Loading...
Backup Documents 01/24/2023 Item #16A11 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 1641J1 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attomey Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office ?32))01 4. BC C Office Board of County Commissioners RL by /0// //31/Z3 5. Minutes and Records Clerk of Court's Office ?2 01 PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Mark Zordan—GMD—Capital Project Phone Number 239.252.5606 Contact/ Department Planning, Impact Fees and Program Management Agenda Date Item was 01/24/2023 Agenda Item Number 16. A. 11 Approved by the BCC Type of Document Change Order Number of Original Attached Documents Attached PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's signature(stamped)? ND 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be ND signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the ND document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's MB signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 01/24/2023 and all changes made during N/A is not the meeting have been incorporated in the attached document. The County 3,1' an option for Attorney's Office has reviewed the changes, if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the N/A is not BCC, all changes directed by the BCC have been made,and the document is ready for the 50, an option for Chairman's signature. this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 10A 1 1' CoLl`ier County Procurement Services `,,,,,, �r—A Change Order Form ® Contract Modification El Work Order Modification Contract#:121-7847 I Change#: 2 Purchase Order#: 4500212114 60102.9.3 Project#: Contractor/Firm Name: Water Resources Management Assoc, Contract/Project: Goodlette-Frank Road Ditch Improvements-A Project Manager Name: Mark Zordan Capital Project Planning, Impact Fees, &Program Division Name: Management Original Contract/Work Order Amount $ 598,817.00 7/13/21 16.A.24 Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 598,817.0M7/13/21 16.A.24 Last BCC Approval Current Contract/Work Order Amount $ 598,817.00 8/7/2022 SAP Contracctt Expiration Datete; n(Master)da Item # Dollar Amount of this Change ° g $ 133,681.00 22.32/o Total Change from Original Amount Revised Contract/Work Order Total $ 732,498.00 22.32% Change from Current BCC Approved Amount Cumulative Changes $ 133,681.00 22.32% Change from Current Amount Completion Date, Description of the Task(s) Change,and Rationale for the Change Notice to Proceed 1 08t131202-1- Original ( 07/08/2022 Last Approved 8/07/2022 Revised Date TBD Date 8/16/2021 sj- Completion Date I Date (Includes this change) J i_ ____ #of Days Added 308 Select Tasks ® Add new task(s) 0 Delete task(s) 0 Change task(s) ® Other Provide a response to the following: 1,)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added (if requested); 2.)why this change was not included In the original contract; and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. `This contract is currently on a STOP-WORK order with 2 days left. 1. On the original contract,time was not allocated to task 8.0 but was left as"to be determined°(TBD). This change order(CO) adds time for this tasks. No additional fee is associated for the above referenced task, Also,the County requested additional design services for an additional box culvert,and design of signalization,mast arm replacement,mobilization of traffic(MOT),and lighting plans for the Goodlette-Frank Road I 221d Avenue intersection. To accomplish this request,this CO will add subtasks 2.7,2.8,4.9 through 4.13. Subtasks 2,7,2.8,and 4.9-4.13 will add$133,681.00 to the original contract. The previously approved tasks with TBD time allocated and the proposed new tasks will add 308 days to the contract. 2, The additional SUE was not included in the original contract because the design requires a deeper ditch cross-section than anticipated by the Gordon River Improvements Master Plan and Is needed to discover any potential utility conflicts below the ditch bottom due to the addition of mast arm relocation. This request was determined to be necessary after 30%design was completed.The additional box culvert design was determined to be necessary for consistency with the Gordon River Improvements Master Plan and the West Goodlette Frank Drainage Improvements Phase 2 project (60142.6). 3. If this change order is not approved,the consultant will not be able to determine crucial design information to properly design the project,and will not have time to complete the work thus the project will be deemed incompleted. Zo rd a n M a rk Ulgitaily signed by LordanMark Prepared by: Date: 2022.11,23 11:36:45-05'00' Date: (Mark Zordan, Project Manager) Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated in this acceptance.The adjustment, if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/ Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Raul M. Mercado Digitally signed by Raul M.Mercado Accepted by: Date:2022.11.2216:to:ao-os'o0' Water Resources Management Associates,Inc. Date: 11/22/2022 (Design Professional and Name of Firm, if project applicable) DYuy,pv,lynrrA..M RomanDaniel Approved by: A;o.,b�.frv,.r-. ,--..-^ �»w���.,...D�... Date: (Daniel Roman,Principal Project Manager) Johnssen b Digitally signed by Johnssen_b Approved by: _ Date: 2022.11.29 09:24:24-05'00' Date: (Beth Johnssen Division Director) �.. Digitally signed by •�,,. ScottTri nity Date 202y12.1209.13:18 Approved by: .es'00' Date: (Trinity Scott, Department Head) er5ara Digitally signed by SchneebergerSara SchneebergerSara Approved by: Date:2022.12,27 08:55:54 05'00' Date: (Procurement Professional) Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin RCC .xx,M • . * * 16A 1 1 Change Order/Amendment Summary COST TIME CO# AMD# Description Days Justification Additive(+) Deductive(-) Added New Amount This change order adds Add 30 days to additional 30 days to address 1 address issues 30 356 right-of-way determination along identified during the western boundary of the the design. project, as identified during the survey, Adds additional This CO adds survey necessary 308 days and to complete ditch and culvert $133,681.00 to design and adds additional address design design, MOT, and time 2 issues and $133,681.00 308 664 necessary to complete the mast for pre- arm relocation at 22nd Street and construction Goodlette Frank Road. support. Without this additional time, consultant will not be able to complete the project. Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin BCC X 16Ai1 ATTEST: BOARD OF COUNTY COMMISSIONERS Crystal K.Kinzel,Clerk of Courts COLLIER COUNTY,FLORIDA &Comptr ller By: • By: Rick LoCastro, Chairman Dated: ! 31-1 23 (SEAL) Attest as to Chairman's sign • only. Appi ved as to form n 1 gality: By: Scott R. each Deputy County Attorney f��.8