Loading...
Backup Documents 02/28/2023 Item #11E ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 1 1 C THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 2. — 3. County Attorney Office County Attorney OfficeS2-4 3/i id3 4. BCC Office Board of County Commissioners R(. ft&/'( 3/71s5 5. Minutes and Records Clerk of Court's Office 3/ / 3a 6-0 PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Jen Reynolds/Corporate Business 239-252-8952 Contact/Department Operations Agenda Date Item was 02/28/23 Agenda Item Number 11% E 16 7 Approved by the BCC Type of Document Number of Original 2 Attached Documents Attached PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? JSR 2. Does the document need to be sent to another agency for additional signatures? If yes, JSR provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be JSR signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's JSR Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the JSR document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's JSR signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip JSR should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on February 28,2023 and all changes made N/A is not during the meeting have been incorporated in the attached document. The County an option for Attorney's Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the an option for Chairman's signature. this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 11E Procurement Services Colter County Change Order Form ®Contract Modification ❑Work Order Modification Contract#: 19-7650 Change#: 3 Purchase Order#: 4500202044 Project#: 80412.3 Contractor/Firm Name: Davidson Engineering Contract/Project: CC Golden Gate Golf Course Redevelopment Project Manager Name: Gary McAlpin/Geoff Willig Division Name: County Managers Office Original ContractNVork Order Amount $ 684,666.50 12/10/16 16F11 Original BCC Approval Date;Agenda Item# Current BCC Approved Amount $ 2,042,726.1e 7/31/21 16C21 Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $ 2,042,726.10 2/23/2023 SAP Contract Expiration Date(Master) Dollar Amount of this Change $ 0.00 198.35% Total Change from Original Amount Revised Contract/Work Order Total $ 2,042,726.10 0.00% Change from Current BCC Approved Amount Cumulative Changes $ 1,358,059.60 0.00% Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 2-24-2020 Original 2-23-2023 Last Approved 2/23/2023 Revised Date 2/23/2023 Date Completion Date Date (Includes this change) #of Days Added 0 Select Tasks 0 Add new task(s) 0 Delete task(s) 0 Change task(s) ®Other Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and I or the additional days added(if requested); 2.)why this change was not included In the original contract;and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. 1. Change Order#3 realigns Phase 2 task funding to provide for required services relative to Phase 2,Task 3, Site Development Plan.This a zero dollar change order. Realign$86,682.50 from Site Design and Permitting Phase 2,Task 5, 1.5 Architectural Design Maintenance and Cart Storage to Phase 2,Task 3 Site Development Plan to obtain the SFWMD ERP and FDEP 404 Permitting authorizations to accommodate the golf course project. 2. These services are necessary to complete Phase 2, Site Design and Permitting but due to unforeseen conditions the quantity of needed services necessary to complete the Phase/task is greater than anticipated. 3. If this change order is not approved permitting for the redevelopment of the Golden Gate Golf Course cannot be accomplished and the project will not proceed. Digitally signed by WilligGeoffrey ,6# �� Date:2022.11.18 10:46:25-05'00' 11/18/2022 Prepared by: Date: (Geoff Willig,CMO) Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above, as fully as if the same were stated in this acceptance.The adjustment, if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/ Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted by: Date: (Contractor/Vendor/Consultant/Design Professional and Name of Firm, if project applicable) .,,An o.wd+a,oo-o.w,on Engfl a,,w•Engln..dnp, ka em.niened..a.amnyon.any.c cam. d Date: Accepted by: non},o.00 s on s.++ .-- (Design Professional and Name of Firm, if project applicable) McCormickJohn Digitally signed by McCormickJohn Approved by: Date:2022.11.18 10:56:16-05'00' Date: (Division Director or Designee) ZimmermanSue Digitally signed by ZimmermanSue Approved by: Date:2022.11.23 09:14:55-05'00' Date: (Procurement Professional) Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin RP° EC ES CAt1 1 1 E ATTEST: BOARD OF COUNTY COMMISSIONERS Crystal K. Kinzel,Clerk of Courts COLLIER COUNTY,FLORIDA &Comptroller (----1/23' By ,v}-e.t,Z.a..L,;�jJa..,,„s-ri. p.L By: (J Rick LoCastro, lestas �halClllall'S Chairman Dated: / 4 anly.'� (SEAL), `Yr , Approved as to form and le lity: By: 0 Scott R.Teach Deputy County Attorney C. 11E Change Order/Amendment Summary COST TIME CO# AMD# Description Days New Justification Additive CO Deductive(-) Added Amount Increase Phase 1- Golf Course Redevelopment 1 (task 7-Survey 0 0 0 Provide necessary surveying Design)utilizing related to property leases allowance for zero dollar change 1 Replace Schedule 0 0 0 Update F, Key Personnel p Key personnel schedule Add additional funding and reallocate existing Provide necessary Golf Course 2 funding for Phase 178,273.40 0 0 1-Golf Course Redevelopment tasks Redevelopment tasks Add tasks 11 &12 (to Phase 1 Golf Course Redevelopment), Provide for necessary Golf Course add Phase 2 tasks 2 1.1 thru 1.9(Site 1,179,786.20 0 0 Redevelopment, Site Design and Design/Permitting), permitting and Services during add Phase 3 tasks Construction tasks 1 thru 3(Services During Construction)! Reallocate existing funding from Provide for neccesary Site Design Phase 2(Site and Permitting as required to 3 Design and 0 0 0 accommodate unforeseen Permitting)task 5, conditions impacting permitting 1.5,to Phase 2 tasks. task 3 Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENTUSE ONLY Admin BRPC BCC ES 11E From: EthnJ To: SchneeberaerSard Subject: email Date: Thursday,November 17,2022 3:58:39 PM Attachments: jmage001.ong From:Tocia Hamlin <TociaPdavidsonengineering.com> Sent:Tuesday,November 15, 2022 2:52 PM To: FinnEd<Ed FinnPcolliercountyfl.gov> Cc:Jeff Davidson<JeffPdavidsonengineering,com> Subject: CO#3-Golden Gate Golf Course EXTERNAL EMAIL: This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Ed, CO#3 is needed to realign the existing budget to obtain the SFWMD ERP and FDEP 404 Permitting authorizations to accommodate the golf course project. Please reallocate$86,682.50 from Phase 2,Task 5, 1.5—Architectural Design Maintenance and Cart Storage to Phase 2,Task 3 -Collier County Site Development Plan Thank you, Tocia Hamlin-Rosa Senior Project Coordinator DAVIDSON , r, c. , r, I , ESTABLISHED Main: 239.434.6060 tocia@davidsonengineering.com www,davidsonengineering,com Under Florida Law,e-mail addresses are public records.If you do not want your e-mail address released in response to a public records request,do not send electronic mail to this entity.Instead,contact this office by telephone or in writing_ S Procurement ServIe E County Change Order Form ®Contract Modification ❑Work Order Modification Contract#: 19-7650 Change#: 4 Purchase Order#: 4500202044 Project#: 80412.3 Contractor/Firm Name: Davidson Engineering Contract/Project: CC Golden Gate Golf Course Redevelopment Project Manager Name: Gary McAlpin/Geoff Willig Division Name: County Managers Office Original Contractlork Order Amount $ 684,666.50 12/10/16 16F11 Original BCC Approval Date;Agenda Item# Current BCC Approved Amount $ 2,042,726.10 7/31/21 16C21 Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $ 2,042,726.10 2/23/2023 SAP Contract Expiration Date(Master) Dollar Amount of this Change $ 0.00 198.35% Total Change from Original Amount Revised Contract/Work Order Total $ 2,042,726.10 0.00% Change from Current BCC Approved Amount Cumulative Changes $ 1,358,059.60 0.00% Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 2-24-2020 Original 2-23-2023 Last Approved 2/23/2023 Revised Date 2/22/2025 Date Completion Date Date (Includes this change, #of Days Added 730 Select Tasks ❑Add new task(s) ❑Delete task(s) ❑Change task(s) ® Other Provide a response to the following:1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(if requested); 2.)why this change was not included In the original contract;and,3.) describe the Impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. 1. Change Order #4 provides an additional 730 days. The Golf Course schedule was affected by unforeseen site, regulatory and permitting requirements. More specifically, (1) revising the Environmental Resource Permitting (ERP) approach to allow for phased permitting, (2) unanticipated environmental surveying for Bonneted Bats, (3) intensified soil testing and development of a soil management plan required by permitting agencies. Change Order#4 also realigns ($7,425.00) from Phase I Task I — Charettes,Concepts, Design, Coordination and ($37,630.00) from Phase I Task 4 Transportation-Rezone GMPA, Access Review to increase Phase 1 Task 5 SFWMD Conceptual ERP Permitting in the amount of$45,055.00. The realignment is necessary to fund , unanticipated additional work,environmental studies, inspections, archaeological work,amended ERP approach, and SFWWD/ FDEP 404 permitting. 2. The additional time and funding realignment reflects the impact of unforeseen conditions and permitting requirements not anticipated in the original contract. 3. If this change Order is not approved sufficient time and funding for project completion will not be provided. Dat2r���rw "� 2/7/23 / / Date:202J.02.07 1 t:J000 Prepared by: 4�,dr/ (/ -0500' Date: (Project Manager Name and Division) Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated in this acceptance.The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein,including claims for impact and delay costs. Accepted by: Date: (Contractor/Vendor/Consultant/Design Professional and Name of Firm, if project applicable) D.�a,mE,q..k..a eRV1 USo,. OW' '..M1pm^',a145 Accepted by: NT'M0f 5 .QO757 Date: (Design Professional and Name of Firm, if project applicable) FinnEd Digitally signed by 1'57:4 Ed Date:ly signed Finn A8 Approved by: -05•00' Date: (Division Director or Designee) Digitally signed by (� DafaPriscilW DOriaPriscilla Dale:2023.02.0713a4:03 Approved by: osoo Date: (Procurement Professional) Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY BCC j' • Admin Rpf BCC ES 1 1 E ATTEST: BOARD OF COUNTY COMMISSIONERS Crystal K.Kinzel,Clerk of Courts COLLIER COUNTY, FLORIDA &Comptroller Attest as to Chairman's Rick LoCastro, Chairman ature only. Dated: — 3/2 1 i (SEAL) `.a�;y� Approved-as to form d le ality: By: 3Ga -� � Scott R.Teach Deputy County Attorney F Change Order/Amendment Summary COST TIME CO# AMD# Description Days New Justification Additive(+) Deductive(-) Added Amount Increase Phase 1-Golf Course Redevelopment Provide necessary surveying 1 (task 7-Survey Design) 0 0 0 related to property leases utilizing allowance for zero dollar change Replace Schedule F, Key Update Key personnel 1 Personnel 0 0 0 schedule Add additional funding and reallocate existing Provide necessary Golf Course 2 funding for Phase 1-Golf 178,273.40 0 0 Redevelopment tasks Course Redevelopment tasks Add tasks 11 &12(to Phase 1 Golf Course Provide for necessary Golf Redevelopment),add Course Redevelopment, Site 2 Phase 2 tasks 1.1 thru 1.9 1,179,786.20 0 0 Design and permitting and (Site Design/Permitting), Services during Construction add Phase 3 tasks 1 thru 3 tasks (Services During Construction)! fundingProvide for neccesary Site Reallocate existing Design and Permitting as 3 from Phase 2(Site Design 0 0 0 required to accommodate and Permitting)task 5, 1.5, unforeseen conditions to Phase 2 task 3 impacting permitting tasks. Provide additional contract time Add additional days for to accommodate adjustment to y approach,unforeseen impact of unforeseen site, conditions, permitting regulatory and permitting requirements and services requirements and realign during construction. Funding 4 task budget from Phase I 0 0 730 1,825 reallocation required to Task I and from Phase I accommodate additional work Task 4 to increase Phase associated with unforeseen 1 Task 5 SFWMD conditions and revisions to Conceptual ERP Permitting. project approach. Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY AdmIn Rpt BCC ES tic Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin Rp! BCC ES 1 i E. DE DAVIDSON Civil Engineering • Planning • Permitting r1 <_ 11•I1 1 I: 1I,1 < ESTABLISHED i>esigningE.xcellence Revised: February 6,2023 December 16,2022 Collier County Facilities Management Division Attn: Ed Finn, Gary McAlpin 3335 Tamiami Trail East,Suite 101 Naples, FL 34112-5356 Email: Ed.finn(Ucolliercountvfl.gov Gary.McAlpin@colliercountyfl,gov Re: Professional Services for the Collier County Golden Gate Golf Course Contract No. 19-7650 Davidson Change Order#4 Dear Ed and Gary, Please accept this request to reallocate funds within the existing contract as outlined below. 1. Reallocate$7,425 from Existing Phase 1 Task 1-Charrettes, Concepts, Design, Coordination,to Phase 1 Task 5-SFWMD ERP 2. Reallocate $37,630 from Phase 1 Task 4—Transportation—Rezone GMPA—Access Review to Phase 1 Task 5—SFWMD ERP Please refer to the below scope of work for details. SCOPE OF WORK: Increase Existing Phase 1-SFWMD Conceptual ERP Permitting Task 5 • As outlined above,this task will increase by reallocating$45,055from existing Phase 1 Tasks 1 and 4. During the Environmental Resource Permitting process, it was determined that additional environmental studies and sewer viewer inspections, not included in the original scope of work/contract, were needed to complete the overall water management design. This extra work scope included contracting with Archaeological and Historical Conservancy Inc. to conduct work needed for the FDEP 404 permitting work. • Additionally, the original contract included a 'Conceptual' Environmental Resource Permit for the entire County owned property. It was determined by CC that the driving range should be treated separately to expedite the ERP &404 FDEP Permitting for the driving range area. The 'Construct to Operate' ERP Permit for the driving range area has been approved. This scope change includes SFWMD/FDEP 404 permitting needed to obtain the construction and operation Environmental Resource Permit. Fee: Increase Existing Phase 1 Task 5 Fee by$45,055 4365 Radio Road • Suite 201 • Naples,FL 34104 • P:239.434.6060 • www.davldsonenglneering.com I. 1: GeneralNotes/Deliverables/Schedule: 1. Deliverables will match the existing contract. 2.This work will be completed within the existing NTP timeline. The time and material charges (noted as Estimate) will be billed monthly in accordance with the attached standard rate schedule. Work can commence immediately upon receipt of your written acceptance of this contract. Sincerely, Jeff Davidson, P.E. President Page 2 of 2 11, E. " . DE Civil Engineering • Planning • Permitting DAVIDSON I t i (:: l 1,1 I 1; I NI ESTABLISHED esigning xcellence REVISED: February 6,2023 December 13, 2022 Collier County Facilities Management Division Attn: Ed Finn, Gary McAlpin 3335 Tamiami Trail East,Suite 101 Naples, FL 34112-5356 Email: Ed.finn@colliercountyfl.gov Gary.McAlpin@colliercountyfl.gov Re: Professional Services for the Collier County Golden Gate Golf Course Contract No. 19-7650 Davidson Change Order 114—Time Extension Request Dear Ed and Gary, Please accept this request to add 730-days to the existing contract due to expire on February 23, 2023. This will extend the contract through February 22, 2025. A time extension is needed to complete the golf course portion of the project. The overall Collier County Golf Course project schedule was affected by three major scope changes listed below. 1. The Conceptual Environmental Resource Permitting (ERP) as originally included in the contract encompassed the entire County owned property including the driving range area. It was determined by CC that the driving range should be treated separately to expedite the ERP, FDEP and CC Site Development Plan permitting for that portion of the property. 2. During the permitting process through the state agencies,it was determined that an acoustic survey for bonneted bats was required. This was not in the original scope. 3. The original soil contaminate testing scope was intensified because preliminary testing indicated that there is more soil contamination than originally anticipated due to past golf course use and maintenance area use. It was determined by SFWMD that a FDEP 404 would be needed therefore a higher level of new soil testing was required. Please contact me directly at 239.434.6060 should you have any questions or concerns. SincerMr? Je D i sonE! resident 4365 Radio Road • Suite 201 • Naples,FL 34104 • P:239.434.6060 • www.davidsonengineering.com ��