in this document is true. y. Requested b James Fasulo Date: l023.0 . 7 f8:56:01 es Signature: aSUIO ameS D5'00' z3.oz.z7os:ss:o1 -05'00' Date:02/27/23 Division Director: John King Digitally sined li Signature:KingJohn ate:?023.022�7v08143:38n -05'00 Date:2/27/23 Revised 06/17/2021 Packet Pg. 1184 16.E.1.b Hydraulic Machinery, Inc. 5024 N. 56th Street Tampa, FL 33610 Bill To Collier County Fleet Maintenance 2900 County Bard Road Naples, FL 34112 Invoice Date Invoice # 11/28/2022 8393 Ship To Collier County Fleet Maintenance 2901 County Bard Road Naples, FL 34112 S.O. No. P.O. No. Terms Rep Project 5984 20-COD SW Description Qty Rate Amount MANITEX 30102WL S.N.295731 Labor Receivable-RyW 1 1 110.00 1,210.00 Labor Receivable-HF 2 110.00 220.00 RED TUB OF GREASE 1 29.76 29.76 TUBE OF GREASE 1 10.26 10.26 HYDRAULIC FILTER 1 54.12 54.12 REMOTE CONTROL TRANSMITTER "C" BATTERIES 4 1.61 6.44 PAINT BRUSH 2" 1 0.91 0.91 Subtotal 1,531.49 Environmental Fee -Service 5.00% 76.57 Performed an Annual Crane Inspection and PM Service on Customer's Manitex, 30102C. Repairs Performed to Allow the Crane To Pass The Annual Crane Inspection Included Replacing the Batteries in The Wireless ATB Transmitter, Tightened up Keeper Pin For The Topping Cylinder Pin, Lengthened the ATB Weight Chain as Customer Had Shortened it, and Replaced the Missing Operators Manual. We Also Performed a PM Service Including, Lubing all the Booms, Outriggers, Rotation Gears, and All The Grease Fittings on The Crane. These Repairs Allow The Crane To Pass The Annual Crane Inspection at This Time. Subtotal $1,608.06 LABOR WARRANTY- 90 DAYS. Sales Tax (0.0%) $0.00 Total $1,608.06 PARTS WARRANTY- WHAT OUR VENDOR OFFERS. Payments/Credits $0.00 Balance Due $1,608.06 Packet Pg. 1185 16.E.1.c CoIL-ier County Instructions After the Fact Form As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or contract terms, an After -the -Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order, when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and services not covered by the current contract or purchase order. All such `After the Fact Procurements" will be reported to the County Manager. Requester Name: Tony Barone Division:Facilities Management Division Director:John McCormick Vendor Name:Q, Grady Minor & Associates, P.A. Amount:$1,825.00 Fcontract#: 16-6622 Purchase Order:4500176296 Why is this deemed a non -compliant purchase? Choose one. Contract W] Ordinance Manual ❑ P-Card ❑ Other ❑ Details of Purchase: Explain the circumstances behind this purchase. Contract 16-6622 "Big Corkscrew Island Regional Park" required that if there were additional services needed of the types listed in Article Two of the agreement that "the agreed upon scope, compensation and schedule for Additional Services shall be set forth in the change order or amendment authorizing those additional services..." The County was in the process of providing Change Order #7; however, while this document was being processed, it was determined that post design services were crucial to the project to ensure no further construction nor government caused delays would further impact the construction and turnover of South Phase's Community Center, maintenance building, and amenities to Parks and Recreation and to County residents/taxpayers. In good faith and in coordination with the County Project Manager, Q. Grady Minor continued to provide the requested post design services at risk without a work directive, agreement amendment, or change order. The work performed by Liebl and Barrow Structural Engineering (sub -sub consultant to Q. Grady Minor) is part of Change Order #7 which was fully executed on 9/15/2022. Change order #7 was in process for review and approval while these post design services were being provided. As a result, invoice 85188 in the total amount of $16,774.75 was short paid by the amount of $1,825.00. Action Required: What are you asking to be done to remedy the situation, include list of invoices if applicable? This "After the Fact" is necessary to approve for payment for the portion of the invoice number 85188 in the amount of $1,825.00 for the Q. Grady Minor & Associates for the sub -sub consultant, Liebl and Barrow Structural Engineering who performed inspection services during the period of 05/05/2022 - 05/26/2022 (see supporting documentation invoice #17-434.2L). Requesting the Board to approve the payment to Q. Grady Minor & Associates in the remaining amount of $1,825 due under invoice number 85188, for work performed before Change Order # 7 which was processed, reviewed, and approved after these requested services were completed. Corrective/Preventive Action: What action is being taken to prevent this violation from re -occurring? The Facilities Management Division will provide training to the Project Managers and guidance, as needed, to ensure that change orders are processed in a timely manner. The requestor affirms that to the best of their knowledge the information provided in this document is true. Requested by: Tony Barone, PMP Digitally signed by BaroneTony Signature:BaroneTony Date. ?023.03.0311:57:40 Date: -05'00Digitally Division Director: John McCormick signed by Signature:McCormickJohn WcormickJohn Date: Date: 2023.03.03 12:21:35-05'00' Revised 06/17/2021 Packet Pg. 1186 16.E.1.c Gradylklinor Q. Grady Minor & Associates, P.A. 3800 Via Del Rey Bonita Springs, FL 34134 239-947-1144 Collier County Board of County Commissioners Clerk Finance Department 3299 Tamiami Trail East, Suite 700 Naples, FL 34112-5749 Billing Period 09/16/2022 to 11/25/2022 Invoice number 85188 Date 12/21 /2022 Project CCU216A Big Corkscrew Island Regional Park PO #4500176296; Project #80039; Contract #16-6622; NTP Date: 03/17/17 ; End Date: 03/16/23 Work Performed for: Facilities Management Project Manager: Tony Barone, P.E. • Continue to coordinate with CEI on construction issues • Continue to coordinate with contractor • Attend virtual meetings • Work on WD's, pay applications and RCO's • Prepare inspection reports • Review test reports • Continue to work with design team on pool issues • Finalizee construction Phasing Plan (CPP) application • Architect & Structural/MEP site inspections and reports Contract Percent Total Remaining Prior Current Description Amount Complete Billed Percent Billed Billed Task 1 Concept Plan and Coordination 244,478.00 100.00 244,478.00 0.00 244,478.00 0.00 Task 2 30% Schematic Design 554,971.00 100.00 554,971.00 0.00 554,971.00 0.00 Task 3 60% Design Development 668,017.00 100.00 668,017.00 0.00 668,017.00 0.00 Task 4 90% Construction Documents 641,973.00 100.00 641,973.00 0.00 641,973.00 0.00 Task 5 Permitting 381,526.00 100.00 381,526.00 0.00 381,526.00 0.00 Task 6 100% Construction Bidding 182,088.00 100.00 182,088.00 0.00 182,088.00 0.00 Task 7 Ancillary Tasks (TIM) 134,100.00 99.93 134,000.00 0.07 134,000.00 0.00 Task 8 Post Design Services (TIM) 518,057.00 99.10 513,382.50 0.90 513,382.50 0.00 Dog Park & Fitness Pavillion (TIM) CO 14,310.00 99.97 14,306.25 0.03 14,306.25 0.00 #6 Post Design Services CO #5 180,672.00 99.99 180,659.77 0.01 180,659.77 0.00 Post Design Services CO #7 193,164.00 45.68 88,241.75 54.32 71,467.00 16,774.75 Task 9 Allowances (TIM) 0.00 0.00 0.00 0.00 0.00 0.00 Task 10 Project Administration (TIM) 94,870.00 100.00 94,870.00 0.00 94,870.00 0.00 Task 11 Reim bursables (Actual) 15,000.00 99.94 14,990.81 0.06 14,990.81 0.00 Total 3,823,226.00 97.13 3,713,504.08 2.87 3,696,729.33 16,774.75 N 1` 0 a m L d R L c� a� U it a) CO .r c a� E a� L V 0 L Q_ a� c E 0 U J a z M N M O ai 0 N a� r ns U 0 Q L 0 c 0 L d U- t- Q c d E t U 0 Q Collier County Board of County Commissioners Invoice number 85188 Inv Packet Pg. 1187 Collier County Board of County Commissioners Project CCU215A Big Corkscrew Island Regional Park Professional Services Project Administrator Inspector Project Manager Senior Designer Consultant Services Consultants Professional Services subtotal Invoice number 85188 16.E.1.c Date 1212112022 Billed Hours Rate Amount 0.25 70.00 17.50 14.00 70.00 980.00 y 1` 35.00 145,00 5,075.00 a 7.00 115.00 805.00 L 56.25 6,877.50 m r R L Billed T) Units Amount ' 2.00 9,897.25 a� Invoice total 16,774.75 it CO .r c a� E a� L V O L a- r r` r` N N C E O U J a z CO) N M O M O N N a+ fC U O to N Q L O C� C /L^ /Vy V u- Q E L U Q Collier County Board of County Commissioners Invoice number 85188 Packet Pg. 1188 16.E.1.c Aquatic Design • �ap Engineering 61.6 189 S. Orange Ave., Suite 1220 Orlando, FL 32801 0. Grady Minor & Associates, P.A. Michael Delate 3800 Via Del Rey Bonita Springs, FL 34134 1723 - Big Corkscrew Professional Fees only Per Agreement Invoice DATE INVOICE # 11 /4/2022 5015 Construction Administration Professional Services (CA) 1,500.00 OEM 1,500.00 Fee - CA Observation #5 of 6 conducted 28 October 2022 and report shipped 04 November 2022 by JT Toays Reimbursables will be invoiced separately P s�;�-��f r, fir• � � �" -- _' f 'y t¢0r... �w:waw.e r e—auca-z-•..aen Total $1,500.00 Thank you for the opportunity to provide oijr services. Please confact Patti Reynolds (5? 407-508-0550 x538 or Pattir0adedesign.corn if you have questions. Please send all payments to the address above. _........... ..-._._ ._._ _...___... __ .. _ _ .. ... .. - . -. 1Pg S. grange Ave„ Suite 1220 v',<<a ede',gn com Orlando, Fl- 32801 Packet Pg. 1189 16.E.1.c VICTOR J. LATAVISH ARCHITECT, PA INVOICE Number: 600-CA-30 Date: November 1, 2022 To: Q. Grady Minor & Associates, PA 3800 Via Del Ray Bonita Springs, Florida 34134 Attn: Michael Delate, PE Project 600- BCP Phase 1- CA Ref: Contract 16-6622 and A/E Agreement dated March 1, 2017 Period: 09-16-22 to 10-31-22 Description Current Invoice 10/31/22 Construction Administration -Architect $8,397.25 Thank you Member of the American Institute of Architect Florida Registered Architect AR11942, AA1831 30D Fifth Avenue south, Suite 221 Naples, Florida 34102 239.643.1665 Telephone 0 a m L L .r- E CU a) a� U) r c a� L 3 V O a ti a� c E 0 U J Q Z U- M N M O M O fA a� r 0 Q 0 c UL V U- r Q Qi E c,> r a Packet Pg. 1190 16.E.1.c VICTOR J. LATAVISH ARCHITECT, P.A. 300 FIFTH AVENUE SOUTH, SUITE 211 NAPLES, FLORIDA 3+102 Project, 600 BCP Construction Administration Period: A/E Services 09-16-22 to 10-31-22 ARCHITECT PRINCIPAL SR DESIGNER FIELD ADMIN FIELD ADMIN CLERICAL TOTAL HOURS0.00 1.25 17.25 1.50 RATE $180.00 100.00 100.00 90.000$50.00 TOTAL $7,416.00 $0.00 $125.00 $1,552.50 $75.00 $9,168.50 600-A MEETINGS 09/30/22 5.50 0.00 1.25 0.00 0.00 10/15/22 3.00 0.00 0.00 0.00 0.00 10 31 22 1.10 0.00 0.00 0.00 0.00 d E TOTAL 9.60 0.00 1.25 - 0.00 - - 0.00 aD 600-B RFI'S o 09/30/22 0.00 0.00 0.00 0.00 0.00 d 10/15/22 0.00 0.00 0.00 0.00 0.00 200ML2......W.....---- Or.50 0.00 M.......OWOfl .. W 0.00 0.00 N TOTAL 0.5D 0.00 OAO � 0.00 0.00 �- 600-C- SHOP DRAWINGS 09/30/22 0.00 0.00 0.00 0.00 0.00 10/15/22 0.00 0.00 0.00 0.00 0.00 E 0 1031 22 0.00 0.00 0.00 0.00 0.00 U TOTAL 0.00 0.00 0.00 0.00 0.00 .r 600-D FIELD REPORTS 09/30/22 3.10 0.00 0.00 0.00 0.00 10/15/22 3.25 0.00 0.00 5.50 0.00 10131122....I..........................5.5Q ..... ....................... 0:40. 1.50 TOTAL 11.$5 0.00 ......0.00...................11.75. 0.00 ........................ 17.25 1.5D 600-E ADDITIONAL SERVICES 09/30/22 2.75 0.00 0.00 0.00 0.00 10/15/22 5.50 0.00 0.00 0.00 0.00 10 31 22 _ 10.25_ .., 0.00 0.00 0.00 0.00 TOTAL 1$.50 0.00 0.00 0.00 0.00 600-F CLOSEOUT 09/30/22 0.00 0.00 0.00 0.00 0.00 10/15/22 0.00 0.00 0.00 0.00 0.00 1Q 31 22 0.75 0.00 0.00 0.00 0.00 TOTAL 0.75 0.00 0.00 0.00 0.00 SUBCONSULTANTS 06/03/22 Liebl & Barrow Structural Engineers 06/03/22 Liebl & Barrow Structural Engineers deduct $1,825.00 -$2,596.25 TOTAL $8,397.25 Packet Pg. 1191 16.E.1.c Llebl & Barrow Engineering (LIEBL BARROW . 2026 Henley PI Fort Myers, FL 33901 US 239-936-7557 ! ,� patsy@lbengineer.com E _ c www.lbengineer.com a INVOICE d '- L BILL TO INVOICE # 17-434.2L Victor J. Latavish Architect, PA DATE 06/03/2022 'a 300 Fifth Ave. South #221 `° N Naples, FL 34102 a� Cn JOB ENGINEER Big Corkscrew Island Park Jeff Ballard E a� L HATE i�ESCRiPTIQry ;QTY. RATE:.AMOUNT a 05/05/2022 Coordinate inspection results w/ Victor and Glob 0:30 185.00 92.50 r 05/20/2022 final inspection #18 3:15 160.00 520.00 ti 05/23/2022 Preparing Repair drawings 1:30 130.00 195.00 05/23/2022 Review observations 0:30 175.00 87.50 05/24/2022 Inspection ##19 Bldgs. 2, 7, 6 2:30 130.00 325.00 E 05/24/2022 Inspection, photo review. Densglass gold ilo plywood at 3:00 175.00 525.00 ° undersides v J 05/26/2022 correspondence 0:30 160.00 80.00 z M SUBTOTAL 1,825.00 0 TAX 0.00 0 TOTAL 1,825.00 BALANCE DUE $17825.00 Q L O C� C ,,Lnn V LL r Q E Q Packet Pg. 1192 16.E.1.c Liahl & Barrow Engineering 10970 S Cleveland Ave Ste 105 Fort Myers, FL 33907 US 239-936-7567 patsy@Ibengineer.com www.lbengineer.com INVOICE BILL TO Victor J. Latavish Architect, PA 300 Fifth Ave. South #221 Naples, FL 34102 JOB Ave Maria Client Revisions ENGINEER Gleb Skljar 1 I► Foils rucTW ngx e r g INVOICE # 21-083.313 DATE 06/03/2022 / DATE DESCRIPTION QTY RATE AMOUNT 05/11/2U22 Telecon regarding Quonset huts manufactured prior to shop 1:00 175.00 175.00 drawing review. Review drawings, propose design of supplemental steel. 0511M22 Preliminary design of canopy, stability 1:00 175.00 175.00 05/16/2022 correspondence, analyze foundation for stand alone canopy 2:00 160.00 320.00 05/16/2022 Checking canopy footers and members, Reviewing with P.E. 2:30 130.00 325.00 05118/2022 correspondence, additional calculations and design 2:15 160.00 360.00 considerations 05/18/2022 Reviewing Engineering for entrances 2:30 130.00 325.00 05118/2022 Canopy redesign review, look at deflection 1:00 175.00 175.00 05/19/2022 Reviewing Engineering for entrances 0:30 130.00 65.00 05/2012022 Detail fastening of canopy to building, review allowable deflection 1:00 175.00 175.00 05/23/2022 coordinate w/ Miriam 0:30 160.00 80.00 05/2312022 Review re -design 1:00 175.00 175.00 05/2512022 send out S&S, coordination 0:30 160.00 80.00 05/25/2022 update phase 1 (men lockers) 1,45 95.00 166.25 SUBTOTAL 2,596.25 TAX 0.00 TOTAL 2,596.25 BALANCE DUE $2496.25 DEDUCT r a Packet Pg. 1193 C;Ot7eY COUnty Procurement S 16.E.1.c Change Order Form ® Contract Modification ❑ Work Order Modification Contract M 16-6622 Change M 7 Purchase Order #: 4500176296 Project #: 80039 Contractor/Firm Name: Q Grady Minor & Associates, P.A Contract/Project: Big Corkscrew Island Regional Park Phase 1 Project Manager Name: Dave Closas Division Name: I Facilities Management Original Contract/Work Order Amount $ 3,630,062.00 02/14/17 11 c Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 3,630,062.00 02/14/17 11c Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 3,630,062.00 7/7/2022 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 193,164.00 5.32% Total Change from Original Amount Revised Contract/Work Order Total $ 3,823,226.00 5.32% Change from Current BCC Approved Amount Cumulative Changes $ 193,164.00 5.32% Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Notice to Proceed 3/01/2017 Original 4/26/2022 Last Approved 7/7/2022 Revised Date TBD Date I I Completion Date Date (Includes this change) # of Days Added 180 Select Tasks ❑ Add new task(s) ❑ Delete task(s) ❑ Change task(s) ❑ Other Provide a response to the following: 1.) detailed and specific explanation/rationale of the requested change(s) to the task(s) and / or the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. *The contract is currently on a Stop Work Order and has 1 day remaining. This Change Order adds 180 days to the contract time and adds $193,164.00 to the contract for Task 8 Post Design Services T&M. Additional Post Design services include Architectural, Electrical, Mechanical/Plumbing, Structural, and Aquatic Engineering/field support by the Engineer of Record (EOR) are required to support the BCIRP Phase 1 construction and contract close out. Construction administration services were estimated based on a June 2022 completion due to construction setbacks due manpower and material/concrete availability, Phase 1 is now projected to be substantially completed in December 2022 and additional time is needed to close out the contract. The construction administration hours to support the construction effort were not sufficient to support the additional months. 180 days are also required to be added to the contract duration for post design services. 2. These unanticipated changes due to manpower availability of manpower, construction schedule delays, concrete materials and other challenges could not have been anticipated at the award of the design contract, but only could have been determined during the construction phase. 3. If this change is not processed the BCIRP Park will not have the required Post Design Services to provide a complete and usable facility and to close out the project and contract documents. Digitally signed by Prepared by: CIDSaSDaVP_ ClosasDave Date: p'... 92��8.' " Dave Closas, Principa- Rdrojimt Manager, FMD Acceptance of this Change Order shall constitute a modification to contract / work order identified above and will be subject to all the same terms and conditions as contained in the contract / work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor / Consultant / Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Digitally signed by Michael J. Delate, P.E. Accepted by: r,a,P ,�„ �a ,a Date: MichaetVeiate, PE1,0WradVMinor PA McCormick) Digitally signed by Approved by: MccormickJohn Date: J® cCormick, Q;1.ram =r, FMD Approved by: SChrleebergep9a„Ys;9„edbYshaebe9esaa Date: WRIement Professional) N 1= 0 a m m r L .E E W U) a) U a� to c a� E U 0 L a N Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin rpacket Pg. 1194 Change Order/Amendment Summary 16.E.1.c COST TIME CO# AMD# Description Justification Days New Additive (+) Deductive (-) Added Amount Utilizes Task 9 Allowance for Additional Drainage Design to tie 1 $5,983 and reduced 0 0 0 0 into the sewer/utility lines with the Allowance to North East Service Area O $479,017 a m Incorrect Rates were L used in Change > Order 1. CO 2' administratively CO 2 administratively corrects 2 corrects the rates to 0 0 0 0 incorrect rates in CO 1 from u_ from $5,983 to $5,983 to $5,905 E E $5,905. Credits Task 9 Allowance($78) to f° $479,095 N a� V Utilizes Task 9 Adds additional it Allowance for $190,412.29 and meeting/coordination and to 3 reduced the 0 0 0 0 engineering support to review -W r- Allowance to Qualite Lights Vs Musco Lighting E $288,682.71 Design L CO 4 administratively o corrects incorrect CO 4 administratively corrects a- 4 rates in CO 3 from 0 0 0 0 incorrect rates in CO 3 from $190,412.29 $190,412.29 to $185,025 $185,025. Change reduces allowance to $294,070 Utilizes Task 9 A change order was not approved c Allowance for $14,310 that and a ATF was submitted in lieu of E ATF reduced the 0 0 0 0 CO #5. Requires design work to U allowance to add a dog park and National J Fitness Campaign d Design Q $279,760 z Utilizes Task 9 E: Allowance for Adds additional Post Design M 5 $180,672 that 0 0 0 0 Services to support the remaining M reduced the of the project due to delays in the allowance to construction schedule o $99,088 N Adds 65 days, r utilizes $99,088 of U Task 9 Allowance rn and reallocates Adds additional Post Design Q 6 $13,000 of Task 11 0 0 65 1947 Services and time to support the Reimbursables to remaining of the project due to c Task 8 Post Design delays in the construction schedule Services. The Allowance is reduced to $0 Adds additional 180 Adds additional Post Design d 7 days and adds $193,164 to the $193,164 0 180 2127 Services and time to support the LL contract post design remaining of the project due to Q delays in the construction schedule services c W E t Q Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin packet Pg. 1195 16.E.1.c GradyMinor Civil Engineers a Land Surveyors a Planners a Landscape Architects July 12, 2022 Mr. David Closas, P.E. Collier County Facilities Management 3335 Tamiami Trail East, Suite 101 Naples, FL 34112-5356 RE: Big Corkscrew Island Regional Park Phase 1 Collier County Contract No.16-6622 Post -Design Services Change Order Dear Mr. Closas: As discussed, we are requesting a change order to the existing contract to cover the increasing amount of additional services required of GradyMinor since the last change order for additional funding of the post -design services task. We are also requesting a six (6) month extension to the contract (which represents less than 10% of the total contract time) from July 7, 2022, to January 7, 2023. The project has continued to encounter a number of extraordinary challenges which were anticipated prior to the last change order. However, that change order was limited because the planned systemic changes by the contractor were hoped to preclude additional effort on the design team. Though the degree of assistance needed from the design team has decreased, additional funds are required for the construction administration services to complete the project. We are requesting a change order to add $193,164.00 to Post Design Task 11. This change order represents less than 10% of the total contract amount. Please note that this does not include post -final acceptance warranty services nor any possible general contractor liquidated damages review, hearings or mediation meetings. Thank you for your assistance with this matter. Very truly yours, Michael J. Delate, P.E. Sr. Vice President G:\AdminMarketing\PROPOSAL\C\Collier County\RFQ 16-6622 Big Corkscrew Island Regional Park\Change Order No. 8\DC20712 CO 7 (8) Post Design Services Rl.docx Q. Grady Minor & Associates, P.A. 3800 Via Del Rey Bonita Springs, FL 34134 Ph. 239-947-1144 a Fax. 239-947-0375 EB 0005151 e LB 0005151 o LC 26000266 Packet Pg. 1196 16.E.1.c Q.Grady Minor STAFF SR. ENG LA PM SR DSGN ADMIN RATE/HR $135.00 $135.00 $145.00 $115.00 $70.00 POST -DESIGN SERVICES TASK HRS HRS HRS HRS HRS Submittal and Shop Dwg Review 8 4 Progress Meetings, Preparation, Followup, Correspondence, Reports 24 1 24 3 8 Payment Applications and Change Order Review 8 4 RFI Review, Reports, Research, Coordination, Replies 30 6 30 6 6 Special Inspections Record Drawings, Substantial Completion, Final Completion, Closeout 40 15 60 24 8 TOTAL *Sub -Contractors Hollis Engineering (EE) Martin Aquatic Victor Latavish, AIA Totals left SUB* FEE $1,440.00 $7,760.00 $1,440.00 $10,320.00 $152,759.00 $152,759.00 $19,445.00 $193,164.00 $ 1,800.00 $ 8,000.00 $ 142,959.00 $ 152,759.00 N O Q d L d 2 r M N ftS rn 0) V it N co C N E N L V O L Q_ r N Q) C E O U J a z CO) 04 M O M O N Q) a+ fti U O to N Q L O C� C /L^ /Vy V U_ Q c� E L U Q Packet Pg. 1197