Loading...
Agenda 11/08/2022 Item #16A 2 (Final Plat for Caymas Phase One - Construction & Maintenance Agreement)16.A.2 11 /08/2022 EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the amended final plat of Caymas Phase One (Application Number PL20210003290), approval of the standard form Construction and Maintenance Agreement, and approval of the performance security in the total amount of $8,490,381.90. OBJECTIVE: To have the Board of County Commissioners ("Board") approve for recording the amended final plat of Caymas Phase One, a subdivision of lands located in Section 11, Township 50 South, Range 26 East, Collier County, Florida, in accordance with the LDC Section 10.02.04.B.4. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: On December 8, 2020, the Board approved the final subdivision plat (PPLA) for Caymas Phase One, PL20200000171. Subsequently, the developer has revised the overall site plan and is proposing the construction of 272 single-family residential units with associated infrastructure, necessitating this additional approval by the Board. According to Section 10.02.04 B.5.b of the Land Development Code, following approval by the Board of the final subdivision plat, but prior to recordation, the Board may approve amendments to the final subdivision plat. The Development Review Division of the Growth Management Department has completed the review of the construction drawings, specifications, and amended final plat of Caymas Phase One. These documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the San Marino PUD, Ord. 2000-10, as amended. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements associated with this amended final plat, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or designee and the County Attorney's office prior to the recording of the amended final plat. This procedure is in conformance with Section 10.02.04 F.2 of the Land Development Code. The Development Review Division recommends that the amended final plat of Caymas Phase One be approved for recording. FISCAL IMPACT: The project cost associated with this amended final plat is $7,718,529 (estimated) to be borne by the developer. The cost breakdown for the amended final plat is as follows: a) Water & Sewer $3,134,547.60 b) Drainage, Paving, Grading $4,583,981.40 The Security amount, equal to 110% of the project is $8,490,381.90. The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327 -- Land Development Services Revenue generated by this project: Total: $233,540.87 Packet Pg. 406 16.A.2 11 /08/2022 The review fees are based on a construction estimate of $7,718,529 and were paid in January 2022. The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5./ac) $ 1,985.00 b) Construction Drawing Review Fee Water & Sewer (.75% const. est.) $ 23,509.11 c) Drainage, Paving, Grading (.75% const. est.) $ 34,379.86 d) Construction Inspection Fee Water & Sewer (2.25% const. est.) $ 70,527.32 e) Drainage, Paving, Grading (2.25% const. est.) $103,139.58 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation, except when the applicant elects to delay obtaining a COA for non-residential developments that are required to obtain approval of a site development plan prior to the issuance of a building permit. LEGAL CONSIDERATIONS: The applicant is requesting approval of the amended final subdivision plat and construction and maintenance agreement. The Board shall consider the County Manager or designee's recommendation and shall take evidence and testimony in regard to the final subdivision plat requirements identified in LDC sections 10.02.04 B, 10.02.04 C, and other provisions of the LDC, as well as Chapter 177, Florida Statutes. If the Board denies or places conditions on the final subdivision plat, it shall state reasons for such denial or conditions. In accordance with the LDC, the applicant is required to submit the final subdivision plat to the County Manager or designee for recording within 18 months of the date of approval of the final subdivision plat by the Board. However, following approval by the Board, but prior to recordation, the County Manager or designee may approve minor insubstantial changes to the subdivision plat, and the Board may approve any changes that are not minor and insubstantial. This item has been approved as to form and legality, and requires a majority vote for Board approval. --DDP RECOMMENDATION: To endorse staff's recommendation to approve the amended final plat of Caymas Phase One (Application Number PL20210003290) for recording with the following stipulations: 1. Approve the amount of $8,490,381.90 as the performance security for the required improvements associated with this amended plat; or such lesser amount based on work completed, and as is approved by the Growth Management Department. 2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager or designee: a. To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the amended plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney's office and the Board of County Commissioners or the County Manager or designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the Land Development Code. Prepared by: Lucia S. Martin, Associate Project Manager, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Plat Map (PDF) 3.Opinion of Probable Cost (PDF) Packet Pg. 407 16.A.2 11/08/2022 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.2 Doc ID: 23532 Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the amended final plat of Caymas Phase One (Application Number PL20210003290), approval of the standard form Construction and Maintenance Agreement, and approval of the performance security in the total amount of $8,490,381.90. Meeting Date: 11/08/2022 Prepared by: Title: Technician — Growth Management Development Review Name: Lucia Martin 10/04/2022 3:49 PM Submitted by: Title: Environmental Specialist — Growth Management Department Name: Jaime Cook 10/04/2022 3:49 PM Approved By: Review: Growth Management Operations & Regulatory Management Kenneth Kovensky Growth Management Development Review Brett Rosenblum Engineering & Natural Resources Growth Management Department Growth Management Department Growth Management Department County Attorney's Office Growth Management Department Office of Management and Budget County Attorney's Office Office of Management and Budget County Manager's Office Board of County Commissioners Jack McKenna Additional Reviewer Diane Lynch Growth Management Department Jaime Cook Division Director Trinity Scott Transportation Derek D. Perry Level 2 Attorney Review James C French Growth Management Debra Windsor Level 3 OMB Gatekeeper Review Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Laura Zautcke Additional Reviewer Geoffrey Willig Level 4 County Manager Review Geoffrey Willig Meeting Pending Additional Reviewer Completed 10/04/2022 6:11 PM Additional Reviewer Completed 10/07/2022 9:57 AM Completed 10/10/2022 10:36 AM Completed 10/13/2022 4:19 PM Completed 10/14/2022 11:22 AM Skipped 10/06/2022 11:04 AM Completed 10/21/2022 3:09 PM Completed 10/25/2022 9:45 AM Completed 10/25/2022 10:00 AM Completed 10/26/2022 9:14 AM Completed 10/26/2022 2:17 PM Completed 10/27/2022 11:06 AM 11/08/2022 9:00 AM Packet Pg. 408 16.A.2.a CAYMAS PHASE ONE LOCATION MAP Packet Pg. 409 conyaaz- m $on°°a qo ,ae msm n'^ a« aw nov nao- �� macai�a ti $s "q�m$° $ ", $-- "" k" � �n zn _ n "$off i cnO n c ^ q- o ° 7m so ommama 7n n o ampon 3 a"$ i mo .a n n$'n �� $zo$$R ya^$m$$" quo spa IN$ gn n nn2 0 n° AR §a'F° a icn"omm q°<� °� � : � _g _ c� $i^' a nao g c UP H nA Ra " n °.`<a oni aim �'n'z g°a°$��c �' :xo 3$i $ n i Rn R`=N' ina, c a� n m mn3 �'� z' n � m7$a z� �$ fin' H 7° zm � q '� R$ a Via^a �` az " znn Rs : a o$ $ $ mm z� y q g°. m o s g" n ^"�^ mzs �m q$ iargoac mai � ERR i�� n � g; am $' ti xzv o'mm" g q m n Hasp az^ yn 2- 1 m� °sum gga`a� a maz z R q �z 'xq c'�7 cc R'" �� nom2q � g �c mi° $i� c$q g�;w a .nm�'�°,° a $ a� a am zp q m zza z za $q anma m $a g a m n �$zR m�'o^n o' a s "11 I n not 3m A ^ €n qg$ g o�^m'zg �^7 miozoz F,m���i i$$�°n" qoa n �n R^n $T mG z x Rai x n� z :c c 7 �.ns $q = $n° g"'"o $ok $`` " m An �° 2A'O g q _ mo <n.amO=$' n `knc�$ $zz< nao a$ o mn R`gg°o ngngo ,^�" R sm n zA i s R,o q 3 $ "^ as z° nqa$^g a is�^mph qq $' m €i q oN i mm �m o q n� mnosn$c i °oh m ^I A o�nhy^ °� $'''i i;a mgo o mq pto a_ xA ~Al S �si`$$ia '^� m°a emn ^'za $nn` anon mq$m $ m a z Isola, � zA � ;' $��ao $�o �"n e a $` a o$ �N. Kv - on a og `� c c ogoa a�$ gao a n a o n m 'RAU o nam maw z m 4^�Oni °�. mg q.. $ $n'aan'n c" q R g jina u ", mgR' z yo�^a ^an° Awn on inm ^ � o i mia'$ $ esa'za go m m o m ; o'z"^- F m$oyx °qQN,agvuN- 'Noll$�a�g boa H � $ $ � $� � an g g a °coFq g^M $"mg n Rn oo $qog�$$$ chi ga n m ^ o '! g$' 07,gyp No All gxmm z m�gga^" ��m all �" n q; ac aq $ a o xo' vivo' INS; m $= m m a o $gig. � x kgg �N� k q qa �� 2a O z$ a A a ga"R01 to- Anah n4ix�s gm� $$ $ <$gn7mcog o $ooq$ UPS gvI$�$�na �$o An to . 3 $" <`m �? 0 08 WHY a o 811 g an m 2 oA l pll go ? g � j j g 'j g RRII i" Pi g $,am a AI 7; $ 7 iol a 7 a"I a agl 7 `i ropy, m $xl � I a � 8 gg mo �I W " Q R m�I l Di ^? .9" iqa"m� aari �m< A 2' a azi ^zm nr�izn� cmm 60$= a g�xll gl oniga j gIN$ m g j `m gj m a n izDAoon Ramp =$`z' na nR sa_ a a '� Ao�Kz"o 2� m z a now o e onin"s� R'z'ai Rn€i was I a ��<zc�io o� woo �°i^max Aoai n�R � g � � o�omm�`"z om 1 la a o�onti�� xi aia m n 7z o g8it o^ nOON�s a:^ _°I�7'I q na yvo�mo� '^� zq goo omit. �ni qll � I II R K�_D�o� no r� -Syr 2t=A ?n� Via'° �om W` qo� not � a� moz Attachment: Plat Map (23532 : Final Plat - Caymas Phase One) I . g � I UNPLAT]£D gm m Naam I "m�� mawm • 0• ■ e °mnocco'On�mn:nm c�a:°oo� '� � 4"z � momi'�i �"�,cn z`�i 4 z 3g �a n�i Diu 4 ° ° 'zR �A4 1€<;x��R°��RzRa°Rmggz�y��nO°°ar$m� RR s1," °,zo I^mmR:"r`zom^nsYv�m�°ig��^umm�g" Rom�� $ Attachment: Plat Map (23532 : Final Plat - Caymas Phase One) COLLIER SOULEVARD (C.R. 951) w w IV L-7. 41 - - - ------------------------------ - ----- - --------- - -------- - --------------- ---- - - - ------------- - -------------- 1 ­0 1 AZ 9'. "o, SL o" (.N) 9V D, OL st, 69 �6019— N > 6t, ""I Cr(IN) 09 19 12 1 0, 99 M1 - ."1".10, 1, 1 "'g., , Z9 , Cr �1019.10 N M �60,9— N CD C9 179 0,1 9 �60,�" 1 i ",-10 N 99 Z9 01, 60,� 0 N ..10 , 1.11 N 99 g 61 N M �60.9— L9 09 �11,1.10 N 3G 1 01-41 1.1.10 N 11 ----------- -------- ------ 1-7 --- 4 4 MATCHUNE SEE SHEET 8 TRACT 'OS2' (OFLN SPA 0, 371.98' 79' 4 (.-1.11T 10 mM z N, 'N N �4 ZA �i �4 ZA �i �4 ZA �i ZA �4 ZA t7' iNgfNimi N g i- tz M 0 2— � a A A M—� . ... OU 010,1ul 0 .Z I Z9 -1-11-,21,1012120 > 1 2 2- -'2 21 2 -'21 2 2R Attachment: Plat Map (23532: Final Plat - Caymas Phase One) COLLIER BOULEVARD (CR 951) — -- — -- — -- — -- W 1/1 CA YM4S WAY "9" ---------- —'45- E 1032,30' ----------------- ----- ----------------------------------------------- -------------------------------- :j "E 14—, Z 2�IM 12212- 90 I 'm�lo "0 m zg,*aeo N N Zv 6 0, 0� 6Z cr 9z 1911�11 N m iz 91611 (IN) IIN) N el,1.10 N 9z (IN),11111 N M �",�,o x, ,�,.10 N ,0� ell (I N) M,,�, 11,�10 N 9 Z cz 1.11 N LL Z LZ I 1) looll 6� oz N ."".,o N-- N -41'�"l — ----------------- N —9'11- 1 V� J42-9j' N 00*4948' E N —11',1 79 MATCHLINE SEE SHEET 5 m a, mm A OA 0-'11 �,A A '1� �M-11 ----------- i q Z� z z g q zi zl 'Ni i-� Mz z Z Z Mz z N, "o t7' 1� tz M 0 m P, -P� MATCHLINE SEE SHEET 4 07, - -------------------- 7- 77 -(v 47- M, - - - - - - - - - - - - - - - - - - - - - Z q "a --------------- ------------ -------------------------------- (OPEN -9-ACE, D. E., A. E --------------------------- I ---------------- -------------------- ------------------------------------- ---- -------------- --------- IfAC'4' LEN SWE MACT 'R" MACALLEAl STREET 10VU1 ---- Ilt2 -------------------------- -------------- ------ ----------- 4 N 61 — t4 cl, 11 ZLZ 08 ZLZ . ...... . VLZ Q3 a A y Z" z 01-Z Qz Im 69 Qz W-11'14- E k, Im �7' - - - - - - - - 9-i-33;7SIrS 7Nj7H7LrV4 98 'ovul 9 p, >: IOVbL A 'ffi%8 t7' M 0 �jp�jqp�,� I L I PIP 1-11-1� 11-1� 1-11-1� Attachment: Plat Map (23532 Final Plat - Caymas Phase One) ATi W ri 1 OR WOW alloys" Myss to no No — NORNO non up 11 NO mu I V MUNI, I RATRIT I I I low I S" jq Aq "M Aq WHO 111 ivl I 'Al INFO 11 t�� ;I i i 1 pill 1 4 11 IN" Aq 9 4 NON; M f"PIM W 1: 000 t "D Sol -L .97. IOVYI - - - - - - - - - - - - - - - - - - - 2.1�3Ha.:L3% 3�.I-�HO;LVI ............... + 1> N A S� 3,1 :M Ln M , 0- I'll 6-N 5 R ;70 RP 8 kA (71 V4 LD bl. JVV N377VO -- ------ ---- -------- F" 2723.77— NumnA RRIAMI, ZA ZA ZA zi t,+, WMVNqgq��-,�H IqNNVNNH� -�Jpjp X4 p1p �Jpjp N3dO) wyj N KURA,, z p �z >: "o t7' tz M 0 M i I- Attachment: Plat Map (23532 : Final Plat - Caymas Phase One) Ann, AM, AN ,00ll, ---------------- --- - -jL 70' - - - - - - - - - - - - - - - - - - - - R n TRACT -02- (OPEN SPACE —A I- z 1— 71' 21 - ----- - --------- ---- -------------- - -------- - --- N --- - MT43-y L L46 A, I oo A,", TRACT "055' L11 (OPEN SPACE, D.E.) c4vY --- ---- 0041�' 1 211 (N.R) A Lh 212 F, oo,VL �4 -3 N, 213 N 00-4..- 1 Qo - oo 214 Ce.60 N ---- _,C-N 160� I - G, (N.R.) qz ;z j 1 T A 14111' > -A 215 1 01, z z Uz t 141.10' rn 9oz 01, 216 ;Q M a rn m ol—, 1 00-41 1 U) i �Sz 41 m y 917Z : . �, I > m i "o '� � 11 oo— z9 Ij " --i rn C) m rn ",.,o N - ----- lc ocz A ; � z 1 76 ---------- LtIz m A 218 ,1,11.10 N 1 00-41'�, 1 ... .... . 6zz 13,z zt "go szz �7, 6K go, 5 Izz it 'ooll p, N �z >: z rl, m 9zz I . . 5 -- v9z oo of H. LqVyj rn '6 1 - I ----- oo ol;-o GO U) rn 3 0 zqz m o Is m zfea, co 6, O� AA o I P lo N . . . . . . . . . . �1119jp . . . . . . . . . . . -I; �141PRIPIPITIR14 I" I I I I I I ;A ZA !Izzzr R- R- �Ii �14 ZIA �Ii I Mzl� 'I R�A�A,2. ZI m m ZA I Attachment: Plat Map (23532: Final Plat - Caymas Phase One) g H z'� z-1 p u oll m m .14 m -7t7373�77 73r - 3NIIHO-LVVY 'H, lon'l P - 100 ooll �4' LO 9 of z m U) m m Pg A- :10 m m 0 0 1 91 27JJ. JJ' V 20 A f 3.15 __L48Vf 3o 00" OOW 000f, T, 90�" '00 '000, R 'OU zg� N N zj M oll m m N U) Ze,�go 09 m m '010 0 733HS 33S 3NI-IHDIViN 6V -11 R, Z" R, 21 -11 21192� R, 1 21, 2N, �12 I--- I � �11 -IllNi '-Il -11. -11, �'N N, 1,- @1-11 I'll R E R, 2� 'I 411� i . . . . . . g av Nvu 'm R n� i� IPIIPIP� -,I 09 PI I'l I I I I I I "0 t7' V tz a:! 0 M 0 m i ID zg 6 pgim z �- I I I Jovyl �97� Jovvy 09� 6 gt 133HS 33S 1 — — — — — - J�I.IHDIvvq 6 OZL 0z, oo,,�,,q, 148 > 121 z M ------- 147 61 11 V) 122 '47'02 N C =: MI 146 145 1.4 > T- C) - ----- ------------ ----------- ---- --- OLZ2-—j M Qz Z 3E A.. N zt 0 p CD >: 1-59'(PRM - PRY) 1 �41'44' W 272.117' NA � �11 �-11 'I �11 ZIA 'I �11 -11 '1 ZIA �11 �-11 �11 �11 �-11 �11 �11 �11 �11 MWMAWMMMMRAW A z! 6,Rv� S M gt t z z A4 �N, I �11 Mv� �N,11 -,IkNIPk-I2 11 , I'll I P 4 1 1 I'l 1 In I ��I, id k I I 1� I 115 t7' U) tz = 0 M 0 M Attachment: Plat Map (23532 : Final Plat - Caymas Phase One) �5, zm A �o Z, - 6221 _77-2-0 6220' 65 7D' 775--7� 'k —52—�84 -6Y 70—., 17-D— 717 --12,21' —6—O'l L-fZ.2� - —62.20 --- --- 11. 71— 1—o --- --- > Z, M, U) M M N 00-4848- E .'14 27JJ JX MATCHLINE SEE SHEET 12 E 1/1 TRACT �Pl � IMMMHMIT N �7' p nggg, n- g j 2 R R,-, R R 2 6 N, il� 13 R NMI VM . . . . . . . . . . Attachment: Plat Mao (23532 Final Plat - Cavmas Phase One) U) tz = 0 IM 0 M I P', Mor Tf- MATCHLINE SEE SHEET 10 N 00'4848' E W L z M Ln M M �4, > p Z, M (A rq M (A M M IJ6t59' (PRU - PRM) S 0047'44' W 272J. 17' t7' UNPLAMD MM z -g" L qzz 50 §82, Attachment: Plat Map (23532 Final Plat - Caymas Phase One) Cayrnas Phase One (fka San Marino) Wastewater $2,447,584.60 Water $686,963.00 Sub -Total $3,134,547.60 Earthwork $88,652.00 Paving $1,515,696.70 Drainage $1,108,026.50 Offsite Improvements $899,163.00 Code Minimum Landscaping $174,147.50 Miscellaneous Structures $126,210.00 Irrigation $415,585.70 Lighting $256,500.00 Sub-Totaij $4,583,981.40 Totall $7,718,529.00 Notes: 1) This Opinion of Probable Cost (OPQ shall be used for budgeting purposes only. 2) This OPC is based on the engineer's understanding of the current rules, regulations, ordinances, and construction costs in effect on the date of this document. Interpretations of these construction costs may affect this OPC, and may require adjustments to delete, decrease, or increase portions of this OPC. 3) All costs provided in this OPC are based on recent contract prices, or the engineer's latest known unit costs. These costs cannot be guaranteed at this time due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. 4) Does not include permit fees or soft costs. 5) Does not include enhanced landscape or hardscape features. re Text Jacquelyn M. Larocque, P.E. State of Florida Professional Engineer License No. 85247 on 05/19/2022 using a digital signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. Jacquelyn M. Larocclue, P.E. Jacquelyn M Laroccue Date Florida License #85247 COA #8636 I Packet Pg. 422 1 WW-1 Connect to Existing Force Main 1 EA $5,000.00 $5,000.00 WW-2 6" PVC Force Main (C900, DR-18) 747 LF $25.00 $18,675.00 WW-3 6" PVC Force Main (C900, DR-14) 90 LF $28.00 $2,520.00 WW-4 4" PVC Force Main (C900, DR-18) 1,856 LF $20.00 $37,120.00 WW-5 4" PVC Force Main (C900, DR-14) 30 LF $23.00 $690.00 WW-6 6" PVC Force Main Plug Valve 2 EA $1,500.00 $3,000.00 WW-7 4" PVC Force Main Plug Valve 1 EA $1,250.00 $1,250.00 WW-8 Pump Station, Complete 3 EA $400,000.00 $1,200,000.00 WW-9 8" PVC Sanitary Sewer SDR-26 (0-6') 1056 LF $27.35 $28,881.60 WW-10 8" PVC Sanitary Sewer SDR-26 (6-8') 3001 LF $32.00 $96,032.00 WW-11 8" PVC Sanitary Sewer SDR-26 (8-10') 2329 LF $37.00 $86,173.00 WW-12 8" PVC Sanitary Sewer SDR-26 (10-12') 1997 LF $44.00 $87,868.00 WW-13 8" PVC Sanitary Sewer SDR-26 (12-14') 786 LF $49.00 $38,514.00 WW-14 8" PVC Sanitary Sewer SDR-26 (14-16') 474 LF $58.00 $27,492.00 WW-15 8" PVC Sanitary Sewer SDR-26 (16-18') 440 LF $63.00 $27,720.00 WW-16 8" PVC Sanitary Sewer SDR-26 (18-20') 191 LF $69.00 $13,179.00 WW-17 Manhole 4' Diameter with IET Coating (0-6') 4 EA $5,200.00 $20,800.00 WW-18 Manhole 4' Diameter with IET Coating (6-8') 11 EA $6,300.00 $69,300.00 WW-19 Manhole 4' Diameter with IET Coating (8-10') 9 EA $7,300.00 $65,700.00 WW-20 Manhole 4' Diameter with IET Coating (10-12') 9 EA $8,800.00 $79,200.00 WW-21 Manhole 4' Diameter with IET Coating (12-14') 11 EA $9,900.00 $108,900.00 WW-22 Manhole 4' Diameter with IET Coating (14-16') 4 EA $11,200.00 $44,800.00 WW-23 Manhole 4' Diameter with IET Coating (16-18') 2 EA $14,000.00 $28,000.00 WW-24 Manhole 4' Diameter with IET Coating (18-20') 3 EA $17,000.00 $51,000.00 WW-25 6" Single PVC Sewer Service w/ Cleanout 40 EA $900.00 $36,000.00 WW-26 6" Double PVC Sewer Service w/ Cleanout 117 EA $1,200.00 $140,400.00 WW-27 Television Inspection 10,274 LF $5.00 $51,370.00 WW-28 Directional Drill 300 LF $260.00 $78,000.00 SUBTOTAL= $2,447,584.60 I Packet Pg. 423 1 Item # I Description W-1 Connect to Existing 12" Water Main W-2 1" Single Water Service, Complete W-3 1.5" Double Water Service, Complete W-4 6" PVC Water Main (C900, DR 18) W-5 8" PVC Water Main (C900, DR 18) W-6 8" PVC Water Main (C900, DR 14) W-7 10" PVC Water Main (C900, DR 18) W-8 10" PVC Water Main (C900, DR 14) W-9 12" PVC Water Main (C900, DR 18) W-10 6" Gate Valve W-11 8" Gate Valve W-12 10" Gate Valve W-13 12" Gate Valve W-14 Fire Hydrant, Complete W-15 Temporary Blow Off with Automatic Flushing Device W-16 Temporary Bacterial Sample Point Estimated I Unit I Unit Price I Amount I EA $2,500.00 $2,500.00 62 EA $950.00 $58,900.00 106 EA $1,000.00 $106,000.00 838 LF $20.00 $16,766.00 9,173 LF $28.00 $256,844.00 273 LF $30.00 $8,190.00 1,707 LF $35.00 $59,745.00 36 LF $37.00 $1,332.00 58 LF $42.00 $2,436.00 2 EA $1,500.00 $3,000.00 10 EA $2,000.00 $20,000.00 2 EA $2,500.00 $5,000.00 1 EA $3,000.00 $3,000.00 29 EA $4,300.00 $124,700.00 5 EA $3,500.00 $17,500.00 A $350.00 $1,050.00 SUBTOTAL= $686,963.00 a. E L) a. 'Fa S U- 04 M LO CO) 0 U 0 a. 4- 0 a 0 0 E I Packet Pg. 424 1 I EARTHWORK Item # Description Estimated Unit Unit Price Amount I I Quantity I I I I EW-1 Sod (1' Behind Curb) 250 SY $2.20 $550.00 EW-2 Sod (20 FT Lake Maintenance Easement) 30,368 SY $2.00 $60,736.00 EW-3 Sod (Swales) 5,537 SY $2.00 $11,074.00 EW-4 2' Silt Fence (Single Row) 9,052 LF $1.00 $9,052.00 EW-5 2'Silt Fence (Double Row) 3,620 LF $2.00 $7,240.00 SUBTOTAL= $88,652.00 0 W a. E a. 'Fa S u- 04 M UI) CO) 0 U 0 a. 4- 0 0 E Packet Pg. 425 PAVING tem # Description Estimated Unit Unit Price Amount I I Quantity I I I P-1 3/4" Asphaltic Concrete (Type S-111) First Lift 27,481 SY $6.50 $178,626.50 P-2 3/4" Asphaltic Concrete (Type S-111) Second Lift 27,481 SY $6.50 $178,626.50 P-3 6" Limerock Base (Compacted and Primed) 27,481 SY $8.50 $233,588.50 P-4 12" Stabilized Subgrade (Onsite Material) 30,143 SY $5.00 $150,715.00 P-5 Valley Gutter 21,544 LF $13.00 $280,072.00 P-6 Type "A" Curb & Gutter 339 LF $15.00 $5,085.00 P-7 Type "F" Curb & Gutter 1,910 LF $17.00 $32,463.20 P-8 4" Concrete Sidewalk (Reinforced) 13,060 SY $32.00 $417,920.00 P-9 Signing and Marking 1 LS $15,000.00 $15,000.00 P-10 ADA Warning Pads 16 EA $850.00 $13,600.00 P-11 Temporary Turn around 2 EA $5,000.00 $10,000.00 SUBTOTAL = $1,515,696.70 0 (L E L) a. 'Fa S U- C14 M LO CO) 0 U 0 a. 4- 0 0 E I Packet Pg. 426 1 D-1 12" HDPE 4,090 LF D-2 15" RCP 1,195 LF D-3 18" RCP 883 LF D-4 24" RCP 3,068 LF D-5 30" RCP 1,498 LF D-6 36" RCP 2,727 LF D-7 15" Flared End 1 EA D-8 24" Flared End 11 EA D-9 30" Flared End 7 EA D-10 36" Flared End 12 EA D-11 Type 9 Inlet 4 A D-12 Valley Gutter Inlet 42 EA D-13 Grate Inlet 17 EA D-14 Yard Drain 28 EA D-15 Junction Box 7 EA D-16 Control Structure I EA D-17 Inlet Protection 63 EA $20.00 $81,808.00 $35.00 $41,821.50 $40.00 $35,336.00 $45.00 $138,051.00 $55.00 $82,379.00 $110.00 $299,981.00 $2,100.00 $2,100.00 $2,500.00 $27,500.00 $3,250.00 $22,750.00 $3,700.00 $44,400.00 $4,800.00 $19,200.00 $3,300.00 $138,600.00 $3,000.00 $51,000.00 $1,000.00 $28,000.00 $3,300.00 $23,100.00 $9,000.00 $9,000.00 $1,000.00 $63,000.00 SUBTOTAL = $1,108,026.50 I Packet Pg. 427 1 OS-1 24'Con-Span Bridge with wingwalls 1 LS OS-2 3/4" Asphaltic Concrete (Type S-111) First Lift 651 SY OS-3 3/4" Asphaltic Concrete (Type S-111) First Lift 651 SY OS-4 Type "I"' Curb 500 LF OS-5 Right Turn lane 1 LS OS-6 Left Turn Lane I LS OS-7 M. 0. T. 1 LS OS-8 Signage and Striping 1 LS OS-9 Guardrail 302 LF $750,000.00 $750,000.00 $6.50 $4,231.50 $6.50 $4,231.50 $11.00 $5,500.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $10,000.00 $10,000.00 $15,000.00 $15,000.00 $100.00 $30,200.00 SUB -TOTAL = $899,163.00 Packet Pg. 428 L-1 L-2 Code Minimum Landscaping 1 LS $150,000.00 $150,000.00 Littoral Shelf 96,590 SF $0.25 $24,147.50 SUBTOTAL= $174,147.50 I Packet Pg. 429 MISCELANEOUS STRUCTURES Description Estimated Unit Unit Price Amount I Quantity I I I 8' Perimeter Chain link fence 4,207 LF $30.00 $126,210.00 SUBTOTAL= $126,210.00 Packet Pg. 430 1-1 Irrigation Pump Station (Complete) I EA 1-2 4" PVC Irr. Main (C900, DR18) 10,158 LIF 1-3 4" PVC Irr. Main (C900, DR 14) 260 LIF 1-4 6" PVC Irr. Main (C900, DR18) 860 LF 1-5 8" PVC Irr. Main (C900, DR 18) 321 LIF 1-6 8" PVC Irr. Main (C900, DR 14) 30 LF 1-7 10" PVC Irr. Main (C900, DR18) 270 LIF 1-8 4" Gate Valve 3 EA 1-9 6" Gate Valve 1 EA 1-10 8" Gate Valve I EA 1-11 10" Gate Valve 1 EA 1-12 Single Irrigation Service, Complete 62 EA 1-13 Double Irrigation Service, Complete 107 EA 1-14 Permanent Blow off 2 EA 1-15 Temporary Blow off 3 EA $60,000.00 $60,000.00 $18.00 $182,836.80 $21.00 $5,457.90 $20.00 $17,200.00 $25.00 $8,025.00 $30.00 $900.00 $30.00 $8,091.00 $800.00 $2,400.00 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $1,750.00 $1,750.00 $550.00 $34,100.00 $800.00 $85,600.00 $1,000.00 $2,000.00 $1,575.00 $4,725.00 SUBTOTAL= $415,585.70 I Packet Pg. 431 1 L-1 Light Fixtures 57 EA $4,500.00 $256,500.00 SUBTOTAL= $256,500.00 0 a. E L) a. 'ro S U- CM m Lo CO) 0 U 0 a. 4- 0 a 0 E Packet Pg. 432 Residential only: $1,000.00 Plus $5.00 per acre (round up to the next acreage) Number of Acres = 197 $ 1,985.00 Non -Residential only: $1,000.00 Plus $10.00 per acre (round up to the next acreage) Number of Acres 0.0 N/A $50 Fire review $ 50.00 COA application fee $200 + $25 per D.U. or per 1,000 sq. ft. commercial ($5,000 max.) Dwelling Units= 272 $ 5,000.00 $2,500 Environmental Impact Statement review N/A $1,000 Listed Species Survey (when EIS is not required) N/A $250 Site Clearing fee (first acre or fraction of an acre, round acres up to next whole acre) $250 for the first Acre plus $50 for each additional acre or fraction of an acre :($3,000 maximum) # of acres Total Acres to be Cleared = 0.0 N/A Utility Modeling and Analysis fee $1,000 (only applies if zoned PUD or DRI) N/A Utility Plan Review & Inspection Fees Water + Wastewater Cost Estimate = $3,134,547.60 Utilities document review — 0.75% of probable water/sewer construction costs 0.75% x Cost Estimate = $23,509.11 $23,509.11 Utilities Inspection Fee —2.25% of probable water/sewer construction costs 100% of Construction Inspections fees to be paid prior to Pre -Construction meeting 2.25% x Cost Estimate = $70,527.32 Paving, Grading, Landscape, Lighting, & Drainage Review & Inspection Fees: Cost Estimate = $4,583,981.40 Construction document review — 0.75% of probable roadway, paving & drainage construction costs 0.75% x Cost Estimate = $34,379.86 $34,379.86 Construction inspection — 2.25% of probable roadway, paving & drainage construction costs 100% of Construction Inspections fees to be paid prior to Pre -Construction meeting 2.25% x Cost Estimate = $103,139.58 Previously Paid Construction Inspection Fees Under PIL 20150001759 = $70,439.68 Difference of construction review fees due prior to Pre -Construction meeting $28,547.15 + $61,908.10 - $70,439.68 = $103,227.22 Excavation Review Fees Application Fee (Private Development)=$400 N/A $200 first 5000 c.y.; $10 per additionaI1000 CY;maximum of $20,000.00 Cubic Yardage N/A Credit for fee paid at pre -application meeting, if submitted within 9 months of pre-app. $ - SUB -TOTAL: $ 64,923.97 PRE-APP CREDIT: $ - TOTAL: $ 64,923.97 I Packet Pg. 433 1