Agenda 07/12/2022 Item #16A 6 (Final Plat for Groves at Orange Blosson Phase 2)07/12/2022
EXECUTIVE SUMMARY
This item requires that ex parte disclosure be provided by Commission members. Should a hearing
be held on this item, all participants are required to be sworn in. Recommendation to approve for
recording the final plat of Groves at Orange Blossom, Phase 2 (Application Number
PL20210003033), approval of the standard form Construction and Maintenance Agreement, and
approval of the performance security in the amount of $3,945,253.40.
OBJECTIVE: To have the Board of County Commissioners ("Board") approve for recording the final
plat of Groves at Orange Blossom, Phase 2, a subdivision of lands located in Section 24, Township 48
South, Range 27 East, and Section 19, Township 48 South, Range 28 East, Collier County, Florida, in
accordance with the LDC Section 10.02.04.B.4. This procedure allows for the Board to approve the plat
and associated construction documents for construction purposes and recording purposes concurrently.
CONSIDERATIONS: The Development Review Division of the Growth Management Department has
completed the review of the construction drawings, specifications, and final plat of Groves at Orange
Blossom, Phase 2. These documents are in compliance with the County Land Development Code and
Chapter 177, Florida Statutes. This project is within the Orange Blossom Ranch PUD, Ord. 04-74, as
amended. All fees have been paid. Security in the amount of 10% of the total cost of the required
improvements, and 100% of the cost of any remaining improvements, together with a Construction and
Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County
Manager or his designee and the County Attorney's office prior to the recording of the final plat. This
procedure is in conformance with Section 10.02.04 F.2 of the Land Development Code.
The Development Review Division recommends that the final plat of Groves at Orange Blossom, Phase 2
be approved for recording.
FISCAL IMPACT: The project cost is $3,586,594 (estimated) to be borne by the developer.
The cost breakdown is as follows:
a) Water & Sewer $1,390,604
b) Drainage, Paving, Grading $2,195,990
The Security amount, equal to 110% of the
project cost, is $3,945,253.40
The County will realize revenues as follows:
Fund: Growth Management Fund 131
Agency: County Manager
Cost Center: 138327 -- Land Development Services
Revenue generated by this project: Total: $109,047.83
Packet Pg. 631
07/12/2022
The Review Fees are based on a construction estimate of $3,586,594 and were paid in December 2021.
The breakdown is as follows:
a) Plat Review Fee ($1,000.00 + $5./ac)
$1,450.00
b) Construction Drawing Review Fee
Water & Sewer (.75% const. est.)
$10,429.53
C) Drainage, Paving, Grading
(.75% const. est.)
$16,469.93
d) Construction Inspection Fee
Water & Sewer (2.25% const. est.)
$31,288.59
e) Drainage, Paving, Grading
(2.25% const. est.)
$49,409.78
GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public
Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation,
except when the applicant elects to delay obtaining a COA for non-residential developments that are
required to obtain approval of a site development plan prior to the issuance of a building permit.
LEGAL CONSIDERATIONS: The applicant is requesting approval of the final subdivision plat and
construction and maintenance agreement. The Board shall consider the County Manager or designee's
recommendation and shall take evidence and testimony in regard to the final subdivision plat
requirements identified in LDC sections 10.02.04 B, 10.02.04 C, and other provisions of the LDC, as well
as Chapter 177, Florida Statutes. If the Board denies or places conditions on the final subdivision plat, it
shall state reasons for such denial or conditions.
In accordance with the LDC, the applicant is required to submit the final subdivision plat to the County
Manager or designee for recording within 18 months of the date of approval of the final subdivision plat
by the Board. However, following approval by the Board, but prior to recordation, the County Manager
or designee may approve minor insubstantial changes to the subdivision plat, and the Board may approve
any changes that are not minor and insubstantial.
This item has been approved as to fort-ii and legality, and requires a majority vote for Board approval. --
DDP
RECOMMENDATION: To endorse staff s recommendation to approve the final plat of Groves at
Orange Blossom, Phase 2 (Application Number PL20210003033) for recording with the following
stipulations:
1. Approve the amount of $3,945,253.40 as performance security for the required improvements; or
such lesser amount based on work completed, and as is approved by the Growth Management
Department.
2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager
or his designee:
a. To withhold Certificates of Occupancy until the required improvements have received
preliminary acceptance.
b. To delay recording of the plat until suitable security and an appropriate Construction and
Maintenance Agreement is approved and accepted by the County Attorney's office and the
Board of County Commissioners or the County Manager or his designee on behalf of the
Board pursuant to Section 10.02.04 F.2 of the Land Development Code.
Prepared by: Lucia S. Martin, Associate Project Manager, Development Review Division
Packet Pg. 632
07/12/2022
ATTACHMENT(S)
1. Location Map (PDF)
2. Plat Map (PDF)
3. Opinion of Probable Cost (PDF)
I Packet Pg. 633
07/12/2022
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.6
Doe ID: 22476
Item Summary: This item requires that ex parte disclosure be provided by Commission members.
Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to
approve for recording the final plat of Groves at Orange Blossom, Phase 2 (Application Number
PL20210003033), approval of the standard form Construction and Maintenance Agreement, and approval
of the performance security in the amount of $3,945,253.40.
Meeting Date: 07/12/2022
Prepared by:
Title: Technician — Growth Management Development Review
Name: Lucia Martin
06/06/2022 4:49 PM
Submitted by:
Title: Environmental Specialist — Growth Management Department
Name: Jaime Cook
06/06/2022 4:49 PM
Approved By:
Review:
Growth Management Operations & Regulatory Management Kenneth Kovensky
Growth Management Development Review
Brett Rosenblum
Growth Management Department
Diane Lynch
Growth Management Department
Engineering & Natural Resources
Jack McKenna
Additional Reviewer
Growth Management Department
Jaime Cook
Additional Reviewer
Growth Management Department
Trinity Scott
Transportation
Growth Management Department
James C French
Growth Management
County Attorney's Office
Derek D. Perry
Level 2 Attorney Review
County Attorney's Office
Jeffrey A. Klatzkow Level 3 County Attorney's Office Review
Office of Management and Budget
Debra Windsor
Level 3 OMB Gatekeeper Review
Office of Management and Budget
Laura Zautcke
Additional Reviewer
County Manager's Office
Amy Patterson
Level 4 County Manager Review
Board of County Commissioners
Geoffrey Willig
Meeting Pending
Additional Reviewer Completed
Additional Reviewer
Completed
Completed
06/13/2022 3:21 PM
Completed
06/13/2022 3:33 PM
Completed
06/13/2022 3:47 PM
Skipped
06/07/2022 11:21 AM
Completed
06/17/2022 12:56 AM
Completed
06/20/2022 9:40 AM
Completed
06/20/2022 11:33 AM
Completed
06/20/2022 11:54 AM
Completed
06/24/2022 1:37 PM
Completed
07/01/2022 10:16 AM
07/12/2022 9:00 AM
I Packet Pg. 634 1
GROVES AT ORANGE BLOSSOM, PHASE 2
0 �E:
- X-I
r'
PROJECT
LOCATION
OIL WELL ROAD
--low
LOCATION MAP
0
I Packet Pg. 635
�e
0
0
7
C
C)
GIN
SIR
(Z OSL'Lld 'WOSSOIS
GBUBJO JB SGAOJE) - Wid IBUI=l 9LVZZ) deW Wid :lUGWLj3L'UV
�ig� �R� ,
ofll 1
-N
'. --. -g
5 -. 21 2�� = 1�1&1 I ! J i
� � �
�Jti
H-1
M
J
ov N
1�2
HUM
�5 911
6d.
CL
Z
ffu m 1,2
2 Z��
Z6
R
9 Y
6v
aj
R'i
Lu
LL
z
uj
VO
Al 1 E i
9,
V2 2,
LL,
W-2
g
c-,
-2
LU in
4�
Lu
n -W4 ig
z 0
F,
I H
Q
HCA
REM'.
lg�
12
C-d
ti .
MM HH'H
�j- pt
t,� t
Mg
a
ZR
V
E� �12
E- R �5
p-HMIR
,Nla -ffitp?
� Uni
�e
0
0
(Z OSPLId 'MOSSOIS SBU12JO
;B SGAOJE) - Wid
IL'ul=l 9L'PZZ)
deW ;Lid :IUGWLIOL'llv
El a :Z�
IS
�p di
URI
C
>
C C)
Rix
MH
IT
RH
(-M-3 a '19 Ddz g.d)
"fq O)VIINI) SgjvjyggjvDNJ(Vio���
sq 'qd 'z 'gj)
vjs.v9,Lv9m94770,9,,
,,69 'ON JIM12 'S�j
u9ploo I I
I& Is I
1 9
�R a
40
7
o?
L�u
3Nr mdvQN.
Ilo,
ftlo7
—o,
W,
—0
a, oalol
� ullol
zp�o7
olo,
-Io7
WA7
I'llo,
�O—T-37
ol
el
R-
I-
ce)
(.0
6
(L
-lid
u
m
(L
w
C)
�e
0
0
(Z OSELId 'WOSSOIS OBUBJO 18 SGAOJE) - Wid IBUI:l 9LVzz) dew Wid :IuGwtVL'UV
WOMSN)
A,
ck
Ing
----------
T- '-x
C)
P
C
>
C)
*0 C-) 2
IMP!
g JIM
If? H,
gg ii;
OEM
a
�Mflpp
ay.Ij v7dAII7
00
ce)
(.0
Cb
a.
(1)
-lid
u
m
a.
w
0
y
0
0
tz;t 1111
R R
2 zo
Jzqz�oos
frpoz 11-10,
t3
9
t107 g
.1
— — — — — — t — — — — — — - 91, g4
H
(Z OsMid 'WOSSOIS OBULIJO JB SGAOJE) - Wid
IBUI.1 9LVZZ) deW Wid
:IU8W43q4V
9
co
3.OZ.9?.00S
L—
WOMSN)
Hum
— — — — — — — — — — — —
W �'- W . i g
CA
C)
Z
C w
>
4
C4�
A HAI
R? g8 H
MIN
ol
I uim
k- 3t 4—
011ol
LOT 21
71
1". 'WO
'e
A.
..........
"%L
VO
+
51% 4
05
A 3,
a)
ce)
(.0
a.
-lid
u
m
a.
L-1
LOU
co
4
L---j
0
0 Z
A
CaL. avou
073ONVI
(d)
LOT12
'.01
1.0111 x4-
%
%
Vol
va,
07
(Z OSPLId 'tUOSSOIS OBUBJO JB SGAOJE) - Wid 1BU1=1 9LVZZ) deW Wid :1uGwt43L'44V
k10
91A107
IM16
'o....
9a.LO7
truo-
Ea
"0'
L1107
o
a U07
5
oo,ogz
".LO'7
"I
W 107
st, 'Lo,
Ectiol
R
"n
ll
bAT.Im"
Z
ems 16VUL
IR 6 107
00 f
,2
Sit 107
c4
019107
US
W.L
9EU07
W107
V-d,01
"F.L'0'7'
R
t 107 D.
61
ZrIJ07
7
0#10
�Ngp� U�
6.
WiO
%s%
.0
3—w
167
.O�Opt
ozozoos
.CagjAS �:
.., ..F _I
it.10 7
LCJ.07
0107
OZ.107
G�OZSESN)
n
HJ21
�4—
i MPH-
UR
v
3
9z
C)
C)
>
c)
C)
C)
i-p
19SH9, Ign,
(D
19T
(.0
6
(L
-lid
u
m
(L
L-1
w
(Z OSPLid 'WOSSOIS GBUBJO ILI SGAOJE) - Wid 1BUIA 9LVZZ) deW Wid :IUGWLIDBIIV
H-6
PWW"
� �4t'
ca
Y
/p
T, �w
IL 0 111-01
e,
-,eo
141,e
b ta
-10
'0
p. 66NI
2,1 M 107
Ea
og
7 9 CL
C)
CA
00 aL,
C)
1l .1
09107
P101
,00 2
9PI07
LP107
9P101
JM k107
M 107
M107
G 110`7
1—M
k Hit H; llfflv
glHOURN
;E
N 9N
.. . ft
49 �g At q:8�8
sa 107
'07
.10,
—V
MZ107
I GkU07 I
91, 1.071
IW107
OW107
UZ1071
OZZ1071
lzziO7
110>
Ott L07
tel.Lol
07
A
z U,
z 107
re 107
qiU.Y6'7 i?
'07��
, �An
g
E: �1:
T-
19T
(.0
(L
-lid
u
M
(L
(*m*a*a Tq'-�� "6 g..T)
=,,69
w
(Z 8SBLId 'WOSSOIS GBUBJo 4LI SGAOJE) - Wid IBUI=l : 9L'Pzz) dew Wid :IUGWLI3L'UV
feuL WJON
13 ;n u8ploo
61 -.0-S iL6
L-.— ...— )—� 1 : Maormowo I-
0
'g
LO'9Z 3.9p3r.69
r
12
IL
t
i; b
sga R
ZA.
A,
A"l- I - -
InIT-1-�--9T 'FIT
'V-2
3NV7 0GV30AV
G
�MNAG A"', C,
8
CLIO A,?'51
ij
P4
A
L
107
3nd—
FT
ZPZ 107
4
-q— L107
ve
v PZ 107 Eg r.
CA 45�
01 07
Ra -7
jj'%lAl OPZI07 g."'
C) 96, 4 z
I- ai"Z'6 Kk'
1%0� 1�
9� zl� 1, 4
-434, 1119,
"0;,
Iezo
C) -ell
o
eqVt"
0.0
A
';0;
�0�
407A �;o
61�
C)
qT
'E4
lo;l
'gr
Aoz
NS
- 'Vk
44
/ I '0�
& '717 '6
eq�'07 0,6
-4
N 'iP
a 0 1
0
PIP
011-01
III-ol
z Lq
MMSKN)
R Z'4
Ht
Ind MH
'JU
04
19T
(.0
6
a.
u
m
a.
7
IS9 *qd 'L
IS2791VONAUM,
w
(Z OSELId 'WOSSOIS GBUBJO JB SGAOJE) - Md 18U1=1 9L'Pzz) dew Wid :WOWLIOLU
p—
jeueo ejeo UOP109 �n LIPON
6 7
061
ok
C >4
C 4
C)
C)
C)
kj
V1 oavo v
2
2'1
z�/ 1,
g"
Vj,
t It
2
c4
z"llov
"O�
4M,
4A
W.6
Z�,;tR
66t 107 �4� &
ki 7
OR I
Stt 107
9jo
9 joeys ei
loci
I'll,
99
-�� 7PR
z
HiM
R zs
N
ce)
19T
(.0
6
(L
-lid
u
m
(L
Barraco www.barraco.ne
and Associates, Inc. Civil Engineers, Land Surveyors and Plannen
ENGINEER'S OPINION OF PROBABLE COST
for the construction of
GROVES AT ORANGE BLOSSOM PHASE 2
February 1, 2022
ITEM UNIT
NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT
1. EARTHWORK
110-1 Erosion Control
1
LS
$8,000.00
$8,00ox
110-2 Silt Fence
9,040
LF
$2.00
$18,o80.c
12o-1 Finish Grading
1
LS
$20,000.00
$20,000.0
120-2 Clearing and Grubbing
50-4
AC
$2,500-00
$126,000.c
775-1 Seed and Mulch
249,300
SY
$0.40
$99,720.0
SUB -TOTAL
$271,800.o
11.
ROADWAY
16o-1
Type "B" Stabilization (12")
20,175
SY
$2.50
C14
$50,437-E
2oo-1
Limerock Base w/Prime Coat (6")
16,883
SY
$9.00
$151,947-C '0
L)
331-1
Asphalt Concrete Type S-III 3/4" (1st lift)
16,883
SY
$5.00
2
$84,415-C
331-2
Asphalt Concrete Type S-III 3/4" (2nd lift)
16,883
SY
$5.00
$84,415-C 0
(L
520-1
Valley Gutter (2'Wide)
14,747
LF
$9.50
4-
$140,o96.E or_
0
.E
520-2
2' Ribbon Curb
48
LF
$30-00
$1,441-).0 0.
0
522-1
4" Concrete Sidewalk
8,231
SY
$35-00
$288,o85-C ;r-;
CD
E
522-2
ADA Detectable Warning
14
EA
$350-00
$4,900-C 'u
575-1
Sodding (Roadway and Lakes)
24,668
SY
$2.50
$61,670-C
700-1 Signing and Pavement Markings 1 LS $4,800.00 $4,800.c
715-1 Street Lights 70 EA $500-00 $35,000-C
SUB -TOTAL: $907,2o6.o
I Packet Pg. 644 1
ITEM UNIT
NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT
111. DRAINAGE
425-1 Valley Gutter Inlet 28 EA $4,250-00 $119,000.0
425-2 Type "C" Inlet 8 EA $3,300-00 $26,400-C
425-3 Junction Box 6 EA $4,500-00 $27,000-C i:Z
425-4
18"
Endwall
1
EA
$1,600.00
$1,600.c
(L
425-5
24"
Endwall
5
EA
$2,000.00
$10,000.0 ff
0
w
425-6
3o"
Endwall
3
EA
$3,000-00
$9,000.c 124
425-7
36"
Endwall
9
EA
$4,500-00
$40,500-C
430-1
18"
RCP Storm Sewer
1,337
LF
$45-00
$6o,165-C 0,
cc
430-2
24"
RCP Storm Sewer
1,483
LF
$70-00
$103,81o.c
0
430-3
3o"
RCP Storm Sewer
354
LF
$95-00
$33,630-C
430-4
36"
RCP Storm Sewer
1,691
LF
$130-00
$219,830-C a.
440-1
8" ADS Pipe
620
LF
$17-00
$10,540-C 'U-
440-2
12" ADS Pipe
2,457
LF
$25-00
'0
$61,425-C le
440-3
18" ADS Pipe
551
LF
$38.00
C14
$20,938.c
0
440-4
ADS Rear Yard Inlets
28
EA
$1,200.00
$33,600.c
SUB -TOTAL:
$777,438.0
0
IV.
WATERLINE AND ACCESSORIES
4-
0
A.
8" DR-18 PVC Watermain
7,267
LF
$32.00
r—
$232,544-C .2
B.
8" DR-14 PVC Watermain
222
LF
$45-00
$9,990-C 0
C.
8 " Gate Valve
20
EA
$2,000.00
$40,000-C OE
U
D.
Fire Hydrant Assembly
15
EA
$5,000-00
$75,000-C m
E.
Single Water Services
75
EA
$800.00
$6o,000.c
F. Double Water Services 99 EA $1,200.00 $118,800.c
G. Temporary Blow -Off 1 EA $2,500-00 $2,500-C
H. Auto Flushing Device 1 EA $9,500-00 $9,500-C
I Packet Pg. 645 1
ITEM UNIT
NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT
1. Permanent Bacterial Sample Point 2 EA $1,800.00 $3,600.c
J. Temporary Bacterial Sample Point 1 A $1,800.00 $1,800.0
K. Connect to Existing Watermain 2 EA $4,000-00 $8,000.c
SUB -TOTAL: $561,734.0 i:Z
V. SENVER SYSTEM
(L
A. 8" SDR 26 Sanitary Sewer 702 LF $6o.00 $430,92o.c E
0
w
B. 4' Sanitary Manhole 30 EA $7,700-00 $231,000-C 120
Lu
w
C. 6" Single Sewer Service 27 EA $1,000.00 $27,000-C
D. 6"Double Sewer Service 123 EA $1,100.00 $135,300-C 0,
E. Connect to Existing Manhole 2 EA $2,100.00 $4,200.0
0
F. Cleanout 1 A $450-00 $450-c 0
SUB-TOTA,L:
$828,870-0 a.
V1.
LANDSCAPING
LL
A.
Slash Pine
84
EA $300-00
$25,200.0 le
B.
Southern Live Oak
104
EA $350-00
C14
$36,400-c
0
C.
Silver Buttonwood
68
EA $250-00
$17,000-C
D.
Simpson's Stopper
902
EA $75-00
$67,650-c -coo
0
L_
(L
E. Swamp Lily 872 EA $6o.00 $52,320.0
0
F.
Saltgrass
872
EA
$2.00
r_
$1,744-C .2
G.
Pink Muhly Grass
872
EA
$2.00
$1,744-C 0
H .
Pickerel Weed
436
EA
$2.00
$872.G OE
u
1.
Sand Cordgrass
436
EA
$2.00
$872.0 2
J.
Fire Flag
872
EA
$2.00
$1,744-C
SUB -TOTAL: $205,546.0
I Packet Pg. 646 1
ITEM UNIT
NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT
VIL IRRIGATION SYSTEM
A. Buffer Irrigation 68,000 SF $0.50 $34,000-C
SUB -TOTAL: $34,000.0
TOTAL: $3,586,594.0
io% BOND TOTAL: $358,659.4
Estimated Date of Completion: 12/2022
Barraco and Associates, Inc.
2271 McGregor Boulevard, Suite loo
Fort Myers, FL 33901
Certificate of Authorization No. 7995
Digitallysigned
by Carl A
0
No�38536 Barraco
STATE OF 10"'Date:
2022.02.22
11:58:11 -05'00'
This item, has been digitally signed and seated by
Carl A. Barraco on the date adjacent to the seal.
Printed copies of this document am not considered signed
and sealed and signature must be wrified on my electronic
copies.
Carl A. Barraco, P. E.
Florida P.E. No. 38536
For the Firm
Pages 1-4
BOND TOTAIL: $3�941253-4
4
I Packet Pg. 647