#20-7810 Change Order #1 (Quality Enterprises USA, Inc.) Procurement Services Co ter County Change Order Form (o Contract Modification ❑Work Order Modification Contract#: 20-7810 Change#: 1 Purchase Order#: 4500210051 Project#: 70140,10.1 Contractor/Firm Name: Quality Enterprises USA, Inc. J Contract/Project: NCWRF RML Pump System improvements Prefect Manager Name: Peter Schell Division Name: Public Utilities Engineering&Project Management Original Contract/Work Order Amount $ 865,393,91 1/26/21 16C2 Original BCC Approval Date; Agenda item# Current BCC Approved Amount $ 885,393.91 1/26/21 16C2 Last BCC Approval Date; Agenda Item# Current Contract/Work Order Amount $ 885,393.91 N/A SAP Contract Expiration Date(Master) Dollar Amount of this Change $ 107,833.37 12.18% Total Change from Original Amount Revised Contract/Work Order Total $ 993,227.28 12.18% Change from Current BCC Approved Amount Cumulative Chan es $ 107,833.37 12.18% Chan e from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 6/14/2021 Original 4/10/2022 Last Approved 4/10/2022 Revised Date TBD* Date Completion Date Date (Includes this change) #of Days Added 91 Select Tasks ®Add new task(s) ❑ Delete task(s) D Change task(s) E.1 Other Provide a response to the fottowIng:1.)detailed and specific explanatlonirsttonate of the requested change(s)to the task(s)and)or the additional days added(if requested);2.)why this change was not included in the original contract;and,3.) describe the impact if this change Is not processed. Attach additional Information from the Design Professional and/or Contractor if needed. 1. Work Directive No.1 is for Installing stop logs in Aeration Basins 6 and 6 for the purpose of isolating flows for maintenance work and cleaning operations. Work Directive No.2 resulted from uncovering of the existing ductbank system to property tie in the new electrical wiring for the project,the contractor identified additional unmarked circuits within eight of nine existing conduits associated with the project electrical scope of work,Wiring in one conduit was found to be unremovable and contained several damaged wires to the existing motor operated valves(MOVs). The Contractor cited that tracing and labeling of additional Incidental wiring is required(or a proper compliant and reliable working system. Installation of additional conduit in the Electrical Room to reroute one return mixed liquor(RML)pump feed is required to complete the project. Removal and replacement of existing damaged MDV wiring is necessary to restore operability to the equipment.This additional work requires art additional 91 days to trace down and identify existing unidentified wires,label thorn accordingly,to Install new RML power wiring,to roster° electrical operation to the MOVe,and to reroute one set of power wires for one RML vadatbie frequency drive(VFD)Pump.The total approved contract allowance was 593,000.00.Work Directive No. 1 utilized$73,080.00 from the allowance and Work Directive No.2 utilizes the remaining$19,920.00.The remaining additional required funds to the amount of$107,633.37 are being sought for approval as a past of this change order. 2. The basins are almost always full of sewage,so once the basins wero drained down for construction,It was discovered that stop togs were needed to perform this work and future maintenance and cleaning.Also the condition of the existing electrical components could not have been anticipated and was only discovered during construction once they were uncovered and identified. 3, Without Installing the stop loga,isolation of the basins could not he performed and til6.rhe electrical system to the new RML pumps and the now VFDs would not operate or function properly. This would hinder sewage treatment capabilities and could petenttalty put the wastewater operation of the plant in non-compliance with permit requirements. * Project is currently on a Stop Work Notice with '71 days remaining, s c h a I t �''} Digitally signed by schait_p Prepared by: —r Date:2022.04.1907:56:22-04'00' Date: Peter Schalt, PMP, Senior Project Manager-EPMD Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated in this acceptance.The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/ Design Professional arising out of or reiated to the change set forth herein,Including claims for impact and delay costs. ,/ Accepted by; tom-^ . r � — 7 Date: 16/ _. 2 Lou Gaudio;Vice-Presidentve, yl !(N,Eiletprises USA,inc. Dawn B. E3arnard Accepted by: n ,„vs pi, Date: Dawn Barnard, Project Manager—Hole Montes Pa erCral Diyitaliy signed byPaJerCrarri Approved by: Jg Date:2022.04.2821:00.03 000' Date: Craig Pajer,P.E.,Sub-Regional Utilities Director h t]igitallysinnedbytieltoneloseph BelloneiosepApproved by: Date:2022.04.2908:35:33•04'00' Date:_ Joseph Belione, PUD Finance Director Revised:01/14/202.1 (Divisions who may require additional signatures may include on separate sheet.) __PROCUREMENT USE ONLY mm A' 04182022 Mafia Rpt acaes tit %.TTEST: BOARD OF CO TY COMMISSIONERS Crystal K. Kinzel,Clerk of Courts COLLIER CO , FL &05-VW*? ....... Ce) C.• By: eVaS tO r Willi L. McDaniel,Jr.,Chairman 111. tetPi (SEAL) Apprls to form n egality: SCOU R. each Deputy County Attorney PI) 41101, CA Approved by: ,Cnneeter�er�ara v �,.: ,y.,... ,.� �",,,�. 04'OO....,. Date: Sara Schneeberger, ProcurerfSent Strategist Date:2022.05.23 12:01:16 44'44' Change Order/Amendment Summary COST TIME CO# AMD# Description Days New ' Justification Additive (+) Deductive (-) Added Amount Additional electrical work and Perform new repairs necessary for proper 1 electrical work and 107,833.37 0 91 391 operation of the new RML pumps add 91 days to the and new VFD system to maintain completion date. compliance with FDEP permit This change order requirements is using all of the allowance funds, and is adding additional funding for its scope. Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin BC BCC ES RML CHANGE ORDER 1 SUMMARY Total Allowance $93,000.00 Work Directive 1 $73,080.00 Allowance Remaining $19,920.00 Work Directive 2 $76,045.00 $27,459.96 $24,248.41 Work Directive 2 Total $127,753.37 Change Order 1 ($107,833.37) This change order is using all of the allowance. Adding additional funding is required for its scope. • r, Collier County Plannini & Project Management Department WORK DIRECTIVE PROJECT NAME: NCWRF RML Pump DIRECTIVE #1 System Improvements DATE OF ISSUANCE: October 22, 2021 EFFECTIVE DATE: October 22, 2021 OWNER: Collier County Board of Commissioners PROJECT#: 20-7810 CONTRACTOR: Quality Enterprises USA, Inc. ENGINEER: Hole Monies, Inc. You are directed to proceed promptly with the following change(s): Description: The Contractor shall install County procured stop logs between MLE Aeration Basin SD and 6A at the common influent channel and common effluent channel. Work proposed by the Contractor for installation of stop logs includes, but it not limited to, chip out concrete (lip) to provide required width for stop logs installation at common influent channel and common effluent channel; install two County supplied stop logs per manufacturer's details and instructions; repair damaged membrane liner and epoxy coatings in influent and effluent channels caused by stop log installation; install grating on top deck to match existing. Contractor shall field verify the dimensions of the influent channel and effluent channel at the locations where the stop logs will be installed. Contractor shall include all work in record drawings. Purpose of Work Directive Change: The installation of stop logs in the common influent channel and common effluent channel will allow the County to isolate flow between Aeration Basin 5 and 6 for maintenance and/or future work. Reason/Justification: The County will procure stop logs for the common influent channel and common effluent channel and has requested the stop logs to be installed by the Contractor during the NCWRF RMI., Pump System Improvements project. The Contractor will be performing work in the influent channel to bulkhead between MLE Aeration Basin 5 & 6 fur the installation of flowmeters on the RML, piping. Performing this work concurrently with the existing project will allow this work to be completed at an economical cost and avoid additional mobilization/demobilization costs. Installing stop logs between Aeration Basin 5D and 6A will allow the County to isolate the MLE Aeration Basins and stop wastewater flows for maintenance and/or any future work that may be required. Attachments: Contractor proposal dated October 14, 2021 Contractor Stop Log Installation Breakdown Structural Record Drawings from 24.1 MGD Expansion If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Contract Price: Method of determining change in Contract Times: El Unit Prices [Z Contractor's records [1 Lump Sum Engineer's record Z Other: Time & Material Other Work beyond Scope of Services Estimated maximum increase (decrease) in Estimated change in Contract Time: Contract Price $ TBD Increase or decrease by TBD calendar days. To be taken from Allowance Fund for Owner Use as Directed RECOMMENDED. _ APPROVED: By: By: scha It p Digitally signed by schalt_p Date:2022.05.24 10:31:23-04'00' Erik J. Mead, P.E. Pete Schalt, PMP Hole Montes, Inc. Senior Project Manager, PPMD (c.:0) 3 4 9 4 S E ANRAWpALTEEsR, 3R4E1 Ei PROPOSAL (239)435-7200 FAX(239)435-7202 QUALITY ENTERPRISES Collier County October 14, 2021 PROPOSAL SUBMITTED TO: DATE PROPOSAL# 10500 Goodlette Frank Road Matt Casey STREET SALES REPRESENTATIVE NCWRF RML Pump System — Stop Log Naples, Florida 34109 Installation CITY, STATE, ZIP JOB NAME Peter Schalt Naples, FL ATTN.: JOB LOCATION 239-252-5343 PHONE NO. FAX NO. 11,7:7 PROPOSE hereby to_famish all labor, materials, equipment and services necessary to complete the fillowing: -Chip out concrete to provide required width for stop logs -Install two (2) county supplied stop logs in effluent and influent channel between MLE Aeration Basin 5 & 6 -Repair damaged membrane liner and epoxy coatings in channels caused by stop log installation -Install grating to match existing Notes: -Installation per Hydro Gate details provided -Hydro Gate to provide stud anchors Grand Total: $73,080,00 CUSTOMER-SIGNATURE&OATE QUALITYENTERPRISES USA,INC,-SIGNATURE&DATE Page 1 QUALITY ENTERPRISES USA,INC. Job# NCWRF RML Pump System Improvements Stop Log Installation Date Collier County-Board of County Commissioners Under Contract#20-7800 ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195,00 1 $150.00 $0.00 $150.00 Project Manager HR S125.00 $162.50 15 $1,875.00 $0.00 $1,875.00 Superintendent HR $85.00 $110.50 40 $3,400.00 $0.00 $3,400.00 Foreman HR $85.00 $110.50 72 8 $6,120.00 $884.00 $7,004.00 Mechanic,Equipment 8 Truck Operator HR $75.00 $97.50 72 8 $5,400,00 $780.00 $6,180.00 Laborer HR $55.00 $71.50 216 24 $11,880.00 $1,716.00 $13,596.00 Administrative HR $75.00 $97.50 1 $75.00 $0.00 $75.00 Equipment Excavator>Cat 349 HR $250.00 $0.00 $0.00 $0.00 Excavator>Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR $150.00 $0.00 $0.00 $0.00 Excavator wlhammer/Epiroc HR 5350.00 $0.00 $0.00 $0.00 Excavator w/side grip vibratory hammer HR $350.00 $0.00 $0.00 $0.00 Wheel Loader>Cat 962 HR $225.00 Wheel Loader>Cat 938 HR $175,00 $0.00 $0.00 $0.00 Wheel Loader<Cat 938 HR $150,00 $0.00 $0.00 $0.00 Bull Dozer HR $175.00 50.00 $0.00 S0.00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/Stone Roller HR $125.00 $0,00 $0.00 $0.00 Telehandler HR $125,00 80 $10,000.00 $0.00 $10,000.00 Man1+1t HR 5125.00 $0.00 $0.00 $0.00 Forklift HR $100..00 $0,00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00 Milling Machine HR $685.00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $150.00 Asphalt)Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weiler 385 HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0.00 $0.00 $0.00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane>130 ton HR $1,500.00 $0.00 $0.00 $0..00 Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 Ion HR $250.00 $0.00 $0.00 $0.00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0,00 Concrete Crusher HR $685,00 $0.00 $0.00 $0.00 Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0.00 $0.00 $0.00 Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone Lidar Ptlotogrammetry HR $350,00 $0.00 $0.00 50.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0.00 Lowboy/Tractor HR $175.00 $0.00 $0.00 $0.00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 Water TrucklTrarler HR 5125.00 $0.00 $0.00 $0.00 Tack/Prime Truck/Trailer HR $150.00 $0.00 $0.00 $0.00 Lube/Mechanics Truck HR $125.00 $0.00 $0.00 $0.00 Truck with Hand Tools HR $95.00 80 $7,600.00 $0.00 $7,600.00 Pickup HR $40.00 25 $1,000.00 $0.00 $1,000.00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 Vacuum Truck HR $475.00 $0.00 $0.00 $0.00 Small Eaulament Air Compressor with Hammer HR $60.00 $0.00 $0.00 $0.00 Concrete Saw HR $60.00 $0.00 $0.00 $0.00 Plate Compactor HR $60.00 $0.00 $0.00 $0.00 Trench Box 16'x 10' HR S50.00 $0.00 $0.00 $0.00 Stone Box HR $50.00 $0.00 $0.00 $0.00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Wellpoint System HR $250.00 $0.00 50,00 $0.00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6"Hydraulic Pump HR $150.00 $0.00 $0.00 $0.00 12"Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw FIR $20.00 $0.00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder HR $50.00 $0.00 $0.00 $0.00 Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150.00 $0.00 $0.00 $0.00 MOT HR S150.00 $0.00 $0.00 $0.00 Fusing Machine 2.16" HR $150.00 $0.00 $0.00 $0,00 Fusing Machine 18"-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine-small(3/4"-3") each tap EA $750.00 $0.00 $0.00 $0.00 Tap Machine-large(4"-12") each tap EA $1,000.00 $0.00 $0.00 $0,00 Pipe Trenchless Piercing tool HR $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 ,y#teriat Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0.00 $0.00 $0.00 Service Painting-Recast disturbed channel sections $12,600.00 Grout Material $500.00 Grating Materials $9,100.00 Grand Total: $73,080.00 10%MARK UP ON MATERIAL 15%MARK UP ON SUBCONTRACTORS If work Is performed other than Monday through Friday,7:00am-4:00 pm,excluding holidays,OT Rates will be used for Personnel.These rates also apply for travel time necessary to mobilize and demobilize to and from work. REV.3+1712021 ar' , a� �g! a �Y x7 o F Iw • „ � J sd ,, _ d aE $t" r e . • f I }-, l P wf.----/-1 C 1 aj .4 i 1 L i - xi " FQn *i Vi FA St < 1 T g i . s... F 3 ! Y sr4 Y "�' ..- I 3 i 3 u � 1 Y rm e g 2s` g i s ! o F s ' ( i x ri J 8 8 8 8 8 B 8 re_____.,,,,,, *; litii-11 -42;si-' 4I34-i -itti- o 1.ii ( l cc €£ 4 t;I"ai% ri I t - - Q- ^i#• I W PK I i \\ O yr iS; t _ ? a V ill : 3 3 Y I9 i a Ii i ._ i p"a a I x a x a p 1 Y Y Y R 41 YCO R P R E S w �1F II_ i...a �+ r �.r lir 1 .xfy .Ilk Y s t r-t a- A A-.t ae'I B-At '� ,c•.a= I -e-ea !S 8 o r]nv. Lh NI o u .� <F :, fi • t :i a. 5,1i ' ^' sic I �i"""' \II -- -- -- \- 'ice :.. iP ° A r` a .� '� ! Alga B —t d t� _ j—,o•t 1 I y a \jam i `^ * —�— ' ti I g Y }}FF o Y, <n } 1 8 51•45,1 .. _ 1 a s I 82 G -...414-0-4ITITIIS '' I: ?1 •, i 'DI k r 1 N, ; . n1r o A ?,i o ''. p i ;•Af4. i 8 , i`,', o•L r,s-o1 t'l 4'. ''o'I ;eq r 17oI;;, 1i•4o„4 Z A 1 Ih. 41 et rX , X. , .. lz n 2 02___,..., ...._, 0., ii,________.0,.. . <0 on (...9 < Z Z 0 0 z ;)( t Z 0 0 'CC t° ". 0 # f, li E ,T, .... ,„ ..... . .... k\.. o/j CC° Lr° ia 1 Eg‘7, '! ,a .a 0 0.} cc i g u g h 1 2 2 . , te i 1 , 4 Q Su vgl ,..)i . / . I ;.....1 4 i T 1 II 1 i R 1 so. . ill .k.,. x IT i I I;r Mu I r, 6 Z1112 41 e 11 R g I •Z ...,a I! Pi :elki;1 ' AD 'it t, 1 1 I 1 SORA i 11)NM] we] la? 2 1 t 51 i 3 ba A t 2 i i t - :... •g i I ID irer 3 .,vi MO o54/4 i 1 1 f i i 4111- i 1 t .. •at . , 1 I , , i ! 1 1 I 7' .2 a , 1 i• I 1' 11? 41ii_ , illi v I 1 , , i o i, i I I i I " ".:: §; ;AO '.,'L ICI 1111 ',', I ... - y" ,„ : II itt:$1 1 . .4 i ; ti 1 '••- . R,.A I t 1 — ' N `11 46 • 7 . r- .0 z ,... . E. •P. :1 a _. -.__ 0 T: ilt. g 1 i •-•4 i 'T 0 I 4 4A h i ifil'' .2 1 " " .6'" ; _1. ( 13 ,- 4,a 111F C0 1401, 4.'. • �i 0 x ( mi N K 3 S z t'1 T 4.4 s r� ^ Ai ak, 1 0 t> x i 0 0TOJ o i t^ � is a M o o I g .gyp aw s —— !' i ? E! e 3 Vat ! wmaag & ,n R e Na r Z N Q zG� r I j Q- oa V I i'''z ct ¢4 k a Vf @ $ 1 t r. iti I $ i t Y q k V. 4 ! N2 iu s r_ _, x 8 'a"u ; v r 'ri ;1 ao 2 e io r a% Aw" u n i' f W ...I ; G a q W T. Y tom.. 7. { r Z xA ger,Vi-- i Wit M ' d 7 r —*- r x -r—•—r -p ?1: ' — i❑� ,n'.c in Am, ,L. to,v1T r,,x 10 n»,� 4,I1 tU TnM •r�i,ill n'Ipr. -� r p too+^ fu tfI /N y r t� xt�;wSM1 7 ri 4; I a i $gy = iF r }, all x ...... 1 I 4f ---."'"\--.--1 e-' , c.-......4-1-. 1 t..i t:i It d a =!4 : " <ii IS F;' q I as O1 - 1!1 is i iill _. e a c. �..ti '^ kt. el A .-f-- y rg Zf c4 1 o ❑ b • . Y z 1— d $1 o 0 0 o u CIs `a E d q , Z oz :ii �i:� iliR� : Na i. z -"hi •nu i um O 'sf t t i , < jlj E *d a a V H tg a 1Et. j I D F N. 1 0 ;. re' ir !d lo E II 1i a s iii. 1 ' ill giiii--77ifi el . t Imi I, fl 1 1 1 1 _nil a. L i fd Ii 3 ' Ibi al i MI& I — 1 .,�i 1.ill I >< 1* I e® e y ao P CD tisl I , R i • :! • '-, l.\,1--. .1-1 , 4 .. N . w v,.... . ! cil i zts t rrd .. i-- ; m 1 ay, r i= 'it .4 r-r. alfc 4. Ill c•-.' /)-- g6 7 J I ! I.. ,:.. I - i § V4 n Ai 3NI1H31.01 - a it Ez 8 ri ifl u a _ .2-------- '71 i .; 7.- . f r '• t , 15 L., t .•.,- 4. v, i f 7 --L. I ' ...._ f i 3- 0 ti 1 , 3N11HOlvvi L__-- 6.tr--------_____ i li ,.,.._ of ii i ! 2 N _ gtvi, .1 , 4 ss • K :"Iii 11 ., '..P ' A X63d /J 11',,% gipil 1 .7. . 7f i I il'4 i 2 i L- 3 § 1=1 i „Nav I t \ al .." 0 z 'ViLz- .. .L v , :., 1 i r1 4.--L 18 • 0 i 4 gli i . II k --.l ,. li 1, A s ;t I I ' ' fi ! 41 i 1 1 t i VT ... 1 ..:',Vitg • 11 I P li 4 g RP 0 I 0 , I I i WI; k 1 ig N r' MI I — . .1 t` ?• $ j 1 li'il 1'- 1 C,r- Z oir ,— 1 t I < (c= : ! 0 Es0 - CV " ••••• Ct 0 - § to ' d ,7; z 11.! I= z' ultll N ----].. . —1 01(5TV 3N119-111,VVI I z ' ) I t': •-, . I - z 0 ---r, Q6 ;:4. anP --....* illik X•r%'" I bbr`g :I • . K f < It N' V_ ..,.. •, I z.,, 4 l 1,---- h i i rl, LE 01 /11 ''' n; A 11/ r '''il t':•'§r • L ,1 i i —,„ :•• -'-' F —'-' 7- 7" "" s"44n-- illin tjt______ ;.1.1;.:: : • t• 1.4:.•, \ \ _.. '• ,..„ t•kl, • li ,. I li 1 .,.- $v , it., ig AI A gN' *PI hil4l 1 i4 A tl 1 iil id b i 46 VI R" '? .441 7,1 ./ ',_ -t $_ n / " eii r I 4 t'l i .4 t,6 x 41 A er X" • -.01- ety:rt lt . ti L ' . .... -', •t ' Y A •,., L. • .‘" ..,_ -e \ -..t .,-. —. 1 ; iMia—Ill II 1 'T 4------E! • • ' ' „...., i ii %.= 41, .4.pi i - t c , 5 31 1 jr5 1 1 t — 1 glk i 1 _ I . .. ;. s . .:J ,. t „II „ v it. i..... • A 5: •;r4' . ' - 7- Ti. -I • V !.. I ; 5! : !I 0 ;^; ..,- . ile 4!, • ; =,'-;f, '54 *.• 4. : ii. 4 tt L • • • • • • . - • • - A - . ) :: " t_t' t ;1• 31 : :P. • tg i 72 \ : ... ",---- : ,.z.. '• ','i' „;'. i--T ' i;>,' ..I. . .... t '"'! 2111111111111NWEN. ra, ,_._: ,---. . . c...,...:.., . 1 .. 1_2 - .._.......... f e ; s_ t..),.. ...i .1 . •C ,.., - I:i , 2- 1, 1..,E,s,.E:'.:1 ! t v, 14144• - 1.-!istt't l I ( y- tt 1 ii 1 i5.i ;A• ;,1 ; .:.,:',. A.., C -I. fi - -- § ..: ..„, L... 't li 4! " : A ' ttttil .-- - 1 i 1 ! , .........-t.-•...! t ' t M0138 3N11Na1Vil i WO? 11; - 8 .r. Z If P5. 1 E �P i E Nf U x X Y 1� 1 � f 1 g : b D • 3 k tellii •f tH I .E.f U c-i._._ ♦ .... N E3 E. Z� .. : ;eYrt aia, w mF. 1 — / �y "f ! ! mg( St: 1 a CWC U y F la to, LC Y E 8 4 ,uaa p4 ;z u rurtIg„' p g. p ' ) mk k § 1 fig § .n Ems! k + ••'t 4 Y k f i 'gi s F ■ x. ., I .; r i E, 1 1.3 3 d CC I �, la 14, YIla d YC k ` ,`1 I != CO s .x,�.It 7 ;w •!p I/ Y Y5i 11 so st R 1 'Y ' i 1k+ g ' /x♦t i a "s4 i i 2 i 4g 5; 1 i Y In X 11# I •'' yiy C 2 t �. I Y� ai.,R M1 t 2; St - f r • a Y t ss a T*1 C - a;.L a! 1Y SX y j hill idgi 8 c t Pill! F ,,,,. . i Z" n lY'4 , Yk ._- 1.2 i ..' .. . e . - la Ra 111111.11E1111. .. z ir0 i lin 1 ,., , ,n .... — ... 1 ir ‹ irr:=111111111111111111E11111117' 1 IE! ' 6 , Mil z ca m„.... COW IV ti !.. lot I 1 ia .1 z3 ou... 111 11 t „A .? < t 61 W 75. 1 v i V t 1 Al o 1 " III 2 IltillAs I..« ',.. I — 1- ill r 1mm z sg a < OD I Ali INN, , i § r ; g I ,Wit . =1111111•111111,11111 E i I NUN. ... ,iii----'-----Fr-- ----v l•;ill immillds. v. i- h•-.. - , - v i inuml IIIIIIIIIII § 1 u " I it ir.wt,if s i 1 I 1! 1111 — li 1 ii v ,. 'li I. ti- •' I"k\:, - rIgI5 t 1 e I I • e* .; ‘...- .:•.- ....- ...• -72—y,, ----... ., • illialluirat11011111111111101Mmogill ---- ''' -• . , , Ir. • - ' 11111111111111111111111111111111111111 1 ;;',F!: pr-N i it ma ls— t 1.411111166. 1 I N ag 1 1 / 1r ---...t....„. 0, 1, Jai il!il i 111i ' c? 1 I 41'."' tz •; ta,sa:ii • gN 11 b.: . ig, -. .„ ... •.., , . , m , , :i. :I i ste ig vsl r,...,s4 gP I I ;if ! _....] i i___: , II 'i.•i f mrsismassawarairralan ID<1 . It 4 P l'i c.' V., II) .., . 1 % . I ,.:.....i 1, ;of 1 44 ta fal. I t a a ----1 0 ig .II II, ; I. V 1 II. t• V C1 „7-1. .11. .3 ..... W 5 ... .:, In IllaillM1111111 k• i I - ----------- i I 1 5 . N !, 421-- -., - - ,..• ... . - - -a ..1 i af *: If A 1 I I i I ,2 :., ,.. _ _ i , lig dr LI , , 1 11,11:$1 4 .- -:-. r— -I W!' ii-, I Will t a,I N., I t,9 i 411111Viingummu ",...,..- -i 't,HerAm•sa.... gAittp, . - ........, . , VVJ . \ -1' e.! - _L.._ .— 9 W. y oD R N/ - h- • A F A I- Y up d zIA • zQ y0n zx .e IrN • ZCa I, I a s a t 4 A Q~z Tali 1 N W t t 4NL4b Q V \ i. y 9 Si I v C Y _ 4 _: / i a ; i• • s C r y 1 YM1 / i O 1 I e•;.t, iiVV �R s e L U K u K Q (0 it $'� ,,,.., cl d k t { 1 iii CC b !i. ' # • t t t I I M , b y " golf. T' v 14 4 i$ [O tjff.t-t •4 ,,, z, i cN 1111 a gr YII I tD I sa#A �, tr. w. If --a.w.—W— xo C r 4u uyi� k f t ---1 r 1 1 1 " IIInfiilni.MM., i I .. ------' . Iii ' y ��iI.Ir. � � , tH a i i 1 .. i I 1 i , Ism., � >44 AP 9 : %i r•'I : ., 2 f t 1 6:1 vi'' i I9 YYk ai t QpyE I ;11 I `" cs .. } ... i t V1' c T P d 0• inBr,; b !D 5. ci ,now oAi l 1 g Qa c«e� § m a i'fil c___— :5 — I r g 5i ‘1 ILL • 3 d7; }� 1 *ae i N .*e \ '�i _ Y pcl?' i xtIn 'Csi O d .9 C e : y 4 ,77,E ;, p g.I I : 7 L ,... )s I ItI S 1 + ` `vim .9-.I .t - li .4,•,l •� ••T. }•:t•,[••1, .i^.•.e.e.e, Cb£. CS Si 'Jim,zi ` E 4 a ',I !! 1 1. 1. ....._ \ , • ......0 " ,� . 'fie'" $ ill n2. ,1 !; VI i R 8;.. ,.. ts ,,, ;It t.d.il t., i Ls. 1...._ ; 4 S . '' 1 , I 3. tAJZ 11 ".'\\\, \ / .. C i I 1 i ! i2: tr -., M1 „9 ?•SJ t r� Rigill I .r•e•.o•01 .$ P^a•Mt 4t1. it:!.... f {'AO z i aciD y Q to f. E ff i c'i $i# b o 1 pig ' 1 3 w ' 1 i�c ri' 1 ii ii , rt f ,..,'' \ Y' 00 L ] yy i _ ■ ¢ i YY '•ya V. 7 8 V Er 8 Ic R .i" . 6 o Z Z K y ti .e i. i6 sY A. ti. i5 3( XV &'a :i as 0• . fir. Vi 0 * 2 . _ a o ci a Q o ® 0 0 0 0 0 0 0 0 0 0 OD OD :x ", Y 14 ! h •IR" _ !I1t § ? i i`?" -"" IN O 0i C 1 ,§ � ' a, 00 O co i._ 'O . o z. . ; {( ® ® ® 3 0 ION .* Q ; 11 t R.�w O O 0 9 0 O a ' % ue:,. it T:=}R +{'r 111,itilii 0 Z 2 t LiWki 0 11 , = ,, O !. m " 6 lJ tTMJ O ® &a �i �'X if e 6 It 00 k'41 4 <P 0 t 111WQ . S3 S" ., , . I W W , N ` u 3 c # l i l t 1 0.\ Qj 4. Sae taar O ? 4j .- .. 1 G `--'' 0 g ni .......0 ....0 0 0 0 . In o in z g g i W I 1i ! 1 1 1 itt 8 pi, 1 '1.1 ..... ..... w cc 6 ... 0, m°-.3 D !X: ..c I fr 11 0 /R”. --I i 3 S L i 1, .1- 2 a90 ' i il 1 -.W LA,L vg .gC 0 ,., --,. ;,,,,- no",„.z <- eft. ,-0. ,,.:1 g" ;v;Tan u hhhhhh1 r-------___ , I! 1! ... I a ggg 1 i g g , 1 i i :, w tg 4 g _ !slot . ,1 A 611 t r 14 4 4 ga , et; -i u4i 1 r- C .3".1!%'itil , L • x 5 II < - 2 1 > i a 1 s., ------14 / i 1 1 i, tr4 in< Ac 1 1 1:3 II' / i PI l' q , ,1 \ 1 g22. I, 1 CO4 N 1 i'41 , r i i I i 0 ,_I .....--- .._, t','tri. ; -----. 1 ilir 1111 !II V I ar 5 8 ; ;- In 0 rl el cs' cs1 •— .-- 1 . . li a L 1 ,...,...„-- • st}{ Collier County Planning& Project Management Department r*r'i r s% WORK DIRECTIVE PROJECT NAME: NCWRF RML Pump DIRECTIVE#2 System Improvements DATE OF ISSUANCE: March 29,2022 EFFECTIVE DATE: March 29,2022 OWNER: Collier County Board of Commissioners PROJECT#: 20-7810 CONTRACTOR: Quality Enterprises USA, Inc. ENGINEER: Hole Mantes,Inc. You are directed to proceed promptly with the following change(s): Description: During inspection of the existing ductbank system,the contractor identified additional unmarked circuit within the eight(8) of nine(9)conduits associated with the project scope of work. Wiring in one(1)conduit was found to be unremovable and contained several damaged wires to existing MOVs. Contractor cited that tracing and labeling of additional incidental wiring is required for a working and reliable system. Additional conduit in Electrical Room to reroute one(1)RML pump feed is required. Removal and replacement of existing damage MOV wiring is necessary to restore operability to the devices. Purpose of Work Directive Change: To trace down and identify existing unidentified wires, label accordingly and facilitate installation of new RMI, power wiring. To restore operation of MOVs. To reroute one(I)set of power wires for one(1)RML VFD/Pump. Reason/Justification: Identification of the incidental unmarked wiring will facilitate the removal and installation of the RML VFD/Pump wiring as well as assist in coordination of necessary shutdowns of equipment which maintains adequate facility operations. It will restore operation of the MOVs. It will allow the reuse of existing conduits to refeed one (1) RML VFD/Pump, in lieu of constructing a new ductbank. Attachments: Contractor proposal dated March 4,2022 If a claim is made that the above change(s)have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Prices ►;4 Contractor's records ❑ Lump Sum ❑ Engineer's record ® Other:Time&Material ❑ Other Work beyond Scope of Services Total Work Directive 2amount is$127,753.37 Estimated change in Contract Time: Estimated maximum increase(deeiease) in Increase or deerease by 91 calendar days. Contract Price$107,833.37 Use of remaining Allowance amount of$19,920.00 will also be utilized in Work Directive'ar. RECOMMENDED: APPROVED: vNh.W�nw.+�R«r.•, sch a It_p ;Digitally 0signed 08:16:lt,_P ere,n.n,.n�F..y..wumc„e.�, pd1P;2022,03.30 U8:16:46 Dawn B.Barnar ,.,:.N. .•....,,7::, 13 Dawn B.Barnard,Project Manager Pete Schalt, PMP Hole Montes, Inc. Senior Project Manager,PPMI:) QUALITY ENTERPRISES USA,INC. Job# NCWRF RML Pump System Improvements Trace&Label Existing Wiring Date Collier County-Board of County Commissioners Under Contract#20-7800 ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 1 $150.00 $0.00 $150.00 Project Manager HR 5125.00 $162.50 10 $1,250.00 $0.00 $1,250.00 Superintendent HR $85.00 $110.50 20 $1,700.00 $0.00 $1,700.00 Foreman HR $85.00 $110,50 $0.00 $0.00 $0.00 Mechanic,Equipment&Truck Operator HR $75,00 $97,50 $0.00 $0.00 $0.00 Laborer HR $55.00 $71,50 $0.00 $0.00 $0.00 Administrative HR $75.00 $97.50 1 $75.00 $0,00 $75.00 Equipment Excavator>Cat 349 HR 5250.00 $0,00 $0.00 $0.00 Excavator>Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR $150.00 $0.00 $0.00 $0.00 Excavator w/hammer/Epiroc HR $350.00 $0.00 $0.00 $0.00 Excavator w/side grip vibratory hammer HR 5350.00 $0.00 $0.00 $0,00 Wheel Loader>Cat 962 HR $225.00 $0.00 MOD $0.00 Wheel Loader>Cat 938 HR $175.00 $0.00 $0.00 $0.00 Wheel Loader<Cal 938 HR $150,00 $0.00 $0.00 $0.00 Ball Dozer HR $175.00 $0.00 $0,00 $0.00 Motor Grader HR $175.00 $0,00 $0.00 $0.00 Soil/Stone Roller HR $125.00 S0,00 $0.00 $0.00 Telehandler HR $125.00 $0,00 $0.00 $0.00 Manlift HR $125.00 $0.00 $0.00 $0.00 Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95,00 $0.00 $0.00 $0.00 Milling Machine HR $685.00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $150,00 Asphalt/Mat.Shuttle Buggy HR $375,00 $0.00 $0.00 $0.00 Asphalt Paver Weiler 385 HR $375.00 $0.00 $0.00 $0,00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0.00 $0.00 50.00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane>130 ton HR $1,500.00 $0.00 $0.00 $0.00 Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR $250.00 $0.00 $0.00 $0.00 Vibratory Hammer HR $400.00 50,00 $0.00 $0.00 Concrete Crusher HR $685.00 $0.00 $0.00 50.00 Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 50.00 $0.00 $0.00 Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone Lidar Photogrammetry HR S350.00 $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0,00 Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0.00 Lowboy/Tractor HR $175.00 $0.00 $0.00 $0.00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 Water Truck/Trailer HR $125,00 $0.00 $0.00 $0.00 Tack/Prime Truck/Trailer HR $150.00 50.00 $0.00 $0.00 LubefMechanics Truck HR $125.00 $0.00 $0.00 $0.00 Truck with Hand Toots HR $95.00 $0.00 $0.00 $0.00 Pickup HR $40.00 $0.00 $0,00 $0.00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 Vacuum Truck HR $475.00 $0.00 $0.00 $0.00 Small Equipment Air Compressor with Hammer HR $60.00 $0.00 $0.00 $0.00 Concrete Saw HR $60.00 $0.00 $0.00 $0.00 Plate Compactor HR $60.00 $0.00 $0.00 $0.00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 Slone Box HR $50.00 $0.00 $0.00 $0.00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Welipoint System HR $250.00 $0.00 $0.00 $0.00 3"Trash/Submersible Pump HR $50.00 $0,00 $0.00 $0,00 6"Hydraulic Pump HR $150,00 $0.00 $0.00 $0.00 12"Hydraulic Pump HR 5200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20.00 $0.00 $0,00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 GeneratorMlelder HR $50,00 $0.00 $0.00 $0.00 Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR 5150,00 $0.00 $0.00 $0.00 MOT HR 5150.00 $0,00 $0.00 $0.00 Fusing Machine 2-16" HR $15D.00 $0.00 $0.00 $0.00 Fusing Machine 18"-42" HR $300.00 $0,00 $0.00 $0.00 Tap Machine-small(3/4".3") each tap EA $750.00 $0.00 $0.00 $0.00 Tap Machine-large(4"-12") each tap EA $1,000,00 $0.00 50.00 $0.00 Pipe Trenchless Piercing tool HR $250.00 $0.00 $0.00 50.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0.00 $0.00 $0.00 Swanson's Electric Quote $69 400 x 1.05 $72,870,00 Grand Total: $76,045.00 10%MARK UP ON MATERIAL 15%MARK UP ON SUBCONTRACTORS If work is performed other than Monday through Friday,7:00am-4.00 pm,excluding holidays.OT Rates will be used for Personnel. These rates also apply for travel time necessary to mobilize and demobilize to and(torn work. fe °. REV.3/172021 (:AO) QUALITY ENTERPRISES USA,INC. Job a NCWRF RML Pump System Improvements Additional Conduit Installation In Electrical Room Date Collier County-Board of County Commissioners Under Contract ff2O.7800 ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL personnel Corporate Officer HR $150.00 $195.00 1 $150.00 $0.00 $150.00 Project Manager HR $125.00 $182.50 5 $625.00 $0.00 $625.00 Superintendent HR $85.00 $110.50 10 $850.00 $0.00 $850,00 Foreman HR $85.00 $110.50 $0,00 $0.00 $0,00 Mechanic,Equipment&Truck Operator HR $75.00 $97.50 $0.00 $0.00 $0.00 Laborer HR $55.00 $71.50 $0.00 $0.00 $0.00 Administrative HR $75.00 $97.50 1 $75.00 $0.00 $75.00 Equipment Excavator>Cat 349 HR $250.00 $0.00 $0.00 $0.00 Excavator?Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR $150.00 $0.00 $0.00 $0.00 Excavator wThammer/Epiroc HR $350.00 $0.00 $0.00 $0.00 Excavator w/side gip vibratory hammer HR $350.00 $0.00 $0.00 $0.00 Wheel Loader>Cat 982 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader>Cat 938 HR $175.00 $0.00 $0.00 $0.00 Wheel Loader<Cat 938 HR $150.00 $0.00 $0.00 $0.00 Bull Dozer HR $175.00 $0.00 $0.00 $0,00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/Stone Roller HR $125.00 $0.00 $0.00 $0.00 Telehandler HR $125.00 $0.00 $0.00 $0.00 Manllft HR $125.00 $0,00 $0.00 $0.00 Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00 Milling Machine HR $685.00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $150,00 AsphallfMat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weiler 385 HR $375.00 SO.00 $0.00 $0.00 Asphalt Paver Cat 1055 HR 5575.00 $0.00 $0.00 $0.00 Asphalt Roller HR 5125,00 $0.00 $0.00 $0.00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane>130 ton HR $1,500.00 $0.00 $0.00 $0.00 Crane>30 ion HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR S250.00 $0,00 $0.00 $0.00 Vibratory Hammer HR 5400,00 $0,00 $0.00 $0.00 Concrete Crusher HR $685.00 $0.00 $0.00 $0.00 Screener HR 5375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0.00 $0.00 $0.00 Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone Lidar Photogrammetry HR $350.00 $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2.000.00 $0.00 $0.00 $0.00 Directional DrB AA 440 HR S4,000.00 $0.00 $0.00 $0.00 Lowboy/Tractor HR $175.00 $0.00 $0.00 $0.00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 Water Truck/Trailer HR $125,00 $0.00 $0.00 $0.00 Tack/Prime Truck/railer HR $150.00 $0.00 $0.00 $0.00 LubefMechanics Truck HR $125.00 80.00 $0.00 $0.00 Truck with Hand Tools HR $95.00 $0.00 $0.00 $0.00 Pickup HR $40.00 $0.00 $0.00 $0.00 Camera Truck HR $400,00 $0.00 $0.00 $0.00 Vacuum Truck HR $475,00 $0.00 $0.00 $0.00 Small Equipment Air Compressor with Hammer HR 560.00 $0.00 $0.00 $0.00 Concrete Saw HR $60.00 $(1,00 $0.00 $0.00 Plate Compactor HR $60.00 $0.00 $0.00 $0.00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50.00 $0.00 $0.00 $0.00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Wellpoint System HR $250.00 $0.00 $0.00 $0.00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0,00 6"Hydraulic Pump HR $150,00 $0.00 $0.00 $0.00 12"Hydraulic Pump HR 5200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20.00 $0.00 $0.00 $0.00 Light Set HR $50,00 $0.00 $0.00 $0.00 Generator/Welder HR $50.00 $0.00 $0.00 $0.00 Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150.00 $0.00 $0.00 $0.00 MOT HR $150.00 $0,00 $0.00 $0.00 Fusing Machine 2.16' HR $150,00 $0.00 $0.00 $0.00 Fusing Machine 18"-42' HR 5300.00 $0.00 $0.00 $0.00 Tap Machine-small(3/4"=3") each tap EA 5750.00 $0.00 $0.00 $0.00 Tap Machine-large(4'-12") each tap EA $1,000.00 $0,00 $0.00 $0.00 Pipe Trenchless Piercing tool HR S250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0.00 $0.00 $0.00 Swanson's Electric Quote $24,533.29 x 1.05 525,759,96 Grand Total: $27,459.96 10%MARK UP ON MATERIAL 15%MARK UP ON SUBCONTRACTORS If work is performed other than Monday through Friday,7:00am-4:00 pm.excluding holidays,OT Rates will be used for Personnel, These rates also apply for travel time necessary to mobilize and demobilize to and from work. REV.3117,2021 / ,',,i}. QUALITY ENTERPRISES USA,INC. Job# NCWRF RML Pump System Improvements Remove and Replace MOV Wiring Date Collier County-Board of County Commissioners Under Contract#20-7800 ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150,00 $195.00 1 $150.00 $0.00 $150.00 Protect Manager HR $125.00 $162.50 5 $625.00 $0.00 $625.00 Superintendent HR $85.00 $110.50 10 S850.00 $0.00 $850.00 Foreman HR $85.00 $110.50 $0.00 $0.00 $0.00 Mechanic,Equipment&Truck Operator HR $75.00 $97.50 $0.00 $0.00 $0.00 Laborer HR $55.00 $71,50 $0.00 $0.00 $0.00 Administrative HR $75.00 $97,50 1 $75.00 $0.00 $75.00 Eaulpmont Excavator>Cat 349 HR $250.00 $0.00 $0.00 $0.00 Excavator>Cat 320 HR S200.00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR $150.00 $0.00 $0.00 $0.00 Excavator wThammerfEpiroc HR $350.00 $0.00 $0.00 $0.00 Excavator wlside grip vibratory hammer HR $350.00 $0.00 $0.00 $0.00 Wheel Loader>Cat 962 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader>Cat 938 HR $175.00 $0.00 $0.00 $0,00 Wheel Loader<Cat 938 HR $150.00 $0.00 $0.00 $0.00 Bull Dozer HR $175.00 $0.00 $0.00 $0.00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/Stone Roger HR $125.00 $0.00 $0.00 $0,00 Telehandler HR $125.00 $0.00 $0.00 50.00 Manlift HR $125.00 $0.00 $0.00 $0.00 Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00 Milling Machine HR S685.00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $150.00 Asphall/Mat.Shultle Buggy HR $375.00 50.00 $0.00 $0,00 Asphalt Paver Weiler 385 HR $375.00 S0.00 50.00 $0.00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0.00 $0.00 $0.00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane>130 ton HR $1,500.00 $0.00 $0.00 $0.00 Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR $250.00 $0.00 $0,00 $0.00 Vibratory Hammer HR $400,00 $0.00 $0.00 $0.00 Concrete Crusher HR $885.90 $0.00 $0.00 $0.00 Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0.00 $0.00 $0.00 Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone Lidar Photogrammetry HR $350.00 $0.00 $0.00 $0.00 Drectional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0.00 Lowboy/Tractor FIR $175.00 $0.00 $0.00 $0.00 Dump TruckRollOff HR $95.00 $0.00 S0.00 $0.00 Water Truck/Trailer HR • $125.00 $0.00 $0.00 $0.00 Tack/Prime Truck/Trailer HR $150.00 S0.00 $0.00 $0.00 Lub&Mechanics Truck HR $125.00 $0.00 $0.00 $0.00 Truck with Hand Tools ttR $95.00 $0.00 $0.00 $0.00 Pickup HR $40.00 $0.00 $0.00 $0.00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 Vacuum Truck HR $475,00 $0.00 $0.00 $0,00 Small Equipment Air Compressorwrth Hammer HR $60.00 $0.00 $0.00 $0.00 Concrete Saw HR $60.00 $0.00 $0.00 $0.00 Plate Compactor HR $60.00 $0.00 $0.00 $0.00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 Slone Box HR $50.00 $0,00 $0.00 $0.00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Weltpont System HR S250.00 $0.00 $0.00 $0.00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 8"Hydraulic Pump HR $150.00 $0.00 $0.00 $0.00 12"Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20.00 $0.00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder HR $50.00 $0.00 $0.00 $0.00 Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150.00 $0.00 $0.00 $0.00 MOT HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 2-16- HR $150,00 $0.00 $0.00 $0.00 Fusing Machine 18"-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine-small(3d4"-3") each tap EA $750.00 $0.00 $0.00 $0.00 Tap Machine-large(4"-12") each rap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchless Piercing tool HR $250.00 $0,00 $0.00 $0.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0.00 $0.00 $0.00 Swanson's Electric Quote $21,474.68 x 1.05 $22,548.41 Grand Total: $24,248.41 10%MARK UP ON MATERIAL 15%MARK UP ON SUBCONTRACTORS If work is performed other than Monday through Friday,7:00am-4:00 pm,excluding holidays,OT Rates will be used for Personnel. These rates also apply for travel lime necessary to mobilize and demobilize to and from work. REV.3A1712021 its,' \t;°i Swanson's Electric Inc. 2316 Pine Ridge Road Naples, FL 34109 a n S O t'S (239)961-3327 office rx swansonselectric.com ELECTRIC http://swansonselectric.com 2 SIIIl tw) ADDRESS SHIP TO ESTIMATE# 2447 Quality Enterprises USA, Inc. Quality Enterprises USA, Inc. DATE 01/12/2022 3494 Shearwater Street 3494 Shearwater Street Naples, FL 34114 Naples, FL 34114 ACTIVITY _ RATE AMOJN1 January 2022 Services 1 21,474,68 21,474.68 This line item is for the removal of MOV wiring and replacement of MOV wiring which is damaged in conduit, At this moment only 2 of the 4 MOV's are operational because of damaged wiring in existing conduit. We will re-pull new wiring through other pipes in the existing duct bank's. This price does not include time or materials if we are to find another damaged conduit. This price is for the pulling of new MOV wiring as we are pulling our new pump wiring. All terminations will be done at the MCC's and at each of the 4 MOV's. We are replacing existing THHN with new XHHW-2. This line item will extend our RML project a potential of 2 weeks. This Line item is for all new wiring from MCC's to the MOV devices. Labor and wire are included in this price. Services 1 24,533.29 24.533.29 This line item is for the addition of one schedule 80 PVC from MCC which will house pump 1 basin 5's wiring. This new conduit is to replace the broken conduit at the man hole outside of the electrical room (as per on site meeting). All conduit, strut, straps and mounting hardware is included in this price. Also we have determined that there will be addition 65' added to the new pump feeders which is also included in this price. This line item will add a potential of 2 weeks onto the RML project. Services 1 69,400.00 69,400.00 This line item is for the tracing of all wiring in conduits which we are to be pulling our new pump wiring through. There 7 conduits out of the 9 conduits which have other wiring in them. These "other" wires will be traced out to the MCC's they are landed in and labelled with blue painters tape and a conduit number plus a pump number so that we can show the county what they are. At that time we will be able to form a plan with the county as to what will be shut off the day we pull in new wiring. All wiring that is in the pipes we will be pulling through will be removed from the MCC labeled then pulled out to the first man hole, then re-pulled back in with our new pump wiring. All existing wiring and our new pump wiring will then be re-landed in the same day. At the minimum all existing wiring will be re-landed in the same business day : ts AoTRiirj r)'`,, RATE AMOUNT pending there are no problems with the existing conduits as we have found prior to the on site meeting about this line item and tracing wiring for removal the day we pull our pump wiring. This line item will extend the RML project 1.5 months potentially. Please note, tracing wiring will be done manually (by hand) not with a wire toner which cannot be used while wires are energized. We will have to take multiple MCC blank covers off to trace out wiring, MCC covers will have to be replaced daily for safety of Staff and other contractors working on this Plant. Tie wraps will be removed from bundles of wires in MCC's to trace wiring, all tie wraps that will be removed will be replaced. There many wires that we have found previously that loop through other MCC's. Once all wires are traced and labeled on MCC buckets with what pump and basin number they coincide with we will be able to tell the Collier County exactly what devices or MCC's will have to be shut down on the day we pull each of the 9 new pumps circuits. This will give Collier County the opportunity to know if they will have to power some equipment with a portable generator or if these shut downs or some of the shut downs will have to be done at night. After this tracing and labeling is done Swansons Electric will provide 18"x18"vinyl danger stickers at every location there is live energized circuits in a MCC that is feed by another MCC. Again we have found this in one MCC already. Stickers will be approved by engineers and it has already been said by the engineers that they have a sample sticker for this very purpose. Lastly there is a 8th conduit that we will be tracing in this line item, there is a 3"coming out of the both of the MCC closet to the east entry door that houses 2 multi conductor control cables. We believe at least one of these cables goes to one of our existing pump starters. We plan on using this 3" conduit to house Basin 5 pump 1 replacement wiring and the new MOV wiring after we remove control cables if they both belong to the old starters on the old MCC buckets power the existing RML pumps. If we can oly delete one of the existing control cables we cannot pull new pumps or MOV's through this conduit and will have to separate wiring into the other 2 - 3"conduit that are right next to the one with control cables in them. Acceptance 1 0.00 0.00 Please Sign and Date this estimate and return it Via Fax, scanned email attachment or Mail to accept this estimate. Name Date Payment not received,within terms stated above,will result in an TOTAL $1 15,407.97 additional charge of 1.5%per month of the overdue balance(Minimum ff++ charge$20.00/Month)in addition the customer is responsible for the total cost of the collections process including reasonable attorney's fees incurred. One year warranty on all work and materials supplied by Swanson's Electric. ;CA' j