Agenda 07/12/2022 Item #16E 2 (Reports prepared by Procurement Services Division for Change Orders and other contractual modifications)07/12/2022 EXECUTIVE SUMMARY Recommendation to approve the administrative reports prepared by the Procurement Services Division for change orders and other contractual modifications requiring Board approval. OBJECTIVE: To promote accountability and provide transparency to the public and gain the Board's approval/ratification for various procurement -related transactions. CONSIDERATIONS: In accordance with the Board's Procurement Ordinance 2017-08 and the Procurement Manual, the Procurement Services Division produces a regular administrative report which provides for Board approval of the following transactions: • Change Orders that do not exceed ten (10%) of the current Board approved aggregate amount, and/or require change in schedule (number of days); • Amendments to contracts; • After the fact memos from various County Divisions, as requested by the Clerk's Finance staff for the timely process of invoices. • Other items as deterniined by the County Manager or designee that require Board approval. This administrative report includes the following: • Four (4) change orders that in aggregate modify contracts by $9,887.00 and add 228 calendar days to completion periods, see attached summary and backup for details; and • Zero (0) amendments this period with a fiscal impact of $0.00; and • Three (3) after the fact memos with a fiscal impact of $0.00 for additional services FISCAL IMPACT: The net total for the seven (7) items is $9,887.00. LEGAL CONSIDERATIONS: This item is approved for form and legality and requires a majority vote for Board action. -JAK GROWTH MANAGEMENT IMPACT: There is no Growth Management Impact associated with this action. RECOMMENDATION: To ratify/approve change orders and/or contract amendments and other items as determined by the County Manager or designee in accordance with Procurement Ordinance 2017-08. Prepared By: Sara Schneeberger, Procurement Strategist, Procurement Services ATTACHMENT(S) 1. 0712 Change Order Report - FY22 (PDF) 2. 0712 Change Order Backup - FY22 (PDF) 3. 0712 After the Fact Report - FY22 (PDF) 4. 0712 After the Fact Backup - FY22 (PDF) I Packet Pg. 1700 1 07/12/2022 COLLIER COUNTY Board of County Commissioners Item Number: 16.E.2 Doe ID: 22651 Item Summary: Recommendation to approve the administrative reports prepared by the Procurement Services Division for change orders and other contractual modifications requiring Board approval. Meeting Date: 07/12/2022 Prepared by: Title: Business Technology Analyst, Senior — Procurement Services Name: Sara Schneeberger 06/28/2022 12:28 PM Submitted by: Title: Manager - Procurement — Procurement Services Name: Sandra Herrera 06/28/2022 12:28 PM Approved By: Review: Procurement Services Procurement Services Procurement Services Office of Management and Budget County Attorney's Office Office of Management and Budget County Manager's Office Board of County Commissioners Sandra Herrera Additional Reviewer Ana Reynoso Level 1 Purchasing Gatekeeper Catherine Bigelow Additional Reviewer Debra Windsor Level 3 OMB Gatekeeper Review Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Laura Wells Additional Reviewer Dan Rodriguez Level 4 County Manager Review Geoffrey Willig Meeting Pending Completed 06/28/2022 2:08 PM Completed 06/29/2022 9:19 AM Completed 06/29/2022 10:39 AM Completed 06/29/2022 10:40 AM Completed 06/29/2022 3:53 PM Completed 06/30/2022 8:29 AM Completed 07/06/2022 10:17 AM 07/12/2022 9:00 AM I Packet Pg. 1701 1 U� (spodoi OAIILIJISIUItUPLI sooimoS juawainOOM : MZZ) ZZAI -:podeN japio o6uetjo ULO :juGwLjoBjjv .2 u c-4 u 0 > > 0 0 E 9 A o6 cl� C6 0 r= m m o6 cq m 0 72 u o, oo N r= M cli cw� 0 01 M N 0 0 < Im 5 > LU D LU D LU D CL .0 2 .0 2 1. U) 1 0 0 > U) 10 t < z E 0— > ale(] # asue4j 'ON lueJD /peiJU03 pr �r Ir Ir # aged a u 0 M m 'E 0 0 E 0 C14 CD I- (D -me u m Procurement Sd 16.E.2.b I C;0*er county Change Order Form Z Contract Modification F-1 Work Order Modification Contract #: 21-7849 Change #: 01 Purchase Order#: 4500211268 Project #: 6066.12 Contractor/Firm Name: I Thomas Marine Construction, Inc. I Contract/Project: I Bridge Replacement- Bridge Package A Project Manager Name] Robert White I Division Name: I Transportation Engineering Original Contract/Work Order Amount $ 4,423,258.99 5-11-2021; 11C Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 4,423,258.9!� 5- 11-2021-1 11C Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 4,423,258.99 1/18/2023 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revised Contract/Work Order Total 1 $ 4,423,258.991 0.00% Change from Current BCC Approved Amount Cumulative Changes I $ 0.001 0.00% Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Notice to Proceed 7-19-2021 Original Last Approved Revised Date Date I I Completion Date Date (Includes this change) # of Days Added 14 Select Tasks [A Add new task(s) E] Delete task(s) E Change task(s) El Other Provide a response to the following: 1.) detailed and specific explanation/rationale of the requested change(s) to the task(s) and / or the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. Item A — Traffic Controller Cabinet Change This change will utilize $4,255.96 from the Owner Al lowance- Roadway to implement a new Traffic Control Plan requested by the County's Traffic Management Center. The new plan will provide for'Time of Day' programming. This change will allow the signal timings to be modified for daytime and nighttime traffic flows to help minimize delays and improve safety. The change being requested was not included in the original contract because the planned signal timing was considered sufficient but traffic conditions changed during construction. If this modification is not processed it will not allow for the implementation of the new signal timings directed by the Collier County Traffic Management Center. Item B — Additional Pile Lengths for Test Pile and Concrete Pile; Bridges 034831 and 034832 1 . This change will utilize $31,238.00 from the Owner Allowance -Structures to pay for additional pile length for preformed pile holes. The preforming was required by the plans. FDOT Specification 455-11.12 requires the preforming to be paid as pile length. 2. The change being requested was not included in the original contract because the Engineer's Estimate did not include the preforming lengths and is an estimate. 3. If this modification is not processed the Engineer's requirement for preformed pile holes would not be met. Item C — Add Milling and Resurface Pavement This change will utilize $18,818.44 from the Owner Al Iowa nce- Roadway for asphalt milling and paving as directed by Work Directive #11. This change will add two (2) days to the original contract time. The change being requested was not included in the original contract because the damage to the existing roadway was not predicted. 3. If this modification is not processed the existing road surface would be left damaged and unsafe. 0 E .2 E U 0 a. LO W CNI !E�� CNI C4 CL M U M 0 a) U Q r_ a) E U 2 Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY I Idmin Packet Pa. 1703 2 Item D — Additional Contract Time for Weather and Holidays 1 . This change will add two (2) days for inclement weather and ten (10) days for holidays for a total of twelve (12) days to the original contract time. This change is required to meet the requirements of FDOT Specifications 8-6.4 Suspension of Contractor's Operations — Holidays and Special Events and 8-7.3.2 Contract Time Extensions. 2. The change being requested was not included in the original contract because the schedule impacts were not predicted. 3. If this modification is not processed the Contractor would not receive the days authorized by Contract documents. S Digitally signed by Vincent A Zaliauskas Vincent A Zaliauska Date: 2022.06.06 12:32:10 -04'00' Prepared by: Date: (Vince Zaliauskas P.E., Principal Engineer, HighSpans Engineering, Inc.) Acceptance of this Change Order shall constitute a modification to contract / work order identified above and will be subject to all the same terms and conditions as contained in the contract / work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor Consultant Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. ligitally signed by Kevin Shimp Accepted by: Kevin Shimp Date: 2022.06.07 09:1119 -04'00' Date: (Kevin Shimp P.E., President, Thomas Marine Construction, Inc.) Digitally signed by WhiteRobert Approved by: WhiteRobeft Date: 2022.06.06 11:39:52 -04'00' Date: (Robert White P.E., Project Manager, Transportation Engineering) Digitally signed by RitterSteve Approved by: RitterSteve Date: 2022.06.07 10:41:49 -04'00' Date: (Steve Ritter, Construction Manager, Transportation Engineering) Digitally signed by AhmadJay Approved by: AhmadJay Date: 2022.06.07 13:03:29 -04'00' Date: (Jay Ahmad P.E., Division Director, Transportation Engineering) Digilally signed by S ottTrinity SCottTri nity Dcate: 2022.06.14 Approved by: 09:27: 15 -04'00' Date: (Trinity Scott, Department Head, Transportation Management Services Department) SchneebergerSara Digitally signed by SchneebergerSara Approved by: Date: 2022.06.21 11:24:20 -04'00' Date: (Sara Schneeberger, Procurement Strategist, Procurement Services) Revise& 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY I I Admi I Packet Pg. 1704 ---t_ 3 Change Order Summary COST TIME CO# AM D# Description Justification Deductive Days New Additive Added Amount Utilize Allowance; Change Signal Timing; Add Roadway - $23,074.40 14 562 Preforming Pile Length; Repair 01 Structures - $31,238.00 Damaged Roadway; Add Days for Add Contract Days Weather, Holidays, Additional Work 0 E .2 E U 0 a. LO W C14 F4- C14 04 CL U M 0 U 6 E Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY I --- I -- Packet Pg. 17051 0 0 Z WMO --A :� �) R��MF, --I --I -V 00I NJ li a) < w- -,4, < 14 0 m Ln 0 rD 0 m <. 7 rD < Q. CDa)05- mw.9:0� 0 CL . — * (D 0- Eno C, z rD 0 rD n (D ,D ]3 (D 0) -6 > L� z M r) n Ln n ID CD 0 > n V, m rD w LA > 0 x zr a) Ln w < 2 CA 3 m 0 OrQ �;u CrQ rD 0 0 m CD > n < 0 C) z > > V 1 m :0 0' > Qj 0 a) rL V� U� t� oo Lu X, rIj a) J, L� p 'Y' I" o 'm ;, c 0 Ln �0) I w �n cr) 'j -P, oo oo M 9) p 0 �j v, cy) Lu w 0 o ;:; 0 0 m 0 Q ui ;z o LU w -UP:, Ul ��3. -P� ul Ln -;�' " V, c)� (D 3 0 CD U:�- 4� Ls� Ln > Co Ll C) V) F Em m X m > G) M n m V) m U, 0 > L/) L, m > M L, o m L, 0 m r-) �o C) m C� �Q M m Ul ;;a M > Ln --A Cn --] 0 < M M M M 0 z F: 0 0 < m -j Co m --i 00 V) G) Im z - -M �3 m -0 OR ul Q 00 > Ll n Co �n I I I I I I I I I I I fl�jl I I I I I I I I I I F 16.E.2.b ] I 0 Co CD 0) cc -P, C, Co Co CL CrQ (D m rD a) 'E -4 Z Ln L/) Ln > n 0 5 O-Q R 3 CL m > !� = '7' -ul -ul LM L� C On Ln uj 0 CD C:) 0 0 0 0 w CD rD (D < > ID 2. a' rD C) zr w 0 + n ID 0 0 CIL (D < (D C2- �-D (D CD Co ul 'mr, w ul w ul C) I o (D un rD U, �u PO rD 0 4� CD 0 0 C) 0 0 o (D C, 00 1 0� C CD wou 3 fD cc Ln < E;;' m (D CL 0 ul o 90 n ul U, 0 rD �O 3 M 00 ul 6 C, 4� -pl. C) 6 o 0 C) rD 0- 0 CL W L. W .2 U) E 0 0 0 L- CL LO w 04 CN C*4 LL CL 2 (D E 0 0 L) C*4 CD E Cu I Packet Pg. 1706 1 EXTRA WORK SHEET %Tboffiss 10 Ifierio iwtioo Goostr Thomas Marine Construction, Inc. Number: CO-292-001 Civil Strtictures, Since 1982 (issued by) 8999 High Cotton Lane Project: Collier 11 Bridge Replacement Package A Cont. No. 66066.12 Fort Myers, FL 33905 Date: 5/9/2022 TMC Proj#: 292 (Address) To: Highspans Engineering 2050 Commerce Ave 11 Material or Subcontractor Immokatee, Ft El Owner Force Account Work (Address) 123 Extra Work Check One • Equipment Lease or Vendor Invoice • Unforeseen Condition ATTN: Micheal O'Shea PE El Cost Savings Initiative Proposal J Description of Work: Per Email dated 1/24/22 from Highspans to Thomas Marine, Collier County Traffic Ops is requesting the Traffic Controtler cabinet that was installed per plan be modified to implement a new Time of Day (TOD) program to the Traffic Controller Cabinet. This will allow the signal timings to be modified for daytime and nighttim traffic flows to help minimize delays and improve safety. Our price to make these modifications are in line with FDOT Historical Costs for Market Area 10 whic inc u( I Collier County. tractor Hours Hrty Rate of Equipment, Materials and Labor J— or or Equipment Material Labor Total IDetail Quantity Unit P Cost Cost Cost Amount LABOR $ $ $ MATERIAL EQUIPMENT Sub Total Directs: $ $ SUBCONTRACTOR JTroffic Control Devices 1.00 $ 4,255.9 $ 4,255 1 $ 1 Sub Total Subcontractors: $ 4,255 PRIME CONTRACTOR MARKUP Total Labor X 10.00% Total Materials $ X 10.00% $ Total Equipment = S - X 10.00% $ Total Subcontract T X 10.00% Sub Total: $ Extra Work Sheet SUB TOTAL: $ 4,255 T Total Liability Et Bond $ 4,255.96 X No markup when using Extra Work Sheet OVERAL TOTAL: pproved for Owner, Material or Sub -Contractor FDOT average Approved for Company By By 0 rL a) T) .E E M U) a) W Cn E U 0 IL W 04 !LN� 04 04 CL M le U M IM E 0 U CD E Page I of 1 Packet Pg. 1707 V TRAFFIC IS C0NTR0L LU DEVICES, INC. TO: Darren Watkins RE: TRAFFIC CONTROL DEVICES, LLC. 6489 Florida Street Punta Gorda, Florida 33950 phone: 941-833-9346 Fax: 941-833-9348 ProposalFor: Traffic Controller Assembly Modification Project Number: 21-7849 ST TCD Project Number: 21032 DATE: 01/22/22 Location: Collier County Bridge 034831 & 034832 Description: This Cost is to Modify the exisng traffic signal controller timming per the direction of the Collier County Traffic Ops Engeer.This cost reflects the onsite review of the project timming plans In real time and to make multiple adjustments onsite per the Collier County Engineer. Also time of day plans were requested to be changed to those specified the the Engineer. Onsite cabinet timing sheets were adjusted and modified in the field cabinets and recorded for onsite use. ftern V/ I This proposal is a jump proposal, For the total amount of $4,255.96 Four Thousand Two hundred Fifty Five Dollars and Ninty Six Cents. 2 AJI Timmings that were Changed were performed under the Direction and Oversire of the Collier County Traffic Ops. Engineer onsite at all temperary Traffic signals installed at Bridge 034831 & 034832 3 All MOT provided by others NOTES: a. This is a Lump Sum Price Proposal ACCEPTED: SUBMI I I . BY: TRAFFIC CONTROL DEVICES, LLC- PURCHASER 6489 Florida Street Punta Gorda, Florlda 33950 BY: Manager Title Jason OW61:i� Project DATE: Z— Date: 112212022 I Packet Pg. 1708 C) C) CD CD CD (D C) CD C) C:) CD m 0) m m m 0) 0) 0) (3) CV) 0) (3) CY) 00 OD 00 00 03 00 03 -4 --4 --4 -4 --4 --4 --4 Cn -[� ", Al� 0) m Cr) 0') CD C) 0 w Ili rj — VI Cli (n Cri Cn M 4�- Co C:) (D CD c, -0 rQ J1. 69 Q4 U) 04 to �a w 'E�o 00 Q4 -4 C.0 41 (n -4 00 -M 00 N) --j Cn OD N) -4 -P, 0 CD m (n Cn Cyl C) CD CTI C) C:) CD M (il 'Co M m C, (D w Cn C) C) C:) C, CD CD �j Co Cil (D m r,�) CD C-n C", �2 �2 .60 <J� Cl) Cl) - Cn - I - m 0 41 0 (n w 0 w C) C:) C:) C) CD C) m C� 0') Cn w C) w (D C) CD CD -r� r1i C) CD C) CD CP <0 w EA �o 4 C) C) C) r1i �o QD C:) (Z) C) C:) CD C) CD C) N) K) (D -4 b) CY) �j C) C�n Cn 'CD 01 CD in C) . CZ) (D CD CD C) CD 0 0 C) C) 0 C> 0 0 a (2) C) C) CD CD CD CD CD CD C:) C) C:) (Z) C:) m m m m m m m m m m m > > > > > > > > > > > > > > Cn (n w z z z z z z z z z z z z z z m DL M z ::a --A > > m C) r 0 Z M U < m x r m r M 0 F m ;a Z F C/) Cf) - C r C go C/) > C z C 0 m > 1 m F 1 0 Q 1 -n - i Fn- F r- r ) 0 C I m r 4 1 I m z m r U) C C) C: Cn o 4 CD Cn Cn > (f) U) 0 C) 0 0 r- > > Co Co m m m -n < < 0 z m C-) C— M� > -0 > > 0 m M M 0 C > > C M C/) 90 zC) r- i-- 0 0 o U) o z 0 =Fl Cf) m m m > m z C) N C r- m > 1 0 z U) C/) C) m C= r- x 0 m Cl) > 0 1 C z C z 70 0 z 0 0 m - z Cn w > m r- > m Cn C/) Cf) Cn 41 C: m N U) N m Cn X m 0) X i -n -n i -n -n 0 0 0 0 21- z 70 m 0 0 I m m I ;o Cf) C/) Cf) C/3 1 m m 00 Co r- E-< < 0 go n Z m -u m m a z (D LQ (D Ilb 0 (D 5 !I Ky 0 -n 0 -n I 0 0 CL > r- m (D C.1) (.0 (D 0 o W 0 CD 0 0 cD > % CD A) C, (D CL CD CD CD < IM (D C 0 0 CD -0 3 (D 0 (n CA I Packet Pg. 1709 8 cofP116y county ITEM C .00111111111 Transportation Management Services Department Transportation Engineering Division WORK DIRECTIVE CHANGE CONTRACT 4 /PROJECT: 21-7849/11 Bridges Immokalee PKG A CHANGE401 DATE OF ISSUANCE: April 7,2022 EFFECTIVE DATE: April 7,2022 OWNER: Collier County Board of Commissioners PROJECT#: 66066.12 CONTRACTOR: Thomas Marine Construction, Inc. ENGINEER/DESIGN PROFESSIONAL: Sadie Dalton, P.E. You are directed to proceed promptly with the following change(s): Description: Mill the existing road surface 1 1/2" (average) from STA 134+52 (existing joint at IW&S patch) to STA 135+60, the limit of pavement reconstruction and mill the area of Airpark Boulevard (STA 135+10 to 135+60) affected by the temporary traffic diversion. The sum of the two areas is approximately 786 SY. Resurface those areas with 1 1/2" asphalt FC- 12.5, approximately 65 TN. Replace the existing road markings throughout the affected areas (field measurements to verify additional striping cost). Maintain the existing slopes and drainage patterns. Purpose of Work Directive Change: The temporary lane diversion affected the existing road surfaces in such a manner that resurfacing is required. Attachments: None If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Contract Price: Unit Prices Lump Sum Fj Other Estimated increase in Contract Price: $ 17,000.00 Method of determining change in Contract Times: F-1 Contractor's records E] Engineer's record Z Other - Field Observations/Daily Work Reports Estimated change in Contract Time: Increase of deer -ease by 2 calendar days RECOMMENDED: AUTHORIZED: Digitally signed by Vincent A t Digitally signed byWhiteRobert Vincent A Zaliauskas WhiteRober Date: 2022.04.21 13:02:23 -04'00' By: Z 'a I P.D.te: 2022.04.26 13:29:41 By. -V1nW �;Mu&as, V."Proj ect Engineer Robert White, P.E., Project Manager HighSpans Engineering, Inc. Axqbl� Collier County Transportation Engineering TrdWoltabm Ergnwrq Drmon - 2885 Saffi Hawshoe Dw - Nq)les, Fbrda 34104 - 239-252-8192 - www.CdafmntfL.Gov 0 E Cn E U 0 a. LO W 04 N- 04 04 CL M �e U M Im L- CD 0 (D U CD E U 2 I Packet Pg. 1710 1 b 0 EXTRA WORK SHEET 1115-5 Nion ion ;,pstruct Thomas Marine Construction, Inc. Number: CO-292-002 Civil Structures Since 1982 (Issued by) 8999 High Cotton Lane Project: Cottier 11 Bridge Replacement Package A Cont. No. 66066.12 Fort Myers, FL 33905 Date: 5/9/2022 TMC Proj#: 292 (Address) To Highspans Engineering 2050 Commerce Ave IJ Material or Subcontractor Immokatee, Ft 0 Owner Force Account Work (Address) IRI Extra Work Check One • Equipment Lease or Vendor Invoice • Unforeseen Condition ATTN: Micheal O'Shea PE 0 Cost Savings Initiative Proposal _J Description of Work: Mill the existing road surface I 1h" (average) from STA 134+52 (existing joint at IWEtS patch) to STA 135+60, the limit of pavement reconstruction and mitt the area of Airpark Boulevard (STA 135+10 to 135+60) affected by the temporary traffic diversion. The sum of the two areas is approximately 786 SY. Resurface those areas with 1/2" asphalt FC-12.5, approximately 65 TN. Replace the existing road markings throughout the affected areas (field measurements to verify additional striping cost). Maintain the existing slopes and drainage patterns. FLrim. Contractor Hours Hrly Rate of Equipment, Materials and Labor I or or Equipment Material Labor Total IDetail Ouantity Unit Price Cost Cost Cost Amount LABOR General Supertindent 8.00 86.01 1 688. $ $ $ $ $ MATERIAL EQUIPMENT Sub Total Directs: $ 688.08 $ 688. SUBCONTRACTOR Preferred Materials MillinglCleanup 786.00 1 5 7— —6,893. Sub Total Subcontractors: S 6,893. PRIME CONTRACTOR MARKUP Total Labor = $ 688.08 X 10.00% $ 68. Total Materials = $ - X 10.00% $ Total Equipment $ X 10.00% $ Total Subcontract $ 6,266.56,6�_ X 5.00% 313.33 $ —344, $6,893.22 / 1.1 $6,266.56 $ 382.14 Sub Total: $ -44-3-. Extra Work Sheet SUB TOTAL: $ Total Liability Et Bond X $7,963. Extra Work Sheet OVERAL TOTAL:1 Approved for Owner, Material or Sub -Contractor Approved for Company $7,963. By By Page 1 of 7 Packet Pg. 1711 10 . � 0 p P.. �; .1 1 & T 0 > Lo S E m M a) 0 Co E T- LO w N Cm N CM U- CN CD -W E I Packet Pg. 1712 46o- Preferred MATERIALS, INC. A CRH COMPANY 3/22/2022 11 Preferred Materials, Inc. 18080 Green Meadow Road Fort Myers, FL 33913 www.preferredmaterials.com Darren Watkins, E.I. Project Manager/General Superintendent 8999 High Cotton Lane, Ft. Myers, FL 33920 21-7849-ST Bridge Replacement - Bridge Package A 2 Bridges - Immokalee PMl Job No. 212836 Cost Proposal # I — Extra Mill & Resurface Bridge 034831 Dear Mr. Watkins, Please see the attached cost proposal from PMl and our subcontractor for the additional work to be performed on the project per our conversation just east of the project limits for Bridge 034831 a total of 786 SY Milling. The total amount requested including equipment, material and labor to complete this work comes to an amount of $6,893.22. The cost breakdown is also attached. Should you have any questions, please feel free to contact us at (239) 910-8460. Sincerely, Digitally signed by Larry C Stesprit DN: c�US, �PRIIIRRID MATIRIALS, Larry C Stespr t ou=AO141 OD000001 6F1 B3589A200001725, cn=Larry C Stesprit Date: 2022.03.22 12:31:38 -04'00' Larry "Chad" St. Esprit Preferred Materials Project Manager I Packet Pg. 1713 12 Extra Work LABOR DESIGNATION Rate(+) Burden BUR RATE Reg. Hrs. OT Hrs. Reg. Cost BUR RATE Total Cost $ $ $ $ LABOR SUBTOTAL is - Bluebook 50% EQUIPMENT Rates Hours Idle Cost Total $ $ EQPT. SUBTOTAL SUBCONTRACTOR Quantity Unit Price Milling and cleanup 786 SY 8.77 $ 6,893.2: $ 6,893.2 MISCELLANEOUS ITEM Unit Price Is 1 1$ MISC. ITEM SUBTOTAL 1 $ EXISTING PAY ITEM Quantity Unit Pme $ $ $ $ NOTES: Additional Milling and Clean-up east of bridge 034831 EXIST. PAY ITEM SUBTOTAL $ SUBTOTAL SUBCONTRACTOR $ 6,893.2 SUBTOTALLABOR $ - SUBTOTAL EQUIPMENT $ SUBTOTAL MATERIAL $ SUB MARKUP, 10% on 1st $50K $ SUB MARKUP, 5% LABOR MARKUP , 17.5% $ EQUIPMENT MARKUP, 17.5% $ MATERIALS MARKUP, 17.5% $ SUBTOTAL $ 6,893.2 LIABILITY& BOND, 1.5% TOTAL $ 6,893.2 IMISCELLANEOUS $ JEXISTING PAY ITEM $ IGRAND TOTAL $ 8932 0 CL 2 .S E .2 U) E 0 0 0 L_ IL LO w 04 04 C*4 04 CL E 0 0 L) C14 CD E CU I Packet Pg. 1714 13 Added Contract Days ITEM D Weather Days (2) 1. 11/05/2021 2. 02/09/2022 Holiday (11) 3. 11/11/2021 — Veteran's Day 4. 11/25/2021 — Thanksgiving 5. 11/26/2021 — Thanksgiving 6. 11/27/2021 — Thanksgiving 7. 11/28/2021 — Thanksgiving 8. 12/24/2021 — Christmas 9. 12/25/2021 — Christmas 10. 12/26/2021 — Christmas 11. 12/31/2021 — New Year 12. 01/01/2022 — New Year 13. 01/02/2022 — New Year Extra Work — 2 Days, added at the end of the revised contract time. Packet Pg. 1715 14 Procurement Sd 16.E.2.b I CAr County Change Order Form Contract Modification F-1 Work Order Modification 70120.4.1, 60139.4.1, Contract #: 21-7823 Change #: 1 Purchase Order #: 4500210679 Project #: 70120.4.2, 60139.4.2 Contractor/Firm Name: I D. N. Higgins Inc. Contract/Project: I 108th & 109th Avenue North Public Utilities Project Manager Namej Diana Dueri, PIVIP Division Name: � EPIVID Original Contract/Work Order Amount $ 12,337,900.00 03/23/21;11 A Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 12,337,900.00 03/23/21;11 A Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 12,337,900.00 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revised Contract/Work Order Total $ 12,337,900.00 0.00% Change from Current BCC Approved Amount ICumulative Changes $ 0.1 0.00% Change from Current Amount ICompletion Date, Description of the Task(s) Change, and Rationale for the Change Notice to Proceed 5/24/2021 Original Last Approved Revised Date Date I I Completion Date Date (Includes this change) # of Days Added 1 6 Select Tasks E] Add new task(s) E] Delete task(s) El Change task(s) 0 Other Provide a response to the following: 1.) detailed and specific explanation/ration ale of the requested change(s) to the task(s) and / ol the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impacl if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. This change order is for the additional of 6 days (3 days for Collier County Emergency Work & Tropical Storm Elsa and 3 days for WD #9) and the use of $33,490.95 of project allowance, as detailed below: Additional 3 Days — Collier County Emergency Work & Tropical Storm Elsa I The purpose of this change is to add 2 days to the contract time due to emergency work for Collier County that prevented the Contractor for working on Tuesday 6/15/2021 and Wednesday 6/16/2021; and add I day to the contract time due to Tropical Storm Elsa that prevented the Contractor for working on Tuesday 7/6/202 1. 2. The additional 3 days were not included in the original contract as it is was unknown that emergency work would be necessary and that a tropical storm would prevent the Contractor from working. If the additional 3 days are not added to the contract, the Contractor will not be able to complete the project within the contract time, at no fault to the contractor. This Change increases the amount of days in the contract by 6 days. This Change DOES NOT change the contract amount. 04222022 0 E .2 E U 0 a. LO W C4 C4 LL U 0 U C4 E U 2 Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY I Ad,in Packet Pg- 1716 15 WD #4 Tree Removal 1. To remove trees on private property near the Right -of -Way (ROW) along 109th Avenue North. 2. Due to multiple property owner concerns the Contractor was directed to not remove several trees at the ROW line along 109th Avenue North, requiring the contractor to remobilize and provide supervision for the removal of the trees. 3. Without the removal of the trees, the roots would extend into the ROW and impact newly installed stormwater system, or once the roots were removed, the trees may die and/or become a fall down hazard. This Change is to use $2,554.00 from the project general allowance for 109th Avenue North. This Change DOES NOT change the contract amount. WD #5 7th Street Temporary Sidewalk 1. The installation of the water main along 7th Street required the removal of the existing sidewalk along 7th Street. The purpose of this work directive is to provide a temporary sidewalk along 7th Street throughout the project work zone. 2. The need for a temporary sidewalk was not anticipated and the contract only required that the sidewalk be restored when the project is functionally complete. Since the contract was executed, Naples Park Elementary requested that a temporary sidewalk be provided. 3. If this change is not processed, the school children which commute to/from Naples Park Elementary along 7th Street will not have a firm, stable, and slip resistant surface to walk on. Without the temporary sidewalk, the safety of the school children would be at risk as they would be detoured and required to walk an additional 0.6 miles to and from school each day. This Change is to use $4,839.25 from the project general allowance for 108th Avenue North and $4,839.25 from the project general allowance for I 091h Avenue North. This Change DOES NOT change the contract amount. WD #6 10882 Vanderbilt Power Service 1. The electrical power service (which was unmarked) to 10882 Vanderbilt Drive (at the intersection of 109th Avenue and Vanderbilt Drive) was damaged due to the utility work along 109th Avenue. 2. The need for repairing electrical power service to 10882 Vanderbilt Drive was not included in the contract as the contract requires that the Contractor has the existing utilities located via the Sunshine 811 system, which the Contractor completed, and protect existing utilities. However, the electrical power service was not marked by the power company's (FPL) utility locating subcontractor (USIC). 3. To quickly restore power to this property, the Contractor was directed to repair the electrical service. If this change is not processed, the Contractor will not be compensated for the restoration of electrical power service to 10882 Vanderbilt Drive. This Change is to use $8,458.45 from the project general allowance for 109th Avenue. This Change DOES NOT increase the contract amount. The County will submit a claim to Risk Management to work with the Contractor on a subrogation claim to recover the cost of the damages. T- Ln W N N- A�� 04222022 Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate geet.) PROCUREMENT USE ONLY I Ad,in Packet Pg- 1717 16 WD #7 - Sanitary Storm Conflict at 1081 Avenue I . The purpose of this change is to adjust the quantity of 24" ADS Pipe by 544 LF, Bid Item No. 4.5a from 2,792 LF to 3,336 LF and to adjust the quantity of 24" ADS Perforated Pipe in Water Quality Trench by 260 LF, Bid Item No. 4.6a from 2,639 LF to 2,379 LF as a result of the proposed stormwater infrastructure elevation needing to be raised, to accommodate the existing sanitary lateral elevations at the connection points. The raising of the proposed stormwater infrastructure at the locations described in WD #7 will result in the stormwater main no longer functioning as water quality trench. Therefore, the raised stormwater main will be installed and billed as 24" ADS Pipe, Bid Item No. 4.5a (unit price of $65.00/LF, increase of $35,360.00) instead of Bid Item 4.6a 24" ADS Perforated Pipe in Water Quality Trench (unit price of $136.00/LF, decrease of $35,360.00). 2. The elevations of the existing private sanitary sewer connections are not known during the design process, as the private sanitary sewer connections are buried. During construction, the elevations of the existing private sanitary sewer connections are determined by the Contractor by excavation at the connections. To provide the required minimum sanitary lateral slope, the storm water infrastructure elevations must be adjusted. The proposed sanitary sewer main was lowered during the design to provide as much room as possible but some of the existing private sanitary sewer connections were determined during construction to be in conflict with the proposed stormwater infrastructure. 3. If this change is not processed, the Contractor will not be able to be paid for the added quantities of 24" ADS Pipe, Bid Item No. 4.5a (unit price of $65.00/LF). Note, this change will result in a reduction of 260 LF to Bid Item 4.6a 24" ADS Perforated Pipe in Water Quality Trench (unit price of $136.00/LF) and an increase of 544 LF to 24" ADS Pipe, Bid Item No. 4.5a (unit price of $65.00/LF), resulting in a net zero dollar change. This Change DOES NOT increase or decrease the contract amount. 04222022 T.- C4 Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY I Ad,in Packet Pa - 1719 WD #9 - Modification of Existing Storm Structures 1. The elevations of sections of the proposed stormwater infrastructure were adjusted to accommodate the existing sanitary lateral elevations at the connection points. To accommodate the elevation adjustments, an additional 11 modifications to existing storm structures will be added for 1081h Avenue under Bid Item No. 4.15a at the contract unit price rate of $800/modification ($8,800) and an additional 5 modifications to existing storm structures will be added for 109th Avenue under Bid Item No. 4.15b at the contract unit price rate of $800/modification ($4,000). Avenue Date Modified Structure Invert(s) Modified No. of Modifications 108th 10/11/2021 S-24 West I 108th 11/17/2021 S-32 East & West 2 108th 10/4/2021 S-110 West I 108th 10/20/2021 S-128 East & West 2 108th 10/28/2021 S-131 West I 108th 11/4/2021 S-132A East 1 108th 11/9/2021 S-138 East & West 2 108th 11/11/2021 S-142 West I Total 11 Avenue Date Modified Structure Invert(s) Modified No. of Modifications 109th 11/1/2021 S-34 East I 109th 11/2/2021 S-39 West I 109th 11/3/2021 S-132 East 1 109th 11/4/2021 S-137 East & West 2 Total 5 2. The elevations of the existing private sanitary sewer connections are not known during the design process, as the private sanitary sewer connections are buried. During construction, the elevations of the existing private sanitary sewer connections are determined by the Contractor by excavation at the connections. To provide the required minimum sanitary lateral slope, the storm water infrastructure elevations must be adjusted. The proposed sanitary sewer main was lowered during the design to provide as much room as possible but some of the existing private sanitary sewer connections were determined during construction to be in conflict with the proposed stormwater infrastructure. 3. If this change is not processed, connecting the sanitary sewer main to the private connections would not be possible and the homes in this area would not be connected to the County sewer system. This Change is to use $8,800.00 from the project stormwater allowance for 1081h Avenue North and $4,000.00 from the project stormwater allowance for 109th Avenue North. This Change DOES NOT increase the contract amount. This Change increases the amount of days in the contract by 3 days. 04222022 T-- Ln W C4 54- C4 cm cc 0 a) C4 E 0 M PROCUREMENT USE ONLY Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate she4 I Ad,in Packet Pa - 171 A 18 10811 Avenue North Beginning General Allowance $140,000.00 Allowance Draw WD #5 $ (4,839.25) Remaining General Allowance $135,160.75 Beainnina Water Allowance $100,000.00 Remaining Water Allowance $100,000.00 Beginning Wastewater Allowance $200,000.00 Remaining Wastewater Allowance $200,000.00 Beginning Stormwater Allowance $150,000.00 Allowance Draw WD #9 $(8,800.00) Remaining Stormwater Allowance $141,200.00 109t' Avenue North Beginning General Allowance $140,000.00 Allowance Draw WD #4 $ (2,554.00) E Allowance Draw WD #5 $ (4,839.25) Allowance Draw WD #6 $ (8,458.45) 0 Remaining General Allowance $124,148.30 0. Beginning Water Allowance $100,000.00 Ln Remaining Water Allowance $100,000.00 Beginning Wastewater Allowance $200,000.00 Remaining Wastewater Allowance $200,000.00 Beginning Stormwater Allowance $150,000.00 Allowance Draw WD #9 $ (4,000.00) Remaining Stormwater Allowance $146,000.00 04222022 Revised: 01/14/2021 (Divisions who may require additional signatures may include on separateshe.t.) PROCUREMENT USE ONLY I Ad,in Packet Pg- 1720 19 Prepared by: Date: 5/10/2022 Diana Dueri, EPMD Acceptance of this Change Order shall constitute a modification to contract / work order identified above and will be subject to all the same terms and conditions as contained in the contract /work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor / Consultant Design Professional arising out r to the change set rt r-ein, including claims for impact and delay costs. ?d 4 Accepted by: Date: Mik�e�o�lbelbZ4�(. S, Inc. 0 k 5/11/2022 CL Accepted by: -2 Date: "i '/ a) J u s�-`.Ki Frederiksen, P.E. — Q. Grady Minor & Associates, P.A. Dig,W11y b,g,bd by bbil--j—, C BullertBenjamin OU-P D Pb—,g nd Prq-t Mb­--, —PUD Q—i—blb, D-11 ­d­b, D—bt Approved by: — 2022 05 25 1,26 02-04 00 Date: Ben Bullert, P.E., Principal Project Manager, EPMD E 0---I, 01-PPM U— A-- OU-PUD P--g -1 Prq-t McLeanMatthew M DC -- Approved by: ... _2 �' 2, Date: Matthew McLean, P.E., Director, EPMD SchneebergerSaraDate: Digitally signed by SchneebergerSara 2022.06.06 09:35:24 -04'00' Approved by: Date: (Procurement Professional) E U 0 IL LO Flk C4 04 CL U M 0 a) U Q E Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin BC� I BCC ES 14 'I Packet Pg. 1721 Change Order/A21ument Summary 16.E.2 COST TIME CO# AMD# Description Justification Days New Additive Deductive Added Amount This CO adds an Days added for emergency work, a additional 6 Days; tropical storm and modification to authorizes the use of existing storm structures; and contract allowance; and allowance utilized for tree removal, adjusts contract N/A N/A 6 456 temporary sidewalk, electrical quantities for work power service restoration, sanitary necessary as a result of sewer lateral conflict avoidance, WDs 4, 5, 6, 7 & 9. and existing stormwater structure modifications. .b 0 rL a) U W E W U 0 L- a. LO W A?a) 04222022 Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY I Ad,in Packet Pg- 1722 COLLIER COUNTY EMERGENCYff RK - 2 ADDITIONAL DAYS 1171" Colfler C014ftty Public Utilities Department Growth Management Department DAILY REPORT OF CONSTRUCTION 108t' AVENUE NORTH PUBLIC UTILITY RENEWAL PROJECT 3� Stantec Date:6/15/2021 RPRs: N/A Stantec PIN: 177311645 Accidents E]Yes ENo Day of Week: Tuesday Contract Day: 23 Total Days: 420/450 Accident Report #: HIGH TEMP(F): 90*F AM Conditions: Sunny PM Conditions: Sunny N/A LOWTEMP(F): 73*F General Remarks #1 - Prime Contractor — D.N. Higgins 0 No general activity today. Planned Activities for the week: No activities planned for the week. Water System Remarks #1 - Prime Contractor — D.N. Higgins 108th Avenue North 0 No water activity today. Planned Activities for the week: Contractor anticipates bacteriological sampling of new 8-inch water main on the 500 and 600 blocks of 108th Avenue North. Wastewater System Remarks #1 - Prime Contractor — D.N. Higgins 108 th Avenue North 0 No wastewater activity today. Planned Activities for the week: No activities planned for the week. Stormwater System Remarks #1 - Prime Contractor — D.N. Higgins: 108th Avenue North 0 No stormwater activity today. 108 1h Avenue North Public Utility Renewal Project Page I of 2 0 CL E U) E a) 0 0 (L LO W 04 CN CL E 0 L) C*4 E I Packet Pg. 1723 22 Planned Activities for the week: No activities planned for the week. Dust Control Activity During the Day Location Time ime ime ime ime Contractor(s) and Personnel # Name Type # Hrs Type # Hrs Type # Hrs 1 Prime: D.N. Higgins PM 0 0 Field Supervisor 0 0 ipe Layer 0 0 Operator 0 0 Laborer 0 0 Truck Driver 0 1 0 0 Contractor(s) Equipment (Active or Idle) Cont/Sub # Equipment ID Description # Pieces # Used Total Hours Used Front Loaders 1 0 0 Excavator 1 0 0 1 - Sweeper 1 0 0 1 - Grader 0 0 0 1 - Utility Truck 1 0 0 1 - Pickups 1 0 0 1 - Dump 1 0 0 1 - Skid Steer 0 0 0 RPR Name and Position Hours at Job Site/Off ice Total Hours N/A From: N/A To: N/A N/A 108 Ih Avenue North Page 2 of 2 Public Utility Renewal Project 0 2A .S E .2 4) E (D U 0 IL LO W N F4- I Packet Pg. 1724 1 Cotier C014ftty Public Utilities Department Growth Management Department 23 DAILY REPORT OF CONSTRUCTION 108t' AVENUE NORTH PUBLIC UTILITY RENEWAL PROJECT At' PuNic, Stantec Date:6/16/2021 RPRs: N/A Stantec PIN: 177311645 Accidents E]Yes NNo Day of Week: Wednesday Contract Day: 24 Total Days: 420/450 Accident Report #: HIGHTEMP(F): 84*F AM Conditions: Cloudy PM Conditions: Rain N/A LOWTEMP(F): 73*F General Remarks #1 - Prime Contractor — D.N. Higgins 0 No general activity today. Planned Activities for the week: No activities planned for the week. Water System Remarks #1 - Prime Contractor — D.N. Higgins 108th Avenue North 0 No water activity today. Planned Activities for the week: Contractor anticipates bacteriological sampling of new 8-inch water main on the 500 and 600 blocks of 1081h Avenue North. Wastewater System Remarks #1 - Prime Contractor — D.N. Higgins 108 th Avenue North 0 No wastewater activity today. Planned Activities for the week: No activities planned for the week. Stormwater System Remarks #1 - Prime Contractor — D.N. Higgins: 108th Avenue North 0 No stormwater activity today. 108 1h Avenue North Public Utility Renewal Project Page I of 2 0 CL E U) E a) 0 0 (L LO W 04 CN CL E 0 L) C*4 E I Packet Pg. 1725 24 Planned Activities for the week: No activities planned for the week. Dust Control Activity During the Day Location Time ime ime ime ime Contractor(s) and Personnel # Name Type # Hrs Type # Hrs Type # Hrs 1 Prime: D.N. Higgins PM 0 0 Field Supervisor 0 0 ipe Layer 0 0 Operator 0 0 Laborer 0 0 Truck Driver 0 1 0 0 Contractor(s) Equipment (Active or Idle) Cont/Sub # Equipment ID Description # Pieces # Used Total Hours Used Front Loaders 1 0 0 Excavator 1 0 0 1 - Sweeper 1 0 0 1 - Grader 0 0 0 1 - Utility Truck 1 0 0 1 - Pickups 1 0 0 1 - Dump 1 0 0 1 - Skid Steer 0 0 0 RPR Name and Position Hours at Job Site/Off ice Total Hours N/A From: N/A To: N/A N/A 108 Ih Avenue North Page 2 of 2 Public Utility Renewal Project 0 2A .S E .2 4) E (D U 0 IL LO W N F4- I Packet Pg. 1726 1 ITROPICAL STORM ELs95 ADDTIONAL DAY AZT* Cojfle-r C;,014ftty DAILY REPORT OF CONSTRUCTION 108" AVENUE NORTH Public Utilities Department Growth Management Department PUBLIC UTILITY RENEWAL PROJECT *4 OP. �-511' - " 3� Stantec Date: 7/6/2021 RPRs: N/A Stantec PIN: 177311645 Accidents E]Yes IR No Day of Week: Tuesday Contract Day: 44 Total Days: 420/450 Accident Report #: HIGHTEMP(F): 78*F AM Conditions: Cloudy/Rain PM Conditions: Cloudy/Rain N/A LOWTEMP(F): 74*F General Remarks #1 - Prime Contractor — D.N. Higgins 0 No general activity today. Planned Activities for the week: No activities planned for the week. Water System Remarks #1 - Prime Contractor — D.N. Higgins 0 No water activity today due to Tropical Storm Elsa. Planned Activities for the week: Contractor anticipates connecting water services along the 500 and 600 blocks of 108 th Avenue North. Wastewater System Remarks #1 - Prime Contractor — D.N. Higgins 108 th Avenue North 0 No wastewater activity today. Planned Activities for the week: No activities planned for the week. Stormwater System Remarks #1 - Prime Contractor — D.N. Higgins: 108 th Avenue North 0 No stormwater activity today. Planned Activities for the week: 0 No activities planned for the week. 108 1h Avenue North Page I of 2 Public Utility Renewal Project 0 CL 2 .r- E U) E a) 0 0 (L LO W 04 04 04 CN CL E 0 L) C*4 E I Packet Pg. 1727 26 Dust Control Activity During the Day Location Time Time Time Time Time Contractor(s) and Personnel # Name Type # Hrs Type # Hrs Type # Hrs 1 Prime: D.N. Higgins PM 0 0 Field Supervisor 0 0 Pipe Layer 0 0 Operator 0 0 Laborer 0 0 Truck Driver 0 0 Contractor(s) Equipment (Active or Idle) Cont/Sub # Equipment ID Description # Pieces # Used Total Hours Used Front Loaders 0 0 0 Excavator 0 0 0 Sweeper 0 0 0 Grader 0 0 0 Utility Truck 0 0 0 1 Pickups 0 0 0 1 Dump 0 0 0 1 Skid Steer 0 0 0 V- LO W N F4- RPR Name and Position Hours at Job Site/Off ice Total Hours N/A From: N/A To: N/A N/A No photos taken. 108 Ih Avenue North Page 2 of 2 Public Utility Renewal Project I Packet Pg. 1728 1 0. --r IWORK DIRECTIVE 4 g-[FREE REMO Collier Coijnty Engineering & Pro'ect Management Division WORK DIRECTIVE CHANGE CONTRACT # �PROTECT NAME; fi2 �-7823 108'11 and 109111 Avenue North Publip Utilirie& Renewal PURCH AS E 0 RD ER 0-. 4 5 0 02 1 D67 9 OWNER: ColliQr Catinty Board of Cornmissicners CONTRACrOR: lkouglas N. Higgins, lite. WORK DIRECTIVE 4 4 DATE OF ISSUANCE: August 10, 2021 PROJECT#: 70120.4.1, 60139.4,1, 70120.4,2, 60139-4.2 ENGINEER/DESIGN PROFESSIONAL: Q. Grady Minor & Asso6ates, P.k You are directed to proceed promptly with the rollowing changc(s)- Detailed and specific explanaticn/rationale or the. requested diangeLs) to the task(sl and / or the additional da s �L added (if requested): To remove trees at the Right -of -Way (ROW) along I 091h Avenue Narth. Why this chanat� was not included in the original ccqtrac�t: Due to property owner comems the Contractor was dircutcd to nutreniovzsrytival trecs at the ROW alorig l00'AvcHui-'NUrtfi, rc-quiriiigthc wrilmaurto retnubilizc. In addition to the remobilization cos(, (lie contractur inust provide supervision ror the removal of the ti-ces, per ContraLft rt!-quiremellts. Describc the imMn t if this chanM is not_proc ssed: Without the removal of the trces, the roots would extcnd into the ROW and irripaQt rievyly instailed stormwater systvm, or omf,- the. routs were removcd, the t=s 111ay diu,-111J/01. become a fall down hazard. Altauhmuinb-. Quutu If a claim is made that the above change(s) have afrected Contrael/Allowanm Price or Contmct *rimes any claim for a Change Order based thereon wi I I involve one or more of the fol lowing method5 ordetermining the effeat of the chaagcs(s)� Mahod of determining change in Method of drtermirting ahnnge in Contrart Times: Contract/Allowance Price. F-1 Unit Prices F1 Contractor's records F1 Lump Sijni Fngirime�; re -cord Z Time& Material Other E] Other (see attar -lied Bid Schedule) Fstirriated ]nerease (dccrease) in Allowance� Estimated change in Contract Time: $3,090,00 Increase or der-cense by 6 catendar days, RECOMMENDED: AUTHORIZED: By: Jufien Devisse, PE By: Diana Duvii Engitirer Owner'� Rerre.�vntarivp, T- Ln W N 54- I Packet Pg. 1729 1 5W Work C&Wve 4 Date Labor Equipment Material Subcontractor Total 811 M021 029,00 5 $ s 1.726.OD $ 2,5&�O L TOTAL 829.00 3 $ 1,726.00 S zpssl�q 0 Co E 0 om T- Ln w N 54- C14 04 0 C CN CD E I Packet Pg. 1730 1 16.E.2.b P.,u�uct.. 1 08LI i & 109th Ave. N. PuLlic Utilities n Date: 811 812l Attri. QCNEFLALCCWRAMUF* . m 0 1 Work Userlpflon Wayk 17�rectivs 94 - RarrvaveTrems at the Right - of -Way aloN 109th Ave. N. Q e QtV. H 0 Mrs Standard Rates Total- Supednterident 0 0 $ 85.()D 5 Forerqan a 0 $ 79.00 $ 0 Operator 0 0 $ 68.01) $ CL Laborer 0 0 $ 61.OD 5 PLoject Manager 1 a $ 96-OD $ 768,00 Clerical I Administrativu 1 $ 61 �00 $ 61.00 Total Labor $ 829.00 E E Eaulipment Qtv. Hours Track backhoe < 3CY $ 144.00 $ - Track backhoe >3GY $ 181.00 $ Terex Crane 45Ton $ 178.00 $ Co Articulated Front Erd Loader $ E Rubber Tire Backhae S 55.00 S vibra(Gry Roller $ 5100 Tandem Dump Truck 69.00 L_ 0 5 CY (SinglePyie) Dumptruck $ 56.00 $ (L Lowboy $ 121.00 $ Ln Jet -vac UnIt $ 390. 00 W N C14 Six (4) Inch Dewatering Systern $ .56.00 $ Cm Eight (8) Inch I)ewaterirg System $ 87.00 $ N >_ LL Pickup arid Miscellaneous Tools $ 54.00 $ Total Equipment $ Material Unit Cost Total D 0 0 D D 0 C 0 0 CN 0 0 0 0 Total Material $ Markup (tD%) $ E Subcontractor QtV_ Unit Cost Total Johnson's Tres Service— $1,600-00 Total Subcontractor 1.50D.00 Markup (15%) $ 226,01) Grand Total LE:::: 2"554,00 Owner Representative Douglas N. Higgins, Inc. Narne, Signature, Date Name, Sigr�ature, Date I Packet Pg. 1731 30 Collier County Engineering & Pro'ect Manap_ement Division WORK DIRECTIVE CHANGE CONTRACT# /1"ROJECTNAME: 421-7823 108"' and 109"' AYCIMe North Public UdlitieS Rejlu%�,al 13LJIZCHASE ORDER 0: 4500210679 OWNER: C011iCI-COLII-Ity 110al-d Of Coln III iSSi0I)GI-S CONTRACTOR: Doughs N. Iliggins, Ine. WORK DIRECTIVE 4 5 DATE OF ISSUANCE: August 6,2021 PROJECT#: 70120.4.1, 60139.4.1, 70120.4.2, 60139.4.2 EMNNEERMESIGN PROFESSIONAL: Q. Orady Minor & Associates, P.A. Vou are directed to proceed promptly with the rollowing change(s): Detailed and specific explanation/rationale of the requested ellanpe(s) to the task(s) and / or the additional days addcd (ir I-CgLlested): The installation of tile water main along 7"' Street reqUired tile rernoval of' tile existing sidewalk along 7"' Street. Additional work (stormwater) will take place along 7"' Street that will affiect tile sidewalk. The sidewalk final restoration per the contract is not reClUil-CCI Until tile proJect is functionally complete (all improvements installed and Functional). The contract does not require that a temporary sidewalk is provided. The purpose ol'this work directivc is to provide a temporary sidewalk along 7"' Street throughout the project work zone. Why this ehunpze was not inClUded in the original contract: The need 11or I temporary sidewalk was not anticipated a. and tile contract only reqUired that tile sidewalk be restored when the proiect is functionally complete. Since the LO contract MIS eXeCLIted, Naples Park Elomentary reqUested that a temporary sidewalk be provided. N- Describe the irnpact. if this change is not processed: Ifthis change is not processed, the school children which 04 CM C01111111.1te to/1-1-om Naples Park Elementary along 7"' Street will not have I firm, stable, and slip I-CSiStant SUITHU >- to wa I k oil. CL Attachments: u m m 11' a claim is made that the above change(s) have afrected Contract/Allowance Price or ContractTimes any 0 claim for -,I Change Order based thercon will involve one or more of the following methods of determining the effect of the changes(s). 0 Method ol'determining change in Contract/A I lowance Price: F1 Unit Priecs 'rime & Material Other (see attached Bid Sclicclule) Estimated increase (decrease) in Allowance: $ TBD RECOMMENDED: By! JUStill Frcderiksen, PE ProJect Engineer Method of determining change in Contract Times: F-1 Contractor's recuds 1-1 Engineer's record El Other Estimated change in Contract Time: increase *I- decrease by 0 calenclar (lays. AUTHORIZED: 161d 3y: Diana DUeri Owner's Representative I Packet Pg. 1732 1 --- Da�le W 7.F?t,2 f Work 2 3 , bQ Equipmen 2—�,—" "14 sol S 4.5F,900 s ive 5 5015.00 16.E.2.b Total=;� I TOTAL 1 $4,504-50 ; S 4,569.00 1 S 605.00 1 3 - 1 $ 9167PA 0 S E Co E 0 Lo w N 54- C14 CM 19 0 a) 04 CD E m I Packet Pg. 1733 1 %5 Z Project: 1 08th & 109th Ave. N. Public Utilities 16.E.2.b n Date: 817121 Attrt Wqrk Discripto , Work Directive 9 5 - Temporary Sidewalk DescriDiflon MY. Hours Overtime Rates Total Superintendent 7.5 $ 119.00 $ W2.50 Foreman 1 7.5 $ 110.60 $ 629.50 Operator 3 7.5 $ 95.20 $ 2,142.00 0 Laborer 1 T5 $ 85.40 $ 640,50 Prcject Manager 0 0 $ 134.40 Z Clerical I Adrninistrativi� 0 0 $ 85.40 $ - MA Total Labor 4,504.50 a E Equiprnent 9-!Y--.-- -H-0-urs Track backhae < 3GY 1 7.5 S 144.00 $ 1,080.00 Track backhae >3GY $ 181.00 $ - Terex Crane 45Ton $ 178.00 $ - Co Articulated Front End Loader 2 7.6 $ 89.00 $ 1.335.00 Rubber Tire Barkhoe $ 55,00 $ - E Vibratory RolleT 1 7-5 $ 69,00 442-50, Tandem DurnE Truck 69.00 $ - 0 5 CY (Single Axle) Dijrriptruck 1 7-5 6&00 $ 42n on Lowboy 121.00 $ Ln Water Truck 1 1 69.00 $ 69.01) CM Six LI) Inch Dewatering System 56.00 $ - CM Broom Tractor 1 7�5 55.00 $ 412,50 CM PiGkup and Misrellarienus Tools 2 7.5 b4.00 810.00 Total Equipment $ 4�569'00 U Material QW. Unit Cost Total Cu BG Ulna - Limerock 50 Tons $11.00 W 0 'a L.. 0 D 0 0 0 0 CN 0 0 CD Total Material 550.00 a 0 Markup (I'D%) $ E Subcontractor QtV_ Unit Cost Total $0.00- Tofal Subcortractor Ma rku p (IS%) $ Grand Total 5 Owner Represantative Douglas N. Higgins, Inc. Nerne, Signature, Date Name, SignatuFc, Date Packet Pg. 1734 I WORK DIRECTIVE #6 - 1(3t3 VANDERBILT POWER SERVICE F, 6.E.2.b I Collier County Engineering & Rrqiect Management Division WORK DIRECTIVE CHANGE' CONTRACT # /PROJECT NAME: 921-7823 108'�'ztid M90'AvenueNotih Public Ufilltic,� Renewal PURCHASE ORDE-R A: 4500210679 OWNER. Collier County Board ofCommissioners CONTRACTOR. Douglas N. Higgins, Inc. WORK DIRECTIVE # 6 DATE OF ISSUANCE: August 17,2021 PROJECT#: 70120.4.1, 6013 9.4.1, 7U 1 20A. 2, 60139*2 FNGINEERMESIGN PROFESSIONAL- O� Grady Minor & Assoaiates, P.A- You are directed to prDeeed promptly with the following change(s): Detailcd and specific qNplanation/rationale of the req=*A cbange(zi) to the task(s) and I or the additional d4ys added (if reguested): T1 ic clecirical power scrvice (which was unmarked) to 10892 Vanderbilt Drive (zt tile, intersection of 109"' AvenLIC ar1d Vanderbilt Drive) was damaged due to the utility work- along 109'h Avenue. 10882 Vanderbilt Drive is without powor as a veSL111 ol'thr, damago, The purposr, of thi�i work dirc�;tive is to direct the Contractor to repair the clez(rica I power service to 10382 Vanderbilt Drive. Why this change was not included in the original contract: The nccd for repairing eii-,c1ricul power �service to 10882 Vanderbilt Drive was not includcd in the contract as the contract requires that the Contractor has the existing utilities located via the Sunshine 811 system, whirh thr, Contraotor rompleted, and protect existing utilities. 1.1mvevrA-, the elcarical power service was not marked by the puwer company's (FPI.) utility locating subcontractor (USIC). Describe the impact i f th is chainw-, is not processed ff this change is not processed, electrical power sury ice to 10882 Vanderbi It Drive wil I not be restored promptly and the rcsidcnts of 108 82 Vanderbilt Drive wi I I bc Famed to relocate to a hotel or another residenc�e until tha electrical power service is restored. Attaarnent-q- If a claim is made that the above charge(s) have affected Conti-actiAllowance Price or Contract Times any clairn for a Chartgc Orde-r basod therton will involve one or raore orthe following methods of determining the effimt of the changes(s). Method of duteri-nining change in Contract/Allowance Price: EJ Unit Priccs E] Lump Sum M Time& Materlai L] 0 ilier (�cc aiftauhc� 13 i d Sched u I e) E stimated increase (dei�,rcase) in Allowance $ TBD RECOMMENDED: By: Justin FmderiLsen, PF Project Engineer MrAud A detertniniag change in Contract Times: [] Coiltmaor's records F] Etiginocesrecord [—] Other Estimated change in CGntract Time: I ricrea s e or de crease by 0 calendar day s AUTHORIZED. By: Diana Duari Owner's 1�cpreseintativa T- Ln W N 54- OR11 7 ?.1 1 L?3 PM I Packet Pg. 1735 34 -E 16.E.2.b Work nTle-clive 5 DaL- Labor Equipment Material Subcontractor Total M7M21 $3.63COD $ 4.22100 $ $ 601-45 8.4E8.4 TOTAL 43,G34.00 $ 4,223.00 S 601.45 $ 8,459,4 0 S E Co E T- Ln w N 54- C14 04 0 C CN CD E I Packet Pg. 1736 1 16.E.2.b Project- I 08th & 1 09th Ave N. Public Utilities T Diate: 8117121 Atin. 4 Ll Lk Wurk- 13Tscriptiori.- WDrk D-FeOve V6 - Electrical Power Servi�ce Damage at 10882 Varidurbilt Drive Descrigtion _Qty, Hours q Rates Total Superinterdent 1 7 _ftgtillar $ 85.00 Foreman 1 7 $ 79-00 $ 6-53.00 0 Operator 2 7 $ 68,00 952.00 0. W Laborer 3 7 $ etoo $ 1,281.00 W Project Manager 1 2 $ 96.00 $ 192.00 Clerical I Administrative J 1 $ 61.00 $ .61 �00 W Total Labor $ 3.634.00 E Equipment Qty. Hours Track backhm < 3CY 1 7 $ 144.00 $ 1,008.00 Track backhoe >3CY 1 7 $ 181.00 $ 1.267.00 .2 Terex Crane 45Ton $ 178.00 $ CO Articulated Frcnt End Loader 1 7 $ 89.00 $ 623.00 C Rubber Tire Daahoe $ 56.00 $ - E Vibratory Roller 1 3 $ 59.00 1177.0113 Tandem Dump Truck $ 69.00 $ - 0 L- 5 GY (Single Axle) Durnptruck 0 0 $ 56.00 $ Lowboy $ 121.00 $ LO Water Truck $ 69.00 $ Six (4) Inch Dawatering System 1 7 $ bb.UO $ CS! Broom Tractor 0 1) $ 55.00 $ CM >- LL PIC . kup and Wscellaneous Tools 7 $ 54�00 $ 756LOO Total Equipment S 4,223LOG Material Qtv� Unit cost Total $100 $0.00 0 0 0 0 0 4) Im C 0 0 0 CN G CD Total Materla I Markup (10%) $ Subcontractor Unit Cost Total Gulf States Electric, Inc. $623.00 $623.00 Total Subcontractor $ 523.00 Markup (15%) $ 78.45 Grand Tatal $ 8,458.46 Owner Representative Dougtas N. Higgins, Inc. Name, Signature, Date Name, Signature, Date —f —Pa­cke—tP—g. 1-73-7 ] Co IWORK DIRECTIVE #7 - SANI-;ARY & STORM CONFLICT I Division WORK DIRECTIVE CHANGE I 16.E.2.b I CONTRACT # /PROJECT NAME: #21-7823 108'h and 109th Avenue North Public Utilities Renewal PURCHASE ORDER #: 4500210679 OWNER: Collier County Board of Commissioners CONTRACTOR: Douglas N. Higgins, Inc. WORK DIRECTIVE # 7 DATE OF ISSUANCE: September 2, 2021 PROJECT#: 70120.4.1, 60139.4.1, 70120.4.2, 60139.4.2 ENGINEER/DESIGN PROFESSIONAL: Q. Grady Minor & Associates, P.A. You are directed to proceed promptly with the following change(s): Detailed and specific eUlanation/rationale of the requested change(s) to the task(s) and / or the additional dqys added (if requested): On 1081h Avenue, the proposed stormwater infrastructure elevation between approximate Stations 10+36 and 13+44 needs to be raised to accommodate the existing sanitary lateral elevations at the connection points. On the north side, the proposed stormwater infrastructure invert elevation between structures S- 18 and S-24 will be raised to 8.00' and on the south side the invert elevation between structures S- 128 and S- 131 will be raised to 8.33'. As the stormwater pipe will no longer function as water quality trench, it will be installed and billed as 24" ADS Pipe, Bid Item No. 4.5a (unit price of $65.00/LF) instead of Bid Item 4.6a 24" ADS Perforated Pipe in Water Quality Trench (unit price of $136.00/LF). Storm structures S-18, S-24, S-128 and S-131 will need to be modified to ad ust for the revised storm infrastructure elevations and billed under Bid Item No. 4.15a at a rate of $800/modification. Why this change was not included in the original contract: The elevations of the existing private sanitary sewer connections are not known during the design process, as the private sanitary sewer connections are buried. During construction, the elevations of the existing private sanitary sewer connections are determined by the Contractor by excavation at the connections. To provide the required minimum sanitary lateral slope, the storm water infrastructure must be raised. The proposed sanitary sewer main was lowered during the design to provide as much room as possible but at this location the existing private sanitary sewer connections were determined during construction to be lower than other areas. Describe the impact if this change is not processed: If this change is not processed, connecting the sanitary sewer main to the private connections would not be possible and the homes in this area would not be connected to the County sewer system. If a claim is made that the above change(s) have affected Contract/Allowance Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Method of determining change in Contract Times: Contract/Allowance Price: M Unit Prices F-1 Contractor's records F-1 Lump Sum F-1 Engineer's record F-1 Time & Material El Other F-1 Other (see attached Bid Schedule) Estimated increase (decrease) in Allowance: Estimated change in Contract Time: $ TBD Increase or decrease by 0 calendar days. RECOMMENDED: By: Justin Frederiksen, PE Project Engineer AUTHORIZED: By: Diana Dueri Owner's Representative 0 E M co E 0 Ln W N E�� C14 CM 19 0 a) 04 CD a a) E I Packet Pg. 1738 1 RK DIRECTIVE #9 - MODIFICATION OF EXISTING STORM STRUCTURES WORK DIRECTIVE CHANGE CONTRACT # /PROJECT NAME: #21-7823 108'h and 109'h Avenue North Public Utilities Renewal PURCHASE ORDER #: 4500210679 OWNER: Collier County Board of Commissioners CONTRACTOR: Douglas N. Higgins, Inc. WORK DIRECTIVE # 9 DATE OF ISSUANCE: October 1, 2021 PROJECT#: 70120.4.1, 60139.4.1, 70120.4.2, 60139.4.2 ENGINEER/DESIGN PROFESSIONAL: Q. Grady Minor & Associates, P.A. You are directed to proceed promptly with the following change(s): Detailed and specific eMlanation/rationale of the requested change(s) to the task(s) and / or the additional days added (if requested On 108th Avenue, the proposed stormwater infrastructure elevations need to be adjusted to accommodate the existing sanitary lateral elevations at the connection points. Twenty (20) storm structures modifications will need to be modified to adjust for the revised storm infrastructure elevations and will be billed for each modification under Bid Item No. 4.15a at a rate of $800/modification. If two inverts are modified in one structure, this equates to two modifications. On 109th Avenue, the proposed stormwater infrastructure elevations also need to be adjusted to accommodate the existing sanitary lateral elevations at the connection points. Ten (10) storm structures modifications will need to be modified to adjust for the revised storm infrastructure elevations and will be billed for each modification under Bid Item No. 4.15b at a rate of $800/modification. If two inverts are modified in one structure, this equates to two modifications. Mly this change was not included in the original contract: The elevations of the existing private sanitary sewer connections are not known during the design process, as the private sanitary sewer connections are buried. During construction, the elevations of the existing private sanitary sewer connections are determined by the Contractor by excavation at the connections. To provide the required minimum sanitary lateral slope while still providing water quality storm infrastructure, the storm water infrastructure must be lowered. The proposed sanitary sewer main was lowered during the design to provide as much room as possible but at this location the existing private sanitary sewer connections were determined during construction to be installed over the proposed storm infrastructure to ensure that water quality is provided. Describe the impact if this change is not processed: If this change is not processed, connecting the sanitary sewer main to the private connections would not be possible and the homes in this area would not be connected to the County sewer system. Attachments: If a claim is made that the above change(s) have affected Contract/Allowance Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). 0 -W -W co E 0 Ln W N E�� I Packet Pg. 1739 1 38 Method of determining change in Method of determining change in Contract Times: Contract/Allowance Price: Z Unit Prices F-1 Contractor's records F LumpSurn F-1 Engineer's record F Time& Material F-1 Other F-1 Other (see attached Bid Schedule) Estimated increase (decrease) in Allowance: Estimated change in Contract Time: $24,000 Increase or decrease by 0 calendar days. RECOMMENDED: AUTHORIZED: By: Julien Devisse, PE By: Diana Dueri Project Engineer Owner's Representative I Packet Pg. 1740 c'_01 ker C,014ntNT D Contract Modification 0 Work Order Modification 39 Procurement Servi Change Order Form Contract M 1 20-7769 Change #:1 7 Purchase Order#: 1 4500204556 Project #: 1 70135.1 Contractor/Firm Name: Mitchell & Stark Construction, Inc Contract/Project: I SCRWTP Reactor Tank #4 Project Manager Name Alicia Abbott Division Name: [ Engineering & Project Management Original Contract/Work Order Amount $ 3,843,000.00 7/14/20 11 F Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 3,843,000.00 Last IBCC Appromal Date; Agenda Item # Current Contract/Work Order Amount $ 3,843,000.00 6/21/2022 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revsed Contract/Work Order Total $ 3,843,0 0.00 0.00% Change from Current IBCC Approved Amount Cumulative- Changes $ 0.0011 0.00% Change from Current Amount Completion Date, Description of the Task(s) Chanqe. and Rationale for the Change Notice to Proceed 8117/20 Original Last Approved Revised Date Date I Completion Date Date (includes this change) 108 i # of Days Added Select Tasks Add new task(s) El Delete task(s) E] Change task(s) E] Other Provide a response to the following: 1.) detailed and specific explanation/rationale of the requested change(s) to the task(s) and / or the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. This contract is currently under a stop work with one day remaining. 1. This change order is to add 108 days to the contract time. Additional time is required due to continuing delays caused by manpower and personnel availability related to the ongoing industry labor shortages, supply chain issues and shipping delays. 2. This change was not included in the original contract as it was not known that there would be a delay in obtaining the final approved submittal for the CO2 diffusers (Work Directive # 11) due to delays in factory responses. This resulted in the subsequent delay in delivery of the equipment. A required plant shutdown (required for Work Directive #5) was predicated by operations and water demand, and could not be performed until June. Time is needed to start up the facility and obtain certifications from the permitting agencies. 3. Impact if this change is not processed: The necessary certifications from the permitting agencies cannot be obtained and start-up of the reactor tank cannot be performed. Prepared by: a bboft—a Alicia Abbott, E.I., PMP., EPMD Project Manager Date: 06152022 C14 Packet Pg. 1741 Contract 20-7769 Mitchell & Stark Construction 40 Change Order #7 Acceptance of this Change Order shall constitute a modification to contract / work order identified above and will be subject to all the same terms and conditions as contained in the contract / work order indicated above. as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor / Consultant Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted by: Jos&a Peterson, Mitchell & Stark Construction Uompany Digitally once b Ch st h T R Contact M Car4n, s, IZ�y Date 2022.06.20 . 23 -oToo Accepted by Chris Reinbold, P.E., Carollo Engineers I.g.=g- ly BullertElenjarnin ni -=I IM.- Approved by� 2.22 �� 21 12 �I Benjamin N. Bullert P.E., EMPD Principal Project Manager y g., McLean Matthew Approved by: 2.22 �� 21 1 � 1141 .4", Matt McLean. P.E.. EMPD Director gitally signed by brogdonh Date 2022.06.22 09 19 45 brogdon h " 04'00' Approved by: Howard Brogdon, Water Director Digitally signed by lunryAnnia CurryAmiaDate: 2022.06.23 13,58,39 -04'00' Approved by: Amia Curry, Financial Operations Support Director S Digitally signed by Schneeberger SchneebergerSara ara Date 2022.06.27 09:34:10 Approved by: -04'00' Sara Schneeberger, Procurement Strategist. Procurement Services Division Revised 0111412021 (Divisions who may require addibonal signatures may include on separate sheet Date: K11 Date: Date: Date: Date: Date: Date: Page 2 PROCUREMENT USE ONLY T-- --- --- A&rM I Rpt 5CC E3 I Packet Pg. 1742 Contract 20-7769 Mitchell & Stark Construction Change Order #7 41 Change Order/Amendment Summary COST TIME CO# AMD# Description JustMeation Days New Additive Deductive Added Amount Added 66 days Due to availability of pipe materials, 1 due to material n/a n/a 66 396 66 days were added to the contract. delivenes Use of Allowance funds in the 2 amount of n/a n/a Use of allowance funds to pay for $39,197.39 with Work Directives No.2, 3, and 8. $210,802-60 Remaining Use of Aflowance funds in the Transfer of monthly rental charges 3 amount of n/a n/a from other project with cost savings $20,465.58 with in lieu of providing new trailer. $190,337.03 Use of Allowance funds in the Additional time for further delays for 4 amount of n/a n/a 78 474 material delivery, and use of i $85,340.13, with allowance funds for work directives $104,996.90 5, 6, 9, and 10. remaining. Additional time of 32 days and use of allowance funds in Additional time for further delays 5 the amount of n/a n1a 32 506 and use of allowance funds for S44,635.10, with work directives 13,14,15. $60,361.80 remaining. Additional time of 93 da, allowance funds in Additional time for further delays 6 the amount of n/a n/a 93 599 and use of allowance funds for $8,891.33, with work directives. $51,470.47 J remaining 7 Additional time of n/a n/a 108 707 Additional time due to furhter 108 days. delays.. Page 3 Lx) I UZU Revised 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY OC' I BCC FS �A'd - rMn --I ---Rpt- V- 04 Packet Pg. 1743 42 Procurement S 16.E.2.b Coter County Change Order Form F-1 Contract Modification F-1 Work Order Modification Contract #: 1 19-7633 —1 Change M 1 6 1 Purchase Order#: 1 4500204554 1 Project #: 1 70135.1 Contractor/Firm Name: I Stantec Consulting Services, Inc. Contract/Project: SCRWTP Reactor Tank # 4 Alicia Abbott Engineering & Project Management Project Manager Namef Bivision Named Original Contract/Work Order Amount $ 318,640.00 - 7/14/20 11 G Original BCC Approwal Date; Agenda Item # Current BCC Approved Amount $ 348,326.00' Last BCC Approwal Date; Agenda Item # Current Contract/Work Order Amount $ 348,326.00 6/30/2022 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 9,887.00 12.42% Total Change from Original Amount /0 Revised Contract/Work Order Total 1 $ 358,213.001 2.84% Change from Current BCC Approved Amount ,Cumulative Changes F—$39,573.001 2.84% Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Notice to Proceed 08/05/20 Original =08/05/21 Last Approved Revised Date Date I J Completion Date Date (Includes this change) # of Days Added 1 100 Select Tasks [JAdd new task(s) El Delete task(s) EJ Change task(s) 0 Other Provide a response to the following: 1.) detailed and specific explanation/ration ale of the requested change(s) to the task(s) and / of the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impaci if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. Detailed and specific explanation/rationale of the requested change(s): This change order is to add 100 days to extend the contract time time, and add $6,372.00 to Task 1, Observation anc Documentation, and $3,515.00 to CEI Project Management Services, for a total of $9,8 87 00 as shown on the Estimated Change Order Fee Schedule, dated May 13th, 2022 These funds are needed to continue the Construction Engineering Inspection (CEI) services required for this project, due to a pending change order to extend the contractor's contract. This will allow Stantec to continue to serve the project until their budget is exhausted or their contract time has elapsed, whichever comes first. In the event that additional budget is needed for Stantec to continue providing services, it is agreed that a subsequent change order will be processed to add additional funds to the contract. 2 This change was not included in the original contract: It was not known that additional time and services would be required due to contractor construction delays. These contractor delays were related to the ongoing industry labor shortages; supply chain issues and shipping delays. 3. If this change is not processed: The CEI firm will not be able to continue providing the necessary Construction Engineering Inspection services required for this project. CEI services are necessary to document the work being performed, and to verify conformance with the design documents. Prepared by: D� M.bb.� OU_G.,.,.I, OU�PPM U— A—n% OU-PUD P1. mg nd P11j- M—g—q —PUD, abbott_a --W-1, —b., DC-1. D- —2.06.23 14 51 16 04 00 Alicia Abbott, E.I., PMP, Project Manager, Public Utilities Engineering & Project Management A?�� Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) Date: 06232022 PROCUREMENT USE ONLY Admin BCC I Rpt 0 CL E .0 U) E 0 0 0 L- IL LO W 04 I Packet Pg. 1744 Change Order No. 5 Reactor Tank #4 — PO 4500204554 Stantec Consulting Services 43 Acceptance of this Change Order shall constitute a modification to contract / work order identified above and will be subject to all the same terms and conditions as contained in the contract / work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor / Consultant Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Approved by: Approved by: Digitally signed by Marc Lean DN: CN=Marc Lean, OU=AO141 00000001 6F2006253CO00021 C7, OXANTEC CONSULTING SERVICES INC., C=US Reason: I have reviewed this document Date: 2022.06.23 14:44:51-04'00' Marc Lean, P.E., Stantec Consulting Services Digitally signed by BulleftBenjamin DN: E�Benjamin.Buile�@collierco,ntyfl.gov, 114=10.113-i .1=13enerei, .1=11. User Acc.un�s J-111J. Pi.n,i.g ..,J P-..t Bullerfflenjamin!A-agern.nt OU-PUD, OU-Divisin-, DC-b­ DC�.-lli.rg­ DC�nnt Dnt.: 2022.06.23 15:34:37-04 00 Benjamin N. Bullert, P.E., Engineering & Project Management Principal Project Manager Date. 06/23/2022 Date: Digitally signed by brogdon h brogdon—hDate: 2022.06.24 07:30:48 -04'00' Approved by: Date: Howard Brogdon, Water Director E Digitally signed by McLeanMatthew E tthew.McLean@colliercountyfl.gov, CN=McLean Matthew, OU=General, OU=PPM User Accou nits, OU=PUD Planning and Project Management , OU=PUD , OU=Divisions, DC=bcc, DC=colliergov, DC=net 0 McLean Matthew"' �` Date: 2022.06.24 08:41:25-04'00' Approved by: Date: (L Matt McLean, P.E., EPMD Director LO W Digitally signed by CurryAmia C4 CurryAmia, F4- Approved by: Date: 2022.06.24 10:13:11 -04'00' Date: 04 04 Amia Curry, Operations Finance Director Digitally signed by SchneebergerSara CL M SchneebergerSaraDate: 2022.06.27 09:37:29 -04'00' -Ie Approved by: Date: U M Sara Schneeberger, Procurement Services Im 062321 Packet Pg. 1745 r-cly I:, /- 44 Change Order/Amendment Summary COST TIME CO# AMD# Description Justification Days New Additive Deductive Added Amount 1 Additional time of n/a n/a 66 431 Contractor delays due to delays in 66 days material delivery. 2 Additional time of n/a n/a 86 517 Further contractor delays due to 86 days delays in material delivery. Approve use of Further contractor delays due to allowance funds delays in material delivery, has ($15,000), and resulted in a longer construction 3 reallocate to n/a n/a 0 n/a schedule and additional inspection Taskl. services. Additional funds were not Reallocate Task 4 included in previous change orders funds ($1,500) to for time. Task 2. Additional time of Further contractor delays due to 50 days, and delays in material delivery. 4 additional funds for $29,868 n/a 50 567 Additional time resulted in additional $29,686. inspection services. Additional time due to further 5 Additional time of n/a n/a 109 676 contractor delays caused by 109 days manpower, personnel availability, and supply chain issues. Additional time of 100 days, and Additional time due to further 6 additional funds for $9,887 n/a 100 776 contractor delays caused by 6,372 for Task 1 manpower, personnel availability, and $3,515 for and supply chain issues. Task 2 Page 3 Revised: 01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin BCC I Rpt 0 An r- .E '10 M co E 0 (L T- Ln W N E�� C14 04 Cal 0 a) cm U C14 CD E I Packet Pg. 1746 1 45 May 13, 2022 File: 177311548 Attention: Ms. Alicia Abbott, Project Manager Collier County Government Public Utilities Engineering & Project Management 3339 Tamiami Trail East, Suite 303 Naples, FL 34112 Dear Ms. Abbott, Reference: SCRWTP — Reactor #4 CEI Services, Stantec; Change Order #6, Rev. 02 Through this letter, Stantec respectfully requests additional time and budget to continue providing CEI Services for the project until October 8, 2022, 100 days beyond our current June 301h completion date. The estimated additional fee, $9,887, has been determined based on Stantec providing services in accordance with the estimated hours identified on the attached Estimated Fee Sheet. I_ - Please be advised that because the Contractor's activities determine our level of services (i.e. manpower W and time in the field) Stantec will only be able to continue providing CEI services for the subject project until M U October 8, 2022 or when our budget is exhausted, whichever comes first. If budget is consumed before 0 October 8, 2022, then Stantec will require an amendment to this work assignment to continue providing CEI a. services. T.- LO W N N Regards, Stantec Consulting Services Inc. Marc Lean PE Principal Phone: 239 910 2757 Marc.Lean@stantec.com Attachment: c. Sergio Hoyos, PE, Stantec Ramon Castella, PE, Stantec Ben Bullert, PE, Collier County EPMD I m ��us0226-ppfssOl�workgroup�1773\active\177311548�management\stantec—proposal—and—contract\change order Wletterchange order #6 stantec-2022-05-1 3—revO 1. docx I Packet Pg. 1747 1 m --I --I --I --I CU 2) a) a) LA LA ul CA X, ;r pr pr N) I -A X > 0 m 0. 3 L:� m 0 :3 m 0 m rn m cu cu x 'D :3 tu m aQ m 0 m > 3 LA m 0 3 :E - m cu L'I 0 m m I fu m (A M m r- C) 0 > 0 0 0 > c LA --I ;o M. LA. CD 0 0 C 0 0 OQ -;� 0 rD C, r,j -C I in CY) 0-1 0 CD CD CY) DJ ro 0 n e) 0 M CD 0 -LA. 4j)- M 00 0') 0*1 0 0 m C m CD C) M M m V1. 4j)- 0 F- 00 A- vi 0 CD CY) 4�- (T) C U� (s:podai GAIJeJISIUIWpe saoiAieS luaweinDOJd : MZZ) ZZA.1 -:podoU joe.1 aLIJ jejjv ULO :Iuewt4oellv 0 -2 ca 8 F, ci 0 .2 .9 E 7�5 c m lo EL E od In L) o o u LL � 0 0 E 7i (D -me u 1 C;OA-r C;omnty Instructions After the Fact Form As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or contract terms, an After -the -Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order, when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and services not covered by the current contract or purchase order. All such "After the Fact Procurements" will be reported to the County Manager. Requester Name: Salma Nader Preston Division: Fleet Management Division Director: Dan Croft Vendor Name:Earl W. Colvard, Inc. Anriount:$6,170.00 Contract #:FSA22-TRS24.0 Purchase Order:4500213560 Why is this deemed a non -compliant purchase? Choose one. Contract W] � Ordinance 1:1 � Manual P-Card Other 0_ Details of Purchase: Explain the circumstances behind this purchase. As we have experienced difficulty in obtaining tires for the ambulances on several occasions this past year, the vendor was informed to contact us (Collier Fleet) as the specific tires are available so we can purchase a batch to keep in stock for emergency use. We have a current Purchase Order in place for piggyback contract #FSA1 9-TRS21.0 (expired on 03/31/2022). The new FSA contract #FSA22-TRS24.0 started 04/01/2022 but was not approved and a new purchase order opened before we made this purchase. Action Required: What are you asking to be done to remedy the situation, include list of invoices if applicable? Need to pay the vendor: Invoice# 21-GS149971 Amount: $6,170.00 Corrective/Preventive Action: What action is being taken to prevent this violation from re -occurring? We will ensure that we follow all Procurement policies and procedures before requesting any goods or services. The requestor affirms that to the best of their knowledge the information provided in this document is true. Requested by: Salma Nader Preston S Digitally signed by nader s Signature:nader Date 2022.06.15 13 29 54 Date: 06/15/2022 -04'00' Division Director: Daniel A. Croft Digitally signed by CroftDan Signature:CroftDan Date: 2022.06.16 16:47:30 Date: 06/16/2022 -04'00' T" LO W C14 04 Revised 06/17/2021 I Packet Pg. 1750 1 21-GS149971 mara-mievaid Tim renwr Inv ice# 21-GS149971 Dealer I D# 000161421 .1 Date 05/11/22 In May 10, 2022 2:50 PM Out May 11, 2022 12:32 PM Sold To: COLLIER COUNTY BOCC PROCUREMENTDEPT 3295 E TAMIAMI TRAIL NAPLES FL 34112 Business Phone: 239-252-8407 Focused on Tomomm qofLxbw Today 7051 ALICO RD FT MYERS, FL 33912 239-267-4701 Page 1 of I Emp: 1-3403 3403 / 1-3403 3403 * * * * I N V 0 1 C E * * * * Ship To: Unit M LOOSE Vehicle: License: Mileage: In: 0 Out: 0 Vin#: PO#: 4500213560 BAR ID: MV-55753 Salesman Vendor# Part # u Ty Description Parts Lacor FET 3403 91043 91043 20.00 225/70RI9.5M[CHELIN XZE 14DIV 307.50 0.00 0.00 6,15, -t 3403 TIR-TAX 20.00 STATE TIRE FEE 1.00 0.00 0.00 21 0 CL 1403 91043TH 91043TH -20.00 225/70R1 9.5MICHELIN XZE 14piv TAG & HOLD 0.00 0.00 0.00 1 a) TlRES PER JAMIE E 'a CU it 0 Cl) E P Cl- T- 04 04 C14 C14 CL IMPORTANT' It is the customer's responsibility to have all lug nuts checked and retorqued to manufacturer's specification after um M to 100 miles of service. Ail Merchandise is limited to the manufacturers warranty unless otherwise noted. Terms: Terms are net 10th Prox. On all accounts over 30 days, a FINANCE CHARGE of 1 1/2% per month, which is an ANNUAL RATE of 18%, will be LL added to your bill. Customer agrees to pay attorney's fees and court costs for the collection of this invoice. Remit to: Boulevard Tire Center 816 S. Woodland Blvd Deland, FIL 32720 Cash: 0.00 Check: 0.00 Credit: 0.00 Charge: 6,170.00 Parts: 6,17( Change: 0.00 Due Date: 06/10/2022 Labor: C4 Subtotal: 6,17( Sales Tax: Total: $6,170. E X Print Name Customer Signature Date 1 of 1 C;OA-r C;omnty Instructions After the Fact Form As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or contract terms, an After -the -Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order, when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and services not covered by the current contract or purchase order. All such "After the Fact Procurements" will be reported to the County Manager. I Requester Name:Robin Bain Division:PUD/SHWMD Division Director:Kari Hodgson Vendor Name:A+ Enviornmental Restoration LLC Anriount:$44,395.61 Contract #: 18-7459 Purchase Order:4500216207 Why is this deemed a non -compliant purchase? Choose one. Contract W] � Ordinance 1:1 � Manual P-Card Other 0_ Details of Purchase: Explain the circumstances behind this purchase. A+ Environmental Restoration LLC. was contracted to perform the clearing and grubbing of 55 acres for the hurricane debris management at the RRBP project. Work commenced on February 7, 2022 with a duration of 60 days, thus on April 8, 2022 this PO expired. The project is lump sum and was 85% complete as of Friday April 8th. The Contractor requested more time to complete the project due to unforeseen delays to obtain and retain rental equipment. Because the project was not time -sensitive, the Project Manager granted the time extension. However, she missed the deadline to obtain an approved time extension -only change order before the PO expired. Action Required: What are you asking to be done to remedy the situation, include list of invoices if applicable? Requesting authorization to pay invoice #18288, in the amount of $44,395.61. Corrective/Preventive Action: What action is being taken to prevent this violation from re -occurring? To mitigate this going forward, the PM and staff immediately developed an SOP where an Outlook calendar appointment is made for 3 weeks prior to each NTP/PO expiration date, sent to the entire team and not only to that project's PM, tracked in a new spreadsheet available to the entire team. This will ensure that sufficient time is allotted for the CO paperwork flow. The requestor affirms that to the best of their knowledge the information provided in this document is true. Requested by: Robin Bain Robin E. Bain, DqitAy �,g­d by R.bm E B­ Signature: P E P. E. D�W 2022.06.20 09 17.34 -04 00' Date: Division Director: Kari Hodgson DgitMy .,g-d hy Hodg—Kan Signature: HodgsonKari D�h� 2D22C620095941 _04'(111 Date: TI, LO W C14 04 Revised 06/17/2021 I Packet Pg. 1752 1 El this exhibitis notapplicable EXHIBIT E FORM OF CONTRACT APPLICATION FOR PAYMENT Robin Bain (County Project Manager) Bid No. 18-7459 Solid Waste Management Division _ (County Department) Project No. 59007.1.6 Collier County Board of County Commissioners (the OWNER) or Purchase Order No. 4500216207 Collier County Solid Waste Management Dept (the OWNER) Application Date: 6/8/2022 FROM: KristaVigne (Contractors Representative) Payment Application No. 4 A+ Environmental Restoration, LLC (Contractors Name) Work accomplished through the Date: 5/31/2022 4346 SW Hull Avenue, Arcadia, FL 34269 (Contractor's Address) RE: Clearing \ Grubbing & Exotic Removal at the Resource Recove!y Business Park (Project Name) Original Contract Time: N/A Original Contract Amount: $295,970.7 Revised Contract Time: NIA Total Change Orders to Date $0.00 Revised Contract Amount $ 295,970.70 Total value of Work Completed Retainage @ 10% thru $ N/A and stored to Date $ 295,970,70 Retainage @ —% after $ Less previous payment (s) $ 251,575.09 Percent Work completed to Date: NIA —% AMOUNT DUE THIS Percent Contract Time completed to Date % APPLICATION: $44,395.61 Liquidated Damages to be Accrued $0 ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in f ull all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment numbered 1 through inclusive; (2) title to all materials and equipment incorporated in said Work or otherwise listed in orcovered by this Application forPayment will pass to OWNER at time of paymentfree and clear of all liens, claims, security interests and encumbrances (except such as covered by Bond acceptable to OWNER); (3) all amounts have been paid forwork which previous payments were issued and received fromthe OWNER and that current payment is now due; (4) and CONTRACTO R agrees that all overruns as shown on the monthly estimate summary shall, in fact, be added to the revised contract and shall be incorporated into a future Change Order: By CONTRACTOR: A+ EnviroDi1re—t1W FiQao�rtion, LLC (Contractor's Name) I \,/ (Signature) DATE: June 8. 2022 Jordan Deris71%*Axt (Type Name & Title) (shall be signelrby a duly authorized representative of CONTRACTOR) Payment to the CONTRACTOR forthe above AMOUNT DUE THIS APPLICATION is recommended: By Design Professional: Not Applicable (DP's Name) (Signature) DATE: N/A (Type Name &Title) Payment to the CONTRACTOR forthe above AMOUNT DUE THIS APPLICATION is approved: By OWNERS Project Manager: (Signature) DATE: Robin Bain, Proiect Manager (Type Name and Title) T" LO to C4 04 -I Packet Pg. 1753 AT EmVIROMMEWTAL REsToRATioN 4346 SW Hull Ave Arcadia, FL 34269 863-494-7585 Bill To Collier County BOCC ATTN: Accounts Payable 3299 Tamiami Trail E, STE 700 Naples, FL 34112 Invoice Date Invoice # 6/8/2022 18288 Terms Project Number Net 30 PO# 4500216207 Date Description Quantity Rate Amount FINAL INVOICE COLLIER COUNTY - Resource Recovery Clearing and Grubbing / Initial Exotic Removal PO# 4500216207 Work Completed from April 9, 2022 - May 31, 2022: 6/8/2022 TASK I CLEARING 30 ACRES 1 39,206.73 39,206. 73 6/8/2022 TASK 2 INITIAL EXOTIC REMOVAL 1 5,1888.88 5,188.88 FINAL INVOICE - PROJECT COMPLETED FOR PO 4500218207 Total $44,395.61 0 M .r- E 0 C14 C14 N N LL T U M LL I Packet Pg. 177574 ] 5 !. tv 05 0 tv to m A .s E cn E 0 L- IL T- N C4 N N U. m m T 0 m U- C4 E m u m 4.- I Packet Pg. 1755 1 C;01&T C;0-14"ty Instructions After the Fact Form As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or contract terms, an After -the -Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order, when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and services not covered by the current contract or purchase order. All such "After the Fact Procurements" will be reported to the County Manager. I Requester Name:Andrew Miller Division: Capital Project Planning, Impact Fees & Program Management Division Director:Beth Johnssen Vendor Name:CSA Ocean Sciences, Inc. Anriount:$2,672.35 Contract #: 17-7188 Purchase Order:4500211404 Why is this deemed a non -compliant purchase? Choose one. Contract W] � Ordinance 1:1 � Manual P-Card Other 0_ Details of Purchase: Explain the circumstances behind this purchase. Not realizing the STOP work covered all work associated with PO 4500211404, CSA Ocean Sciences, Inc. staff took advantage of the suspended fieldwork time and inadvertently conducted data analysis between the STOP work dates of July 27, 2021 through July 29, 2021. CSA Ocean Sciences, Inc. then billed Collier County (invoice No.: 006914) for that data analysis work and travel performed between 7/27/2021 and 7/29/2021 during a stop. Action Required: What are you asking to be done to remedy the situation, include list of invoices if applicable? Coastal Zone Management staff respectfully requests the Board of County Commissioners to approve the charges within Invoice No. 006914 in the amount of $2,672.35 for the data analysis charges and and travel performed between 7/27/2021 and 7/29/2021 during a stop. Corrective/Preventive Action: What action is being taken to prevent this violation from re -occurring? CSA Ocean Sciences, Inc. has been notified of the issues and directed on how to properly handle future STOP work letters. They now understand that NO work associated with the PO is to be done during the STOP time frame. The requestor affirms that to the best of their knowledge the information provided in this document is true. Requested by:Andrew Miller Digitally signed by MillerAndrew Signature: Mi Ile rAndreW Date 2022.06.16 12 59 12 Date: -04,00, Division Director: Beth Johnssen Digitaily igned by Johnssen_b Signature: John sse n_b Date 20S22.06.28 08:49:04 Date: -04'00' T" LO W C14 04 Revised 06/17/2021 I Packet Pg. 1756 1 I--E3^ E:)C�ENE]n E;C-iE�nC-E�E3 IFIC�. E3-13C)E? F--W ^,ziar-kuca E3r,LjmF--r,. F�lc:)r-ic:lm 23-4EIE3_7 F�HCWIE�. -777�24;21 0-:3CX:)0 Collier County Board of County Commissioners Attn: Accounts Payable 3299 Tamiami Trail E., Suite 700 Naples FIL 34112-5749 Contract No. 17-7188 Collier County Project No. 195-90033/PO #4500211404 Period of Performance: 7/17/2021 - 8/5/2021 Task I Administration, Travel, Mobilization and Demobilization Labor PS1 Project Scientist 1 Mikaela McCarthy PS2 Project Scientist 2 Lystina Kabay PS2 Project Scientist 2 Jeffery Pennell PS3 Project Scientist 3 Robert Douglas PM2 Project Manager 2 John Moulton APM Asst Proj Manager Kasey Jacobs Labor Total Non Labor Mikaela McCarthy - Travel Expenses (See Attached Travel Voucher) Per Diem - Dinner (7/30) Rental Vehicle (7/30-8/5) Rental Vehicle Gas (8/5) Tolls (8/5) Jeffrey Pennell - Travel Expenses (See Attached Travel Voucher) Per Diem - Dinner (7/30) Non Labor Total Task 11 Field Monitoring Survey Labor PS1 Project Scientist 1 Mikaela McCarthy PS2 Project Scientist 2 Jeffery Pennell PS3 Project Scientist 3 Robert Douglas GISD GIS Developer Dustin Myers Labor Total Non Labor Robert Douglas - Travel Expenses (See Attached Travel Voucher) Per Diem - Dinner (7/18) Per Diem - Full days during Survey (7/19-7/25) Per Diem - Breakfast & Lunch (7/26) Rental Vehicle (7/18-7/27) Rental Vehicle Gas (7/24) Rental Vehicle Gas (7/26) Lodging - Rm 107 (7/18-7/21) Lodging - Rm 107 (7/22-7/25) Invoice #: 006914 Invoice Ref. Nbr.: 4584 Date: 05-Aug-2021 Due Date: 04-Sep-2021 Voucher#: 1 Terms: Net 30 Days 4 3708 - Hard Bottom Monitoring Year !"I 6.00 HOUR 99.83 598.98 4.00 HOUR 111.57 446.28 13.50 HOUR 111.57 1,506.20 7.00 HOUR 146.80 1,027.60 0.50 HOUR 184.97 92.49 2.00 HOUR 82.21 164.42 3,835.97 1.00 EA 19.00 19.00 1.00 EA 743.58 743.58 1.00 EA 27.18 27.18 1.00 EA 7.20 7.20 796.96 1.00 EA 19.00 19.00 19.00 815.96 Task Subtotal 4,651.93 64.00 HOUR 99.83 6,389.12 160.00 HOUR 111.57 17,851.20 96.00 HOUR 146.80 14,092.80 8.00 HOUR 129.18 1,033.44 39,366.56 1.00 EA 19.00 19.00 7.00 EA 36.00 252.00 1.00 EA 17.00 17.00 1.00 EA 1,299.98 1,299.98 1.00 EA 65.36 65.36 1.00 EA 33.02 33.02 4.00 EA 144.48 577.92 4.00 EA 110.88 443.52 Continued... Page: 1 of 2 I Packet Pg. 1757 1 Lodging - Rm 113 (7/18-7/21) 4.00 EA 144.48 577.92 Lodging - Rm 113 (7/22-7/25) 4.00 EA 110.88 443.52 Staples - Rubberbands (7/16) 1.00 EA 4.04 4.04 Ace Hardware - Latex Gloves (7/19) 1.00 EA 9.62 9.62 Ace Hardware - Electrical Connectors (7/23) 1.00 EA 7.05 7.05 Office Max - Supplies (7/23) 1.00 EA 37.41 37.41 3,787.36 Jeffrey Pennell - Travel Expenses (See Attached Travel Voucher) Per Diem -Dinner (7/18) 1.00 EA 19.00 19.00 Per Diem - Full days during Survey (7/19-7/25) 7.00 EA 36.00 252.00 Per Diem - Breakfast & Lunch (7/26) 1.00 EA 17.00 17.00 Per Diem - Full Days during Survey (7/31-8/4) 5.00 EA 36.00 180.00 Per Diem- Breakfast & Lunch (8/5) 1.00 EA 17.00 17.00 Rental Vehicle Gas (7/30) 1.00 EA 52.04 52.04 Toll (8/5) 1.00 EA 3.25 3.25 Lodging - Rm 335 (7/30-8/3) 5.00 EA 116.48 582.40 Lodging - Rm 335 (8/4) 1.00 EA 110.88 110.88 Lodging - Rm 337 (7/30-8/3) 5.00 EA 116.48 582.40 Lodging - Rm 337 (8/4) 1.00 EA 110.88 110.88 Home Depot - Hex key set to adjust lasers (7/19) 1.00 EA 10.67 10.67 Ace Hardware - 9mm wrench to adjust lasers (7/19) 1.00 EA 9.62 9.62 Ace Hardware - 9mm wrench to adjust lasers (Credit - bought wrong size initally) (7/19) (1.00) EA 1.07 (1.07) Ace Hardware - 20 pack of AA batteries (7/22) 1.00 EA 19.25 19.25 Ace Hardware - All weather Pen (7/23) 1.00 EA 16.04 16.04 /Best Buy - Video Camera battery charger and float (7/23) 1.00 EA 85.58 85.58 Ace Hardware - Flip Top Bin for Cameras (7/31) 1.00 EA 18.18 18.18 2,085.12 Mikaela McCarthy - Travel Expenses (See Attached Travel Voucher) Per Diem - Full Days during Survey (7/31-8/4) 5.00 EA 36.00 180.00 Per Diem- Breakfast & Lunch (8/5) 1.00 EA 17.00 17.00 197.00 Field Equipment (See Attached Breakdown) - 7/19-7/23 1.00 EA 1,300.00 1,300.00 Field Equipment (See Attached Breakdown) - 7/30-8/5 1.00 EA 1,300.00 1,300.00 2,600.00 Non Labor Total 8,669.48 Task 11 Subtotal 48,036.04 Task III Analysis, Reporting and Deliverables Labor PS3 Project Scientist 3 Robert Douglas 4.00 HOUR 146.80 587.20 Labor Total 587.20 Task III Subtotal 587.20 A,pproved By: A� X�4�, 31312022 Final invoice: NO Progress Billing Total: $ - Time and Material Total: $ 53,275.1' Wiring Bank of America NA Account # 898068427662 - Routing # Tax Total: $ - instructions: 026009593 - Swift Code: BOFAUIS3N - ACH: 063100277 Total: $ 53,275.1 Page: 2 of 2 I Packet Pg. 1758 1