Agenda 06/28/2022 Item #16A16 (FY2022 Annual Progress Report of the Collier County Transit Development Plan w/FDOT)06/28/2022 EXECUTIVE SUMMARY Recommendation to approve the FY2022 Annual Progress Report of the Collier County Transit Development Plan and authorize its submission to the Florida Department of Transportation. OBJECTIVE: To obtain authorization to submit the FY2022 Annual Progress Report of the Transit Development Plan to the Florida Department of Transportation (FDOT) in order to continue receiving State Block Grant funding to offset the cost of the Transit system operation. CONSIDERATIONS: In order to receive State Block Grant Funds for system operations, each transit agency must develop a Transit Development Plan (TDP) Major Update every five (5) years and an annual progress report for all other years. The deadline to submit all TDP updates to the Florida Depar tment of Transportation for approval is September 1, 2022. The requirements that must be met in the TDP Annual Progress Report are outlined in Rule 14-731, Florida Administrative Code. The FY2022 TDP Annual Progress Report outlines the progress that Collier Area Transit (CAT) has made in FY2022 towards achieving the goals and objectives identified in the last TDP Major Update, which was approved October 27, 2020. The TDP Annual Progress Report is a ten-year planning document that recommends implementation strategies to achieve the goals and objectives. This document also evaluates where there were discrepancies in the implementations that differ from the TDP Major Update. The funding shown in the Financial Section of the TDP Annual Progress Report for FY 2023-2032 is for planning purposes only and should not be considered a proposed budget. The report documents change that occurred in the system between July 1, 2021 through June 30, 2022. Collier County completed a Comprehensive Operations Analysis (COA) in July 2021. The COA has set up a road map for CAT system improvements over the next few years. Significant changes were introduced during the first quarter of the County Fiscal Year 21-22 with the implementation of the Seasonal Schedule Change in November 2021. These changes were identified as some of the COA near- term recommendations for the system and included route timing and alignment modifications to eight of the 19 routes and eliminated one route entirely. These changes were made to improve operati onal efficiencies, including ensuring the remaining routes were able to service the area where the route was eliminated. Specifically, the changes were as follows: • Route 11: Added additional trips throughout the day to increase frequency. Route timing was adjusted to increase connections with the LinC to connect Collier Area Transit to Lee County Transit. • Route 12: Removed one morning trip at 6:30 to allocate time to other routes. • Route 17: Service along US41 was removed, creating a new loop along Col lier Blvd and Rattlesnake Hammock Rd. • Route 18: Removed from service. • Route 22 and Route 23: These two Immokalee routes were designed as bi-directional loops servicing the Immokalee area on routes that serve in opposite directions. • Route 24: The route remains on the same path but will only make select trips to the farthest part of the route, allowing higher frequency along the busier part of the route. • Route 27: The North Collier Regional Park was removed from service due to very low ridership. • Route 121: The starting timepoint was changed to remove duplicative service in Immokalee on the morning run. As all these modifications were implemented, CAT has witnessed a steady re-growth in ridership over 16.A.16 Packet Pg. 669 06/28/2022 FY22 as compared to the year prior. Ridership has stabilized as residents feel more comfortable resuming normal activities. Currently, ridership is back up to approximately 80% compared to pre -pandemic ridership numbers. Other activities that occurred during this annual update period include the constru ction of 15 ADA accessible transit stops, including 12 shelters throughout the county. There are more ADA and shelter improvements planned for later in FY22. CAT was able to attend many events and visited local schools to make presentations about the Fixed Route system. CAT completed or continues to make progress on many of the goals and initiatives identified in the TDP. The TDP Annual Progress Report has gone through the Collier Area Transit Public Participation Plan and was presented to the Public Transit Advisory Committee (PTAC). The PTAC meeting was conducted without an in-person quorum with one member in-person and 3 members participating online with all reaching concurrence to move the Annual Report forward to the Board for approval. The TDP has undergone a fifteen-day public comment period as required by the Collier Area Transit Public Participation Plan. FISCAL IMPACT: The TDP is not a budget or a financial commitment. The potential alternatives and recommendations are part of the vision for transit. If new funding is not identified, the services in the needs plan will not move forward. GROWTH MANAGEMENT IMPACT: This action supports the goals and objectives of the Transportation Element of the Growth Management Plan. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to form and legality and requires majority vote for approval. -JAK RECOMMENDATION: To approve the Fiscal Year 2022 Annual Progress Report to the Transit Development Plan for submittal to the Florida Department of Transportation . Prepared by: Alexander Showalter, Senior Planner, PTNE ATTACHMENT(S) 1. TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (PDF) 2. Ridership by Route and Fiscal Year (PDF) 16.A.16 Packet Pg. 670 06/28/2022 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.16 Doc ID: 22407 Item Summary: Recommendation to approve the FY2022 Annual Progress Report of the Collier County Transit Development Plan and authorize its submission to the Florida Department of Transportation (FDOT). Meeting Date: 06/28/2022 Prepared by: Title: Planner, Senior – Public Transit & Neighborhood Enhancement Name: Omar Deleon 05/27/2022 4:28 PM Submitted by: Title: Division Director - Pub Tran & Nbrhd Enh – Public Transit & Neighborhood Enhancement Name: Michelle Arnold 05/27/2022 4:28 PM Approved By: Review: Public Transit & Neighborhood Enhancement Caroline Soto Additional Reviewer Completed 05/31/2022 9:14 AM Public Transit & Neighborhood Enhancement Michelle Arnold Director Review Completed 06/01/2022 11:42 AM Growth Management Operations Support Michelle DAndrea Additional Reviewer Completed 06/01/2022 1:09 PM Growth Management Department Jeanne Marcella Growth Management Department Completed 06/01/2022 1:20 PM Growth Management Department Michelle Arnold Growth Management Skipped 05/31/2022 8:15 AM Growth Management Department Jeanne Marcella Transportation Completed 06/21/2022 10:46 AM Grants Erica Robinson Level 2 Grants Review Completed 06/21/2022 11:07 AM County Attorney's Office Jeffrey A. Klatzkow Level 2 Attorney Review Completed 06/21/2022 11:52 AM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 06/21/2022 11:15 AM Grants Therese Stanley Additional Reviewer Completed 06/21/2022 11:41 AM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 06/21/2022 2:55 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 06/21/2022 3:40 PM County Manager's Office Dan Rodriguez Level 4 County Manager Review Completed 06/22/2022 3:07 PM Board of County Commissioners Geoffrey Willig Meeting Pending 06/28/2022 9:00 AM 16.A.16 Packet Pg. 671 Collier Area Transit Transit Development Plan (TDP) FY2022 Annual Progress Report Prepared by: Public Transit and Neighborhood Enhancement Division 8300 Radio Road Naples, Florida 34104 (239) 252-5840 Collier Area Transit – Transit Development Minor Update 1-1 | P a g e 16.A.16.a Packet Pg. 672 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 1-2 | P a g e Section 1 – Introduction Collier Area Transit Mission: “Collier Area Transit (CAT) is committed to providing safe, accessible and courteous public transportation services to our customers.” Collier Area Transit (CAT) operates under the supervision of the Collier County Public Transit & Neighborhood Enhancement Division (PTNE) for the Collier County Transportation Management Services Department. CAT serves as the public transit provider for Collier County, serving the Naples, Marco Island, and Immokalee areas. TDP Annual Progress Report Requirements The State of Florida Public Transit Block Grant Program was enacted by the Florida Legislature to provide a stable source of funding for public transit. The Block Grant Program requires public transit service providers to develop, adopt, and annually update a 10-Year Transit Development Plan (TDP). Based on legislation that became effective February 20, 2007, the TDP must undergo a Major Update every five years. In between the subsequent four years, an annual progress update is required to be submitted to the Florida Department of Transportation (FDOT) District Office by September 1st annually. A TDP or an annual update shall be used in developing the Florida Department of Transportation (FDOT) Five-Year Work Program, the Transportation Improvement Program, and the Department’s Program and Resource Plan. The most recent Major Update of the Collier County TDP was adopted by the Collier County Board of County Commissioners (BCC) in October 2020 with an extension grant by FDOT. An approval of the TDP was received from FDOT in December 2020. This 2022 TDP Progress Report is the second progress report to that 2020 TDP Major Update and documents Collier County’s implementation activities since the 2020 TDP Major Update. This progress report complies with all the requirements contained in Rule 14-73.001, Florida Administrative Code (FAC) as represented in Table 1. Table 1-1: TDP Progress Report Checklist TDP Annual Progress Report Review Items Location in TDP Annual Progress Report Past year’s accomplishments compared to original TDP Section 2 Analysis of any discrepancies between plan and its implementation for the past year Section 3 Revisions to the Implementation Program for coming year and the 10th year Section 3 Added recommendations for the new tenth year of updated plan Section 3 Steps to be taken to attain Goals, Objectives, and Policies Section 4 Revised Financial Plan Section 5 List of projects or services needed to meet goals and objectives Section 5 Source: FDOT TDP Handbook, Version III, 2022 Update, page 119. 16.A.16.a Packet Pg. 673 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 1-3 | P a g e Report Organization In addition to the Introduction Section, this progress report includes the following sections. Section 2: Previous Year’s Accomplishments provides a review of the past year’s implementation actions and describes improvements made since the last annual progress report. Section 3: Revisions to Implementation Program provides a review of the past year’s accomplishments compared to the original implementation plan. It also provides an analysis of the discrepancies between the 2021-2031 Major Transit Development Plan and its implementation and any revisions to the steps that will be taken to attain the original goals and objectives. This section addresses Rule 14-73.001, F.A.C., (4)(a), past year’s accomplishments compared to the original implementation program; and Rule 14- 73.001, F.A.C., (4)(c), any revisions to the implementation program for the coming year. This section also provides recommendations for the new tenth year of the updated plan with any revisions or additions to the goals, objectives, and implementations. This addresses both Rule 14-73.001, F.A.C. (4) (d) Revised implementation program for the tenth year; and Rule 14-73.001, F.A.C. (4) (e) Added recommendations for the new tenth year of the updated plan. Section 4: Status of Goals and Objectives provides the status of the goals and objectives, including a revised list of projects or services needed to meet the goals and objectives, which include projects with funding that, may not have been identified. This section addresses Rule 14-73.001, F.A.C. (4) (b) Analysis of any discrepancies between the plan and its implementation for the past year and steps that will be taken to attain original goals and objectives. Section 5: Financial Plan provides the revised financial plan of how the transit improvements will be funded, with stated cost and revenue assumptions. This section will include a cost and revenue summary. This section addresses both Rule 14-73.001, F.A.C. (4) (f) A revised financial plan; and Rule 14-73.001, F.A.C. (4) (g) A revised list of projects or services needed to meet the goals and objectives, including projects for which funding may not have been identified. 16.A.16.a Packet Pg. 674 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 2-1 | P a g e Section 2 – Previous Year’s Accomplishments This section provides a review of each program and activity identified for implementation in the first two years (2021 and 2022) of the TDP Program Elements and briefly describes the milestones or achievements between July 1, 2021 and June 30, 2022. Additional noteworthy accomplishments over the last year are also documented. Discrepancies between the 2020 TDP Major Update and the projects and activities are noted in the corresponding activity descriptions, and steps to be taken to modify the program or activity are described. Planning and Service Operations Service Improvements - Collier County completed Comprehensive Operation Analysis (COA) in July 2021, shortly after completing its TDP Major Update. The COA set up a road map for improvements to the CAT system over the next few years. Significant changes were introduced during the first quarter of the County Fiscal Year 21-22 with the implementation of the Seasonal Schedule Change in November 2021. These changes were identified as one of the COA near-term recommendation for the system and included route timing and alignment modifications to eight of the 19 routes and eliminated one route entirely. These changes were made to improve operational efficiencies, including ensuring the remaining routes were able to service the area where the route was eliminated. Specifically, the changes were as follows: • Route 11: Added additional trips throughout the day to increase frequency. Route timing was adjusted to increase connections with the LinC to connect Collier Area Transit to Lee County Transit. • Route 12: Removed one morning trip at 6:30 to allocate time to other routes. • Route 17: Service along US41 was removed, creating a new loop along Collier Blvd and Rattlesnake Hammock Rd. • Route 18: Removed from service. • Route 22 and Route 23: These two Immokalee routes were designed as bi-directional loops servicing the Immokalee area on routes that serve in opposite directions. • Route 24: The route remains on the same path but will only make select trips to the farthest part of the route, allowing higher frequency along the busier part of the route. • Route 27: The North Collier Regional Park was removed from service due to very low ridership at the stop. • Route 121: The starting timepoint was changed to remove duplicative service in Immokalee on the morning run. With the implementation of these changes CAT have seen a steady growth in ridership for the months of November 2021 through April 2022 compared to the year prior during the same months as depicted in Figure 2-1. The route modifications allow CAT to attain the following Service improvements recommended in the Implementation Program for 2022  Realign Route 17 eliminate portions of US 41;  Eliminate Route 18; 16.A.16.a Packet Pg. 675 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 2-2 | P a g e  Realign Route 22;  Realign Route 23;and  Shorten headway for Route 24 from 85 to 60 minutes Figure 2-1: Service Improvement Impact on Ridership Other route changes listed in the implantation plan with an implementation year of 2022 are being evaluated as part of the seasonal schedule change in the Fall of 2022. Off-season modifications were implemented in April 2022, to adjust route timing in response to the traffic volume shifts and to add an additional run to Route 24 to enhance the service to rural residents into the urban area. Bus Shelter Improvements - CAT continues to implement is bus shelter improvement plan with the construction of 10 shelters and installation of one bench at various location throughout Collier County during County FY 20-21. The goal of completing at least 10 bus stop improvement per year was exceeded FY21 FY22 April March November December January February 70,000 60,000 50,000 40,000 30,000 20,000 10,000 - Ridership Improvements 16.A.16.a Packet Pg. 676 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 2-3 | P a g e this past year with the construction of 12 shelters and one bench so far this fiscal year (October 2021 thru April 2022) with more planned for installation for this year. ADA Bus Stop Improvements - The bus stop improvement plan as includes improvements to stop locations to make them ADA accessible. In County FY 20-21, CAT constructed 28 ADA accessible boarding and alighting pads. So far this fiscal year, 15 ADA accessible pads have been constructed with more planned throughout the year. These counts incorporate the shelters that were built with ADA improvements. Paratransit Software Improvements – Ecolane – In July 2021, CAT implemented the Ecolane scheduling software as a replacement to the RouteMatch system previously used for the paratransit service. The new system is a fully automated, real-time, batch order taking, scheduling, and dispatching software solution that will schedule standard paratransit demand response trips. In March 2022, an enhancement to the Ecolane system, called CATconnect Mobile App, was implemented and added the capability for users to schedule and monitor their trips. CATCash was also implemented as part of the mobile app, giving passengers and their caregivers access to an account-based system in which they can deposit money and fares are deducted as trips are completed. This mobile app is proving to be a time saver for passengers and removes the hassle of handling cash on each ride. The app allows users to view and edit trip details as well as keep record of past and upcoming trips. CAD/AVL System Upgrade – CAT invested in a Computer Aided Dispatch/Automated Vehicle Locator (CAD/AVL) system over 10 years ago and is ready for an upgrade. In an effort to improve existing products and services, system efficiencies, and customer convenience when utilizing the system, the Public Transit & Neighborhood Enhancement Division (PTNE) put out a solicitation to obtain proposals for a turnkey, industry-standard system. In March 2022, the Collier County Board of County Commissioners approved a contract between INEO dba Engie and Collier County which allows the replacement of the following components: • CAD/AVL – Computer Aided Dispatch/Automatic Vehicle Locator. • MDT - Mobile Data Terminals which allows single log-on for operators. • AVA - Automatic Voice Annunciation System for ADA compliance. • APC - Automated Passenger Counters for easy fare collection. • Integration with the Fare Box solution (currently being solicited) with single sign on capability. 16.A.16.a Packet Pg. 677 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 2-4 | P a g e • Integration with Collier Area Transit (CAT) Mobile Ticketing system operated by Masabi with the ITxPT standard. • Signs, onboard infotainment system. • Business Intelligence tools for incident management. • A fully operational schedule software or the ability to integrate with a third-party scheduling module. • Pre and Post Trip Inspection capability to be integrated on the MDT. • Integration with Traffic Signal Priority (TSP) to fully automate via the CAD/AVL, utilizing the bus schedule and real time vehicle location. CAT has been working to provide the best technology available to stay up to date with the latest Intelligent Transportation Systems. These implementations push CAT toward a better riding experience for passengers and users of our service. 16.A.16.a Packet Pg. 678 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 2-5 | P a g e Figure 2-3 System Map 16.A.16.a Packet Pg. 679 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 2-6 | P a g e Figure 2-4 Route 29 Beach Trolley 16.A.16.a Packet Pg. 680 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 2-7 | P a g e Capital Equipment, Facility Changes and Improvements There are currently two (2) passenger transfer stations and five (5) passenger transfer points provided on the CAT system as shown in Figure 2-3. The two transfer stations are located at the Intermodal Transfer Facility at the government complex and the CAT Radio Road Operations facility. Other transfer point locations include: Walmart Plaza; Pine Ridge and Goodlette-Frank Rd (Magnolia Square Plaza); Coastland Center; Creekside (Immokalee Road); and the Health Department in Immokalee. Intermodal Transfer Facility CAT Radio Road Operations Facility There were no significant changes made to the transfer facilities since the last Annual progress report. Marketing and Public Invovlement/Communications CAT is always working towards promoting the service that it provides and educating the public about the modifications made to the service for public awareness. As our previous TDP Annual Update did not include events within FY21, the following efforts were conducted between October 1, 2020 and April 2022. CAT staff gave presentations about the Fixed Route system and gave bus rides when able at the following schools and camps: • October 13, 2020 - Barron Collier High School Web Ex Presentation • November 13, 2020 - Naples High School Web Ex Presentation • May 7, 2021 - Bridge Prep Academy Presentation • June 23, 2021 - North Collier Regional Camp Presentation • June 24, 2021 - Eagle Lakes Camp Presentation • February 26, 2021 - CAT’s 20th Anniversary Transportation Show - The theme of CAT’s 20th Anniversary celebration was 20 Years of Movement, which included a transportation show, displaying various forms of transportation throughout the years, with a chance to win a trophy for the Best of Show. The public was invited to attend and CAT had the Deputy County Manager 16.A.16.a Packet Pg. 681 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 2-8 | P a g e and a County Commissioner speak to the growth of our system and the value of transit that CAT has provided over the past two decades. This event was awarded 2nd place in the special events category at the 2021 FPTA Conference for agencies in our category. • April 22, 2021 - COA Workshop-Government Center – As part of our Comprehensive Operations Analysis, we took our findings and recommendations to the public at our transfer stations to ask for their input on the plans developed. We were able to survey several riders with valuable input for our process. We provided staff at the workshop that could communicate in English Spanish, and Creole to provide information for multiple languages. • April 24, 2021 -COA Workshop- Immokalee - As part of our Comprehensive Operations Analysis this was our second workshop to share our findings and recommendations with the public at our transfer stations. We provided staff at the workshop that could communicate in English Spanish, and Creole to provide information for multiple languages. • August 25, 2021 - Marco Island Transportation Summit - A Transportation and Hospitality Summit was hosted by Marco Beach Ocean Resort in partnership with the Florida Restaurant and Lodging Association (FRLA), Blue Zones Project, Collier Area Transit, Commute Connector and Commute Enterprise. CAT was able to present our current services within the Marco Island area and discuss challenges and areas in need of improvement to better serve the commuting workforce as well as provide transit options for residents. • October 15, 2021 - White Cane Event - Every year on October 15th, clients and their families and friends are invited to participate in a short walk on 5th Avenue to promote White Cane Safety Day and recognize the white cane as a tool of independence for blind and visually impaired pedestrians in our communities. White Cane Safety (Awareness) Day commemorates the state and federal laws requiring motorists to yield the right-of-way to pedestrians using a white cane or guide dogs. CAT participated in the walk and set up an information booth for the duration of the event. • November 5th, 2021 - Try Transit Day for Mobility Week w/ Public Workshop on Seasonal Changes - Collier Area Transit offering FREE RIDES in honor of Mobility Week. Staff was stationed at the Immokalee Health Department passing out information regarding the Season 2021 schedule, passing out refreshments, 16.A.16.a Packet Pg. 682 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 2-9 | P a g e promoting the new rideCAT app, and answering any questions about the transportation system. Spanish and Creole speakers were also present. • December 11, 2021 - Immokalee Christmas Parade – CAT participated in the annual Christmas parade in Immokalee. We distributed thousands of pieces of candy as well as a large amount of CAT branded items. • February 15, 2022 - Know Your County Government Presentation - This is an annual event that is sponsored by Collier County 4-H, Collier County Schools, and League of Women Voters. During this 4-day event, 32-35 youth tour around Collier County Government and the county to learn about services provided by the local government. CAT was able to meet with the group at our Intermodal Transfer Station to educate the students on our services transporting people all over Collier County. • April 23, 2022 - Try Transit Day – CAT partnered with Lee, Sarasota and Manatee Counties to offer Try Transit for FREE regionally on Saturday, April 23, 2022, to commemorate Earth Day, which takes place the day before. This was a great opportunity to promote our services along with the environmental and health benefits that go along with riding transit. • March thru May 2022 - Display Case at Naples Regional Library – The Naples Regional library reached out to CAT requesting us to fill a display case at their location. CAT accepted for three months with us updating the theme and content in the display each month. March had a rideCATconnect app display with flowers and spring-like decorations to draw attention to the table. April had Earth Day/Try Transit Day decorations, with literature focusing on the health and environmental benefits of riding transit. May has a Summer Paw Pass display, with beach-themed decorations. 16.A.16.a Packet Pg. 683 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 3-1 | P a g e Section 3 – Revisions to the Implementation Plan Tenth Year Transit Implementation Plan The 2021-2030 Collier County Major TDP Update included a very comprehensive list of activities leading up to the creation of an implementation plan that would guide the County’s development of services over a ten-year planning horizon. With each annual update, an additional tenth year is added to the implementation plan. Although an additional year was added, no improvements are scheduled to take place beyond what was identified in the last TDP Major Update. Collier County will actively pursue funding opportunities to implement recommendations from the 2021-2030 TDP. The following items not listed in the implementation plan were addressed within the current reporting period: • Expand and improve bus stop infrastructure – Improved infrastructure at bus stops, including benches, shelters, bicycle storage facilities, and other infrastructure, is included in the Cost Feasible Plan to enhance the rider experience while waiting for a bus and potentially attract new riders. • Improve bus stop safety and ADA accessibility – Ensuring the safety all riders while accessing bus stops and waiting for a bus and guaranteeing that ADA requirements are fulfilled for all transit facilities are important to the overall safety and accessibility of the transit system. As noted within the document a variety of bus stop and ADA accessible improvements have been completed in FY22, Collier County will continue this effort to provide an accessible service for all. Implementation Plan Accomplishments and Changes We have made significant progress on many of the goals listed on the implementation plan shown in our previous Major TDP Report. We have pushed back implementation of some of the route changes, frequency enhancements, and service expansions by one year due to funding constraints. There were a few projects listed in the Implementation Plan within the Major TDP that projected an implementation year of 2022. CAT has completed and made progress on many of them with others being evaluated for implementation later in the year. During FY21, Collier Area Transit procured the services of Kimley-Horn to conduct a Comprehensive Operations Analysis (COA). Through this process, recommendations have been made regarding the frequency and realignment of our routes and a timeline for these changes. With the completed COA, the years set out in the implementation plan for service improvements may be changed. We implemented many of the near-term service enhancements recommended in the COA at the start of FY22 with plans to continue implementation at the start of FY23. As part of the recommendations, a few items listed on the implementation plan were completed with our seasonal schedule change at the start of FY22. Re- alignments of Routes 22 and 23 were completed, Route 17 was realigned which removed part of the US41 corridor from the service area on the route, and Route 18 was removed from service. 16.A.16.a Packet Pg. 684 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 3-2 | P a g e We have made significant progress towards reaching the listed technology upgrades. In January of 2022, the onboard surveillance system on all buses were upgraded to have live feed capability, event tagging, download tagging, and one unified component on the buses. CAT recently completed a Request for Proposal to solicit for upgrades to much of our other software and onboard technology. We have started and are planning to have this technology installed during FY22. The Board of County Commissioners approved a contract March 8, 2022 that will allow the replacement and installation of a wide array of Intelligent Technology Systems, listed in Section 2. CAT is currently working with the Collier MPO to draft a scope and request a study regarding Regional Service and Regional Fares. When completed, this would include studying the UF/IFAS / Lehigh Acres area for possible connection with our services. The study may also produce additional ideas for regional connectivity and fare-sharing. Table 3-1 below provides a copy of the implementation plan included in the last TDP Update highlighting those service improvements that are on target with the plan. The other route network modifications slated for implementation in 2022 are in planning and expect to be implemented in the fall of 2022. Due to funding constraints the 2 studies identified for implementation in 2022 (I-75 Managed Lanes Express Study; and Immokalee/Lehigh Acres Service Study) are being recommended to be deferred to 2025 for completion. 16.A.16.a Packet Pg. 685 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 3-3 | P a g e Table 3-1 CAT TDP 2022–2031 Implementation Plan Service Improvements Implementation Year 10-Year Operating Cost 10-Year Capital Cost Existing or New Revenues YOE YOE Maintain Existing Service $117,818,191 $20,769,768 Maintain Existing Fixed-Route Service 2022 $68,693,299 $15,836,143 Existing Maintain Existing Paratransit Service 2022 $49,124,892 $4,742,027 Existing Replacement of Support Vehicles 2022 $0 $191,598 Existing Route Network Modifications $9,441,652 $2,153,818 Extend Route 11 into Walmart Shopping Ctr 2024 $0 $0 Existing Extend Route 12 into Walmart Shopping Ctr 2024 $0 $0 Existing Realign Route 13 shorten to 40 min. headway 2024 $0 $0 Existing Realign Route 14 operate at 60 min. headway 2024 $0 $0 Existing Realign Route 17 eliminate portions of US 41 2022 $0 $0 Existing Eliminate Route 18 Realign Route 19/28 eliminate part of 846 2022 $0 $0 Existing Realign Route 20/26 eliminate Santa Barbara 2022 $0 $0 Existing Realign Route 21 create Marco Express 2025 $0 $0 Existing Realign Route 22 2022 $0 $0 Existing Realign Route 23 headway 60 to 40 minutes 2024 $3,805,909 $503,771 Existing Golden Gate Pkwy Split Route 25 E-W Route 2027 $0 $0 Existing Goodlette Frank Rd - Split Route 25 N-S Route 2027 $1,838,052 $550,016 Unfunded Immokalee Rd - Split Route 27 E-W Route 2027 $1,898,845 $550,015 Unfunded Collier Blvd - Split Route 27 N-S Route 2027 $1,898,846 $550,016 Unfunded Increase frequency $22,092,501 $4,551,796 Route 15 from 90 to 45 min 2024 $1,632,384 $503,771 Unfunded Route 16 from 90 to 45 min 2024 $1,561,054 $503,771 Unfunded Route 24 from 85 to 60 minutes 2022 $2,045,921 $503,771 Existing Route 121 - add one AM, one PM 2024 $1,632,384 $503,771 Unfunded Route 14 from 60 to 30 min 2024 $2,439,146 $512,698 Unfunded Route 17/18 from 90 to 45 minutes 2024 $2,585,495 $503,771 Unfunded Route 11 from 30 to 20 mins 2024 $6,529,536 $503,771 Unfunded Route 12 from 90 to 45 mins 2024 $2,829,466 $503,771 Unfunded Route 13 from 40 to 30 min 2024 $837,115 $512,698 Unfunded 16.A.16.a Packet Pg. 686 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 3-4 | P a g e CAT TDP 2022–2031 Implementation Plan – (cont.) Service Improvements Implementation Year 10-Year Operating Cost 10-Year Capital Cost Existing or New Revenues YOE YOE Service Expansion $2,404,181 $0 Route 17/18 - Extend to 10:00 PM 2024 $1,202,011 $0 Existing New Route 19/28 - Extend to 10:00 PM 2027 $292,876 $0 Unfunded Route 24 - Extend to 10:00 PM 2027 $302,976 $0 Unfunded Route 11 - Extend to 10:00 PM 2029 $256,914 $0 Existing Route 13 - Extend to 10:00 PM 2029 $174,702 $0 Existing Route 14 - Extend to 10:00 PM 2029 $174,702 $0 Existing New Service $14,346,741 $2,862,604 New Island Trolley 2024 $5,510,821 $864,368 Unfunded New Bayshore Shuttle 2025 $2,009,995 $531,029 Unfunded New Autonomous Circulator 2029 $524,105 $569,681 Unfunded New Naples Pier Electric Shuttle 2029 $822,125 $569,681 Unfunded MOD – Golden Gate Estates 2029 $1,634,460 $81,961 Unfunded MOD – North Naples 2029 $817,230 $81,961 Unfunded MOD – Naples 2029 $1,938,887 $81,961 Unfunded MOD – Marco Island 2029 $1,089,119 $81,961 Unfunded Route from UF/IFAS to Lehigh Acres 2029 Unknown Unknown Unfunded Express Premium Route to Lee County 2029 Unknown Unknown Unfunded Other Improvements $0 $2,974,000 Technology improvements* 2022 $0 $2,720,920 Existing Study: I-75 Managed Lanes Express 2025 $0 $25,000 Existing Study: Santa Barbara Corridor Service 2024 $0 $25,000 Existing Study: Immokalee/Lehigh Acres Service 2022 $0 $25,000 Existing Other Technology improvements** 2022 0 $35,000 Existing Study: Immokalee Road Transfer Hub TBD Unfunded Branding beach buses, other services TBD Unfunded Park and Ride Lots (pending study) TBD Unfunded 10-Year Funded Projects and Maintain Existing Service $127,110,733 $25,255,082 10-Year Total of Unfunded Projects $38,992,532 $8,056,904 *Avail Replacement, APC, Annunciators, Onboard Information Media, Farebox Replacement, paratransit scheduling software, TSP, on-board surveillance, paratransit fare payment, IVR **Fixed-route scheduling software 16.A.16.a Packet Pg. 687 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 3-5 | P a g e Section 4 – Status of Goals and Objectives Assessment of 2019 TDP Major Update Goals and Objectives Goals and Objectives are an integral part of any transportation plan as they provide the policy direction to achieve the community’s vision. CAT’s TDP contains seven goals, each with objectives and initiatives designed to meet the corresponding goal. An assessment of CAT’s goals, objectives, and initiatives, as outlined in the 2020 Major Update, was conducted as part of this progress report. Importantly, several goals and objectives are modified from the prior year. The goals, objectives, and initiatives contained in the TDP Major Update were developed to support the service network redesign that was underway when the Major Update was completed in 2019. Having implemented that new service design, revisions to goals, objectives, and strategies were necessary to reflect a new service delivery approach and operating environment. Coupled with new initiatives to improve the CAT brand, expand services marketing, and customer-facing technology enhancements, several of the prior objectives and targets are no longer applicable or relevant. 16.A.16.a Packet Pg. 688 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 4-1 | P a g e - ASSESSMENT OF GOALS, OBJECTIVES, & INITIATIVES Objective/ Initiative Description Timeline/ Implemented 2022 Assessment Target Goal 1 Operate reliable, convenient, and cost-effective mobility services that safely and efficiently meet the mobility needs of Collier County’s workers, residents, and visitors. Objective 1.1 Improve efficiency, service quality, and level of service to adequately serve workers, residents, and visitors while contributing to the economic vitality of the county. Initiative 1.1.1 Operate east/west corridor service to provide access to jobs, education, healthcare and community services, and recreation. Ongoing CAT has several routes that further this initiative. Route 27 runs along Immokalee Road from Collier Boulevard to Creekside Commerce Park; Route 25 provides service along Golden Gate Parkway; Routes 20 & 26 provides service along Pine Ridge Rd; and Route 24 provides service along Tamiami Trail E from the Government Center to 6 L’s Farm and frequency has been enhanced.. Route 20/26 modifications are being studied to ensure proposed modifications do not affect the access needed to destinations/opportunity. CAT has exceeded maintaining the 95% target. Maintain 95% of Existing Service Initiative 1.1.2 Operate north/south corridor service to provide alternative access to jobs, education, healthcare and community services, and recreation. Ongoing Route 11 (US41) and Route 12 (Airport Pulling Rd) currently provide service north/south. Routes 19 and 28 provide service from Immokalee and Ave Maria to the Government Center. Route 121 runs an express route from Immokalee to Marco Island. Modifications were made to increase frequency to Route 11. Additional modification to the remaining north/south routes is not scheduled for this year. CAT has exceeded maintaining the 95% target. Maintain 95% of Existing Service 16.A.16.a Packet Pg. 689 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-2 | P a g e Initiative 1.1.3 Improve peak weekday service to 45 minutes or better on CAT routes. Partial PTNE has evaluated peak service and implemented increased frequency to route 11 during peak hours. 100% of the identified frequency enhancements for FY22 has been achieved. The completion of increased frequency along some routes is not scheduled for implementation until future progress reports. PTNE staff will continue to seek additional funding. Implement 30% of route frequency enhancement noted in the Implementation plan. Initiative 1.1.4 Evaluate the feasibility of premium transit services, such as bus rapid transit (BRT) within corridors where density of demand and activity warrants frequent service. No The Plan does not contain an implementation year for this initiative. A study is being worked on between CAT and the Collier MPO to look into regional travel which may include BRT as an option if warranted. Complete Regional Study by 2024 and evaluate bus rapid transit as part of study. Initiative 1.1.5 Provide mobility-on-demand service in areas with lower density of demand than is productive for fixed-route service and to access areas that are not able to be served by fixed-route. 2029 Areas have been identified for potential MOD. This type of service will have to be further evaluated and funding identified before it can be implemented. Implement 2 MOD projects from the implementation plan by 2029. Objective 1.2 Provide adequate bus stop amenities at all stops according to bus stop threshold and accessibility guidelines within available fiscal capacity. Initiative 1.2.1 Pursue funding to maintain and improve existing bus stops. Ongoing Collier County pursues funding for improvements to bus stops on an ongoing basis. A portion of 5307 is dedicated to bus stop improvements and 5339 has been applied for the purpose of bus stop improvements. Current Average OCR Status is Good, which exceeds the target. Maintain Cartegraph Overall Condition Rating (OCR) of Average as an accumulative average of all bus stops. Initiative 1.2.2 Install and maintain bus stop amenities according to an ADA compliant Passenger Amenities Ongoing CAT has developed an Amenities Program, to identify future bus stop improvements and standards. As funding becomes Install a minimum of ten ADA- 16.A.16.a Packet Pg. 690 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-3 | P a g e Program and Bus Stop Amenities Guidelines. available the program will be followed. 15 ADA compliant bus stop improvements have been completed so far in FY22. compliant bus stop improvements. Initiative 1.2.3 Install a minimum of ten ADA- compliant, accessible bus stop shelters per year. Ongoing In FY22, 12 new ADA-compliant shelters have been constructed. Further construction is planned within the year. Install a minimum of ten ADA- compliant, accessible bus stop shelters per year. Initiative 1.2.4 Coordinate with the Collier County and local governments to include sidewalks and bus stop shelters in design and construction of roadway projects and new developments. Ongoing Coordination with FDOT as well Collier County Transportation Planning occurs regularly to evaluate potential stop improvements in conjunction with roadway improvements. Coordination is underway for needed bus stop improvements along Collier Blvd. Meet a minimum monthly with staff regarding roadway and new developments Initiative 1.2.5 Monitor and implement the recommendations from the CAT Bus Stop ADA Assessment report. Ongoing Collier County continues to implement the recommendations as funding is available. 15 ADA-compliant stops have been constructed in FY22 with more planned for improvement. Install a minimum of ten ADA- compliant bus stop improvements. Objective 1.3 Structure transit service with a focus on providing job access for workforce and access to mobility for persons with no or limited access to a private automobile. Initiative 1.3.1 Improve transit service for areas with high mobility needs per the transit orientation index identified in the latest TDP Major Update. Ongoing CAT provides service to all Very High and High TOI areas noted in the latest TDP Update and will continues to explore opportunities to enhance service in those areas. Evaluate TOI once new census data becomes available. Initiative 1.3.2 Provide efficient transit and mobility access to major employment centers, development corridors, and other significant activity centers as funding allows. Ongoing Collier County continues to explore ways to expand service within existing funding limitations. No service expansions were identified to be completed this fiscal year. Implement at least 2 service expansions from the implementation plan. 16.A.16.a Packet Pg. 691 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-4 | P a g e Initiative 1.3.3 Focus transit and mobility services in areas with high employment and dwelling unit densities and connect targeted jobs-housing locations to serve the workforce, including Golden Gate Estates and areas located in the eastern portion of the county. Ongoing CAT currently provides service in these areas but will continues to explore funding opportunities for improved service to these areas. By 2029, implement MOD or expanded service for Golden Gate Estates area from Implementation plan. Initiative 1.3.4 Focus improved service frequency on transit routes that serve high mobility needs communities; target service frequency of hourly or better where demand and fiscal capacity allow; apply mobility on demand (MOD) solutions for areas with lower population densities and where fixed-route service is not productive and cost-effective. 2023, 2024, 2027, 2029 CAT has completed the Route 11 frequency enhancement this fiscal year which completes 11% of the total listed frequency enhancements. CAT continues to explore MOD options with plans for implementation by 2029. Implement 30% of route frequency enhancement or at least 2 MOD areas noted in the Implementation plan. Objective 1.4 Create an optimized interconnected multimodal mobility network designed to fit the range of needs and conditions for the service market. Initiative 1.4.1 Focus improved service frequency on transit routes that serve high mobility needs communities; target service frequency of hourly or better where demand and fiscal capacity allow; apply mobility on demand solutions for areas with lower population densities and where fixed-route service is not productive and cost-effective. 2023, 2024, 2027, 2029 CAT has completed the Route 11 frequency enhancement this fiscal year which completes 11% of the total listed frequency enhancements. CAT continues to explore MOD options with plans for implementation by 2029. Implement 30% of route frequency enhancement noted in the Implementation plan. 16.A.16.a Packet Pg. 692 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-5 | P a g e Initiative 1.4.2 Coordinate with FDOT Commuter Services to enhance and expand carpool and vanpool strategies and services to connect workforce communities with employment locations within the service area; identify properties for park-and-ride lots in areas with high mobility demand as funding is available. Implement recommendations from the current park-and-ride study. Ongoing CAT is working with Commuter Services to establish vanpooling with major employers. As of March 2022, 6 vanpools were established in Collier County with 88 participants. A park and ride study has been conducted identifying potential properties suitable for these facilities. Funding opportunities will be pursued for the acquisition and/or development of these lots. Meet quarterly with FDOT and Commute Connector to discuss the progress and effectiveness of the Vanpool service. Pursue Park and Ride Study initiatives towards acquisition and construction of lots in the future. Initiative 1.4.3 Coordinate with the CAT Connect paratransit program to identify and target areas with high TD ridership and lower density of demand and develop programs to shift TD riders to a mobility on demand for a solution with connections to the fixed-route network. 2023, 2024, 2027, 2029 Collier County has obtained a grant through Florida Developmental Disabilities Council to provide on demand service, which will provide informative data for further implementation for TD riders in the future. Implement at least one MOD service from Implementation plan based on paratransit ridership data. Initiative 1.4.4 Require local governments and FDOT to provide accessible sidewalks, bus stops, and other bus stop improvements within roadway projects and all new developments. Ongoing CAT staff currently attends the MPO’s Bicycle and Pedestrian Advisory Committee and Congestion Management Committee (CMC) committee meetings and encourages accessible sidewalks and bus stop improvements be added as part of every project. In addition, staff reviews sidewalk construction projects for bus stops improvements needed within the project limits. Continue regular partnership coordination with the MPO, FDOT and County Division to provide input of how transit improvements can be incorporated in 16.A.16.a Packet Pg. 693 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-6 | P a g e applicable roadway projects. Initiative 1.4.5 Coordinate with community improvement organizations that support investments in enhanced mobility such as: the Immokalee CRA, Bayshore Gateway Triangle CRA, Naples CRA, Opportunity Naples, Golden Gate Estates Civic, Immokalee Chamber of Commerce, and the Greater Naples Chamber of Commerce to affect improvements in mobility through increased funding, roadway and sidewalk improvements, new developments, to assure transit and mobility services are integral to economic development planning and decision-making. Ongoing Coordination occurs with the listed organizations to see where and how we can implement improvements within project scopes to increase mobility options and access within their respective communities. Attend at least 2 Community Improvement Organization’s meetings annually to encourage transit improvements in their applicable district. Initiative 1.4.6 Make transit and mobility reviews a part of the development and redevelopment review and approval process within the county and cities. Require the development community, as part of the development review and approval process, to follow guidelines on bus stop siting and design, land use, and roadway Partial CAT staff meets with Transportation Planning to discuss upcoming Development projects. CAT is notified of any roadway, utilities, and or storm water projects. A meeting is scheduled bi-weekly to discuss upcoming projects. A recommendation was put forth in our Transit Impact Analysis to update the Collier County LDC and GMP with verbiage on transit improvement associated with development projects, but they have not been implemented. Attend monthly County coordination meetings. Pursue Land Development Code (LDC) amendments as applicable. 16.A.16.a Packet Pg. 694 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-7 | P a g e design factors that affect transit design; and to coordinate with CAT for transit services during the development process. Include CAT as a reviewing agency within the development review and approval process. Consider adding a transit component to traffic impact studies. Initiative 1.4.7 Develop and adopt a transit level of service (LOS) policy and guidance to provide a framework and metrics for improving, modifying, funding transit services. Completed 2021 The Comprehensive Operating Analysis developed metrics to determine the adequate level of service for each route type and a process to take if levels are not being met. Objective 1.5 Provide coordinated transportation services between Collier and adjacent counties to support workforce commutes to major employment centers and facilitate connections to both transit networks in support of regional economic and community benefits. Initiative 1.5.1 Identify high travel volumes between Collier and adjacent counties; develop regional services for travel markets that have high transit propensity and support regional community and economic benefits, including Immokalee and East Naples communities. Ongoing Since the inception and as a result of the success of the LinC Route connecting Lee and Collier County, discussions have occurred regarding a secondary route. CAT and the Collier MPO are working to fund a regional transportation study that will look into these areas. Complete Regional Study by 2024. Initiative 1.5.2 Coordinate with LeeTran and FDOT to identify funding for expanded cross county public transportation services. Ongoing CAT and LeeTran continue to have quarterly meetings to discuss cross-county transportation service and potential funding for expansion of service. Complete Regional Study by 2024 and pursue funding recommendation from the study. 16.A.16.a Packet Pg. 695 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-8 | P a g e Objective 1.6 Enhance transit services targeted at tourists, seasonal residents, and the workforce that supports this market. Initiative 1.6.1 Broadcast CAT television commercials, radio advertisements, digital advertisements, and social media advertising, monitor ridership vis-a-vis marketing and advertising efforts to determine ridership increases attributable to marketing efforts. Ongoing CAT is continuously evaluating the best means of broadcasting initiatives and promotion of services, radio ,social media and digital advertising is consistently published by our Marketing Coordinator. Further effort is needed to monitor ridership connected to marketing campaigns. 2% increase in ridership attributable to marketing and advertising efforts. Initiative 1.6.2 Develop CAT branded services and amenities within the coastal markets to better attract ridership by visitors, seasonal residents, and workers. 2024, 2029 CAT’s Beach Bus is a branded service specific to fit the coastal theme. As services associated with tourism branding will be a key element. A local, on-island, trolley was proposed for the residents in Marco Island, but they were not supportive of the idea. Brand routes that are targeting tourist. Objective 1.7 Enhance awareness of CAT services and accessibility to service information for riders, workers, residents, and visitors. Initiative 1.7.1 Continue to leverage technology applications to increase and enhance awareness of CAT services and to connect riders with CAT services, including enhancing the access to fixed- route through the introduction of mobility-on-demand service to the system. Ongoing, 2029 The rideCAT and planCAT apps are available to riders to view current routes and bus locations as well as buy and use tickets. The Transit App is also available which allows users to track the routes with additional capabilities. MOD is still being investigated for feasibility. Implement MOD software along with MOD Service to manage and facilitate the use of service. Initiative 1.7.2 Obtain professional services for a market study and development of marketing strategies and best practices to increase awareness of CAT, CAT services, CAT image, and Partial CAT initiated communications with a firm for a market study and marketing strategies in FY20, but the cost was not feasible at the time. CAT however was able to rebrand the website along with creating a mobile application for using CAT services. Larger Complete Marketing Strategies study by 2024. 16.A.16.a Packet Pg. 696 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-9 | P a g e increase market share in terms of model split ridership. This effort should leverage use of technology, social media, traditional media, branding, and develop and provide strategies to attract interest in CAT to build choice ridership and generally improve the image of CAT as a service. marketing strategies will continue to be explored. Initiative 1.7.3 Continue to partner with the Chamber of Commerce to develop and disseminate information and materials to businesses, residents, visitors, about the value of CAT services, the benefits of riding CAT, and information about how to access and use CAT services. Ongoing In FY22, CAT has attended multiple public outreach activities/events but further coordination with the Chamber of Commerce is required to distribute CAT service information. A planned increase in our corporate bus pass program advertising may help complete this goal with more outreach to the local businesses. Develop material to promote they use of CAT geared towards the employer to be completed by 2023 Initiative 1.7.4 Provide travel training for persons interested in using the CAT system. Ongoing CAT Travel Training is available to educate riders on how to use the system whenever requested. CAT's website also includes detailed guides on how to use the system, read our schedules, and the services available. Maintain CAT’s website with the latest information regarding travel training and provide information to paratransit passengers that may be able to utilized Fixed Route services. Initiative 1.7.5 Conduct outreach activities at community events, schools, and other organizations to teach Ongoing CAT staff has so far attended or hosted 6 events in FY22. Further outreach activities are planned for the rest of the year. Attend or host at a minimum 6 events 16.A.16.a Packet Pg. 697 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-10 | P a g e students and the public how to use CAT and the benefits of CAT services. through out the year. Initiative 1.7.6 Garner relationships with local media and news outlets to keep the community aware and involved. Ongoing CAT created radio advertisements on local radio stations and will continue to explore further marketing strategies with local media outlets. Submit news release to media outlets to promote service change and events. 16.A.16.a Packet Pg. 698 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-11 | P a g e Goal 2 Increase the resiliency of Collier County, protecting our man-made and natural resources, by providing attractive and convenient mobility alternatives that will reduce adverse carbon and environmental impacts within our communities. Objective 2.1 Provide services and programs to reduce vehicle miles traveled within Collier County. Initiative 2.1.1 Coordinate with FDOT Commuter Services to enhance and expand carpool and vanpool strategies and services to connect workforce communities with employment locations within the service area; implement recommendations from current park-and-ride study as funding is available. Ongoing Refer to Initiative 1.4.2 Refer to Initiative 1.4.2 Initiative 2.1.2 Coordinate with the Naples Pathway Coalition, the MPO Pathways Advisory Committee, and local non-profit and/or for- profit groups to expand the use of bicycles as a commute and mobility option, including bicycle share programs. Ongoing As bike sharing program discussions have surfaced, CAT staff has been at the table to coordinate as needed. Collier County staff currently attends the MPO’s Bicycle and Pedestrian Advisory Committee and the Congestion Management Committee (CMC) meetings and encourages accessible sidewalks and bus stop improvements be added as part of every project. Attend MPO Committee meeting including BPAC and CMC. Initiative 2.1.3 Coordinate with Collier County Driver License and Motor Vehicle Service Centers to promote CAT fixed-route Recommend target implementation in 2025 Develop promotional material and meet with DMV to be completed by 2025 16.A.16.a Packet Pg. 699 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-12 | P a g e services to persons unable to obtain a driver’s license or with an unsafe and/or inoperable vehicle. Initiative 2.1.4 Broadcast CAT television commercials, radio advertisements, digital advertisements, and social media advertising, monitor ridership vis-a- vis marketing and advertising efforts to determine ridership increases attributable to marketing efforts. Ongoing CAT is utilizing digital media to reach a more diverse audience rather than commercial and radio advertisements alone. Efforts need to be made to determine impacts attributable to marketing. Complete Marketing Strategies study by 2024. Initiative 2.1.5 Develop partnerships with employers and major activity centers (educational, government, healthcare, retail, residential, commercial) to provide education and awareness of CAT services and benefits, and incentives to use CAT services rather than drive. Ongoing CAT is planning to increase awareness of the corporate bus pass program, which will reach out to major businesses in the area with information about our services and a special rate on the monthly pass for large businesses. Develop marketing material for corporate bus pass program. Distribute to all the qualified employers by 2023. Objective 2.2 Design mobility services to reduce environmental impacts. Initiative 2.2.1 Transition fleet to alternative fuels vehicles. 2023, Ongoing CAT is required to develop an electrification plan and will have to hire a consultant to help them prepare this Complete Electrification Transition plan by 2023. 16.A.16.a Packet Pg. 700 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-13 | P a g e plan. Recommended implementation date is 2023 in order to qualify for future grant. In FY20 CAT applied and was awarded the 5339 Bus and Bus Facility Grant which include the purchase of 2 Electric Vehicles. Initiative 2.2.2 Transition to smaller cleaner vehicles and match service delivery to demand by time of day using a mobility on demand strategy where and when service area and demand characteristics warrant; this may include converting low productivity fixed-route service to mobility on demand and/or transitioning fixed-route to mobility on demand at certain times of the day. 2023, 2029 A smaller vehicle was purchased to service Marco Island to match the capacity requirements, the vehicle is in use. CAT will continue to evaluate routes to determine the need of vehicle capacity. MOD has not been implemented. Complete Electrification Transition plan by 2023. Implement 1 MOD area from the Implementation Plan. Objective 2.3 Improve resiliency for extreme weather events and changing environment. Initiative 2.3.1 Use electric vehicles as back-up power for emergency facilities. 2023, 2024 In 2020 CAT was awarded the 5339 Bus and Bus Facility Grant which includes purchasing 2 Electric Vehicles to serve as back-up power for emergencies. Complete Electrification Transition plan by 2023. Initiative 2.3.2 Explore solar powered canopies to energize the maintenance building and buses and provide shade. 2024,2025 In 2020 CAT was awarded the 5339 Bus and Bus Facility Grant which include the purchase of solar panels to provide electricity to the facility. Complete the construction of solar canopies by FY25 16.A.16.a Packet Pg. 701 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-14 | P a g e Goal 3 Build meaningful partnerships that increase awareness and education of and about mobility options and increase the viability of mobility services to promote livability and enhance economic and social well- being. Objective 3.1 Develop marketing strategies to increase awareness of CAT services and to increase ridership. Initiative 3.1.1 Participate in local job fairs and outreach/ partnerships with employers to increase knowledge about the transit system and to encourage use. Ongoing CAT regularly participates in events to promote Public Transit. None of the events this fiscal year have been specific to job/employer outreach. Participate in a minimum of 2 job/employer outreach events. Initiative 3.1.2 Develop marketing materials and programs to demonstrate the value and role of transit as a mobility option, including benefits accruing to personal finances, access to opportunities, and reduction of regional carbon emissions. Ongoing CAT developed a flyer describing the benefits of utilizing Public Transportation which included economic, health and environmental benefits. Develop marketing material. Initiative 3.1.3 Distribute transit service information and user- friendly brochures to at least 25% of businesses within ¼-mile of existing transit routes prior to initiating the next TDP Major Update. 2024 Develop marketing material and distribute by 2024. 16.A.16.a Packet Pg. 702 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-15 | P a g e Initiative 3.1.4 Continue the CAT public relations campaign, including television, radio, and social media advertisements, designed to promote transit ridership and sustainability. Ongoing CAT is utilizing digital media to reach a more diverse audience rather than commercial and radio advertisements alone. Use of social media, media outlets, and radio to disseminate information. Initiative 3.1.5 Facilitate social media tools and campaigns to promote CAT awareness, services, and benefits for individuals, businesses, organizations. Ongoing CAT is utilizing Facebook and Instagram as social media tools to promote CAT services. Utilization of social media ad placements to market transit. Initiative 3.1.6 Conduct an on-going program of outreach and education targeted at governments, employers, community organizations, community services, healthcare services to build and foster partnerships to provide, fund, and support mobility services. Ongoing Event, Sales & Marketing Coordinator manages all forms of social media to reach out and communicate with the public to provide information regarding mobility services. Develop marketing strategies to target different demographic and programs by 2024. Objective 3.2 Build partnerships for participation in discussions relating to proposed future development and redevelopment. Initiative 3.2.1 Continue to coordinate and partner with LeeTran to improve and expand cross-county mobility services to support workforce travel demand Ongoing Quarterly meeting occurs between Collier and Lee County to discuss current routes and possible future routes. Any schedule changes are discussed to determine impact on connection of the LinC route. Participate in Quarterly Meetings. 16.A.16.a Packet Pg. 703 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-16 | P a g e with a focus on commuter express routes, connecting workers to employment, and provide connections strategically to the transit networks in Lee and Collier counties to facilitate access to key activity centers. Initiative 3.2.2 Coordinate with FDOT Commuter Services to enhance and expand carpool and vanpool strategies and services to connect workforce communities with employment locations within the region; identify properties for park-and-ride lots in areas with high mobility demand as funding is available. Ongoing Refer to Initiatives 1.4.2 and 2.1.1 Participate in quarterly meetings. Goal 4 Coordinate the development and provision of mobility services with local, regional, state planning efforts and through public and private partnerships. Objective 4.1 Coordinate integrated land use and transportation planning efforts to incorporate transit needs into the development review and approval process. Initiative 4.1.1 Work with Collier County to implement recommendations listed in the Collier County Transit Impact Analysis (TIA). 2023 CAT will coordinate with County Planning Division to pursue inclusion of the recommended changes listed in the TIA into the Collier County Land Development Code and Growth Management Plan as applicable. Implement recommendations from TIA by 2023. 16.A.16.a Packet Pg. 704 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-17 | P a g e Initiative 4.1.2 Participate in planning and development review meetings to ensure that county and city policies support transit services and funding needs. Ongoing Collier County receives notices of upcoming development review meetings and participates as required. Participate in bi-weekly meetings to review future developments. Initiative 4.1.3 Require local governments and FDOT to provide accessible sidewalks, bus stops, and other bus stop improvements within roadway projects and for all new developments. Ongoing Collier County participated in the development of the Master Mobility Plan. The Plan looked at options to reduce vehicle miles traveled, including transit-oriented development design. Staff will work to ensure that transit- oriented design is incorporated into the planning process. Implement recommendations from TIA by 2023. Initiative 4.1.4 Make transit and mobility reviews a part of the development and redevelopment review and approval process within the county and cities. Require the development community, as part of the development review and approval process, to follow guidelines on bus stop siting and design, land use, and roadway design factors that affect transit design; and to coordinate with CAT for transit services during the development Ongoing Collier County monitors development meetings and responds to any request to review development. Staff continues to work hard to become more involved in the review process. CAT staff currently attends bi-weekly meetings with the Transportation Planning Department. Coordination with Transportation Planning is needed to determine whether adding a transit component to traffic impact studies is feasible. Implement recommendations from TIA by 2023. 16.A.16.a Packet Pg. 705 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-18 | P a g e process. Include CAT as a reviewing agency within the development review and approval process. Consider adding a transit component to traffic impact studies. Initiative 4.1.5 Meet quarterly with staff from the Collier County Transportation Engineering and Planning departments to identify upcoming utilities, roadway, and /or stormwater projects, planning studies, and site developments that will affect the provision of transit services. Ongoing CAT staff has a bi-weekly meeting with Transportation Planning to discuss upcoming Development projects. CAT is notified of any roadway, utilities, and or stormwater projects. Meet monthly with appropriate divisions. Goal 5 Use technologies and innovations in service delivery to improve productivity, efficiency, reliability, and cost-effectiveness of mobility services and operations. Objective 5.1 Explore, monitor, test, and deploy technology applications to enhance mobility services, increase awareness of CAT services, and ease of access to CAT services. Initiative 5.1.1 Improve customer information systems, including website and through directly curated and through available mobile applications, to enhance availability of and access to CAT service information and trip planning, to support increased ridership. Completed Collier County continuously strives to improve information systems. Already in place are: A Mobile App and Website functionality to display Real-time arrival and departure per stop information and also allowing riders to buy tickets, view routes, and plan trips for Fixed Route. CAT has developed General Transit Feed Specifications that were submitted to Google Transit and approved. Passengers can plan their Implement ITS initiatives within the Implementation Plan. 16.A.16.a Packet Pg. 706 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-19 | P a g e trip using Google Maps. A paratransit app for Paratransit Service allowing passengers to view and edit trips as well as manage their account balance on the app. Initiative 5.1.2 Explore and acquire cloud-based Software as a Service (SaaS) and/or Mobility as a Service (MaaS) functionalities to support mobility on demand services, directly operated and/or operated through contract or partnership, to serve general public and augment or replace ADA paratransit services where and when warranted based on costs, productivity, and service quality. 2029 Implement MOD software along with MOD service to manage and facility the use of service by 2029. Initiative 5.1.3 Explore use of account- based payment systems to reload smart cards and other fare media as part of a SaaS or MaaS platform and to facilitate compatible fare policy and fare technology with LeeTran. 2029 The data and evaluation of the paratransit mobile app, will allow us to determine what is needed upon implementation of MOD Service. Implement ITS initiatives within the Implementation Plan by 2023 Initiative 5.1.4 Explore technology to allow merchants and employers to reduce 2023 CAT offers a corporate 30-Day Pass for employers with more than 300 Implement ITS initiatives within the Implementation Plan by 2023. 16.A.16.a Packet Pg. 707 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-20 | P a g e fares for patrons and employees using smart cards and/or mobile pay applications. employees for a discounted rate. The existing program is being evaluated. 16.A.16.a Packet Pg. 708 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-21 | P a g e Goal 6 Monitor and improve mobility service quality and service standards. Objective 6.1 Develop ongoing processes to measure and monitor service quality. Initiative 6.1.1 Use a Route Monitoring System to examine fixed-route services on an annual basis and make revisions to low- performing services as needed, including transitioning to mobility on demand solutions where and when warranted. Ongoing Routes are monitored regularly and updated as needed when route performance is not meeting desired standards. CAT previously conducted a Comprehensive Operations Analysis (COA) to examine existing service and are acting on the recommended improvements moving forward. Annual review of route performance and compare to the established level of service. Initiative 6.1.2 Conduct a survey at least every two years to obtain passenger information including user demographics, travel behavior characteristics, transfer activity, and user satisfaction. 2022, 2024, 2026 Surveys are developed and distributed or advertised as necessary. Surveys have been created to pull a variety of information from transit users. Conduct passenger survey every two years. Initiative 6.1.3 Maintain an ongoing public involvement process to solicit and assess input through online reviews, calls/comments cards, discussion groups, surveys, and CAT booths at community events. Ongoing CAT seizes every opportunity to solicit information from the public at events. In addition, CAT conducts frequent surveys to evaluate the service provided as well as soliciting suggestions/feedback. Provide comment cards at all events. Maintain website to allow for comments and suggests to be submitted. 16.A.16.a Packet Pg. 709 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-22 | P a g e Initiative 6.1.4 Maintain an on-going process for operators to communicate transit service comments and suggestions to identify passenger needs and improve services and service performance; comments to be reviewed monthly by service planning and operations. Ongoing Operators are available to make suggestions and observations as they notice them. The COA process incorporated operator feedback into the route examinations and service recommendations. Conduct operator surveys to obtain operational input every two years. Initiative 6.1.5 Manage the CAT fleet of fixed-route vehicles to maintain an average fleet age of less than seven years as funding permits. Completed/ Ongoing Collier County replaces fixed-route vehicles as they meet their useful life dependent upon funding. The average age of the fleet is 5. Maintain Fleet age of less than seven years. Initiative 6.1.6 Maintain an on-going process for operators to communicate potential vehicle maintenance problems to be logged with the preventative maintenance program to identify and investigate problems early. Completed/ Ongoing Collier County Fleet Management performs scheduled maintenance activities for all transit vehicles as required following the preventative maintenance program. Drivers conduct pre-and post-trip inspections on all vehicles through the Zonar system and supervisors report any issues to Collier County Fleet Management. Fleet Management addresses actual maintenance problems before the bus leaving the Operations facility. Maintain inspection process to allow for operator to communicate concerns regarding vehicles. Goal 7 Maximize the use of all funding sources available, including through partnerships with businesses, employers, and other institutions to increase and improve access to mobility services and mobility for workers, residents, visitors. Objective 7.1 Increase and expand revenue sources. 16.A.16.a Packet Pg. 710 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-23 | P a g e Initiative 7.1.1 Explore opportunities for generating advertising revenue on and inside the buses. Ongoing Collier Area Transit has an adopted Advertising Policy, the selling of advertising commenced in FY15. Our Marketing coordinator is in contact with advertisers. Maintain advertising program within the bus. Modify program to allow for wrapping vehicles by 23. Initiative 7.1.2 Educate the general public and local decision-makers on the importance of public transportation and the need for financial support. Ongoing CAT educates the public and local decision- makers on the importance of public transportation and the need for financial support at every opportunity. Attend Board meetings and MPO Board meetings to discuss transit initiatives and general services. Initiative 7.1.3 Submit grant applications available through Federal, State, local, and private sources. Ongoing Grants are submitted as required. Annually submit FTA and FDOT Grants. Initiative 7.1.4 Annually seek to identify and obtain available alternative revenue sources for the provision of new and improved transit services. Ongoing CAT continuously searches for alternative revenue sources for new and improved transit services. Evaluate Notice of Funding Opportunities as they become available. Initiative 7.1.5 Serve on and coordinate with the Collier County Tourist Development Council (TDC) and to explore the potential for using tourist development tax revenue to expand and improve transit service for Collier No Due to a lack of staff resources, this initiative has not yet been implemented. Serve on and coordinate with the Collier County Tourist Development Council (TDC) by 2024 16.A.16.a Packet Pg. 711 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 4-24 | P a g e County’s tourists and visitors, help enhance awareness of CAT services, develop private-public partnerships to design and fund transit services that serve visitors and employees. Initiative 7.1.6 Explore opportunities to leverage and enhance share of funding from existing taxes and fees to be assigned to transit. Explore means to secure impact fees, development fees, and new taxes to be secured for supporting transit, maintenance, and expansion of transit services. Partial Refer to Initiative 4.1.1 Refer to Initiative 4.1.1 Initiative 7.1.7 Use a 501(c)(3) that allows persons to donate funds to CAT for the purpose of “adopting a shelter” or “adopting a rider.” 2024 There is a current provision for interested parties to participate in an “Adopt a Bench” program but the program will have to be enhanced and the opportunity for receive funding from a “Friends of CAT” group will have to be explored. Modify advertising program to allow funds to be accepted via an establishment of 501(c)(3). By 2024. 16.A.16.a Packet Pg. 712 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 5-1 | P a g e Section 5 – Financial Plan This section of the TDP presents the financial plan consisting of the capital and operating costs and revenues associated with maintaining the existing system (status quo) and with the implementation of the 10-year Needs Plan. The financial plan is a planning tool utilized to quantify the cost of service and related capital enhancements but does not represent a commitment of funding or a requirement to provide any identified service/project in the year shown. There have been no commitments from local, state, federal, or other sources to increase transit funding levels over the proposed amounts identified in the Collier County Fiscal Year (FY) 2022 Adopted Budget. Based on currently identified funding, existing service levels and capital improvements are planned through the first nine years of this Annual Progress Report, with needs-based improvements being added to the tenth year. All improvements included in the tenth year related to addressing the transit needs will require new revenue sources. Numerous assumptions were made to project public transportation costs and revenues for this TDP planning timeframe of FY 2023 through FY 2032. The assumptions made for operating and capital costs and revenues are based on a variety of factors, including NTD data, trend data, operating characteristics, planning documents, the FDOT Work Program, the Collier MPO Transportation. The only difference between the table in this update and the tables contained in the Major TDP is the addition of a new 10th year utilizing the assumption noted. Transportation Improvement Program (TIP) FY 2022 - 2026, staff correspondence, and the Collier County FY 2022 Adopted Budget. These assumptions are summarized below. Cost Assumptions Operating Numerous cost assumptions were made to forecast transit costs for 2023 through 2032. These assumptions are based on a variety of factors, including service performance data from CAT and information from other recent Florida TDPs. These assumptions are summarized as follows: • Annual operating costs for fixed-route and paratransit services are based on the most recent validated NTD data. These costs include the cost to operate and maintain existing services and facilities, such as administrative buildings, maintenance facilities, and transit hubs. • An annual inflation rate of 1.89% was used for all operating cost projections, based on the average Consumer Price Index (CPI) historical data from 2012–2021. • Annual operating costs for future service enhancements are based on the projected annual service hours and cost per revenue hour of $91.92 for fixed-route service and $50.41 for paratransit service (both in FY21). • Implementing the new route alignments represents increased levels of service in improvements such as Route 14, Route 19/28, and Route 23 with no additional costs. 16.A.16.a Packet Pg. 713 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 5-2 | P a g e • As ADA paratransit service is not required for express routes or MOD, it is assumed that any express and MOD would not require complementary ADA paratransit services if implemented. Capital Several assumptions were developed to project the costs for capital needs identified previously and are summarized as follows: • New vehicles planned to be purchased include those necessary to replace vehicles within the existing fleet that have reached the end of their useful life and vehicles to implement the new service. • Vehicles are assumed to cost $495,000 for fixed-route bus and $82,600 for paratransit cutaway vehicles, based on information provided by the CAT. Twenty-nine fixed-route vehicles and 58 paratransit vehicles will need to be purchased between 2020 and 2030. • An annual growth rate of 1.89% was used for capital cost projections, based on average CPI historical data from 2012 to 2021. • A 20% spare ratio was factored into the vehicle replacement and expansion schedule. • The useful life for motor bus replacement is assumed to be 12 years. The useful life for paratransit vehicle replacement is assumed to be 7 years. • The CAT FY 22/23 budget estimates 1% Enhancement Shelter Rehab to be $45,000. Bus shelter expenses were assumed at the FY 2022Collier County Government Requested Budget for the first fiscal year but thereafter based on the cost to construct 10 shelters annually to be consistent with the ADA Assessment Plan, with an annual inflation rate of 1.89%. • Technology costs for Avail replacement, APCs, annunciators, onboard information media, and farebox replace were obtained from the draft budget, “proposals received. Revenue Assumptions Revenue assumptions for fixed-route service are based on information from several State and local agencies. Assumptions for different revenue sources, including annual operating revenues from existing federal, state, and local sources, are based on the FDOT Adopted Five-Year Work Program (FY 2023–2027), the CAT FY 2021 TDP Annual Progress Report, and the Collier County Government FY 2022 Requested Budget. The distribution of 10-year operating revenues included in the 10-year Cost Feasible Local revenues for CAT are anticipated to increase at a moderate rate of 1.8% annually starting in 2023. Under this plan, there are no new local revenue sources in the 10-year period. • Federal Grants 5307 and 5311 for operating assistance from FY 2021–FY 2025 reflects FDOT Adopted Work Program FY 2023–2027 for Collier County; an annual growth rate (1.89%) is applied after FY 2022, to reflect 10-year average CPI increase to the revenue source. • Federal and State grant 5305 funds for planning was based on the FDOT Adopted Work Program FY 2023–2027 for Collier County. 16.A.16.a Packet Pg. 714 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 5-3 | P a g e • Projected FDOT Block Grant revenues for 2023–2027 were obtained from the FDOT Adopted Work Program FY 2023–2027 for Collier County. A conservative annual growth rate of 1.89% was used to increase these revenues and thereafter were based on a 10-year average CPI. Projected fare revenues for existing services are based on FY 2019 YTD Route Statistics data provided by CAT, with a conservative 1.8% annual growth rate applied. • Projected local contributions were obtained from the FDOT Adopted Work Program FY 2023– 2027 for Collier County. A conservative annual growth rate of 1.89% was used to increase revenues and thereafter was based on a 10-year average CPI. • Based on vehicle information provided by CAT staff, a total of $15.9 million in capital funds was assumed in the 10-year plan to fund the existing fixed-route bus replacement program and $4.5 million for paratransit vehicles. • New State Block Grant – The formula to allocate Block Grant funds is based on three components: population of service area, ridership, and revenue miles. Block grant revenues are approximate based on information provided by FDOT’s Public Transit Office. It is assumed these revenues will increase when implementing new/expanded transit services, two years after the start of new/expanded services. • FTA Section 5307 – Revenues are based on federal formula funding criteria such as increased ridership and passenger-miles. Funding levels are subject to change due to transit performance relating to route revenue miles, passenger trips, and the performance of the whole system. For expansion to existing routes and new services, it is assumed these revenues will increase and would be realized two years from year of service expansion or new services. • The detailed 10-year Cost Feasible Finance Plan is presented in Table 5-2. Table 5-2 includes all services, facilities, and capital, existing and proposed, that is within the fiscal capacity of existing revenue streams. There are several projects identified through the TDP process that have no funding allocated for its implementation. Annually, the Transit Staff presents a list of those unfunded projects to the Metropolitan Planning Organization (MPO) so that if funding is identified these projects can be considered for funding. Table 5-1 shown below, is the updated list of unfunded transit priorities approved by the MPO Board on April 8, 2022 . Additional revenue sources will be required to balance the funding needs with the costs of the improvements. Actual revenue to fund the alternatives may be secured for these activities from any individual or combination of local, state, and federal sources, private contributions, or innovative financing techniques. When revenue is secured, staff can proceed with the implementation of any listed service or improvement. 16.A.16.a Packet Pg. 715 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 5-4 | P a g e Table 5-1 2022 Transit Priorities Improvement Category Ranking Implementation Year Annual Cost 3-Year Operating Cost 10-Year Operating Cost Capital Cost Transit Asset Management (TAM) 1 $- $7,900,000 Maintenance and Operations Facility Replacement 2025 $ - $ - Transit Asset Management (TAM) 2 $- $357,000 Administration/Passenger Station Roof Replacement 2022 $ - $ - Route 15 from 90 to 45 minutes Increase Frequency 3 2023 $163,238 $489,715 $1,632,384 $503,771 Route 11 from 30 to 20 minutes Increase Frequency 4 2023 $652,954 $1,958,861 $6,529,536 $503,771 Route 12 from 90 to 45 minutes Increase Frequency 5 2023 $282,947 $848,840 $2,829,466 $503,771 Route 16 from 90 to 45 minutes Increase Frequency 6 2024 $156,105 $468,316 $1,561,054 $503,771 Transit Asset Management (TAM) 7 $- $520,000 Fixed Route Bus - Replacement 2023 $ - $ - Route 14 from 60 to 30 minutes Increase Frequency 8 2024 $243,915 $731,744 $2,439,146 $512,698 9 $ - $- $ - $564,940 Site SL-15 Creekside Park and Ride 2024 Beach Lot Vanderbilt Beach Rd 10 $ - $- $ - $2,318,200 Park and Ride 2024 Route 17/18 from 90 to 45 minutes Increase Frequency 11 2024 $258,550 $775,649 $2,585,495 $503,771 Route 13 from 40 to 30 minutes Increase Frequency 12 2024 $83,712 $251,135 $837,115 $512,698 New Island Trolley New Service 13 2025 $551,082 $1,653,246 $5,510,821 $864,368 Study: Mobility on Demand Other Improvements 14 2025 $ - $- $ - $50,000 Study: Fares Other Improvements 15 2025 $ - $- $ - $50,000 Transit Asset Management (TAM) 16 $- $30,000 Support Vehicle - Replacement 2024 $ - $ - New Bayshore Shuttle New Service 17 2026 $201,000 $602,999 $2,009,995 $531,029 Transit Asset Management (TAM) 18 $- $30,000 Support Vehicle - Replacement 2025 $ - $ - 19 $ - $- $ - $479,961 Radio Rd Transfer Station Lot Park and Ride 2027 16.A.16.a Packet Pg. 716 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 5-5 | P a g e 20 $ - $- $ - $2,587,310 Beach Lot Pine Ridge Rd Park and Ride 2027 Immokalee Rd - Split Route 27 creating EW Route Route Network Modifications 21 2028 $189,885 $569,654 $1,898,846 $550,016 Transit Asset Management (TAM) 22 $- $525,000 Fixed Route Bus - Replacement 2027 $ - $ - Collier Blvd - Split Route 27 creating NS Route Route Network Modifications 23 2028 $189,885 $569,654 $1,898,846 $550,016 Transit Asset Management (TAM) 24 $- $525,000 Fixed Route Bus - Replacement 2027 $ - $ - New Route 19/28 - Extend Hours to 10:00 PM Service Expansion 25 2028 $29,288 $87,863 $292,876 $0 Transit Asset Management (TAM) 26 $- $525,000 Fixed Route Bus - Replacement 2027 $ - $ - Route 24 - Extend Hours to 10:00 PM Service Expansion 27 2028 $30,298 $90,893 $302,976 $0 Transit Asset Management (TAM) 28 $- $525,000 Fixed Route Bus - Replacement 2027 $ - $ - Goodlette Frank Rd - Split Route 25 creating NS Route Route Network Modifications 29 2028 $183,805 $551,416 $1,838,052 $550,016 MOD – North Naples New Service 30 2030 $81,723 $245,169 $817,230 $81,961 New Autonomous Circulator New Service 31 2030 $52,411 $157,232 $524,105 $569,681 MOD – Marco Island New Service 32 2030 $108,912 $326,736 $1,089,119 $81,961 MOD – Golden Gate Estates New Service 33 2030 $163,446 $490,338 $1,634,460 $81,961 New Naples Pier Electric Shuttle New Service 34 2030 $82,213 $246,638 $822,125 $569,681 MOD – Naples New Service 35 2030 $193,889 $581,666 $1,938,887 $81,961 COSTS AND REVENUES SUMMARY Table 5-2 provides a balanced status quo operating budget based on the best financial data available to project future year costs and revenues. New funding would be required to realize any service or improvement beyond maintaining the current level of service. Nevertheless, operating and capital costs for the Needs Plan have been prepared in the event that additional funding is identified. The financials for the Needs Plan is identified in Table 5-3. 16.A.16.a Packet Pg. 717 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Report) Collier Area Transit – Transit Development Minor Update 5-6 | P a g e Table 5-2 – Status Quo Financial Plan 16.A.16.a Packet Pg. 718 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 5-7 | P a g e 16.A.16.a Packet Pg. 719 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 5-8 | P a g e Table 5-3 – Needs based Financial Plan 16.A.16.a Packet Pg. 720 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Collier Area Transit – Transit Development Minor Update 5-9 | P a g e 16.A.16.a Packet Pg. 721 Attachment: TDP Annual Report - FY2022 Annual Progress Report DRAFT 6.17.22pdf (22407 : TDP Annual Route Boarding by State Fiscal Years FY2018-19 FY2019-20 FY2020-21 FY2021-22* Route 11 110,783 92,884 82,827 92,899 Route 12 87,844 73,612 60,305 55,910 Route 13 75,823 54,471 44,622 37,008 Route 14 54,694 42,933 31,187 29,224 Route 15 94,929 79,941 68,101 71,159 Route 16 50,752 47,595 32,991 37,006 Route 17 50,208 41,269 33,448 31,435 Route 18 34,096 27,873 24,009 10,458 Route 19 50,675 56,470 63,001 72,933 Route 20 8,809 6,853 6,038 3,735 Route 21 11,095 12,788 9,675 11,482 Route 22 57,079 55,998 44,975 37,552 Route 23 32,823 34,046 25,314 22,945 Route 24 55,826 51,545 36,627 49,744 Route 25 19,705 17,715 13,336 8,744 Route 26 8,325 6,008 4,341 2,908 Route 27 39,644 33,358 30,802 25,793 Route 28 21,676 25,496 24,138 28,716 Route 121 17,088 17,160 17,801 24,450 0 20,000 40,000 60,000 80,000 100,000 120,000 Route 11 Route 12 Route 13 Route 14 Route 15 Route 16 Route 17 Route 18 Route 19 Route 20 Route 21 Route 22 Route 23 Route 24 Route 25 Route 26 Route 27 Route 28 Route 121 Ridership by Route and State Fiscal Year FY2018-19 FY2019-20 FY2020-21 FY2021-22* 16.A.16.b Packet Pg. 722 Attachment: Ridership by Route and Fiscal Year (22407 : TDP Annual Report) Route Boarding by County Fiscal Years FY2017-18 FY2018-19 FY2019-20 FY2020-21 Route 11 95,772 96,554 79,974 73,398 Route 12 77,461 74,053 60,298 51,986 Route 13 69,505 66,365 47,957 37,484 Route 14 53,068 51,111 36,294 28,429 Route 15 91,666 86,683 63,917 59,780 Route 16 47,663 43,509 34,356 28,254 Route 17 47,411 41,221 33,539 30,319 Route 18 29,427 27,836 22,638 19,801 Route 19 65,543 64,392 57,637 62,848 Route 20 10,845 6,545 5,462 4,006 Route 21 10,126 11,688 10,702 8,241 Route 22 47,970 49,650 44,251 34,079 Route 23 29,031 27,918 24,075 19,276 Route 24 46,955 49,587 37,129 31,658 Route 25 25,496 15,986 11,810 10,693 Route 26 7,206 5,730 4,568 2,879 Route 27 30,556 29,874 24,120 22,534 Route 28 31,794 27,697 25,403 25,780 Route 29 1,903 6,738 2,825 2,155 Route 121 19,278 22,229 15,473 20,501 0 20,000 40,000 60,000 80,000 100,000 120,000 Route 11 Route 12 Route 13 Route 14 Route 15 Route 16 Route 17 Route 18 Route 19 Route 20 Route 21 Route 22 Route 23 Route 24 Route 25 Route 26 Route 27 Route 28 Route 29 Route 121 Ridership by Route and County Fiscal Year FY2017-18 FY2018-19 FY2019-20 FY2020-21 16.A.16.b Packet Pg. 723 Attachment: Ridership by Route and Fiscal Year (22407 : TDP Annual Report)