Loading...
Backup Documents 11/08/2022 Item #16C 5 16C 5 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. ** ROUTING SLIP** Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s)(List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office /Y(4' /2;1 4. BCC Office Board of County Commissioners 4UY4 j// // 22/22 5. Minutes and Records Clerk of Court's Office I Iff.O' PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above may need to contact staff for additional or missing information. Name of Primary Staff Diana C.Dueri Phone Number 239-601-1290 Contact/Department Agenda Date Item was November 8,2022 Agenda Item Number 16.C.5 Approved by the BCC Type of Document(s) Change Order#3 Number of Original 1 document,7 pages Attached Documents Attached PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature(instead of stamp)? 2. Does the document need to be sent to another agency for additional signatures? If yes, provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. N/A 3. Original document has been signed/initialed for legality. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney.) 4. All handwritten strike-through and revisions have been initialed by the County Attorney Office and all other parties except the BCC Chairman and the Clerk to the Board. N/A 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the final negotiated contract date whichever is applicable. N/A 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. N/A 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is uploaded to the agenda. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 11/08/2022 and all changes made during MIRK— the meeting have been incorporated in the attached document. The County Attorney L an option for Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the L an option for Chairman's signature. is line,, I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04;Revised 1.26.05;2.24.05;11/30/12;4/22/16;9/10/21 I6C 5 MEMORANDUM Date: November 21, 2022 To: Diana Dueri, Project Manager III Public Utilities Engineering & Project Management From: Martha Vergara, Sr. Deputy Clerk Minutes & Records Department Re: Change Order #3 for Contract #21-7823 "108t" & 109th Avenue North Public Utilities" Contractor: D. N. Higgins, Inc. Enclosed please find one (1) copy of the original of the document referenced above (Agenda Item #16C5), approved by the Board of County Commissioners on Tuesday, November 8, 2022. The Minutes and Record's Department has kept the original of the agreement as part of the Board's Official Record. If you have any questions, please feel free to call me at 252-7240. Thank you. Attachment 16C 5 Procurement Services .,olLier County Change Order Form Contract Modification ❑Work Order Modification 70120.4.1, 60139.4.1, Contract#: 21-7823 Change#: 3 Purchase Order#: 4500210679 Project#: 70120.4.2, 60139.4.2 Contractor/Firm Name: D.N. Higgins Inc. Contract/Project: 108:'&109''Avenue North Public Utilities Project Manager Name: Diana Dueri. PMP Division Name: EPMD Original Contract/Work Order Amount S 12,337,900.00 03/23/21;11A Original BCC Approval Date;Agenda item# Current BCC Approved Amount S 12,337,900.00 03/23/21;11A Last BCC Approval Date; Agenda Item# Current Contract/Work Order Amount S 12,337,900.00 SAP Contract Expiration Date(Master) Dollar Amount of this Change S 0.00 I 0.00%; Total Change from Original Amount Revised Contract/Work Order Total S 12,337.900.00: 1 0.00% Change from Current BCC Approved Amount Cumulative Changes S 0.00, 0.00%1 Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 5i24/2021 Original 8/17/2022 Last Approved 10/3/2022 Revised Date 10/26/2022 Date Completion Date Date (Includes this change) #of Days Added 23 Select Tasks E Add new task(s) ❑ Delete task(s) ❑Change task(s) Zl Other Provide a response to the following:1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(if requested);2.)Why this change was not included In the original contract;and,3.) Describe the impact if this change is not processed. Attach additional information from the Design Professional and'cr Contractor if needed. This change order is for the addition of 23 days(14 days for Acquisition of Material Delays, 7 days for WD=14 and 2 days for\\'D`-'16)and the use of S140.520.98 of project allowances.as detailed below: Time Extension Due to Acquisition of Material Delays 1. This change requests a contract time extension of 14 days due to the Contractor's inability to complete the scope of work by the final completion being impacted by a delay in the manufacturing and delivery of critical material necessary to complete the project. 2. This change was not included in the original contract as it was not known when the project was bid of the supply chain issues that would negatively impact the contractor's ability to meet the project schedule. 3. If the time extension is not proceeded. the Contractor will not be able to complete the project on schedule and would be liable for liquidated damages for no fault of their own. WD#8-579 109'h Sanitary Sewer Lateral I. To install a new sanitary sewer lateral at 579 109'h Avenue N within the ROW meeting the County's standards. 2. Prior to construction. the exact location and configuration of the existing sanitary sewer was unable to be determined as the lateral was buried and under a driveway. During construction it was discovered that the sanitary sewer lateral has 90 bends which horizontally change the direction of the lateral. 3, if this change is not processed.the sanitary sewer lateral would have horizontal bends in it.which increases the potential for grease and debris to pile up in the pipe which can lead to sanitary sewer blockages and added maintenance for the County. Additionally, horizontal bends in sanitary sewer laterals are not permitted per the County's current utility standards. \\'D=8 will use 57.337.E-1 from the project wastewater allowance for 109 h Avenue North.This DOES NOT change the contract time. Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY /- 09192022 Admin R ace ES R'� ._ 16C 5 WD#10- 108't'Avenue& 8'h Street Change WM from PVC to DIP I. To install the new water main (WM) as 8" ductile iron pipe (DiP) over the existing 72" stormwater pipe at 108t1i Avenue and 8'1' Street instead of 8" PVC per the contract drawings. 2. During the design of the project, the available data obtained detailed the elevation of the existing 72"RCP. During construction,the Contractor determined the existing 72"RCP elevation was higher than shown on the available data; therefore the new WM would not meet the minimum requirements for separation and cover. 3. Changing the pipe material from PVC to DIP will allow the new WM to be installed over the existing 72" RCP as per the contract documents resulting in less concern of failure/damage to the new WM in the future. If this change is not processed,the 8"PVC WM would not be in compliance with County standards and the main could be damage due to inadequate separation and cover. WD#10 will use$13,017.00 from the project water allowance for 108'1' Avenue North.This DOES NOT change the contract time. WD#13-875 109th Avenue Fire Service Connection 1. To connect the fire service at 875 109'h Avenue as a result of the recent commercial complex construction. 2. After the project was designed and bid, the fire service for the commercial complex at 875 109'1' Avenue North was installed, the new fire service was not known during the design of the project. 3. If this change is not processed,the fire service for 875 109'1'Avenue would not be connected to the new water main, resulting in the loss of fire protection for the commercial complex. WD#13 will use$3,218.00 from the project water allowance for I09'h Avenue.This DOES NOT change the contract time. WD#14— 108'h &8'1'Manhole I. To connect the new sanitary sewer main on 108'h Avenue to the existing manhole at the intersection of 108`h Avenue and 8'h Street. The existing sanitary sewer main along 8'1' Street, at 108th Avenue, is a 14-inch main not 10-inch, therefore the proposed new manhole cannot be used to connect to the existing 14-inch sanitary sewer main as is. 2. During construction it was determined that the existing sanitary sewer main along 8'h Street, at 108'h Avenue is a 14- inch main not 10-inch and the required fittings to adapt the existing sanitary sewer main to the proposed new manhole is not available.The existing manhole was inspected and determined to be in good condition. 3. If this change is not processed. the project's schedule will be delayed while fittings arc sourced and brought to the project. WD#14 will use$67,494.95 from the project wastewater allowance for l08'h Avenue North. This increases the amount of days in the contract by 7 days. NOTE: The contractor is not requesting payment for line items 3.5a- Precast Polymer Concrete Manholes(Remove, Dispose and Replace)and 3.6a—Connect Existing Gravity Sewer to New Polymer Concrete Manhole per the approved schedule of values for the work completed per this work directive as detailed on page 2 of the backup attached. Revised:01114/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin BCCftpt BCC ES 09192022 �M`�� I C 5 WD#16—8*h & 109'h Force Main Deflection I. To deflect the existing 12"PVC wastewater force main(FM)at the intersection of 1096 Avenue North and 8th Street to provide the County's required separation between the existing FM and the proposed 8"PVC gravity sewer main. 2. During construction the Contractor discovered that the existing FM deflects in the roadway and is in conflict with the proposed 8" PVC gravity sewer main. Available data during design did not depict the defection in the roadway. 3. If this change is not processed, the required separation between the existing 12" PVC wastewater FM and the proposed 8" PVC gravity sewer main will not meet the County's requirement. WD'16 will use S49.453.49 from the project wastewater allowance for 109th Avenue North. This increases the amount of days in the contract by 2 days. Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY 09192022 gamin Rpt ecc Es 16C 5 108th Avenue North Beginning General Allowance $135.160.75 Remaining General Allowance $135,160.75 Beginning Water Allowance $100,000.00 Allowance Draw WD 410 $(13.017.00) Remaining Water Allowance $86,983.00 Beginning Wastewater Allowance $200,000.00 Allowance Draw WD #14 $(67.494.95) Remaining Wastewater Allowance $ 132,505.05 • Beginning Stormwater Allowance $141,200.00 Remaining Stormwater Allowance $141,200.00 109'h Avenue North Beginning General Allowance $124,148.30 Remaining General Allowance $124,148.30 Beginning Water Allowance $100,000.00 Allowance Draw WD#13 $(3,218.00) Remaining Water Allowance $96,782.00 Beginning Wastewater Allowance $200,000.00 Allowance Draw WD#8 $(7,337.54) Allowance Draw WD 416 $(49.453.49) Remaining Wastewater Allowance $143,208.97 Beginning Stormwater Allowance $146,000.00 Remaining Stormwater Allowance $146,000.00 Revised:01/14/2021 {Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY K. ,,/) 09192022 Admin BRPt BCC ES 16C 5 Prepared by: _ Date: 09/16/2022 Diana Dueri. PtvMP Senior Project Manager. EPMD Acceptance of this Change Order shall constitute a modification to contract/work order identif ed above and will be subject to all the same terms and conditions as contained in the contract work order indicated above.as fully as if the same were stated in this acceptance.The adjustment.if any.to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor!Consultant I Design Professional arising out.of or reyatet,,to the change set forth herein.inch,ding claims for impact and delay costs. y�'/ _ Accepted by: � ��''t---•----'` Date: Mike Lob, !' - D_N ins. IOC. Accepted by: Date: 9/22/2022 Justin Frederiksen. P.E.—Q. Grady t.iinor&Associates.P.A. BullertBenjamin° .�...ar Approved by: � a't�:�..� "°a"."'d"". Date: Benjamin N. Bullert. P.E.. Principal Project Manager. EPMD n.'fp.».unae.a„c.. McLean Matthew aol.�"'g,C041 '*.MK.*NI.. ""�"` Approved by: a.,O� t,..pew, ....a o...,"a.te, .a At MROf 001 34.04 Date: Matt McLean. P.E. Director EPMD Approved by: SchneebererSa Digitally signed by SchneebergerSara _._.Date:202210.03-1.0:10,25-04:00' Date: (Procurement Professiona, Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) I PROCUREMENT USE ONLY 09192022 Adman Rp; BCC ES Cat I6C 5 { ATTEST: BOARD OF CO T OMMISSIONERS Crystal K.Kinzel,Clerk of Courts COLLIER co Adore re , FLO' t: Ali &Comptroller -, ., By: OIL • By: • ^:1 Willi.,' L. McDaniel,Jr.,Chairman Dated: ') ' •�Ij �-- ` fit OS to ch8 rman's ignatu'r'e"only. Appr ved as t for n egality: By: Sco R. each Deputy County Attorney Piet, i6C 5 Change Order/Amendment Summary COST TIME CO# AMD# Description Days New Justification Additive(+) Deductive(-) Added Amount This CO adds an Days added for emergency work,a additional 6 Days; tropical storm and modification to authorizes the use of existing storm structures; and contract allowance; and allowance utilized for tree removal, 1 1 NIA N/A 6 456 temporary sidewalk,electrical adjusts contract quantities for work power service restoration,sanitary necessary as a result of sewer lateral conflict avoidance, WDs 4,5,6,7&9. and existing stormwater structure modifications. This CO adds an 2 2 additional 30 days and N/A N/A 30 486 Days added due to supply chain corrects date errors delays and Covid. made in CO#1 This CO adds an additional 23 Days and authorizes the use of Days added for proposed FM 3 3 contract allowance for N/A 23 509 deflection and connection to an work necessary as a existing manhole to remain. result of WDs 8, 10, 13, 14,&16 I tt Revised:01114/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY 09192022 Adm+n RP! ecc es