Parcel 169TCE Project: 51029 Golden Gate City Stormwater
Parcel: 169TCE
Folio: 35990000004
TEMPORARY CONSTRUCTION EASEMENT AGREEMENT
THIS TEMPORARY CONSTRUCTION EASEMENT AGREEMENT (hereinafter referred
to as the"Agreement") is made and entered into on this (c. day of S lorc,c.ar , 2023,
by and between ANNETTE L. HALL, a single woman, whose mailing address is'4501 25T"
Court SW, Naples, FL 34116 (hereinafter "Owner") and COLLIER COUNTY, a political
subdivision of the State of Florida, its successors and assigns, whose mailing address is 3299
Tamiami Trail East, do the Office of the County Attorney, Suite 800, Naples, Florida 34112
(hereinafter "the County").
WHEREAS, the County requires a Temporary Construction Easement (hereinafter "the
Easement") over, under, upon and across the lands described in Exhibit "A" (hereinafter "the
Property"), which is attached hereto and made a part of this Agreement, for the purpose of
replacing and constructing drainage and related facilities within the public right of way and
drainage and utility easement immediately adjacent thereto, together with the right to place,
excavate, use, store, remove, and dispose of soil, trees, landscaping and other materials and
improvements as shall be required to construct said drainage facilities; subject to the
restrictions contained herein; and
WHEREAS, Owner recognizes the benefit to Owner and desires to convey the Easement
to the County for the stated purposes, on the terms and conditions set forth herein, said terms
including that no compensation shall be due and payable for the Easement requested by
County.
NOW THEREFORE, in consideration of these premises, the sum of Ten Dollars ($10.00),
and other good and valuable consideration, the receipt and sufficiency of which are hereby
mutually acknowledged, it is agreed by and between the parties as follows:
1. RECITALS - All of the above RECITALS are true and correct and are hereby expressly
incorporated herein by reference as if set forth fully below, and all Exhibits referenced
herein are made a part of this Agreement.
2. CLOSING DOCUMENTS - Owner shall convey the Easement to the County, in a form
acceptable to the County and at no cost to the County, unless otherwise stated herein.
Said conveyance (Owner's delivery to the County of a properly executed easement
instrument) is hereinafter referred to as the "Closing." The County shall pay all Easement
instrument recording fees.
3. TIME IS OF THE ESSENCE - Both Owner and the County agree that time is of the
essence. Therefore, Closing shall occur within 30 days of the date of execution of this
Agreement or within 30 days of the County's receipt of a properly executed Temporary
Construction Easement, whichever is the later. This agreement shall remain in full force
and effect until Closing shall occur, until and unless it is terminated for other cause.
4. TERM OF EASEMENT - The term of the Easement shall commence upon the issuance
of the County's official Notice to Proceed to its contractor for the construction of Golden
Gate City Stormwater Project 51029 and shall automatically terminate one year
therefrom.
5. EFFECTIVE DATE - This Agreement and the terms and provisions hereof shall be
effective as of the date this Agreement is executed by both parties and shall inure to the
benefit of and be binding upon the parties hereto and their respective heirs, executors,
personal representatives, successors, successor trustee, and/or assignees, whenever the
context so requires or admits.
6. ENTIRE AGREEMENT- Conveyance of the Easement, or any interest in the Property, by
the Owner is contingent upon no other provisions, conditions, or premises other than
those so stated herein; and this written Agreement, including all exhibits attached hereto,
shall constitute the entire agreement and understanding of the parties, and there are no
other prior or contemporaneous written or oral agreements, undertakings, promises,
warranties, or covenants not contained herein. No modification, amendment or
cancellation of this Agreement shall be of any force or effect unless made in writing and
executed and dated by both Owner and the County.
7. SEVERABILITY - Should any part of this Agreement be found to be invalid, then such
invalid part shall be severed from the Agreement, and the remaining provisions of this
Agreement shall remain in full force and effect and not be affected by such invalidity.
8. VENUE - This Agreement is governed and construed in accordance with the laws of the
State of Florida.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date
first above written.
AS TO THE COUNTY:
DATED: 62-'01 I2v4
ATTEST:
CRYSTAL K. KINZEL, Clerk of the BOARD OF COUNTY COMMISSIONERS
Circuit Court & Comptroller COLLIER COUNTY, FLORIDA
BY: BY
eputy Clerk, RICK LoCASTRO, Chairman
Attest as t Chainnan's
signature c4ry. .:� `r
AS TO OWNER:
DATED: 2 iC (23
----
Witness ignature) a,IcEA NETTS L. HALL
k0�2P+ �' / .
E4ame (Pr' t or Type)
fitness (Signature)
&5•144-1' I-6
Name (Print or Types e"3 0pAoved as to form and legality:
VAIL O Cet-m7,
Derek D. Perry, ESQ.
Assistant County Attorney
Last Revised 11/14/22
TE-ROW 169TCE LEGAL DESCRIPTION & SKETCH
3/22/22 TEMPORARY CONSTRUCTION EASEMENT
4501 25th COURT S.W. (FOLIO NO. 35990000004)
NAPLES, FLORIDA
EXHIBIT A
Page 1 of 2
DESCRIPTION: TCE-1
THAT PORTION OF LOT 4, BLOCK 90, GOLDEN GATE UNIT 3, AS RECORDED IN PLAT
BOOK 5, PAGES 97-105 OF THE PUBLIC RECORDS OF COLLIER COUNTY, FLORIDA,
LYING IN SECTION 27, TOWNSHIP 49 SOUTH, RANGE 26 EAST, COLLIER COUNTY,
FLORIDA, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCE AT THE SOUTHEAST CORNER OF SAID LOT 4; THENCE NORTH, ALONG THE
EAST LINE OF SAID LOT 4, FOR 6.00 FEET; THENCE WEST FOR 6.00 FEET TO THE
POINT OF BEGINNING; THENCE WEST FOR 8.50 FEET; THENCE NORTH FOR 28.00
FEET; THENCE EAST FOR 8.50 FEET; THENCE SOUTH FOR 28.00 FEET TO THE POINT
OF BEGINNING.
SAID LANDS CONTAINING 238 SQUARE FEET, MORE OR LESS.
z
0
DESCRIPTION: TCE-2
THAT PORTION OF LOT 4, BLOCK 90, GOLDEN GATE UNIT 3, AS RECORDED IN PLAT
BOOK 5, PAGES 97-105 OF THE PUBLIC RECORDS OF COLLIER COUNTY, FLORIDA,
LYING IN SECTION 27, TOWNSHIP 49 SOUTH, RANGE 26 EAST, COLLIER COUNTY,
FLORIDA, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCE AT THE SOUTHEAST CORNER OF SAID LOT 4; THENCE NORTH, ALONG THE
EAST LINE OF SAID LOT 4, FOR 78.00 FEET; THENCE WEST FOR 6.00 FEET TO THE
POINT OF BEGINNING; THENCE CONTINUE WEST FOR 14.00 FEET; THENCE NORTH FOR
41.00 FEET; THENCE EAST FOR 14.00 FEET; THENCE SOUTH FOR 41.00 FEET TO THE
POINT OF BEGINNING.
SAID LANDS CONTAINING 574 SQUARE FEET, MORE OR LESS.
�.�t K`•"°"•'".sue Digitally signed
v • 6476 • by Darren
U �
ti
Townsend
Si'. STATE OF Date: 2022.03.16
C
lSu FLORIDA
NOTES: .D�4'4 ....• o<9� 15:06:34 -04'00'
rvS'
1. ALL DIMENSIONS ARE IN U.S. SURVEY FEET OR DECIMALS
THEREOF. DARREN TOWNSEND
N 2. BEARINGS BASED ON PLAT OF GOLDEN GATE, UNIT 3, PROFESSIONAL SURVEYOR AND MAPPER
PLAT BOOK 5, PAGES 97-105. FLORIDA CERTIFICATE. NO. 6476
NOT VALID WITHOUT THE ORIGINAL SIGNATURE AND
• NOT VALID WITHOUT THE ATTACHED SKETCH OF DESCRIPTION. THIS IS NOT A SURVEY. SEAL OF A FLORIDA LICENSED SURVEYOR AND MAPPER.
AIM Engineering& Surveying, Inc. SMIL-10049 - SMOF-1533
▪ -= 2161 FOWLER STREET, SUITE 100 TEMPORARY CONSTRUCTION EASEMENT (FOLIO NO. 35990000004)
FORT MYERS, FLORIDA 33901
®® www.aimengr.com DRAWN: CHECKED: CLIENT:
PHONE (239) 332-4569 JS 3-9-22 DT 3-10-22 COLLIER COUNTY C>
TOLL FREE (800) 226-4569 PROJECT NO: SECTION: TOWNSHIP: RANGE: COUNTY: �,
A I M LICENSED BUSINESS No. 3114 20-1121 27 49 5 26 E COLLIER SHEET 1 OF r
169TCE LEGAL DESCRIPTION & SKETCH
N
TEMPORARY CONSTRUCTION EASEMENT 401
4501 25th COURT S.W. (FOLIO NO. 35990000004) /0tV
NAPLES, FLORIDA4t
CANAL(P) EXHIBIT A a l0 20
5 70 Raw Page 2 of 2 5
INTENDED DISPLAY SCALE: ]" = 20'
6' D&PUE (P) 6' D&PUE (P)
EAST P
14.00' o
0
`,z o 0
0 0
>- O U
cc p H r
cc D 1— a a
OcL z --------_,„._ -- --
IZ I— w w LU
2 Lh 2 >
w z w
a a
� O H H 0 0
Q I
cC
U w 0 O 0 LO
z in
WEST
14.00' _ LEGEND:
0
oA f
Ln D&PUE = DRAINAGE & PUBLIC
00 0 0 o cn o UTILITIES EASEMENT
p Y N o Y - INST. = INSTRUMENT
u I "'o c.i o
I w LB = LICENSED BUSINESS
Ln v m c0 NO. OR # = NUMBER
rn CO a I H M a (P) = AS SHOWN IN
- ^ P.B. 5, PGS. 97-105
O LU COCOw z ~O 0 H m P.B. = PLAT BOOK
Cl-O • ci PGS. = PAGES
POB = POINT OF BEGINNING
O POC = POINT OF COMMENCEMENT
w = R/W = RIGHT OF WAY
a (Ni H
o EAST
00
`O z ' 8.50' z
H } O w
N Q U o o
oDz o
3 U.) -� N H
-az LU w
v0 w POC: TCE-1 & TCE-2
SE CORNER LOT 4, BLOCK 90
" 0 0 GOLDEN GATE UNIT 3
w z
o
4 6' D&PUE (P) 6' D&PUE (P)
' WEST POB: 25TH COURT S.W.
v
W 8.50 TCE-1 60' R/W (P)
w
U
ti
NOTES:
a,
O 1. ALL DIMENSIONS ARE IN U.S. SURVEY FEET OR DECIMALS
THEREOF.
• 2. BEARINGS BASED ON PLAT OF GOLDEN GATE, UNIT 3,
0 PLAT BOOK 5, PAGES 97-105.
,,
NOT VALID WITHOUT THE ATTACHED DESCRIPTION. THIS IS NOT A SURVEY.
AIM Engineering& Surveying, Inc. SMIL-10049 - SMOF-1533
�r 0 2161 FOWLER STREET, SUITE 100 TEMPORARY CONSTRUCTION EASEMENT (FOLIO NO. 35990000004)
FORT MYERS, FLORIDA 33901
www.aimengr.com DRAWN: CHECKED: CLIENT:
PHONE (239) 332-4569 JS 3-9-22 DT 3-10-22 COLLIER COUNTY
TOLL FREE (800) 226-4569 PROJECT NO.: SECTION: TOWNSHIP: RANGE: COUNTY:
` A I M LICENSED BUSINESS No. 3114 20-1121 27 49 S 26 E COLLIER SHEET 2 OF .,,..,,