Agenda 07/26/2022 Item #16E 1 (Administrative Reports from Procurement Services)07/26/2022 EXECUTIVE SUMMARY Recommendation to approve the administrative reports prepared by the Procurement Services Division for change orders and other contractual modifications requiring Board approval. OBJECTIVE: To promote accountability and provide transpar ency to the public and gain the Board’s approval/ratification for various procurement -related transactions. CONSIDERATIONS: In accordance with the Board’s Procurement Ordinance 2017-08 and the Procurement Manual, the Procurement Services Division produces a regular administrative report which provides for Board approval of the following transactions: • Change Orders that do not exceed ten (10%) of the current Board approved aggregate amount, and/or require change in schedule (number of days); • Amendments to contracts; • After the fact memos from various County Divisions, as requested by the Clerk’s Finance staff for the timely process of invoices. • Other items as determined by the County Manager or designee that require Board approval. This administrative report includes the following: • Two (2) change orders that in aggregate modify contracts by $0.00 and add 45 calendar days to completion periods, see attached summary and backup for details; and • Zero (0) amendments this period with a fiscal impact of $0.00; and • One (1) after the fact memo with a fiscal impact of $0.00 for additional services Approval of the following documents by the County Manager is subject to formal ratification by the Board of County Commissioners. If the decision by the County Manager is not ratified by that Board, the document(s) shall be enforceable against Collier County only to the extent authorized by law in the absence of such ratification by that Board. FISCAL IMPACT: The net total for the three (3) items is $0.00. LEGAL CONSIDERATIONS: This item is approved for form and legality and requires a majority vote for Board action. -JAK GROWTH MANAGEMENT IMPACT: There is no Growth Management Impact associated with this action. RECOMMENDATION: To ratify/approve change orders and/or contract amendments and other items as determined by the County Manager or designee in accordance with Procurement Ordinance 2017-08. Prepared By: Sara Schneeberger, Procurement Strategist, Procurement Service ATTACHMENT(S) 1. 0726 Change Order Report - FY22 (PDF) 2. 0726 Change Order Backup - FY22 (PDF) 16.E.1 Packet Pg. 5 07/26/2022 3. 0726 After the Fact Report - FY22 (PDF) 4. 0726 After the Fact Backup - FY22 (PDF) 16.E.1 Packet Pg. 6 07/26/2022 COLLIER COUNTY Board of County Commissioners Item Number: 16.E.1 Doc ID: 22819 Item Summary: Recommendation to approve the administrative reports prepared by the Procurement Services Division for change orders and other contractual modifications requiring Board approval. Meeting Date: 07/26/2022 Prepared by: Title: Business Technology Analyst, Senior – Procurement Services Name: Sara Schneeberger 07/13/2022 11:53 AM Submitted by: Title: Manager - Procurement – Procurement Services Name: Sandra Herrera 07/13/2022 11:53 AM Approved By: Review: Procurement Services Ana Reynoso Level 1 Purchasing Gatekeeper Completed 07/13/2022 12:10 PM Procurement Services Sara Schneeberger Additional Reviewer Skipped 07/13/2022 12:14 PM Procurement Services Catherine Bigelow Additional Reviewer Completed 07/13/2022 12:23 PM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 07/13/2022 1:22 PM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 07/15/2022 2:12 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 07/21/2022 3:18 PM County Manager's Office Amy Patterson Level 4 County Manager Review Completed 07/26/2022 2:37 PM Board of County Commissioners Geoffrey Willig Meeting Pending 07/26/2022 9:00 AM 16.E.1 Packet Pg. 7 Item page #Contract/ Grant No.Change #DateProject Name Vendor Name Division ‐ Project ManagerOriginal Contract AmountCurrent Contract Amount Current Change Order AmountRevised Contract Amount% Over Board Approved AmountContract LengthChange in length (Days)Updated contract length    Change in length       (%)1 1 21-7888 2 6/30/2022Collier County Landfill Scalehouse ConstructionDEC Contracting Group, Inc. PUD SHWMD - Paul Abbott $1,155,932.61 $1,155,932.61 $0.00 $1,155,932.61 0.00% 210 42 252 20.00%2 5 20-7741 4 7/8/2022Carica Pump and Pipe ImprovementsFlorida Design Drilling Corp. PUEPMD - Shon Fandrich $1,354,000.00 $1,354,000.00 $0.00 $1,354,000.00 0.00% 630 3 633 0.48%Meeting Date Total number of Change OrdersTotal Dollar ChangeTotal Change in Days7/26/20222 $0.00 4516.E.1.aPacket Pg. 8Attachment: 0726 Change Order Report - FY22 (22819 : Procurement Services administrative reports) 1 116.E.1.b Packet Pg. 9 Attachment: 0726 Change Order Backup - FY22 (22819 : Procurement Services administrative reports) Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.)PROCUREMENT USE ONLY Admin BCC Rpt BCC ES Change Order/Amendment Summary CO# AMD# Description COST TIME JustificationAdditive (+) Deductive (-) Days Added New Amount 01 N/A Allowance in amount $63,558.82: WD 01 - Relocate Construction Trailer; WD 02 Relocate tie-in location of new FM to existing; WD 03 Door & Hardware to meet CC Standards; WD 04 Additional conduit for Drop Gates $0.00 $0.00 0 N/A These unforeseen changes were of Work and added at the request/Direction of Collier County 02 Z$ Change request for additional Time $0.00 $0.00 42 252 CC approved 42 days (of the 85 days requested by the Contractor) determined to have impacted the project schedule s critical path BCC Rpt 2 16.E.1.b Packet Pg. 10 Attachment: 0726 Change Order Backup - FY22 (22819 : Procurement Services administrative reports) 3 16.E.1.b Packet Pg. 11 Attachment: 0726 Change Order Backup - FY22 (22819 : Procurement Services administrative reports) 4 16.E.1.b Packet Pg. 12 Attachment: 0726 Change Order Backup - FY22 (22819 : Procurement Services administrative reports) Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.)PROCUREMENT USE ONLY Admin BCC Rpt BCC ES Contract Modification Work Order Modification Contract #: Change #: Purchase Order #: Project #: Contractor/Firm Name: Contract/Project: Project Manager Name: r:Division Name: Original Contract/Work Order Amount $ 1,354,000.00 7/14/20, 11I Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 1,354,000.00 7/14/20, 11I Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 1,354,000.00 3/4/2022 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revised Contract/Work Order Total $ 1,354,000.00 0.00% Change from Current BCC Approved Amount Cumulative Changes $ 0.00 0.00% Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Notice to Proceed Original Last Approved Revised Date Date Completion Date Date (Includes this change) # of Days Added Select Tasks Add new task(s) Delete task(s) Change task(s) Other Provide a response to the following: 1.) detailed and specific explanation/rationale of the requested change(s) to the task(s) and / or the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. Prepared by: ___________________________________________________________________________ Date: ________________ Shon Fandrich, P.E. Procurement Services Change Order Form 71067.24.4 Florida Design Drilling 450020466120-7741 4 Carica Pump and Pipe Improvements Engineering and Project ManagementShon Fandrich, P.E., PMP 3/4/228/31/20 1. This change is to authorize the use of allowance funds for the following items: Work Directive #12 –To add stone and a wooden retaining wall around the flow meter pad . Item Description Amount Remaining Allowance Balance 1 Work Directive #12 –Add stone around the flow meter pad. $5,053.84 $71,319.90 2. These items were additional items that were added to the contract. These items were added to prevent future erosion to the flow meter pad. 3. If these changes are not processed, the flow meter pad was at risk of havin erosion occur around it and possibly causing future damage to the newly poured concrete pad. 06302022 $68,126.26 BCC Rpt BCC Rpt 5 216.E.1.b Packet Pg. 13 Attachment: 0726 Change Order Backup - FY22 (22819 : Procurement Services administrative reports) $20,284.83 $11,868.28 6 16.E.1.b Packet Pg. 14 Attachment: 0726 Change Order Backup - FY22 (22819 : Procurement Services administrative reports) 05/26/22 12:02 PM Collier County Engineering & Project Management Division WORK DIRECTIVE CHANGE CONTRACT # /PROJECT NAME: 20-7741 / Carica Pump Station Improvements WORK DIRECTIVE # 012 PURCHASE ORDER #:4500204661 DATE OF ISSUANCE: 05/26/22 OWNER: Collier County Board of Commissioners EFFECTIVE DATE: 05/16/22 per SDF Email Attached CONTRACTOR:Florida Design Drilling Corporation ENGINEER/DESIGN PROFESSIONAL: Tetra Tech Inc. You are directed to proceed promptly with the following change(s): Description:This work directive is to add a wood retaining wall and #57 stone around the new concrete pad at the flow meter. Purpose of Work Directive Change:The purpose of this change is to ensure that the new pad does not become undermined from stormwater/rainwater running off from the adjacent structure Reason/Justification:After the new concrete pad was constructed the project team noticed that rainwater from the adjacent road/building was running off around the flow meter and soil was being eroded away. To ensure that the flow meter pad does not become undermined and to prevent future cracking the retaining wall and stone is proposed. Attachments: None If a claim is made that the above change(s) have affected Contract/Allowance Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Method of determining change in Contract Times: Contract/Allowance Price: Unit Prices Contractor’s records Lump Sum Engineer’s record Time & Material Other Other Estimated increase (decrease) in Allowance: $5,053.84 RECOMMENDED: Estimated change in Contract Time: Increase or decrease by calendar days. AUTHORIZED: By: Tyler Wainright, P.E.By: Engineer Owner’s Representative 7 16.E.1.b Packet Pg. 15 Attachment: 0726 Change Order Backup - FY22 (22819 : Procurement Services administrative reports) From:FandrichShon To:nick@fldrilling.com; Wainright, Tyler Cc:BauerJoshua; GrossenbaughDustin; "Selwyn Woodley" Subject:RE: #20124 Carica PS - Stone Around Flowmeter Pad Date:Monday, May 16, 2022 8:12:28 AM Attachments:image001.png CAUTION: This email originated from an external sender. Verify the source before opening links or attachments. Nick, Tyler will prepare WD. Just to ensure we are covered, please consider this email as written direction to proceed with the installation of the stone around the flow meter pad as described in cost proposal 14 and RFI 28. Shon Fandrich, P.E., PMP Senior Project Manager Engineering & Project Management Division “Continuous Improvement” 3339 Tamiami Trail East, Suite 303, Naples, FL 34112-5361 Cell: 239-315-2181 www.colliergov.net From: nick@fldrilling.com <nick@fldrilling.com> Sent: Sunday, May 15, 2022 8:45 AM To: 'Wainright, Tyler' <Tyler.Wainright@tetratech.com>; FandrichShon <Shon.Fandrich@colliercountyfl.gov> Cc: BauerJoshua <Joshua.Bauer@colliercountyfl.gov>; GrossenbaughDustin <Dustin.Grossenbaugh@colliercountyfl.gov>; 'Selwyn Woodley' <selwyn@fldrilling.com> Subject: RE: #20124 Carica PS - Stone Around Flowmeter Pad EXTERNAL EMAIL:This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. See attached not to exceed proposal for this work. Work will be billed T&M. Please send work directive ASAP to prevent issues with payment from the clerk. Thanks, Nick Martin Florida Drilling 561-222-6823 nick@fldrilling.com 8 16.E.1.b Packet Pg. 16 Attachment: 0726 Change Order Backup - FY22 (22819 : Procurement Services administrative reports) COST PROPOSAL NO. :014 DATE: May 15, 2022 DRAWING NO.: SPEC. SECTION: R E F E R E N C E:X REQUEST FOR PROPOSAL: DESCRIPTION: P R I C I N G I N F O R M A T I O N SKILL/TRADE MAN-HOURS RATE COST 1. DIRECT LABOR Welder MH 104.00$ -$ 1.A GENERAL LABOR:Unskilled 20 MH 43.68$ 873.60$ Skilled 20 MH 58.24$ 1,164.80$ Operator MH 62.40$ -$ 1.B FIELD ENGINEERING:Foreman 20 MH 72.80$ 1,456.00$ Superintendent MH 98.80$ -$ Project Engineer MH 93.60$ -$ Project Manager MH 124.80$ -$ Vice President MH 156.00$ -$ 1.C DAILY GENERAL CONDITIONS Time Increase 3 DAY -$ 3,494.40$ SMALL TOOLS & CONSUMABLES -$ OVERHEAD & PROFIT 349.44$ 3,843.84$ 2. MATERIALS AND EQUIPMENT DESCRIPTION WEEKS UNIT PRICE COST 2.A EQUIPMENT:-$ Wellpoint System DY $224.00 -$ 4" pump DY $168.00 -$ Loader DY $840.00 -$ Compactor DY $84.00 -$ Telehandler DY $420.00 -$ Backhoe WK $336.00 -$ DY $1,232.00 -$ -$ -$ FUEL (ON 2.A ONLY)-$ 2.B MATERIAL 1 LD $850.00 850.00$ 1 EA $250.00 250.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 1,100.00$ SALES TAX (ON 2.B ONLY)included above 2.C DIRECT COSTS:1,100.00$ OVERHEAD & PROFIT 110.00$ 1,210.00$ 3. SUBCONTRACTORS COST -$ OVERHEAD & PROFIT -$ -$ 5,053.84$ Bonds & Insurance -$ Permits -$ 5,053.84$ By: By: Date: FLORIDA DESIGN DRILLING CORP. 7733 Hooper Road West Palm Beach, FL 33411 Carica Pump and Pipe Improvements Date:Date: By: Owner (Authorized Signature)Florida Design Drilling Corp. SUBTOTAL (2) Engineer (Authorized Signature) GRAND TOTAL 5% 0.0% Install 24" wide gravel perimeter strip around flowmeter pad including filter fabric beneath gravel and 2x4 pressure treated lumber edging per RFI #28 response. TIME & MATERIAL: DESCRIPTION OF WORK UNITS NOTED SUBTOTAL (1) Excavator PROJECT NAME: LOCATION: OWNER: ENGINEER: Naples, FL Collier County Tetra Tech 7% Sales Tax 0.0% SUBTOTAL (2.A) Filter Fabric #57 Stone SUBTOTAL (2.B) 10% TOTAL (1) TOTAL (2) TOTAL (1)+(2)+(3) SUBTOTAL (3) 10% TOTAL (3) 9 16.E.1.b Packet Pg. 17 Attachment: 0726 Change Order Backup - FY22 (22819 : Procurement Services administrative reports) Item Page #Contract or Purchase OrderDate Description of Project Vendor Name Division ‐ DirectorFiscal Impact for Additional ServicesOutstanding Invoices Description1120-7800 45002164176/30/2022Kirkwood Ave Sanitary Lateral InstallationDN Higgins, Inc. PUEPMD - Matthew McLean $0.00 $4,100.00Contractor paid for permitting fees that should have been processed by the County, per the contract.Meeting DateTotal number of After the Fact MemosFiscal Impact for Additional ServicesOutstanding Invoices7/26/2022 1 $0.00 $4,100.0016.E.1.cPacket Pg. 18Attachment: 0726 After the Fact Report - FY22 (22819 : Procurement Services administrative reports) Instructions As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or contract terms, an After-the-Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order, when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and services not covered by the current contract or purchase order. All such “After the Fact Procurements” will be reported to the County Manager. Requester Name: Division: Division Director: Vendor Name: Amount: Contract #: Purchase Order: Why is this deemed a non-compliant purchase? Choose one. Contract Ordinance Manual P-Card Other Details of Purchase: Explain the circumstances behind this purchase. Action Required: What are you asking to be done to remedy the situation, include list of invoices if applicable? Corrective/Preventive Action: What action is being taken to prevent this violation from re-occurring? The requestor affirms that to the best of their knowledge the information provided in this document is true. Requested by: Signature: Date: Division Director: Signature: Date: Collier County After the Fact Form Haralambos Raftopoulos Engineering & Project Management Matthew McLean Douglas N. Higgins, Inc. $4,100.00 20-7800 4500216417 ✔ The Contractor paid the ROW permit fees; per contract, permits shall be processed internally by the County. Approval to open a purchase order to cover the ROW permit costs of $4,100.00 and approve the payment of the permit costs included in Invoice #5088 dated 6/7/22. The County will short pay the permit credit card processing fee of $118.49. Contractor will be reminded to use the Inter Departmental payment letter when applying for permits. H. Raftopoulos HaralambosRafto poulosVEN Digitally signed by HaralambosRaftopoulosVEN Date: 2022.06.30 08:31:57 -04'00' M. McLean McLeanMatthew Digitally signed by McLeanMatthew DN: E=Matthew.McLean@colliercountyfl.gov, CN=McLeanMatthew, OU=General, OU=PPM User Accounts, OU=PUD Planning and Project Management, OU=PUD, OU=Divisions, DC=bcc, DC=colliergov, DC=net Date: 2022.06.30 11:58:14-04'00' 1 116.E.1.d Packet Pg. 19 Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 216.E.1.dPacket Pg. 20Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 316.E.1.dPacket Pg. 21Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 416.E.1.dPacket Pg. 22Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 516.E.1.dPacket Pg. 23Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 616.E.1.dPacket Pg. 24Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 716.E.1.dPacket Pg. 25Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 816.E.1.dPacket Pg. 26Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 916.E.1.dPacket Pg. 27Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 1016.E.1.dPacket Pg. 28Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 1116.E.1.dPacket Pg. 29Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 1216.E.1.dPacket Pg. 30Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 1316.E.1.dPacket Pg. 31Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 1416.E.1.dPacket Pg. 32Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports) 1516.E.1.dPacket Pg. 33Attachment: 0726 After the Fact Backup - FY22 (22819 : Procurement Services administrative reports)