Loading...
Backup Documents 10/25/2022 Item #16C1 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office �K(// �K 1 ZS Zz 4. BCC Office Board of County Commissioners L'A jy/i/5/ /I/3/Z 2 , 5. Minutes and Records Clerk of Courts Office t'/V;n nF �9 PRIMARY CONTACT INFORMATION 7 1 Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Phone Number ( Contact/ Department HARRY RAFT°POUL4 S I P U C.39)B S-ZI 37 Agenda Date Item was 101251 2 O ZZ Agenda Item Number ` C . t Approved by the BCC Type of Document �,, Number of Original IIW Attached 0 a k- 0 21)C Documents Attached PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? AVA 2. Does the document need to be sent to another agency for additional signatures? If yes, N 1� provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. N /� Some documents are time sensitive and require forwarding to Tallahassee within a certain I time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on and all changes made during N/A is not the meeting have been incorporated in the attached document. The County an option for Attorney's Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the an option for Chairman's signature. this line. p1Ms6 R&wait-) f ,U 1) 7 ) Zq,m;ra ..b e:2-k)r-o cw l exco-t,n i Ft,,s. WORK ORDER/PURCHASE ORDER Contract#20-7800"Underground Contractor Services" Contract Expiration Date: June 21, 2026 This Work Order is for professional underground utility services for work known as: Project Name: Pump Station 109.05—Wastewater Pump Station Repair and Renovations. Project No: 70240.4.1 The work is specified in the proposal dated June 17, 2022 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, this Work Order/Purchase Order is assigned to: Quality Enterprises USA, Inc. Scope of Work: As detailed in the attached proposal and the following: * Task No.1. —Repair and Renovate PS 109.05 (Per Sections #1 And #2 of the Request for Quotes Issued May 24, 2022). * Task No. 2.—Owner Allowance Schedule of Work: Complete work within 210 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement#20-7800-UC14-6213 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above, the County will compensate the Firm in accordance with following method(s): ®Negotiated Lump Sum (NLS) ['Lump Sum Plus Reimbursable Costs (LS+RC) Time & Material (T&M) (established hourly rate— Schedule A) _ Cost Plus Fixed Fee (CPFF), (define which method will be used for which tasks) as provided in the attached proposal. Task No. 1. $ 794,101.78 (NLS) Task No. 2. $ 75,000.00 (T&M) TOTAL FEE (Not to Exceed) $ 869,101.78 Prepared by H. Raftopoulos, PM DeltoroZamira Digitally signed by DeltoroZamira Date:2022.08.10 10:00:21 -04'00' APPROVED BY: Zamira Deltoro, Project Manager Date Page 1 of 3 Oaftelly signed by McLeanMetthew tlN:E=Metthew.McLean®colllercounlyfl.gov, CN=McLeanMetthew,OU=General,OU=PPM User M cLea n M atth ew Accourtb�°U=PU°Planning and Prged Management,OU=PUD,OU=Divisions,DC=bob, DC=colllergov,DC=net APPROVED BY: Date:2o2zoe.,o,4:g3:,a-0 Matthew McLean, EPM Division Director Date Digitally signed by VonHolleRobert VO n H O I I e RO EJ E rt Date:Dig 2022.08.17 09:40:59-04'00' APPROVED BY: Robert VonHolle, Wastewater Division Director Date s Digitally igned by CurryAmia CurryAmia Date: signed 8.17 14:02:47-04'00' APPROVED BY: ---- Amia Curry, Operation Support Director Date ign YilmazGeorge YilmazGeorge Date:Digitally 202s2.08.22edby15:01:01-04'00' APPROVED BY: Dr. George Yilmaz, Department Head Date By the signature below, the Firm,(including employees, officers and/or agents) certifies, and hereby discloses, that, to the best of their knowledge and belief, all relevant facts concerning past,present, or currently planned interest or activity(financial, contractual,organizational, or otherwise)which relates to the proposed work; and bear on whether the Finn has a potential conflict have been fully disclosed. Additionally,the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Quality Enterprises USA,Inc. - -Z1. Louis J. Gaudio,Vice President, QE USA, Inc- Date (Remainder of page intentionally left blank) KOV 08102022 Page 2 of 3 CAD) • IN WITNESS WHEREOF, the parties hereto, have each, respectively,by an authorized person or agent, have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS Crystal.;K. Kinzel, Clerk of Courts COLLIER CO ► f • .A C?) 41. ' ..qs-.. AP-, By: I.4By: .a_ tti 1 22 . Willi L. McDaniel, Jr., Chairman Dated:" • i 1 :'`; = el 4/O�' (SF )1:Attest as to Chairman's signature only. ' Quality Enterprises USA,Inc. --) �"� By: First tness Signa re ` /ram • Inn tk.' V C TType/print signature and titleT TTTint witness meT Y Sec---- -:.#Z ond Witness U Veal, TType/print witness nameT A ved as t rm yid Legality: 4 .4',....._. ______ Aoeietant ounty Attorney pSe_it Q c Print Name Page 3 of 3 i Col ler County Public Utilities Department Engineering & Project Management Division Date: May 24, 2022 From: Harry Raftopoulos Project Manager 239-315-2137 Haralambos.Raftopoulos@colliercount f�l.,gov_ To: Potential Quoters Subject: Request for Quotes.for Multiple Projects under Contract#20-7800 "Underground Contractor Services" Project: Pump Station 109.05 Repair and Renovations RFQ Due Date: Tuesday June 14,2022, at 3:00 PM Pre-Quote Meeting (Non-Mandatoy): Wednesday June 8,2022, at 10:00 AM at project site Q&A Deadline: Wednesday, June 8, 2022, at 3:00 PM Number of Days to Final Completion: Substantial Completion: 150 Days from NTP Final Completion: 180 Days from NTP Documents Provided: 1. RFQ Cover Letter 2. Construction Plans 3. Bid Schedule (PDF and Excel Format) 4. Project Manual (See all Sections) Liquidated Damages: $1,690.00 per day Payment and Performance Bonds: Required if quote exceeds $200,000 Your quotation response for this project is due electronically to the Email address listed above no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date.We look forward to your participation in this request for information/quotation process. Please return the following documents with your quote: • This RFQ Letter signed by an officer of the Firm. • Bid Schedule Form with quote costs. • Any and all Bid Addendums signed by an officer of the Firm. Quality Enterprises USA, Inc. Firm's Complete Legal Name 239-435-7200 / 239-435-7202 Telep_lone--u umber Signature Vice President Title Louis J. Gaudio 6/14/22 • Print Name Date 01144, opN4 Public Utilities Engineering&Project Management Division•3339 Tamiami Trail East,Suite 303.Naples,Florida 34112-5361 .239-252-4285•FAX 239-252-5378 r Col lei County Public Utilities Department Engineering & Project Management Division BID ADDENDUM #1 for PUMP STATION 109.05 WASTEWATER REPAIR AND RENOVATION Contract No. 20-7800 ISSUE DATE: Wednesday, June 8, 2022 The following, changes, additions, deletions and/or clarifications are made to the Contract Documents and Specifications for the above referenced project: a -r 1. The RFQ due date remains to be Tuesday June 14, 2022(a.3:00 PM. 2, The Q&A deadline remains to be Wednesday June 8,2022 (c,3:00 PM. REVisED DQG,U. 1. Plan Sheet 05 on the Construction Plans was revised to remove any reference to work being performed in the center median of Pelican Bay Boulevard. LARIFICATIONS ,t , 1. Refer to Plan Sheet 05, Bypass Pumping Notes: Note 4 for approximate capacity of bypass pumping system. 2. It was asked whether there is a 2" invert(NW) in the master manhole. Response: See attached internal picture of the master manhole. Please ac Qwledge receipt of this Addendum and Include with your bid. �as� 6/8/22 (Signature)Louis J. Gaudio, Vice President (Date) Quality Enterprises USA, Inc.' (Name of Firm) 01,1.44,� 0. a>4'oti Public Utilities Engineering&Project Management Division'3339 Tamiami Trail East,Suite 303.Naples,Florida 34112-5361 .239-252-4285•FAX 239-252-5378 6/17/2022 SECTION 1:GENERAL CLASS i DESCRIPTION BEST.'WANT. UNIT UNIT PRICE EXTENDED PRICE 1 Mobilization/Demobilization(Maximum of 10%of Construction Total) 1 LS $ 79,000.00 $ 79,000.00 _ 2 Pre-Construction AudloNideo Recording 1 LS $ 1,400.00 $ 1,400.00 3 Survey Layout and As-Built Drawings 1 LS $ 10,092.00 $ 10,092.00 IN 4 Establish&Maintain Bypass Pumping System 1 LS $ 19,486.80 $ 19,486.80 6 Furnish and Install Construction Project Sign 1 LS $ 2,252.26 $ 2,252.26 - 6 Maintenance of Pedestrian and Vehicular Traffic 1 LS $ 5,081.70 $ 5,081.70 SECTION I SUBTOTAL: $ 117,312.78 8, RVII P.STq. '. W.NY. , ► 4114ER M'' Man: i "ntia.. J ITEM CLASS NO. DESCRIPTION _ EST.QUANT. UNIT UNIT PRICE : EXTENDED PRICE Demolish,Remove,and Dispose of Concrete Ud and Hatches,Concrete Support Pad,Hooks, 7 Rails,Riser Pipes,Valve Vault,Discharge Piping and Valves,and other Misc.Wet&Dry Well 1 LS $ 11,672.80 $ 11,572.80 Components 8 Abandon,Demolish,Remove,and Dispose Odor Control Unit and Associated Plumbing and 1 LS $ 16,172.80 $ 16,172.80 Electrical Components and Panels 9 Abandon,Remove,and Dispose of Pump Control Panel,Service Meter,Telemetry Antenna, 1 LS $ 17,786.40 $ 17,786.40 Equipment Racks and other Misc.Panels,Boxes,end Electrical Components E° 10 Abandon,Remove,and Dispose 12 LF of 12"DIP Force Main(Station Site) 1 LS $ 6,786.40 $ 5,786,40 E 11 Demolish,Remove,and Dispose Existing Master Manhole Rim,Frame,and Cover 1 LS $ 1,160.88 $ 1,180.86 12 Demolish,Remove,and Dispose Portion of Existing Asphalt Concrete Sidewalk 1 LS $ 1,446.61 $ 1,448.81 13 Clear,Grub,Remove,and Dispose of Existing Trees(4"-8"Trunk Diameter) 5 ii EA $ 145.88 $ 728.40 14 Clear,Grub,Remove,and Dispose of Existing Trees(12"-18"Trunk Diameter) 2 EA $ 674.20 $ 1,148.40 16 Clear,Grub,Remove,and Dispose of Existing Trees(24"-36"Trunk Diameter)_ 2 EA $ 844.20 $ 1,688.40 18 Clear,Grub,Remove,and Dispose of Hodges,Shrubs,and Misc.Vegetation within Pump 1 LS $ 1,020.00 $ 1,020.00 Station Easement 17 Clear,Grub,Remove,and Dispose of Hedges,Shrubs,and Misc.Vegetation within ROW 1 LS $ 1,668.40 $ 1,668.40 18 Furnish and Install Three(3)FLYGT NP3102 Adaptive 464-Impeller 5-HP,230V,3-Phase, 1 LS $ 119,230.89 $ 119,230.69 Submersible Pumps and Associated Hardware and Accessories Furnish and Install Evoqua CAP 30 Odor Control Unit,230V,3-Phase,end all associated€ 19 Plumbing and Electrical Components,with 8'x5'Concrete Pad 1 LS $ 122,017.98 $ 122,017.98 n 20 Furnish and Install Pump Control Panel,Equipment Rack and Posts 1 LS $ 66,189.22 $ 66,189.22 .6 5 21 Furnish end Install Automatic Transfer Switch(120/240 VAC 3-Phase 226 Amp),Panel Board, 1 LS $ 83,818,69 $ 83,818.69 Generator Receptacle,Main Disconnect,Utility Meter,Equipment Rack and Post 22 Furnish and Install Telemetry Antenna with Structural Engineer Certification 1 LS $ 7,737.38 $ 7,737.38 Furnish and install 8"Discharge Piping and Valves with H-Tech ARV end 4" Combination 1 LS $ 73,188.28 $ 73,188.26 L.• Suction&Vent Piping and Above Ground 4"Discharge Connection and 4"Plug Valve 5 24 Furnish and Install 16 LF 8"PVC DR14 Force-Main 1 LS $ 12,369,73 $ 12,369.73 25 Connect to Existing 12"DIP Force Main 1 LS $ 6,168.74 $ 6,158.74 26 Furnish and Install 8"Thick Concrete Wet Well Lld end Access Hatches 1 LS $ 8,741.70 $ 8,741.70 S 27 Furnish and Install 1'-1"Wet Well Riser Section 1 _ LS $ 4,889.70 $ 4,889,70 S 28 Furnish and Install Master Manhole Riser Ring(ss),Frame,and Cover 1 LS $ 6,173.70 $ 6,173.70 29 Furnish and Install Protective Liner on Interior Surface of Wet Well and Level Wet Well Floor 1 LS $ 16,000.00 $ 15,000.00 30 Furnish and Install Protective Liner on Interior Surface of Master Manhole 1 LS $ 6,600,00 $ 6,600.00 31 Furnish and Install 110 SY<1"Diameter Stone Ground Surface 4"Thick with Filter Fabric 1 LS $ 13,498.80 $ 13,498.80 32 Furnish and Install Vehicle Guard Post 8 EA $ 1,786.80 $ 14,294.40 0 33 Furnish and Install 8"Thick 12'Wide Concrete Access Driveway(Up to the Fence/Gate) 1 LS $ 8,595.48 $ 8,696,48_ v 34 Furnish and Install 6"Thick Concrete Site Pad(Inside Fence) 1 LS $ 16,263.72 $ 16,263.72 LA 35 Furnish and Install 195 LF of 6'Tall Black Vinyl Coated Chain Link Fence with Black Slats and 1 LS $ 30,600.00 $ 30,600.00 18'Wide Cantilever Slide Gate 36 Furnish end Install 216 LF of Temporary Silt Fence 1 LS $ 1,715.54 $ 1,716.54_ 37 Furnish and Install 3/4"Water Meter and Backflow 1 LS $ 10,647.84 $ 10,647.84 ' ' SECTION 2 SUBTOTAL: $ 676,789.02 SECTION3 ALLOWANCES',`• - ' CLASS ITEM NO, DESCRIPTION UNIT UNIT PRICE' EXTENDED PRICE Allowance 38 Owner Directed Work Allowance:FPL Electrical Services T&M $ 5,000.00 $ 5,000.00 39 Owner Directed Work Allowance:Unforeseen Conditions T&M $ 70,000.00 $ 70,000.00 ,._..;.SECTION 3:SUBTOTAL: $ 75,000.00 COST',§U.MNARY, SECTION 1 GENERAL SUBTOTAL: $ 117,312,76 SECTION 2 PUMP STATION IMPROVEMENTS SUBTOTAL: $ 676,789.02 SECTION 3 ALLOWANCE SUBTOTAL: $ 75,000.00 CONSTRUCTION TOTAL: $ 869,101.78 s.'*"