Loading...
Agenda 06/28/2022 Item #16A 7 (Recording of Final Plat for National Golf and Country Club at Ave Maria PL20220000047)06/28/2022 EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of National Golf and Country Club at Ave Maria, Phase 4, (Application Number PL20220000047) approval of the standard form Construction and Maintenance Agreement, and approval of the performance security in the amount of $3,098,691.45. OBJECTIVE: To have the Board of County Commissioners ("Board") approve for recording the final plat of National Golf and Country Club at Ave Maria, Phase 4, a subdivision of lands located in Section 9, Township 48 South, Range 29 East, Collier County, Florida, in accordance with the LDC Sec tion 10.02.04.B.4. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: The Development Review Division of the Growth Management Department has completed the review of the construction drawings, specifications, and final plat of National Golf and Country Club at Ave Maria, Phase 4. These documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the Ave Maria SRA. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement f or Subdivision Improvements, shall be provided and accepted by the County Manager or their designee and the County Attorney’s office prior to the recording of the final plat. This procedure is in conformance with Section 10.02.04 F.2 of the Land Development Code. The Development Review Division recommends that the final plat of National Golf and Country Club at Ave Maria, Phase 4 be approved for recording. FISCAL IMPACT: The project cost is $2,816,992.23 (estimated) to be borne by the developer. The cost breakdown is as follows: a) Water & Sewer $1,496,035.50 b) Drainage, Paving, Grading $1,320,956.73 The Security amount, equal to 110% of the project cost, is $3,098,691.45 The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327 -- Land Development Services Revenue generated by this project: Total: $40,888,71 16.A.7 Packet Pg. 396 06/28/2022 The Fees are based on a construction estimate of $1,320,956.73 (does not include Ave Maria Utilities) and were paid in February, 2022. The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5./ac) $ 1,260.00 b) Construction Drawing Review Fee Water & Sewer (.75% const. est.) n/a c) Drainage, Paving, Grading (.75% const. est.) $ 9,907.18 d) Construction Inspection Fee Water & Sewer (2.25% const. est.) n/a e) Drainage, Paving, Grading (2.25% const. est.) $29,721.53 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation, except when the applicant elects to delay obtaining a COA for non-residential developments that are required to obtain approval of a site development plan prior to the issuance of a building permit. LEGAL CONSIDERATIONS: The applicant is requesting approval of the final subdivision plat and construction and maintenance agreement. The Board shall consider the County Manager or designee’s recommendation and shall take evidence and testimony in regard to the fi nal subdivision plat requirements identified in LDC sections 10.02.04 B, 10.02.04 C, and other provisions of the LDC, as well as Chapter 177, Florida Statutes. If the Board denies or places conditions on the final subdivision plat, it shall state reasons for such denial or conditions. In accordance with the LDC, the applicant is required to submit the final subdivision plat to the County Manager or designee for recording within 18 months of the date of approval of the final subdivision plat by the Board. However, following approval by the Board, but prior to recordation, the County Manager or designee may approve minor insubstantial changes to the subdivision plat, and the Board may approve any changes that are not minor and insubstantial. This item has been approved as to form and legality, and requires a majority vote for Board approval. -- DDP RECOMMENDATION: To endorse staff’s recommendation to approve the final plat of National Golf and Country Club at Ave Maria, Phase 4 (Application Number PL202200000 47) for recording with the following stipulations: 1. Approve the amount of $3,098,691.45 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Growth Management Department. 2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager or their designee: a.To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney’s office and the Board of County Commissioners or the County Manager or their designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the Land Development Code. Prepared by: Lucia S. Martin, Associate Project Manager, Development Review Division 16.A.7 Packet Pg. 397 06/28/2022 ATTACHMENT(S) 1. Location Map (PDF) 2. Plat Map (PDF) 3. Opinion of Probable Cost - AMUC (PDF) 4. Opinion of Probable Cost - Collier County (PDF) 16.A.7 Packet Pg. 398 06/28/2022 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.7 Doc ID: 22340 Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of National Golf and Country Club at Ave Maria, Phase 4, (Application Number PL20220000047) approval of the standard form Construction and Maintenance Agreement, and approval of the performance security in the amount of $3,098,691.45. Meeting Date: 06/28/2022 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 05/25/2022 9:54 AM Submitted by: Title: Environmental Specialist – Growth Management Department Name: Jaime Cook 05/25/2022 9:54 AM Approved By: Review: Growth Management Operations & Regulatory Management Kenneth Kovensky Additional Reviewer Completed 05/25/2022 10:30 AM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 05/27/2022 9:25 AM Growth Management Development Review Brett Rosenblum Additional Reviewer Completed 05/27/2022 11:23 AM Growth Management Department Jaime Cook Additional Reviewer Completed 06/02/2022 5:09 PM Growth Management Department Diane Lynch Growth Management Department Completed 06/06/2022 5:18 PM Growth Management Department Trinity Scott Transportation Skipped 05/26/2022 5:27 PM County Attorney's Office Derek D. Perry Level 2 Attorney Review Completed 06/08/2022 11:41 AM Growth Management Department James C French Growth Management Completed 06/12/2022 2:28 PM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 06/13/2022 12:05 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 06/13/2022 1:27 PM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 06/13/2022 6:12 PM County Manager's Office Geoffrey Willig Level 4 County Manager Review Completed 06/20/2022 11:08 AM Board of County Commissioners Geoffrey Willig Meeting Pending 06/28/2022 9:00 AM 16.A.7 Packet Pg. 399 NATIONAL GOLF AND COUNTRY CLUB AT AVE MARIA, PHASE 4 LOCATION MAP 16.A.7.a Packet Pg. 400 Attachment: Location Map (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) Digitally signed by Lance T Miller, PSM #5627 DN: cn=Lance T Miller, PSM #5627, o=and the signature must be verified on any electronic copies. SHA-1 authentication code must be verified on any electronic copies., ou=Digitally signed and sealed using a SHA-1 authentication code; and Printed copies of this document are not considered signed and sealed, email=lance.miller@stantec.com, c=US Date: 2022.05.12 08:44:48 -04'00' Adobe Acrobat version: 2022.001.2011716.A.7.bPacket Pg. 401Attachment: Plat Map (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) 16.A.7.bPacket Pg. 402Attachment: Plat Map (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) 16.A.7.bPacket Pg. 403Attachment: Plat Map (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) 16.A.7.bPacket Pg. 404Attachment: Plat Map (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) 16.A.7.bPacket Pg. 405Attachment: Plat Map (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) 16.A.7.bPacket Pg. 406Attachment: Plat Map (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) 16.A.7.bPacket Pg. 407Attachment: Plat Map (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) 16.A.7.bPacket Pg. 408Attachment: Plat Map (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) 1 of 3 Project: Task: Prepared By:NL Date:3/29/2022 Checked By:CT Date:3/29/2022 POTABLE WATER 537,815.60$ SANITARY SEWER 958,219.90$ TOTAL 1,496,035.50$ POTABLE WATER, SANITARY SEWER: TOTAL O.P.C. = NOTES: 1) 2) Carl Thrushman, P.E. FL Registration #86499 Peninsula Engineering Certificate of Authorization #28275 This Opinion of Probable Cost shall be used for Review Fee Calculation Purposes Only. National Golf and Country Club Phase 4 PPL Engineer's OPC for Subdivision Fee Calculations (Rev01) Calculation Summary 958,219.90$ 537,815.60$ SUB-TOTAL 1,496,035.50$ TOTAL 1,496,035.50$ All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at this time due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. P:\Active_Projects\P-LENN-019\001_National-Ph4-PPL\Budgets\Cost_Estimates\OPC\Rev01\OPC_Detail-National_PPL-Ph4-AMUC_REV01.xlsx 16.A.7.c Packet Pg. 409 Attachment: Opinion of Probable Cost - AMUC (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4)Digitally signed by Carl Thrushman Date: 2022.03.29 09:15:41 -04'00' 2 of 3 Project: Task: Prepared By: NL Date: 3/29/2022 Checked By: CT Date: 3/29/2022 POTABLE WATER ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE WAT-1 8" PVC WATER MAIN (C900, DR18) 2,258 LF 21.70$ 48,998.60$ WAT-2 8" PVC WATER MAIN (C900, DR14) 270 LF 23.00$ 6,210.00$ WAT-3 10" PVC WATER MAIN (C900, DR18) 5,201 LF 36.00$ 187,236.00$ WAT-4 10" PVC WATER MAIN (C900, DR14) 390 LF 38.30$ 14,937.00$ WAT-5 8" GATE VALVE 6 EA 1,361.00$ 8,166.00$ WAT-6 10" GATE VALVE 14 EA 2,000.00$ 28,000.00$ WAT-7 AIR RELEASE VALVE 5 EA 1,713.00$ 8,565.00$ WAT-8 TEMPORARY BACTERIAL SAMPLE POINT 4 EA 324.00$ 1,296.00$ WAT-9 PERMANENT BACTERIAL SAMPLE POINT 2 EA 2,222.00$ 4,444.00$ WAT-10 1-1/2" DOUBLE WATER SERVICE (SHORT SIDE) (COMPLETE)38 EA 977.00$ 37,126.00$ WAT-11 1-1/2" DOUBLE WATER SERVICE (LONG SIDE) (COMPLETE)41 EA 1,214.00$ 49,774.00$ WAT-12 1" SINGLE WATER SERVICE (SHORT SIDE) (COMPLETE)6 EA 572.00$ 3,432.00$ WAT-13 1" SINGLE WATER SERVICE (LONG SIDE) (COMPLETE)7 EA 823.00$ 5,761.00$ WAT-14 FIRE HYDRANT ASSEMBLY (COMPLETE) 30 EA 4,129.00$ 123,870.00$ WAT-15 AUTOMATIC FLUSHING DEVICE 5 EA 1,500.00$ 7,500.00$ WAT-16 REMOVE EX. BLOW-OFF AND CONNECT TO EX. WATER MAIN 1 EA 1,000.00$ 1,000.00$ WAT-17 TESTING 1 LS 1,500.00$ 1,500.00$ SUB-TOTAL = 537,815.60$ National Golf and Country Club Phase 4 PPL Engineer's OPC for Subdivision Fee Calculations (Rev01) P:\Active_Projects\P-LENN-019\001_National-Ph4-PPL\Budgets\Cost_Estimates\OPC\Rev01\OPC_Detail-National_PPL-Ph4-AMUC_REV01.xlsx 16.A.7.c Packet Pg. 410 Attachment: Opinion of Probable Cost - AMUC (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) 3 of 3 Project: Task: Prepared By: NL Date: 3/29/2022 Checked By: CT Date: 3/29/2022 SANITARY SEWER ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE SAN-1 8" SDR 26 PVC GRAVITY SEWER MAIN (6'-8' CUT) 509 LF 34.90$ 17,764.10$ SAN-2 8" SDR 26 PVC GRAVITY SEWER MAIN (8'-10' CUT) 1,098 LF 43.10$ 47,323.80$ SAN-3 8" SDR 26 PVC GRAVITY SEWER MAIN (10'-12' CUT) 959 LF 49.70$ 47,662.30$ SAN-4 8" SDR 26 PVC GRAVITY SEWER MAIN (12'-14' CUT) 2,245 LF 68.60$ 154,007.00$ SAN-5 8" SDR 26 PVC GRAVITY SEWER MAIN (14'-16' CUT) 1,635 LF 93.20$ 152,382.00$ SAN-6 8" SDR 26 PVC GRAVITY SEWER MAIN (16'-18' CUT) 743 LF 100.00$ 74,300.00$ SAN-7 8" SDR 26 PVC GRAVITY SEWER MAIN (18'-20' CUT) 300 LF 122.90$ 36,870.00$ SAN-8 4' SANITARY SEWER MANHOLE (6'-8' CUT) 2 EA 5,830.00$ 11,660.00$ SAN-9 4' SANITARY SEWER MANHOLE (8'-10' CUT) 6 EA 7,264.00$ 43,584.00$ SAN-10 4' SANITARY SEWER MANHOLE (10'-12' CUT) 5 EA 8,529.00$ 42,645.00$ SAN-11 4' SANITARY SEWER MANHOLE (12'-14' CUT) 8 EA 10,316.00$ 82,528.00$ SAN-12 4' SANITARY SEWER MANHOLE (14'-16' CUT) 6 EA 12,478.00$ 74,868.00$ SAN-13 4' SANITARY SEWER MANHOLE (16'-18' CUT) 1 EA 13,000.00$ 13,000.00$ SAN-14 4' SANITARY SEWER MANHOLE (18'-20' CUT) 1 EA 14,000.00$ 14,000.00$ SAN-15 6" SERVICE LATERAL (SINGLE) 27 EA 950.00$ 25,650.00$ SAN-16 6" SERVICE LATERAL (DOUBLE) 72 EA 997.00$ 71,784.00$ SAN-17 CORE EX. MANHOLE AND CONNECT 2 EA 3,500.00$ 7,000.00$ SAN-18 TELEVISION INSPECTION 7,489 LF 5.30$ 39,691.70$ SAN-19 TESTING 1 LS 1,500.00$ 1,500.00$ SUB-TOTAL SANITARY SEWER = 958,219.90$ National Golf and Country Club Phase 4 PPL Engineer's OPC for Subdivision Fee Calculations (Rev01) P:\Active_Projects\P-LENN-019\001_National-Ph4-PPL\Budgets\Cost_Estimates\OPC\Rev01\OPC_Detail-National_PPL-Ph4-AMUC_REV01.xlsx 16.A.7.c Packet Pg. 411 Attachment: Opinion of Probable Cost - AMUC (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) 1 of 5 Project: Task: Prepared By:NL Date:1/28/2022 Checked By:CT Date:1/28/2022 EARTHWORK 93,650.50$ PAVING 899,984.23$ DRAINAGE 181,322.00$ LANDSCAPE AND LIGHTING 146,000.00$ TOTAL 1,320,956.73$ EARTHWORK, PAVING, DRAINAGE, LANDSCAPE AND LIGHTING: TOTAL O.P.C. = NOTES: 1) 2) Carl Thrushman, P.E. FL Registration #86499 Peninsula Engineering Certificate of Authorization #28275 This Opinion of Probable Cost shall be used for Review Fee Calculation Purposes Only. National Golf and Country Club Phase 4 PPL Engineer's OPC for Subdivision Fee Calculations (Rev00) Calculation Summary 93,650.50$ 899,984.23$ 146,000.00$ 181,322.00$ 1,320,956.73$ SUB-TOTAL 1,320,956.73$ TOTAL All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at this time due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. \\NAP-FS01\PenEng\Active_Projects\P-LENN-019\001_National-Ph4-PPL\Budgets\Cost_Estimates\OPC\OPC_Detail-National_PPL-Ph4-CC.xlsx 16.A.7.d Packet Pg. 412 Attachment: Opinion of Probable Cost - Collier County (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4)Carl Thrushm an Digitally signed by Carl Thrushman Date: 2022.02.02 16:09:02 -05'00' 2 of 5 Project: Task: Prepared By: NL Date: 1/28/2022 Checked By: CT Date: 1/28/2022 EARTHWORK ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE EW-1 TURBIDITY BARRIER / INLET PROTECTION 1 LS 5,934.00$ 5,934.00$ EW-2 SILT FENCE - SINGLE ROW 1 LS 8,621.50$ 8,621.50$ EW-3 CONSTRUCTION ENTRANCE 1 LS 3,000.00$ 3,000.00$ EW-4 FINISH GRADING 1 LS 76,095.00$ 76,095.00$ SUB-TOTAL EARTHWORK = 93,650.50$ National Golf and Country Club Phase 4 PPL Engineer's OPC for Subdivision Fee Calculations (Rev00) \\NAP-FS01\PenEng\Active_Projects\P-LENN-019\001_National-Ph4-PPL\Budgets\Cost_Estimates\OPC\OPC_Detail-National_PPL-Ph4-CC.xlsx 16.A.7.d Packet Pg. 413 Attachment: Opinion of Probable Cost - Collier County (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) 3 of 5 Project: Task: Prepared By: NL Date: 1/28/2022 Checked By: CT Date: 1/28/2022 PAVING ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE PAV-1 3/4" ASPHALTIC CONCRETE TYPE S-III (FIRST LIFT) 1 LS 141,223.25$ 141,223.25$ PAV-2 3/4" ASPHALTIC CONCRETE TYPE S-III (SECOND LIFT) 1 LS 141,223.25$ 141,223.25$ PAV-3 8" LIMEROCK BASE 1 LS 124,608.75$ 124,608.75$ PAV-4 12" STABILIZED SUBGRADE 1 LS 40,468.18$ 40,468.18$ PAV-5 TYPE 'A' CURB 1 LS 11,121.00$ 11,121.00$ PAV-6 TYPE 'D' CURB 1 LS 2,200.00$ 2,200.00$ PAV-7 TYPE 'F' CURB 1 LS 690.00$ 690.00$ PAV-8 2' VALLEY GUTTER 1 LS 126,600.00$ 126,600.00$ PAV-9 4' SIDEWALK VALLEY CROSSING 1 LS 5,083.00$ 5,083.00$ PAV-10 CONCRETE SIDEWALK (4" THICK) 1 LS 256,966.40$ 256,966.40$ PAV-11 WHEELSTOP 1 LS 800.00$ 800.00$ PAV-12 ADA DETECTABLE WARNING 1 LS 2,000.00$ 2,000.00$ PAV-13 SOD (BAHIA - BETWEEN BOC AND SIDEWALK AND 1' BEYOND SIDEWALK)1 LS 32,000.40$ 32,000.40$ PAV-14 SIGNAGE AND STRIPING 1 LS 15,000.00$ 15,000.00$ SUB-TOTAL PAVING = 899,984.23$ National Golf and Country Club Phase 4 PPL Engineer's OPC for Subdivision Fee Calculations (Rev00) \\NAP-FS01\PenEng\Active_Projects\P-LENN-019\001_National-Ph4-PPL\Budgets\Cost_Estimates\OPC\OPC_Detail-National_PPL-Ph4-CC.xlsx 16.A.7.d Packet Pg. 414 Attachment: Opinion of Probable Cost - Collier County (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) 4 of 5 Project: Task: Prepared By: NL Date: 1/28/2022 Checked By: CT Date: 1/28/2022 DRAINAGE ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE DRA-1 6" HDPE SECONDARY DRAINAGE PIPE 1 LS 6,034.00$ 6,034.00$ DRA-2 12" HDPE SECONDARY DRAINAGE PIPE 1 LS 3,708.00$ 3,708.00$ DRA-3 15" RCP STORM SEWER 1 LS 4,100.00$ 4,100.00$ DRA-4 18" RCP STORM SEWER 1 LS 17,040.00$ 17,040.00$ DRA-5 24" RCP STORM SEWER 1 LS 64,840.00$ 64,840.00$ DRA-6 30" RCP STORM SEWER 1 LS 20,150.00$ 20,150.00$ DRA-7 15" FLARED END 1 LS 1,750.00$ 1,750.00$ DRA-8 DOUBLE VALLEY GUTTER INLET 1 LS 45,000.00$ 45,000.00$ DRA-9 JUNCTION BOX - ROUND 1 LS 5,200.00$ 5,200.00$ DRA-10 DITCH BOTTOM INLET 1 LS 2,500.00$ 2,500.00$ DRA-11 GRATE INLET (TYPE "X") 1 LS 5,000.00$ 5,000.00$ DRA-12 REMOVE EXISTING PLUG AND CONNECT TO RCP 1 LS 6,000.00$ 6,000.00$ SUB-TOTAL DRAINAGE = 181,322.00$ National Golf and Country Club Phase 4 PPL Engineer's OPC for Subdivision Fee Calculations (Rev00) \\NAP-FS01\PenEng\Active_Projects\P-LENN-019\001_National-Ph4-PPL\Budgets\Cost_Estimates\OPC\OPC_Detail-National_PPL-Ph4-CC.xlsx 16.A.7.d Packet Pg. 415 Attachment: Opinion of Probable Cost - Collier County (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4) 5 of 5 Project: Task: Prepared By: NL Date: 1/28/2022 Checked By: CT Date: 1/28/2022 LANDSCAPE AND LIGHTING ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE LL-1 LANDSCAPE 1 LS 70,000.00$ 70,000.00$ LL-2 STREET LIGHTING 1 LS 76,000.00$ 76,000.00$ SUB-TOTAL LANDSCAPE AND LIGHTING = 146,000.00$ NOTES: 1) National Golf and Country Club Phase 4 PPL Engineer's OPC for Subdivision Fee Calculations (Rev00) LANDSCAPE COST INCLUDE CODE MIN LANDSCAPING, SOD, MULCH, AND SECONDARY IRRIGATION \\NAP-FS01\PenEng\Active_Projects\P-LENN-019\001_National-Ph4-PPL\Budgets\Cost_Estimates\OPC\OPC_Detail-National_PPL-Ph4-CC.xlsx 16.A.7.d Packet Pg. 416 Attachment: Opinion of Probable Cost - Collier County (22340 : Final Plat - National Golf and Country Club at Ave Maria, Phase 4)