Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Agenda 09/13/2022 Item #16A38 (FY22 FTA Program of Projects)
09/13/2022 EXECUTIVE SUMMARY Recommendation to approve the FY22 Program of Projects and authorize submittal of the Federal Transit Administration 49 U.S.C. 5307/ 5339 FY22 grant application to support the transit system capital and operating costs in the amount of $4,805,353 through the Transit Award Management System, accept the award, and authorize any necessary budget amendments. OBJECTIVE: To obtain grant funds for the operations and management of the Collier Area Transit (CAT) System including capital projects. CONSIDERATIONS: Each year the Public Transit & Neighborhood Enhancement (PTNE) Division receives federal grant funds for the management of the CAT system under Urbanized Area Formula Grant Programs (49 U.S.C. 5307/5339) to be used predominately for transit capital projects as defined by the Federal Transit Administration (FTA). FTA published the annual apportionment formula on April 6th, 2022. Collier County is located within the Bonita Springs/Naples Census Urbanized Area; therefore, a portion of the 5307 funding is shared with Lee County. The amount of 5307 funds allocated to the Bonita Springs/Naples Urbanized Area is $4,305,952. The 5307 apportionment designated for CAT is $3,864,850 and $441,102 for Lee County Transit. The 5339 apportionment is $352,333 and is not shared with Lee County. Staff prepared the proposed Program of Projects based on Collier’s total allocation for 5307 and 5339 funding $4,217,183. The Program of Projects has gone through the Public Involvement Process, which concluded on August 4th, 2022. Proposed projects include: 1. Transit enhancement projects which include the rehabilitation of bus stops 2. Safety and security enhancement that include the replacement of vehicular and pedestrian gates 3. Provision of Americans with Disabilities Act (ADA) paratransit services 4. Electrification/Zero-Emissions Transition Plan, a requirement of the Bipartisan infrastructure Law to be eligible for competitive grants under the Buses and Bus Facilities Competitive Program (49 U.S.C. § 5339(b)) and the Low or No Emission Program (49 U.S.C. § 5339(c)) 5. Preventative Maintenance of Rolling Stock 6. Construction funding for the replacement of CAT’s Operations and Maintenance facility * Specific project information will be presented to the Board for direction at a future meeting. 7. Operating Assistance which requires fifty percent (50%) local match 5307/5339 FY22 Program of Projects Item Description Amount Enhancements (Minimum 1%) Bus Shelter Rehab $38,649 Safety and Security (Minimum 1%) Replacement of vehicular and pedestrian gates $38,649 ADA (Maximum 20%) ADA Paratransit Services $772,970 Planning Study Electrification/Zero-Emissions Transition Plan $60,000 Preventative Maintenance Preventative Maintenance of Rolling Stock $942,600 Construction Operations & Maintenance Facility Construction* 1,776,115 Operating Assistance Operational Expenses $588,200 Total Federal Award 4,217,183 A grant application must be entered into the Transit Award Management System (TrAMS) to utilize these 16.A.38 Packet Pg. 1287 09/13/2022 funds. The application has been prepared and attached for the Board of County Commissioners' (Board) consideration. The grant requires a twenty percent (20%) match. Collier County has requested approval from the Florida Department of Transportation (FDOT) for the use of $907,246 transportation development credits as a soft match for the grant. In addition, the grant requires a fifty percent (50%) match for FTA defined operating assistance. After review and approval by FTA, the grant award is electronically executed in TrAMS by the Transportation Management Services Department Head, who serves as the Board-appointed designee. The electronic system is also used to manage the award and submit all required reports. As noted in the attachment, staff is requesting pre-award authority from the Board to create the required budget appropriations for the new fiscal year as it is essential for funds to be budgeted in time for the beginning of FY23. FISCAL IMPACT: A budget amendment is required in FY22 to recognize grant revenue within CAT Grant Fund (424) in the amount of $3,864,850 for Project 33833 (Section 5307) and $352,333 (Section 5339) for Project 33832. Collier County has requested approval from FDOT for the use of Transportation Development Credits in the amount of $907,246 as a soft match for the twenty percent (20%) capital match requirement. A cash match of fifty percent (50%) is required for the operating assistance portion of the award and is available within CAT Match Fund (425) Reserves in FY23 supported by an annual transfer of General Fund (001) Revenue. A Budget Amendment in FY23 is required within CAT Match Fund (425), Project 33833 in the amount of $588,200. GROWTH MANAGEMENT IMPACT: Transit capital and operations support goals and objectives of the Transportation Element of the Growth Management Plan. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to form and legality and requires majority vote for approval. -JAK RECOMMENDATION: To approve the FY22 Program of Projects and authorize submittal of the Federal Transit Administration 49 U.S.C. 5307/5339 FY22 for funds to support the transit system capital and operating costs in the amount of $4,805,353 through the Transit Award Management System, accept the award, and authorize any necessary Budget Amendments. Prepared By: Omar De Leon, Transit Manager, PTNE ATTACHMENT(S) 1. View Print Application - 1032-2022-3 (Final Draft) (PDF) 2. FFY 2022 FTA Section 5307 Large Urban Split Letter (PDF) 3. 1032-2022-3 5307 TDC_signed packet (PDF) 16.A.38 Packet Pg. 1288 09/13/2022 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.38 Doc ID: 23122 Item Summary: Recommendation to approve the FY22 Program of Projects and authorize submittal of the Federal Transit Administration 49 U.S.C. 5307/ 5339 FY22 for funds to support the transit system capital and operating costs in the amount of $4,805,353 through the Transit Award Management System, accept the award, and authorize any necessary budget amendments. Meeting Date: 09/13/2022 Prepared by: Title: Planner, Senior – Public Transit & Neighborhood Enhancement Name: Omar Deleon 08/19/2022 11:15 AM Submitted by: Title: Division Director - Pub Tran & Nbrhd Enh – Public Transit & Neighborhood Enhancement Name: Michelle Arnold 08/19/2022 11:15 AM Approved By: Review: Public Transit & Neighborhood Enhancement Michelle Arnold Director Review Completed 08/19/2022 12:02 PM Public Transit & Neighborhood Enhancement Caroline Soto Additional Reviewer Completed 08/19/2022 1:38 PM Growth Management Department Ellen Sheffey Growth Management Department Completed 08/22/2022 2:20 PM Growth Management Operations Support Michelle DAndrea Additional Reviewer Completed 08/25/2022 1:42 PM Growth Management Operations Support Tara Castillo Additional Reviewer Completed 08/25/2022 4:36 PM Growth Management Operations Support Nicole Diaz Additional Reviewer Completed 08/25/2022 5:47 PM Growth Management Department Trinity Scott Transportation Completed 09/02/2022 4:22 PM Grants Erica Robinson Level 2 Grants Review Completed 09/06/2022 7:53 AM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 09/06/2022 8:57 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 09/06/2022 9:43 AM County Manager's Office Ed Finn Additional Reviewer Completed 09/06/2022 8:29 PM Grants Therese Stanley Additional Reviewer Completed 09/07/2022 11:53 AM Office of Management and Budget Christopher Johnson Additional Reviewer Completed 09/07/2022 1:18 PM County Manager's Office Amy Patterson Level 4 County Manager Review Completed 09/07/2022 3:14 PM Board of County Commissioners Geoffrey Willig Meeting Pending 09/13/2022 9:00 AM 16.A.38 Packet Pg. 1289 DOT FTA U.S. Department of Transportation Federal Transit Administration Application Federal Award Identification Number (FAIN) 1032-2022-3 Temporary Application Number 1032-2022-3 Application Name FY22 5307 and 5339 Funds; Super Grant; Capital, ADA, Operating; Collier & Lee County , Bonita Springs/Naples UZA, FL Application Status In-Progress Application Budget Number 0 Period of Performance Start Date N/A Original Period of Performance End Date 3/31/2027 Current Period of Performance End Date N/A Revision #: N/A Part 1: Recipient Information Name: COLLIER, COUNTY OF Recipient ID Recipient OST Type Recipient Alias UEI DUNS 1032 County Agency COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS JWKJKYRPLLU6 076997790 Location Type Address City State Zip Headquarters 3299 TAMIAMI TRL E STE 700 NAPLES FL 34112 Physical Address 3299 TAMIAMI TRL E NAPLES FL 34112 Mailing Address 3299 TAMIAMI TRAIL E NAPLES FL 34112 Union Information Union Name TRANSPORT WORKERS UNION, AFL-CIO Address 1 122 Dixie Lane 16.A.38.a Packet Pg. 1290 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) Address 2 City Cocoa Beach State Florida Zipcode 32931 Contact Name Kevin Smith Telephone 8667954255 Fax E-mail jptwu500@aol.com Website Union Name TRANSPORT WORKERS UNION, AFL-CIO Address 1 122 Dixie Lane Address 2 City Cocoa Beach State Florida Zipcode 32931 Contact Name Kevin Smith Telephone 8667954255 Fax 3217848847 E-mail Kevin.Smith@SCLS-LLC.com Website Part 2: Application Information Title: FY22 5307 and 5339 Funds; Super Grant; Capital, ADA, Operating; Collier & Lee County , Bonita Springs/Naples UZA, FL FAIN Application Status Application Type Date Created Last Updated Date From TEAM? 1032-2022- 3 In-Progress Grant 8/1/2022 8/1/2022 No Application Executive Summary This application is to request section 5307 funds apportioned to the Bonita Springs/Naples UZA in the amount of $4,305,952 for FY22. The Collier County portion of the FY22 apportionment is $3,864,850 and the remaining amount of $441,102 is allocated to Lee County. The Collier portion of the FY22 apportionment is identified as STIP number 410146-1 for capital projects and 410146-2 for operating assistance. STIP pages are attached to this application. The purpose of this award is to provide 1 year of preventive maintenance, 1 year of operating assistance, 1 year of ADA paratransit services, the reconstruction of the Agency's Operations and Maintenance Facility, including the vehicular and pedestrian gates; bus shelter rehabilitation, and the preparation of a Zero-Emissions Transition Plan, to assist the fixed route transit operations during the period of 10/01/2021 to 3/30/2026. Funds will be used to cover all eligible preventive maintenance and operating expenses such as the operation contract expenses and fuel; the hiring of a 3rd Party Vendor to develop a Zero-Emissions 16.A.38.a Packet Pg. 1291 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) Transition Plan; contribute towards the reconstruction of a new transit operations and maintenance facility; the purchase and installation of a replacement vehicular and pedestrian gates that have met their useful life and the rehabilitation of bus shelters. Funding will permit Collier County to meet preventive maintenance standards, continue to provide operations and comply with its Transit Asset Management (TAM) Plan by extending the life of bus shelters, replacing its operations and maintenance facility that has exceeded useful life, improving safety and security of assets and facility with the replacements gates, and set a plan for the transition to sustainable bus operation for the Agency. Collier County and the riders that rely on its service will benefit from continued services, permitting workers to get to work and other destinations. This application also requests section 5339 Bus and Bus Facilities Formula funds apportioned to the Bonita Springs/Naples UZA in the amount of $352,333 for FY 22. The apportionment is identified as STIP number 434030-1. STIP page is attached to this application. The purpose of the award is to provide funding towards the construction of a new transit operations and maintenance facility that has exceeded its useful life. The funds will be utilized towards the unfunded construction cost for the replacement facility and will improve the state of good repair for Collier Area Transit assets. Transportation Development Credits in the amount of $907,246 will be utilized as the soft match for the capital grant projects in this grant. The overall start and end dates are 10/1/2022-03/30/2027. Collier County is not applying an indirect cost rate to the activities within this application. Collier County does not have a sub-recipient. Frequency of Milestone Progress Reports (MPR) No Selection Made Frequency of Federal Financial Reports (FFR) No Selection Made Does this application include funds for research and/or development activities? This award includes research and development activities. Pre-Award Authority This award is using Pre-Award Authority. Does this application include suballocation funds? Recipient organization is the Designated Recipient and can apply for and receive these apportioned funds. Will this Grant be using Lapsing Funds? No Selection Made Will indirect costs be applied to this application? This award does not include an indirect cost rate. Indirect Rate Details: N/A Requires E.O. 12372 Review No, this application does not require E.O. 12372 Review. Delinquent Federal Debt No, my organization does not have delinquent federal debt. Application Point of Contact Information First Name Last Name Title E-mail Address Phone Omar Deleon Transit Manager omar.deleon@colliercountyfl.gov 239-252-4996 16.A.38.a Packet Pg. 1292 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) Application Budget Control Totals Funding Source Section of Statute CFDA Number Amount 5307 - Urbanized Area Formula Grants (2013 and forward) 5307-2A 20507 $3,864,850 5339 – Buses and Bus Facilities Formula 5339-1 20526 $352,333 Local $588,200 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $907,246 Adjustment $0 Total Eligible Cost $4,805,383 Application Budget Project Number Budget Item FTA Amount Non-FTA Amount Total Eligible Amount Quantity 1032- 2022-3- P1 114- 00 (114- ) BUS: SUPPORT EQUIP AND FACILITIES $1,462,431.00 $0.00 $1,462,431.00 3 1032- 2022-3- P1 11.43.03 CONSTRUCT - ADMIN/MAINT FACILITY $1,423,782.00 $0.00 $1,423,782.00 1 1032- 2022-3- P1 11.43.09 CONSTRUCT - MOBILE SURVEILL/ SECURITY EQUIP $38,649.00 $0.00 $38,649.00 2 1032- 2022-3- P1 117- 00 (117- ) OTHER CAPITAL ITEMS (BUS) $942,600.00 $0.00 $942,600.00 0 1032- 2022-3- P1 11.7A.00 PREVENTIVE MAINTENANCE $942,600.00 $0.00 $942,600.00 0 1032- 2022-3- P1 119- 00 (119- ) Bus Associated Transit Improvements $38,649.00 $0.00 $38,649.00 13 1032- 2022-3- P1 11.94.02 BUS SHELTERS $38,649.00 $0.00 $38,649.00 13 16.A.38.a Packet Pg. 1293 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) 1032- 2022-3- P1 300- 00 (300- ) OPERATING ASSISTANCE $588,200.00 $588,200.00 $1,176,400.00 0 1032- 2022-3- P1 30.09.01 UP TO 50% FEDERAL SHARE $588,200.00 $588,200.00 $1,176,400.00 0 1032- 2022-3- P1 442- 00 (442- ) METROPOLITAN PLANNING $60,000.00 $0.00 $60,000.00 0 1032- 2022-3- P1 44.22.00 GENERAL DEVELOPMENT/ COMPREHENSIVE PLANNING $60,000.00 $0.00 $60,000.00 0 1032- 2022-3- P2 117- 00 (117- ) OTHER CAPITAL ITEMS (BUS) $772,970.00 $0.00 $772,970.00 0 1032- 2022-3- P2 11.7C.00 NON FIXED ROUTE ADA PARATRANSIT SERVICE $772,970.00 $0.00 $772,970.00 0 1032- 2022-3- P3 114- 00 (114- ) BUS: SUPPORT EQUIP AND FACILITIES $352,333.00 $0.00 $352,333.00 1 1032- 2022-3- P3 11.43.03 CONSTRUCT - ADMIN/MAINT FACILITY $352,333.00 $0.00 $352,333.00 1 Discretionary Allocations This application does not contain discretionary allocations. Part 3: Project Information Project Title: Collier County Section 5307 FY22 Project Number Temporary Project Number Date Created Start Date End Date 1032-2022-3-P1 1032-2022-3-P1 8/3/2022 5/26/2020 12/31/2026 Project Description The Collier County portion of the FY22 5307 funding for the Bonita Springs/Naples UZA. ($3,091,880) will be utilized for several projects that will maintain and/or enhance the Transit system for the Community. A portion of the funds will be utilized to improve safety and security by replacing the vehicular and pedestrian gates, with a useful life of 10 years. The funds will also be utilized to make the following transit enhancements: bus shelter rehab; contribution to the construction of a new operations and maintenance facility; preventative maintenance of rolling stock; transit operating expenses, and the preparation of a Zero-Emissions Transition plan. 16.A.38.a Packet Pg. 1294 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) Transportation Development Credits in the amount of $625,920 will be utilized as the soft match for the capital grant projects in this grant. Collier County will comply with FTA's Buy America requirement. Collier County will follow all 3rd party procurement policies as defined in C4220.1F (Third Party Contracting Guidance). Collier County will ensure that contractors procured will not be on the FTA Suspension and Debarment list. The overall start and end dates are 10/1/2022-03/30/2027 Project Benefits Residents and visitors of Collier County will benefit from this project by improving the operations and efficiency of the Collier Area Transit System. Additional Information None provided. Location Description Collier County Project Location (Urbanized Areas) UZA Code Area Name 120000 Florida 123610 Bonita Springs, FL Congressional District Information State District Representative Florida 12 Gus M Bilirakis Program Plan Information STIP/TIP Date: 8/4/2022 Description: Florida Department of Transportation STIP UPWP Date: N/A Description: N/A Long Range Plan Date: N/A Description: N/A Project Control Totals Funding Source Section of Statute CFDA Number Amount 5307 - Urbanized Area Formula Grants (2013 and forward) 5307-2A 20507 $3,091,880 Local $588,200 Local/In-Kind $0 16.A.38.a Packet Pg. 1295 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $625,920 Adjustment $0 Total Eligible Cost $3,680,080 Project Budget Project Number Budget Item FTA Amount Non-FTA Amount Total Eligible Amount Quantity 1032- 2022-3- P1 114- 00 (114- ) BUS: SUPPORT EQUIP AND FACILITIES $1,462,431.00 $0.00 $1,462,431.00 3 1032- 2022-3- P1 11.43.03 CONSTRUCT - ADMIN/MAINT FACILITY $1,423,782.00 $0.00 $1,423,782.00 1 1032- 2022-3- P1 11.43.09 CONSTRUCT - MOBILE SURVEILL/ SECURITY EQUIP $38,649.00 $0.00 $38,649.00 2 1032- 2022-3- P1 117- 00 (117- ) OTHER CAPITAL ITEMS (BUS) $942,600.00 $0.00 $942,600.00 0 1032- 2022-3- P1 11.7A.00 PREVENTIVE MAINTENANCE $942,600.00 $0.00 $942,600.00 0 1032- 2022-3- P1 119- 00 (119- ) Bus Associated Transit Improvements $38,649.00 $0.00 $38,649.00 13 1032- 2022-3- P1 11.94.02 BUS SHELTERS $38,649.00 $0.00 $38,649.00 13 1032- 2022-3- P1 300- 00 (300- ) OPERATING ASSISTANCE $588,200.00 $588,200.00 $1,176,400.00 0 1032- 2022-3- P1 30.09.01 UP TO 50% FEDERAL SHARE $588,200.00 $588,200.00 $1,176,400.00 0 1032- 2022-3- P1 442- 00 METROPOLITAN PLANNING $60,000.00 $0.00 $60,000.00 0 16.A.38.a Packet Pg. 1296 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) (442- ) 1032- 2022-3- P1 44.22.00 GENERAL DEVELOPMENT/ COMPREHENSIVE PLANNING $60,000.00 $0.00 $60,000.00 0 Project Budget Activity Line Items Budget Activity Line Item: 11.43.09 - CONSTRUCT - MOBILE SURVEILL/SECURITY EQUIP Scope Name / Code Line Item # Line Item Name Activity Quantity BUS: SUPPORT EQUIP AND FACILITIES (114-00) 11.43.09 CONSTRUCT - MOBILE SURVEILL/SECURITY EQUIP CONSTRUCTION OF BUS SUPPORT EQUIP/FACIL 2 Extended Budget Description Collier County will utilize the funding to improve safety and security by the purchase and installation of vehicular and pedestrian gates. The gates have a useful life of 10 years. Will 3rd Party contractors be used to fulfill this activity line item? Yes, 3rd Party Contractors will be used for this line item. Funding Source Section of Statute CFDA Number Amount 5307 - Urbanized Area Formula Grants (2013 and forward) 5307-2A 20507 $38,649 Local $0 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $9,662 Adjustment $0 Total Eligible Cost $38,649 Milestone Name Est. Completion Date Description RFP Date 9/30/2024 Contractual Award 9/30/2025 Contract End Date 12/31/2026 Budget Activity Line Item: 30.09.01 - UP TO 50% FEDERAL SHARE 16.A.38.a Packet Pg. 1297 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) Scope Name / Code Line Item # Line Item Name Activity Quantity OPERATING ASSISTANCE (300-00) 30.09.01 UP TO 50% FEDERAL SHARE OPERATING ASSISTANCE 0 Extended Budget Description Collier County will use $588,200 towards operating expenses and fuel. The 50% FTA share is $588,200, Collier County will provide a 50% match in the amount of $588,200for transit operating and fuel expenses through 09/30/23. Will 3rd Party contractors be used to fulfill this activity line item? No, 3rd Party Contractors will not be used for this line item. Funding Source Section of Statute CFDA Number Amount 5307 - Urbanized Area Formula Grants (2013 and forward) 5307-2A 20507 $588,200 Local $588,200 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $0 Adjustment $0 Total Eligible Cost $1,176,400 Milestone Name Est. Completion Date Description Start Date 10/1/2022 End Date 9/30/2023 Budget Activity Line Item: 11.7A.00 - PREVENTIVE MAINTENANCE Scope Name / Code Line Item # Line Item Name Activity Quantity OTHER CAPITAL ITEMS (BUS) (117-00) 11.7A.00 PREVENTIVE MAINTENANCE OTHER CAPITAL ITEMS (BUS) 0 Extended Budget Description Collier County will use $942,600 for preventative maintenance (PM) of Collier Area Transit rolling stock and support vehicles as defined in the National Transit Database. The PM will be completed by in house staff with an established force account. The period of performance is 10/1/2023-09/30/2024. Collier County does not anticipate the purchase of items over $5,000 in value at this time. A budget Revision will be executed to specify any items with a value of over $5,000 identified during the execution of the activities under this ALI. Typically, individual parts purchased are less than $5,000. Will 3rd Party contractors be used to fulfill this activity line item? No, 3rd Party Contractors will not be used for this line item. 16.A.38.a Packet Pg. 1298 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) Funding Source Section of Statute CFDA Number Amount 5307 - Urbanized Area Formula Grants (2013 and forward) 5307-2A 20507 $942,600 Local $0 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $235,650 Adjustment $0 Total Eligible Cost $942,600 Milestone Name Est. Completion Date Description Start Date 10/1/2023 End Date 9/30/2024 Budget Activity Line Item: 44.22.00 - GENERAL DEVELOPMENT/COMPREHENSIVE PLANNING Scope Name / Code Line Item # Line Item Name Activity Quantity METROPOLITAN PLANNING (442-00) 44.22.00 GENERAL DEVELOPMENT/ COMPREHENSIVE PLANNING METROPOLITAN PLANNING 0 Extended Budget Description Collier County will use $60,000 of the funding to develop an Electrification Plan/ Zero Emissions Transition Plan. Will 3rd Party contractors be used to fulfill this activity line item? Yes, 3rd Party Contractors will be used for this line item. Funding Source Section of Statute CFDA Number Amount 5307 - Urbanized Area Formula Grants (2013 and forward) 5307-2A 20507 $60,000 Local $0 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $15,000 Adjustment $0 Total Eligible Cost $60,000 16.A.38.a Packet Pg. 1299 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) Milestone Name Est. Completion Date Description RFP Date 12/31/2023 Contract Award Date 12/31/2024 Contract End Date 9/30/2026 Budget Activity Line Item: 11.43.03 - CONSTRUCT - ADMIN/MAINT FACILITY Scope Name / Code Line Item # Line Item Name Activity Quantity BUS: SUPPORT EQUIP AND FACILITIES (114- 00) 11.43.03 CONSTRUCT - ADMIN/MAINT FACILITY CONSTRUCTION OF BUS SUPPORT EQUIP/FACIL 1 Extended Budget Description Collier County will use $1,423,782 of the funding to demolish, construct, and furnish a replacement operations/maintenance facility located at 8300 Radio Rd. The upgrades will optimize available space (approximately 25,000 square ft.) for effective operational use and utilize LEED standards for sustainability. The new facility will meet state hurricane and building codes and local vertical standards. The new facility will have a useful life of 40 years. Will 3rd Party contractors be used to fulfill this activity line item? Yes, 3rd Party Contractors will be used for this line item. Funding Source Section of Statute CFDA Number Amount 5307 - Urbanized Area Formula Grants (2013 and forward) 5307-2A 20507 $1,423,782 Local $0 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $355,946 Adjustment $0 Total Eligible Cost $1,423,782 Milestone Name Est. Completion Date Description RFP Date 12/31/2024 Contract Award Date 12/31/2025 Contract End Date 12/31/2026 Budget Activity Line Item: 11.94.02 - BUS SHELTERS 16.A.38.a Packet Pg. 1300 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) Scope Name / Code Line Item # Line Item Name Activity Quantity Bus Associated Transit Improvements (119-00) 11.94.02 BUS SHELTERS REHAB/RENOVATION 13 Extended Budget Description Collier County will use $38,649 of the funding for the rehabilitation of up to 13 existing bus shelters and amenities located throughout the County to extend their useful life. Rehab of the existing shelters and amenities will include but not be limited to refurbishing and painting the components to extend their useful life by an additional five years. Collier County will follow all 3rd party procurement policies as defined in C4220.1F (Third Party Contracting Guidance) and ensure that contractors procured will not be on the FTA Suspension and Debarment List. Will 3rd Party contractors be used to fulfill this activity line item? Yes, 3rd Party Contractors will be used for this line item. Funding Source Section of Statute CFDA Number Amount 5307 - Urbanized Area Formula Grants (2013 and forward) 5307-2A 20507 $38,649 Local $0 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $9,662 Adjustment $0 Total Eligible Cost $38,649 Milestone Name Est. Completion Date Description RFP Date 5/26/2020 Contract Award Date 9/30/2024 Contract End Date 8/31/2026 Project Environmental Findings Finding: Class II(c) - Categorical Exclusions (C-List) Class Level Description Class II(c) consists of projects that do not have a significant environmental impact on the human or natural environment and are therefore categorically excluded from the requirement to prepare an environmental assessment or an environmental impact statement. FTA requires a sufficient project description to support a CE determination. The project may require additional documentation to comply with other environmental laws. Categorical Exclusion Description 16.A.38.a Packet Pg. 1301 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) Type 08: Maintenance, rehabilitation, and reconstruction of facilities that occupy substantially the same geographic footprint and do not result in a change in functional use, such as: improvements to bridges, tunnels, storage yards, buildings, stations, and terminals; construction of platform extensions, passing track, and retaining walls; and improvements to tracks and railbeds. Date Description Date Class IIc CE Approved Scope Name / Code Line Item Number Line Item Name Quantity FTA Amount Total Eligible Cost Bus Associated Transit Improvements (119-00) 11.94.02 BUS SHELTERS 13 $38,649.00 $38,649.00 Finding: Class II(c) - Categorical Exclusions (C-List) Class Level Description Class II(c) consists of projects that do not have a significant environmental impact on the human or natural environment and are therefore categorically excluded from the requirement to prepare an environmental assessment or an environmental impact statement. FTA requires a sufficient project description to support a CE determination. The project may require additional documentation to comply with other environmental laws. Categorical Exclusion Description Type 09: Assembly or construction of facilities that is consistent with existing land use and zoning requirements (including floodplain regulations) and uses primarily land disturbed for transportation use, such as: buildings and associated structures; bus transfer stations or intermodal centers; busways and streetcar lines or other transit investments within areas of the right-of-way occupied by the physical footprint of the existing facility or otherwise maintained or used for transportation operations; and parking facilities. Date Description Date Class IIc CE Approved Scope Name / Code Line Item Number Line Item Name Quantity FTA Amount Total Eligible Cost BUS: SUPPORT EQUIP AND FACILITIES (114-00) 11.43.03 CONSTRUCT - ADMIN/MAINT FACILITY 1 $1,423,782.00 $1,423,782.00 Finding: Class II(c) - Categorical Exclusions (C-List) Class Level Description Class II(c) consists of projects that do not have a significant environmental impact on the human or natural environment and are therefore categorically excluded from the requirement to prepare an environmental assessment or an environmental impact statement. FTA requires a sufficient project description to support a CE determination. The project may require additional documentation to comply with other environmental laws. Categorical Exclusion Description Type 04: Planning and administrative activities which do not involve or lead directly to construction, such as: training, technical assistance and research; promulgation of rules, regulations, directives, or 16.A.38.a Packet Pg. 1302 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) program guidance; approval of project concepts; engineering; and operating assistance to transit authorities to continue existing service or increase service to meet routine demand. Date Description Date Class IIc CE Approved Scope Name / Code Line Item Number Line Item Name Quantity FTA Amount Total Eligible Cost METROPOLITAN PLANNING (442-00) 44.22.00 GENERAL DEVELOPMENT/ COMPREHENSIVE PLANNING 0 $60,000.00 $60,000.00 Finding: Class II(c) - Categorical Exclusions (C-List) Class Level Description Class II(c) consists of projects that do not have a significant environmental impact on the human or natural environment and are therefore categorically excluded from the requirement to prepare an environmental assessment or an environmental impact statement. FTA requires a sufficient project description to support a CE determination. The project may require additional documentation to comply with other environmental laws. Categorical Exclusion Description Type 04: Planning and administrative activities which do not involve or lead directly to construction, such as: training, technical assistance and research; promulgation of rules, regulations, directives, or program guidance; approval of project concepts; engineering; and operating assistance to transit authorities to continue existing service or increase service to meet routine demand. Date Description Date Class IIc CE Approved Scope Name / Code Line Item Number Line Item Name Quantity FTA Amount Total Eligible Cost OTHER CAPITAL ITEMS (BUS) (117- 00) 11.7A.00 PREVENTIVE MAINTENANCE 0 $942,600.00 $942,600.00 Finding: Class II(c) - Categorical Exclusions (C-List) Class Level Description Class II(c) consists of projects that do not have a significant environmental impact on the human or natural environment and are therefore categorically excluded from the requirement to prepare an environmental assessment or an environmental impact statement. FTA requires a sufficient project description to support a CE determination. The project may require additional documentation to comply with other environmental laws. Categorical Exclusion Description Type 04: Planning and administrative activities which do not involve or lead directly to construction, such as: training, technical assistance and research; promulgation of rules, regulations, directives, or 16.A.38.a Packet Pg. 1303 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) program guidance; approval of project concepts; engineering; and operating assistance to transit authorities to continue existing service or increase service to meet routine demand. Date Description Date Class IIc CE Approved Scope Name / Code Line Item Number Line Item Name Quantity FTA Amount Total Eligible Cost OPERATING ASSISTANCE (300-00) 30.09.01 UP TO 50% FEDERAL SHARE 0 $588,200.00 $1,176,400.00 Finding: Class II(c) - Categorical Exclusions (C-List) Class Level Description Class II(c) consists of projects that do not have a significant environmental impact on the human or natural environment and are therefore categorically excluded from the requirement to prepare an environmental assessment or an environmental impact statement. FTA requires a sufficient project description to support a CE determination. The project may require additional documentation to comply with other environmental laws. Categorical Exclusion Description Type 08: Maintenance, rehabilitation, and reconstruction of facilities that occupy substantially the same geographic footprint and do not result in a change in functional use, such as: improvements to bridges, tunnels, storage yards, buildings, stations, and terminals; construction of platform extensions, passing track, and retaining walls; and improvements to tracks and railbeds. Date Description Date Class IIc CE Approved Scope Name / Code Line Item Number Line Item Name Quantity FTA Amount Total Eligible Cost BUS: SUPPORT EQUIP AND FACILITIES (114-00) 11.43.09 CONSTRUCT - MOBILE SURVEILL/SECURITY EQUIP 2 $38,649.00 $38,649.00 Project Title: Non Fixed Route ADA Paratransit Service Project Number Temporary Project Number Date Created Start Date End Date 1032-2022-3-P2 1032-2022-3-P2 8/3/2022 4/9/2019 9/30/2023 Project Description Collier County will use $772,970 of these funds to provide non fixed route ADA paratransit services. Collier County allocates 20% of the 5307 apportionments for this purpose. Local funding is used to supplement complimentary ADA services. Project Benefits This project will benefit Collier County residents by providing paratransit services for those in need. 16.A.38.a Packet Pg. 1304 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) Additional Information None provided. Location Description Collier County Project Location (Urbanized Areas) UZA Code Area Name 120000 Florida 123610 Bonita Springs, FL Congressional District Information State District Representative Florida 12 Gus M Bilirakis Program Plan Information STIP/TIP Date: N/A Description: N/A UPWP Date: N/A Description: N/A Long Range Plan Date: N/A Description: N/A Project Control Totals Funding Source Section of Statute CFDA Number Amount 5307 - Urbanized Area Formula Grants (2013 and forward) 5307-2A 20507 $772,970 Local $0 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $193,243 Adjustment $0 Total Eligible Cost $772,970 16.A.38.a Packet Pg. 1305 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) Project Budget Project Number Budget Item FTA Amount Non- FTA Amount Total Eligible Amount Quantity 1032-2022-3-P2 117- 00 (117-) OTHER CAPITAL ITEMS (BUS) $772,970.00 $0.00 $772,970.00 0 1032-2022-3-P2 11.7C.00 NON FIXED ROUTE ADA PARATRANSIT SERVICE $772,970.00 $0.00 $772,970.00 0 Project Budget Activity Line Items Budget Activity Line Item: 11.7C.00 - NON FIXED ROUTE ADA PARATRANSIT SERVICE Scope Name / Code Line Item # Line Item Name Activity Quantity OTHER CAPITAL ITEMS (BUS) (117-00) 11.7C.00 NON FIXED ROUTE ADA PARATRANSIT SERVICE OTHER CAPITAL ITEMS (BUS) 0 Extended Budget Description Collier County will use $772,970 of these funds to provide non fixed route ADA paratransit services from 10-1-2022 through 9-30-2023. A multi-year contract for paratransit services will be utilized for the provision of these services for this annual period. The contract dates are referenced in the milestone. Collier County allocates 20% of the 5307 apportionment for this purpose. Local funding is used to supplement complimentary ADA services. Will 3rd Party contractors be used to fulfill this activity line item? Yes, 3rd Party Contractors will be used for this line item. Funding Source Section of Statute CFDA Number Amount 5307 - Urbanized Area Formula Grants (2013 and forward) 5307-2A 20507 $772,970 Local $0 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $193,243 Adjustment $0 Total Eligible Cost $772,970 Milestone Name Est. Completion Date Description 16.A.38.a Packet Pg. 1306 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) Contract Award Date 4/9/2019 Start Date 10/1/2022 End Date 9/30/2023 Project Environmental Findings Finding: Class II(c) - Categorical Exclusions (C-List) Class Level Description Class II(c) consists of projects that do not have a significant environmental impact on the human or natural environment and are therefore categorically excluded from the requirement to prepare an environmental assessment or an environmental impact statement. FTA requires a sufficient project description to support a CE determination. The project may require additional documentation to comply with other environmental laws. Categorical Exclusion Description Type 04: Planning and administrative activities which do not involve or lead directly to construction, such as: training, technical assistance and research; promulgation of rules, regulations, directives, or program guidance; approval of project concepts; engineering; and operating assistance to transit authorities to continue existing service or increase service to meet routine demand. Date Description Date Class IIc CE Approved Project Title: Collier County Section 5339 FY22 Project Number Temporary Project Number Date Created Start Date End Date 1032-2022-3-P3 1032-2022-3-P3 8/3/2022 12/31/2024 12/31/2026 Project Description Collier County will use funding in the amount of $352,333 to demolish, construct, and furnish a replacement operations/maintenance facility. Collier County will follow all 3rd party procurement policies as defined in C4220.1F (Third Party Contracting Guidance). Collier County will ensure that contractors procured will not be on the FTA Suspension and Debarment list. Transportation Development Credits in the amount of $88,083 will be used as a soft match for the capital projects in this grant. Project Benefits Residents and visitors of Collier County will benefit from this project by improving the operations and efficiency of the Collier Area Transit System. Additional Information None provided. Location Description Collier County Project Location (Urbanized Areas) UZA Code Area Name 16.A.38.a Packet Pg. 1307 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) 120000 Florida 123610 Bonita Springs, FL Congressional District Information State District Representative Florida 12 Gus M Bilirakis Program Plan Information STIP/TIP Date: 8/4/2022 Description: Florida Department of Transportation STIP-5339 UPWP Date: N/A Description: N/A Long Range Plan Date: N/A Description: N/A Project Control Totals Funding Source Section of Statute CFDA Number Amount 5339 – Buses and Bus Facilities Formula 5339-1 20526 $352,333 Local $0 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $88,083 Adjustment $0 Total Eligible Cost $352,333 Project Budget Project Number Budget Item FTA Amount Non- FTA Amount Total Eligible Amount Quantity 1032-2022-3-P3 114-00 (114-) BUS: SUPPORT EQUIP AND FACILITIES $352,333.00 $0.00 $352,333.00 1 16.A.38.a Packet Pg. 1308 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) 1032-2022-3-P3 11.43.03 CONSTRUCT - ADMIN/ MAINT FACILITY $352,333.00 $0.00 $352,333.00 1 Project Budget Activity Line Items Budget Activity Line Item: 11.43.03 - CONSTRUCT - ADMIN/MAINT FACILITY Scope Name / Code Line Item # Line Item Name Activity Quantity BUS: SUPPORT EQUIP AND FACILITIES (114- 00) 11.43.03 CONSTRUCT - ADMIN/MAINT FACILITY CONSTRUCTION OF BUS SUPPORT EQUIP/FACIL 1 Extended Budget Description Collier County will use $352,333 of the funding to demolish, construct, and furnish a replacement operations/maintenance facility located at 8300 Radio Rd. The upgrades will optimize available space (approximately 25,000 square ft.) for effective operational use and utilize LEED standards for sustainability. The new facility will meet state hurricane and building codes and local vertical standards. The new facility will have a useful life of 40 years. Will 3rd Party contractors be used to fulfill this activity line item? Yes, 3rd Party Contractors will be used for this line item. Funding Source Section of Statute CFDA Number Amount 5339 – Buses and Bus Facilities Formula 5339-1 20526 $352,333 Local $0 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $88,083 Adjustment $0 Total Eligible Cost $352,333 Milestone Name Est. Completion Date Description RFP Date 12/31/2024 Contract Award Date 12/31/2025 Contract End Date 12/31/2026 Project Environmental Findings Finding: Class II(c) - Categorical Exclusions (C-List) 16.A.38.a Packet Pg. 1309 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) Class Level Description Class II(c) consists of projects that do not have a significant environmental impact on the human or natural environment and are therefore categorically excluded from the requirement to prepare an environmental assessment or an environmental impact statement. FTA requires a sufficient project description to support a CE determination. The project may require additional documentation to comply with other environmental laws. Categorical Exclusion Description Type 09: Assembly or construction of facilities that is consistent with existing land use and zoning requirements (including floodplain regulations) and uses primarily land disturbed for transportation use, such as: buildings and associated structures; bus transfer stations or intermodal centers; busways and streetcar lines or other transit investments within areas of the right-of-way occupied by the physical footprint of the existing facility or otherwise maintained or used for transportation operations; and parking facilities. Date Description Date Class IIc CE Approved Part 4: Fleet Details No fleet data exists for this application. Part 5: FTA Review Comments There are no review comments to display at this time. 16.A.38.a Packet Pg. 1310 Attachment: View Print Application - 1032-2022-3 (Final Draft) (23122 : FY22 5307 & 5339 Super Grant) 16.A.38.bPacket Pg. 1311Attachment: FFY 2022 FTA Section 5307 Large Urban Split Letter (23122 : FY22 5307 & 5339 Super Grant) 16.A.38.gPacket Pg. 1312Attachment: 1032-2022-3 5307 TDC_signed packet (23122 : FY22 5307 & 5339 Super Grant) 16.A.38.gPacket Pg. 1313Attachment: 1032-2022-3 5307 TDC_signed packet (23122 : FY22 5307 & 5339 Super Grant) 8/4/22, 5:58 PM FDOT OWP - Federal Aid Management; STIP Project Detail and Summaries Online Report https://fdotewp1.dot.state.fl.us/fmsupportapps/stipamendments/stip.aspx 1/2 Federal Aid Management Cynthia Lorenzo - Director Florida Department of TRANSPORTATION E-Updates | FL511 | Site Map | Translate Home About FDOT Contact Us Maps & Data Offices Performance Projects Web Application STIP Project Detail and Summaries Online Report ** Repayment Phases are not included in the Totals ** Selection Criteria Current STIP Detail County/MPO Area:Collier Project Description Contains:5307 As Of:8/4/2022 FLP: TRANSIT Item Number: 410146 1 Project Description: COLLIER COUNTY FTA SECTION 5307 CAPITAL ASSISTANCE District: 01 County: COLLIER Type of Work: CAPITAL FOR FIXED ROUTE Project Length: 0.000 Extra Description:SECTION 5307 - URBANIZED AREAS Fiscal Year Phase / Responsible Agency <2022 2022 2023 2024 2025 >2025 All Years CAPITAL / MANAGED BY COLLIER COUNTY Fund Code: FTA-FEDERAL TRANSIT ADMINISTRATION 32,056,979 2,944,107 3,276,650 3,768,148 4,136,463 4,550,109 50,732,456 LF-LOCAL FUNDS 7,952,292 736,027 819,163 942,037 1,034,116 1,137,527 12,621,162 Phase: CAPITAL Totals 40,009,271 3,680,134 4,095,813 4,710,185 5,170,579 5,687,636 63,353,618 Item: 410146 1 Totals 40,009,271 3,680,134 4,095,813 4,710,185 5,170,579 5,687,636 63,353,618 Item Number: 410146 2 Project Description: COLLIER COUNTY FTA SECTION 5307 OPERATING ASSISTANCE District: 01 County: COLLIER Type of Work: OPERATING FOR FIXED ROUTE Project Length: 0.000 Fiscal Year Phase / Responsible Agency <2022 2022 2023 2024 2025 >2025 All Years OPERATIONS / MANAGED BY COLLIER COUNTY Fund Code: FTA-FEDERAL TRANSIT ADMINISTRATION 3,689,165 75,490 588,200 676,430 798,900 500,000 6,328,185 LF-LOCAL FUNDS 3,689,165 75,490 588,200 676,430 798,900 500,000 6,328,185 16.A.38.g Packet Pg. 1314 Attachment: 1032-2022-3 5307 TDC_signed packet (23122 : FY22 5307 & 5339 Super Grant) 8/4/22, 5:58 PM FDOT OWP - Federal Aid Management; STIP Project Detail and Summaries Online Report https://fdotewp1.dot.state.fl.us/fmsupportapps/stipamendments/stip.aspx 2/2 Phase: OPERATIONS Totals 7,378,330 150,980 1,176,400 1,352,860 1,597,800 1,000,000 12,656,370 Item: 410146 2 Totals 7,378,330 150,980 1,176,400 1,352,860 1,597,800 1,000,000 12,656,370 Project Totals 47,387,601 3,831,114 5,272,213 6,063,045 6,768,379 6,687,636 76,009,988 Grand Total 47,387,601 3,831,114 5,272,213 6,063,045 6,768,379 6,687,636 76,009,988 This site is maintained by the Office of Work Program and Budget, located at 605 Suwannee Street, MS 21, Tallahassee, Florida 32399. For additional information please e-mail questions or comments to: Federal Aid Management Cynthia Lorenzo: Cynthia.Lorenzo@dot.state.fl.us Or call 850-414-4448 Reload STIP Selection Page Office Home: Office of Work Program Contact Us Employment MyFlorida.com Performance Statement of Agency Web Policies & Notices © 1996-2019 Florida Department of Transportation Florida Department of Transportation Consistent, Predictable, Repeatable 16.A.38.g Packet Pg. 1315 Attachment: 1032-2022-3 5307 TDC_signed packet (23122 : FY22 5307 & 5339 Super Grant) 8/4/22, 5:58 PM FDOT OWP - Federal Aid Management; STIP Project Detail and Summaries Online Report https://fdotewp1.dot.state.fl.us/fmsupportapps/stipamendments/stip.aspx 1/2 Federal Aid Management Cynthia Lorenzo - Director Florida Department of TRANSPORTATION E-Updates | FL511 | Site Map | Translate Home About FDOT Contact Us Maps & Data Offices Performance Projects Web Application STIP Project Detail and Summaries Online Report ** Repayment Phases are not included in the Totals ** Selection Criteria Current STIP Detail County/MPO Area:Collier Project Description Contains:5339 As Of:8/4/2022 FLP: TRANSIT Item Number: 434030 1 Project Description: COLLIER CO./BONITA SPRINGS UZA FTA SECTION 5339 CAPITAL ASSISTANCE District: 01 County: COLLIER Type of Work: CAPITAL FOR FIXED ROUTE Project Length: 0.000 Extra Description:LEE COUNTY (LEE TRAN) $00.00 ZERO FUNDS Fiscal Year Phase / Responsible Agency <2022 2022 2023 2024 2025 >2025 All Years CAPITAL / MANAGED BY COLLIER COUNTY Fund Code: FTA-FEDERAL TRANSIT ADMINISTRATION 2,832,779 367,591 352,333 509,334 560,267 616,294 5,238,598 LF-LOCAL FUNDS 708,197 91,898 88,083 127,333 140,067 154,073 1,309,651 Phase: CAPITAL Totals 3,540,976 459,489 440,416 636,667 700,334 770,367 6,548,249 Item: 434030 1 Totals 3,540,976 459,489 440,416 636,667 700,334 770,367 6,548,249 Project Totals 3,540,976 459,489 440,416 636,667 700,334 770,367 6,548,249 Item Number: 448065 1 Project Description: COLLIER COUNTY AREA TRANSIT 5339(B) BUS/MAINT BLDG District: 01 County: COLLIER Type of Work: TRANSIT IMPROVEMENT Project Length: 0.000 Fiscal Year Phase / Responsible Agency <2022 2022 2023 2024 2025 >2025 All Years CAPITAL / MANAGED BY COLLIER COUNTY Fund Code: FTA-FEDERAL TRANSIT ADMINISTRATION 9,020,000 9,020,000 16.A.38.g Packet Pg. 1316 Attachment: 1032-2022-3 5307 TDC_signed packet (23122 : FY22 5307 & 5339 Super Grant) 8/4/22, 5:58 PM FDOT OWP - Federal Aid Management; STIP Project Detail and Summaries Online Report https://fdotewp1.dot.state.fl.us/fmsupportapps/stipamendments/stip.aspx 2/2 LF-LOCAL FUNDS 2,255,000 2,255,000 Phase: CAPITAL Totals 11,275,000 11,275,000 Item: 448065 1 Totals 11,275,000 11,275,000 Project Totals 11,275,000 11,275,000 Item Number: 450306 1 Project Description: 5339 RURAL CAPITAL COLLIER COUNTY BOCC - MATCH WITH TRC'S District: 01 County: COLLIER Type of Work: CAPITAL FOR FIXED ROUTE Project Length: 0.000 Fiscal Year Phase / Responsible Agency <2022 2022 2023 2024 2025 >2025 All Years CAPITAL / MANAGED BY COLLIER COUNTY Fund Code: DU-STATE PRIMARY/FEDERAL REIMB 222,355 222,355 Item: 450306 1 Totals 222,355 222,355 Project Totals 222,355 222,355 Grand Total 3,540,976 11,956,844 440,416 636,667 700,334 770,367 18,045,604 This site is maintained by the Office of Work Program and Budget, located at 605 Suwannee Street, MS 21, Tallahassee, Florida 32399. For additional information please e-mail questions or comments to: Federal Aid Management Cynthia Lorenzo: Cynthia.Lorenzo@dot.state.fl.us Or call 850-414-4448 Reload STIP Selection Page Office Home: Office of Work Program Contact Us Employment MyFlorida.com Performance Statement of Agency Web Policies & Notices © 1996-2019 Florida Department of Transportation Florida Department of Transportation Consistent, Predictable, Repeatable 16.A.38.g Packet Pg. 1317 Attachment: 1032-2022-3 5307 TDC_signed packet (23122 : FY22 5307 & 5339 Super Grant) COLLIER MPO FY 2023 - 27 TIP 4101461 COLLIER COUNTY FTA SECTION 5307 CAPITAL ASSISTANCE Project Description: Prior Years Cost:N/A Future Years Cost:N/A Work Summary:CAPITAL FOR FIXED ROUTE Total Project Cost:N/A Lead Agency:COLLIER COUNTY Length:NA 2045 LRTP:p5-3, Table 5-1 Phase Fund 2022/23 2023/24 2024/25 2025/26 2026/27 Total CAP FTA 3,418,565 3,760,421 4,136,463 4,550,109 4,741,514 20,607,072 CAP LF 854,641 940,105 1,034,116 1,137,527 1,185,379 5,151,768 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 4,273,206 4,700,526 5,170,579 5,687,636 5,926,893 25,758,840 Adopted 06/10/2022 H-3 SECTION H - TRANSIT 16.A.38.g Packet Pg. 1318 Attachment: 1032-2022-3 5307 TDC_signed packet (23122 : FY22 5307 & 5339 Super Grant) COLLIER MPO FY 2023 - 27 TIP 4340301 COLLIER CO./BONITA SPRINGS UZA FTA SECTION 5339 CAPITAL ASSISTANCE Project Description:PURCHASE VEHICLES & EQUIPMENT Prior Years Cost:N/A Future Years Cost:N/A Work Summary:CAPITAL FOR FIXED ROUTE Total Project Cost:N/A Lead Agency:COLLIER COUNTY Length:NA 2045 LRTP:p5-3, Table 5-1 Phase Fund 2022/23 2023/24 2024/25 2025/26 2026/27 Total CAP FTA 463,031 509,334 560,267 616,294 592,009 2,740,935 CAP LF 115,758 127,333 140,067 154,073 148,002 685,233 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 578,789 636,667 700,334 770,367 740,011 3,426,168 Adopted 06/10/2022 H-5 SECTION H - TRANSIT 16.A.38.g Packet Pg. 1319 Attachment: 1032-2022-3 5307 TDC_signed packet (23122 : FY22 5307 & 5339 Super Grant) 8/5/22, 9:24 AM 1032-2022-3 | FY22 5307 and 5339 Funds; Super Grant; Capital, ADA, Operating; Collier & Lee County , Bonita Springs/Naples U… https://faces.fta.dot.gov/suite/sites/trams-recipients/page/records/record/lcBUBiUIVyuBs1xJ-hym5E1iUDhRwOQKjPFGAEWdLxp2WR9y54DoeLIIfRVh…1/2 1032-2022-3 | FY22 5307 and 5339 Funds; Super Grant; Capital, ADA,Operating; Collier & Lee County , Bonita Springs/Naples UZA, FL In-Progress Initial Review / Concurrence Final Concurrence Obligation Executed Active Closed Recipient Details Recipient ID 1032 Recipient Name COLLIER, COUNTY OF Application Status Information Application Number 1032-2022-3 Application Name FY22 5307 and 5339 Funds; Super Grant; Capital, ADA, Operating; Collier & Lee County , Bonita Springs/Naples UZA, FL Status In-Progress Last Modi ed On Aug 05, 2022 Last Modi ed By Omar Deleon Application Tasks for Completion Status Annual C&As COMPLETED Executive Summary COMPLETED Project(s) Validated MISSING Period of Performance Start Date The start date will be set to the date of the award Original Period of Performance End Date Mar 31, 2028 Current Period of Performance End Date Mar 31, 2028 Period of Performance Revision Number N/A Executive Summary This application is to request section 5307 funds apportioned to the Bonita Springs/Naples UZA in the amount of $4,305,952 for FY22. The Collier County portion of the FY22 apportionment is $3,864,850 and the remaining amount of $441,102 is allocated to Lee County. The Collier portion of the FY22 apportionment is identi ed as STIP number 410146-1 for capital projects and 410146-2 for operating assistance. STIP pages are attached to this application. The purpose of this award is to provide 1 year of preventive maintenance, 1 year of operating assistance, and 1 year of ADA paratransit services. In addition, reconstruction of transit maintenance building; replacement vehicular and pedestrian gates; Zero-Emissions Transition Plan, and bus shelter rehab. during the period of 10/01/2021 to 3/30/2026. Funds will be used to cover all eligible preventive maintenance and operating expenses; the hiring of a 3rd Party Vendor to develop a Zero-Emissions transition plan. Funding will also be utilized towards the reconstruction of transit maintenance building; purchasing and installing replacement vehicular and pedestrian gates that have met their useful life and transit enhancements by way of bus shelter rehab. Funding will permit Collier County to meet preventive maintenance standards, continue to provide operations, and keep our Maintenance facility and bus shelters in a state of good repair. In addition, improve safety and security with the replacements of facility gates. Collier County and the riders that rely on its service will bene t from continued services, permitting workers to get to work and other destinations. This application also requests the section 5339 The total FY 22 Bus and Bus Facilities Formula funds have been made available to the Bonita Springs/Naples UZA. The total amount of the FY 22 apportionment is $352,333 and is identi ed as STIP number 434030-1. STIP page is attached to this application. These funds will be utilized to contribute to the construction of a new transit operations and maintenance facility. Transportation Development Credits in the amount of $907,246 will be utilized as the soft match for the capital grant projects in this grant. The overall start and end dates are 10/1/2022-03/30/2027. Collier County is not applying an indirect cost rate to the activities within this application. Collier County does not have a sub-recipient. Application Details Type of Financial Assistance Grant Frequency of Milestone Progress Report No Selection Made Frequency of Financial Federal Reports No Selection Made Does this application include funds for research and/or development activities? Yes, this application includes funds for research and/or development activities. Pre-Award Authority Yes, this application is using Pre-Award authority. Does this application include suballocation funds? Recipient organization is the Designated Recipient to apply for and receive these apportioned funds. Will this Grant be using Lapsing funds? No Selection Made Will indirect costs be applied to this application? No, indirect costs will not be applied to this application. Summary Points of Contact Application Control Totals Application Projects Related Actions 16.A.38.g Packet Pg. 1320 Attachment: 1032-2022-3 5307 TDC_signed packet (23122 : FY22 5307 & 5339 Super Grant) 8/5/22, 9:24 AM 1032-2022-3 | FY22 5307 and 5339 Funds; Super Grant; Capital, ADA, Operating; Collier & Lee County , Bonita Springs/Naples U… https://faces.fta.dot.gov/suite/sites/trams-recipients/page/records/record/lcBUBiUIVyuBs1xJ-hym5E1iUDhRwOQKjPFGAEWdLxp2WR9y54DoeLIIfRVh…2/2 Requires E.O 12372 Review? No State Application ID N/A Date Submitted for State Review N/A Indirect Cost Description N/A Delinquent Federal Debt No, my organization does not have delinquent federal debt. Delinquent Federal Debt Description N/A 16.A.38.g Packet Pg. 1321 Attachment: 1032-2022-3 5307 TDC_signed packet (23122 : FY22 5307 & 5339 Super Grant)