Agenda 07/12/2022 Item #11E (Change Order #10 to Collier County Sports Complex Phases 2.1 and 2.2A)
11.E 07/12/2022 EXECUTIVE SUMMARY Recommendation to approve deductive Change Order No. 10 to Collier County Sport Complex Phases 2.1 and 2.2A Agreement No. 17-7198, with Manhattan Construction (Florida), Inc., for a time extension of 145 days; acknowledge staff report for update on phase 1, and modified phases 2.1 and 2.2 scopes; provide direction to staff for phase 3 and phase 4, and authorize the County Manager or designee to issue a notice of intent to terminate to Manhattan Construction, if necessary, and subject to Board ratification at a future Board meeting. (Project 50156). OBJECTIVE: To provide the Board with an update on the current and future phases of the Sports Complex, obtain direction for phases 3 and 4 and approve Change Order #10 for extension of time necessary to accommodate unforeseen delays as discussed below. CONSIDERATION: On February 13, 2018 (Item 16.D.21) the County entered into Agreement No. 17- 7198 (the "Agreement") with Manhattan Construction (Florida), Inc. ("Manhattan") for Construction Manager at Risk ("CMAR") services for all preconstruction phases for the Collier County Sports Complex. The process contemplated using individual contract amendments for each subsequent GMP construction phase. Phase 1: On September 25, 2018 (Agenda Item 11.13), the County entered into the First Amendment to the Agreement with Manhattan for work for Phase 0 that included the preparatory work required in anticipation of Phase 1, where the infrastructure and fields will be installed. Phase 0 included most of the land clearing, full lake excavation, a construction access road, and preliminary drainage work. On March 26, 2019 (Agenda Item 11.C), the County entered into the Second Amendment to the Agreement with Manhattan for work for Phase IA. This completed phase is open to the public and includes the primary underground utility work on the parcel, provides five fields, maintenance building, welcome center, market, ticket booth and restrooms. Phase IA also completes City Gate Boulevard South, main entrance improvements on City Gate Boulevard North, and parking for this phase. On October 22, 2019 (Agenda Item 16.D.9), the County entered into the Third Amendment to the Agreement with Manhattan to revise and correct the Construction Manager's Standard Rates in Exhibit "G" to the Agreement. On December 10, 2019 (Agenda Item I I.D), the County entered into the Fourth Amendment to the Agreement with Manhattan for work for Phase 113. That phase consists of the Stadium, Great Lawn and Championship Field. The Great Lawn was completed ahead of schedule and is open to the public. Amenities include the Cove with a food truck pavilion and bar, the Factory that consists of a MoveStrong workout area, National Fitness Court, open air classroom, open air weight room, lake trail, yoga area, climbing wall, volleyball, and bocce courts. On March 26, 2019 (Agenda Item 1 LC), the County entered into the Second Amendment to the Agreement with Manhattan for work for Phase IA. This completed phase is open to the public and includes the primary underground utility work on the City Gate parcel, provides five fields, maintenance building, welcome center, market, ticket booth, and restrooms. Phase IA also completes City Gate Boulevard South, main entrance improvements on City Gate Boulevard North, and parking for this phase. Phase 1 update: Phase 1 construction is completed with buildings and improvements open to the public under temporary Certificates of Occupancy originally issued in July 2020 for the Welcome Center and December 2020 for the Stadium. Manhattan has been pursuing final certificates of occupancy that require completion of required inspections and other work. There are pending Phase 1 issues including: final Certificate of Occupancy, punch list items, outstanding change orders, other potential contractor claims, and liquidated damages. Notwithstanding the foregoing, the improvements in this phase have been in use by the County under a Temporary Certificate of Occupancy. Packet Pg. 150 07/12/2022 Phase 2: On November 10, 2020 (Agenda Item 11.1)), the County entered into the Fifth Amendment to the Agreement with Manhattan for work for Phase 2.0. That phase consists of clearing, grubbing, and construction fencing of approximately 110 acres of the entire remaining complex including the extension of City Gate Boulevard North. This work was completed in May 2021. On December 8, 2020 (Agenda Item 1 LB), the County entered into the Sixth Amendment to the Agreement with Manhattan for work for Phase 2.1 and 2.2A. That phase consists of excavation of additional water management areas (lakes) the extension of City Gate Boulevard North, the addition of five sports fields, internal roadways and parking lots, infrastructure, overnight campground, and the additional parking spaces for the Cove area. Phase 2 update: The excavation of water management areas and other related site construction elements are largely complete. The extension of City Gate Boulevard North, the addition of four sports fields, internal roadways, and parking lots are approximately 70% complete. With a priority placed on delivering four fields in advance of the December FBU National Football Championship and in consultation with the operator of the Sports Complex, Sports Facilities Management, LLC, it was determined that field completion target date needs to be November 2022. To achieve this completion date, the fifth field (field No. 9) and its associated prefabricated metal building allowance are scoped out of Phase 2.1 and moved into a future Phase 3. Change Order No. 10 (CO #10) to Collier County Sport Complex Phase 2.1 and 2.2A, the Sixth Amendment of Agreement No. 17-7198, provides for a time extension of 145 days to complete Phase 2.1 and 2.2A. Change Order No. 10 includes additional time and related General Conditions and Requirements expense with a budgeted Time and Materials cost of $590,726.28. Other deductive and additive changes that are part of CO #10 result in this Change Order having a small net deductive impact of ($3,088.63) on the Agreement. The time extension provided by CO #10 is required due to the impact on the supply chain caused by both material shortages and shipping delays in the aftermath of the COVID-19 pandemic. Impacts to the production and shipping schedule of PVC conduit drastically influenced the construction schedule. Much of the delay in material delivery was related to the agreement between the County and Florida Power and Light to provide roadway and parking lighting along with required materials including conduit. Additionally, internal Purchase Order and Notice to Proceed processing timelines for Phase 2.1 and 2.2A may have contributed to the need for additional time. Outstanding Phase 2.1/2.2A matters include material cost escalation claims that have not yet been reviewed by staff or the County Attorney's Office and are referenced herein for informational purposes. Phase 3 update: Phase 3 will include field No. 9 and its associated prefabricated metal building structure, the south parking lot and potentially a bathroom structure (Bldg. 18) originally value engineered out of Phase 2. Staff will construct this phase through a new contract mechanism separate from the current Manhattan contract. Potential start of construction is early 2023 with an approximate construction timeline of six to eight months. Next step: present a contract award to the Board at a future meeting. Phase 4 update: This phase consists of eleven multipurpose fields (five fields will be softball, mini soccer, and little league, six fields will be baseball and soccer) as well as ancillary buildings. Building selection and design will be determined through the design process and may include: • Mini -welcome center • Several concessions and restrooms • Trophy presentation plaza • Mini marketplace Packet Pg. 151 07/12/2022 • Storage and maintenance building Phase 4 design and construction management services are estimated to be $1.4M with estimated construction costs between $25M and $30M. Financing will be required. Next step will be to present a design contract and a plan of finance to the Board at a future meeting. Phase 5: Phase 5 contemplates a two-story field house, a gymnasium, and RV Parking. Estimated construction cost is approximately $42M. Estimated design cost is approximately $2.5M. On September 16, 2021, a Community Development Block Grant (through the Department of Economic Opportunity ("DEO")) grant application for the Paradise Coast Sports Complex Field House/Shelter was approved by the Board. The intent of the grant is to harden the field house structure to accommodate special needs & general population during storm events. This grant application is in the amount of $14.3M. Staff anticipates notification of award status once the application review from the DEO is complete. Next step: report back to the Board on grant award status. Potential Termination: Section XV of Agreement No. 17-7198 allows the County to terminate the Agreement, at any time upon 30 calendar days written notice to the Construction Manager. The recommendation includes Board direction to the County Manager or designee to issue the requisite notice of intent to terminate to Manhattan Construction, if necessary, subject to Board ratification at a future Board meeting. At the moment, staff has not determined the actual cost of terminating the Agreement, including compensating the Construction Manager for work completed through the various phases or ancillary expenses/costs that are subject to reimbursement upon terminating the Agreement. FISCAL IMPACT: Change Order No. 10 is offset by additive and deductive scope adjustments and does not impact the current Sports Complex budget (Sports Complex Fund (370) Project No. 50156). The primary deductive element of Change Order No. 10, (prefabricated metal building structure), will be bid as part of Phase 3 following completion of Phase 2 work. Phase 3 funding: Sufficient estimated budget of approximately $3M is available from contract deductions and budgeted funds in the FY 22 and FY 23 Sports Complex Fund (370) Project No. 50156 to complete Field 9 and related shade structure being moved from Phase 2 to Phase 3. Phase 4: Design and construction cost is expected to be between $26M and $31M. Moving forward with this phase will require a combination of pay -go funding from the TDC 5th Penny allocation for the Sports Complex, General Fund capital program funding, and a Commercial Paper/Bonding plan of finance. A more specific plan of finance will be presented when the Phase 4 design contract is brought to the Board for approval. Phase 5 design and construction costs are estimated to be $45M. Proceeding with Phase 5 will depend on several factors including the availability of grant funding. GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to this action. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval.-SRT RECOMMENDATION: Recommendation to approve deductive Change Order No. 10 to Collier County Sport Complex Phase 2.1 and 2.2A Agreement No. 17-7198, with Manhattan Construction (Florida), Inc., for time extension of 145 days; acknowledge staff report for update on phase 1, and modified phases 2.1 and 2.2 scopes; provide direction to proceed with phase 3 and phase 4 as provided herein, and authorize the County Manager or designee to issue a notice of intent to terminate to Manhattan Construction, if necessary, subject to Board ratification at a future Board meeting. (Project 50156) Packet Pg. 152 07/12/2022 Prepared by: Ed Finn, Director, Facilities Management Division ATTACHMENT(S) 1. Change Order 10 (PDF) Packet Pg. 153 11.E 07/12/2022 COLLIER COUNTY Board of County Commissioners Item Number: 11.E Doe ID: 22489 Item Summary: Recommendation to approve deductive Change Order No. 10 to Collier County Sport Complex Phases 2.1 and 2.2A Agreement No. 17-7198, with Manhattan Construction (Florida), Inc., for a time extension of 145 days; acknowledge staff report for update on phase 1, and modified phases 2.1 and 2.2 scopes; provide direction to staff for phase 3 and phase 4, and authorize the County Manager or designee to issue a notice of intent to terminate to Manhattan Construction, if necessary, and subject to Board ratification at a future Board meeting. (Project 50156) Meeting Date: 07/12/2022 Prepared by: Title: — Facilities Management Name: Paula Brethauer 07/06/2022 12:20 PM Submitted by: Title: Director - Facilities Maangement — Facilities Management Name: Ed Finn 07/06/2022 12:20 PM Approved By: Review: Procurement Services Sandra Herrera Level 1 Purchasing Gatekeeper Procurement Services Sandra Herrera Additional Reviewer Facilities Management Ed Finn Director - Facilities Facilities Management Jennifer Belpedio Manager - Real Property Public Utilities Operations Support AmiaMarie Curry Additional Reviewer Public Utilities Department Drew Cody Level 1 Division Reviewer Public Utilities Department George Yilmaz Level 2 Division Administrator Review County Attorney's Office Scott Teach Level 2 Attorney Review Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Office of Management and Budget Susan Usher Additional Reviewer County Manager's Office Amy Patterson Level 4 County Manager Review Board of County Commissioners Geoffrey Willig Meeting Pending Completed 07/06/2022 12:44 PM Completed 07/06/2022 12:45 PM Completed 07/06/2022 1:01 PM Completed 07/06/2022 1:11 PM Completed 07/06/2022 1:42 PM Completed 07/06/2022 1:58 PM Completed 07/06/2022 2:07 PM Completed 07/06/2022 2:16 PM Completed 07/06/2022 2:37 PM Completed 07/06/2022 3:03 PM Completed 07/06/2022 3:24 PM Completed 07/06/2022 4:52 PM 07/12/2022 9:00 AM Packet Pg. 154 11.E.1 ❑ this exhibit is not applicable ® Contract Modification EXHIBIT F CHANGE ORDER ❑ Work Order Modification Contract #; 17-7198 Change tl: EA Purchase Order #; 4600209838 Project #. 5o156 Contractor/Firm Name: Fmanhattan Construction Florida Inc. Project Name: F hase 2.1 Collier County Sports Complex Project Manager Name: Ayoub Ai-bahou, P.E. Department: Facilities Management Original Contract/Work Order Amount $ 32,998,449.06 11.B 1218/20 Original BCC Approval Date; Agenda Item# Current BCC Approved Amount $ 29,185,545.49 11.13 1218/20 Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 29,185,545,49 8/7/2022 'I SAP Contract Expiration Date (Master) ' Dollar Amount of this Change $ (3,088.63) -11.66% ',Total Change from Original Amount E Revised ContractlWork Order Total 1 $ 29,182,466.86 -0.01% %Change from Current BCC Approved Amoun Cumulative Changes $ (3,815,992.14) -0.01 % f Change from Current Amount j Completion date, Description of the Task(s) Change, and Rationale for the Change Nottee to Proceed 3I9121 Original 618i22 Last Approved 817122 Revised Date , 12/3C/22 Date Completion Date Date Inctudes this change # of Days Added 145 Select Tasks ❑ Add new task(s) ❑ Delete task(s) ❑ Change task(s) 0 Other (see below) Provide a response to the following: 1.) detailed and specific expl a nationiration ale of the requested change(s) to the task(s) and 1 or the additional days added (If requested); 2.) why this change was not included to the original contract; and, 3.) describe the impact of this change is not processed, Attach additional information from the Design Professional and Contractor if needed. 1) This change order is to add an additional one hundred forty-five (145) days to the contract time and requests the following: Authorization Request: 7675,012- CaretakerAllowance To reduce the project amount for the Caretaker Allowance and associated fees, which will not be utilized for a deductive change in the amount of ($107,069.14). Authorization Request: 7676.024- HDPE Watermaln Credit- Jensen Underground To reduce the project amount associated with a credit to change the water main from HDPE to 0-900 due to a delay In materials for a deductive change in the amount of ($89,121.69). Authorization Request: 7675,026- SDI Adjustment and reallocation -» SCG Fields To reallocate Subcontractor Default Insurance from Manhattan's SDI to SCG Fields In the amount of ($76,783.14) for a zero -dollar change. The subcontractor did not qualify for Manhattan's SDI program. To add the SDI, which was omitted from the escalation of costs submitted on CO 0. The additional SDI will be funded from Owner Contingency in the amount of ($8,173.62) for a zero -dollar change. Authorization Request: 7676.426- Extended General Conditions and Requirements- Manhattan Added costs for extended General Conditions and Requirements due to FPL lighting and distribution drawings and delays in material delivery for an increase to the project in the amount of $590,726.28 and 145 days (60 days was Issued in change order #9) Authorization Request: 7676.031- Prefabricated Engineered Metal Building Allowance To reduce the project amount for the Prefabricated Engineered Metal Building Allowance and associated fees which will not be utilized for a deductive change in the amount of ($428,276.55). Packet Pg. 155 11.E.1 Authorization Request; 7675.033- Stormwater Revisions -Jensen Underground Added costs for slormwater revisions addendum #11 and RF1 #43 to the pathway drainage North of fields 1 and 2 for an increase to the project in the amount of $9,088,88. Authorization Request; 7675.034- FPL Transformer -Jensen Underground Additional materials are required to accommodate the structure conflict with the existing FPL Transformer for an increase to the project in the amount of $16,900.83. Authorization Request; 7676.035- Field Marking Revisions -- SCG F'lelds Added costs for field marking revisions addendum #17 for the additional line packages for an Increase to the project in the amount of $4,662.76 2) Time Extension is due to the Impact on the supply chain caused by both material shortages and shipping delays in the aftermath of the COVID-19 pandemic. Changes in the production and shipping schedule of PVC conduits drastically influenced the construction schedule of this project, Most of the delay in material delivery was based on an agreement with Florida Power and Light to provide the required conduits to the site. FPL has failed to deliver these materials on time and as needed for this project. 3) The impact on this project if this Change Order is not processed Is that project time will be lost due to both material shortages and shipping delays, ripple effects of the COVID-19 pandemic; The construction schedule will be delayed, the project will not be able to move forward into the next phase, nor been completed. The necessary modification will not be able to be completed. Digitally signed by Zurlma ruff, for Ayoub Zurima Luff, for Ayoub Albahou Albahou 07/01 /2022 Prepared by: Date: 2022W.01 10:38:36.04'00' Date: (Ayoub AI-bahou, P.E., ADAC,LEED GA, Principal Project Manager, Facilities Management Division) Acceptance of this Change Order shalt constitute a modification to the contract/work order identified above and will be subject to all the same terms and conditions as contained In the contract/work order Indicated above, as fully as If the same were stated in this acceptance, The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor 1 Vendor 1 Consultant 1 Design Professional arising out of or related to the change set forth herein, Including claims for impact and delay costs. Rtgllaltyslgned by Mallhaw Jonas IM C=US, f=m�anas�rnanhatlancanstrucgon.com, Matthew J o n e3s O-MAnhatlan ConstfucRon, CN-Matthew Jones Accepted by: Data:2022.07.01 B•36:28-04100' Date; (Manhattan Constwollon Florida, Inc.) cn-Jeff Davidson, O=Davidson Eaglneedng, ou=Englnaedng, emall=leff@davidsonangineering.com, Approved b : a=us en�r;4gN pp y �nnne_m•��•�a�n��nzna Qa#a: (Davidson Engineering) F i n n E d Digitally signed by FinnEd Date: 2022. Q7.€l6 11:03:503:51 Approved by: 04'00' Date: (Ed Finn, Interim Division Director) Digitally signed by BigeloWCatherino Bigelowcatherine Approved by: Date: 2022.07.06 12:17:00 -04'00' Date: (Procurement Professional) 7/6/2022 I � 'r;neg �i,aen ucc�us< Joslj Fru!h °�„� FivR� Dili 2a7Il1r.65 fROr:?i01S7R Packet Pg. 156 11.E.1 Change Order/Amendment Summary COST TIME COO AMD# Description Justification s Da Additive (+} Deductive (-) Added New Amount To deduct builders' risk The use of the owners .I Insurance and ($146,843.00) allowance and deduction for the approve the use builder's risk Insurance would of owners survey not be recognized. allowance. To approve the use of the The use of the subcontractors 2 subcontractors allowance would not be allowance. I recognized To approve the The use of the owners 3 use of owners allowance would not be testing allowance. recognized. To deduct and 4 approve Direct E$753'38a'80) To take advantage of sales tax Material savings. Purchases. To approve the The use of the owner's use of Owner contingency would not be 5 Contingency for ($1,627,901.54) recognized. To take advantage price escalation. of sales tax savings. DMP Turf 6 reallocate SDI to the proper line To reconcile/reallocate SDI To deduct and 7 approve Direct Material ($189,635.66) take advantage of sales tax Purchases. Core sa savings. & Main To deduct and approve Direct Material 8 Purchases. E$1,095,177.51) To take advantage of sales tax Conrad savings. Yelvington and Sportsfieid Specialties Project time will be lost due to 9 To extend the 60 616 both material shortages and time by 60 days shipping delays, ripple effects of the COVID-19 pandemic Deduct allowances that are not being Deductive change and Project utilized. Extended increase amounts would not be GCs and GRS. lme will be Projectmaterial 10 Increase to the (3,088.63) 145 661 last due to both project due to shortages and shipping delays, materials delays ripple effects of the COVID-19 And to extend the pandemic lime b 145 days c 0 c ar X w 0 E H N a) N 0 t d x m a E 0 U 0 a ao r ti r; Packet Pg. 157 11.E.1 CO #10 Summary of Allowance Description Contract Amount Remaining alter Previous Change Orders Remaining after this Chan a Order Owner Contingency $833,503.00 $286,604.57 $280,510.95 Caretaker Allowance $100,000.00 $100,000.00 $0.00 Prefabricated engineered metal buildlung $400,000.001 $400,000.00 $0,00 7675.025 $ 8,173.62 Contingency a) 00 1* N N O L L 0 d Cn r- R t U c O E t c.� r Q Packet Pg. 158 ..r,. ,.t....: n e .UA1% 7675.012 Caretaker allowance $ (107,069.14) Approved 7675.024 HDPE to PVC $ (89,121.69) Approved 7675-025 SGC Fields SDI $ Approved, taken from project allowance 7675-026 MCC GC & GR $ 690,726.28 Approved 7675-031 Descope metal Building #21 $ (428,276.55) Approved 7675-033 Addendum 11 & RF143, stormwater $ 9,088.88 Approved 7675-034 RFI 16, conflict with FPL transformer $ 16,900.83 Approved 7675-035 Addendum 17, field marking $ 4,662.76 Approved TOTAL, $ (3,088.63) Packet Pg. 1579 ] 11.E.1 Building (,,xc ll en.CG, Manhattan Authorization Request Detailed form, Grouped by Number (with GE Breakdown) Collier County Sports & Rvonts Complex Project tl 7675 To: Ayoub AI-bahou Frain: Cherlsse Travis Collier County Manhattan const(uctlon Company o 3290 Tamlaml "frail Easi $708-1 Westvlaw DR N Naples, FL 34112 Naples, FL 34104 d d •, , _„ : K W CARETAKER ALLOWANCE pending Subntitled a) Emmm 0 ($107,069.14) N Notes N Collier County has advised this al[owartca 3vlll not be utilized in this GMP and return the full value of this allowance. MCC has not proceeded previously will) any aepects of this scope of work, tl m Q19 31012021 (S11071WO.14) 0 owner Change owner Dlrootive Q- E gesort tp Intt o to ALLOWANCE - 2,1 Ctirelakers Office to °� O 12+3012t - coiller Cdunty advised via emalt (see otlaehed) the Carelokers Offlre Allowance iNll not he tuill7.ed on tills project and the value Q- co assoc[ated Will this allowance should be returned. Cost Event 8reakdowa; rb (7) 001 CONTRACT ALLOWANCES - CARETAKER OFFICE: ($100,000,00) ~ Level 1 1.6 9i�f (51,500,00) rn Level 2 1.176% General Liability (S1,192,52) rb N Level3 0,736% Bond (Ti7�it3.82) Level d $,6°/o cM Fee ($3,020,70) e In ordor to tnitipato possible delays and oxpoditq tho approval for the direct cost of work ra[aled to Otis change, uninss spacifically notod ataavor vre L O ere submitting this change request without sohedule timel❑ost Impact, We reserve the right to submit for coMIUme impacts related to this change 0 under separato Over Man that Intormallon Is available, � Contractor does not release impacts that arise out of Acts of Nature (Including fire, (food, earthquake, starn-k hufricane or other natural disaster), � war, Inveslon, aot of public enamles, hostllities (vAtelher war Is deolared or not), ul�il tvar, rebellion, revolution, insurrecllon, milltary or usurped r�o povror or canfiscalloq tarrodst activltlos, viol, naliona0zatie11, Q❑vernmant actt❑ns, tariffs, btockago, embargo, transportation delays not rausonably U foreseeable, labor dispute, strike, lookculr disesse outbreak, epidemics, panderhtcs, quarantine restrictions, or Interruption or fellure of power sourcori. To the silent thrpso conditions may occur and Impeot the Project, there sha[l bo an aqultable adjustment to the contract. E t C� a+ r Q Authorizatlan Requosti 7675.012 Approved By., Ayoub At.bahou -. Sr Project Manager SIGMA TURE WE Cofllee County Sports 4% Events Complex ProlugManriger Project It 7075 Packet Pg. 160 11.E.1 Manhattan Authorization Request Bi lill excellence. Detailed Form. Grouped by Number(viilh CE Breakdown) Collier County Sports & Evanta Corti Project it 7676 / t l c i• i 1 1 To: Ayoub At-behOLI From: Chill Travis Collier County Manhattan Construction Company o 3209 Tamlami hall East 3706-1 Weslvlew DR N Naples, FL 34112 Naples, FL 34ill r A e 1 1 I+ x W North RV Park Walarmain - HOPE Credit Pending Panding 0 E I- 4112022 0 ($09,121,G9) N Notes y Reference RFI fl30. The cost shown fs associated with the credit to chanhs the Walermain from HOPE to C•9.00 due to material delays. t a Exclusions: x Schedule Timer Cost Impacts m Engineering 0. 036 W12l 0 Owner Chpril Owner Dlreo lvka N Description a RFI 11036- HDPE ve C-900 rn Notes o0 3,17.22 • RF'I #31]; HOPE vs 0-900 Walormaln North of RV Park ti HOPE has very Ilntltod ovaltability duo to material shortages and it Is roqueslod to replace 114" HOPE Walormain with 12" C-900. Rerotortcei the attached sketch, . Cost Event g"e &down: rn 00 N N 001 STORM DRAINAGE (m.7.37.62) c Level 1 115% SPI ($1,240.66) L Level IIA7600 Goiteral Liability ($002.71) Levoi 3 0,73l goad p20,12) O Level 4 3.6% OM Pee (5 .m.74) In order to ntltlgata possible doll and oxpodlte Ilia approval for the direct cost of work related to this changa, unless specifically noted above, vro rJ are submitting this change request without schedule tlnielcost impact. We reserve the right to submit for costltime impacts related to thI4 change under soperala cover when that Information Is avaliabla. Contractor duos not release Impacts that arise out of Acts of Nature (Including Oro, flood, earthquake, storm hurricane or other natural disaster), E war, Invade». Sot of pubito enernles, hostilllles (whoihsr veer Is dooltared or not), 00 war, febelli on. revolution, Insuird0l in, mililory or usurped t powdror confiscnllorl terrorist activitlas, dot, rtallonallntion, government actions, tariffs, blockage, embargo, transportation delays not reasonably c roreseeablei labor dispute, atdka, lockout, disease outbreak, epidemics, pandemics, quarantine restrictions. or Internapttoe or (allure of prnvor Q sources}. To the extant Ill condittpns spay occur and Impact the Project, there shall be an aqullablo adjusinient to Elie Conl ill County Sports A Events Complex Project 11 7016 PralofrMetrraprar Packet Pg. 161 11.E.1 Manhattan Building excellence. AuthOV12WIdri Request: 7675.024 Approved By: Authorization Request Dotalled Form. Grouped by Numbor (wIIh CE RronkdowA) Ayaub AbhAhou - Sr Project Manager SfGIV k TURF DATE Collier County Sports & Events Complex PrologmPnoger p(Oleat N 1616 Packet Pg. 162 11.E.1 Manhattan Building tacellencL. MY nhatlan Consiruclien (Florida), Inc. Project: 7676 - Collier County Sports Compiox Phase 2 3705.1 WestvieiY Drive City (3ete t3lvd NoPles, Florida 34104 Naples, Ffarlda 34110 Phone: (239) 643.6000 Fax: (239) 643-6030 HDPE- D-900 Watermain North RV Park TO, Ryin Fruth (Peninsula Etlghworing) FROM: Magan Phillips (Manhattan . Naples) Joshua ill (Peninsula EntlIneorinpj DATE INITIATED: 03117/ 2022 STATUS: LOCATION: South City Gate Blvd. HOT RFI: COST CODE- DUE DATE: COSTIMPACT: NIA REFERENCE: SCHEDULE IMPACT: Yes (Unknown) SPEC SECTION: DRAWING NUMBSR: C•20.06 LINKED DRAWINGS: RECEIVED FROM: Ricky Pullen (Janson Undorground Utllltoo, Inc.) Yes 031I M022 330600 - LIIIIIII9s QUestion from fAegan P till lips. (Man h altan.- Naplles� at 04:01 PM on 0311712022 HDPE is currently In a shortage "and still unavallabta at thle lima, It Is requested to Change 14" Watornlaln (drawn In red horlxonlally and cuivas :vest In attached ptclu`e) to be replaced wilh 12' C-900, Watermaln 12' (drawn vailically In attar}lad ploluro) to be changed 10" PVC Attachments: W lerrtlnlrt G; QO reglremted iuc NII 3.17W.p11e Of iviiiI Rospvitux Joshua Fruth (Peninsula Engineering) responded art Tueeday, March 2911), 2022 al 12; 14PM EDT Ploaso proceed and follow the detail and spat G•10 Prpa Restraint DotpII)on shoot C•26.02. Tho location of this work for the 14" 112, valor nialn (change to 12' 110") Is shown on sheets 0-24.11. C-202, and C-24.38. If a credit was previously provided, Please send to the Client. Attachments: OF(jclal RespartsQ, Ayoub Al -bah ou (Collier County) responded on Friday, March 251h, 2022 all 9;51AM 60T as disused In tile OAQ meeting, please provide engineering documents and sketches ail the location and number of joints. engineering data to restrain joints. Attachments: All Replies; Pleaso proceed and follow the detail and spot G•10 pipe Restraint Dolail) on shalt 0-26.02. The location of this vrork for the 14" 112' wator main (change to 12." 110`) Is shown nn 011014 0-24.11, C-24.12, and C-P4.30. If a credit wrls previatisly provldoo, ploase sond to tho Cltont, Attachments: Manhattan Construction Company Pogo 1 or 2 Prinlert On: 0410$12022 10 :46 AM Packet Pg. 163 11.E.1 Manhattan B11111flrrg ("weellence. '< i • s + � � � i • s f 6• i I s � r• k I as disused lit the OAC meeting, please prOVldo engineadng documents and sketches on the lcoatlon and nunlbar of Joints, onginaoring (late to restrain jolnis, Attaolimonts; The N of lolnls necessary to complete these runs are concerning, thus the reason HOPE pipe was proposed. A16o, myself and the Client have previously asked for t:osi implications. Please provide this lltfonnallan to itno Client, So a floal decision can be mada. Tho conversion from HDPE to PVC is dcceptable from our end II meterlul Is unavailable / zero dollar or reduction In fees is proposed (Le, PVC Is cheaper than HOPE), Attachments: Atlaclied Is ran dOWntertla1100eRer born Supplier Vedlying supply ahortago. Attachments: Supplier. Prnall-Jensen 1.10 22,pdt COPIUS TO. Ayoub At-bahou (Collier County), Melly Edwards (Jenson undarpround Willies, Inc.), Joshua Ruth (Polttnsula Enghraoring), Kyle Truth (Peninsula Engineodno), Mogan Phillips (Manhattan - Naples), Picky Pullen (Jensen Underground Utllltes, ]no.), Cherlsse Travis (Manhattan - Maples), Breit tlalltol Ianhattan - Naples) Coordinate mid/or Incorporate iho enelosed elarifloallons to the Contract Documents as desorlhed In till$ RFI. Proceed %vilh the clarifications descilt)ed herein unless there is a cost or time Impact to your work. If this RFI constitutes a change In cost or contract time to your scope, provide written notificntion of change to Manhattan within 40 hours of receipt of this RVI, Manhattan Construcuon (Flar►da). Ino, Page 2 of 2 printed On: 04I0612022 10:40 AM an Co N N O L a) L 0 d Cn C R t U c O E t V r Q Packet Pg. 164 11.E.1 Packet Pg. 165 11.E.1 JENSEN PROPOSAL UNDERGROUND UTILITIES, INC. NO. 24709 6685 TAYLOR ROAD, NAPLES, FL 34100 DATE: 3i24/22 PHONE: 239.697.0060 FAX:239-597.0061 SHEET NO. 101 CERTIFIED UNDERGROUND UTiLlTY: CU cg44996 FIRE. SPRINKLER CONTRACTOR V: 1170Big 00192 PROPOSAL SUBMITTED TO: WORK TO BE PERFORMED AT: NAME Manhattan Construction Company, Ino. Colller County sports Park STREET $706.1 Westvlew Drive STREET City Gale Blvd CITY Na Ica CITY Naples STATE FL DATE OF PLANS Pflco 011forenco PHONE 643.6000 FAX: ENGINEER Peninsula Engineering We hereby propose to furnish the materials and perform the labor necessary for the completion of. PVC 1N LIEU OF HOPE 1 LS HDPE-218,681.77 1 LS PVC 142,911.30 1 LS OVERHEAD 4X67.05 CHANGE ORDER TOTAL-03,237.52 EXCLUSIONS: 1) NOT RESPONSIBLE FOR PRIVATE UTILITIES NOT LOCATED BY THE RESPECTIVE OWNER. 2) THERE WILL. BE AN ADDITIONAL CHARGE TO EXTRACT ROCK AND REMOVE ROCK FROM PROJECT SITE. 3) NO UNSUITABLE MATERIAL REMOVAL OR REPLACEMENT WITH ACCEPTABLE MATERIAL, 4) NO LAYOUT OR CERTINED AS•BUILTS. 6) NO DENSITY TESTING COST, 6) NO CONNECTION, INSPECTION, PERMITS OR IMPACT FEES. All ntatortal Is guarantaod to be as specified, and the above work to be parformod In accordance with tho drawings and spocineallona aubmttied for above work, Any alloratlon or dovlatlon from above speclfloations tnva(ving oxtra costa, will be axeoulod opoa written orders, and will hecomo ark axlra eharga over tho eonitaot amounl. Owner agreas to acoepl current inouraneo in place by Coniraclor time of bld. Owner agf4os to bear any cost for changes or aileratlons In Insurance coverage. This proposal may be withdrawn by us If not accopidd wllhln 34 days, Payments to be made as follows: As work progresses, payment duo wllhln thirty (3e) dsys of bliling. Packet Pg. 166 11.E.1 Roapoetrully submt1led: JENSHN UNDMGROUND UTILITIE6.INC, Acceplance or Proposal; Us above prices, speelfloaltons and conditions are satlsractwy and are hereby accepted, You are hereby authodced to perform the wcrk. Date Stpnoturo to CO N N O L a) L 0 0 Cn C R t U c O E t r Q Packet Pg. 167 11.E.1 Al-hahouA oub From: Joshua Fruth 4jfruth@pen-eng.com> Sent, Tuesday, April 19, 2022 2A3 PM To: AI-WhouAyoub; Jeff Davidson Cc: LuffZurlma; ArnoldKelly Subject: RE, CCSC 7„1 - AR 7675.024111 - RFI 30 FXTFRNAL FMAII., This -email is from an external source. Confirm this Is a trusted sender and use extreme caution when opening attachments or clicking links, My notes are included In the request jtaken from Procure) and the credit was verified. I recommend moving forward. Thank you, PLNINttSULA LNUINURING ,lash Truth Vice President of Engineering 2600 Golden Gate Parkway Naples, Florida 341.05 Phone, 239.403,6700 Direct, 239.403.6739 ifruth@pen-eng,corn only current, slgned, and seals{l plans shall be consisted valid canstructlon documents, aecaus4 Of the cmOstantly changing naturo of construEtlotr donrnienis, It Is the mdpleni's responsibility to request the latest documents from Peninsula Enginhering rat Ihelr partitWar task, From: Ai-bahQuAyettb <Ayoub.Al-biihou@@ olllercountyfl.gov> Sent: Tuesday, April 19, 26221:28 PM To, Joshua Fruth <jfruth@pen-eng.com>; Jeff Davidson <Jeffedavfdsonenginearing,com> Cc: Loffzurima{zurilna.Luff@colliercountyfl.gov>; ArnoldKelly <Kelly.Arnold@coillercountyfi.gov> Subject: FW: CCSC 2.1- AR 7675.024111- RFI 30 Josh, Jeff Please provide us with your recommendation. Thank you Respectfully, Ayoub Ayoub R. All-Bahou, PV, LF.IED ' GA Principal Project Manager Packet Pg. 168 11.E.1 Facllltlo6 Management DIVlsion, 3135 Tarniaml Trail Fast Naples, Florida 34112 Avot)b,zl•I)c7h4iu(�gUIIIE'rcrxrrl�tyil.REiV 239-252.-7704 (o) 239.778-4559 (c) From: Cherlsse Travis { Travis njanl� ttanconstruction.coni> Sent; Thursday, April 14, 262.2 4:50 PM To: Al-bahouAyoub <A aub.Al-bahou(c)colliercount H, ov>; Josh Fruth <Ifruthften-enE.conv; ArnoldKelly EKelly.Arnol.d n coillercouritytl.t;av>;1eff Davidson Jeff R dayldsonen�ineerin8.coni> Cc, Susan Sturgill <Susan.5tu(P ilpo, mailt tiantunstn,ctlnn,eurn>; Victorla Burns 4VBurns@manhattanconstruction.coiti>; Megan PhillipsCMPiiilllps�Canianliattanconstructioi}.com>; James Land <,[gmrs.Land@manhattanrn,com>; Brett Vantol <i3VantolC7manhattanconst[tickian corrl> Subject; CCSC 2.1 - AB 7675.024Ri - RFI 30 EXTERNAL EMAIL. This emaii Is from an external source,. Confirm this is a trusted .sender and use extreme caution when opening attachments or clicking links, Ayoub, Please see the attached AR for your review and approval. Thank YOU, Chorisse A. Travis Sr Project Monagar !~ut�dt�'Pz,�ax Manhattan C;onstructIon Conipiny 3(( 6-t WesIvIpw D lve Naples, I L 34104 239.404.9653 Oil ct(avisj2mrinhatLail wstrur:tlon.Gnrt1 www.inanhaltaticonstrucllon,com Follow thv.. L'tnkedin I Facebook I Googlef ! Twitter Linder Florida Law, f-mall nddresses are public records. If you do not want your e-mall address released in resprinse to n public records request, do not sand electronic; snail to Ihls Pnlity. Instead, contact this office by talephona or in wriling. ;[ll ETERNAL EMAIL] fib NOT CLICK links ar a#4hrnenls unless you recognize the Sender and know'the' content Is sdFo, Packet Pg. 169 11.E.1 Manhattan Building dwell once. Collier County Sports & Events Complex TO: Ayoub Al-bahou Collier County OOJ 311612i)22. Descriptim 801 Adjustment (SCG fields - Bond lieconclllation) Authorization Request Detailed Form, Grouped by htumber (wllh CE Breakdown) Project # 7675 From: Cherlsse Travis Manhattan Construction Company .0 Owner'Changa owner Dimotive pldf' 681imalo 00000 1.6% $pl rxt $0,114,670, PCCQ It006 Approved Iho va[tto 4i escalation due to the delayed NTP, PCGC 0006 did not Include the delta far SDI or bond. iCost Event .o ���. (t911j� litemrt]nu 001 SURCONTRAOTOR D. a i t 002 SYNTHETIC TURF $04,950,70 003 OWNER CONTINGENCY (Stj,1nm) In ardor to mitigato possible delays and expodito the approval far the direct cost of work rotated to this change, unless specifically nolad above, wo 00 are submitting this change request without schedule Grnelcost impact, We reserve the right to submit for cost/time impacts related to this change N under > oparato cover whan that Information lta available. CN Contractor does not release impacts that arise out of Acts of Nature (including fire, flood, oarthqunko, storm, hurricane or other natural dlasster), VAM irty ION e01 Of publio anemles,110s11lillas (►vlielher war Is dealoted or not), civil war, robetljoh, revolution, lnsurreclldrr, milllory or usurped o power or confiscation; terrorist activities, dot, nationalizattm govarnmoat actlono, tariffs, blockage, embargo, transportation delays not reasonably forezeeabla, labor dispute, strike, lockoul, disease outbreak, epidemics, pandemics, qunrantlae rostdcilons, or Interruption or failure of potter sources. To the extent those conditlons may Occur and impact the Prejecl, there shall be an equitable adjustmont to the Contract. p m c Ic t U c m E t U O r Q Authorlxation Roquestt 7675.026 Approved By: Ayoub Obahou— srProjectManeaer SIGNATURE DATE Cdlljer County Sports $ Events Complex Pr01nat H 7075 Prora#Mansfter Packet Pg. 170 11.E.1 DocuS:gn Cnvolopa ID: L04BIF12-6i:F3-46A2-8252•C227244DE?F'8 Manhattan MANHATTAN CONSTRUCTION (FLORIDA), INC. 3706-1 Westview Drive, Naples, Florida 34104 Phone: (239) 643.6000 Fax: (239) 643.6030 SUBCONTRACT AGRIEWENT Date; 1 /31/2022 Projeot Name; Collier County Sports Complex Phase 2 Address, City Gate. Blvd Naples, Florida 34116 Project No: 7676 Cost Coda: 200-3260-326090-5 Subcontract No: SC-7675-009 Subcontract lVpe: Lump Sum Subcontractor: SCG Fields, Lt_C Address; 10303 Brecksville Road Brecksville, Ohio 44141 Attn: Mike Swan Email; mswan@scgflolcls.com Telephone No: (440) 646-1200 Fax No: (440) 646-0400 1. Subcontractor shall perform all work and furnish and pay for all supervision, labor, materials, services, scaffolding, hoisting, tools, equipment, supplies, systems, machinery, transportation apparatus, drawings, shop drawings, samples, mock-ups, submittals, plans, job hazard analysts, and anything else necessary for the construction and comple#lon of all work described In Exhibit A, and all work Incidental: thereto or reasonably Inferable there from, In strict accordance and in full compliance with the Contract Documents (all of which Is hereinafter reforred to as the VOW'). 2. Manhattan shall pay Subcontractor, for lbe performance of the Work, subject to additions and deductions by change order or other Subcontract provisions, the total sum of Fiva-Militon, Seven Hundred_ Forty -Fight Thousand, Seven Hundred _Forty. Pollars And Seventy -Six Cents_($5,T4li,740,7f}. 3. Applications for payment shall be submitted monthly in a form and on a date to be determined by Manhattan, Payments shall be made to Subcontractor within five (5) working days of receipt of payment from Owner subject to the terms and conditions contained In the Manhattan General Provisions, 4. Retainage shall be withheld from each pay application In the amount of Ten Percent (10.0%): S. Payment and performance bonds are_reguirerf In a form attached as Exhibit B. The premium for said Bonds Is Included within the Subcontract price. 6. Subcontractor roust furnish a certificate of insurance in nccordanco with Exhibit C, Manhattan's Insurance Rider which Is a part of the Manhattan General Provisions, and as required In the Contract Documents, arid submit documentatlon of these insurance coverages prior to rhobilizing on site or corhmehrring Its work. 7. The terms and conditions contained in the following documents Which are attached hereto are Incorporated herein fully: Exhibit A (Scope of Work) Exhibit B (Payment and Performance Bond Forms) Exhibit C (Insurance Requirements) Exhibit D (Construction Documents) Exhibit E (Special Conditions) Exhibit F (Schedule) Exhibit Q (Tax Exemptions) Exhibit H (Manhattan Additlonal Safety Requirements) Exhibit I (Specific Inclusions) Exhibit J (Site Safety Plan) Page 1 of 2 Packet Pg. 171 11.E.1 DocuSidn Envnrago ID: CD48IFi2•eFF3 46R2-82S2•E227244DE7F6 Manhattan llu/lding ('m:etteflca, U. The terms and conditions contained In the following documents are Incorporated herein by reference as if fully written out, Manhattan General Provlslons Rider to MGP - Insurance Requirements Rider to MOP - Fl. Rider Dated: 02/2812019 Dated: 02/28/2011) Dated: 04112/2021 It Is acknowledged that the Subcontractor has executed the Manhattan General Provisions and Riders as referenced above with a different Manhattan entity, However, it Is understood and agreed that all provisions of the previously executed Manhattan General Provisions and Riders are incorporated herein and shall be bindino upon the Subcontractor In the periarmance of Its Work and In Its Subcontract with Manhattan Construction (Florida), Inc.: Furthermore, any reference to "Manhattan" in the executed MGP's and Riders and this Subcontract are understood to mean Manhattan Construction (Florlda), Inc. after completion of the Work and final payment. "Subcontractor° "Manhattan" SCG FIELDS, t,t_C Manhattan Construction (Florida), Inc. Umsipnsd byr DODU44urlod by, S vt^alnki Mom# J,ti gna u e g a r ue chriS Franks Matt cones Printed Dante Printed Name Pre5idant SVP Titles Tice 3/16/2022 1 1:40 PM EDT 3/16/2022 1 2:01 PM CDT Date Date Page 2 of 2. Packet Pg. 172 11.E.1 D=Sign Envotopa I€3: LD464F12-fiFF3.46A2-8262•E2272440L--7F6 EXHIBIT "A" SCOPE OF SUBCONTRACTOR'S WORK FOR SUBCONTRACT AGREEMENT BETWEEN MANHATTAN And SCG Fields, LLC Far Collier Cowity Sports Complex Phase 2 APPLICABLE SPECIFIGAPONS: c 000110 Table of Contents c 011000 Summary of Work 320000 Exterior Improvement w 321824 Synthetic Turf Playing Field Surfacing E GENERAL SCOPE OF.WORK: N Includes, but Is not limited to, providing and paying for all the necessary labor, materials, tools, supplies, supervision, d U' insurance, equipment, scaffolding, hoisting, fees, otc- necessary to provide the 8 nthetic. Turf. Playing Vielcts at the a CoilEar County Sports Complex.Phase 2 Project In accordance with the Contract Documents It is further understood m and agreed that this Subcontract also Includes ilia furnishing and Installation of the below listed Items regardless of a Whether or not they are In the listed specification section(s) or any other specification sectlon(s), or shown on the plans. E Drawing and detail references are provided for reference only and are not to be considered as all Inclusive of Contract C Documents for life particular items referenced. (Please note: The word "provide" when used herein shall mean furnish and w Install completely, Including all casts for labor, materials, equipment, holsting, layout, scaffolding, ladders, staging, tools, rlgging and any other facilities necessary to complete the work.) Q. co INCLUSIONS.- ti It Is the Intent of this Subcontract to provide the Owner with a complete Synthetic Turf Playing Fields scope of work as Indicated: on the Contract Documents, which are In compliance with the Contract Documents and all :applicable building codes: This Subcontractor has included all Items which are reasonably Inferable to make these systems complete and 00 functional even If necessary items are not shown or Indicated in the Contract Documents. If the Agreement between cm Manhattan rind the Owner (Including any documents Incorporated by reference) requires Manhattan to include any specific provisions in its subcontracts, then such provisions are deemed Included in the Subcontract. o The scope of work Includes, but Is not limited to, the following items: L It Is the intent of this Subcontract to provide the fawner with a complete SYNTHETI.G TURF PLAYING. FIELDS scope of m � O work as Fndlcntdd in the Contract Documents, which are In compliance with the Contract Documents and all applicable Building Codes. This Subcontractor has Includes all Items which are reasonably Inferable to make these systems complete and functional even If necessary Items are not shown OF Indicated In the Contract Documents, The scope of M work Included, but Is riot limited to, the fallowing Items, SYNTHETIC TURF PLAYING FIELDS � E 1.. Provide the complete synthetic turf playing field system including but not limited to subsoil drainage, earthwork, bedding and grading as required for a complete Installation. 2, Provide field concrete encasement as shown In the Contract Documents, Include nailers as required for the a Installation of the synthello turf system. 3. Provide all earthwork, dewatering, bedding, approved fill and finish grading for this work The playing field subgrado shall be provided at an elevation. 10.93 NAVD. Tho field subgrade shall be crowned In the middle and slope to drain to the field perimeter subgrado drainage system, Subcontractor shall provide all excavation and trenching from this subgrade elevation as required to perform the work of this Subcontract, Subcontractor shall also provide additional exeavatlon and earthwork as required at each playing field, Pagoiof6 Packet Pg. 173 pocusign Envolopa ID: F1)404F12-BFF3-98A2d3252.G227244RE7F6 11.E.1 4. Provide the playing field subsoil drainage system In accordance with the Contract poouments, this includes but Is not limited to all subsurface piping, french drains, catch basins, and the forming, reinforcing and pouring of concrete encasement of the surface drainage materials. 6. Provide ail tick marks and (told markings as indicated In the Contract documents. 6. Provide all materials testing per the specillcatlons. 7. provide (ha Independent subgrade surveys as required by the. Contract Documents. 8.. Provide the Mockpiling for haul off by others of unacceptable and/or excess sails associated with the work of this Subcontract, 5, Provide All necessary field engineering and layout. Manhattan shall provide dimensional control benchmarks and offsets only. 10,Provldo. goal post complete to Include footing and sleeves In accordance with ilia goal past manufacturer's recommended Installation details. Foundation design, engineering, and details are the responsibility of this Subcontract, and If the manufacturer's recommended deslgn and engineering does not Include an engineer licensed in tho State of rioride, this cost shall bo Included as part of this Agreement. Englnoer shall provide errors and omission insurance for all subml(Ws that are required to be stamped and sealed by a professlonal engineer licensed In the State of Florida. 11:This Subcontractor mutually understands and agrees that there shall be multiple Subcontractors working concurrently in the area and phasing of work activities shall be required. 12, Provide temporary protection for adjacent work In place throughout the activities required for the scope or this Subcontract. This Includes, but Is not limited to lire protection of the concrete perimeter drive at the geld level MEP and low voltage equipmenUboxes within the perimeter hardscape. 13, Provide all warranties and/or oxlended warranties as specified by (he Contract Documents. 14. Provide all spare parts, attic stock and additional materials noted In the specifications. 16. Subcontractor and manufacturer's representative shall participate in all preparatory and pre -installation meetings and cooperate fully with all quality control requirements of the contract Documents. Subcontractor shall provide further cooperation, assistance, and documentation sign -off by field designer prior to commencement of work. Playing field subgrade system shall he provided to plus (*) or minus (-)1/10 of a foot. 16, This Subcontractor understands FIFA Testing will be required of all Installed playing fields. 17. This Subcontractor will provide FIFA Certification of the all Installed playing fields. Ia. This subcontractor will provide coordination with the field manufacturer and installation to ensure certification requirements are met. SPORTS EQUIPMENT 1. Provide all sports cqulpment as shown In the Contract Documents including, but not limited to all field netting, and goat post base foundations. (Sports Equipment per Specification 1168 35 Only,) 2. ProvlOo delegated design for netting foundations, and goal post foundations. Profossidnal Englnoor shall be registere..d In the State of Florida. GENERAL. SCOPE ITEMS. 1. This Subcontractor acknowledges that the value in this Agreement represents an Individual line Item in. the Guaranteed Maximum Prloe (GMP) accepted and approved by Colllor County for the Collier County Sports Complex and Events Center — Phase 02 project. This value combines this Subcontractor's final bid proposal and cost for work currently undetermined and shall not cover any part of the base bid scope shown In the Contract Documents or as required to provide a complete scope of work. 2. This Subcontract and Schedule of Values shall held these.costa in reserve until authorized for use by Manhattan In writing and executed via a mutually agreeable "zero dollar" change order to Incorporate the scope of wdrk Instructed to perform. (When known and defined, these Items shall be l)riced on a case -by -case basis and offset from the sum Identified herelm) At which time, this Subcontractor will be allowed to bill for the scope incorporated via change order. All ehAngo items will be separately Identified on the schedule of Values. ANY costs for work performed without consent will not be considered for reimbursement, Should conditions not arise that require the use of these reserves, Manhattan will organize a deductive change order for final reconcillation of this Subcontract Agreement and adjustment of the GMr? 3. Subcontractor shall provide adequate manpower, supervision, materials and equipment In accordance with Project Schedule, Including sufficient resources to work in multiple areas concurrently and/or In multiple mobilizations. P(oiect Schedule Is Inclusive of weather days per NOAA 10-year averages. No weather extensions will be Issued for weather occurrences which remain within the yearly averages. 4. Subcontractor agmes to make up lost time due to Inclement weather an Saturdays (As permitted and client) to make a 5-day work week at no additional cosi to Contractor and/ or Owner. 6. Cleanup of all waste and debris caused by this scope of work is the responsibility of this (Unregulated) waste shall be cleaned up on a daily basis, to an onsile durrrpster (provided by Pogo 2 of 5 by local authorities subcontractor. All others). Provide a Packet Pg. 174 DocuSign Enwpiopa ID, COABIF42-6FF3•4BA2-8262•G2272448C7F6 11.E.1 daily broom Sweep of all areas in which work has been performed. Subconlractor shall lawfully dispose of any regulated materials generated by, remaining from or exposed as a result of the Work of this Subcontract, Including haul -off and deposit (with any associated fees) in an approved facility/location. 6. This subcontractor shall remove, all trash and debris and dispose into CM provided trash containers daily. Daily cleanup and the containment of all debris from this work Is required, an Inspection of the work area is roqutred before craws can be dismissed for the day. 7. Provide printing costs for all shop drawings, coordlnationl layout drawings, and product submittals as required to properly coordinate the work Included In this Subcontract with other trades. Include costs for revising and resubmitting shop/ coordination drawings as required.. 8. Parking, storage, manpower trailers, and vehicles must be reviewed and approved by the Manhattan Construction Superintendent. Subcontractor shall coordinate all deliveries, manpower access, and needs for lay -down or storage with the Manhattan Construction Superintendent- 9, Subcontractor understands that this Is a phased project and Involves work within an active public park, Work may be phased and/or requiro non-standard work hours and/or weekend work to minimize disruption to (Ile Collier County facility., 10, All applicable engineering, taxes, permits, and -fees as may be required to perform this scope of work are Included In (his contract. A Subcontractor coordination meetings will be held on a weekly basis or as determined by the Manhattan Construction project team. Subcontractor meetings for scheduling (lean building) will be hold on a daily basis. A qualiflad representative from each subcontractor currently working on site Is required to attend. This representative will have the authority to make binding decisions on behalf of the subcontractor with respect to manpower, materials, schedule and monetary commitments, Subcontractor shall provide the names of the indlvidual(s) per the following and shall not remove or change stalf without written approval from Manhattan Construction; Title Name Years In Ifadelbuslness % of time allotted for this project Project Manager Nlr+k Pappas 75% Superintendent Foreman 12. This subcontractor shall protest, clean and maintain all Items within their scope of work until acceptance by Manhattan, the Design Professional; and the Owner. 13. This Subcontractor must submit written notice for change requests no later than forty-eight (48) Fours after Subcontractor recognizes condition giving Ciao to tho claim and provide prlcing within seven (7) days thereafter. Noncompliance will result In the rejection of claims submitted. 14. All change order requests are to include backup documentation (supplierlmaterial Invoices and for quotes, labor rates, and breakdowns for labor, material, and markups, Subcontractors will be allowed overhoad and profit markups per the approved Collier County Prime Contract. This allowable mark-up on change orders Includes all management and field supervision and no overhead will be allowed above and beyond the fiat fees described above. Additional Supervision costs will not be allowed for Construction Manager's personnel or Subcontractor's personnel already on site: Requests for additional supervision costs trust be accompanied by evidence of additional personnel present on site, the hours and clays worked, And the tasks performed. No'overhead will be. allowed above and beyond the flat fees described above. 16. OWnee Direct Material Purchases: Subcontractor will .cooperate with tho owner's Direct Material Purchase Program, thereby maximizing the owner's ability to use its state sales tax exempt status, Subcontractor will still be responsible for the coordination, procurement, -delivery, sforagalprotection, shop drawings, submittal lcloseoUt packages and Installation of materials from the equipment supplier based on dates 'furnished by Manhattan Construction, The Subcontractor will also be responsible for assisting In the coordinatlon of any warranty related Items Involving material purchased directly by Owner Included In the Subcontractor's scope of work after construction Is complete, All Sales tax Is Included in your contract price. You-wlll be Issued purchase orders by the Owner to purchase your materials, Invoices for these materials will be paid for directly by the Owner. This amount paid; plus sales tax, will be deducted from the amount owed you under your subcontract on a monthly basis. NOTE: Collier County CMP Reduction value includes O.D.M.P value, Uwner to reconclle final subcontract amount upon recelpt of all ODMP paperwork. Deductive value shown Is not a guaranteed reimbursement to this subcontract, NOTE: Subcontractor agrees to Issue CCSC PO 141800216329, dated 01125/22 .to Astro Turf LLO no later than February 1, 2022. Should the PO not be Issued prior to this date, the subcontractor shall absorb ali additional escalation associated with the PO not being Issued. P.pgo 3 or 6 Packet Pg. 175 DocuSign Envnlopo 10: CD464F12-6FF3.46A2-13252-E2272440E7F6 11.E.1 16. All work must be performed In strict accordance with OSHA Safety Regulations, the Manhattan Construction Over - OSHA procedures, and the Manhattan Construclion Site Specific Safety Plan, All work must be performed with facial gvverings and gloves worn at all times, Manhattan Construction reserves the right to remove any employee front the jobsite at any time, 17. The subcontract6r's held staff will be required to attend weakly safety meetings scheduled by the project superintendent. 18. All Sub0ntraotQrs shall have at least one supervisor onslte that has attended the OSHA 30-hour safety course and supply documentation to demonstrate this training. Any accidenls, near misses and Injuries, no matter how slight, shall be Immediately reported to Manhattan In writing. 10, Subcontractor shall become familiar with and comply with the site Crisis Management Policies and Evacuation Plan. 20. All Subcontractors shell maintain sito JHA and SDS Information. This subcontractor shall provide both a paper and digital copy Manhattan with .1HAs for all activities being conducted on site and 5DS reports for all materials delivered to the site, 21. Subcontractor shall Inspect and accept substrate materials provided by others prior to installing work under this Subcontract Agreement. Subcontractor shall perform normal and usual preparatory work required to Install work under this Subcontract: The Installer shall report any unsatisfactory conditions In writing to Manhattan Construction In a timely manner to allow for corrective measures to be completed without -affecting the Project Schedule. 22. Prior to beginning an element of the work, a preparatory meeting (inspection) will be held and this Subcontractor shall demonstrate and contra that personnel who will perform the work understand the Contract Documents L and material manufaoturer's written Instructions; that the preceding work in the area is satisfactory; that a physical check of the material verifies contormance to submittal data: A As soon as a representative portion of a feature of the work Is completed, this Subcontractor shall schedule a meeting with Manhattan for an Initial inspection of the initial work to verify; the quality of the workmanship; control testing procedures and testing results are consistent. with work; appearance and quality are uniform and within range of applicable mpckups; nothing Is being omitted; and the work Is dimensionally accurate. 24, The Subcontractor shall furnish all specified spare parts as Well as "attic stock," and shall furnlsh specified operation and maintenance training. Subcontractor will flay any vendor tuition costs and provide all specified training documentation as required by the Contract Documents. 25, Due to the location of the staging srosilaydown yard, subcontractor shall clean all equipment thoroughly prior to mobillzingldemoblilzing on any public roadways. Glean all streets, as necessary or as directed by Manhattan, of soil end debris caused from equipment performing under this Scope of Work, In accordance with ordinances of local authorities' 26; Provide all required barricades, liagmen, and traffic control and safety devices necessary to accomplish the work of this subcontract. 27. This subcontractor warrants that they have reviewed ALL of the documents detailed In the Document Log and Bid Manual and Includes the costs to coordinate this scope of work with the work of the project and the conditions thereof. There will be no Change Orders due to a lack of coordination. Subcontractor agrees to identify in writing to Manhattan for resolution by owner and Architect all situations In which any element of ilia work Is. not of proper sloe and shape to properly receive all items necessary to provide a complete.job. In addition, this.subcontractor has reviewed ALL of the documents and Is responsible for ALL worwscope related to the turnkey 5YNTHETIO TURF. -PLAYING FIQLpS scope. 26. There Is no smoking or tobacco, including E-Clgarettes, or Vapor Cigarettes allowed on the property. Violation of this palloy will result In an employee being removed fr6m the site for the day regardless of posIflon. A second violation will result in an employee being banned from the site, regardless of position. 29. All employees must abide by all jobsite rules and requirements as described in the Manhattan Construction Welcome Package and IN jobsite orientation, 30- Eating and drinking, anything other than water will not be allowed inside the building at any time during construction, Violation of this policy will result In an employes being removed from the site for the day regardless of position. A second violation will result In an employee being banned from the site, regardless of position. 31. Breaks are permitted In designated areas ONLY as described In the Manhattan Construction Welcome Package and the,jobsite orientation, 32. The project schedule Is based upon a six (6) day work week for certain phases, refer to rho construction schedule. Subcontractor has Included premium time, overtime, late shift and weekend work as required to complete this scope of work within the schedule durations provided, W.BCONTKACT _SREAKDOW.N # COST CODE DESCRIPTION TYPE~ AMOUNT 1 200-3260.326090 - $YNTHI TIC TURF &ynthatla Turf & Sports Equipment (ADD ALTERNATE) 9ubcnnlract t;6,048,876,57 2 200.3260.326090 • SYNTHETIC TURF Additional Enavatlonr Earthwork Subcontract $65,000.00 3 200=32tf0 92tiU90 - 8YNYH9YIC TURV COVID Reilef/ Escalation Subcontract 3544,906.43 4 200-326"26000 -SYNTHETIC TURF FIFA CeriiElaAiion Subcout(aci $16,000.00 Page 4 or 5 Packet Pg. 176 DocuSlOn Gnvolopo II]: CU4fl4F72-6FF3-46A2-0252-1 227244DE7F6 11.E.1 11 COST CODE 0R80rVPTION TYPE AMOUNT 5 200.3260-326080 • SYNTHETIC TURF Bond 0.6°!0) Isuboonlract $64,956.76 arandTotel: $5,740,140.70 CQ NTRACTQR'_S._QP.TIQNS.; If requested by Manhattan, Subcontractor wlil add (or delete) the following items of work at quoted cost below Inclusive of all the necessary labor, materials, tools, supplies, supervision, insurance, equipment, sonffold(ng, hoisting, fees, etc, necessary to provide the scopa work: ALTERNATES mono URIT_PRICINQ None SCOPE OIL WORK EXCLIfMONS: The following ilerns are exciuded front this Subcontract: Irrigation System at each Playing Field - $283.200 Alternate 12x12 perimater curb In lieu of f x12 - $66.773 Atlernate Brockfili Pad - $708,175 Alternate 1-112"Turf Pago 6 of 6 Packet Pg. 177 Mouslgn Eiivnlopa ID: E04E4FI2-6FF3,46A2-8252•E227244aE7Fe 11.E.1 Bond Premium EXHIBIT "13" SUBCONTRACT' PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS, That we As Principal and IW as Surely, are held and firmly hound unto MANHATTAN `CONSTRUCTION (FMIQA), INC. as Obligee. In the penal suns of DOLLAR$ $ lawful money of the United States, for the payment of which sum well and truly, to be made, we hind ourselves, our helrs, exectllors, adminlstrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THE OBLIGATION IS SUCH, That whereas, the Principal entered Into a Subcontract with the Obligee dated ,which is Incorporated herein and made apart herepi, For j- I - being part of the work covered by a cotilfaci dated on or about I 09,23" 18 Between collier County 1] hard of County Com mltisionerg . — ... ..................� _. hereinafter called Owner, and the said Obligee for r t"olllcr. coiulty Sports G©n-olex which contract and the plans, speciftcatlans and general conditions thereof are hereby incorporated herein and shall be deemed a part hereof as fully as if sot out herein. NOW, THEREFORE, If Iho said Principal shall fully Indemnify and save harmless the Obligati from all loss, liability, costs, damages, penalty, altomoys` fees or expense which Obiigaa may Incur by roa son of failure to well and truly keep, perform and fullill each, every and ail of the terms and conditions of said Subcontract on Ilia part of the sold Principal to be kept, performed and fulfilled, including but not limited to completion within the time specified of all work covered by said Subcontract, performance and fulfillment of all obligations and guarantees of the Obligee relating to such work under the contract wllh the Owner; then tills obligation shall be of no effect, but otherwise It shall remain in foil force and effect. II Is a condition hereof that any change, alteration, modification or amendment of any nature whatsoever that may be made In the terms of said Subcontract, any change in the character or scope of the work to be performed, or the method of performance, under said Subcontract or modification of said Subcontract or In the time for completion thereof, any change in the manner, time or amount of payment as provided thereln, any change of any nature whalsosvor that may be made In the terms of the contract between the said Obligee and the Owner or any change that may be made in the performance of the work under said Subcontract by the Principal, assented to by the Obligee, whether made under express agreement or not, may be made without notice to the surety and without affecting the obligations of the Surety on this bond and wilhout requiring the consent of Ilia Surely, and no such change or changes shall release the Surely from any of Its obligations hereunder, the Surety hereby consenling to and waiving notice of any such change, alteration, modification or amendment. In addition, the penal sum of this Bond shall automatically Increase as the Subcontract amount increases provided however that the penal sum shall not Increase more than 21516 above any previously established amount absont written consent from Surely and such consont shall not be unreasonably withheld. It is a furthor oondilion hereof that no one other than the named Obligoa and Ilia successors, administrators, or assigns of the Obiipao shall have any right to action under this bond. IN WITNESS WHEREOF, the said Principal and Surety have hereunto sot lholf hands and soals, tills I day oll , 20I ATTEST: (Principal) Seal) syi (Name and Title) (Signature) WITNESS. (Surety) seal 8y (Name and Title) (Slglraturo) Packet Pg. 178 11.E.1 r7=81S n Envolopo ID: ED48AF12-6FF3-46A2.8262•C227249aE7F6 YW EXHIBIT "B" SUBCONTRACT PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS, That we I - unto MANHATTAN CONSTRUCTION Ft CiRIpAJ INC, as Bond No.I As Principal and as Surety, are hell and Mt)ly bound Obllgoo, In ilia penal sum of DOLLARS lawful $ money of the United States, for the payment of which sun) %yell and truly, to be made, via bind ourselves, our hobs, executors, administrators, successors and assigns, Jointly and severally, finely by those presents. c THE CONDITION OF THE OBLIGATION IS SUCH, That whereas, the Principaf entered Into it Subeoritracl vilth the Obligee dated r- I,%vh1ch Is Incorporated heroin and made a For t w being part of the work covered by a contract dated on or about 109,25• 18 Between I t'1111t1:1 County Ino[I d orCoul,ry c;ti111111101111om E hareinefter called Owner, and ilia said Obligee for I C.'nlficr C'ownty Snolts C 011VOK which contract and the plans, specificallons and general conditions thereof are hereby Incorporated herein and shall be deemed d pelt hereof as fully Ci as It set out, herein, a� NOW, THEREFORE, If the said Principal shall pay prornpUy and in full the claims of all persons, firms or corporations, performing labor or furnishing equipment, materials, or supplies incurred In connection vilth the contract to bd performad and fulfilled under said Subcontract, acid shall indomnlfy a And save harmless the Obligee from all loss, liability, costs, damages, penalty, allornays' fees or expanses for all taxes. Insurance premiums, any and all applicable contribullorts, allowances or other paymonts or deductions, however lormod, required by statue or union labor agreement, axi a Including voluntary payment Ihareof by the Obligee necessary to insure orderly prosecution of work or other Items or services used In, upon or for or E Incurred In connection with the contract to be performed under bald Subcontract, then this obligation shall be of no effect, but otherwise it shall remain in full torte and effect, e, It Is a condition hereof that any change, alteration, modification or amendment of any nature whatsoever that may be made In the terms of said Subcontract, any change in the character or scope of the work to be performed, or the method of performance, under said 'Subcontract or , modlfleation of sold Subcontract or In ilia time for completion thereof, any change in the manner, time or amount of payment as provided therein, any 00 change of any nature whatsoever that may be made In the terms of the contract between the said Obligee and the Owner or any change that may be made In the performance of the work under said Subcontract by the Principal, assented to by the Obligee, whelher made under express agreement or not, may be made without 11011ce to the Surety and without affecting the obligatlon$ of the Surety on this bond and %vilhout requiring the consent of the Surety, and no such change or changes shall release the Surety from any of Its aNigatlons hereunder, the Surety hereby consenting to and Q; waiving notice of any such change, aflerallon, modification or amendment, In addition, the penal sum of this Bond shall automatically Increase as 00 the Subcontract amount Increases provided however that the penal sure shall not increase more than 26% above any previously established amount N absent wiillon consent from Surety and such consent shall not be unreasonably withhold. v 0 Subject to the priority of the named Ohligoo wlth respect to recovery up to the penal sure of this bond, persons who have supplied or rumishad labor. L material, rnachfnary, equipment or supplies to the Principal for the use in the prosecutlon of tea worst provided for In said Subcontracl shall Nava a direct right of action against said Principal and Suroly under this bond, O IN WITNESS WHEREOF, the said Princl al and Surety have hereunto their hands this day set and seals, of ATTFST; I U (Principal) I sy (Name and Tille) r (Signature) a WITNESS! (Surety Baal By (Name and Title) (Slgnaturo) Packet Pg. 179 11.E.1 RaauSlgn Envolopo ID: ED464Fi2-6FF3-46A2-0252-r-227244flC7F6 0 Exhibit C.' NIANIIAT I`AN CONSTRUC"I'IION (FLORIDA), )INC, SUBCONTRAC.TOWS WNIMUM INSURANC R REQUIRL;MMI'S ". 1'Lt.r1Sf, lk.9VIMSUBCO10RACTOR NMI! I'NNWRANCT RIVER VOR CO11PI,ts'I'l; CONTRACTUAL Ii�itiilRA(\CF; 1tl QUllit dlt i�'t"$""" 1'1' IS TILL R1 SPONSIBILITY.OIE SUBCONTRACTOR AND THEIR AGENTTO &IAKR WRE THEIR INSURANCLe NIL,I;01'S '1'HWR CION'1RA.CTOAL OBLIGATIONS PROJECT: COLLIER COUNTY SPORTS & EVENT COMPLEX PROJECT NUMBER, 7075 PROJECT OWNER: COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS COMMENICIAL Gia;NERAL LIABILITY (OCCURRENCE BASIS) General Aggregate Limit S 2,000,000 Products & Completed Operations Aggrogatc Limit $ 2,000,000 (To be owled for FOUR (4) years after complCtiot) Of ProlCCI 111Clnding required ondorsemems) Por,omil Injury Limit S 1,000,000 Each Occurrwwc Limit $ I'mo,000 Aggregate Loss Limit to ripply per Proicct (2503 Form or F.gnivalanl) iblanhallnn C.'onstruction (Florida), Inc., Collier Comity Board of County Commissioners (Owner) & Others are included as Additional Jnstareds (CO2010 & CO2037 Forms or I1.11uivxleot type). Attached Additional Insaired Fridort;entcilt(s) shrill he for Otlgoing tmcl Completed Operations. luburanc Anil be Primary l+rid Non-contributory, Wuivor ofSuhrogalinn in savor of Manhattan Construction (Florida), lac„ Collier County Board of'Comity Commissionen, (Owner) & Others. BUSINESS AUTO LIABILITY Combined Single Limit for Bodily Injury & Propurty Damage S 1'owgm (Above to incloda Owned, Hired, and Non-Ownt:d Auto) Manhattan Construction (Florida), Inc., 011111cr County Board orCounty Commissioners (Onmer) and Others to ho included as Additional Jatwmck WORKERS COMI'ENSAnOW, MPLOVER'S LIABILITY Covers ALL cttlpioycos oribc insured sit the State where work is porformcd. Lnoh Accident Disease Limit — Policy Diseme Limit — Each Employee S I,UOU,ppU t ,ODU,UpU t,UUU,UUO Waiver of 811hrogation Ill favor ofMnllhattan Constnlction (Florida), Collier Cowity Board of County Commissioners (Owner) and Other's IMORELLA,;, LIARIL lytlti• EXCESS POLICY Fello��v Form) OCC RRENCL+' W S Combined Single Limit S 31000,000 (Ovorhbove Cleneral, Auto trod Employer's Liability Limils) Manhnitntl Construction (Florida), Inc., Collier Courtly Board of County Commissioners (Owner) ind Others to be included as Additional 111sulvds Wnivur ofSubrogntion in Avor of Mmallottim Consiniclion (Florida), Inc., Collier County Ilunrd of County Cotmnimioalers (Owner) and Others Insurance is Primary and Non -Contributory to tally other available insurance to the Additional insureds. PROFESSIONAL LIABILITY AND POLLUTION LIABILITY Limit orl-labiilty S 2,000,000 (Must be carried for tour (4) year's allor completion ofdw projeol) Matlllnuan Construction (Floridit), Inc., Collier County Board of County Commissioners (Owner) & Others be Included as Additional Insureds on Pollution Policy. Pollution covsrage, is to be Primary & Non -Contributory and Waiver ot'Saibrogation is to apply to nil Additional lnsurcds, NOTE: ADDITIONAL INSURED ENDORSEMENT IS TO BE PROVIDED FOR THE POLLUTION LIABILITY COVERAGE, Packet Pg. 180 L>'x>18'?,I:u�t+rf� IP: CCltbtf 17fiPf3-lbh2•L�44•E2277StBE716 F-AllUll C. 11.E.1 CERTIFICATE OF LIABILITY INSURANCE ImCiA..NI Illy• Illld. At€ i' ;,ykHl�' A'.IAlli 11t3 ,11€idlshlN"ll ,.r;fY r.N,7 ,n'AGENTS PLEAST3REVIEW BIJUCO14MCTOR II,.VOW: Iit( $A.NI:I::ATlllp,l,Ifr IIII}I,fl€II'rf;All- MOP IRSl1RANU RID811 FOILALL 00141HACtl1AL uii, 11f:' S': ENi, I tlE'.h r'i ra lE r Eul IYIJ:Y X4 r,I FLAN F'RV 'ill INSURAIAMREOUIRMENYS'+1 '';III,Al° Ill;l,,: INSURERS AFFORMING COVERArrE A r1dkT.A r, , , rb FF "•„ D !1 1! II COVERAGES It1'.!+I'�It;li I1t,.111, 1.,tII',kl f!',k'4'Fli'1 I I'll•+,IF'S„l,,S' I.11'k,.t'1 Iit 11,':01,;l.,\.11i'r-I'`I11110 11111 r11r r-'1111i+. P,1n 4110 rl"I:, Ill. 11,y1,n'' h,Y tI .t. li:1, 11 INN.,: i., 04,',1,,'„-I a+,1r,11... A. l r,t, P,,111. p,1,!rq y1 idnl>I, i,'..1I ., e... 4'IP 1 k Fl,l 1 ..11 VA, 111 /.'. ill 14 00 $141 "1 M;01 Ill 01%IIU,,- 1 .4' 1,k 1'1111 P 'III l4' 1 i It i• "I b+ l.11.' 0 I• "I th1'i %41' 11t i't,ll l it r.i" W,V I'll!II VQt1=.I: t 1111'.,:•Ifll'rS INII, NSVi hl,, Iull bli,F'Il'F r 6101 StR. ,IF b0I!.%I,.IM I'll Milk. I LIMITS Cili0.0 tHd11E'[+.1 nu; 1 <r,n,r„r,.kl, Il.l fFOSM X't't,,,lr•,1,1A—llll1lllin,r W-W tail❑ttu��% lu� •rna.• n, 1,-, lr; 17�dAJC�4 IAnI'rlAtll'r NEl11Y i rlt ,11 ••'„' 11 , i "r ,,111...11., X .-Mll L. J: ff X x '• r:141 FS 1 VAM1INCR thslxttlAsrtici :a1'�.••iui.'1 F)!U)iIA , I1'4n ti X.,I '•1, ,1'1• hfq\IRYfgrFR1Al`FNiMfl K h' :I, I!„+., „11i, ' I lr•:•1+..' 1 •,.+ 1l/1WF1G0 - _ _ fllEr4,tR51k18'1„Y X .. ,,I .a..1l.l:•,, „ -11• I! .,Ir1,1 kiR'-0!� 11. 1:•I,.enll,orF lTA4)AW I,i1 lwrl!k "t I_x1i 1:11. V 11.11 11111.. lnl/�IYA71l,1iNliR! ,..,. d,r ,)r'Ir,•il. ,IA' „ MhAIA s:,00aa� rlFtYlKiri µoxN .+I,.,Jr•.rL,,, . „I,U . ,t 19t",;np4AW.i.S,:drva1 11, xl „1, ., i,','.'. PRRfECIHAME, WlIIIER0pt711FY9PpRT9Ili MIll13CMIUCK PR47EC16Y11EF,R1 G41C4RC4lllIIYUPAfi0E7f G414H1YG¢s�R�l�$14,'EFft3 PRQUECI NUTABEM FAA hddltlonel lAt4f0A'lAl�yru d;iwnl+Al+AnCAA;llucllon(<irfl3aF klc , coll1w County owd A!cAt.mty I„ faqulrad titynkltal eonlrel! al CL, hala, Ux,W[+lA' A PetaUtrl voiulas. hQ+iulllnal k1f uN'S i IrAutemenit Kr pPlWrnp � Camplathi 4pCr'alkrp9 9ra d1Vi:hE10. FttpsS sllitbf UlnLsct� ldm11'; rdlm. An PoNtm, IorJYding W[ mof Vmb'dio poll&'o, mra pllmnfy And Filar Ronht4Uttiq to 6Py Obw mftitaR=a 64%0410 to thR Addltla lInIlurais 1Yah•c�ol Saleopa47un En Id,nr IN A1+nbN[an tit�nllrlrslk+n {Ffrx1M€. ind , CSF�i C41fn1P OOHr4 a! �utpli Ccnsellablontts R)Atli'A bglt ollYr9 � re'ivkE6 6/ Nil11tA erlRllx! oR Gt,1YL tsnd Pnll�!''1lR IVIk le; IW llm [omlrRualkn Carera�aeaYszs Akk gl�ploytas a! 1Aolnwled in Ifla;lalq�fenwtL K bdl,p oa+f«etnl CEMIFICATE HOLDER CANCELLATION Ji'If€nhellsn GOnnuell6O (FIorlIl$}, Inli, 376G•1 WdsVl6W on .l<,1,,p A,h ryl IPI ?f •.5s €•.:.:1:E'P IaU:'I'!1't rgYl Ir 111 III''" P11' I1,114t.t1t'y mf I IF1,F „r 1,,, +. I„1'.,:':"','/, : 'rl r,1 1 ab JAI'. .. ,i 11,t ,, 11'1 Ill It,, Hnplu#;, FL 54104 4,11111 M1. 1,'11 r, I'd \r•, I,1 It 1(11 ANII IQAII[b RCPALfiRTA1F4L to 170 N v CD L E L O a) t U t It a+ Q Packet Pg. 181 11.E.1 Manhattan Authorization Request Bu1ld trig cm.celleticE. Detailed Form, Grouped by Number (with CE Breakdown) Collier County sports & Events Complox Project t1 7675 To: Ayoub A!-bahou From: Fad! T!b! Collier County Manhattan Construction Company O_ 3299 Tamiaml Tfall Fast 3705.1 Wasiviow DR u) C Naples, FL 34112 Naples, FL 34104 0; X r W EXTENDED GUS AND GR'S Dlrect Cast Submitted d E 7/712022 205 $590,728.28 N Notes N This AR Includes the extended Manhattan General Conditions (GC's) and General Requirements (GR's) associated with the following schedule R t Impacts: (L X d Q 1. FP&L Lighting & Distribution Drawings and Material E O Please note this schedule fragnet assumes a date each respective Item will be released for construction. It does not assuma cosutlme for U additional schedule Impacts beyond the dates shown. O 1) Time Extension is due to the Impact on the supply chain caused by both material shortages and shipping delays - aftermath of the COVID-40 pandemlo. Changes In the production and shipping schedule of PVC conduits drastically Influenced the construction schedule of this project. Most of the delay In maleriat delivery was based on agreement with Florida Power and Light to provide the required conduits to the site. FPL has railed to 00 deliver these material on time and as needed for this project. r ti 2) The additional time was not Included in the original contract because a severe disruptions of the supply chain such as the one the market Is � currently experiencing, with worldwide material shortages and worldwideshipping delays, was not anticipated at the star(of the project. 00 3) The two hundred and five (205) day request changes the Subslanllal Completion date from May 9, 2022 to November 30, 2022. N N_ 4) AR 26 (Change Order No. 10) adds 145 days, changing Final Completlon from August 7, 2022 to December 30, 2022. Change Order No 0, c approved on May 24, 2022, added 60 days without a General Conditions and Requirements Contract dollar change. AR 26 (Change Order No. 10) L Includes General Conditions and Requirements for the combined 206 days. a) L 6) Builders Risk Insurance Is by the owner. Collier County to update the policy accordingly. 0 d s� Exclusions: C Subcontractor cost Increases associated 04 the impact outlined above t Subcontractor Material and Labor Shortages and Impacts U Acceleration Cost + ; C Additional Manpower ar Builders Risk Extension E L c� This AR Initially created on 04114/2022 r rImunr Q 053 6/9/2022 $590,728,28 205 Owner Change Owner Directive Collier County Sports & E'venfs Complex Project # 7675 Prolog Manager Packet Pg. 182 Manhattan Bit 11ding excellence. Descrift1lon Extended GC's and GR's . FP&L; Delayed GMP Funding Notes 1. General Conditions per GMP - $1,W7,235 a, $112,190 per mo 2, General Requirements per GMP - $438,050 a. $26,802 per mo CE Inilialy Created on 0411312022 Cost Event Breakdown. Authorization Request Detailed Form, Grouped by Number (wish CE Breakdown) In order to mltigata possible delays and expedite the approval for the direct cost of work related to this change, unless speclfcally noted above, we are submItUng this change request without schodufe tlmolcost Impact. We reserve the right to submit for costllime Impacts related to this change under separate cover when that Information Is available. Contractor does not release impacts that arise out ofActs of Nature pnclud(ng f(e, flood, earthquake, storm, hurdoane or other natural disaster), war, Invasion, act of public enemies, hostilities (whether war Is declared or not), civil war, rebellion, revotulfon, insurrection, military or usurped power or confiscation, terrorist activities, riot, nationalization, government actions, tariffs, blockage, embargo, transportation delays not reasonably foreseeable, labor dispute, strike, lockout, disease outbreak, epidemics, pandemics, quarantine restrictions, or Imerruplfon or failure of power sources. To the extent these conditions may occur and impact the Project, there shall be an equitable adjustment to the Contract. Authorization Request: 7676.026 Approved By: Ayoub At-babou — Sr Project Manager ColRerCourrfy Sports d EVOWS Conrplox Prolog Manager SIONA7URS UA're: Profeci 0 7675 Packet Pg. 183 Cherisse Travis From: Al-bahouAyoub <Ayoub.Al-bahou@colliercountyfl.gov> Sent; Thursday, April 14, 2022 7:22 AM To: Brett Vantol; Cherisse Travis; Hal!James; James Land; Jeff Davidson; Joshua Fruth; BakerMarissa; Megan Phillips; PaquetteRichard; Victoria Burns; LuffZurima Cc: Matthew Jones; FinnEd Subject: RE; Sport Complex phase 2,1 - Field 9 & Pavilion Importance; High Based on the emall below Please provide and update schedule Collier County strong desire to complete the project by November and having the site ready for the upcoming event first week of December. We will discuss further at our OAC meeting. Thank you Respectfully, Ayoub Ayoub R. All-Bahou, PE, ILEED ` GA Principal Project Manager Facilities Management Division 3335 Tamlaml Trail East Maples, Florida 34112 Avoub.al-bahouCa colliercountvfl.eov 239-252-7704 (o) 239-778-4559 (c) C;Ofle*,-r C;Ounty From: AI-bahouAyoub Sent: Thursday, April 14, 2022 7:20 AM To: Brett Vantol<BVantol@manhattanconstruction.coin>; Cherisse Travis<CTravis@manhattanconstruction.com>; James Hall <James. Hall @colliercountyfl.gov>; James Land <James,Land@man hattanrb.com>; Jeff Davidson <Jeff@davldsonengineering.com>; Joshua Fruth <jfruth@pen-eng.com>; Marissa Fahey <Marissa.Baiter@ col liercountyfl.gov>; Megan Phillips<mphi Ilips@manhattanconstruction.com>; Richard PAQUETTE < Rich ard.Paquette@cotile rcountyfl.gov>; Victoria Burns <VBurns@manhattanconstruction.cam>; Zurima Luff <Zurima.tuff@colllercountyfl.gov> Packet Pg. 184 11.E.1 Cc; Matthew Jones<MJones@manhattanconstruction.corn>; Ed Finn <Ed.Finn@colllercountyfl.gov> Subject: Sport Complex phase 2,1- Field 9 & Pavilion Importance, Nigh Matt, Given project execution delays and other schedule and financial Impacts associated with Covid 19, supply chain problems, material cost escalation, the inability of FPL to supply required material, Impossibly long material lead time requirements and contract and budget Issues, Collier County will not be moving forward with the construction of Building #21(pavilion), Field #9 and the southern, parking lot. We will dicuss in detail the removal of these scopes From the current contract, then the E OR will be issuing Addendum to your office for execution. Let mne know if you have any questions Thank you Respectfully, Ayoub Ayoub R. AI-Bahou, PE, LEEb ` GA Principal Project Manager Facilities Management Division 3335 Tamiaml Trail East Maples, Florida 34112 Avoub.al-bahou@colliercountyfl.gov 239-252-7704 (o) 239-778-4559 (c) Cor County Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released In response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. Packet Pg. 185 11.E.1 i ..................... .............��,.,..,.,,...,.....,..,.,.....,,.,.,.,....,.,...,., , .,,,. ,..,,....,..,.. ; Igv;J ua(otJ 6..., VIP ;i g� a ll a � IA all .....................' .,.,.,..,.,,.,...,.,,........,,,,.,......,..,............ ............,...........,... No .............. _... �.................................................... . .............................. _.-................ .w......... y g � �itei5 i�a(oi Q Packet Pg. 186 11.E.1 j.................................................................................. ...... ...... .......... ......... ... .... .. ui,rs r Y� N it 0. va4t V a Packet Pg. 187 ................... ............... ........... .............. .......... ...................... ..................... .......................... ...................................... . ................ ................. ..................... ................................ ................ ................... .. . ......................... .............. ..... ....... .. ...... ................. .. .. ................ ........... .. ............ h SA 99 9 I H i� F ll 11mgALI I I Packet Pg. 188 11.E.1 1.!•rrrt,ill lLill 4u!rsl a,f t,nvrl:tll�! �. I,:r. 7.3�1 ti4;i ii49 t (u'tb:ay Mfi•I vVw'tv:'fw Div. : 19M l:i ()*q(I {1nc!:Iffattn} S1,1I.I ,I -It ;:rla 311kv4 %vqw.i I I :v Ji M I ;I I ii id h t;xnn! Ayoub Al-bahou Collier County • Principle Project Manager 3335'ramiauni'rratii Fast Napluy, FL, 34112 Projdcu Collier County spotis Complex Agrccmont # 17-7198 -- Phases 2.1 and 2.2A Collier County Project No. 50156 RE: A17 #7675.031 Ocar Mr Alnbahou, As regnestad, this totter iti to confirm that Manhattan Construction Co. has reviowed till documents included Within tilt atinciicd AR and believes it is rair nand reasonable. Please accept this as our mconm endation of Your approval. Should you have any additional questions, and/ or concerns please feel free to cotttnet us, Regards. Fadi Tihi Assistant Project Matnuger Cc: C'hcrisse A, '11-avis - Sr Project Manager Packet Pg. 189 11.E.1 Authorization Request Detailed Form, Grouped by We mbar (Kith CE Broaltdown) Collier County Sports & Evorit$ Complex Project It T075 To: Ayoub Al-hahau From: Cherisse Travis Collier County Manhattan construction Company o nowromiaml Trail East V08-1 Weslvla w OR N c Naples, FL 34112 Naples, FL 341(14 x w CONTRACTAtLOWANCF - PREFABRICATED PRE-ENGINEERED METAL BLI) Altowanpo pending m E 612712072 0 ($428,270,65) 7 ar 023 3012021 ($428,278.¢5)' 0 Owner'Ghangs Owner Dlrecttve, d Desorinflon x m CONTRACT ALLOWANCE - PRUAIIRICATED PRE-I'NGINEPRPD METAL OLD Q Nato as 413122 -CANCELLED SE;E CE 11041 U Collier County does not lvish to ulilizo'CONTRACT ALLOWANCE - PREFABRICATED PRE-ENGINEERED METAL BLO' on this project and the v i essooirited Wlh this allowance should be relumed, o a Cost Event Breakdown: to 00 001 CCNTRACTALLOWANCES • PREFABRICATED PRE-ENGINEERED METAL ($400,000.00) Leval 1 1.5% 5D1 ($6,000.40) ti Level 2 1,175',b General Liability (S4,770.50) Level 3 0.73Ii°10 Bond ($3,023.27) 00 Leval 4 15% CM Fee ($14,482.78) N In order to mitigate possible delays and expadlle the approval for the direct nest of work related to this change, unless specifically noted above, vie e pro suUmllUng this change request %Whoul sohpduf p tintaloast Impact. Wo rose rvo the right to subntft for cosMinte Irnpads related to this chango under eeparato cover'when that Inform allon is available. Contractor does not release Impa4ts that arise out of Ants of Nature (inewing fire, flood, oatihquake, slorok hurrloana or other natural disaster), 0 war, Invasion, act of public onomles, hostilities (whelhor war Is declared or not), civil war, rebellion, revolution, Insurrection, military or usurped d povror or confisoallor% terrodst ucilvilles. dol, nationalization, government actlons, taftffe, blockage, ombargo, transportation delays not reasonably cn foreseeable, labor dispute, strike, lockout, disoase outbreak, opidomtcs, pandomirs, qua ranlino restrictions, or Inter+upilon or [allure of power � avurces. To the extent these conditions may occur and Impact the Projevl, there shall bean equitable adjustment to the Contract. U c E t v r Q Authorizatlan Request: 7675.031 Approved By: Ayoub Al.bahuu •- Sr projaot Mauuaar SIGNATURE DATE C0111or County Sports A Events Complox rrploot 0 7675 prolob Msnnger Packet Pg. 190 Julie 9, 2072 Collier County board of Commissioners 3301 Tamlaml Trail East Maples, FL 34112 Re: Collier County Sports Complex and Events Center Phase 2.1-- AR Review AR 7675,033 To Whom It May Concern, We have received and reviewed the documents referenced above from Manhattan Construction Company, Regarding pricing, we find this work to be competitive and reasonable for the current market standards. Thank you, Josh Truth 11'.15il11,1�411 A ENGINEERING Vice President li:.,`liiidirilu:+l'I`.'•tb.:5;,f•i.q.� i3mi-i.� :,III`; iIf1,,, +11l•AI"'I/l';1 a.l. .�;'i•I1/'lJ I L. L.ImiM dj)lr 0% 1S:: I�tlliWI.0 P1ge I 1 Packet Pg. 191 11.E.1 Authorization 111.11 F2eques natallod>;orm, Groupod by Nuatber (with CE Broakdown) Collier County Sports & Rvonts Complex Project 0 7076 To: Ayoub At-bahou Collier County From: Chorlese Travis Manhattan construction Company Ito 'D 1e Ftoferonce AMouttt Proposed. day; R9.:q Category Rv�tsan 030 111141201 t • :: owner Dirontivo Dosoriniian ADOLNr1UM N11 & Rri lf43-Slormwater Rev]slant, jtlotes Pathway Drainage _ Neith of Fled 1 a 2 Shoot C21.01 & G21.61 dated 40/20121 Cast E e r ak& n 001 STORM DRAINAGE - RFI 43 88,48B.80 Leval 1 1.6°A SDI $1271" Level 2. 1A760/9 General Liability $101,24 Level 3 V36%4 Sund $64,16 Level 4 3.611/a CM Fee $307.36 to order to mitlgata possible delays and expedite Ilia approval for the direct coat of Ymrk related to this change, unless specifically noted above, vie are submitting this change request vrithout schedule iimelcost Impact. We reserve the right to submit for costllime impacts related to this change under separate cover when that Inforroallon Is evalfoble. Contractor does not release impacts that arise cut of Acts of Nature (including fire, flood, earthquake, storm, hurricane or other natural disaster), war: invasion, act of public enemies, hostilities (whether war Is declared or not), civil tear, rebellion, revolution, Insurreetlon, military or usurped povroror confiscation, terrorist activitios, riot, nationalizatlom government actions, ladifs, blockage, embargo, transportation delays not reasonably foreseeable. labor dispute, strike, lockout, disease outbreak, epidemics, pandemics, quarantine restrictions, or interruption or (allure of power sources. To the extent those condglons may occur and Impact the Project, there shot[ bean equitable adjualneont to the Contract. AlllhoriAelian Roquast: 7075.033 Approved By: Ayoub At.bahou -. Sr Project I,loneger SIGNATURE DATE Collier County Sports & Events Complex Prolog Manager Project fl 1076 am 00 It N N 0 a� O m c its t U c am E t U 2 r Q Packet Pg. 192 J EN E N PROPOSAL UNI ERGROCJIND UTILITIES, INC. NO. 24010 6685 TAYLOR ROAD, NAPLES, Ft_ 34109 DATE:._._.5I6172.....� PHOW., 230-607.0060 VAX, 239-697-006.1 SI IEET NO. 1 of 1 GERTIFIEP UNDERGROUND UTILITY, OU 0044096 FIRS SPRINKLER CONTRAOTOR V.1 V9111800192 PROPOSAL SUBMITTED TO,' WORK TO DE PERFORMED AT: NAME Manhattan Construotton Company, Inc, Colflor County Spotis Paik (R I # 43) STREET 3706A Weatvtew Drive STRCET City Gate Blvd CITY I cmSrles � CITY Naples STATE .Ff. VATE OP PLANS NIA, PHONE 643.6000 FAX: ENGINEER Peninstila.Engineering We hereby Propose to furnish the materials and perform the labor hecossary for the complotion of: RAI3 NACRE: PROPOSED GHANOE ORDER (RFI # 43) 81 Lr 1 W AD$ (N-12) 3628.80 81 LF Rock Excavation 4,860.00 TOTAL CHANGE ORDER $8,488.80 EXCLUSIONS.: 11 NOT RESPONSIBLE FOR PRIVATE UTILITIES NOT LOCATED EY THE RESPECTIVE OWNER, 2 THEME WILL, BEAN ADDITIONAL CHARGE TO EXTRACT ROCK AND REMOVE ROCK FROM PROJECT SITE, 3) NQ UNSUITABLE MATERIAL REMOVAL OR REPLACEMENT WITH ACCEPTABLE MATERIAL A NO LAYOUT OR CERTIFIED AS-BUILTS, 5 NO DENPIRY TESTING COST. 6) NO CONNECTION, INSPECTION, PERMITS OR IMPACT FEES. All maledal is guaranteed to be as spaoined, and the above work to be pertained In accordanve wllh the dra%vrtnv wid s31 wfimila to submitted for above work, Any altorntion or doviatlon from above upeclfloaltone Involving oxtra 0001, will bo Qxauuted upon wrillan orders, and WI11 bacome an extra chargo ovor tho contract arnount. OWner agrous to aaaept Rrrrront Insurance In plaa© by Contractor (� tIM0 of bid, owner APYnoa to boar any east far o1wan6oa or alloralions In 111011ranao covorago. Thl;a proposal nlsy he wItildeavin by us If not accepted within 30 days. Pgmomo to ho mads as follows; As work progrossos, payment duo wlthfn thirty (30) bays of blllinp, Reepeotfullysubmittedl Keily clw refs , _ _m�._�. . JWEN UNDEROROUNl7 UT uffifi is, INC, ►taceplanao of Propoenf: T110 0110VA pricas, 0parlficatlonn and conditPona ar'o ealtafactory and aro haraby accoptori, You are heroby authorixodto perform the work, Dato 9ltlnttluro Packet Pg. 193 1 June 6, 2022 Collier County Board of Commissioners 3301 Tamiaml Trall East Naples, FL 34112 He: Collier County Sports Complex and Events Center Phase 2.1—AR Review AR 7675.034 — 5TRH1(FPL TRANSFORMER) To Whom It May Concern, We have received and reviewed tho documents referenced above from Manhattan Construction Company, Regarding pricing, we find this work to be competitive and reasonable for the current market standards. Thank you, Josh Fruth 111'NIN,11 AENGINEERING Vice President €�I�I-• I'' ,, 5".,1. 0L€1.,,1. !(i,!I 7 .1IIrI Of;o €9 -A'f 1_I•1€€I1 32 . "i iLl .')'i1 I to 1:ilghwvi CA I.f; 7F I !.s I..m d!I t.opu ('Il Page 11 Packet Pg. 194 11.E.1 Collier County Oport:s & Event* Complex Authorization Request ❑aloilad Form, Grouped by Number(-Aith CE Broakdown) Project 1t 7676 Aulllot lzatlonAoqu661,11375,034 Hato 512312022; Collier County 039 12117/2021 $1e,900.413 Desoription AN ff 16 - Ctruolure conflict vrith Exlriling FP&L Transformer Manhattan Construction Company Field Condltlon Natee RFI01S rats$d the fallowing question, Please sea the attached screen shot from our surveyor. Structure PH2•STR•H1 Is lecntod directly to the North of the FPL Transformer, located on City GAte Blvd North just outside our construction gate. The drainage pipe nuns directly under the transformer, to strualure PH2-3TR-220. Plosso provide us Willi olther a rolooation of one or hoih gtrualuros, or an oddilion of a junction box. The offaclal response prom Kyle Fruth was, See the attached plan update. An additional 0- 62 LF of 3611 RCP will be required to accommodate the structure shift to avold the existing Iransrommat, 001 STORM DRAINAGE - RFl #16 $19,784.96 Level 1 1.6% 801. $236.77 Level 2 1,176% Oonorml Liability $188.26 Level 3 0.736% Bond $119.31 Levels 3.6% OM Fee $571.53 In order to mitigate possible delays and expedite the approval for The direct cost of work related to this change, unless specifically noted above, vm are submltling this change request without schodulo Umolcost impact. We reserve lho right to submit for cosl111mo Impacts related to this change under separate cover when that information is available. Controctor does not release lnmpacls Ihat arise out of Aos of Nature (€rEcludln$ fird, flood, earlliquako, stern; hurricane or ather naturat disaster), Vrar, Invasion, act of puWlc enomlos, hoslililler (whother war Is duclarod or not), civil tear, rebellion, ravolutlon, insurrection, military or usurped power or r onflscallocl terrorist activities, riot, netlonailrallorr, government actions, tariffs, blockage, ernbaroo, iranypoNrmlion delays not reasonably foreseeable, labor dlspula, 61dke, lockout, disease outbreak, opidomlcs, pandemics, quernnitno rostrictipns, or Interrupt€on or failure of powor sources. To the extent these conditions may occur and Impact the Project, there shall be an equitable adjustment to the Contract. ColllerCounty Spurts d, Cvenfs Complex prolog Msnager Prol"I tl 7675 c O .N c d x w m E N N rn M t a x m Q. E O U O a co as ti I: Q Packet Pg. 195 11.E.1 Authorization Request Datattod Form, Grouped by Number (%%Ith CE Broakdown) Authorization Raquaat: 7075.034 Approved By., Ayoub A[.bahou --Sr Projeet Manager MONAWRE DATE Coiner County Sports & Events Complex hrojew 11 7878 ProtopMnnager Packet Pg. 196 JEN PROPOSAL UNDERGROUND UTILITIES, INC. NO. 24612 6686 TAYLOK ROAD, NAPLES, FL 34100 DATE, � 1022 PHONE: 239a597 0060 FAX, 239-W7•0061 SHPET NO..m 1 of 1 Or:k'rlr-IED UNDE-ROROUND UTILi7Y: OU 0044900 FIRK SPRINKLER CONTRACTOR V: 117001000102 PROPOSAL, SUBMITT90 TO'. NAME Manhatt6n ComAreellon CompanY, lttG, 31RECT 3706-1 Westvlew Drive CITY Naples STATE F PHONE 043,GgOa FAX., y� WORK TO HI" PI;AFORMED AT: Collier County Spatts Park(RFI !F 16 STREET Cl!y Gate Blvd CITY Na les DATE OF PLANS NIA ENGINEER t3OhlhWl_ �nglRL ri1 � _...._ -- Wes hereby propose to flirnIsh the inatertals and. purform the labor necessary for the completion of: PROPOSED CHANGE ORDER (RFI 1116) RAINAGEt (CONFLfCT WITH FP-RANSFORMER) 64 LF $6" kOf (OL 3) 64 LP Rork Excavallon TOTAL. CHANGE ORDER l i,944.96 3,840.00 $16,704.96 EXCL� s. 1) NOT RESPONSIBLE: FOR PRIVATE UTILITIES NOT LOCATED RY THE RESPECTIVE; OWNER, 2) YH15RE WILL UE= AN ADDITIONAL CHARGE TO EXTRACT ROCK AND REMOVE ROOK FROM PROJECT SITE. 3) NO UNSUITABLE MATERIAL. REMOVAL OR REPLACEMENT WITH ACCEPTABLE MATERIAL. 4) NO LAYOUT OR CERTIFIED AS•l3UILTS, 5) NO DENSITY TESTING COST. 6) NO CONNECTION, INSPECTION, PERMITS OR IMPACT FEES, All rnderlal is guarantood to bo as speclflod, and the Abovo work to bo performed In aecordanvs vlAh fha drativinge aitil sl +ciitcatiotts submitted for above work, My olloratlon or doviatlon from obavo spoalfloations Invotving oxlra oasis, will be oxen itied upon wrttt.on ordors, anti wilt hoogata an extra charga ovor the contract amount. owner a0rooc to accept cufmot Insuranou In place by contractor e tinto of 4Id, Ovinar agross to ltpar any wont foe oli$tigos or altorntlons In Insurance Gov$rAga. Tbls proposal may be withdrawn by Rs if nut accepted wipiln all days. Paymants fo be made as follows: As work progresses, paymont duu within thirty (30) days of Wiling. Respootfulty eEitltnittod: Pjally Edwards dE SEN UNDERGROUND UTILITIHS, Wd. Ad:oep%nco of Proposal: The alcove prlcos, sp"Iftcationsi and oondMunu arc nRllafantory gild are Woby aaaopted. YOU are Morally titilligriAod fo partonnthtn work. late Sigliaturo i i Packet Pg. 197 June 6, 2022 Collier County Hoard of Commissioners 3301 Tamiarni Trail East Naples, FL 3411.2 Re: Collier County Sports Complex and Events Center Phase 2.1—AR Review AR 7675.035 -- Field Markings To Wham It May Concern, We have received and reviewed the documents referenced above from Manhattan Construction Company, Regarding pricing, we find this work to be competitive and reasonable for the current market standards, Thank you, ,�22M�- Josh Fruth i'1'.NIINl.`.101 A ENGINEERING Vice President !i, Fiirllt nc, t l•• IS,I'. v,,, v, Q. II, .iII-ti-t ,',',III'., rtlt,t• ,ul,;fI",I I f : : > 1:,.,;.',1 1/1Ir 11,1 1=ogiltr,;.i {ale 1W47 S I h tarl lsi,,tpo CA IX +i,rF006 Page I i Packet Pg. 198 11.E.1 Coiitor Co my Sports & Bv4nte Complox Authorization Request Detailed Form. Grouped by Number (with GE Breakdown) Project # 7675 r . i r 1 1. I 11 To, Ayoub At-bahou From: Cherlsse Travis Collier County Monhailen Construction Company $209 Ternlumi Trail East 3Y05-11 Weslvlew DR Naples, FL 34112 Naples, FI. 34'iO4 7 •Field Markinii Rovislons Desoriptlort Addenduin 917 - Field Mwlsing Revisions Notes 4,662,76 Direct cost Change Conditlon 001 SYNTHETIC TURF 60, 66,00 4354.90 Level 1 1,15% 801 $06.32 l.ov4l2 1,175°/a Gonorol Liability $5 4 5,1.94 Level 3 0,736% Bond $32 93 32.92 Level 4 3,6% CM Fee $167.6t0 In order to mitigate possible delays and expedite the approval for the direct cost of work related to this change, unless specifically noted above, vie are subm€lung this change request without sohedule timelcoat impact. We reserve 1116 right to submil for cost/lime impacts related to this change under sapamte cover whan that information Is available. Contractor does not release Impacts that arise out of AM of Nature (including fire, flood, earthquake, storm, hurricane or ether natural disaster), war, Invastpn, 00t of publio enemles, hosiltllios (whether Vier IS doolored or n0l), Civil war, rebellion, revolultoo, Instineclion, rrtliitary or usurped power or conflscatlon, terrorist sctivittes, riot, nationalization, government actions, tariffs, blockage, embargo, transpeltallon delays not reasonably foreseeable, labor dispute, strike, lookout, disease outbreak, epidenvot,.pandenstcs, quawillne reslrfatlans, or lnlbatiptlorti or failure of power sources. To the extant those conditions may occur and Impact the Project, there shall be on equitable adjustment to the Contract. Authorization Request, 7675.035 Approved By, Ayoub Abbahau Sr Prolsol Manager SIGNATURE DATE Coffler County Sports & Events Complex ProloftManngnr l'r imi 11 7676 Packet Pg. 199 11.E.1 414 ft I � Gfie I d si % 1] C 9 1 G N 1 fj 01 L Q 'li I N 8 T A L L March 25111, 2022 Ms. Clleri8se Travis St.. Project manager Matlhtlttan Construction CTravis(rt}inatlllattanco►lstruetioil.cout SCGi Fields, LLC 10303 Brecksville (toad Brecksville, Ohio 44141 T 440.546.1200 / F 440.546.0400 WW1V. segfletds. cam Project; Collier Comity Sporis Complex — Phan, 2 New Lines Pavkages on Plr(ving Nelrly SC.G is pleased to provide this change order request for the additional lisle packages as shown oil the updated )field Striping Plaits issued by Poptilotis Design for the new conf'ormaneo set of project drawings. The following Is what we have included in our proposal for your review. Please 2 S nthetle Turf Line Packa ►es • Remove (2) full soccer inlay packages Removo (2) Hill lacrosse inlay packages Remove (2) full football tick mark packages Add (2) soccer tick mark packages e Add (2 lacrosse tick mark piu *ages • Add (2) Fall football inlay packages with shadowed numbers • Please mute: Repr tt[tl ,serum dare( higs have beet(.submitled lur, afrpruvrrl (miter fete nett, laYoul hiclrrcled. PRICE; $4,355.00 Should you have any rlucstions or require additional inforn]ntion please contact its at your earliest convenience. Very trtily yours, SCG Fields, LLC Nick Pappas Estimator & Project Manager I`agC I I I Packet Pg. 200 11.E.1 Astroturf Corporation 4509 liwy 150 South Corporation Lexington, NC 27295 TOE W0ft LQ LEADER IN SeOnTS A AECROAT1014 51JnrACJeS Astroyurf tlwrlail' Wn4 'LA FYf41AWts' .M'4 fkn(•i [44,14 11.11 Change Order #1 Change Order Proposal Date: 3/14/2027. Project: Collier County Sports Complex, Phase 2.1 Owner: Collier County Board of County Commissioners The contract Is proposed to be changed as follows., nescriplion Amount Fields 5 & 6: Remove (2) full soccer Inlay packages Remove (2) full lacrosse Inlay packages Remove (2) football tick mark packages -Add (2) soccer tick mark packages Add (2) lacrosse tick mark packages Add (2) full football Inlay packages with shadowed numbers TOTAL The original Contract was Net change by previously authorized Change Orders The Contract Amount prior to this Change Order was The Contract will be Increased by this Change order in the amount of The new Contract Amount including this Change Order will be 'fhe Contract time will be changed by this many days The date of Substantial Completion as of the date of this Change Order therefore is NOT VALID UNTIE. SIGNED BY BOTH PARTIES Astroturf corporatlan Name: 45119 Hwy 150 Sputh Address: tex;aglon, NC 27295 (SignuturelbaleJ (SlyJleluielDwr') $ 3,959.00 $3,959.00 $1,535,709.00 $0,00 $1,535,709.00 $3,959.00 $1,539,668.00 0 days Packet Pg. 201