Loading...
Backup Documents 02/14/2023 Item #16C 7 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP i 6 C — TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office 1. County Attorney Office Initials Date County Attorney Office ;� ' 2. BCC Office Board ��'�I� c9 of County Commissioners Chairman RL 4 gb Pr Z/i/Z 3 3. Minutes and Records Clerk of Court's Office " 4,43.3 PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Bendisa E.Zela, Facilities Phone Number Contact/ Department Division 239-252 8440 Agenda Date Item was February 14,2023 Agenda Item Approved by the BCC Number 16.C.7 Type of Document Change Order Number of Original Attached Documents 1 Attached PO number or account Please send a completed copy to number if document is to Bendisa.Zela@colliercountyfl.gov be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? N/A 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information (Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman, with the exception of most letters, must be reviewed and signed BEZ by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the BEZ document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on February 14,2023 N/A is not and all changes made during the meeting have been incorporated in the attached /.. an option for document. The County Attorney's Office has reviewed the changes, if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the N/A is not BCC, all changes directed by the BCC have been made,and the document is ready for the 5 i an option for Chairman's signature. this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 C 7 ❑ this exhibit is not applicable EXHIBIT F CHANGE ORDER El Contract Modification ❑Work Order Modification Contract#: 17-7198 Change#: 14 Purchase Order#: 4500209838 Protect#: 50156 Contractor/Firm Name: Manhattan Construction Florida Inc. Project Name: Phase 2.1 Collier County Sports Complex Project Manager Name: Ayoub Al-bahou,P.E.,ADAC,LEED GA Department: Facilities Management Original Contract/Work Order Amount $ 32,998,449.011' 11.B 12/8/20 Original BCC Approval Date; Agenda Item# Current BCC Approved Amount $ 29,688,852.4T 11.8 12/8/20 !Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 29,688,852.43 2/28/2023 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 -10.03% !Total Change from Original Amount Revised Contract/Work Order Total $ 29,688,852.43 0.00% !Change from Current BCC Approved Amount Cumulative Changes $ (3,309,596.57) 0.00% (Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 3/9/21 Original Last Approved Revised Date 6/8/22 2/28/23 4/14/23 Date Completion Date Date Includes this change) 45 #of Days Added Select Tasks D Add new task(s) ❑Delete task(s) ❑Change task(s) iD1 Other(see below) Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and i or the additional days added(if requested);2.)why this change was not included in the original contract;and,3.) describe the Impact of this change is not processed. Attach additional information from the Design Professional and Contractor if needed. 1)This change order requests the following:This Change Order is for additional time only adding forty-five(45)days to Contract time due to FPL's design was missing material for 4 lighting locations on the project. FPL was made aware of the issue and requested that the required material be provided for installation by Construction Manager's electrician. After numerous repeated requests by Davidson Engineering and Manhattan,the material was not provided until January 25th Which has preliminary schedule impact of 45 days in Manhattan request In its Notice of Claim. 2)The changes were not included in the original contract because F.P.&L.is direct vendor of Collier County and Construction Manager does not have any control over their performance. 3)If the Change Order Is not processed the contractor will not be credited for additional project time needed because of factors outside of the contractor's control. AI-bahouAyoub Digitally signed by Al-bahouAyoub } Date: 2023.01.27 10:21:06 -05 00 Prepared by: Date: (Ayoub AI-bahou,P.E.,ADAC,LEED GA,Principal Project Manager,Facilities Management Division) Acceptance of this Change Order shall constitute a modification to the contracUwork order identified above and will be subject to all the same terms and conditions as contained In the contract/work order Indicated above, as fully as If the same were stated in this acceptance. The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. } ) I C 7 rYiIysigned by Craig Bryant Craig Bryant DN ztsUS,Estbrynnt@rnatinhelltinconstructiorscom,0=litenballon goari:12ngrgiAncsnili.olg President,Clit:Cfelg Bryant Accepted by: Date: (Manhattan Construction Florida,Inc.) cEnoo.tIltlaelto„niontrd.invson. tigiusnerdollsep.Fnni,th • emee• o. felligdovidsonenpineellog. PENINSULA 0)o.reanlkia Encrneenng. PAY)Ps.° corn,sAis 2023 01.77 i7,76 os osixr 2073.01.30 07:18 17-05'00' Approved by: Date: (Davidson Engineering) McCormickJohn Digitally signed by McCormickJohn Date: 2023.01.30 14:45:13 -0500' Approved by: Date: n McCorrmlck rim Division Director) Us 11 Approved fky: — Date: IA/ (Procurement rofesslo al) I6C 7 ATTEST: BOARD OF COUNTY COMMISSIONERS Crystal K.Kipzer;tift of Courts COLLIER COUNTY,FLORIDA & Comptrol'ler. •• :-4% /' / 1.-fr By: .• �A % By: air' Rick LoCastro, Chairman Dated: t.!► � � t • A !, SklnattiretTlly. App ved s to rm 1 gality: By: Sco . Tea h Deputy County Attorney 41( C�.t's I6C 7 Change Order/Amendment Summary COST TIME CO# AMD# Description Days Justification Additive(+) Deductive(-) Added New Amount To deduct builders'risk The use of the owner's 1 insurance and ($146 803 00) allowance and deduction for the approve the use builder's risk insurance would of owners survey not be recognized. allowance. To approve the use of the The use of the subcontractor's 2 subcontractor's allowance would not be allowance. recognized To approve the The use of the owner's 3 use of owners allowance would not he testing allowance. recognized. To deduct and approve Direct To take advantage of sales tax 4 Material ($753,385.80) savings. Purchases. To approve the The use of the owner's use of Owner contingency would not be 5 Contingency for ($1,627,901.54) recognized.To take advantage price escalation. of sales tax savings. DMP Turf 6 reallocate SDI to To reconcile/reallocate SDI the proper line To deduct and approve Direct To take advantage of sales tax 7 Material ($189,635.66) Purchases.Core savings. &Main To deduct and approve Direct Material Purchases. To take advantage of sales tax 8 Conrad ($1,0%,1i7„'1) savings. Yelvington and Sportsfield Specialties Project time will be lost due to 9 To extend the 60 516 both material shortages and time by 60 days shipping delays,ripple effects of the COVID-19 pandemic Deduct allowances that Deductive change and Project are not being increase amounts would not be utilized.Extended recognized. Project time will be 10 GCs and G S. the (3,fltia.63) 145 661 lost due to both material Increase to the shortages and shipping delays, project due to ripple effects of the COVID-19 materials delays pandemic And to extend the time by 145 days CAf1 1 bC 7 Change Order/Amendment Summary COST TIME CO# AMD# Description Days Justification Additive(+) Deductive(-) Added New Amount To approve the use of Owner The use of the owner's 11 Contingency for 0 661 contingency would not be changes to the recognized. project Reversed of 12 DMPoriginally $506,305.57 0 661 Local supplier cannot provide the approved on CO required material #8 13 Hurricane Ian 0 0 60 721 Adding 60 days due to Impact of Impact Hurricane Ian to the site 14 FP&L schedule 0 0 45 766 Adding 45 days due to lack of impact FP&L material I6C 7 Manhattan Construction Group 239.643.6000(office) 3705-1 Westview Drive 239.643.0090(facsimile) Naples,FL 34104 www.manhattanconslructiongroup.com Manhattan Building excellence. January 25, 2023 Facilities Management Division Ayoub Al-Bahou Principal Project Manager 3335 Tamiami Trail East Naples,FL 34112 RE: Notice of Claim for Delay and Impacts, FPL#3 Collier County Sports Complex Dear Mr. Al-Bahou, As we have discussed previously,Florida Power&Light continues to impact our ability to complete the project. As a direct vendor to Collier County, MCC has no control over their performance and they have, on multiple occasions, failed to deliver necessary materials to the project so that our contract work to install the material can be completed. This is the 3rd of such delays by FPL and our contract has been previously extended for these events. On November 4'h, while reviewing the as-builts for the FPL conduit,Davidson Engineering discovered that FPL's design was missing material for 4 lighting locations on the project. MCC and Davidson Engineering immediately made FPL aware of the issue and requested that the material be provided for installation by our electrician. After numerous repeated requests by Davidson Engineering and Manhattan,the material was not provided until today,January 25`''. We will also need approximately 5 days to install the material, 10 days to as-built and 5 days to revise and record easements. Furthermore, FPL has subsequent work to complete after MCC completes the installation of the conduit. This includes of street lighting, parking lot lighting and pathway lighting. All of this work will be required to be finished by FPL in order for MCC to pass final inspections on the site and achieve Substantial Completion. While there are concerns for FPL's ability to furnish material and labor to complete their work,the full impact to MCC's ability to achieve Substantial Completion is not currently known due to FPL's inability to provide a schedule. It's due to these conditions that MCC respectfully requests an extension of time of 45 days now and further reserves its rights to additional time as additional delays occur. Regards, Craig Bryant Vice President Manhattan Construction Company < 125 CAO 'q� 4 4 tia croC.