Agenda 11/08/2022 Item #16C 5 (Change Order #3 for Contract #21-7823 w/Douglas N. Higgins, Inc.)11/08/2022 EXECUTIVE SUMMARY Recommendation to approve administrative Change Order No. 3, under Agreement No. 21-7823 pertaining to the 108 th & 109th Avenues Public Utilities Renewal Project with Douglas N. Higgins, Inc., and approve an anticipated project completion date of November 22, 2022. OBJECTIVE: To obtain the Board's approval to Change Order No. 3 under Agreement No. 21-7823 with Douglas N. Higgins, Inc., and approve an anticipated project completion date of November 22, 2022. CONSIDERATIONS: On March 23, 2021 (Agenda Item 1 LA), the Board approved Agreement No. 21-7823 to Douglas N. Higgins, Inc. ("Higgins") for the 108' and 109' Public Utilities Renewal Project to replace aged infrastructure for water, wastewater, and stormwater in Naples Park. Currently the project is under construction and Change Order Nos. I and 2 were administratively approved and processed. This executive summary presents Change Order No. 3 for review and approval by the Board. The following is a summary of Change Orders/Work Directives issued under the Agreement. Chanae Order No I - Administratively Approved (reported to the Board July 12, 2022, Agenda Item 16E2): This Change Order No. 1 added six days (three days for Collier County Emergency Work & Tropical Storm Elsa and three days for Work Directive #9) and utilized $33,490.95 of the project allowance for Work Directive #'s 4, 5, 6, 7, and 9. This Change Order also established a new substantial completion date of July 24, 2022, and the new final completion date of August 23, 2022. Change Order No 2 - Administratively Approved In Absentia on August 23, 2022 (ratified by the Board Septembe 13, 2022, Agenda Item 161714: Change Order No. 2 added 30 days and corrected errors on Change Order No. I concerning the last approved/revised dates, which had not included a Stop Work and Start Work Notice. As corrected, Change Order No. 2 changed the substantial completion date to August 4, 2022, and the final completion date to September 3, 2022. After adding the requested 30 days, the new substantial completion date was September 3, 2022, with a new final completion date of October 3, 2022. Change Order No 3 - Administratively approved October 3, 2022: Change Order No. 3 adds 23 days to the contract time due to delays in the acquisition of materials (14 days) and additional time to complete Work Directives #14 (7 days) and #16 (2 days), establishing a new substantial completion date of September 26, 2022, and a new final completion date of October 26, 2022, although work on the project is not anticipated to conclude until November 22, 2022. Change Order No. 3 also utilizes $140,520.98 of the project allowance for Work Directive Nos. 8, 10, 13, 14, and 16. Work Directive #8: Installation of a new sewer lateral at 579 109' Avenue North. Prior to construction, the team was unable to locate the existing lateral as the lateral was buried under a driveway and the pipe has 90 bends. Since Collier County Utility Standards does not permit horizontal bends this sewer lateral needed modification during construction. Work Directive #8 will use $7,337.54 from the project wastewater allowance and does not change the contract time. Work Directive #10: 108th Avenue & 8th Street Change water main ("WM") from PVC pipe to Ductile Iron Pipe ("DIP"). This work directive is to install the new WM as 8" DIP over the existing 72" storm water pipe at 108th Avenue and 8th Street instead of 8" PVC pipe per the contract drawings. During construction, the Contractor discovered that the existing 72" storm pipe elevation was higher than shown on the construction plans; therefore, the new WM would not meet the minimum requirements for separation and cover. Changing the pipe material from PVC to DIP will allow the new WM to be installed over the existing 72" storm pipe as per the contract documents resulting in less concern of failure/damage to the new WM in the future. Work Directive #10 will use $13,017.00 from the project water allowance and does not change the contract time. - Work Directive #13: 875 109th Avenue Fire Service Connection. To connect the fire service at 875 109th Packet Pg. 797 11/08/2022 Avenue because of the recent commercial complex construction. After the project was designed and bid, the fire service for the commercial complex at 875 109th Avenue North was installed; therefore, the new fire service was not known during the design of the project. Work Directive #13 will use $3,218.00 from the project water allowance and does not change the contract time. Work Directive #14: 108th & 8th Manhole. During construction it was determined that the existing sanitary sewer main along 8th Street, at 108th Avenue is a 14- inch main not 10-inch and the required fittings to adapt the existing sanitary sewer main to the proposed new manhole are not available. The existing manhole was inspected and determined to be in good condition. Work Directive #14 will use $67,494.95 from the project wastewater allowance and increase the contract time by seven days. The contractor will not request payment for line items 3.5a - Precast Polymer Concrete Manhole ($73,000) and 3.6a - Connect Existing Gravity Sewer to New Polymer Concrete Manhole ($30,000) per the approved schedule of values as related to this change. Work Directive #16: 8th Street & 109th Avenue Force Main Deflection. To deflect the existing wastewater force main ("FM") at the intersection of 109th Avenue North and 8th Street to provide the required separation between the existing FM and the proposed gravity sewer main. During construction the Contractor discovered that the existing FM deflects in the roadway and conflicts with the proposed gravity pipe. Available data during design did not depict the deflection in the roadway. Work Directive #16 will use $49,453.49 from the project wastewater allowance and increase the contract time by two days. The County's Procurement Services Division administratively approved Change Order's Nos. 1-3, as authorized by the Board in accordance with its Procurement Ordinance, Section Nineteen, Contract Administration, Section 19, subsection 3b. On September 2, 2022, contractor Higgins met substantial completion but was unable to meet the October 26, 2022 final completion date provided for in the last administratively approved Change Order No. 3. Staff and the Higgins anticipate that the project will be concluded and accepted by the County as completed on or before November 22, 2022, which allows for an additional 27 days to complete the project due to the following reasons: Hurricane Ian - 14 Days: On September 27, 2022, Hurricane Ian made landfall and severely impacted Collier County. Higgins lost a week of work due to the Hurricane itself and their crews were focused on Hurricane cleanup and restoration for the weeks following the storm. Material Delays - 7 Days: Higgins' ability to complete the scope of work by the final completion date has been impacted by a delay in the delivery of sod material necessary to complete the project restoration. Pending Work Directives - 6 Days and $30,522.10 utilizing project allowances: There are 5 pending work directives that need to be approved with an estimated total amount of $30,522.10 and increasing the final contract date by 6 days to complete these pending work directives. The pending work directives include tree replacements, sodding, irrigation restoration, and storm water modifications. Due to this being an ongoing construction project in which the County and Higgins have worked to timely process Change Orders, inclusive of the intent to extend the dates identified as Substantial and Final Completion, Staff does not believe there is any basis that would warrant an assessment of damages against Higgins. Substantial damages are not applicable because Higgins met the Substantial Completion date within the time provided for in the previous administratively approved change orders. The assessment of liquidated damages may only be appropriate when substantial completion is not met, and under some circumstances even when the specified date is not met, contractors can argue that the assessment of such damages is punitive in nature, which is inapposite of the lawful reason for assessing such damages. Further, considering the above articulated circumstances, as well as Higgins' good standing and satisfactory performance of services under the Agreement, and the fact that staff cannot show that the County sustained any actual damages as a result of the anticipated final completion and acceptance of the project, staff sees no basis to seek actual damages against Higgins. Finally, historically the County has had difficulty encouraging the participation of contractors in competitive solicitations; asserting such damages under Packet Pg. 798 11/08/2022 circumstances here involving delays caused by Acts of God and supply chain delays could only further exacerbate that situation. Notwithstanding the foregoing, the County reserves its right to assess actual damages in the event Contractor does not meet final completion if actual damages are incurred. Per Section 5, subsection A, of the contract, ... "Final Completion shall occur when the Agreement is completed in its entirety, is accepted by the Owner as complete and is so stated by the Owner as completed." As part of staff s request for approval of this Executive Summary, it requests that the Board authorize payment on any payment application submitted by the Contractor after the final completion date, provided that it is submitted with all required backup documentation establishing the basis for payment as required under the Agreement, and staff concludes that no actual damages have been incurred since the date of this request. FISCAL IMPACT: Funds are available in the contract allowance. There is no additional fiscal impact associated with these actions. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval.-SRT GROWTH MANAGEMENT IMPACT: There is no impact to the current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RIECOMMENDATION: Recommendation to approve administrative Change Order No. 3 under Agreement No. 21-7823, 108th & 109th Avenues Public Utilities Renewal Project, with Douglas N. Higgins, and acknowledge an anticipated project completion date by November 22, 2022 as provided above. Prepared by: Diana C. Dueri, Project Manager 111, Public Utilities Engineering & Project Management Division ATTACHMENT(S) 1. Change Order 3 DN Higgins 102622 (PDF) 2. Certificate of Substiantial Completion Higgins 108 and 109 (PDF) I Packet Pg. 799 11/08/2022 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.5 Doe ID: 23751 Item Summary: Recommendation to approve administrative Change Order No. 3 and approve an anticipated final completion date of November 22, 2022, under Contract No. 21-7823 pertaining to the 108th & 109th Avenues Public Utilities Renewal Project with Douglas N. Higgins. Meeting Date: 11/08/2022 Prepared by: Title: Project Manager — Public Utilities Planning and Project Management Name: Diana Dueri 10/26/2022 4:37 PM Submitted by: Title: Director — Public Utilities Planning and Project Management Name: Matthew McLean 10/26/2022 4:37 PM Approved By: Review: Public Utilities Planning and Project Management Benjamin Bullert Procurement Services Ana Reynoso Level 1 Purchasing Gatekeeper Procurement Services Sara Schneeberger Additional Reviewer Procurement Services Sandra Herrera Additional Reviewer Procurement Services Sue Zimmerman Additional Reviewer Public Utilities Planning and Project Management Matthew McLean Public Utilities Operations Support Public Utilities Department Public Utilities Department County Attorney's Office Office of Management and Budget County Attorney's Office Office of Management and Budget County Manager's Office Board of County Commissioners AmiaMarie Curry Additional Reviewer Drew Cody Level 1 Division Reviewer George Yilmaz Level 2 Division Administrator Review Scott Teach Level 2 Attorney Review Debra Windsor Level 3 OMB Gatekeeper Review Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Laura Zautcke Additional Reviewer Dan Rodriguez Level 4 County Manager Review Geoffrey Willig Meeting Pending Additional Reviewer Completed 10/26/2022 5:18 PM Completed 10/26/2022 5:21 PM Completed 10/27/2022 10:32 AM Completed 10/27/2022 4:06 PM Completed 10/27/2022 5:04 PM Additional Reviewer Completed 10/28/2022 4:51 PM Completed 10/30/2022 9:15 AM Completed 10/31/2022 10:28 AM Completed 10/31/2022 1:21 PM Completed 11 /0 1 /2022 8:02 AM Completed 11 /0 1 /2022 8:27 AM Completed 11 /0 1 /2022 9:36 AM Completed 11 /0 1 /2022 11:06 AM Completed 11/01/2022 4:00 PM 11/08/2022 9:00 AM I Packet Pg. 800 1 Procurement Services Change Order Form Z Contract Modification M Work Order Modification 70120.4.1, 60139.4.1. Contract M 21-782 Change #: 3 Purchase Order#: 4500210679 Project M, 70WOA.2. I I I I --- 60 1 39A.2 ContractoriFirm Name: FD. N. Higgins Inc. ContractJProject: Lfr & 109`7 Avenue North Public Utilities Project Manager Name] Diana Dueri, PIVIP Division Name: I EPIVID Original ContractlWork Order Amount S 12,337,900.00 03/23121;11A Original IBCC Approval Date; Agenda Item # i: Current BCC. Approved Amount $ 12,337,900.00 03/23/21:1 IA. Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 12,337,900.00 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 O�00% Total Change from Original Amount Revised Contract/Work Order Total S 12,337,900.001 0100% Change from Current BCC Approved Amount ,Cumulative Changes $ 0.06 n nr)% Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Notice to Proceed Original Last Approved Revised Date Date Completion Date Date (Includes this change) # of Days Added Select Tasks Add new task(s) El Delete task(s) [I Change task(s) Z Other Provide a response to the following: 1.) detailed and specific explanationlratlonale of the requested change(s) to the task(s) and I or the additional days added (if requested); 2.) Why this change was not included In the original contract; and, 3.) Describe the impact if this change Is not processed. Attach additional information from the Design Professional and/or Contractor if needed. This chancre order is for the addition of 23 days (14 days for Acquisition of Material Delays, 7 day-s foi- WD�' 14 and 2 days for WD9 16) and the use of S140,520.98 of project allo,,vances, as detailed below: Time Extension Due to Acquisition of Material Delays 1. This change requests a contract time extension of 14 days due to the Contractor's inability to complete the scope of work by the final completion being impacted by a delay in the manufacturing and delivery of critical material necessan- to complete tile prcject� 2. This chanae was not included in the original contract as it was not known when the project was bid of the supply chain issues that would negatively impact tile contractor's ability to meet the project schedul e. If the time extension is not proceeded. the Contractor will not be able to complete tile project on schedule and would be I iable for liquidated damages for no fault of their own. 'WD #8 - 579 109" Sanitary Sewer Lateral 1. To instal I a new sanitary sewer lateral at 579 109'� Avenue N within tile ROW meeting the County's standards. Prior to construction.. the exact location and configuration of the existing sanitary sewer was unable to be determined as tile lateral was buried and under a driveway. During construction it was discovered that the sanitary sewer lateral has 90 bends which horizontally change the direction of the lateral. 3. If this change is not processed. the sanitary sewer lateral would have horizontal bends in it, which increases the potential for grease and debris to pile up in the pipe which can lead to sanitary sewer blockages and added maintenance for the County. Additionally, horizontal bends in sanitary sewer laterals are not permitted per the County�s current LitilitV standards. WD48 will use S7,3 )37.54 fi-om tile project wastewater allowance for 100 Avenue North. This DOES NOT change tile contract time. Revised: 0111412021 (Divisions who may require additional signatures may include an separate sheet.) A�� 09192022 PROCUREMENT USE 014LY Ad.ln I "C' Rpt 8CC ES I T_ LC) P_ I Packet Pg. 801 1 VVD glo _ 1081h Avenue & 8th Street Change VvFM from PVC to DIP 1. To install the new water main (WM) as 8" ductile iron pipe (DIP) over the existing 72" stormwater pipe at 100 Avenue and Wh Street instead of 8" PVC per the contract drawings. 2, During the design of the project, the available data obtained detailed the elevation of the existing 72" RCP. During construction, the Contractor determined the existing 72" RCP elevation was higher than shown on the available data; therefore the new WM would not meet the minimum requirements for separation and cover. 3. Changing the pipe material from PVC to DIP will allow the new WM to be installed over the existing 72" RCP as per the contract documents resulting in less concern of failure/damage to the new WM in the future. If this change is not processed, the 8" PVC WM would not be in compliance with County standards and the main could be damage due to inadequate separation and cover. WD# 10 will use $13,017.00 from the project water allowance for 108"' Avenue North. This DOES NOT change the contract time. WD 413 - 875 10911 Avenue Fire Service Connection I . To connect the fire service at 875 1 091h Avenue as a result of the recent commercial complex construction. 2. After the project was designed and bid, the fire service for the commercial complex at 875 109'h Avenue North was installed, the new fire service was not known during the design of the project. 3. If this change is not processed, the fire service for 875 1 09,h Avenue would not be connected to the new water main, resulting in the loss of fire protection for the commercial complex. WD# 13 will use $3,2 18.00 from the project water allowance for 109" Avenue. This DOES NOT change the contract time. WD #14 — 1081h & 8111 Manhole 1. To connect the new sanitary sewer main on 108'h Avenue to the existing manhole at the intersection of 108'h Avenue and 8"' Street. The existing sanitary sewer main along 8" Street, at 108'h Avenue, is a 14-inch main not 10-inch, therefore the proposed new manhole cannot be used to connect to the existing 14-inch sanitary sewer main as is. 2. During construction it was determined that the existing sanitary sewer main along Vh Street, at 108 1h Avenue is a 14- inch main not I 0-inch and the required fittings to adapt the existing sanitary sewer main to the proposed new manhole is not available. The existing manhole was inspected and determined to be in good condition, 3. If this change is not processed, the project's schedule will be delayed while fittings arc sourced and brought to the project. WD# 14 will use $67,494.95 from the project wastewater allowance for 108'� Avenue North. This increases the aniount of days in the contract by 7 days. NOTE: The contractor is not requesting payment for line items 3.5a - Precast Polymer Concrete Manholes (Remove, Dispose and Replace) and 3.6a — Connect Existing Gravity Sewer to New Polymer Concrete Manhole per the approved schedule of values for the work completed per this work directive as detailed on page 2 of the backup attached. Revised: 0111412021 (Divisions who may require additional signatures may include on separate sheet.) A?W 09192022 PROCUREMENT USE ONLY Admin Bcc Rpt I ecc ES FPacket Pg. 80=2 AND #16 —8" & 109" ForeeNlain Deflection I - To deflect the existing 12" PVC wastewater force main (Fivl) at the intersection of 100 Avenue North and 8,h Street to provide the County's required separation between the existing FNNI and the proposed 8" PVC gravity sewer main, 2. DUI-illg COnStrUCti011 tile C011traCtor discovered that the existing FNI deflects ill the roadway and is in conflict Nvith 0 the proposed 8" PVC gravity sewer main. Available data during design did not depict the defection in the roadway. Z, Z7 - 3. If this chang-le i's not processed, tile required separation between the existing 12" PVC wastewater FM and the proposed 8" PVC gravity sewer main will not rneet the County's reqUirCillent. WD--4 16 will use S49,453.49 fi-otil tile project wastewater allow-ance for 109'4 AvellUe North. This increases the arnotint of days in the contract by 2 days. Revised: 011i4f2021 (Divisions who may requ�re additional signatures may include on separate sheet.) A?0-11 09192022 PROCUREMENT USE ONLY AdMin � OCC I GCC ES Rpt I Packet Pg. 803 1 108" Avenue North Beginning General Allowance $135,160.75 Remaining General Allowance $135,160.75 Beginning Water Allowance $100,000.00 Allowance Draw WD #10 $03.017.00) Remaining Water Allowance $86,983.00 Beginning Wastewater Allowance $200,000.00 Allowance Draw WD # 14 $(67,494.95) Remaining Wastewater Allowance $ 132,505.05 Beginning Stormwater Allowance $141,200.00 Remaining Stormwater Allowance $141,200.00 1091h Avenue North Beginniniz General Allowance $124,148.30 Remaining General Allowance $124,148.30 Beginning Water Allowance $100,000.00 A] lowance Draw WD #13 $Q,2 18.00) Remaining Water Allowance $96,782.00 Beginning Wastewater Allowance $200,000.00 Allowance Draw WD #8 $(7,337.54) Allowance Draw WD # 16 $(49,453.49) Remaining Wastewater Allowance $143,208.97 Beizinning Stormwater Allowance $146,000.00 Remaining Stormwater Allowance $146,000.00 Revised: 01/14/2021 PROCUREMENT USE O"LY Admin OCC I " 8CC ES I T- LC) I- ce) N- (Divisions who may require additional signatures may include on separate sheet.) A?&, 09192022 Packet Pg. 804 Prepared by: ------ Date: 09/16/2022 Diana Dueri, PMP Senior Project Manager. EPMD Acceptance of fts Change Order shall constitute a modification to contract / work order identified above and will be subject to all the same terms and conditions as contained in the contract i work order indicated above. as fully as if the same were stated in this acceptance. The adjustment, if anyz to the Contract shaH constitute a full and final settlement of any and all claims of the Contractor I Vendor I Consultant Design Professional arising - I'M or !��to the change set forth herein. including claims for impact and delay costs. Accepted by: Date: M fins, Iffc. 'j�eI'Lo,4eJf6 06 Accepted lay: Date: 9/22/2'022 00 Justin Frederiksen. P.E. — Q� Grady �.Ionor &Associates, P.A. 0 Approved by: BullertBenjamin Benjamin N. Bullert, P-E . Principal Project Manager. EPMD Date: Mcl-ean!Vlatthew Approved by: Date: 0 Matt McLean, RE.. D�rector EPMD CD Digitally signed by SchneebergerSara Approved by:SchneebemerSara - Date; 2022-1-0,0340-110-25 -04'00' Oate: (Procurement ProfessionaT 2M 04 04 N W 04 CD z 0 a) E U Revised� 0111412021 (Divisions who may require additionai signatures may include on separato Sheet) PROCUREMENT USE ON Admin I= A?a-1 09192022 1 RPI Packet Pg. 805 ATTEST: Crystal K. Kinzel, Clerk of Courts & Comptroller LOIN Dated: (SEAL) Approved as to form and legality: -0 Scott R. Teach Deputy County Attorney BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA By: William L. McDaniel, Jr., Chairman - zo FPacket Pg. 806 Change Order/Amendment Summary COST TIME CO# AMD# Description Justification Additive Deductive Days Added New Amount This CO adds an additional 6 Days; authorizes the use of contract allowance; and adjusts contract quantities for work necessary as a result of WDs 4,6,6,7 & 9. N/A N/A 6 456 Days added for emergency work a tropical storm and modification io existing storm structures, and allowance utilized for tree removal, temporary sidewalk, electrical power service restoration, sanitary sewer lateral conflict avoidance, and existing stormwater structure modifications - This CO adds an 2 2 additional 30 days and corrects date errors NIA NIA 30 486 Days added due to supply chain delays and Covid. made in CO #1 This CO adds an additional 23 Days and authorizes the use of Days added for proposed FIVI 3 3 contract allowance for NIA 23 509 deflection and connection to an work necessary as a existing manhole to remain. result of WDs 8. 10, 13. 14, & 16 ... . ....... .... ... . Revise& 0111412021 (Divisions who may require additional signatures may include on separate sheet.) A?"-, 09192022 PROCUREMENT 9 0 LY Admin 50C I Rpt 1 BOO ris I 06 00 W 0 W ME T- Ul) r- ce) C14 C14 C14 (D C14 Q P Z 0 CV) 0 a) E U EXHIBIT F: CERTFICATE OFSUBSTANTIAL CO LETION OWNER'S Project No. Design Professional's Project No. CCU272 PROJECT: 108th and 109th Avenues Public Utilities Renewal Project CONTRACTOR: Douglas N. Higgins, Inc. Contract For $12,337,900.00 Contract Date February 8, 2021 This Certificate of Substantial Completion applies to all Work Undel- the Contract Documents or to the following specified parts thereof-, To Collier County Board of County Commissioners OWNER And To Collier County Public Utihtits V_ LO Substantial Completion is the state in the progress of the Work when the Work (or designated portion) Is sufficiently complete In accordance with the Contract Documents so that. the Owner can occupy or utilize the Work for its Intended use. The Work to which this Ceilificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR AND DESIGN PROFESSIONAL, and that Work is hereby declared to be substantially complete in accordance with the requirements of the Contract Documents on: !pternber 2, 2022 DATE OF SUBSTANTIAL COMPLETION A tentative list of items to be completed or corrected is attached hereto, This list may not be all-inclusive, and the failure to Include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work In accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR within 30 days of (lie above date Of Substantial Completion. The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities, inSUrance and warranties shall be as follows'. ?a Consliuction Sesvices Agreemeiit: Revised '12-28-20 (vT - I Packet Pg. 808 1 RESPONSIBILITIES: OWNER: CONTRACTOR Complete the project, specifically punch list items and restoration per contract documents The following documents are attached to and made a part of this Certificate: 1). Substantial completion walk through punch lists for 108th and 109th Avenues. T- Ln 1— CV) FM - This certificate does not constitute an acceptance of Work not In accordance with the Contract Documents nor Is it a release of CONTRACTOR'S obligation to complete the Work in accordance with [fie Contract Documents. Executed by Design Professional on September 13, 20 22 Q. Grady Minor & Associates, P.A. I P f , 1 _2 VDe !,n olession8l By: /Ype Name and Title - Justin Frederiksen, PE CONTRACTOR accepts tills Certificate of Substantial Completion on -§ept mber 2 2022 Douglas N. Higgins, Inc. CONTRACT R, By: Type Name and TiRe - Midael Lobello,-Kegional Mgr. OWNER accepts tills Certificate of Substantial Completion on September 13 '2022 Collipr-,County Publijc-Mities By; Type Name and Title - Diana Dueri, PM 27 Construction Seivices Agreement: Revised 1 2-28-20'(VB) (�`, 9 I Packet Pg. 809 0 X CD C? C) G) 6) Ro E. QL E. 2L 2L 2L > w < T. T. Ro 0 W. x I.D IM 0 0 w E; ID M ID a- 2L 0- 0 0 Cr IM 0 I'D w 'a w 2L w FF < w 0 3 00 9L FF 0 91 .0 Attachment: Certificate of Substiantial Completion Higgins 108 and 109 (23751 : Higgins Change Order #3 0 X CD C? 0) W M ID (D ID (D (D aL (D > 12 ID eD < W. w T. r- w < M w 0- W 20 0 M x x I�D 3 0 * 3 I_D < Er 0 0- (D (D 0 < CT 0 x 0 �L < (D CT (D (D 0 0 (D CL 0 (D < 0 0 0 < 0 (D 00 41 (D w In 0 0 0 0 10 10 01 Attachment: Certificate of Substiantial Completion Higgins 108 and 109 (23751 : Higgins Change Order #3 0-S Q & > 0 z 0