Agenda 11/08/2022 Item #16C 9 (Change Order #11 to Collier County Sports Complex Phase 2.1 and 2.2A on Contract #17-7198 w/Manhattan Construction)11/08/2022 EXECUTIVE SUMMARY Recommendation to approve Change Order No. 11 to Collier County Sports Complex Phase 2.1 and 2.2A on Agreement No. 17-7198 with Manhattan Construction (Florida), Inc., for use of the Owner's Contingency. (Project 50156) OBJECTIVE: To approve Manhattan Construction (Florida), Inc.'s request to utilize the project allowance for authorization requests for change orders totaling a negotiated amount of $56,567.79. CONSIDERATION: On February 13, 2018 (Item 16.D.21) the County entered into Agreement No. 17-7198 (the "Agreement") with Manhattan Construction (Florida), Inc. ("Manhattan") for Construction Manager at Risk ("CMAR") services for all preconstruction phases for the Collier County Sports Complex. On December 8, 2020 (Agenda Item 11.13), the County entered into the Sixth Amendment to the Agreement with Manhattan for work for Phase 2.1 and 2.2A. Change Order #11 to Collier County Sports Complex Phase 2.1 and 2.2A, the Sixth Amendment of Agreement No. 17-7198, includes the following authorization requests: 1) Authorization Request: 7675.036- FPL Precast. Receipt and offloading of 8 precast manhole boxes in the amount of $2,956.75. 2) Authorization Request. 7675.03 7- Storm drainage: RFI 23 adjustment to existing storm drainage structure in the amount of $3,311.86. 3) Authorization Request: 7675.044- Civil Plans: Changes to the underground pipe and structures per addendum #14R2 civil plans in the amount of $38,884.00. 4) Authorization Request: 7675.045 - Rehab Manhole: Raise and rehab existing manhole #115 per RFI C-012 in the amount of $6,415.18. 5) Authorization Request. 7675.046 - FPL Easements: To provide the necessary sketch and legal description for FPL easements based on plans and field as -built data in the amount of $5,000.00. The above listed items were not included in the executed Guarantee Maximum Price for the work or the issued construction documents, and funding is proposed through the owner's contingency. Modification to existing elements is necessary for Phase 2 infrastructure systems to operate properly. Further, the number five legal description authorization request above is required to turn over the required easements to Florida Power & Light so that underground electrical lines can be installed. FISCAL IMPACT: Change Order #11 is being funded by owner contingency and has a zero -dollar change to the approved contract. GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to this action. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to form and legality, and requires majority vote for approval.-SRT RECOMMENDATION: To approve Change Order No. 11 to Collier County Sport Complex Phase 2.1 and 2.2A for Agreement No. 17-7198 with Manhattan Construction (Florida), Inc., allowing for use of the Owner's Contingency. Prepared by: Ayoub R. Al-Bahou, PE, Principal Project Manager, Facilities Management Division ATTACHMENT(S) 1. change order 17-7198 No. 11 102022 (PDF) I Packet Pg. 865 11/08/2022 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.9 Doe ID: 23711 Item Summary: Recommendation to approve Change Order No. I I to Collier County Sports Complex Phase 2.1 and 2.2A on Agreement No. 17-7198 with Manhattan Construction (Florida), Inc., for use of the Owner's Contingency. (Project 50156) Meeting Date: 11/08/2022 Prepared by: Title: Principal Project Manager — Facilities Management Name: Ayoub Al-bahou 10/20/2022 11:29 AM Submitted by: Title: — Facilities Management Name: John McCormick 10/20/2022 11:29 AM Approved By: Review: Facilities Management Ayoub Al-bahou Additional Reviewer Facilities Management Jennifer Belpedio Manager - Real Property Procurement Services Ana Reynoso Level 1 Purchasing Gatekeeper Procurement Services Sandra Herrera Additional Reviewer Facilities Management John McCormick Director - Facilities Procurement Services Sue Zimmerman Additional Reviewer Procurement Services Sara Schneeberger Additional Reviewer Public Utilities Operations Support AmiaMarie Curry Additional Reviewer Public Utilities Department Drew Cody Level 1 Division Reviewer Public Utilities Department George Yilmaz Level 2 Division Administrator Review County Attorney's Office Scott Teach Additional Reviewer County Attorney's Office Jeffrey A. Klatzkow Level 2 Attorney Review Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Office of Management and Budget Christopher Johnson Additional Reviewer County Manager's Office Amy Patterson Level 4 County Manager Review Board of County Commissioners Geoffrey Willig Meeting Pending Completed 10/20/2022 11:34 AM Completed 10/20/2022 1:38 PM Completed 10/20/2022 2:30 PM Completed 10/21/2022 1:07 PM Completed 10/25/2022 11:08 AM Completed 10/25/2022 4:06 PM Completed 10/26/2022 8:24 AM Completed 10/26/2022 11:32 AM Completed 10/26/2022 12:08 PM Skipped 10/26/2022 4:35 PM Completed 11 /0 1 /2022 8:23 AM Completed 11 /0 1 /2022 9:40 AM Completed 11/01/2022 8:31 AM Completed 11 /0 1 /2022 9:57 AM Completed 11/01/2022 2:11 PM Completed 11/02/2022 11:20 AM 11/08/2022 9:00 AM I Packet Pg. 866 1 F-1 this exhibit is not applicable M Contract Modification EXHIBIT F CHANGE ORDER F1 Work Order Modification Contract #: 1 17-7198 Change #: El Purchase Order 4500209838 Project #: 1 50156 Contractor/Firm Name: F-m anhattan Construction Florida Project Name: Phase 2.1 Collier County Sports Complex Project Manager Name: I Ayoub Al-bahou, P.E. Department: Facilities Management Original Amount Current BCC Approved Amount Current Contract/Work Order Amount Dollar Amount of this Change Revised Contract/Work Order Total Cumulative Changes $ 32,998,449.00""-11.B 12/8/20 Original BCC Approval Date-, Agenda Item $ 29,182,456.861 11.13 12/8/20 Last BCC Approval Date; Agenda Item # $ 29,182,456.86 12/30/2022 SAP Contract Expiration Date (Master) $ 0.00 -11.56% Total Change from Original Amount $ 29,182,45=86 0.00T Change from Current BCC Approved Amoun 1 $ (3,815,992.14)1 0.00% Change from Current Amount ICompletion Date, Description of the Task(s) Change, and Rationale for the Change Notice to Proceed Original Last Approved Revised Date Date Completion Date Date Includes this change) # of Days Added Select Tasks El Add new task(s) El Delete task(s) El Change task(s) Z Other (see below) Provide a response to the following: 1.) detailed and specific explanationfrationale of the requested change(s) to the task(s) and i o the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact o this change is not processed. Attach additional information from the Design Professional and Contractor if needed. 1) This change order requests the following: Authorization Request. 7675.036- FPL Precast- Fortune Receipt and offloading of 8 precast manhole boxes to be funded from Owner Contingency in the arnount of ($2,956.75) for a zero -dollar change. Authorization Request: 7675-037- Storm drainage- Jensen Underground RFI 23 storm drainage structure 224 to be funded from Owner Contingency in the amount of ($3,311.86) for a zero -dollar change. Authorization Request. 7675.044- Civil Plans- Jensen Underground Changes to the underground pipe and structures per addendum #14R2 civil plans to be funded from Owner Contingency in the amount of ($38,884,00) for a zero -dollar change. Authorization Request: 7675.045 - Rehab Manhole- Jensen Underground Raise and rehab existing manhole 115 per R F1 C-0 12 to be fu nded f rom Owner Contingency in the arnou nt of ($6,415.18) for a zero -dollar change. Authorization Request: 7675.046 - FPL Easements- Agnoll Barber To provide the sketch and legal description for FPL easements based on plans and field as -built data to be funded from Owner Contingency in the amount of ($5,000.00) for a zero -dollar change. 0 U CNi (D a. X E 0 U 0 0- (n F4_ N I Packet Pg.��777] 2) These changes were not included in the original contract because the items listed above add value to the project. These charges are being funded through owner contingency. Items listed above were not included in the executed G.M.P` or the construction bid documents. Modification to existing elements are necessary to able phase 2 to connect to them. Legal description is required to turn over to F.P.L. so they can run their electrical lines to the complex. 3) The impact on this project if this Change Order is not processed; construction schedule will be delayed, the project will not be able to move forward into the next phase, nor been completed. The necessary modification will not be able to be completed. All Prepared by: f—% I — KJ CA I I V U /—%y V U LJ Date: 2022.09.12 10:23:46 -04'00' Date-, (Ayoub Al-bahou, P.E., Principal Project Manager, Facilities Management Division) Acceptance of this Change Order shall constitute a modification to the contract/work order identified above and will be subject to all the sarrif terms and conditions as contained in the contract I work order indicated above, as fully as if the same were stated in this acceptance. ThE adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/ Vendor / Consultant / Desigr Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Dig 181ty sig ed by Cmq Bryant DN: C�US, E=cbwn1QmaAShat(anC*n$1ruCV0n wm, QzManhaltan Const Won Company, OU=Vn� President. CN=Cmlg BryaAl Accepted by� Craig Bryant Dat1b: 2Z20,14 12:58:2"4W Date: (Manhattan Construction Flodda, Inc.) Approved by: tn�JefrDavid a=Dayid� E gln�nng. =.Egbeering, I I �.J JE '00'04-10:41:36 2022.09.13 (Davidson Engineering) UgWy Wd by Jmk FNUr PEN I NSUI L Wr'�"Usf-"@O—Q� -4- G=pm.oa E�§.." en-J.,ts FNGINFER NG Fro� D.W: 2M.09.12 IVASIG,041W Date: ligitally signed by McCormickJohn McCormickJohnDate: 2022.09.14 14:29:12 -04'00' Approved by: Date: (John McCorrmick, Interim Division Director) Digitally signed by SGhneebergerSara Approved by� SchneebergerSaraDate: 2022.09.22 12:50:10 -04'00' Date: (Procurement Professionai) 04 04 CD N 0 z 00 M 0 a) E U M I— _' Packet Pg. 868 ATTEST: Crystal K. Kinzel, Clerk of Courts & Comptroller M Dated: (SEAL) Approved as to form and legality: 0 Scott R. Teach Deputy County Attorney BOARD OF COUNTY COMNESSIONERS COLLIER COUNTY, FLORIDA By: William L. McDaniel, Jr., Chairman 04 C*4 Q FPacket Pg. 869 Change Order/Amendment Summary COST TIME CO# AMD# Description Justification Days Additive H Deductive Added New Amount To deduct builders'risk The use of the owner's 1 insurance and ($146,803.00) allowance and deduction for the approve the use builder's risk insurance would of owners survey not be recognized. allowance. To approve the The use of the subcontractor's 2 use of the subcontractor's allowance would not be allowance. recognized To approve the The use of the owners 3 use of owners allowance would not be testing allowance. recognized. To deduct and 4 approve Direct ($753,385.80) To take advantage of sales tax Material savings. Purchases. To approve the The use of the owners use of Owner contingency would not be 5 Contingency for ($1,627,901.54) recognized. To take advantage price escalation. of sales tax savings. DMP Turf 6 reallocate SDI to To reconcile/reallocate SDI the proper line To deduct and approve Direct To take advantage of sales tax 7 Material ($189,635.66) Purchases. Core savings. & Main To deduct and approve Direct Material 8 Purchases. ($1,095,177.51) To take advantage of sales tax Conrad savings. Yelvington and Sportsfield Specialties Project time will be lost due to 9 To extend the 60 516 both material shortages and time by 60 days shipping delays, ripple effects of the COVID-19 pandemic Deduct allowances that Deductive change and Project are not being utilized. Extended increase amounts would not be GCs and GRS. recognized. Project time will be 10 Increase to the (3,088.63) 145 661 lost due to both material project due to shortages and shipping delays, materials delays ripple effects of the COVID- 19 And to extend the pandemic time by 145 days I 0 (L X E 0 0 04 04 CD N 6 Z 00 M T-- 0 a) E U a Packet Pg. 870 Change Order/Amendment Summary CO# AMD# DescOption COST TIME Justification Additive Deductive Days Added New Amount 11 To approve the use of Owner Contingency for changes to the Proiect 0 661 The use of the owners contingency would not be recognized. 0 CIA x 2 CL E 0 L) 0 CL (n C*4 N 6 Z 00 M 0 U E U FPacket Cy) c r_ 0 C) LO (000000) r- 00 0 � C) r- (6 1: If t6 6 t_: LO OD C� ED 0) Ce) co C> tf) C,f C6 6 (6,6 ce) tp* 6% 6% G�* 6p� (D r- U') co (Y) M Nr IT (D CD CD C) 0 Lf) U) Lr) LO U) C4 C4 0 C%4 CD (CA FPacket Pg. 8721